Issue 71 FULL

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 100

$15

Number 71 2022
www.ccj-online.com

Mega Event
2022 Conference and Vendor fair
San Antonio Marriott Rivercenter
August 29 – September 1
Page 36 Page 12 Page 72 Page 23

Page 78 Page 86 Page 89

Legacy Turbine Users Group


Other content Shock waves deep clean HRSG tube bundles................. 88
Power Users conference: Coming of age with the electric power industry: A bio-
graphical sketch of industry icon Clyde V Maughan......... 92
Sponsors...........................................................................6-7
Program at a glance.........................................................8-9 Miscellany
Vendor fair.....................................................................10-11 Best Practices Awards: 2022 recipients............................... 3
Air-Cooled Condenser Users Group.................................. 30 Sponsored content:
HRSG Forum........................................................................54 EthosEnergy Group.......................................................... 38
European HRSG Forum..................................................... .60 Millennium Power Services.............................................. 59
Clean turbine fluids promote trouble-free operation.......... 68 Index to advertisers.............................................................. 91

INDEPENDENT VOICE OF THE GAS-TURBINE-BASED GENERATION SECTOR


Six plants earn Best of the Best honors in
CCJ’s annual Best Practices Awards program
CPV Towantic Energy Center Fairview Energy Center
Owned by Competitive Power Ventures Owned by Competitive Power Ventures
Operated by NAES Corp Operated by NAES Corp
C T Genelba McIntosh Power Plant
Pampa Energía SA Lakeland Electric
Empire Generating Co St. Charles Energy Center
Owned by Empire Acquisitions LLC Owned by Competitive Power Ventures
Operated by NAES Corp Operated by CAMS
Amman Levant Power Plant Owned by Rockland Capital
AES Jordan PSC Operated by IHI Power Services
Anson and Hamlet Generation Plants Milford Power
st Practices A
Be North Carolina Electric Membership Corp Owned by Starwood Energy Group and JERA Co
Athens Generating Plant Operated by NAES Corp
2

wa
202

rd

Owned by Kelson Energy MPC Generating


Operated by NAES Corp Owned by Mackinaw Power
BASF Geismar Operated by Cogentrix Energy Power Mgt
l
CO

na

BASF Corp Pleasant Valley Station


ur

BI Jo
M

NE
D CYCLE Central Eléctrica Pesquería Great River Energy
Techgen River Road Generating Plant
CPV Valley Energy Center Owned by Clark Public Utilities
Owned by Competitive Power Ventures and Dia- Operated by General Electric Co
mond Generating Corp Rolling Hills Generating
Energía del Valle de México I Owned by Eastern Generation LLC
Owned by EVM Energía del Valle de México Gen- Operated by CAMS
erador SAPI de CV Rumford Power
Operated by NAES Corp Cogentrix Energy Power Mgt
Essential Power Newington Salem Harbor Station
Owned by Essential Power LLC Owned by Footprint Power Salem Harbor Develop-
Operated by Cogentrix Energy Power Mgt ment LP
Griffith Energy Operated by NAES Corp
Owned by Griffith Energy LLC Saudi Aramco Power Generation Sites
Operated by CAMS Saudi Aramco
Kings Mountain Energy Center Sentinel Energy Center
Owned by Carolina Power Partners LLC Diamond Generating Corp
Managed by CAMS State Line Power Station
Operated by NAES Corp Owned by Liberty Utilities and Evergy
Kleen Energy Systems Walton County Power
Owned by EIF Kleen LLC Owned by Mackinaw Power
Operated by NAES Corp Operated by Cogentrix Energy Power Mgt
Lawrence County Generating Station Washington County Power
Owned by Hoosier and Wabash Valley Power Assn Owned by Gulf Pacific Power LLC
Operated by NAES Corp Operated by Cogentrix Energy Power Mgt
Liberty Energy Whitewater Cogen
Vistra Corp Owned by LSP Whitewater LP
Magnolia Power Project Operated by NAES Corp
Owned by Southern California Public Power Auth Worthington Generation Station
Operated by Burbank Water and Power Owned by Hoosier Energy Rural Electric Co-op
Mid-Georgia Cogen Operated by NAES Corp

Editorial Advisory Board Marketing Services


Jason Makansi, Chairman How to access customers and prospects
President, Pearl Street through the CCJ Network:
Editorial Staff Robert W Anderson
n Print advertising.
n ONline advertising
Scott G Schwieger Competitive Power Resources n Custom sponsorships
General Manager Robert D Threlkeld n Webinars
Print and Electronic Products Principal, RT Power Consulting n Special promotions
702-612-9406, scott@ccj-online.com Sam Graham n Buyers Guide
Kiyo Komoda Plant Manager n eMarketing
Creative Director Tenaska Virginia Generating Station To learn more, please contact:
Steven C Stultz Peter So Lisa Juncaj
Consulting Editor Director of Project Management & Advertising Sales Director
Development, Calpine 914-774-1947, ccjadvertising@gmail.com
Clark G Schwieger
Gabriel Fleck
Special Projects Manager Chief Engineer, Greyt Minds
COMBINED CYCLE Journal is published by PSI Media
Inc, a Pearl Street company. Editorial offices are at 7628
Robert G Schwieger Sr Engineered Services LLC Belmondo Lane, Las Vegas, Nev 89128. Office manager:
Robert G Schwieger Jr.
Editor Emeritus Dr Barry Dooley To cancel or change your subscription, write scott@ccj-
702-869-4739, bob@ccj-online.com Structural Integrity Associates Inc online.com

COMBINED CYCLE JOURNAL, Number 71 (2022) 3


NEXT GENERATION

4 COMBINED CYCLE JOURNAL, Number 71 (2022)


TURBINE WARMING
Operational Advantages
ŸŸ Eliminate Cold Starts
ŸŸ Maintain Hot-Start Conditions
ŸŸ Faster Starts
ŸŸ Mitigate Case Distortion
ŸŸ Advanced, Customizable Control

Maintenance Advantages
ŸŸ Easy Access to Critical Areas
ŸŸ Quick & Easy Removal / Reinstall
ŸŸ Enhanced Operator Safety Features

Economic Advantages
ŸŸ Gain Competitive Market Advantage
ŸŸ Seamless Turnkey Solution
ŸŸ Reduced Fuel Consumption
ŸŸ Increase Protability

Contact: Pierre Ansmann


pierre.ansmann@arnoldgroup.com

COMBINED CYCLE JOURNAL, Number 71 (2022) 5


2022 Annual Conferences
San Antonio Marriott Rivercenter
August 29 – September 1

Sponsors
DIAMOND PLATINUM

GOLD

PLATINUM PLUS

6 COMBINED CYCLE JOURNAL, Number 71 (2022)


LTUG
Legacy Turbine Users Group

SILVER

BRONZE

COMBINED CYCLE JOURNAL, Number 71 (2022) 7


Technical Program at a glance
DAYS CCUG GUG STUG
Monday, AM: Training (vibration AM: Training (insulation sys- AM: Training (evaluating
August 29 analysis) tems) equipment upgrades)
PM: User + vendor presen- PM: User presentations + PM: User presentations +
tations roundtable roundtable

Vendor Fair, 5:30 – 8:30 p.m.

Tuesday, AM: Vendor presentations AM: Vendor presentations AM: Vendor presentations
August 30 PM: User presentations + PM: Vendor + user presenta- PM: Siemens + user presen-
roundtable tions + roundtable tations + roundtable

Wednesday, AM: MD&A + Siemens AM: Siemens AM: MD&A + GE


August 31 PM: GE PM: GE PM: GE + FieldCore

Thursday, AM: User presentations AM: User presentations AM: User presentations +
September 1 PM: No sessions sched- PM: No sessions scheduled roundtables
uled PM: No sessions scheduled

8 COMBINED CYCLE JOURNAL, Number 71 (2022)


Breakfasts: 7 - 8 a.m. daily
Luncheons: 12 – 1 p.m. daily

PPCUG 7EA Frame 6B Frame 5


AM: No sessions AM: MD&A shop tour AM: Legacy-engine short AM: Legacy-turbine short
PM: Training sessions or legacy-engine short course course
course PM: User presentations + PM: Vendor presentations
PM: Vendor roundtables (safety, renew-
presentations ables)

AM: Baker Hughes


AM: Vendor presenta- Vendor presentations GE Day PM: User presentations +
tions
roundtables (engine, safety,
PM: Siemens auxiliaries)

AM: Baker Hughes + Vendor presentations AM: Training (generator, con-


GE GE Day + roundtables (inlet air, trols)
PM: GE + user compressor, combustion, PM: Training (rotor) + user
presentations turbine) presentations + roundtables

AM: Vendor presentations


AM: Vendor + user
+ roundtables (I&C, No sessions scheduled
No sessions scheduled presentations +
generator/exciter)
roundtable
PM: No sessions
PM: MD&A shop tour
scheduled

Who knows more about your pressure parts than

Who’s Behind
the folks who made them?
As a contractor to the major HRSG OEMs, Chanute

Your HRSG
Manufacturing has the most experience fabricating
HRSG pressure parts of any company in the U.S.
There is a very good chance some of your HRSG

Pressure Parts?
parts originated at Chanute.
We’re familiar with all OEM designs. And if we
didn’t originally fabricate your HRSG, or if drawings
are not available, we can reverse-engineer your
pressure parts when needed.
Contact us to discuss our recent HRSG
aftermarket installations.
So, bring your replacement pressure part fabrication
back home to the company with over 35 years of
pressure part experience...Chanute.

“Bring It Back Home”

Chanute Manufacturing Company


a unit of Optimus Industries, LLC.
Headers • Harps • Bundles • In-House Finning Replacement Pressure Parts from the Source
© 2014 Optimus Industries, LLC. www.chanutemfg.com

COMBINED CYCLE JOURNAL, Number 71 (2022) 9


Alphabetical order
Company Booth no.
3angles Inc...................................... 12
Vendor Fair
Monday, August 29, 5:30 – 8:30 p.m.
AAF International............................. 64
Advanced Turbine Support.............. 24
AGT Services Inc............................. 37
BAR BAR
Allied Power Group......................... 73
American Thermal Solutions............. 2 FOOD
AP4 Group....................................... 27 6 68
ARNOLD Group.............................. 47 25 26 48 67
AZZ Inc (The Calvert Company)......11 47
7
Baker Hughes.................................. 52 24 27 49 66 69
Bearings Plus.................................. 23 94
BPhase Inc...................................... 56 28 46
Buffalo Pumps................................. 88 5 8 23 50 65 70
93
C C JENSEN, Oil Maintenance....... 49 29 45
9 22 51 64 71
CleanAir Engineering Inc................. 41 92
Core Tech Industrial Corp.................. 9
Crown Electric Engineering & 10 21 30 44 52 63 72
91 4
Manufacturing LLC...................... 40
Cutsforth Inc...................................... 4 43 FOOD
Dekomte de Temple......................... 86 90 31 73
Donaldson....................................... 18 FOOD 42
Doosan Turbomachinery 89 3
Services Inc................................. 10 11 20 32 41 53 62 74
Electrical Builders Inc...................... 83 88
Emerson............................................ 5 12 19 33 40 54 61 75
Emory Industrial.............................. 28 87
EMW filtertechnik GmbH................. 74 2
Engineered Pump Services............. 35 13 18 34 39 55 60 76
86
Environex Inc................................... 14
Environment One Corp.................... 57 14 17 35 38 56 59 77
EthosEnergy.................................... 13
ExxonMobil...................................... 79 15 16 36 37 57 58
1 78
Falcon Crest Aviation Supply Inc..... 30 FOOD
Filter-Doc Corp................................ 59 FOOD
79
Flange Band-It LLC......................... 71 BAR BAR
Gas Path Solutions............................ 1
Gas Turbine Parts & Services Inc... 43
GE Power........................................ 68 85 81 80
83 82
Groome Industrial Service
Group LLC................................... 72 84 BAR
GTC Control Solutions.................... 22
Hansen Turbine Assemblies............ 36
Hexagon.......................................... 63
HILCO® .......................................... 54 Registration desk 2
HRST Inc......................................... 55
Hy-Pro Filtration.............................. 29
HYTORC......................................... 51 Registration desk 1 Guest elevators
IAFD................................................ 69
Independent Turbine
Consulting LLC............................ 46
Escalators
Integrity Power Solutions................. 17
ISOPUR Fluid Technologies Inc...... 75 Company Booth no. Company Booth no.
JASC............................................... 15 Philadelphia Gear............................ 85 SUEZ Water Technologies &
K-Machine....................................... 16 Pioneer Motor Bearing Co............... 67 Solutions...................................... 87
Kinectrics......................................... 80 Power Services Group...................... 3 Sulzer................................................ 7
King Filtration Technologies............. 44 PowerFlow Engineering Inc............. 50 SVI Industrial/BREMCO.................. 34
Koenig Engineering Inc................... 33 Powmat Ltd..................................... 65 SvoBaTech...................................... 32
Lubrication Engineers...................... 77 PSM................................................... 6 Taylor’s Industrial Coatings Inc........ 58
MD&A.............................................. 31 Republic Turbines............................ 76 TesTex Inc....................................... 82
Mee Industries................................. 42 Reuter-Stokes, a Baker Hughes TG Advisers Inc................................. 8
Miba Industrial Bearings.................. 91 business...................................... 38 Thompson Industrial Services LLC. 90
Millennium Power Services............. 48 Rochem Technical Services............ 26 TOPS Field Services LLC................ 92
National Breaker Services............... 39 Schock Manufacturing..................... 61 Toshiba America Energy Systems... 89
National Electric Coil....................... 25 Shell Oil Products............................ 20 TRS Services LLC........................... 93
Nederman Pneumafil....................... 19 Siemens Energy.............................. 78 TTS Energy Services...................... 21
Nord-Lock Group............................. 70 Southwest Impreglon Inc................. 94 Veracity Technology Solutions......... 81
OILKLEEN....................................... 45 STAR Turbine Inc............................ 62 Viking Turbine Services Inc............. 53
Petrotech......................................... 84 Stork H&E Turbo Blading................ 60 Woodward Inc.................................. 66
10 COMBINED CYCLE JOURNAL, Number 71 (2022)
TURBınE ınSULATıOn AT ıTS FınEST

Booth number order Booth no. Company Booth no. Company


Booth no. Company 33................... Koenig Engineering Inc 64.............................AAF International
1............................Gas Path Solutions 34.................. SVI Industrial/BREMCO 65..................................... Powmat Ltd
2............. American Thermal Solutions 35.............Engineered Pump Services 66................................. Woodward Inc
3...................... Power Services Group 36............Hansen Turbine Assemblies 67...............Pioneer Motor Bearing Co
4...................................... Cutsforth Inc 37............................ AGT Services Inc 68........................................GE Power
5............................................Emerson 38...... Reuter-Stokes, a Baker Hughes 69................................................ IAFD
6...................................................PSM business 70.............................Nord-Lock Group
7................................................ Sulzer 39...............National Breaker Services 71......................... Flange Band-It LLC
8................................. TG Advisers Inc 40.......... Crown Electric Engineering & 72................Groome Industrial Service
9..................Core Tech Industrial Corp Manufacturing LLC Group LLC
10.................. Doosan Turbomachinery 41.................CleanAir Engineering Inc 73......................... Allied Power Group
Services Inc 42.................................Mee Industries 74................. EMW filtertechnik GmbH
11...... AZZ Inc (The Calvert Company) 43... Gas Turbine Parts & Services Inc 75...... ISOPUR Fluid Technologies Inc
12......................................3angles Inc 44............ King Filtration Technologies 76............................Republic Turbines
13....................................EthosEnergy 45.......................................OILKLEEN 77......................Lubrication Engineers
14...................................Environex Inc 46........................ Independent Turbine
78.............................. Siemens Energy
15............................................... JASC Consulting LLC
16....................................... K-Machine 79......................................ExxonMobil
47.............................. ARNOLD Group
17.................Integrity Power Solutions 48............. Millennium Power Services 80.........................................Kinectrics
18....................................... Donaldson 49....... C C JENSEN, Oil Maintenance 81.........Veracity Technology Solutions
19.......................Nederman Pneumafil 50.............PowerFlow Engineering Inc 82....................................... TesTex Inc
20............................Shell Oil Products 51......................................... HYTORC 83...................... Electrical Builders Inc
21...................... TTS Energy Services 52..................................Baker Hughes 84.........................................Petrotech
22.................... GTC Control Solutions 53............. Viking Turbine Services Inc 85............................Philadelphia Gear
23.................................. Bearings Plus 54...........................................HILCO® 86........................ Dekomte de Temple
24..............Advanced Turbine Support 55.........................................HRST Inc 87............SUEZ Water Technologies &
25....................... National Electric Coil 56......................................BPhase Inc Solutions
26............ Rochem Technical Services 57....................Environment One Corp 88................................. Buffalo Pumps
27.......................................AP4 Group 58....... Taylor’s Industrial Coatings Inc 89...Toshiba America Energy Systems
28.............................. Emory Industrial 59................................ Filter-Doc Corp 90. Thompson Industrial Services LLC
29.............................. Hy-Pro Filtration 60................ Stork H&E Turbo Blading 91..................Miba Industrial Bearings
30.....Falcon Crest Aviation Supply Inc 61.....................Schock Manufacturing 92............... TOPS Field Services LLC
31.............................................. MD&A 62............................ STAR Turbine Inc 93...........................TRS Services LLC
32...................................... SvoBaTech 63..........................................Hexagon 94.................Southwest Impreglon Inc
COMBINED CYCLE JOURNAL, Number 71 (2022) 11
2022 conference preview, 2021 highlights

T
he eighth annual meeting of study on the importance of correct the afternoon break: Fixators are not
the Generator Users Group alignment of endwinding support sys- as fixed as you’d expect, flex connec-
returns to in-person confer- tem components, and diagnostics for tors, and main- and neutral-lead mod
encing at the Power Users outage planning. A roundtable discus- for Siemens modular units. A round-
mega event in the San Antonio Mar- sion on materials, manufacturing, and table discussion on common failures
riott Rivercenter, August 29 through installation challenges closes out the and maintenance issues closes out the
September 1, following virtual meet- day’s classroom program. Doors to the day’s activities.
ings in 2021 and 2020. From 2015 to vendor fair open at 5:30. Wednesday, August 31. Siemens
2019 in-person meetings were conduct- Tuesday, August 30. Vendor pre- presents in the morning, GE in the
ed in Las Vegas, San Antonio, Phoenix, sentations dominate the program until afternoon. Siemens topics include the
Louisville, and St. Louis. the afternoon refreshment break. The following: Generator monitoring (case
lineup is as follows: studies), FASTWedge, major findings

2022 n HV stator-coil rewind, National in the fleet, enhancements for robot-


Electric Coil. ics inspections, optical flux probe, pole

conference n Accurate partial-discharge evalua- cross over (tutorial), generator purging,


tion; new-bar pre-qualification, AES flexible connectors (tutorial).

overview
Kinectrics. GE’s presentation topics: Hydrogen
n Advances in fiberoptic core and coil leakage investigations, TIL-2260—
monitoring, B-Phase. MELCO-built core iron looseness,
The technical program for the upcom- n Isophase-bus anti-condensation TIL-2337—Rotor core migration,
ing meeting was developed by an measures, Electrical Builders Inc TIL-2323—H65/H84 nozzle-assembly
all-volunteer steering committee of (EBI). design update, H65/H84 seal-ring
electrical engineers and managers n CO2 purge, Airgas, an Air Liquide RCA, supply chain issues, collector-
(sidebar)—many with decades of rel- company. ring flashover prevention, air-cooled
evant experience. An overview of the n Troubleshooting plan using EMSA— collector megger issues, generator fan
presentations scheduled for the week a case study, Cutsforth Inc. design, robot development updates.
beginning August 29 follows. All ses- n HV bushings: Inspection, testing, Thursday, September 1. User pre-
sions are user only. Presenting vendors manufacturing, and failure exam- sentations and a roundtable discus-
are allowed in the room only when it ples, MD&A. sion are featured until the meeting
is their time to present. n 7F generator issues, AGT Services concludes at noon. Presentation topics
Expectation is that most of this Inc. include these: Bus-duct circulating-
year’s presentations will be made avail- Three user presentations follow current issues, case history of a sud-
able to owner/operators through the den field excitation increase, fleet
Power Users website a few months issues seen by one utility, and shaft
from now. Slide decks from previ-
Steering committee, 2022 grounding-brush issues.
ous meetings already are accessible Dave Fischli, generator program manager,
Duke Energy
2021 virtual
to registered users. If you are not
registered, sign up now at www. Andres Olivares, generator specialist,
Calpine
meeting
powerusers.org: It’s easy and there’s
no charge. Jeff Phelps, principal engineer/generator
Monday, August 29. The first SME, Southern Company
morning features a training ses- Joe Riebau, senior manager—electrical The 2021 conference of the Gen-
sion on generator insulation sys- engineering/NERC, Constellation Power erator Users Group aired on con-
tems, with Siemens, GE, and NEC Craig Spencer, director of outage services, secutive Thursdays from July 15
participating. User presentations Calpine through August 5, plus Wednesday,
dominate the afternoon. Topics Jagadeesh Srirama, senior electrical engi- July 21. Siemens Day was July
are vendor quality, stator-winding neer, NV Energy 21. GE Day was July 22. Sessions
manufacturing issues, the sharing Advisor: Jane Hutt, webmaster, Intl started at 11 a.m. Eastern each day
of lessons learned by one utility, Generator Technical Community and concluded at about 3:30.
a stator-winding installation case As noted above, presentations
12 COMBINED CYCLE JOURNAL, Number 71 (2022)
GENERATOR USERS GROUP

Participate in the Generator Expert Skill Register quickly disseminate technical mate-
rial presented at its conferences to the
Clyde Maughan has spearheaded tory online—while snowed in at his managers, engineers, and technicians
several generator-themed industry Schenectady (NY) home a couple who would benefit most from it by
initiatives in his 70-plus years (yes, of years ago. He partnered with CCJ improving plant performance. CCJ is
70+) of unselfish service to power General Manager Scott Schwieger working with Power Users to facilitate
producers, most recently the Gen- to launch the Register, now hosted at access to this information.
erator Expert Skill Register. https://www.ccj-online.com/generator- Fact: Everyone is not interested
Finding a well-qualified genera- expert-skill-register. in everything presented at a meeting
tor expert for a specific assignment They invite every engineer with and very few, if any, with equipment
sometimes can challenge plant man- deep generator experience to reg- responsibilities today have the time to
agement, particularly so during these ister and provide the requested “pan” for information that might help
unsettling times of pandemics, global background information and skill them grow in their chosen profession.
supply-chain issues, and shortages description summary. This allows the CCJ and Power Users believe they
of just about everything. generator owner’s staff to review the can help in this regard by enabling
Given the ongoing tsunami of per- posted material at https://www.ccj- readers to quickly locate technical
sonnel changes at generating com- online.com/generator-experts and material conducive to making better
panies, OEMs, and specialty service communicate directly with those who O&M decisions. As you read through
companies, many in yesterday’s pool seem to best fit the requirements for the summaries below, bear in mind
of generator experts may well have the task at hand. they are not intended to provide the
moved on. How do you find the per- This is a win-win: Qualified engi- “answers” you might be looking for,
son you need? neers often do not know who needs but rather point you to presentations
Maughan came up with the their services and the generator by experts who can.
Skill Register idea—perhaps best owner/operator rarely has a current Think of this article as a “TV Guide”
described as a “yellow pages” direc- list of problem-solvers. of sorts for the web. To our knowledge,
no one previously has provided such a
by users and vendors—but not the mens power-generation equipment and service to the power industry. Now you
OEMs—are available to registered you do not have access to that portal, can peruse a meeting’s content in sound
owner/operators in the GUG section use the link to request it. Or contact bites and locate relevant details in a
of the Power Users website at www. the Siemens representative for your minute or two. Efficiency!
powerusers.org. company/plant. We apologize in advance for possibly
Most of the material presented by For access to the GE presentations, overstepping our editorial bounds by
the Siemens speakers is posted on visit the OEM’s MyDashboard website identifying presentations we believe
company’s Customer Extranet Portal at https://mydashboard.gepower.com. to be excellent for a particular reason
(https://siemens.force.com/cep). If your A goal of all user groups operating (exceptional photos, for example). Our
organization owns and/or operates Sie- under the Power Users umbrella is to opinions are based on years of atten-
dance at user-group meetings and in
hallway discussions with knowledge-
able plant personnel like you.
As found If you have any thoughts to share on
our approach here, we would welcome
After corrective them. Please drop an email to Scott
machining Schwieger at scott@ccj-online.com.
Wedge
Cut line Crack User presentations
Rotor tooth-top cracking
n A valuable paper for all who have
1. Tooth-top cracking solution was to machine off cracked areas on both sides responsibilities involving rotor
of the 28 rotor teeth (left) on a 42-year-old generator. This required 112 cuts— operation and maintenance.
one on each side of each tooth on both ends of the rotor (right) n Two Westinghouse 68-MVA genera-

Film
placement

Minimum
distance,
15 in.

Source

3. Visual and dc resistance 4. A 3-in. hole in the stator end turns, a cable,
2. Radiography is a proven method checks were made on each slicing into the outer axials, and severe slicing of bar
for detecting braze defects or crack- bushing. Overheating, identified insulation from the broken-loose gas baffle contrib-
ing in the copper here, damaged silver plating uted to this failure after only four years of service
14 COMBINED CYCLE JOURNAL, Number 71 (2022)
GENERATOR USERS GROUP

tors that after 42 years of moderate- a few years of operation. Stator-winding collateral damage
duty operation were found with n Problems ranged from small ones, resulting from an isophase-bus fault
many serious problems—including such as minor greasing in stator event
extensive tooth-top cracking of the windings, to large ones, such as par- n A valuable, well-illustrated pre-
rotor-body forging (Fig 1, left). tial core restacking, stator rewinds, sentation describing an accurate
n Two highly skilled engineers devel- and field rewinds. analysis of a catastrophic isophase/
oped ingenious repairs (Fig 1, right) n An instructive presentation. stator-winding failure (Fig 5).
that are described with many excel- n Well worth spending some time
lent photos.

Radiographic inspection of phase


straps (TIL-1965)
n Valuable and interesting study
of use of radiographic inspection
to replace OEM recommendation
of stripping insulation to look for
cracking of copper leads (Fig 2).
n Findings seem to indicate successful
results: No cracks found, time and
cost saving significant.
n But some complications, for exam- 5. Damage resulting from an isophase-bus fault included the bushing-to-PT
ple: (1) Large isolation area roped compartment failure at left and neutral and line enclosure damage at right
off may interfere with other work.
Stripping of insulation still required
if cracks found.

Stator-winding resistance tests: Trou-


bleshooting and investigation
n Excellent discussion of high DLRO
(digital low-resistance ohmmeter)
readings found on stator winding
copper:
• One was a true reading that led
to corrective action on an incor-
rectly assembled bolted joint (Fig
3). This action likely prevented a
catastrophic failure.
• The other was attributed to 6. Main-lead mechanical and electrical failures included broken J-strap leaves
improper DLRO “homemade” leads at left and J-strap overheating/arcing at right
being used.
n The message: Use care and good
judgment in dealing with instru-
mentation readings.

Generator failure and subsequent


extent of condition inspections
n Many slides describing extensive
problems (Fig 4) found on seven
combined-cycle generators with only
7. Core looseness can lead to outside space block (OSSB) migration on large
generators (left). Tooth loss on 7FH2 generators (right) most often is associated
with units made by Mitsubishi Power

8. High-voltage connection inspec-


tions by qualified personnel allow rapid 9. Unintended magnetism can cause problems such as eddy current damage
identification of overheating issues to bearing journal at left and housing damage to turbine bearing at right
16 COMBINED CYCLE JOURNAL, Number 71 (2022)
GENERATOR USERS GROUP

10. Nomex tab rivet failures were


in evidence after retaining rings were
removed to inspect endwindings.
Photo shows jumper condition with
melted blocking

with this presentation following the


logic illustrated in the analysis and 11. Two example hot spots in a stator core are compared using the rated-flux
resolution of a huge event. measurement technique

Vendor presentations
Generator main-lead failures, MD&A
n An excellent tutorial on field-wind-
ing main-lead design, failures (Fig
6) and repairs.
n Highly valuable reading for anyone
responsible for field operation and
maintenance.
n Many excellent photographs and
drawings.

Generator-stator core looseness and 12. Repairs are made in photo at left to correct a stator failure (T6 neutral phase ring
failures, AGT Services Inc at flex leads). Rewind complete, the phase ring is prepared for bump testing at right
n A detailed review of serious core- 13. Rewinding of
looseness problems on modern GE GVPI generator stators
generators for large gas and steam is a time-consuming,
turbines—specifically, outside expensive task. Bar
space block (OSSB) migration on removal options are
390H and 450H GTs and 324 STGs mechanical stripping,
(Fig 7 left); trailing-edge end-iron shown here, and water
looseness on 7FH2s (typically on jet blasting. Latter
peaking/high cycling units); tooth requires specialized
loss on 7FH2s built by Mitsubishi equipment and highly
Power (Fig 7 right). skilled technicians
n Concludes that “Modern GE sta-
tors need to be evaluated for core rective measures for
tightness frequently.” improved mainte-
n Very important reading for anyone nance programs and
responsible for reliability of the risk reduction, MPS
models of GE generators identified Gaussbusters
in the first bullet point. n C o m p r e h e n s i v e
review of unintended
Generator-stator bolted and brazed (residual) magnetism
connection inspections, AGT Ser- in turbine/generator
vices Inc n Valuable presentation for anyone components.
n Tutorial on connection inspection, with responsibilities relating to n Many photos and sketches illus-
with emphasis on bolted designs. stator-winding reliability. trating components and problems
n Many photographs illustrating (Fig 9).
good and poor connections (Fig 8). Unintended magnetism and cor- n A good presentation for anyone
18 COMBINED CYCLE JOURNAL, Number 71 (2022)
Smarter catalysts: two in one
Better emissions compliance

Clean air is our business. The GTC-802 (NOx/CO-VOC) “Dual Function” catalyst will
help your plant meet stricter emission standards while improving performance and
profitability. GTC-802 combines two catalysts in one, delivering both superior
NOx reduction and outstanding CO and VOC oxidation. Lowest pressure drop,
near zero SO2 oxidation and reduced ammonia slip add up to improved heat
rate, increased power output and fewer cold-end maintenance issues. GTC-802 is
positioned downstream of the ammonia injection grid in the same location as the
current SCR catalyst. As an added benefit, the catalyst allows direct injection of
liquid ammonia or urea in place of the traditional vaporized ammonia.

http://secc.umicore.com
involved in overall equipment n Details of the cleaning and repair
Siemens Energy
operation and repairs. work are well illustrated (Fig 12).
n Valuable reading for plant per- Colleen Crawford, generator service
Generator retaining-ring failure case sonnel responsible for generator frame owner, opened Siemens Day
studies, MD&A maintenance. by introducing the engineering team
n Well-illustrated retaining-ring participating in the conference. The
design and function tutorial. No Successfully rewinding GVPI gen- presenters were:
retaining-ring failures. erator stators, National Electric Coil n Randy Whitener, manager, Genera-
n Discussion of Nomex tab rivet n Valuable semi-tutorial presenta- tor Service Engineering.
failures on certain GE generator tion on rewinding of GVPI stators n Michael Garmon, principal engi-
designs (Fig 10). (Fig 13). neer, Generator Engineering.
n Some useful information for those n Discussion of relative merits of n Eric McDonald, manager, Genera-
responsible for operation and main- GVPI vs hard-coil windings. tor Services.
tenance of generator fields. n Useful presentation for anyone n Forrest Morlan, engineer, Genera-
with responsibilities relating to tor Engineering.
Stator-core condition assessment generators. n Ben Humphries, principal key
with CPC 100, Omicron expert, Generator Engineering.

OEM
n Good tutorial on stator design, n Jim Lau, expert engineer, Genera-
duties, and fault measurement (Fig tor Engineering.

presentations
11). n Chris Mize, materials engineer,
n Emphasis on measurement with Generator Engineering
CPC 100 and at higher frequency,
400 Hz. OEMs Siemens and GE each had four Generator-fleet significant findings
n Valuable presentation for anyone hours of presentation/discussion time during the period June 2020 to June
with responsibilities for stator-core with the virtual attendees at GUG 2021 increased sharply in the stator
maintenance. 2021. Siemens Day was July 21; GE winding/stator core to 45% from the
Day was July 22. As noted earlier, 24% recorded from 2017 to present.
Rewind versus repair when com- most of the material presented by Meanwhile, rotor (18%) and exciter/
mercial and technical aspects are Siemens speakers is posted on the collector (14%) findings dropped sig-
diametrically opposed, National company’s Customer Extranet Portal nificantly compared to historical data
Electric Coil a/k/a Siemens Energy Portal (https:// of 25% and 21%, respectively.
n Detailed summary of decision pro- siemens.force.com/cep), that by the GE Discussion points include the Aero-
cess, commercial versus technical, presenters at https://mydashboard. Pac™ drip pan—in particular the pans
on two stator winding failures. gepower.com. welded to the generator frame and
20 COMBINED CYCLE JOURNAL, Number 71 (2022)
subject to cracking from vibration. An While this technology offers many n Conventional tap test.
upgrade to a flexible mounting is avail- advantages, it can present challenges n Ripple spring measurement.
able to mitigate vibration damage. if a rewind is necessary. An alternative n FastGen™ wedge impact test.
Issues with main leads, bushings, and to a GVPI rewind is Siemens’ Rapid
parallel rings also are discussed, from Stator ReCore™ offering. In brief: A Electrical engineers ripe for a techni-
the standpoints of inspection, perfor- wound core is shipped from the factory cal refresher will find value in these
mance, and replacement. Guidelines to the plant “ready to install.” The gen- tutorials:
for success are offered in the service erator base frame remains on founda- n “Generator endwinding mode
and other bulletins identified. tion during the replacement process. shape,” which reviews the natural
frequencies of the stator endwind-
Generator stator case studies begins Maintenance case studies includes ing that are excitable in service.
with an overview of SGen6-1000A fleet presentations on the following: Bear in mind that identification
performance. The product line, intro- n The company’s fault isolation pro- and control of excitable natural
duced in 2002, now numbers north of cess: How to find a fault, isolate a frequencies are required for control-
200 units. Significant events experi- fault, test to confirm the existence ling endwinding vibration.
enced in the fleet over the last 20 years of only one fault, and address the n “Causes and effects of negative
are identified in a table presenting fault component. sequence current.” Recall that nega-
both cause and corrective action taken. n A robotics update, which should tive sequence currents are based on
A stator-winding case study takes be of significant interest to plant unbalance in the armature current
you from the finding of two ground personnel, focuses on reduced clear- and these create a reverse rotation
faults observed during maintenance ances for inspection and higher- flux wave that heats the rotor sur-
hi-pot testing to the root cause of the resolution cameras. face and causes vibration. You may
problem: “Local overheating due to n Emerging technologies that you remember that large unbalances
displaced core seals caused insulation might want to learn more about can cause significant heating of a
debonding; cracks initiated and propa- include FME Artificial Intelligence machine.
gated in the de-bonded insulation due Attendant and Stator Online Flush
to load cycling.” Recommendation was Technology (SOFT™). GE Gas Power
to inspect and replace displaced core
seals. A product bulletin is identified Stator slot wedge tightness evalu- Ryan LeClair, generator product line
for users similarly affected. ation methods described in the Sie- manager, and Tom Freeman, chief cus-
The Global Vacuum Pressure mens slide deck are those listed below. tomer consultant, led the GE team at
Impregnated (GVPI) technology used Plus, the presenters review issues GUG 2021. The technical presenters:
in making Siemens stator coils over encountered when operating with n Ross Sacharow, leader, Global
the last three decades is discussed. loose wedges. Generator and Electrical Systems
COMBINED CYCLE JOURNAL, Number 71 (2022) 21
Product Service. provides a list of the generator models decide whether to replace or not to
n Paul Defay, senior engineer, Fleet so affected as well as photos and draw- replace copper coils based on inspec-
Management. ings to facilitate your understanding of tion reports, age/service, style of wind-
n Guillermo Ramos, Generator Prod- the issue. At the time of the meeting, ing/configuration, etc. Excellent pho-
uct Services Engineering. no forced outage had been caused by tos. A second presentation discusses
n Dhruv Bhatnagar, technical leader, the damaged insulation components, possible scenarios for the axial migra-
Generator Application Engineering. deformed copper, or slot-liner strip tion of generator field coils.
n Ben Mancuso, technical leader, breaking/migration in the rotor slot.
Generator Design Engineering. However, the risk of a ground fault Other presentations:
n Peter Finigan, engineering lead, during operation does exist. n Generator stator bar repair.
Generator Design. Recommendations from the OEM n Recent H65/H84 fleet experience,
n R Daniel Cárdenas, engineer, Glob- on when to inspect, what to look for, which focuses on inner nozzle-shield
al Generator and Electrical Product suggested remedial action, etc, are findings (cracking).
Services provided. n Generator core compression bands
n Ian Hughes, principal engineer, discusses the purpose of core com-
Fleet Management. 7FH2 stator-core step-iron damage. pression bands, their design, and
Discussion focuses on key fleet findings experience with them.
TIL-2256, TopAir* 60-Hz 21Z/23Z rotor regarding core lamination damage and n Short presentations on recom-
slot insulation cracking. Evidence looseness—in particular in generators mended lifecycle maintenance to
of cracked slot cover channels and outsourced for manufacture by third achieve high generator reliability;
migrated slot liner strips has been parties—such as MELCO. TIL-2260 health monitoring; and inspection
identified during field inspections at is the document of importance. A case outage preparations.
different customer sites over the last history is included.
decade. Plus, during rings-off inspec-
tions, deformed copper top turns (in Stator core update for the 324/390H
the slot portion) have been detected. fleet. Outside space block (OSSB)
This experience has been detailed in migration is reviewed for both the 324
two customer information bulletins and 390H, and the results of thermal
(the second, in 2014, an updated ver- and mechanical root-cause analyses
sion of the first, published in 2012), (RCAs) are presented.
which offer guidance on the reported
problems. Important to note: This is When to include new coils in a rotor
not a safety concern. rewind. Practical presentation for
The well-illustrated presentation decision-makers explaining how to
22 COMBINED CYCLE JOURNAL, Number 71 (2022)
T
he Power Plant Controls You can get a good idea of the fine sion are scheduled from 3 p.m. to 5.
Users Group conducts its fifth work this organization performs by Baker Hughes will present a con-
annual symposium at the perusing the summaries of presenta- trols overview, supply-chain update,
Power Users mega event in tions made by both users and vendors and summary of current and future
San Antonio at the end of August. This last year. They follow the 2022 over- offerings before the morning break
group, organized to provide an open view immediately below. You’re likely at about 9:45. Then GE takes over.
forum through in-person conferences to find some best practices and lessons Its topics:
and online seminars, disseminates learned ripe for implementation at n Supply chain/obsolescence.
information of value to owner/opera- your plant. n From theory to practice.
tors regarding the operation, mainte- Monday, August 29. The program n Inside the black box.
nance, inspection, troubleshooting, and begins after lunch at 1 p.m. with a n System advancements—safety,
repair of control systems tasked with series of training sessions—including: controllers, foundation field bus.
maximizing equipment performance n How to set up a Mark VIe controller. n Controls Technical Informa-
and reliability. n Tools of the trade: Watch Windows, tion Letters and accessories.
While controls user groups serving Toolbox Trender, dynamic data

2021 user
the electric power industry typically recorders.
focus on a given product—the Siemens n Updating control constants to pre-

presentations
T3000, for example—PPCUG presen- vent data loss.
tations and discussions cover systems n Trip logs.
and equipment made by all OEMs. n PI historian.
Slide decks for presentations by

2022
Tuesday, August 30. Introductory owner/operators at PPCUG 2021 in
remarks begin at 8 a.m., with half-hour the Marriott St. Louis Grand, Aug

conference
presentations by the suppliers listed 23-27, 2021, are available for viewing
below following immediately. Morning by registered owner/operators on the

overview
session ends with lunch at noon. Power Users website (https://powerus-
n OEM versus non-OEM controls, ers.org). The preces below can quickly
AP4. point you to subject matter of interest.
The technical program for the upcom- n Digital twin, PSM.
ing meeting was developed by an n Controls upgrade? Lessons learned, Legacy DCS network conversion to
all-volunteer steering committee of GTC Control Solutions. Ethernet is from a one-off type of pow-
industry engineers with deep controls n Controls and excitation overview, erplant and it’s knee-deep in control
experience (photo). An overview of the MD&A. engineering lingo, but offers some
presentations scheduled for the week n Direct EGD interface with GE Mark valuable pointers if you are experi-
beginning August 29 follows. Note VI/VIe, Emerson. encing failures with a 1990s-era DCS
that all PPCUG sessions are user- n Operator-initiated generator purge/ based largely on proprietary technol-
only. Presenting vendors are allowed DHCP upgrades, Environment One. ogy. The plant in question experienced
in the room only when it is their time n Group discussion. two serious control-system failures,
to present. The afternoon session comprises one in 2016 and the other in 2019.
Expectation is that most of the four presentations by Siemens—sup- During the first incident, plant
presentations will be made available ply chain, energy market trends and staff had to shut down an entire fuel
to owner/operators through the Power distributed control technology, flexing processing (coal gasification) block
Users website a few months from now. for the future, and updates from the manually because of failed relays in
If you are not registered to access world of cyber—plus one by Southern a fiber termination unit that affected
material on the Power Users website, Co on GE controls enhancements. both primary and redundant commu-
this is a good time to sign up at www. Wednesday, August 31. The day is nications networks. Failed relays were
powerusers.org: It’s easy and there’s dominated by Baker Hughes and GE; the root cause of the second incident
no charge. user presentations and group discus- with similar consequences, but at a
COMBINED CYCLE JOURNAL, Number 71 (2022) 23
POWER PLANT CONTROLS USERS GROUP

tion, just opening the top of the panel


to let heat escape was able to drop the
temperature by 20 deg F.

GT/ST auxiliary controls improve-


ments
Steam-turbine (D11) and gas-tur-
bine (7F) lube oil systems’ leak detec-
tion and instrument upgrades; motor
starting coil monitors; and fuel-oil
recirculation system controls are the
focus of this presentation. Leak detec-
tion for both the ST and GT are based
on level measurement in the lube-oil
tanks, along with associated alarms.
Good details on types of measure-
ments, alarms, setpoints, measuring
device (Magnetrol guided-wave level
PPCUG steering committee for 2022: Brian Hall, TECO Energy; Bryan Eddins, transmitter), etc, are provided.
Duke Energy; Peter So, Calpine; David Martorana, Tenaska; Clift Pompee, Duke Lube-oil instrument upgrades
Energy; Jason Justice, Southern Co (l to r). Camera shy: Adam McCool, Tenaska included:
n Transmitters added to monitor
different termination unit. replaced. Fail notices clutter up alarm pump discharge pressure before
The DCS OEM had released a new screens and distract operators from the check valve and to calculate
(still proprietary) network module more important alarms. If a tempera- the differential pressures across
mid-2019 which allowed the plant to ture element fails, the control system filters and heat exchangers.
migrate to an Ethernet hub and spoke reads a faulty signal and protection n Added filter in-service status mes-
network. This eliminated a single is compromised. sage.
point of failure. However, the plant In a similar rationalization exer- n E x i s t i n g p r e s s u r e s w i t c h e s
decoupled the network design from cise, the plant added a feature to replaced with transmitters, eas-
the supply of proprietary modules. the wheel-space T/C screen allowing ing maintenance.
This “moral of the story” ensured operators to turn off bad temperature
a robust network design based on elements, and disable faulty readings Gas control valve issue
standard hardware for industrial and alarms associated with them. In the category of “it’s the little
environments and allowed the owner/ Meanwhile, the control code substi- things that’ll getcha,” locating and
operator’s engineers to become famil- tutes an appropriate neighboring removing a plug in the drain line
iar with the design and installation, working element so control remains of a gas control valve (GCV) solved
which should reduce response times functional and a diagnostic alarm a big problem, but not before enor-
in case of a future network failure. annunciates, alerting I&C special- mous consequences were experienced
Several lessons learned are offered ists to plan replacement at the next in reduced unit output and hours of
but are very specific to this DCS and opportunity. diagnostic time.
plant design. Historian changes after upgrade. The GCV in question, on a 1999-vin-
Fair warning! Upgraded GT control tage cogen plant with a 80-MW 7EA
Combined-cycle control system system tags may be taking up much gas turbine and 39-MW steam tur-
modifications more space than you are aware of in bine, had been replaced within the
The generic presentation title your plant historian. One plant in this last eight months but caused a unit
belies some very practical information owner/operator’s system noticed that trip during baseload ops at valve posi-
about specific aspects of a combined- more than 300 new tags were auto- tion of 62% or less. Stroking the valve
cycle control and monitoring system— matically added to the plant’s PI sys- offline failed to get beyond the 62%
alarm rationalization, wheel space tem after upgrading to the Mark VIe. position. Installing a new servo valve
thermocouples (T/C) bypass, historian Options were to expand (and pay did not change the situation.
updates, and high temperatures in for) historian licensed tags or modify The valve OEM had no replace-
Mark VIe controller panels. Most library databases to eliminate the ment available and you can read about
combined cycles likely are dealing new tags. Rationalizing the tags was the mitigation strategies the plant
with one or more of these issues. selected, along with creating new undertook to continue to operate at
This owner/operator, with dozens standards to determine which tags limited load and steam supply. Fortu-
of gas turbines and combined cycles, to add to historians—including physi- nately, the OEM had heard of similar
has its own standardized alarm- cal inputs/outputs, learned critical symptoms with this valve at another
management rationalization process tags, totalizer tags, critical timers site. It turned out the problem at the
and screen display design. Alarms and counters, deadbands, and max/ other site was a plastic “dust plug”
were reclassified, consolidated, and min ranges. inserted in a drain line. Staff at this
prioritized into six categories, with Hot panels. Several of the owner/ plant found a metal plug in the drain
presentation to the operator greatly operator’s plants have experienced line location, which was allowing oil to
simplified. Comparing the alarm Mark VIe controller failures over build up on one side of the actuator,
screens of “before rationalization” the last five years. The new “rip and inhibiting full stroke.
and after alone is worth the effort of replace” panels were running up to 20 Once the plug was removed, the
linking to these slides. deg F hotter than the migration Mark valve stroke was verified to operate
Wheel space T/Cs are physically V panels. Top-fitted vent filter/fan correctly. Lessons learned include
difficult to access. Months and even units are being added to the panels tighter communication with the OEM,
years can go by before they are running hot. As a temporary mitiga- better oversight of contractors, and
24 COMBINED CYCLE JOURNAL, Number 71 (2022)
HRSG
Maintenance
Services
SCR Catalyst Cleaning & Repacking
CO Catalyst Cleaning & Repacking
Ammonia Injection Grid Cleaning
Ammonia Vaporizer Cleaning
SCR & CO Catalyst Replacement
HRSG Tube Cleaning
Inlet Filter House & Duct
Refurbishment

| (800) 505-6100
POWER PLANT CONTROLS USERS GROUP

comparing photos and drawings of old up to 15% to eliminate icing concerns. Remote automated generator
and new equipment for discrepancies. The demand position of the valve is purging is on the minds of many
determined by whichever is greater, users as they seek to cut the time
Anti-icing protection the original OEM control demand required to come back from an out-
This set of slides is for you if you’re or the alternative control scheme age. Mark Williams, regional man-
experiencing icing incidences and demand. ager (Americas), described for the
damage even after you’ve installed Two additional features: (1) Dew- PPCUG crowd what an automated
the OEM’s anti-icing package at your point temperatures from both GTs purge system looks like, and more
7F compressor inlet. can be compared, and if a 10 deg F importantly, showed them, with a
The OEM’s current response deviation is detected, an alarm will series of photos of the gas manifold/
to the issue is that sites increase annunciate, and (2) operators can H 2 monitoring system (Fig 1) and
the ambient temperature enabling bypass relative- humidity require- remote automation panel.
anti-icing protection from 41F to ments (and the original OEM scheme) Asking yourself these questions
45F, and increase and maintain the if/when dewpoint measurements are Williams posed to the audience should
temperature differential between not believable. help you decide if you should take a
dewpoint and the compressor inlet Overall recommendation to other closer look at the full slide deck:
at from 10 to 15 deg F once anti-icing users is as follows: n How long is it taking to purge your
is enabled. n Execute on the OEM’s recommen- generator?
After analysis, this owner/opera- dations, including the challenging n Are you having CO 2 delivery
tor determined that the OEM’s model piece of increasing the amount of issues?
and methodology rely too heavily on compressor bleed heat to raise and n Can you confirm the amount of CO2
relative humidity/dewpoint readings. maintain the temperature 15 deg that has flowed to the generator?
Comparison of side-by-side GT units F above the original 10 deg rise in n Do you have CO2 rated regulators
revealed that these sensor readings the spec. and are they in functional condi-
showed substantial differences—that n Await outcome of OEM’s root-cause tion?
is, sensors drift. What’s more, opera- analysis around this issue. n What gives you the most concern
tors have no alternative except to n Install this operator’s solution to when going into a purge?
depend on these readings. monitor and control in parallel n Do operators have a good under-
The operator’s counter-solution with the OEM’s. standing of the process and are
starts with this premise: Icing con- they well-trained?
cerns exist when temperature is below

2021 vendor
41F and humidity is greater than Chentronics
80%. The methodology is to enable High-energy ignition and flame

presentations
anti-icing when turbine control instru- detection
mentation detects temperature below More a company and product
41F and relative humidity greater profile than a technical presenta-
than 78%. Then the control system Slide decks for presentations by prod- tion, the Chentronics (part of Koch
uses the inlet bleed heat (IBH) control ucts and services providers made Engineered Solutions) presenta-
valve to maintain compressor inlet at PPCUG 2021 in the Marriott St. tion offered a review of two types
temperature between 39F and 41F. Louis Grand, Aug 23-27, 2021, are of igniter systems (low tension and
This continues until compressor inlet available for viewing by registered high tension, Fig 2), and their rela-
temperature is detected to be 45F or owner/operators on the Power Users tive advantages and disadvantages.
greater website (https://powerusers.org). The Highlights of the Chentronics design
The control system is given the preces below can quickly point you include high-efficiency universal
ability to open the IBH control valve to subject matter of interest. Nearly input power, patented solid-state
200 users attended the Power Users electronics, high reliability (22-year
event, which hosted annual confer- mean time between failures claimed
ences for the 7F, PPC, and ST Users for its SureSpark product), complete
Groups and a vendor fair showcasing system from one vendor, and exper-
products and services from more than tise in a wide range of applications,
a hundred suppliers. including burners/pilots, flares, and
gas turbines. SureSpark is further
Environment One distinguished by the use of a semi-
Automated gas-manifold and gen- conductor in the spark gap.
erator-purging best practices

1. Automated gas manifold/ hydro-


gen monitoring system is recom-
mended for plants wanting to reduce
the time required to come back from 2. High-spark-energy/low-tension ignitor system at right features patented
an outage solid-state circuitry; the high-tension/low-spark-energy design at left does not
26 COMBINED CYCLE JOURNAL, Number 71 (2022)
POWER PLANT CONTROLS USERS GROUP

4. Digital-twin simulator offers key benefits in pre- and post-commissioning oper-


ating environments, though it does require maintenance annually or more often

engineering test bed, and process Signals are transmitted to the con-
model visibility. trol room and data aggregated and
3. Digital motor controllers are Two case studies are presented, trended by Cutsforth’s InsightCM™
powered by 120-Vdc batteries, have the first to demonstrate the benefits platform and software, then archived
IP65-rated enclosures, accept 24- or before plant commissioning, the second in the historian.
125-Vdc trip signals, and come with to demonstrate benefits after plant The first case study involved a
hazardous environment certification commissioning. shaft grounding event. First indica-
The first case revealed DCS logic tor was voltage spikes greater than
Young & Franklin/AP4 Energy Services issues early on and problem tran- 100 V, followed by a notice from the
Electric gas valve installation sitional states at controls interface M&D center that electromagnetic sig-
Core message in the YF/AP4 team points; provided testing of configura- nature analysis levels were trending
presentation is for users to relieve them- tion heavy algorithms and validation higher than values predicted by the
selves of the incessant headaches (leaks, of set points and alarms and multiple M&D models. Two different monitor-
varnish, cleaning, filter replacement, etc) operating modes; and helped establish ing systems were displaying similar
presented by valve hydraulic systems operating procedures. anomalies.
and replace OEM-supplied actuators The second case, involving one Inspection of the generator revealed
with Y&F’s electromechanical actua- owner/operator’s three combined cycles the lead from the shaft ground moni-
tors (EMA). demonstrated pre-testing of logic toring (SGM) instrumentation to the
EMAs offer a ten-fold return on changes in a safe environment, opti- plant ground system had become
investment over the life of the product, mization of plant startup conditions, disconnected. When reconnected, the
they claimed. and deeper insight into the behavior voltage levels returned to normal.
Applications discussed (with of turbine controls. Bearing degradation and electrolysis
product and installation photos) Thompson stressed that the digi- leading to a shutdown could have been
were electric stop/ratio valves, gas tal twin does require maintenance the consequence without early detec-
control valves, and inlet-guide-vane at least annually, because plant tion of the issue.
actuators. Installation (“easier than conditions are always changing. The The second case study involved
you think”) is handled by TC&E maintenance should be tailored to a weather-related event. First sign
and requires five pre-outage days the way the digital twin is used. For was spikes measured during rain/
to run cables and mount digital example, if used primarily for train- snow in mid-February from the radio-
motor controllers (Fig 3), three out- ing, ensure the degree of realism has frequency cable tester (RFCT) at the
age days for the mechanical install, not been compromised; for process generator step-up transformer (GSU),
and one day for calibration and optimization, ensure process models which were different from the RFCTs
commissioning. are up to date; for controls optimiza- at the generator and the generator
tion, ensure DCS and virtual controls circuit breaker (GCB).
Emerson Automation Solutions are synchronized. During the spring outage, 13 insula-
Using digital-twin technologies to
improve plant operations Cutsforth Inc/Kent Smith Consulting
James Thompson, lead engineer, A case study on electromagnetic
updated the PPCUG audience on interference (EMI) monitoring
plant experience with Emerson’s Steve Tanner, Cutsforth, and Kent
digital-twin technology, especially Smith begin with some basics on EMI
when used as a simulator. The digital monitoring before diving into several
twin “embeds” simulation within the case studies. EMI is used to detect
Ovation DCS via “virtual controllers” and identify electrical defects like
using physical models of all power- arcing, gap discharge, corona, and
plant main and sub-systems (Fig 4), micro-sparking. Each of these has
workstation software, and replicated its own characteristic “demodulated”
control logic. waveforms which can be detected by
The value stack justifying the non-intrusive radio frequency EMI
digital twin are operator training on monitors which typically require no 5. RFCT installed on the frame
a system as close to the actual DCS as outage time to install around motors, ground; usually coupled around the
one can get, DCS controls checkout, generators, isolated-phase busses, generator to the neutral ground con-
operating procedure development, and transformers. nection
28 COMBINED CYCLE JOURNAL, Number 71 (2022)
tors in one of the isophase ducts were ing. Because gas turbines and com- Balance of Chandler’s presenta-
found damaged from water intrusion. bined cycles will be expected to “pick tion explains how the company’s
This would have led to a multi-day up the megawatt slack” when renew- Ecomax Extended Turndown opti-
forced shutdown at some point in the ables output drops by hundreds, and mization package can extend the life
future. Periodic readings or ad hoc even thousands, of megawatts precipi- of the equipment while operating
EMI inspections likely would not have tously, combined cycles need to adapt more hours at LSL. It addresses the
revealed this issue. for operation at the “lowest sustainable consequences of operating at pro-
The presenters stress that the limit” (LSL, Fig 6). longed maximum turndown states,
permanent EMI most importantly
continuous moni- 10 75 the inability of
toring system (Fig Atypical load characteristic the HRSG to ade-
5) with InsightCM 9 70 quately attemper-
“collaborates” with ate and higher CO
existing monitoring 8 production from
techniques to iden- Wind generation 65 the combustor.
tify defects. Operators are
7 alerted in real
60
System demand, GW

EthosEnergy Group time what the LSL


Gas-turbine oper- 6 is and the Ecomax
Wind generation, GW

ability challenges 55 Extended Turn-


in an unstable grid 5 down “knobs” are
environment used to operate at
50
Chris Chandler, that point until
4
chief technologist CO becomes an
for turbine optimi- 45 issue. The sys-
zation, warned the 3 tem can boost GT
PPCUG crowd that output by 5 to 15
recent grid-wide Wind 2924 MW 40 MW per unit at
2 System demand Demand 25,600 MW
reliability events in the low end, says
California (summer 1 35 Chandler. As of
2020 ) and Texas this presentation
(calamitous winter last year, the con-
freeze 2021) were 0 30 cepts had been
1 3 5 7 9 11 13 15 17 19 21 23
likely to be experi- Hour ending, June 14, 2021, Ercot validated and the
enced nationwide 6. The challenge for powerplant owners/operators: Reduction in wind coin- program was in
as the percentage cides with an increase in demand, driving the need for maximum gas-turbine commercial devel-
of renewables on operating flexibility (shaded area). Texas experience shows that as tempera- opment with a
grids keeps grow- tures increase, wind capacity generally decreases lead user. ccj
COMBINED CYCLE JOURNAL, Number 71 (2022) 29
T
he Air-Cooled Con- His presentation
denser Users Group began with a review of
(ACCUG) began in 2009 key aspects discussed
as a grassroots body to since the first conference
stimulate technical exchange in 2009. Those interested
among ACC owner/operators, in such primer material
OEMs, third-party vendors, and should listen to Dooley’s
consultants—focusing on these three recorded presentation. The
areas: Chemistry and corrosion, design visuals provided clearly show
and performance, and operation and typical damage indicators at tube
maintenance. entries, support structures, and
Annual in-person meetings transport ducting.
began in fall 2009, the first in the He also reviewed the
Las Vegas offices of NV Energy, Dooley Howell Air-Cooled
which together with CCJ founded Condenser Corrosion Index
the organization. Conferences Air-Cooled Condenser Users Group (DHACI), now used world-
since have been held throughout wide. This metric also is
the US, plus one in Mexico and one know that your gearbox could fail fairly explained in ACCUG Guideline Docu-
in China. But because of Covid-19, quickly.” If this piques your interest ment 01, “Internal Inspections,” avail-
ACCUG 2020 was postponed and in learning more about gearbox issues able at http://acc-usersgroup.org.
ACCUG 2021 was conducted virtually and solutions, access Hubregtse’s pre- Dooley continually monitors global
in October. sentation on the user group’s website. efforts to address ACC corrosion,
In-person conferences benefit from In a later example, Hubregtse including the following: increasing bulk
one-on-one interaction, the ability discussed steam evacuation systems condensate pH, applying an amine or
to discuss specific details with spon- and a site visit to investigate exces- film-forming substance, filters and con-
sors, and a specific site visit with ACC sive backpressure. He brings readers densate polishers, coatings, alternative
tour. But going virtual did carry some in with: “So I told the guy, let’s have materials, and ACC design.
advantages—including deep dives into a look!” His case history walks you Medupi’s ACC. Sabelo Khanyile,
valuable ACC experiences in Iran and through the solution. Eskom, South Africa, provided a window
South Africa. Such narrative recollections, cap- on the large supercritical units in his
ACCUG 2021 was fully recorded tured both during the presentations home country to show the complexities
and is now available for viewing on- and during the Q&A sessions, provide of corrosion assessments related to both
demand and at no cost via http://acc- guidance with credibility. cycle-chemistry treatments and plant
usersgroup.org/presentations/2021- operations (Fig 2). He also noted that
virtual-conference. “temperature is a significant factor”
As a first step, the editors suggest
you read this conference summary,
Day One when analyzing the effects of treat-
ments.
prepared by Consulting Editor Steve Moderator for the first day of the con- Using the DHACI, Khanyile includ-
Stultz, to find items of interest and ference, focusing on chemistry and cor- ed many visual examples of “good
then dig into the details on the web. rosion (and two-phase FAC, was Barry universal hematite formation” (Fig 3).
The following passage illustrates this Dooley, Structural Integrity Associates During the discussion period, Dooley
process and its benefits. (UK), who opened the meeting with a came back to this to clarify: “There has
Stultz’s summary introduces you presentation on the “Latest in ACC to be magnetite first. Red oxide follows.
to Huub Hubregtse, owner of ACC- Chemistry and Corrosion.” But in two-phase this can’t happen, so
Team Technology, The Netherlands, “Corrosion basically is the same it takes place during shutdown.”
an expert on gearboxes (and other com- worldwide with all chemistries and Dooley as the day’s moderator
ponents as well). He said the following: plant types,” he stated. More point- moved quickly to the expanding expe-
“What’s happening is when you have edly, Dooley added, “the air-cooled con- rience with film-forming substances
side winds, the fans will start rocking, denser controls the plant’s chemistry.” (FFS, CCJ No. 63, 2020, p 71). Many
moving a little bit one side up the other
side down, giving the end bearing quite
heavy loads. Oil has actually passed
through the gearbox and end-bearing
chamber (Fig 1) and is dispersed by
centrifugal force. If you see this type of
pattern, you know what’s wrong. You

1. Fan housing shows evidence of


gearbox wear (left)

2. ACC at Medupi Power Station in


South Africa is one of the world’s larg-
est (above)

3. Hematite formation at Medupi


(right)
30 COMBINED CYCLE JOURNAL, Number 71 (2022)
NOXCO raises the bar
with the very first LTSA for
emissions compliance.

We’re removing the burden and responsibility of protecting & managing


complex emission systems for power plants. We’re delivering performance, predictability,
cash flow, and 100% risk mitigation through a turnkey solution.

Turnkey solutions for:


Independent Power Operators | Regulated Industries
Power Plant Management Teams | Investors

Contact us today to learn more.

844-GO-NOXCO 844-466-6926
www.gonoxco.com
ACC USERS GROUP

summary brought it back to the basics:


“Look at this (online particulate moni-
toring) as another set of eyes that is
available 24/7/365”
Ronny Wagner, Reicon, Germany,
ended the discussion with a look back
to early FFS experiments in Moscow,
and the more than 30 years of develop-
ment and applications, both with and
without air-cooled condensers.
Questions and general discussions
for the day followed.

Day Two
ACC design and performance was
the focus of Day Two, beginning with
4. Dominion’s Warren County Power Station shared its significant experience a review of the operational histories,
in reducing iron transport and the positive impact of amines challenges, and solutions associated
with the massive ACCs serving South
of those who had attended previous widespread FFS applications across Africa’s large supercritical coal-fired
conferences quickly recognized the the Dominion Energy fleet (Fig 4). stations (Figs 5 and 6).
increasing focus on this topic. Ferrante, formerly with Suez WTS Stellenbosch University is actively
He then provided a detailed sum- Systems USA, covered inspection involved with the nation’s operating
mary of international FFS experience and operational objectives of these units for measurement research and
while highlighting “still missing” infor- applications. analysis, as well as for fan design. Dan-
mation that will come only through Dominion wants to minimize down- iel Els compared two large stations—
experience. Dooley’s highlights empha- time, reduce iron transport during Medupi and Kusile—with varying
sized the complexities of FFS applica- startups, improve iron levels during startup modes (direct and thyristor-
tion and the lingering lack of a full operation, and analyze for chloride type soft start), and a measurement
understanding. and sulfate. “Reducing high iron lev- setup of strain gauges, accelerometers,
Some chemicals in use today remain els during startup is a key benefit magnetic sensors, and both wired and
proprietary by their suppliers. Applica- of using amines,” she said. Listen to wireless connections to measure shaft
tion methods and amount are in the the discussion for feed points, dosing, speed and torsion, fan torsion load, and
trial phase. Therefore, cautions remain and results. Inspection photos clearly shaft bending.
for end users. show improvements related to DHACI Hannes Pretorius continued with
Dooley’s final thought: “Much care guidelines. an overview of the university’s ACC
also is required when using FFS for “Another set of eyes.” Cogentrix research.
possible problems in the remainder of and Dominion site data formed the Discussion of extended gear life, oil
the plant (boiler/HRSG tube failures, basis for an interesting discussion by conditioning, and remote monitoring by
drums, valves, etc).” Ken Kuruc, Hach, on the importance C C Jensen’s Axel Wegner followed. He
of corrosion-products monitoring. provided graphically supported cover-
FFS trials on large scale The discussion of both online and age of abrasive and other wear mecha-
grab samples included some helpful nisms on bearings and gears, particle
Jeff Demattos, Cogentrix, discussed tips (for example, proper cleaning of visibility, abrasion, and erosion. Els
FFS application at four identical sample bottles) based on experience, recommended that ACCs be equipped
H-class 1 × 1 combined cycles with which he listed as things to “keep in with dedicated gearbox kidney-loop
triple-pressure HRSGs, covering vary- mind.” Kuruc included clear and easy- filters with remote monitoring.
ing results from ammonia only, ano- to-follow steps and details. His verbal Bhaumik Modi, Hudson Products
damine, and filming
amines.
A key section in his
presentation included
details on “Filming
Amine Hypothetical
Risks versus Cogen-
trix Experience.” This
is worthy of review by
anyone considering
amine application and
incudes many photo-
graphs of results. It is
of particular value to
those interested in the
chemical evolution of
these particular units,
leading to the Cogentrix “typical chem- 5, 6. The ACC at Kusile Power Sta-
istry today.” tion in South Africa (above) and view
Shana Ferrante then presented on of fans from below (right)
32 COMBINED CYCLE JOURNAL, Number 71 (2022)
ACC USERS GROUP

impacts of changes in operation


conditions on equipment and per-
formance.
n Move critical maintenance strate-
gies from reactive to predictive.
Melisie focused on common issues
(vibrations and bearing failures) while
simultaneously monitoring assets and
wind conditions. He explained, “This
helps, for example, determine if prob-
lems are with the side winds or with
the fan itself.”

Look for the little things


to see typical problems
Hubregtse, introduced at the begin-
ning of this report, then gave his
informative talk on ACC maintenance,
focusing on fans, gearboxes, motors,
pumps, and evacuation systems.
7. A representation of the digital twin His presentation was based entirely
on hands-on experience and case
histories. Included were typical life
expectations and recommendations
for spare-parts inventories.
An interesting component noted
during discussion of gearbox mainte-
nance, is a breather filled with silica
that absorbs water from air entering
and leaving the gearbox during ther-
mal expansion.
“Maintenance on the steam evac-
uation system,” he said, is quite
Cooling systems
Once through
Wet
Heller
Air cooled
8. Powerplant cooling systems in Iran by type and location

Corp, followed with a look at the lat- ended with a performance comparison
est thinking on axial fan design. He between co-current and counterflow
reviewed the history of fan development ACC tubes.
and ongoing efforts to reduce fan noise. 9. Automated clean-
All development milestones encompass ing system that has
aerodynamic (fan blade shape) and
structural design issues as well as
Day Three been adapted to vari-
ous ACCs worldwide
manufacturing. “Airfoil selection,” he The final day of the confer-
explained, “is the first and most critical ence began with a presenta-
part of the design process.” tion on real-time monitoring of
The latest designs feature so-called ACC fans by Mirko
resin transfer molding manufacturing Melisie of Howden
to fabricate structurally reliable FRP (The Netherlands).
blades. This method allows for complex He focused on what
blade shapes and monolithic design. he termed the “digital
twin” (Fig 7)—that is,
Wind, gravity, pressure in-depth asset ana-
lytics are available
Another topic with increased atten- through a dynamic
tion was windscreens, covered here link between real-
for both A- and V-type frame designs. time performance
Current research was presented by data and physics-
Cosimo Bianchini, Ergon Research, based models. The
Italy, who focused on modeling details purpose is three-fold:
with sub-models for fans, bundles, n Detect rotating-
and designs—both with an without equipment failure
screens. before it occurs.
Formal presentations for Day Two n Understand the
34 COMBINED CYCLE JOURNAL, Number 71 (2022)
simple, but a key is the gaskets. Be various air-cooled heat exchangers in n ACC.03, “Guidelines for Air In-
mindful that gaskets are subject to tem- Germany and elsewhere in Europe, leakage in Air-Cooled Condensers”
peratures of 480F to 570F, and when plus South Africa and the US (Fig 9). (in preparation).
the system cools, thermal movement ● Guidance for in-leakage issues
will damage them. ACCUG Guidelines specific to ACCs.
“Pumps,” he says, “are rarely kept ● Expandable document for input
in stock, but you should have some EPRI’s Andy Howell, the ACCUG chair- on experiences and locations.
spares around for seals, gaskets, bear- man, was last on the list of formal pre- ● Identify the effects of air in-
ings—things like that.” sentations with an in-depth look at three leakage on performance and system
Questions focused on oil quality ACCUG Guidelines covering steam-side chemistry.
and testing, bearings, and unit vibra- inspection, finned-tube cleaning, and air ACC.01 and ACC.02 are available for
tions. During the Q&A, Dooley offered in-leakage. The thumbnails: download at no cost from the ACCUG
the idea of a global database on com- n ACC.01, “Guidelines for Internal website (www.acc-usersgroup.org).
mon maintenance items and common Inspection of Air-Cooled Condens-
failure modes, leading to guidance ers.” 2021 ACCUG update
documents. The ACCUG leadership ● Guidance to ensure a comprehen-
is considering this. sive inspection. n Steering committee: Andy Howell,
● Focal point for the ACC commu- EPRI; Barry Dooley, Structural
Cooling systems in Iran nity to optimize steam-side inspec- Integrity Associates (UK); Riad
tions. Dandan, Dominion Energy; and
ACCs in Iran were introduced by ● Use of a quantifiable index to Rishi Velkar, NV Energy.
Mohammadreza Vaghar of the coun- show improvements and allow com- n Conference sponsors: C C Jensen,
try’s MAPNA Development Co. Iran’s parisons among ACCs. CONCO, Evapco Dry Cooling,
first wet cooling system was installed n ACC.02, “Guidelines for Finned- Galebreaker Industrial, IPC Lydon,
in 1959, the first ACC in 1985 (Fig 8). Tube Cleaning in Air-Cooled Con- MVM EGI. Reicon, SPG Dry Cool-
High winds can be an issue in Iran, densers.” ing, and Suez.
and several plants are planning for ● Guidance for important issues n Conference coordinators: SV Events
the possible retrofit of windscreens. involved in the cleaning of finned and CCJ.
Vaghar shared CFD analyses used tubes.
to identify the preferred geometries. ● Expandable document for ACC Finally, please visit the organiza-
community to input on experiences tion’s website at www.acc-usersgroup.
Automated cleaning and needs. org to access the Q&A Forum, presen-
● An initial basis for cleaning tations from past meetings, registra-
Arndt Krebs, JNW Cleaning Systems, options. tion information for upcoming events,
offered a detailed view of a patented ● Effects of blocked fins on system and group-generated specific technical
mobile cleaning system adapted to performance. information. ccj
COMBINED CYCLE JOURNAL, Number 71 (2022) 35
T
he Combined Cycle Users n Repair versus replacement of P91 ing: Lessons learned.
Group returns to San Anto- non-return valves—a case study. n Better filtration pays for itself: The
nio in 2022 where it was n HRSG inspection tools. impact of HEPA filters on gas tur-
launched in fall 2011 as an n Insurance hot topics. bines.
independent, user-directed group to Tuesday, August 30. A potpourri n P91 planning and inspection.
serve owner/operators of combined- of topics important to O&M personnel Following the afternoon break. sev-
cycle, combined heat and power (CHP), focused on improving plant perfor- eral short presentations based on user
and cogeneration plants. This year’s mance are addressed in the following experiences, plus a discussion period,
in-person meeting follows virtual meet- presentations by vendors and users: are planned until closing at 5 p.m.
ings in 2020 and 2021. n HRSG life extension and long-term Wednesday, August 31, is reserved
maintenance planning: A data- for MD&A and the turbine OEMs.

2022
driven approach. MD&A launches the day right after
n Group 1 turbine oils—a return to breakfast with these two presenta-

conference
reliability. tions:
n Is your SCR/CO system ready for n Steam-turbine valve outages: Com-

overview turndown?
n Advantages of periodic field testing
mon issues.
n Unintended reliability risks through
on critical pumps. parts replacement/obsolescence.
Technical program for the upcom- n DCS-replacement knowledge shar- A safety discussion follows until the
ing meeting was developed by the morning break at 9:45.
all-volunteer steering committee of
engineers and managers identified in
Steering The Siemens team is next at the
podium with presentations on cyber-
the sidebar—many with decades of committee, 2022 security, battery technology advance-
relevant experience. An overview of the Chair: Phyllis Gassert. director of ments, plant operating flexibility, and
presentations scheduled for the week asset management (PJM), Talen upgrade assessments.
beginning August 29 follows. Energy GE dominates the afternoon with
Most sessions are user only. Non- Vice chair: Brian Fretwell, director presentations on market analytics,
users wanting to participate must be of mechanical services, Calpine decarbonization, transformers, impact
approved by the steering committee Steven Hilger, PE, plant manager, of increased low-load operation and
to gain admission. Presenting vendors NAES Corp, Dogwood Energy cycling on steam turbines and HRSGs,
are allowed in the room only when it Facility and HRSG lifecycle management.
is their time to present. Jason Jauregui, production team Thursday, September 1, features
Expectation is that most of this lead, CAMS, Woodbridge Energy user presentations on carbon capture,
year’s presentations will be made Center a condenser explosion, non-jurisdic-
available to owner/operator through Aaron Kitzmiller, PE, plant engineer, tional pressure vessels, and a case
the Power Users website a few months Luminant, Fayette Power Plant history on the failure of an excitation
from now. Slide decks from previous Robert Mash, plant manager, GE auxiliary transformer. The meeting
meetings already are accessible to reg- Power Services, River Road closes at noon.
istered users. If you are not registered, Generating Plant

2021 virtual
sign up now at www.powerusers.org: Jonathan Miller, maintenance man-
It’s easy and there’s no charge. ager, CLECO, Arcadia Power

meeting
Monday, August 29. Monday morn- Station
ing training is four hours on the basics Marih Salvat de Jesus, operations
of vibration analysis. The afternoon manager, Tenaska Virginia Gen-
session includes the following pre- erating Station User and vendor technical presenta-
sentations: Ben Stanley, VP operations, Con- tions and discussions were conducted
n Online HRSG inspection: Tying solidated Asset Management July 13 and 27, and August 3; GE Day
together offline inspection and Services was July 20, Siemens Energy Day was
maintenance. July 28.
36 COMBINED CYCLE JOURNAL, Number 71 (2022)
Sponsored content

70,000 MW per year increase via ECOMAX® with Tru-Curve®


Flexible and responsive auto-tuning solution to maximize performance and efficiency
THE CHALLENGE: A US chemical refinery with a fleet
of four 172-MW 7FA gas turbines was looking to maximize About ECOMAX® with Tru-Curve®
the performance and efficiency of their units as part of their Burning a lean premixed flame can keep NOx emissions
long-term sustainability goals. Without an auto-tuning solution, low; but, too lean of a flame can result in instability. This
they were forced to contract a third-party to perform manual instability (combustion dynamics) can result in costly dam-
tuning which had a great effect on their bottom line. It also age to the combustion chamber and downstream compo-
didn’t maximize MW output potential, caused the units to burn nents. Manual tuning demands a conservative balance
more fuel than needed, decreased life of parts, and was not between emissions compliance and combustion dynamics. 
minimizing CO2 emissions. ECOMAX® is a fully automated platform which man-
The plant was in search of an auto-tuning solution as well ages emissions, provides flexible operation, and increases
as guidance and education around de-rating their units and thermal efficiency of a gas turbine power plant. The base
properly reading and identifying the significance of combustion system automates tuning for continuous NOx and CO com-
dynamics monitoring system (CDMS) alerts. pliance, flame stability, and acceptable combustion dynam-
The CDMS gave them the ability to receive alerts when ics. Turbine fuel-to-air ratio is a key parameter affecting gas
they exceeded combustion limits and they had a remote turbine (and power plant) performance. Although raising
monitoring agreement with the OEM, however it was costly the turbine’s baseload fuel-to-air ratio will improve power
and inefficient to bring in someone to manually tune the units output and heat rate; emissions and combustor dynamics
every time the CDMS indicated an issue. The current tool was are adversely affected. 
only for reporting and identification with little ability to solve Tru-Curve® is a module for ECOMAX® that raises the
any tuning issues internally. turbine’s baseload fuel-to-air ratio.  Specifically, it is a bias
To maximize efficiency, they needed a nimble and respon- of combustion operation toward one edge of the operational
sive solution that could be controlled from within the plant. envelope, while ECOMAX® continues to manage emissions
Adding to the challenge, the units did not initially have raw and combustor dynamics within the envelope. 
NOx probes, limiting their flexibility within the control system.
● Observed 8000 lb/hr of HP steam flow per each 10
THE SOLUTION: After discussions with EthosEnergy’s degrees of firing temperature increase for a total output
engineering team, the plant contracted EthosEnergy to install increase of 10.4 MWeqv of steam.
ECOMAX® with Tru-Curve® auto-tuning on one of the units. ● 20 additional MWs for 98 MMBtu of additional fuel (4.9
This allowed greater flexibility and control from within the INHR).
control room via a computer-based turbine controller utility. ● 465k MMBtu per year of fuel savings.
As a result, there was no longer a need for a tuner to come ● 27,200 tons per year of CO2 reduction from increased
to site after a combustion inspection, hot gas path inspection, steam efficiency and lower CO from tuning improve-
or major inspection, saving on planning and costs. ments.
It also allowed winter and summer max firing temperature ● Over 70,000 new MWs per year produced at 4.9 MMBtu
adjustment while mitigating combustor dynamics, increased per MW.
parts life, and automatic de-rating of the gas turbine if com-
bustion dynamics could not be maintained below established SUMMARY: ECOMAX® with Tru-Curve® allowed the units
limits. to run up to the firing limit year-round, generating substantial
Because the unit was always tuned, this allowed operation gains in performance (a cumulative 70,000+ MWh per year),
up to the firing limit year-round, truly maximizing the perfor- reduced fuel consumption, and greatly reduced emissions
mance of the unit. (27,000 tons per year CO2 reduction).
After a full cycle of reliable
run-time and a review of com-
bustion hardware, the same sys-
tem was successfully installed
on the remaining three gas tur-
bines at the site and later across
eight other units for the parent
company across North America,
including the following engine
types: 7FA, 7EA, and 501D.

THE BENEFITS: 
● Firing temperature increase
from 2400F to 2424F.
● Observed one MWe per 10
degrees of firing tempera-
ture increase for a total out-
put increase of 9.6 MWe.
COMBINED CYCLE USERS GROUP

As noted above, presentations with Millennium Power Services suggest those who answered in the
by users and vendors—but not the Discussions at CCUG and other negative to both questions may wish to
OEMs—are available to registered user groups remind that poorly main- get their leadership to reconsider the
owner/operators in the CCUG section tained valves can negatively impact value of having a formal QA/QC plan:
of the Power Users website at www. plant performance—perhaps even n “We’ve found valves welded in back-
powerusers.org. contribute to a forced outage. The wards!”
Most of the material presented by O&M manager at this combined cycle n “Our sites have often had 100%
the Siemens speakers is posted on the offers a solution: Partner with a quali- dropouts of ‘certified’ welders who
company’s Customer Extranet Portal fied third-party services firm having show up but can’t pass a perfor-
(https://siemens.force.com/cep). If your the capability to inspect, monitor, and mance test.”
organization owns and/or operates Sie- repair valves as part of an ongoing n “We’ve had a contractor cut out
mens power-generation equipment and maintenance program. equipment even before the appropri-
you do not have access to that portal, The PowerPoint describes the suc- ate measurements have been made.”
use the link to request it. Or contact cessful program developed by vendor n “The foreman of a contractor crew,
the Siemens representative for your and staff to track and prioritize main- on whom we depend for the QA/
company/plant. tenance for the 200 major valves serv- QC, got Covid, and workers were
For access to the GE presentations, ing three 1 × 1 G-class combined cycles, not following procedures without
visit the OEM’s MyDashboard website thereby bringing the plant up to indus- the foreman’s supervision.”
at https://mydashboard.gepower.com. try standards. Several best practices n We’ve had major problems with
to take away from this experience. You failed welds on 12-in. P91 HRSG
User presentations can get the CliffNotes version, “Service steam headers.”
provider tracks valve health, makes Follow-on discussion indicated
Catastrophic failures: Does your expert repairs, cuts maintenance cost,” that these weren’t isolated incidents;
backup system work. . .really? in CCJ No. 69 (2022), p 70. many plants are suffering from poor
“A $400 relay takes out ST/G; multi- weld quality, repeat work at failed
ple single-point vulnerabilities found,” Blockage of inlet filters due to snow, weld locations, and general rework.
which appeared in CCJ No. 68 (2021), debris, dust Roundtable leaders suggested having
p 76, was compiled from information This presentation was developed to a formal QA/QC oversight process, or
shared in this presentation. stimulate discussion on filter blockage, making your existing one more robust,
The case study reminds why atten- why it occurs, and how to mitigate with these elements: pre-planning,
dance at user-group meetings is so it. You can use the slides to guide a implementation, and completion/veri-
important. It focuses on the trip of a 2 lunch-and-learn in the plant break fication (Sidebar, pages 42-43).
× 1 F-class combined cycle at baseload room (plant manager must provide the The details involve mostly common
with duct burners in service that was pizza) to get personnel thinking about sense—and include the following: verify
caused by an operator who opened the how to prevent the operational upsets proper materials are being used and
wrong breaker in the switchyard, and that filter blockages can cause. Such include drawings and manufacturers’
the failure of the plant’s ac pumps to an interactive discussion on a practi- data report on pressure vessels (U1A
restart after that event. A review of cal topic is far better than a formal form) during preplan; verify contractor
critical systems identifies single-point presentation that promotes snoring welding procedure specifications (WPS),
vulnerabilities tied to the steam tur- by “participants.” work breakdown structures (WBS), and
bine and its auxiliaries. Some highlights: Benefits offered procedure qualification records (PQR)
Presentation tells how plant person- by pre-filters; challenges presented by during implementation phase; and
nel conducted their troubleshooting, wildfires (smoke and ash); backgrounder review NDE and post-weld heat-treat-
what they found, and the changes on particle sizes; mitigation strategies ment reports to verify completed work.
made to prevent a recurrence. Recom- for snow, ice, freezing; and blockage sce- The important thing is to formal-
mendations made to users based on narios—solutions and planning. ize, checklist, and document that the
this experience might be a valuable proper steps have been taken and con-
addition to your station’s lessons- Roundtable: QA/QC process to check firmed with written or digital records.
learned file. contractors Valuable contributions from audi-
Registered users can listen to a ence members included these:
Arc flash—remote racking best prac- recording of the roundtable, posted on n Use a PMI (positive material iden-
tices www.powerusers.org. Alternatively, tification) machine to verify alloys.
Arc flashes are low-frequency, high- you can read the following summary of n Have stores verify that materials
impact events but their occurrence is the session developed by CCJ editors. arriving onsite match the materials
increasing industry-wide. About 2.5% During the QA/QC roundtable, led data sheets before accepting.
of arc-flash incidents result in the by two members of the CCUG steering n Check transmitters from overseas
death of a worker; 95% are caused by committee, two polls were conducted. for cybersecurity issues.
human error, so training and strictly When attendees were asked if their n Require that plans be developed in
adhering to, and updating, best prac- facilities had a formal plan for welding collaboration between contractors
tices are vital. contractor QA/QC, 13.4% said “yes,” and site personnel to ensure that
By adhering to the guidance offered 14.2% said “no”; the others did not scope of work is aligned.
in this presentation, you and your col- answer. When asked if they used a n Consider either hiring a third-party
leagues likely can make your plant a third-party QA/QC service to monitor QA/QC contractor or certifying one
safer workplace. Key material from contractors, 16.4% said “yes,” 11.9% of the site staff for this function,
this slide deck was used to develop the said “no,” and 71.6% did not answer. increasing their compensation if
CCJ article, “Learn from one utility’s However, since there were about 140 necessary.
arc-flash safety program,” published attendees at that point, more than one A representative from one of the
in issue No. 68 (2021), p 83. quarter did respond, so the sample size largest combined-cycle owner/opera-
isn’t trivial. tors noted that his company pre-tests
Plant’s valve maintenance program Experiences shared by attendees all welders coming onsite even though
40 COMBINED CYCLE JOURNAL, Number 71 (2022)
COMBINED CYCLE JOURNAL, Number 71 (2022) 41
Resource qualification an important step in contractor
Average length of service of the con- and conduct of the actual job. weld inspectors. Note that some weld-
tractor’s employees and the skill levels Quality assurance. Evaluation ers also are CWIs. At SVI/Bremco,
of the various tradespeople are impor- of supervisory and craft resources QA staff is responsible for maintain-
tant qualification metrics, advises Bill are only one part of the due diligence ing code stamps (National Board “R,”
Kitterman, GM, Bremco, a recent addi- effort. Perhaps just as important to and ASME “S” and “U” certificates of
tion to the SVI family of companies. project success is the support staff authorization), promptly answering
He recommends that you ask for and responsible for quality assurance and questions from field personnel regard-
carefully review resumes. Contractors safety. ing what the various codes allow and
worth considering for your work should Your QA audit, in the specific case what they don’t, visiting sites where
have them ready for your review with- of HRSG work, should focus on knowl- specialty work—P91/T91 welding, for
out asking, Kitterman says. edge of ASME and NBIC (National example—requires their expertise, etc.
In your evaluation, be sure to dif- Board of Boiler and Pressure Vessel Important to investigate is the con-
ferentiate between supervisory per- Inspectors) code requirements, experi- tractor’s experience in making repairs
sonnel and crafts. Length of service, ence in code work, welder qualifica- and modifications similar to the ones
formal training, and work experience tions, registering of repairs and work, you require. Where possible, you want
of supervisors is particularly important. etc. to avoid having contractor personnel
For example, service time is an indica- The QA department and its proce- “learn” on your project. Part of this
tor of the company’s health, quality of dures are particularly important when effort is a review of weld procedures
management, job performance, etc. work involves repair or changes to and qualifications specific to the work
At SVI/Bremco, supervisors average boiler pressure parts. A plant manager at hand.
more than 15 years of company ser- auditing a specialty contractor for such Project reports. Sometimes over-
vice; crafts about half that. services wants to verify staff capabili- looked, says Kitterman, is the value
Pay particular attention to craft ties with respect to weld inspection, of complete, orderly paperwork at the
skill levels. What codes are weld- familiarity with the code, accessibility project’s conclusion detailing work
ers qualified to? Does the contractor of staff code experts to field personnel, procedures followed, welder qualifica-
have millwrights, fitters, iron workers, availability of QA specialists to monitor tions, identification of welders with
riggers, etc, on staff? Most HRSG repair work, etc. Last thing any owner/ specific welds, materials receipt and
work requires all of these skills. In operator wants is to slow down or halt test reports, quality-control documen-
Kitterman’s experience, the more the a job while waiting for a weld-quality tation, applicable drawings, etc. All
owner/operator knows about the con- verification or a code interpretation. this, and more, should be archived
tractor’s capabilities and personnel, Kitterman says SVI/Bremco has by the owner/operator in support of
the smoother the planning process two QA experts on staff—both certified required registration of work conduct-

42 COMBINED CYCLE JOURNAL, Number 71 (2022)


evaluation
ed, as well as for insurance and other to a safe working environment by dard 10- and 30-hr OSHA courses
purposes. reviewing its safety manual, suggests to employees and also be able to
The diligent contractor will file all Kitterman. It should be a living docu- conduct or supervise other required
applicable paperwork as required by ment—one capable of addressing training—such as forklift operation
regulatory authorities immediately any and all customer and site-specific and confined-space working practices.
following job completion. Be sure to safety requirements based upon Latter includes training to pass the so-
check that procedures are in place to sound OSHA guidelines. Names and called pulmonary function test, which
make this happen. Using HRSG work contact information for members of the qualifies workers to use a respirator
as an example, repairs to pressure company’s safety committee should and work with it.
parts require signoff by an uninvolved be in evidence. Further, committee Review of government and insur-
third party to verify job integrity. One members should be a mix of manage- ance records can offer an objective
example: An authorized inspector ment and craft personnel. assessment of the candidate contrac-
from an insurance company offering A conscientious contractor will tor’s safety performance. For example,
boiler and machinery coverage would perform an initial job-hazard analy- companies are required to log work-
supervise a hydro test. Upon success- sis, continues Kitterman, to address related injuries and illnesses on OSHA
ful completion of the test, repair forms site-specific challenges as well as to 300 forms and maintain that file. The
and other certifications can be filed incorporate any policies required by Experience Modification Ratio (EMR)
with NBIC, state/local jurisdictions, the plant owner/operator into the proj- is another index to check.
etc. ect safety plan. In addition, brief daily EMR, an industry factor used in
A safe working environment is meetings for contractor personnel are Workers’ Compensation Insurance, is
one of the few things on which all peo- important for communicating unsafe based on an employer’s claim history
ple agree. Plants and contractors take conditions and changes to the existing and determined by the claims paid
particular pride in having “no lost-time safety plan. If you don’t see mention of and reserved in the previous three
accidents.” This, of course, doesn’t these actions in a prospective contrac- years along with the audited premiums
happen by accident: It takes thorough tor’s safety manual that company may paid. It is considered a fairly accurate
training, testing, retraining, record- not be your best partner. reflector of a company’s safety record,
keeping, vigilance, management com- Next, carefully check safety- and is often used as a factor for
mitment, etc. training records. At a minimum, all prequalification during a project’s bid-
A safety audit is an important part field personnel should be current on ding process. An index of more than 1
of the plant manager’s due diligence OSHA-required training. Ideally, the is indicative of a poorer-than-average
effort. You can get a quick read on contractor should have someone on safety record; below 1, better than
a particular company’s commitment staff capable of teaching the stan- average.

COMBINED CYCLE JOURNAL, Number 71 (2022) 43


Lesson learned: Heat tracing demands constant attention
What follows are details on heat-trace changes were required to complete was updated to reflect as-built condi-
initiatives shared by one of the dis- the installation—changes performed tions. This information and a thorough
cussion leaders, some of which were without the knowledge of the designer review ensured the system was
not discussed during the roundtable and poorly documented. designed and installed as originally
because of time constraints. Heat tracing was designed to intended.
Get off on the right foot. Plant maintain an equipment temperature With the proper installation and
personnel learned during commission- of 40F at an ambient of -8F. The heat- operational techniques identified for
ing, and afterwards, that poor installa- trace supplier implemented the use the new technology, the plant opera-
tion practices coupled with the lack of of microprocessor-based temperature tor developed a heat-trace guide to
documentation made it difficult to trou- control and monitoring panels which provide a laymen’s approach to better
bleshoot the heat-trace system. This required other new equipment— understanding of equipment and oper-
required staff to spend roughly 60 including various temperature sen- ational requirements. In the guide,
man-hours per week identifying and sors, new alarm capability, DCS inte- details which had been segregated
fixing issues with heat-trace circuits gration, self-testing circuit cards, and because of scope breaks are included
not functioning as designed. The poor programmable RTD outputs. in one location, eliminating the need
performance of the heat-trace system The lack of qualified oversight for multiple sources of documentation.
jeopardized reliability and operability from the heat-trace designer during The guide is written in plain language
by allowing critical instruments and equipment installation and in prepar- and includes pictures of installed
equipment to freeze-up. ing documentation of as-built condi- equipment to better acclimate the
The facility was constructed by a tions proved challenging for the plant reader and facilitate troubleshooting.
single EPC contractor with multiple operator once it took possession of Success. Using the original design
equipment suppliers. Design of the the facility. team to identify and fix the instal-
heat-trace system was subcontracted The first step in fixing the prob- lation issues the heat-trace system
to a reputable supplier while instal- lem was to bring back the original achieved its specified objectives.
lation was handled by the EPC con- heat-trace designer to audit the entire System performance now is aligned
tractor’s craft electricians, who had system and identify and correct any with the original design intent, ensur-
little or no experience with heat-trace deficiencies. This required all 612 ing safe and reliable operation of plant
equipment. individual circuits to be reviewed to equipment during times of inclement
The various scope-of-supply ensure the correct materials were weather.
boundaries and types of heat trac- used along with the correct installation Upon release of the guide, per-
ing proved problematic. Many field practices. Next, all the documentation sonnel were immediately able to

44 COMBINED CYCLE JOURNAL, Number 71 (2022)


reference site-specific information for isometrics. The field engineer may they leave at least 3 ft of heat-trace
heat-trace issues in a timely manner. not necessarily understand the cable on both ends. When they cut
Today, only about 10 man-hours per mechanical properties of the piping the heated tube bundles short, there
week are required to properly trouble- system and may miss things that is not always enough cable to reach
shoot system issues, down from the should be included in the isometric the power connection kit inside the
60 mentioned earlier. The guide also drawings. In addition, the mechani- heated enclosure, or to trace the
helped personnel identify equipment cal engineer is better positioned to root valve. This results in having to
improperly installed, before it adverse- be aware of potential piping chang- relocate power-connection kits and
ly impacted heat-trace performance. es needed. add jumpers to accommodate.
More ideas. One or more of the fol- n Since the heat-trace design usu- n Ideally, start the heat-trace crew
lowing best practices pertaining to the ally is not complete until late in when the piping discipline is at
development/design, and construction/ the project, the necessary conduit least 65% complete. Prior to this,
startup of a plant-wide heat-trace sys- cannot be installed until very late the pipe systems generally are not
tem may have value at your facility. in the schedule. You can benefit by complete (missing valves, perma-
moving a large portion of this work nent supports not installed, etc)
Development/design
forward. For example, run small (12 which creates rework for heat-trace
n Add smart-panel amp indication
in.) cable trays in areas known to crews. This will allow a large run-
on each circuit as well as a light to
require heat tracing (finger racks, way ahead of the heat-trace crew,
visually indicate that the circuit is
main racks, bottom of HRSG, etc); increasing productivity. Impact
energized. This makes it easier for
once the heat-trace design is final- upon the project completion sched-
operators to walk down the system,
ized and power connection devices ule and weather conditions may
verifying that the heat tracing is on
are located, only short pieces of override this.
and working when it should be.
conduit from the tray to the devices n When installing the rubber boots
n Have your engineer do a detailed
are needed. in the termination kits, the leads
evaluation of all vendor equipment
(gas and steam turbines, HRSGs, Construction/startup tend to bunch up at the bottom and
etc) requiring heat tracing and n Ensure that compressor bleed- touch. If there’s a ground fault dur-
make sure that the information is valve actuators and inlet-filter dif- ing commissioning, 80% of the time
clearly presented to the heat-trace ferential-pressure instruments are it’s likely to be in the rubber-boot
system supplier. heat-traced and insulated properly connection.
n The mechanical engineer respon- for adequate freeze protection. n Perform a thorough heat-trace
sible for the heat-trace design n Coordinate with the instrumentation audit each summer to identify and
scope should be the same person fitters to make sure that when cut- address any issues before the cold
who reviews the vendor’s design ting back the heated tube bundles weather sets in.

COMBINED CYCLE JOURNAL, Number 71 (2022) 45


they have certifications. The weld perfor- hammer and extra radio. noted, “Most equipment, even our
mance tests include a plate test, a bend n Notes of caution, such as not allow- HRSG drums, lack enclosures and are
test, a monster or super coupon test, and ing heavy loads to cross where the open to the wind.”
a coupon-9Cr wire test. Regarding the pipe is buried. However, the facility has added
last, the rep said that welders might be warming sheds on top of the HRSG to
qualified on carbon steel but not higher- Roundtable: Cold-weather preparation keep personnel warm, and purchased
alloy materials. He said, “9Cr material Registered users can listen to a several 120-Vac instrument space
flows much faster and easier.” recording of the roundtable, posted on heaters wired to plug into outlets.
www.powerusers.org. Alternatively, These are used in transmitter boxes
Underground circulating-water pipe you can read the following summary of and ductwork with failed heaters.
inspection the session developed by CCJ editors. Some of these temporary measures
Tests revealed circ-water flow rates If this CCUG roundtable is any have their risks. Portable gas or pro-
were marginal and pump vibration was guide, winterization continues to vex pane heaters, for example, used in
a likely indication of a balance prob- plant personnel. Many of the issues can enclosed space elevate CO exposure
lem. The 8-yr-old pump was removed be traced to inadequate design bases to workers and present fire hazards.
and visual inspection showed severe and insufficient equipment (Sidebar, The impacts aren’t solely on the
erosion of its cast-iron impeller—a pages 44-45). equipment either. “Operators find rea-
dramatic change since its last inspec- However, the root cause appears to sons to be absent when it is cold out-
tion three years earlier. be building “outdoor” facilities in loca- side,” the discussion leader continued.
It turned out that the wrong mate- tions which clearly require far better Steel-toed buck boots were purchased
rial had been selected. The cast-iron protection against protracted frigid for winter work and rooms are booked
impeller was replaced with one made conditions. Exhibit One: The Ercot in nearby motels to keep employees
of stainless steel. Rebalancing was experience in early 2021. off the highways. Plus, personnel are
the next step, with stiffeners added to The roundtable was led by two reminded to look up for icicles in areas
the upright pump support. No visible highly experienced engineers, both which may have leaks and to review
damage has been exhibited after five with management responsibilities at work orders to identify equipment
years of service. plants in locations subject to freezing which may be leaking.
The presentation offers a punch list temperatures that were designed as Equipment of special interest
of things to consider during inspection outdoor facilities. includes drip-pot drains, attempera-
planning, tools and aids to have on- One of the discussion leaders noted tors, air filters (which can become
hand, and photos of what to look for. that the lowest ambient temperature plugged with ice), and outside air com-
The slides included in the presenta- experienced at his plant was minus pressors. The heat-tracing contractor
tion are a veritable tutorial with bul- 23F while the heat-trace design basis was tasked with conducting an audit
leted checklists on these topics: was plus 2F. The other said his plant to compare design conditions to actual.
n Planning for safety and timing. was designed to minus 8F, but that An attendee suggested that plants
n Tools and aids should include a rock does not account for wind-chill. He check for clogged drain lines using
46 COMBINED CYCLE JOURNAL, Number 71 (2022)
DESIGN/BUILD & REPLACEMENT OF INTAKE HOODS
New Yoke Assemblies
Grit Blasting & Coatings
Media Change-Outs
█ Cartridge filters
█ Panel filters
█ New 4-point mounting hardware

█ New pre-filter mounting frames

█ Evaporative media

█ CELdek® and DRIFdek®  

█ New metering and setups

Combustion Turbine Inlet Services

Contact: Robert Murphree, Pres m: 901.734.5954 o: 901.396.3625


Robert@filter-doc.com
Greg Murphree, VP, Sales m: 901.412.1195 o: 901.396.3625
Greg@filter-doc.com      
303 East Brooks Road, Memphis, TN 38109 www.filter-doc.com 

NDE. He said it takes his plant about How to effectively treat powerplant three criteria: space is large enough
three hours to check all HRSG drains cooling water with fewer chemicals and configured so that a worker can
in this way. And actions taken in other Forced to eliminate use of chlorine enter bodily, has limited or restricted
seasons, like a contractor removing for biological control in its cooling means for entry or exit, and is not
heat tracing for a valve repair in sum- tower, the plant tried bromine. How- designed for continuous employee
mer, need to be checked. ever, that promoted the growth of occupancy. The gray areas here were
Users struggling with winteriza- a resilient and chemically resistant underscored by the fact that the rep-
tion might spend quality time listen- form of filamentous blue-green algae. resentatives of these three facilities
ing to the recording. Here are a few Its growth in spring and summer got “saw things differently.”
takeaways: out of control, requiring the removal One of the panelist’s noted that
n Review the 32F action plan (or pre- of forebay trash screens for cleaning many process plants classify all
pare one if your plant doesn’t have every third day at great expense. enclosed spaces as confined. In other
one). Presentation summarizes the tech- words, they do not distinguish between
n Review alarm points and opera- nologies investigated to solve the a permit-required or non-permit-
tional permissives which may be problem. Alternatively, you can read required confined space.
impacted by cold-weather opera- the article in issue No. 64 (2020), p Much of the discussion focused on
tion. 53. The best practice described was three options for rescue teams: third
n Order bulk chemicals and review a major reason for the plant receiv- party offsite, trained onsite, and local
chemical properties to determine ing Best of the Best honors in CCJ’s fire department. There are pros and
freeze points. annual awards competition. cons with each. Examples: the local fire
n Stage electric and propane heaters department is experienced with rescue
in problem areas. Roundtable: Confined-space safety events but may not be able to respond
n Develop HRSG drain procedures best practices in a timely manner, typically within 15
with valve identification in case Registered users can listen to a minutes; an onsite team may be most
there is only enough fuel to operate recording of the roundtable, posted on familiar with the facility but the addi-
one unit. www.powerusers.org. Alternatively, tional responsibilities may be a burden
n Perform a heat-trace audit in you can read the following summary of on shrinking staffs; and a third-party
August/September and evaluate the session developed by CCJ editors. team may have its own equipment but
heat-trace insulation for deficien- This discussion was facilitated by not able to respond on short notice.
cies, keeping in mind that heat three members of the CCUG steering The panelists created a list of “pos-
tracing cannot protect areas with committee. One of the surprising state- sible best practices”:
water-soaked insulation. ments during the opening remarks was n Sign in and out for all (permit and
n Verify calibration of all transmitters that there is no accepted way to clas- non-permit) confined space work—
suspected of freezing or of over- sify “confined space.” The OSHA defi- described as a nuisance but neces-
heating. nition, for compliance purposes, has sary (Sidebar, p 49).
COMBINED CYCLE JOURNAL, Number 71 (2022) 47
COMBINED CYCLE USERS GROUP

n At least one continuous air monitor although that’s the word they used. testing relates to reliability and per-
per team in a confined space. “Threatening” might be more accurate. formance and can help assess impact
n Create and review the rescue plan While the events themselves tend of process demands on pump condition.
before entry. to be unique and site-specific, many
n Document the time-weighted aver- readers can relate to the pain, and the Improving combined-cycle plant per-
age personal air sampling pump “lessons from the field” they presented. formance, EPRI
readings when welding, to under- Above all, it never hurts to be reminded Presentation began with some stats
stand potential for contaminants. that virtually anything can take you on the Top 20 combined-cycle plants
n Use “Rite in the Rain” or equivalent out in a powerplant and everything to engage the audience in a review of
all-weather paper to print permit needs to be checked, rechecked, etc. techniques to improve heat rate and
materials and avoid the problems A short article based on this pre- boost output:
associated with using off-the-shelf sentation appeared in CCJ No. 68 n The Top 20 have an average 88%
paper when it gets wet. (2021), p 76. capacity factor, remainder of the
n Invite local fire department person- fleet about 60%.
nel to the site to get familiar with Vendor presentations n Heat rate for the Top 20 aver-
the spaces. ages 6860 Btu/kWh (best is 6649),
n Use tubes (familiar in real estate) Kinetic shock: An alternative way to remainder of the fleet averages
with labels and rare earth magnets thoroughly clean your HRSG, Groome 7400.
to house confined space permits. Industrial Service Group The slides amount to a summary
n Step through “what ifs” before start- Calling it “safer, faster, and deeper” of EPRI products, including report
ing the project. than dry-ice blasting, Groome CEO #3002005048, which identifies and
n Test communication devices. Jeff Bause introduced attendees to analyzes 50 mods/actions to improve
A few which might be added based KinetiClean HRSG tube cleaning, a heat rate, 32 capital projects, and 18
on the Q&A are make sure contractors patented kinetic shockwave technique maintenance actions, etc.
understand the distinction between widely used in other industries but new
permit- and non-permit-required con- to combined cycles. You can get the Operability challenges in an unstable
fined spaces and defer to the more rig- details in the recorded presentation or grid environment, EthosEnergy Group
orous one, perform audits on confined slide deck at www.powerusers.org, or This message also was delivered
spaces early in the outage, and know read an article on the subject in CCJ in-person at the Power Plant Controls
where everyone is working to avoid No. 68 (2021), p 56. User Group meeting in St. Louis, Aug
issues with falling objects. 23-27, 2021. The presentation is sum-
Improving reliability in segmental-ring marized in that section of this issue on
Cybersecurity: Application and mis- boiler feed pumps, Hydro Inc p 29. Recall that both the PPCUG and
conceptions in power generation Segmental-ring designs are lower the CCUG operate under the Power
The slide deck for this presenta- first cost than barrel pumps but are Users umbrella.
tion is a summary of broad talking less robust, attendees were told. They
points on cost, need for management exhibit significantly less mass and Covered piping systems: Regulatory
guidance, government requirements, therefore lower stiffness and damping, requirements and practical findings
etc. It does not offer actionable plant- and are more susceptible to external for steam piping programs, HRST Inc
level information, in the opinion of factors (pipe strain, soft foot, tie-rod Presentation reviews ASME Stan-
the editors. Suggest listening to the torque value, and sequence) and dard B31.1, focusing on “oft overlooked
presentation, available in the CCUG hydraulic instability when operating Code requirements,” common problem
section of www.powerusers.org. off the best-efficiency point. areas, and case studies. First includes
A case study focuses on a segmen- written O&M procedures covering top-
New safety equipment installed at tal-ring pump exhibiting repeated cat- ics mandated by the Code, review of
CCGT plants astrophic failures (that is, shaft break- dynamic events since the last condition
Two members of the CCUG steer- age) that was analyzed for root causes, assessment, and record-keeping.
ing committee walk you through some then modified with engineered solu- Reading of the four case studies
of their safety best practices (such tions. One impressive result, among described is recommended. They cover
as separating high-risk zones of the others: Reducing the last-stage casing HRSG interstage attemperator issues;
plant—where chemicals are handled, gap from 0.007 to 0.008 in. to 0.001 to a spray-water line to a bypass valve
for example—from those seeing regu- 0.002 in. improved pressure-carrying for an HRSG at an LM6000-powered
lar traffic) and share their experiences capacity from 2500 to 4000 psig. plant that illustrates cyclic operation
with newly installed safety equipment. can cause more problems than one-
This well-illustrated PowerPoint might Leveraging pump testing and condi- time events; HP interstage piping at
form the basis of a productive lunch- tion monitoring for an effective predic- an early 2000s G-class unit exhibiting
and-learn in your plant’s break room. tive-maintenance strategy, Hydro Inc vibration issues; and creep damage at
Some of the topics covered: Impor- Presentation argues for certified a P91-P22 HRSG weld.
tance of designating chemical safety performance testing and vibration/
areas, racking devices, safety curtains, condition monitoring for pumps as part Obtaining simple-cycle GT speed in
transformer-yard access control, fall- of a preventive-maintenance strategy, existing CCGT powerplants—oppor-
protection improvements, hazard iden- especially for plants at which “original tunities and pitfalls, HRST Inc
tification with illustrated examples, design may not be how the plant oper- This is a treatise on whether and
lighting additions, etc. ates today.” Differences in performance how a plant with frame engines can
at low- or maximum-flow conditions adapt to meet the 30-min non-spinning
Lessons from the field: Generator can be considerable, attendees were reserve market—given the speakers’
circuit-breaker maintenance told, plus impellers may have been contention that the 10-min market is
“Interesting” doesn’t do justice to modified, or other factors are likely the domain of aero machines.
the generator circuit-breaker failure affecting performance and reliability. The five combined-cycle fast-start
events described by two utility users, Several slides show how pump considerations addressed: Drum ramp
48 COMBINED CYCLE JOURNAL, Number 71 (2022)
Site map helps track confined-space status
One of the discussion facilitators has shared his plant’s window in the photo) to the left-hand side of the site map
safety best practices with colleagues for years via CCJ’s and then places a red magnetic dot at the location of the
editorial pages. One, not discussed in detail during the confined space on the map.
confined-space roundtable but worth revisiting here, is This provides plant personnel a visual of the approxi-
described below. It protects against entry into a confined mate location of open confined spaces at any given time.
space after LOTO clearance. The example given was an After a confined space has been closed and returned
HRSG door left open following an outage. to its normal state, the label and dot are removed and
This facility has over 150 confined spaces to keep returned to the storage board. Keeping the process simple
track of, challenging the responsible individuals. A control enables its success.
room operator (CRO) and a member of the plant’s safety The map also provides a visual representation of the
committee, advocated for a visual way to account for plant to facilitate discussions among plant personnel and
confined-space status in the control room. After review- contractors and to show evacuation routes and muster
ing different ways to keep an eye on the confined spaces, points, and all door swings.
he noticed that most of the solutions relied on technology The confined-space map, in use for well over a year,
that increased costs as well as the workload of the CRO. is a safety and awareness win for both employees and
He focused his task on finding a low-risk, low-cost, low- contractors.
technology, high-results outcome.
The idea was to create a site map showing the major
equipment and some of the underground systems on a
white magnetic board that included all the plant confined
spaces. This map would be in the control room above the
LOTO cabinet (photo).
The CRO worked with NAES Corp drafting to develop
a simplified site plan for his plant. In addition to the major
equipment and underground information, the 45 × 45-in.
map also includes the following:
n Safety showers in green.
n Tornado shelters.
n Water storage tanks and capacities.
n Manholes with system identification and numbers.
n Electrical manways.
n Hazardous chemical locations.
For work requiring entry into a confined space, the
CRO moves the magnetic label for the associated con- Confined-space mapis mounted above LOTO cabinet
fined space from the label storage board (right of the and alongside the label storage board

COMBINED CYCLE JOURNAL, Number 71 (2022) 49


verted into performance insights—sup-
ported by several case studies.

Generator fast purge system for


emergencies and normal operation at
Cleco’s Arcadia Station, Lectrodryer
New, automated fast-purge system
for hydrogen-cooled generators enabled
plant to reduce its gas purge time from
12 to four hours, and added the abil-
ity to “emergency purge,” something
most combined-cycle plants are not
equipped to do. The vendor’s package
includes a generator fast-degas sys-
tem and gas monitoring and control
piping skid. First system took three
weeks to install.

Main-steam/hot-reheat isolation and


non-return valves: Key problems and
resolutions, MD&A
Check/non-return/flapper-type
valves, which allow flow in only one
direction, generally are difficult to
service because they operate with two
centerlines which must be maintained
during servicing, and require special
tooling that many repair shops do not
have on-hand.
Some plant personnel have been led
to believe that such valves do not have
to “blue” 100%. Not true, attendees were
told. More likely, the presenters said, the
valves have not been properly repaired
so users accept a new normal. An inspec-
tion and repair case study illustrates
how this work should be done.
rates, purge-time calculation/credit, nal duct/piping steel that “touches: the
startup-procedure checks, venting gas path directly, usually the insula- OEM presentations
capacity, and demin-water capacity. tion and protection systems. Hot spots
Presenters contend that many “older” identified by external thermography GE Gas Power and Siemens Energy
combined cycles can adapt to partici- are “the first-line indication of heat each had a day for their programs.
pate in the NSR30 markets. Risks and getting in behind the liner system.” GE’s was July 20, 2021 and includ-
rewards are identified. Because most slides in this presen- ed the impact of gas-turbine upgrades
tation are photos of failures and of on BOP systems and equipment, case
Effect of variable-load-path gas-tur- subsequent repaired and upgraded study of a 7F upgrade, generator life-
bine operation on HRSGs, HRST Inc areas (little explanation, if any), you cycle considerations and forced-outage
Variable load path (VLP) opera- might want to listen to the recorded avoidance, HRSG pressure parts/
tion is one way for combined cycles presentation. replacement, steam-turbine low load
to become more flexible to compete and cycling operation, turbine-valve
with renewables. Essence of VLP is to Condenser performance monitor- outage considerations, and case study
modify the typical linear gas-turbine ing with advanced instrumentation, on steamer operation.
operating curve to stay within an Intek Inc You can get the details on the
“envelope” in which GT load and tur- Focus is on new instrumentation OEM’s MyDashboard website as indi-
bine exhaust-gas flow are controlled said to make it easier to both monitor cated in the introductory remarks on
independently by modulating IGVs to condenser performance and identify the first page of this report, or you can
achieve the desired TEG mass flow. the root causes of degradation. Most access the CliffNotes summary in CCJ
Attendees were told that the poten- plants have a standard instrumentation No. 68, p 22.
tial negative impacts of this transition package to monitor cooling water inlet Siemens Energy Day was July 28,
can be addressed with equipment and outlet temperatures, steam pres- 2021 and included presentations/dis-
modifications or changes to lifecycle sure and temperature, and condensate cussions on battery solutions, cyber-
expectations. The important point temperature—but that’s about it. security, plant assessments, startup
made by the speakers: Use thermal Adding instrumentation for air optimization, continuous performance
analysis to understand the impacts in-leakage; cooling-water flow, tem- optimization, and decarbonization.
and then optimize the upgrade options perature, and fouling, and high-density Most of the material presented by
with a practical operating envelope. temperature arrays; and differential- the Siemens speakers is posted on the
pressure meters, allows for deeper company’s Customer Extranet Portal
HRSG liner plates: Improvements and analysis to troubleshoot losses and what (https://siemens.force.com/cep). Find
necessary upgrades, IAFD Inc to do about them. Slides include graphs/ a summary in CCJ No. 68, beginning
Recall that a liner plate is any inter- graphics to show how the data are con- on p 18. ccj
52 COMBINED CYCLE JOURNAL, Number 71 (2022)
Experts assess drain-line, bypass-valve
cracks using lab analysis, reams of data

T
he two user-driven presen-
tations during the eighth See Fig 1
virtual HRSG Forum, Apr
5, 2022, organized by Chair-
man Bob Anderson, took deep dives
into issues plaguing combined cycles
with high transient operating hours:
Drain-line and bypass-piping crack-
ing. The first confirmed yet again Stainless-steel filler
that lab metallurgical analysis of
failed components is a must, even
ID
if it adds a day or two to an outage,
while the second revealed the grow- 2. Lab metallurgical analysis
ing importance of data mining in revealed areas where improper
failure assessment. stainless-steel filler weld material was
Albert Olszewski, Constellation used, as well as areas where improper
Energy Generation, titled his presen- weld material was covered up to make
Flo

tation “Why Failure Analysis Is Per- it appear Code-compliant


w

formed,” and the implicit “answer” is,


to avoid repeat cracking failures of
the same component in the same loca- 1. Repeated cracks and leaks were
tion. Olszewski’s initial slides showed discovered at this location of the hot-
three crack failures (Fig 1) over a reheat drain piping. They were exca-
year’s operation of a 2-in., P22, wye- vated and weld-repaired with plant
block fitting with a full-penetration guidance before engineering was
weld on an HP evaporator drain line called in
to the blowdown tank. After each dis-
covery, the crack was excavated and The Q&A was a veritable brain-
weld-repaired by the plant without storming session about other factors
engineering being involved. which could affect this type of crack-
Then the plant replaced the wye- ing (for example, pipe movement 3. Cracks in the HRH bypass dump
block, only to experience a “terrible and inadequate supports), ways to arrangement were discovered at the
crack” right through the weld within obtain additional data (for example, nozzle housing (upper area) and at
a year and a half of operation. Engi- add thermocouples to measure tran- the water manifold (lower area)
neering finally was called in. Met- sients), etc—so best to link to Olsze-
allurgical analysis (Fig 2) revealed wski’s recording at https://HRSGfo-
improper stainless-steel filler mate- rum.com. Some experts cautioned Capital Power acquired its Gore-
rial in the field weld, probably from that the stainless-steel filler may not way plant in Ontario, in 2019, about
a welder grabbing the wrong filler be the root cause of the crack. a decade after it went commercial.
rod during construction. Remnants Most everyone knows that data The failure involved a two-stage,
of improper weld filler material used mining permeates our work and per- low-noise, hot-reheat (HRH) dump
since construction seemed to explain sonal lives, but it’s refreshing to see valve system to the air-cooled con-
the repeated leaks and how often it laser-focused on a specific plant denser (ACC)—including a 16 × 24
they occurred. problem common to many combined in. steam pressure-control valve
During the post-preso discussion, cycles. Diederic Godin, senior man- with desuperheater, a 24 × 34 in.
Chairman Anderson re-iterated that ager, Mechanical and Optimization, second-stage desuperheater, and a
best practice is to always take a at Capital Power, and Valve Doctor 34-in. low-noise resistor ahead of
sample to the lab for analysis when Ory Selzer, application engineering the ACC.
failures like this one occur. However, manager at IMI-CCI, tag-teamed, The end plate cap from the first-
he added, such decisions that extend with Godin setting the context of stage desuperheater also was found
forced-outage durations rarely are the plant design and the failed com- liberated, with no evidence in the
taken unless senior management ponent, while Selzer focused on ana- process data that it was missing. The
has agreed pre-failure that this is a lyzing the operating data and details desuperheater thermal liner posed
best practice. of an improved component design. problems early in life, apparently,
54 COMBINED CYCLE JOURNAL, Number 71 (2022)
HRSG FORUM

250 DCS logic (Fig 4). Several other


100
“critical findings” also fell out of

Steam and water valve position, %


Average valve outlet temp
the analysis. But you’ll have to get
200 80
Valve outlet them from the video tape at https://
Temperature, C

saturation temp HRSGforum.com. They provide the


150 60 hardware design modifications and
First-stage water
valve position feedback control logic revisions.
100 40 Attendees wondered where the
end cap was found (just upstream
Superheat at valve outlet
of the ACC) and whether there were
50 20 any operating “symptoms” suggesting
Steam valve position feedback that it was missing (none). Another
0 in the audience suggested that the
12:30 12:35 Time 12:40 12:45
plant should have seen a change in
4. The 50-deg-C superheat override drives the behavior of variables near the pressure drop when the end plate was
12:40 point on the x-axis, affecting the failure area lost. In response to another inquiry,
Godin noted that a sample of the
and was removed after only a few were then overlaid to detect patterns liberated end cap was not taken for
years of operation under the previ- and anomalies. analysis.
ous owners. The “big catch” was a massive Barry Dooley, Anderson’s co-
The external water manifold and quench down to saturation taking moderator for these forums, asked if
nozzle housing are in one “spool.” place at the desuperheater first the failed component was analyzed
Cracks were discovered at the nozzle stage during each hot start after the metallurgically and the answer was
housing to steam-pipe connections bypass (dump) valve opens, a quench “no.” He then added that reheaters
and in the manifold (Fig 3). Capital that should be taking place at the 1 and 2 are typically constructed of
decided to replace the valve and second stage. This was occurring T23, one of the worst materials for
desuperheater with an improved because of a 500-deg-C minimum exfoliation. Godin responded that he
design. But once the upgraded outer superheat override setpoint in the would “dig into this.”
pipe spool, nozzles, and manifold
for a new desuperheater were pur-
chased, internal erosion damage Experts address why, when,
was discovered on the diffuser, so
the upgraded design included a new and how to deal with HP
diffuser. The final unit was being
installed literally as Godin was mak-
ing his presentation.
evaporator deposits
Selzer then turned to the root- The most recent HRSG Forum, Vir- along with other mechanisms, in con-
cause analysis. IMI Insyt, with spe- tual Session No. 9, held July 21, 2022, tributing to HTF explained why/when
cialized data mining techniques, broadly addressed high-pressure (HP) removing these deposits is important.
acquired four weeks of operating data evaporator deposits, and specifically Then the second presentation, “So I
in small intervals representing 28 under-deposit corrosion (UDC), a lead- Need to Chemical Clean My HRSG. .
startups across three units, or 25-mil- ing cause of HRSG tube failures (HTF). .Now What?” delivered by Doug Hub-
lion data points total. In other words, The first presentation, by Barry bard, an independent consultant,
not an analysis you’d want to attempt Dooley, Structural Integrity Associates was chock full of practical guidance
using Excel spreadsheets. The startup Inc, focused on why UDC occurs, how for the onsite user community. Both
data important to this component to detect and analyze it, and its role, presentations are available for view-
Temporary chem-clean piping
)
#/4/.0)32'2/%.)))))1+"# , )
!

Chem-clean
heating station

1. Substantial real estate is neces-


Chem-clean
mixing station sary on-site for a chemical cleaning,
including for frac tanks (right), clean-
Chem-clean ing fluid containers, temporary piping,
pumps
heat exchanger with aux boiler/steam
source, pumps, mixing station, and dis-
charge collection areas
56 COMBINED CYCLE JOURNAL, Number 71 (2022)
HRSG FORUM
in the HP-evaporator tube surfaces.
You must ensure that the unit is
“fully flushed” to avoid an aggravating
startup. Passivation of the unit, done
chemically after the cleaning, only
gives weak protection of the surfaces
until the system is restored during
a normal startup. For this reason,
the unit must be returned to service
immediately after cleaning and run
at full drum pressure for at least 76
hours (an empirical value from Hub-
2. Cleaning to remove corrosion cells (right) is more involved than a clean- bard’s experience) to maintain the
ing to remove high levels of iron-only UDC (left) passivation layer.
It is critically important to “hydro”
Pressure, MPa
the unit prior to circulating the chemi-
6.9 8.2 9.6 11.0 12.4 13.8 15.1 16.5
cals, he warns. “Leaks are manage-
60 64.8 able when you are passing only water
through; they don’t get better as clean-
ing proceeds,” Hubbard noted wryly.
50 54 Don’t assume your valves will hold
either, he added. If you do have a leak-

Deposit loading, mg/cm²


Deposit loading, g/ft²

Chemical cleaning needed ing valve during cleaning, remember


40 43.2 to flush the other side.
Three types of cleanings delineated
by Hubbard are (1) pre-operational (to
30 32.4
remove mill scale, cutting oils, etc),
(2) high-deposit iron removal, and
20 Think about chemical cleaning; start of 21.6 (3) UDC/H2 damage cleaning. Each
corrosion products within porous scales cleaning has its own characteristics
with respect to solvent selection, cir-
10 10.8 culation times, discharge material,
etc. Cleaning time will be apprecia-
Optimum HRSG chemistry and meeting the “Rule of 2 and 5”
bly higher if you have any corrosion
cells (Fig 2).
1000 1200 1400 1600 1800 2000 2200 2400 Determining which level of cleaning
Pressure, psig you need is based on analysis of the
3. Deposit loading and operating pressure can guide decisions about when to deposits and static and dynamic tests
start planning for, then conducting, a chemical cleaning for deposition (iron, cop- with the deposit material. A static test
per, silica, calcium, others), UDC, and hydrogen damage in HP evaporators involves taking a 1-in.-tube cross sec-
tion, placing it in a beaker with solvent
ing at https://hrsgforum.com/2022- spill after the tank leaves the site? To and stir bar on a hot plate, and timing
recordings. think through these scenarios, Hub- how long it takes for the deposit to
Hubbard’s years of experience, bard doesn’t just say “involve” your break up and fall to the bottom. In a
with one of the nation’s largest environmental subject matter expert, dynamic test, the tube sample is placed
electric-utility powerplant owner/ he/she must be “intimately involved” in a test loop and solvent is pumped
operators, were etched into every in the entire project, from initial plan- around to determine how long it takes
slide, wisdom suitable for a laminat- ning to project closure. for the corrosion products to break up.
ed pocket guide of bullet points one Resist the temptation to cut a few Cleaning generates hydrogen gas,
pulls out during all stages of chemi- hours from the cleaning process, even so make sure the system is properly
cal cleaning (Fig 1). For example, he if the higher-ups are pressuring you vented of gases and air at the high
inserted the slide on waste disposal in the interest of getting back on line points at least every hour. An “enor-
of cleaning discharges twice, to drive quickly. In fact, Hubbard recommends mous quantity of fumes can get into
home how this aspect of the process doubling the time for chemicals to the steam turbine,” he cautioned, if
can haunt you. circulate from what is indicated by you don’t backfill the superheater with
“Waste disposal can be up to half the static test (usually done by your ammoniated condensate.
the cost of the cleaning,” he said. Those contractor)—for example, from six to Other bullet points for that pocket
20,000-gal frac tanks that the cleaning 12 hours—especially if it’s a cleaning guide:
contractor had delivered to your site? for UDC and hydrogen damage. n Don’t assume all the deposits are
“Inspect every one of them,” Hubbard You’ve just spent extensive man- iron, even if that might be the case
urged, “and make sure they were thor- hours and dollars planning the clean- the majority of the time.
oughly cleaned, and if not, send them ing, installing temporary piping, n Flows should be between 2 ft/sec
back.” If you don’t, then you just took pumps, heat exchangers, etc—and (minimum flow for the cleaning
ownership of any nasty residue from now you want to save three hours of solvent) and 5 ft/sec (maximum flow
the last place those tanks were used, outage time and risk subverting the for the corrosion inhibitor).
such as the oil/gas fields. result? Where’s the logic? n Color-code a system flow diagram,
Good questions to ask: What do you One good reason to allow ample mark dead legs, valves, and the
do if you fill up your frac tanks? How margin in circulation time: You won’t cleaning path (fluid entry point and
do I handle the material if it is deemed really know if your tube sample is rep- exit point).
hazardous waste? How do I manage a resentative of all the corrosion deposits n Walk down the system as the clean-
COMBINED CYCLE JOURNAL, Number 71 (2022) 57
ing proceeds. plant’s situation, Dooley’s slides also loading, along with tube conditions,
n Cover storm drains. include categories within several of the are required before determining how
n Add 5-10 deg F to the cleaning pro- nine RCCS listed above. For example, to mitigate or prevent them in the
cess temperature as extra margin; under “contaminants,” Dooley notes future (Fig 3). Several slides of tube
remember that the fluid tempera- “high number of condenser tube leaks” samples show the consequences of poor
ture is not the tube surface tem- and “continuing to operate when con- chemical cleanings and/or application
perature. taminant levels exceed action and of film forming substances.
n Pull samples while cleaning is tak- shutdown limits.” During the Q&A, Dooley notes that
ing place to “see what’s going on.” The balance of the slide deck dis- 65% of the plants assessed experience
Evaporator failure mechanisms. cusses why taking tube samples is online instrumentation issues, but also
Dooley’s slides first placed UDC in critical, how to analyze tubes for that operators often are not trained on
the context of other leading chemically deposits and damage, and what the how to recognize and respond to an
induced HRSG reliability issues and morphologies look like under close exceedance event.
contributors to failures, then went on examination by high-powered lab Technical guidance documents are
to show resplendent examples of UDC, instruments. A detailed chemical and available from IAWPS at no cost for
UDC with acid phosphate corrosion physical analysis of the deposits and many of the topics Dooley addressed
(APC), and pictures of deposits under deposit gradations, distribution, and (www.iapws.org). ccj
various treatment regimes.
Using the term “Repeat Cycle
Chemistry Situations (RCCS),” Dool-
ey explained that damage and result-
ing failures arise when a plant has
experienced two or more of these
RCCSs: Corrosion products, HRSG
evaporator deposition, contaminant
ingress (no reaction), drum carryover,
lack of shutdown protection, inad-
equate alarmed on-line instrumenta-
tion, not challenging the status quo,
non-optimum chemical cleaning, and
high level of air in-leakage. RCCS
analysis methodology is based on
over 260 plant assessments globally.
If you want to benchmark your
58 COMBINED CYCLE JOURNAL, Number 71 (2022)
Sponsored content

Supply-chain woes restricting the availability


of valve parts, access to valve repairs
A conversation with Aaron Florek, executive director, Millennium Power Services

“M
aterial shortages is less expensive and faster, so it’s often a win-
the number-one issue win situation.”
the industry is facing “We can repair, refurbish, and manufacture
today,” says Millen- parts for pretty much any valve,” Florek con-
nium Power Services’ Aaron Florek. “Gen- tinues. “We use a state-of-the-art 3D scanner
erally speaking, the raw materials needed and conduct other analyses to understand the
for valve parts are either out of stock, have materials used in a part, the amount of wear on
incredibly long lead times, or are simply that part, and provide root-cause analysis with
unavailable. But this is not the case at recommendations for improvements. We aren’t
Millennium: We have the resources to there to just do a repair or replacement; we can
keep your valve projects moving forward rethink the component and application from the
without the challenges others may face.” ground up.”
The industry always has lived with the Florek went on to say another offering that
necessary evil of long lead times for OEM sets Millennium apart from other service provid-
parts; it has become “par for the course” ers is its TrimKit program, which helps determine
in plant operations. However, when the whether the company should manufacture or
already-long lead times are now twice as long, or longer, refurbish your valve parts. All components required for a par-
because OEMs are waiting on materials and parts, then you’re ticular job—refurbished or new—are shipped to the job site
in real trouble if you don’t have an alternative. in a protective case. Project complete, the used parts are put
“Almost all OEM parts you order for your equipment are back in the shipping case and sent to Millennium.
manufactured overseas. That means they’re facing universal “Our customers can come to us for everything they need,”
supply-chain issues,” Florek says. “If you need an OEM part says Florek. “They don’t have to outsource their parts from 10
fast, you might be out of luck these days. In some cases, you different suppliers. We are their single-source vendor.”
can’t even get the part at all.”
What can powerplant managers do when it seems OEM What our customers have told us:
parts will be unavailable for the foreseeable future? Florek’s ■ Maintenance supervisor. “We’ve been using Millen-
answer: Align with a domestic supplier having the capability nium’s services onsite for close to 10 years. They do valve
to make the parts required. “That’s our business model,” he work, safety-valve testing, and safety-valve overhauls, and
continues. their valve-parts turnaround is extraordinary. If you need
“Millennium Power Services has never been more relevant something in a pinch, they won’t leave you hanging and
than it is today. The supply-chain issues we’re seeing only you’ll never be the one waiting on them.”
further illustrate the need for your plant to have a domestic, This client, which also uses Millennium’s TrimKit pro-
responsive valve manufacturer on call at all times.” Recall gram, added: “TrimKit has everything you need and it’s all
that Millennium is an industrial-valve service provider serving labeled. It’s easy to store, move around, and hand over to
the entire US from its shops in Massachusetts, Maine, and contractors. With the TrimKit, you have everything needed
Virginia. All of the company’s valve parts are manufactured to repair the valve.”
at these facilities. ■ Maintenance manager. We throw almost everything we
Millennium also has the flexibility to refer to an unlimited can at Millennium and the company has yet to fail us. “They
number of vendors to get what customers require. Overseas reverse engineer our parts, provide TrimKits, safety valves,
OEM providers typically are stuck with one source—which is control valves; the list could go on and on. The Millennium
precisely why they’re facing huge delays in their manufactur- team understands valves and it gives us peace of mind
ing. knowing we have the best people on valve repairs. On
“We continue to meet, or exceed, our customers’ our last outage, we found problems with our CCI valves.
requests—including emergencies, which seem to occur almost Millennium took the valves to their shop and repaired them
every week now. We are just as responsive today as we were in a tenth of the time it would have taken the manufacturer
pre-Covid, and we continue to grow every year.” to help us.”
One of the greatest advantages of a valve repair shop ■ O&M manager credits Millennium with the creation of his
equipped with machining facilities is that it allows Millennium plant’s maintenance program. “We overhaul three or four
to think “outside the box.” If one material is unavailable, we valves per unit annually. TrimKit assures our valves always
can discuss alternatives with our clients to come up with are in working order. The biggest benefit of the company’s
quick solution—despite shortages. “Our materials are sourced parts program is that it takes the pressure off of us. Any-
domestically,” Florek reminds. “We get them from the same thing you need, they either have a replacement in inventory
people we’ve always gotten them from. They are not affected or will quickly repair the one in service and bring it back to
by the severe supply-chain issues plaguing overseas manu- the plant.
facturers. Wrapping up, Florek suggests that perhaps the best way
“Beyond that, we have one of the industry’s largest to combat shortages is to simply shorten the supply chain—
inventories of valve parts. Plus, we can manufacture most which is what Millennium Power Services is doing by bringing
parts in just a few days. Remember, too, we usually can what you need closer to home. Plus, it provides precision and
repair your valves in a fraction of the time it takes to get flexibility to give you repair options even when you feel your
new ones—or parts—from the OEM. Repairs typically are hands are tied.
COMBINED CYCLE JOURNAL, Number 71 (2022) 59
Eighth Annual Conference

T
he eighth IAPWS European 1200
HRSG Forum (EHF), held
virtually May 17-19, 2022,
connected 140 participants
1000
from 26 countries. This annual event HP attemperator
is conducted in association with the US outlet temp
HRSG Forum (HF), and the Austral-
asian Boiler and HRSG Users Group 800
Temperature, F

(ABHUG).
EHF 2022 featured 17 technical HPSH outlet temp
presentations, participant questions, 600
active discussions, and answers from Saturation temperature
users and experts. Consulting Editor
Steven C Stultz prepared the follow-
ing highlight reel from presentations 400
the editors believe of greatest interest
to readers of Combined Cycle Journal.
200

Global issues
Thermal transients remain the para- 100
mount cycling concern worldwide. As 5 10 15 20 25 30 35
one presenter put it, “We are now the Time, hr
weather-dependent power source that 1. Inappropriate attemperator operation has increased by 22% to 31% in the
compensates for fluctuating solar and plants surveyed
wind capacity, and operates with fre-
quent starts and stops.” A perspective tracking 31 key issues for 58 plants n 90% have no management policy for
shift for some, perhaps. featuring five gas-turbine OEMs, 10 identifying the root cause of tube
steam turbine OEMs, and 20 HRSG failures.
Thermal transient OEMs from around the world. Negative recent trends were noted
A few factoids from recent surveys: for inappropriate attemperator opera-
damage n Management at 31% of the plants tion and monitoring, master control/
In 2019, Combined Cycle Journal surveyed allows operators to manu- martyr block-valve logic, and tube-
reviewed a 10-year global analysis of ally manipulate attemperator con- failure root-cause programs.
thermal transient damage impact- trols, leading to quench cracking of Take, for example, inappropriate
ing gas-turbine/HRSG/steam-turbine downstream pipework. attemperator operation (Fig 1). Damag-
plants (CCJ No. 61, 2019, p 44). Key n Only 16% perform routine inspection ing actions include manual manipula-
items in that report included attem- of attemperator hardware. tion of set point or control valve, spray-
perator design and operation, super- n 84% experience spray water leaking ing too early during startup, spraying
heater and reheater drain systems, in sufficient quantity to appear in too late during shutdown, and using
ramp rates and pressure-control-valve DCS operating data. only attemperation to match cold
erosion, among others. The surveys and n 96% use master control/martyr block steam-turbine metal temperatures.
assessments are ongoing. spray valve logic (accelerates leak- A second example is HP bypass valve
Bob Anderson, Competitive Power age). erosion. See CCJ report on ABHUG 2021
Resources and EHF co-chair, updated n HPSH (high-pressure superheater) discussing warming steam flow for cold
attendees on these and other issues and RH (reheater) drains fail to lag starts (No. 69, 2022, p 62). “We know
at EHF 2022. Data-gathering began adequately remove condensate in the solutions, but seem to be going in the
in 2009, he explained, and continues, 63% and 68% of the plants surveyed. wrong direction,” Anderson stressed.
60 COMBINED CYCLE JOURNAL, Number 71 (2022)
The survey began with thermal
transient reviews, causes, and correc-
tive actions. The findings:
n Leaking attemperator spray, aggra-
vated by piping design and protec-
tive control logic.
n Attemperator overspray and
impingement on pipework, aggra-
vated by piping design and attem-
perator hardware.
n Variability in startup/shutdown
practices, typical of highly manual
operation.
n Inconsistent performance of control
logic.
n Inability to consistently drain the
HPSH/RH during startup, typical
of both early designs and manual
2. Hot zone featured in exhaust-gas temperature versus GT load operation.
What followed was a thorough
The significance of thermal transient review of preferred actions, selected
issues was discussed throughout this from a total list of 18 to achieve accept-
conference. able low-load operation:
1. Repair or replace existing spray
A search for improved block valves and add tandem block
valves in units without attemperator
turndown piping drains.
Dan Blood, Uniper Engineering, and 2. Modify spray-valve protective logic;
Anderson reviewed an ongoing case his- change to master block/martyr con-
tory for a specific 2002-vintage F-class trol.
plant that switches between maximum 3. HP attemperator liner cracks are 3. Establish spray leak detection and
and minimum load to avoid startup in evidence from borescope inspection annual valve/nozzle maintenance.
penalties. They highlighted startup, 4. Troubleshoot and correct control-
shutdown, and layup as primary long- are capable of 50% turndown without logic anomalies.
term concerns. The GE gas turbines modification. 5. Modify startup practices and attem-
COMBINED CYCLE JOURNAL, Number 71 (2022) 61
perator control logic to eliminate or recommended. perators are ring-style with mechanical
minimize overspray. Longer-term strategy options were spray nozzles.
6. Replace existing integral control considered: Retrofit and use air attem- “For all practical purposes,” said
valve/nozzle attemperators (direct peration at low load (dilute GT exit gas Eagle, “SH and RH outlet temperatures
replacement of mast-nozzle assem- with ambient air), and GT upgrade are functions of gas-turbine exhaust
bly and an external control valve). (inlet-guide-vane control modification). conditions, which means they cannot
7. Automate HPSH/RH drains. Both represented high potential costs, be controlled without attemperation.”
Discussion followed on reducing load but would be considered for detailed And without this control, downstream
into the hot zone, apparent on a plot of techno-economic assessment. components could overheat.
exhaust-gas temperature versus GT Blood and Anderson completed the Typical setup is operation with a
load (Fig 2). “This conflict is a direct con- review by walking through other model block valve/temperature control valve
sequence of the heating-surface layout results of relevance that included HP combination. Wear on the block valve
with respect to attemperator position. economizer steaming, steam flashing can lead to leak-by which has detrimen-
It limits the turndown capability of the across the IP level control valve, acid tal effects on the attemperator, internal
HRSG,” stated Blood. dew-point deposition on cold-end struc- liner, steam piping, and surrounding
This presentation walked through tures and pressure parts, and risk of components. Thermal quenching is
details of several strategies, highlight- flow- accelerated corrosion (FAC) in likely.
ing the pros and cons. First, however, some areas. For Duke Energy, many units have
the must-do was to upgrade the inter- The project is ongoing. had attemperator steam pipes/liners
stage attemperators. This was not a replaced (Fig 3). Plus, two units had the
solution, but was considered an essen- Clamp-on leak entire attemperator and downstream
tial prerequisite, preventing both off- loop piping replaced—both projects
load and on-load spray leakage. monitoring were expensive.
The plant chose direct replacement Duke Energy operates 14 combined- Leak-by monitoring history. To
of mast-nozzle assembly and an exter- cycle sites with 39 total units, powered detect leak-by, Duke looked at exist-
nal control valve. But this would not mainly by GE and Siemens F-class gas ing differential-pressure flowmeters,
resolve the conflict between overspray turbines. The triple-pressure HRSGs but found a non-linear relationship
and final steam-temperature control at were sourced from multiple OEMs. A between differential pressure and flow,
reduced minimum load. presentation by Eugene Eagle focused rendering the meter useless for trickle-
Beyond this, there are two short- on HRSG interstage-attemperator flow detection.
term options: Reduce HP operating concerns. Engineers also looked at thermo-
pressure (not possible if in sliding- A key issue is block-valve leak-by couple comparisons downstream and
pressure mode), or fire the duct burn- attributed to poor maintenance fre- upstream of the attemperators, but
ers (subject to burner capability and quencies and quenching during startup determined this also to be inaccurate
emissions compliance). Neither was and shutdown. Most interstage attem- measurement for low-leakage flows.
62 COMBINED CYCLE JOURNAL, Number 71 (2022)
EUROPEAN HRSG FORUM
attemperators, installed at Marchwood
Power Station in 2012, remain in opera-
tion after 10 years, with more than 2250
stop/starts.

All materials
degrade
Low-cycle fatigue
A 1200-MW combined cycle in Turkey,
commercial since 2017, experienced sig-
4. Measurement principle for the Flexim system is transit-time difference nificant reheater failures (Fig 6). The
cause: Low-cycle thermal-mechanical
fatigue attributed to cycling operation
and condensate quenching. Basically,
the HRSG pressure parts suffer peri-
odic mechanical movements excited by
excessive temperature gradients associ-
ated with cycling.
Tugrul Basaran, Limak (Turkey),
walked attendees through a detailed
root-cause analysis— including metal-
lographic examinations, operational
data, failure histories (locations), and
piping arrangements (design).
Ongoing solutions include attem-
perator PID control parameter adjust-
ments, and tube-stub replacement/
upgrades. “In this particular case, the
attemperator operates smoothly after
control parameters are adjusted,” he
said. He then showed P91 stub replace-
CONVENTIONAL COOLED ments with stubs of increased wall
ATTEMPERATOR DESIGN ATTEMPERATOR thickness (Fig 7)—an ongoing project.
5. Cooled attemperator, installed a decade ago, eliminated thermal-stress failures Discussions included the possibil-
ity of oxide growth/exfoliation, and a
They considered acoustics, but current Duke’s first permanent installation recommendation to add thermocouples
technologies only gave noise signatures, was completed at a 3 × 1 plant in early for monitoring. Plus, consideration of
not actual flow rates. 2021. It has been adopted as the fleet an HRSG sidewall baffle examination.
Enter the Flexim portable ultrasonic standard.
flowmeter. The F601 model was placed Remaining life
on field trial. Eagle explained: “Two Nozzle head
ultrasonic transducers are externally Raphael Stevens, John Cockerill Ener-
mounted on the pipe with a defined dis- improvement gy Solutions (Belgium), presented
tance between them. By sending sound Cor Pauws, Advanced Valve Solutions “Remaining lifetime assessment—
signals alternating with and against (Netherlands), presented a multi- where an HRSG health checkup meets
the flow, a transit time difference can nozzle spray-type desuperheater as material sciences.” His go-to quote:
be measured. This corresponds to the an alternative to the traditional radial “Small streams make big rivers.”
flow velocity.” spring-loaded type. The former pro- Example given was for a combined cycle
Testing has been completed at three vides small droplets (good for primary in Peru, which highlighted the HRSG,
sites on HP and RH spray lines. atomization), was said to work well at gas turbine, electrical generator, steam
Installation of the Flexim F721 all loads, and needs only low system turbine, and condenser.
system (Fig 4), also covered, provides requirements for secondary atomiza-
leak detection down to 0.01 m/s, zero- tion. His examples employed Weber
point stability, high turndown, accurate number as a measure for secondary
factory-calibrated measurement, non- atomization.
invasive retrofit (no pipe work needed), “The traditional nozzle head con-
and easy maintenance (no moving parts nection becomes the weakest point,”
or contact with spray water). While not he explained, “so we have designed this
needed on spray-water pipes, a solution as one piece.”
for flow measurement on high-temper- Advanced Valve Solutions chronicled
ature pipes (up to 1165F) is available. a case study of a combined-cycle plant
This allows measurement at very in the UK that experiences more than
low and previously undetectable leak- 250 start/stops per year. The OEM
age rates to enable repairs before attemperator nozzle heads failed after
pressure-part damage occurs. It also about six months. “Thermal stresses 6. P91 reheater failure was caused
provides better accuracy than the DP were the main issue.” The solution was by cycling-induced thermal-mechani-
meter at low spray flow rates. to cool the lance (Fig 5). The first cooled cal fatigue and condensate quenching
COMBINED CYCLE JOURNAL, Number 71 (2022) 63
n Creep-fatigue interaction.
The R&D cooperative project covers
the time period 2018-2022. Material
considered is P92, and a significant
study incentive is unit cycling.
Findings and results will help guide
future revisions of European design
codes, as well as improved methods for
fatigue and creep-fatigue assessments.
The final report, funded in part by the
German Ministry of Economic Affairs,
will be in German.
7. P91 stubs were replaced with ones of increased wall thickness

To understand remaining lifetime time) for lifetime analysis and failure


Film formers
analysis, he said, you must first rec- prediction. Film Forming Substances (FFS) was a
ognize that “material degradation will hot topic at EHF 2022, expanding both
always occur, even with perfect design, First words from VGB experience and information on the sub-
excellent operation, and state-of-the-art ject. Co-chair Barry Dooley, Structural
maintenance, and you need to build Jurgen Rudolph, Framatome (Ger- Integrity and IAPWS, directed this por-
bridges among pressure parts, steels, many), presented the first public com- tion of the program, updating attendees
operation, and maintenance.” munication on a collaborative R&D on the application of FFS—both amine
Degradation is natural, and mate- project, “VGB calculation methods— (FFA)- and non-amine (FFP)- based.
rial science teaches us there are two including perspectives on updates of Overall, the applications illustrate
main factors: the European standard on calculation reduced corrosion-product transport
n Number of hours the pressure parts methods.” VGB is the association of and general protection in water-touched
are operated above 842F (450C). German powerplant operators with a circuits, but questionable film forma-
n Number of cold, warm, and hot charter similar to that of ASME. tion in steam circuits.
starts. Work-package contents of this semi- Participants were provided the key
The two key degradation types, nal public release included: pre-application procedures required to
creep and thermal fatigue, were n Component tests. achieve optimum results and prevent
explained in detail. Next, the speaker n Thick-walled components, non- problems of under-deposit corrosion
covered “critical points” (welds, etc), elastic stress calculation. and gunk formation. To dig deeper,
testing methods, and collection of oper- n Welds and weld assessment. read the 2022 FFS meeting report
ating data (temperature, pressure, and n Low-cycle fatigue assessment. elsewhere in this issue.
64 COMBINED CYCLE JOURNAL, Number 71 (2022)
control in feedwater and condensate, Chemistry enhancement strate-
Anodamine HPFG and trisodium phosphate for pH control gies were planned in 2019 with these
An in-depth and optimistic review of in drums (the latter stopped in 2021). requirements:
Anodamine HPFG for two-phase cor- During operation, corrosion was not n Steam cation conductivity must
rosion control was presented by Ondrej fully controlled and some flow-acceler- remain below the OEM guideline
Soukup, CEZ Group (Czech Republic), ated corrosion (FAC) was present. No of 0.2 µS/cm.
who explained FFS application and additional measures were taken for n Non-toxic.
chemistry optimization at an 888-MW 2 shutdowns. After 21 days, water had n Compatible with applied treatment
× 1 F-class plant, commissioned in 2014, to be refreshed completely because of program.
with GT upgrades in 2020. The plant has corrosion impacting system integrity, n Easy to handle and dose.
experienced up to 193 starts per year. water consumption, cost, and unit n Good and credible reference projects
Original chemistry applied at this availability. At the same time, cycling (experience).
particular plant is ammonia for pH requirements were increasing. Anodamine HPFG dosing was select-
ed and began in September 2019. Dis-
cussion at EHF 2022 focused on the
following online analyzers:
n Conductivity (specific, cation, and
degassed).
n Silica.
n Sodium.
n pH.
n Phosphate.
These analyzers are trended by the
DCS. No anomalies have been detected
on any of the instruments. Note that a
turbidity analyzer also was installed to
monitor corrosion-product transport.
A key result of the FFS program
was reduced online turbidity, where
the startup peak virtually disappeared
after two months of application on both
warm and hot starts. Anodamine.com
reports similar data for cold starts.
May 2019 (before Anodamine application) 2022 (after Anodamine application) Soukup reviewed annual inspec-
8. Skid sampling shows oxides before and after Anodamine application tions with conclusions: “The system
COMBINED CYCLE JOURNAL, Number 71 (2022) 65
EUROPEAN HRSG FORUM

Gas n CCW with Odacon treatment was


successful after a seawater leak into
Air-cooled the system.
Chillers heat exchanger During the open discussion segment
at the end of the presentation, Dooley
commented: “Results are encouraging
for conventional plants changing FFAs.
IAPWS will add this to its recent expe-
rience changing an FFP.”

A quiz, a
puzzle, etc
9. Closed cooling water system, air-cooled (blue pipes), is the preferred
arrangement. Chillers (white) provide extra cooling during summer. Yellow sec- Due diligence and a quiz
tion at right heats gas before it enters the turbine David Addison presented on the due
diligence and planning that should
is much cleaner given less corrosion result was the ability to change the film precede the use of film forming sub-
products, and two-phase FAC locations forming amine. stances. Get the details in the 2022
are transferring to hematite-protected The CCW discussed serves a range of FFS conference report elsewhere in
locations. Surfaces that were showing components and processes. It is a closed this issue.
blank metal have turned red (dull and loop of water with no blowdown and no One of Addison’s key points was to
hematite colored).” evaporation, and a range of dissolved use caution when relying only on visual
In the sample skid, for example, the oxygen values. There are many systems evidence to gauge hydrophobicity. Fig
orange deposit of oxides at the oxygen (clients) from many manufacturers, 10 illustrates why. This is a complex sci-
sensor (Fig 8 left) has almost completely with no single specification or mainte- ence, poorly understood by the majority
disappeared (right). nance guide. Piping system diameters of managers and engineers responsible
Annual inspections focus on clean- and flow velocities vary. for powerplant operation and mainte-
liness (quantity of oxides), color of Clients served include the gas and nance and often an incorrectly applied
protective hematite layers, history of steam turbines, seawater sampling “metric” for assessing the effectiveness
FAC locations, and visual checks for system, feed- and condensate-pump of FFS dosing.
hydrophobicity. bearings, air compressor and vacuum Addison said that failure to under-
Again from Anodamine.com, “Two- pumps. All are potential points for leaks. take proper due diligence can lead to
phase FAC was drastically mitigated, Thus, corrosion in the CCW is a major one or more of the following:
along with reduced maintenance cost, concern, and the target for EZOM’s n Suboptimal FFS selection for the
shorter startups, and removal of costly review of traditional treatment versus application.
shutdown methods of nitrogen blanket- FFS. One target was the main air-cooled n Incorrect application of an FFS.
ing and dehumidified air. Results were system (Fig 9), with piping sizes between n Failure to obtain the benefits of an
validated using total iron digestion 0.5 and 10 in. and temperature range FFS.
analysis, Millipore filter tests, online between 30 and 37C/86 and 99F. n Plant issues—including equipment
laser nephelometer, and physical equip- In 2018, the move was made from failures.
ment inspection.” sodium nitrite to Cetamine. In 2022, n Excessive application costs with no
Anticipated future improvements a further move was made to Odacon. additional technical benefits.
include reduced blowdown of the drums, Long-term details were given for all A deep dive into the science of
no phosphate dosing, potential cost CCW components. hydrophobicity—including its value
saving on demineralized water, and The conclusions: in assessing the effectiveness of FFS
reduced makeup requirements. n Anticorrosion protection of FFS (Cet- alternatives—is under consideration
amine, Odacon) is verified by field for publication as an IAPWS Tech-
Changing the amines tests in five different CCW systems. nical Guidance Document. To learn
n FFS (Cetamine, Odacon) can replace more about how you can benefit, at
Yitzak Nussbaum, EZOM (Israel), dis- the anticorrosion treatment of nitrite no cost, from the work being done by
cussed use of FFS in a closed-circuit and borate in CCW. the International Association for the
cooling-water (CCW) system. This was n Such replacement requires patience Properties of Water and Steam to sup-
said to be the first application of this and control in the earlier stages, port the electric-power industry, go to
type presented to the industry. A key working with small doses. www.iapws.org.

10. Caution is urged when relying only on visual evidence for


hydrophobicity. Reheater tube at left was dosed with Anodamine, 11. Complete roof module features upgraded cold
the one at the right was not casing and penetration seals
66 COMBINED CYCLE JOURNAL, Number 71 (2022)
The puzzle
Dekomte analyzes and provides both
fabric and metal custom-engineered
expansion joints and replacements
throughout the powerplant. For ret-
rofits, the starting point is proper
inspection.
The company’s Jake Waterhouse
stressed the use of thermal imaging
to assess thermal expansion at joints
throughout the HRSG—specifically
the roof casing and penetration seals.
“Visual and thermographic inspec-
tions create condition reports on
all existing joints in the plant,” he
explained. “The goal is to understand
the existing conditions and develop
tailored long-term reliable perfor-
mance resolutions.”
To illustrate his points, Waterhouse
used the case study for a 552-MW 2 × 1
F-class combined cycle commissioned in
2001. Visuals walked attendees through
the gas-turbine outlet and HRSG inlet
joints, front-wall mechanical seals,
metallic bellows in the roof HP and
IP sections, among others, including
front-wall mechanical seals.
Roof-casing and penetration-seals
discussions then revealed a complex
retrofit (Fig 11). This part of the
retrofit solution (Fig 12) included
18 4-in. roof seals, 18 4-in. plus 4-in.
combined seals, three 6-in. roof seals,
six 4-in. front wall seals, and six 4-in. retrofit, performed over 37 single-shift also lead to investigations of adjacent
plus 4-in. combined seals— repeated days within a 60-day outage. elements in the plant—to look for cor-
51 times per unit. Safety note: The thermal imaging rosion, cracking, distortion, and any
Site photos showed the complete reviews launching the retrofit should direct personnel safety issues.
Cover plate roof A participant comment at the end:
“Impressive. Quite a puzzle.”

Other presentations
Not all presentations could be covered
Loose inside here. Other topics included a root cause
insulation often ignored for high SCR ammonia
Assembly direction

New casing use, updates on cycle chemistry con-


ring trol, PressureWave+ deep cleaning,
HP bypass valve erosion, bypass valve
Casing
damage, and desuperheater lifetime
insulation case studies.
for pen seals Organizers and sponsors of EHF
2022 were IAPWS, ABHUG 2022,
HRSG Forum, Advanced Valve Solu-
tions, HRST, Mettler Toledo, Precision
Iceblast Corp, Reicon, and Veolia. Spon-
Prefabricated sors made short presentations during
sandwich panel
the conference.
Assembly direction

Arrangements and activities were


handled by MECCA Concepts Pty Ltd
and Combined Cycle Journal.
Cover plate lining Co-chairs for EHF 2022 were Barry
Dooley, Structural Integrity, and Rob-
ert Anderson, Competitive Power
Resources.
EHF 2023. The ninth EHF Confer-
Z profile ence will be held in-person May 16-18,
2023 in Florence, Italy. Details will be
12. This retrofit/rebuild became a complex project available at www.ccj-online.com.
COMBINED CYCLE JOURNAL, Number 71 (2022) 67
GAS AND STEAM TURBINE/GENERATORS

Clean turbine fluids promote


trouble-free operation

B
rent Converse, the plant engi- and lube oil; the Alstom hydrogen- with the Jensen system was a catalyst
neer at Old Dominion Electric cooled generator a separate sump for for a discussion with the company’s
Cooperative’s Wildcat Point seal oil. The fluid common to both technical manager, Axel Wegner,
Generation Facility (Sidebar systems is Mobil DTE 746. at a user group meeting. The result
1), has three decades of experience Converse, who has been at Wild- was two-fold: Installation of Jensen’s
in the operation and maintenance cat Point since before commissioning, varnish removal unit (VRU) on both
of powerplant equipment—includ- said the first oil conditioning systems gas turbines and its PTU-type Filter
ing advanced-class gas and steam installed were C.C.Jensen Inc’s off-line Separator on the steam turbine.
turbines. Among the most important (a/k/a kidney loop) HDU fine-filter More recently an HDU-type Fine
lessons Converse has learned over his solution for the gas-turbine control-oil Filter, similar to that serving the
career: “Stay ahead of the curve” on sumps (Fig 1). gas-turbine control-oil system, was
things having a significant impact on The plant engineer monitors control installed on the ST generator seal oil
reliability and performance, and pay oil quarterly, judging its condition pri- system. The major difference between
close attention to detail. marily based on the results of RPVOT, the two is that the latter is explosion-
The editors asked Converse to RULER, and acid-number tests. The proof.
share an example during a telephone HDU can mitigate fluid degradation
interview. He chose the lube- and conducive to the formation of acids and Why kidney loop
hydraulic-oil conditioning systems for insoluble oxidation products that could
his plant’s three turbine/generators. impede the operation of components Kidney loop or offline filters benefit
Background: Wildcat Point’s Mitsubi- critical to turbine control. users because they are independent of
shi Power 501GAC gas turbines have However, antioxidant depletion the fluid system and always in service
separate sumps for control and lube makes it necessary to replace control at an optimal flow rate—thereby avoid-
oil—the former 150 gal, the latter oil every two years, or so. “Having had ing pressure fluctuations and other
about 6900. Both systems are charged no unit trips attributed to control/lube- disturbances that might otherwise
with Idemitsu’s Daphne Super Turbine oil issues since commissioning, such negatively impact rotating equipment.
Oil MG32. attention to detail has paid dividends,” Plus, they achieve very fine filtration.
The Alstom steamer has a nominal said Converse. As Fig 1 shows, turbine fluids are
6600-gal combination sump for control The plant engineer’s familiarity withdrawn from the lowest point in

1. Wildcat Point
Wildcat Point Generation Facil-
ity, located in Rising Sun, Md, and
owned by Old Dominion Electric
Cooperative (ODEC), is a nominal
1000-MW 2 × 1 combined cycle. The
gas turbine/generators are Mitsubi-
shi Power 501Gs (air cooled); the
supplementary-fired heat-recovery
steam generators and steam turbine
were supplied by Alstom.
The oil/gas-fired project began
commercial operation in April 2018.
Transcontinental Gas Pipe Line Co,
a subsidiary of Williams Partners,
supplies gas to Wildcat Point via
its 11-mile Rock Springs expansion
project.
Cycle heat rejection is via a
16-cell counterflow mechanical-draft
tower. Cooling water is supplied via Plant site is near the Maryland/ equipped with four GE 7F peakers.
a 5-mile supply/discharge pipeline Pennsylvania border and adja- Power is delivered to the PJM Inter-
connected to the Susquehanna cent to The Carlyle Group’s Rock connection via a 500-kV switchyard
River. Springs Generation Facility, which is at the Rock Springs site.

68 COMBINED CYCLE JOURNAL, Number 71 (2022)


GAS AND STEAM TURBINE/GENERATORS

2. How to determine the ISO fluid cleanliness rating


Fit the counts in the right-hand column of the sample lab analysis (table at left)
to the appropriate range of particles per milliliter (ml) in the table at the right ISO cleanliness rating
to determine the Range Number defined in ISO 4406. (Range Number)
Example: The sample has 1752 particles larger than 4 microns (the first Up to an
number in the series), 517 larger than 6 microns, and 55 larger than 14 microns. More than including
The Range Numbers from the right-hand table expressed in ISO convention this no. of this no. of Range
are 18/16/13. particles per ml particles per ml Number
Keep in mind that 80,000 160,000 24
turbine journal bearing Sample particle count 40,000 80,000 23
and hydraulic servo- No. of 20,000 40,000 22
valve clearances dictate particles 10,000 20,000 21
the need for clean oil. Particle size, larger than 5000 10,000 20
Excessive bearing wear microns size at left 1752 particles per ml
larger than 4 microns 2500 5000 19
and servo-valve sticking 4 1752 1300 2500 18
can result if tight cleanli- 517 particles per ml 640 1300 17
6 517 larger than 6 microns
ness standards are not 320 640 16
maintained. Turbine 10 144 160 320 15
OEMs offer specific 55 particles per ml
14 55 larger than 14 microns 80 160 14
guidelines on recom- 40 80 13
mended cleanliness 20 25
20 40 12
levels, typically 50 1.3 10 20 11
16/14/11. Best prac- 5 10 10
tices suggest that ISO cleanliness testing be conducted quarterly or more 2.5 5 9
frequently depending on service duty. 1.3 2.5 8

Kidney-loop contaminant removal


systems in Jensen’s portfolio
Oil
system

Inline (last
chance) filter
HDU

System Air vent


pump

Oil reservoir
PTU 2. Filter disks are effective in remov-
ing varnish
Fig 2, made primarily of compressed
wood cellulose and cotton linters.
Composition of the filter inserts
Contaminated oil
may vary from the standard Jensen
Clean and offering where special requirements
dry oil
HDU, PTU, warrant. This has not been necessary
or VRU at Wildcat Point. Wegner notes that
VRU independent laboratory tests show
Contaminant removal system
1. Kidney-loop contaminant removal systems from C.C.Jensen Inc rely on a the Jensen filter inserts do not affect
stack of filter disks to eliminate particulate matter, water, acidity, and degradation the phenolic and aminic antioxidant
products from lube, hydraulic, gear, transformer, diesel, and other oils used in additive packages typically used in
powerplants. Composition of the filtration medium varies depending on the duty hydraulic/lube oil formulations for
powerplants.
the oil reservoir, removing sediment (1) remove particles 3 microns absolute Applications. The HDU and its
in the process. and larger, (2) absorb up to 1 gal of standard filter insert are designed for
All of the Jensen offline filters water per filter insert, and (3) remove use in applications except where water
installed at Wildcat Point—HDU, insoluble varnish. This performance ingress is expected. Special inserts
PTU, and VRU—are arranged in this is achieved by a stack of two or more are available for acidity reduction,
manner. Likewise, all are designed to filter inserts, such as those shown in dissolved-water removal, and soluble-
COMBINED CYCLE JOURNAL, Number 71 (2022) 69
GAS AND STEAM TURBINE/GENERATORS

3. Varnish factoids and turbine-fluids best practices


n There are more than 30 differ-
ent kinds of varnish; some are
colorless. When in doubt, add an
ultra-centrifuge (UC) test to your
MPC (membrane colorimetric
patch) analysis (Fig A). Recall
that the MPC patch is made
by isolating and agglomerating
insoluble by-products associ-
ated with varnish, the color of the
patch being a measure of varnish
potential. By contrast, the “g”
forces imposed on the oil sample
in the UC test extract insoluble
contaminants too small for nor-
mal particle counting. MPC value: 1 UC value: 4
n Varnish can be dissolved, A. That some varnishes are colorless is in evidence here with the MPC
insoluble, or cured, and its state test showing pristine lube oil (MPC value of 1) and the ultra-centrifuge result
depends on temperature and con- on the same sample having a UC value of 4 (scale is 0 to 8)—a varnish level
tact with air (Fig B). Varnish can of some concern
cover surfaces immediately when
it becomes insoluble.
n Hundreds of machine inspections
and oil analyses have shown that
(1) critical concentrations of var-
nish can be present with generally
acceptable antioxidant levels, and
(2) oil can be varnish-free with
completely depleted antioxidant
levels. Oil cleanliness is the deter-
mining factor.
n To assure accurate test analyses
for varnish, take oil samples when
the machine is running and in ther-
mal equilibrium. Testing of cool oil
will give lower-than-actual concen-
trations of varnish. B. Same turbine oil in the left and center bottles. At 140F (left), varnish is
n Testing for particulate contamina-
dissolved in the base oil. At 40F (center), it is insoluble—meaning the satura-
tion can be by the optical or pore- tion level of the varnish in the oil exceeds its solubility at the fluid tempera-
blockage methods. In the former, ture. Varnish is “cured” and no longer soluble in the base fluid when “baked
the oil sample is passed through a on” hot surfaces (thrust bearing shoe at right)
beam of light. Anything that inter-
rupts that beam is counted as a ence of water, soft contaminants, kidney loop system, the company
“particle.” The calibrated mesh and/or insolubles. recommends scheduling your
screen used in the pore-blockage n A sudden high-pressure alarm annual filter insert changes when
method captures only hard particu- from your kidney-loop filtration the oil is coolest–for example, at
lates. Thus, there can be a signifi- system likely is caused by water the end of an outage–before the
cant difference between the two ingress. system is returned to service and
results, depending on the pres- n When using a C.C.Jensen Inc the oil heats up again.

varnish removal. are limited in their ability to work reli- tion systems run 24/7/365 and that
The PTU is used mostly with steam- ably over long periods and to reduce the filter inserts be changed annu-
turbine lube-oil systems (and diesel-oil moisture levels to the 20 ppm often ally, when the pressure drop across
filtration systems) because of its abil- recommended today. the filter exceeds the recommended
ity to remove large quantities of water Jensen’s VRU typically serves on limit, or when oil analysis requires a
from the turbine fluid and discharge large gas and steam turbines where change—whichever comes first.
it automatically. large amounts of soluble varnish must A high pressure drop requiring new
Wegner says the PTU has advan- be removed from lube oil. A specially filter inserts can be caused by a leak
tages over dehydrators often used in designed filter insert removes dis- exceeding the water holding capacity of
ST control and lube-oil systems for this solved and suspended soft contami- the filter or by a high concentration of
application—including lower capital nants by polar attraction and alerts on particulates in the turbine fluid. Wear
and operating costs, ability to remove varnish saturation by high pressure. and tear of mating parts and rusting
particulates and varnish, and faster The varnish-free oil produced cleans of carbon steel components—such as
water removal. However, dehydrators all system components it comes in the oil reservoir—contribute to the
may be beneficial in systems charged contact with, ultimately reducing the latter. Wildcat Point avoids rust to the
with fluids having poor demulsibility level of varnish in the full charge of degree possible with oil sumps made
(don’t shed water easily). Centrifuges, fluid to near zero. of stainless steel.
a third alternative for water removal, Jensen recommends that its filtra- Regarding control of particulates,
70 COMBINED CYCLE JOURNAL, Number 71 (2022)
Wegner says that begins when the your knowledge of ISO cleanliness within recommended specifications.
oil is purchased. He urges filtering ratings. Jensen changes out filter elements
new oil or specifying a required ISO Sidebar 3 offers best practices on annually and performs all PMs called
cleanliness level at that time to avoid turbine fluid systems and varnish. for in its O&M instructions. Any
receiving a fluid that may be dirtier Extended warranties and service. interim issues are responded to in
than that called for by manufacturers There’s only so much plant personnel timely fashion and there have been no
of servos and other hydraulic control can handle today given busy schedules, delays in service and in the receipt of
components. new operating regimes, etc. Converse necessary parts. As noted earlier, “no
Based on his experience, you can said Wildcat Point opted for Jensen’s failed starts” is the objective and the
expect an average contamination level extended warranties and service to fluid systems for the principal rotating
of about 19/17/14 unless you write a keep equipment running the way it equipment at Wildcat Point continue
tighter spec. Go to Sidebar 2 to refresh should, maintaining turbine fluids to meet these expectations. ccj
COMBINED CYCLE JOURNAL, Number 71 (2022) 71
T
he Steam Turbine Users tion, and questions to consider asking the morning session, advising users
Group officially launched during a design review. on what to focus on during their first,
at its first meeting in Rich- The afternoon session features user second, third, and later majors. Discus-
mond, Va, August 2014. In its presentations and roundtable discus- sions on long-term planning and life-
infancy, the all-volunteer organization sions. Two of the topics available at cycle management follow. Inspection
focused primarily on the GE A10 and press time: Turning-gear maintenance and maintenance of Rexroth actuators
D11 steam turbines used in combined and failure, and two failure modes for for turbine valves takes the group to
cycles. Today, it covers steamers for crossover bellows. the mid-morning break.
combined cycles made by all the lead- Tuesday, August 30. The morning GE steps to the podium after
ing OEMs. is devoted to presentations by leading refreshments and holds the mic until
The 2022 meeting will be the group’s vendors: C.C.Jensen, EthosEnergy closing at 5:30. The lineup of topics:
second visit to San Antonio (2016). It Group, Oilkleen, Advanced Turbine n Recent TILs and top issues.
also has met in St. Louis twice (2019 Support, Cutsforth, and Independent n Importance of insulation and indica-
and 2021) and once each in Louisville Turbine Consultants. The titles: tors of concern.
(2018), Phoenix (2017), Orlando (2015), n De-mystifing varnish analysis and n Service best practices.
and Richmond. There was a virtual mitigation. n Water-induction impacts and poten-
conference in 2020. n In-situ repair and upgrade of LP tial root cause.
turbine blades. n Outage planning and forecasting

2022 n Keys for a successful transition to emergent work based on fleet expe-
a new turbine fluid. rience.

conference n Steam-turbine cycling risks. n Improving outage OTD (FieldCore).


n Condition-based turbine monitor- n Upgrade experience.

overview
ing. n Combined-cycle steam-turbine out-
n Steam-turbine valve maintenance. age 101.
First half of the afternoon session Thursday, September 1, is devoted
Sessions are user only, with this excep- will be conducted by Siemens. Top- to user presentations and roundtable
tion: Representatives of companies ics include erosion monitoring and discussions until the meeting concludes
exhibiting at the vendor fair on Mon- corrective actions, troubleshooting at noon.
day can sit in on the Tuesday morning rotor vibration, and a replacement

2021 user
presentations. Presenting vendors are steel blade for the existing titanium
allowed in the room only when it is L-0 fleet.

presentations
their time to present. User presentations and roundtable
Expectation is that most of this discussions are scheduled following the
year’s presentations will be made refreshment break. A topic that should
available to owner/operators through be of great interest to attendees is LCC 15 Spring 21 outage HP/IP, LPDF,
the Power Users website a few months “Pinned L-0 buckets: Variability in UT valves
from now. Slide decks from previous inspection results and pin removal.” Results of the spring 2021 outage—
meetings already are accessible to reg- Wednesday, August 31. MD&A findings and repairs/replacements—
istered users. If you are not registered, takes the reins for the first half of are presented in bullet-point fashion
sign up now at www.powerusers.org: for this 2 × 1 M501F-powered com-
It’s easy and there’s no charge. bined cycle with 40-in. titanium L-0
Monday, August 29. The first-morn- Steering committee, blades. Service history: 67,000 hours;
ing training session for steam-turbine 2022 475 starts. Rubs, clearance/alignment
users focuses on a topic of interest to issues, erosion, LP exhaust-hood vibra-
Eddie Argo, Southern Company
many owner/operators today: Evalu- tion, etc, were addressed. Turning gear
Jake English, Duke Energy
ating equipment and/or component was replaced and the original repaired
Jay Hoffman, Tenaska Virginia Gen-
upgrade considerations. The program and put into inventory.
erating Station
will be conducted by Team EPRI. It Bearing vibration increased from
Connor Hurst, Teco Energy
will begin with the question, “What pre- to post-outage but remained
Mark Johnson, FPL
pain points are users experiencing below the action limit of 4 mils and
John McQuerry, Calpine
regarding equipment replacement con- considered acceptable for long-term
Matt Radcliff, Dominion
siderations?” Takeaways will include operation. Eccentricity also increased
Lonny Simon, OxyChem
guidance on how to build and solicit an from pre- to post-outage from -1 to -2.5
Seth Story, Luminant Generation
effective bid specification, the impor- mils but the cause was not determined.
Services
tance of quality oversight and execu- However, the eccentricity is steady and
72 COMBINED CYCLE JOURNAL, Number 71 (2022)
TURBınE ınSULATıOn AT ıTS FınEST

has not impacted operation. system; its rubber-seal life expectancy available? Three choices: Normal,
Journal- and thrust-bearing metal was eight years. overhung, and super-overhung. The
temperatures post-outage remained During a recent inspection, the speaker acknowledges that old-school
below the action limit despite all the floating ends of the coolers were heavy weights are no long used given
drive-train adjustments made during checked and oil was found weeping the belief they came out at speed, in
the outage. from the seals, indicating a possible at least some cases.
hydrogen leak. Also observed: Several The rotor is hot: How long can you
ST valve maintenance issues of the lantern-ring retaining plates be off-gear? Some say no more than
Review of steam-turbine valve were bent. Overtorquing of bolts was 10 minutes with a hot rotor, although
maintenance issues encompasses units believed the cause. others have been off longer. “Listen
serving in both conventional steam After cooling lines were discon- for rubs when you re-engage” was a
plants and combined cycles. The many nected and lantern rings disassembled, suggestion. What’s the best way to roll
cutaway drawings of valves might staff found oil and debris around the the rotor, given there’s not enough con-
prove valuable for training purposes. cooler sealing area. Housekeeping, trol with the turning gear? There are
Presentation highlights include the seal maintenance/replacement, and several alternatives, including a pipe
following: straightening of the lantern-ring threader and air ratchet/drill.
n Recommended maintenance inter- retaining plates were among the cor- Next question: Any tricks for mak-
vals. rective actions taken. ing balance-shot removal possible?
n Technical bases for maintenance You’ll have to review the slides to
intervals. Balance shot on a hot rotor (D11 steam get this answer, as well as to see the
n Technological differences among turbine) results of a two-day plot of eccentricity.
valves from different manufactur- The speaker declares at the outset
ers. Plus, areas considered most that this is not a presentation, rather HP/IP rotor end-of-life concerns
likely subject to degradation. it is a quiz. Whatever, it’s worthwhile This case study reports the findings
accessing the slide deck. He begins of a KN steam-turbine major on a 2003
Taft Cogen cooler maintenance with the question: After you identify unit purchased from the original owner
Personnel at this 800-MW 3 × 1 high vibrations, what do you do? And in 2017. History: 76k operating hours
combined cycle noted that generator then lists the three things he did to and approximately 1900 starts, which
hydrogen usage was increasing over move forward. Next question: What translates to about 124k EOH accord-
time to maintain purity. Hydrogen special tools do I need? Then: Where ing to the OEM’s calculation. The HP/
leaks appeared after about two years do the weights go? Photos and a cross- IP rotor was sent to Siemens’ shop for
of service; cooler seals were leaking sectional diagram of the turbine assist a complete technical evaluation.
from the bottom. Cooling water was in understanding the approach taken. It revealed rotor hardness levels at
sourced from the closed cooling-water What balance-weight options are the HP and IP inlet grooves were less
COMBINED CYCLE JOURNAL, Number 71 (2022) 73
STEAM TURBINE USERS GROUP

than previously observed by the OEM ing potential are the following: rotor told. Better blade tip seals also can
for other steamers inspected in the KN and blade-attachment creep-fatigue, help reduce losses caused by leakage
fleet. A table giving inspection results casing distortion, rotor deformation, between stationary diaphragms and
estimated remaining life at 11 rotor and diaphragm dishing. rotating blades.
locations given the reduced hardness Low-temperature risks evaluated Other sealing solutions described
properties. Most troubling was that at include rotor-shaft high-cycle fatigue, include the following:
the IP second-stage blade groove, 78% L-0/L-1 attachment and pin fatigue/ n Articulated inlet seals to replace
of rotor life had been consumed with stress corrosion cracking, L-0 blade conventional snout rings, which
respect to localized creep-fatigue—99% HCF, and L-0 leading- and trailing- control steam leakage at the tur-
considering material properties with edge erosion. bine inlet between the inlet pipe
reduced hardness values. and outer and inner shells.
Options for dealing effectively and Combined journal and thrust bearing n Anti-swirl packing rings that reduce
economically with the findings were This presentation features photos steam-whirl destabilizing forces,
evaluated and rotor replacement in of thrust axial position keys as found, significantly increasing rotor sta-
2023 offered the best balance of reli- thrust pedestal condition as found, new bility margin.
ability and risk avoidance given the hardened key design, bearing-support n HP/IP midspan joint leakage at the
operational flexibility the owner sought repairs, and L-0 blade arch binding on N2 packing box is minimized by
in both unit dispatch and turndown. 40-in. steel airfoils. However, the slides using improved materials, a double-
offer virtually no written explanation, nut arrangement, and increased
Industry L-0 erosion issues so if you’re not a steam-turbine expert preload (Fig 2).
Presentation begins with an over- it’s unlikely you will gain much from The benefit of upgrading shaft and
view of erosion issues on 40-in. L-0 this PowerPoint. tip seals and snout rings to the Ethos-
blades for a nominal 500-MW Toshiba Energy SMART seal™ designs is said

2021 vendor
four-flow steam turbine which photos to be a reduction in heat rate of from
show to have exceeded the level of dam- 2% to 4% and an increase in output of

presentations
age expected. Measurements taken from 4% to 7%.
to assist in corrective action, erosion
findings for other units in the Toshiba Advanced rotor-straightening technol-
fleet, and options for refurbishment or Considerations for reducing trailing- ogy, EthosEnergy
replacement are given. edge erosion, Siemens Energy The first few slides review (1) the
Next, photographic evidence of ero- Trailing-edge erosion, attributed root causes of rotor bow (including rub-
sion of last-stage blades from Alstom, to moisture droplet impacts, has been bing during startup, water induction,
Mitsubishi, and GE show this to be an observed on the suction side of some and foreign object damage) and (2)
industry problem—generally speaking. L-0 blades near the base of the airfoil traditional rotor straightening meth-
Final slides in the deck offer a sum- (Fig 1). This easy-to-understand, com- ods. EthosEnergy’s advanced rotor
mary of technologies for inspecting prehensive, presentation with excel- straightening technique (Fig 3), said to
installed blades—both reaction and lent graphics explains the damage have been applied successfully on more
impulse types. Simplified illustra- mechanisms and sources of moisture, than 150 rotors—including some with
tions make this material, based on with a focus on spray-system consider- bows exceeding 200 mils—is detailed
EPRI research and test results, easy ations. Conclusion: Poorly coordinated, in the remainder of the presentation.
to comprehend. configured, and/or maintained spray A case history is included.
systems can lead to elevated rates of Metallographic analysis, magnetic
Considerations for cyclic operation trailing-edge erosion. particle inspection, FEA, and engi-
An overview of recommended main- neering all play a role in the success
tenance intervals, and the technical SMART Seals™: An advantage in of the technique, well described with
basis for them, gets the reader involved today’s challenging steam-turbine diagrams and photos.
quickly. A risk-informed approach to environment, EthosEnergy
interval optimization provides users Reason to review this presenta- Advanced single-layer turbine warm-
a road map and includes a table of tion on the Power Users ing system, ARNOLD Group
equivalent-hours calculations and website: Audits indicate Pierre Ansmann opened
target hours for valves and turbine that around 70% of steam- his presentation on “the most
majors for machines manufactured path losses can be attrib- advanced turbine insulation
by Alstom, GE, Hitachi, Mitsubishi, uted to operating with combined with a high-per-
Siemens, Westinghouse, and Toshiba. excessive seal clearances. formance heating system to
Examples of different OEM steam- On a 300-MW steam tur- improve startup flexibility,” by
Area of
turbine designs and degradation areas bine this can equate to interest summarizing its value proposi-
are of particular value to owner/opera- about $300,000 in fuel cost tion thusly:
tors with a mixed bag of turbines in and a $1.2-million loss in n Increased in-market avail-
their fleets. Example: Areas of concern annual generation—while ability.
for the D11 include steam-path SPE, increasing CO2 emissions n Lower startup costs.
diaphragm dishing, HP and IP inlet by up to 25,000 tons/yr. n Reduced thermal fatigue
sealing, N1/N2/N3 gland casings, rotor One area of focus is and longer mean time to repair
bow, low-cycle fatigue at wheel-inlet labyrinth seals which con- for critical components.
transitions, and N2 creep deformation. tribute to reduced turbine
Tables of high- and low-tempera- performance when they
ture steam-turbine high-impact risks suffer mechanical dam- 1. Trailing edge erosion,
benefit all those with responsibilities age and thermal distor- associated with moisture-drop-
for steamers. Among the high-temper- tion. Retractable packing let impacts on some L-0 blades,
ature risks evaluated for impact, driv- and brush seals mitigate can lead to crack initiation and
ers, traditional detection, and monitor- losses, attendees were possibly airfoil liberation
74 COMBINED CYCLE JOURNAL, Number 71 (2022)
Varnish below MPC 5 - Always - Guaranteed!
The only system that works without chemicals
and shows when the inserts are full!

Benefits
Varnish on journal
bearing, gas turbine

• Increase turbine reliability


and availability

• No valve sticking of e.g.


Varnish on
lifting or tripping system valve spool
Install a
• Prolong lifetime of your oil CJC™ Varnish Removal Unit
- for Gas & Steam Turbines
• Low maintenance costs
Before and after
and avoid
installation • No system flushing Turbine Trips! Varnish on plate
of a CJC™ Varnish Contact us - today heat exchanger
Removal Unit, VRU

C.C.JENSEN Inc.
Newnan, GA | USA | +1 770 692 6001 | ccjensen@ccjensen.com | www.ccjensen.com

n Increased operating flexibility. the zone is responding correctly and shutdown. Results are the following:
The ARNOLD system features at the specified temperature. Below n Temperature control setpoint, 750F.
interlocking high-performance blan- every heating zone, multiple t/cs are n System cooled naturally from 1000F
kets which conform perfectly to the mounted on the casing to confirm even to 750F where the casing upper-to-
turbine surface. High-quality materi- heating of the turbine (Fig 4). lower differential reached only 40 deg
als and manufacturing, and long-term A properly maintained ARNOLD F; previous shutdowns the differential
high-temperature resistance, allow insulation system is said to maintain had reached as high as 100 deg F.
the company to guarantee reuse of your turbine in a hot-start condition n The warming system maintained
its insulation system for 15 outages for at least four or five days after 750F casing surface temperatures
without a decrease in efficiency. shutdown. No preheating of the unit for over 100 hours and reduced the
Dozens of thermocouples, strategi- is required prior to a start within this upper-to-lower casing differential
cally located on the turbine, ensure time period, reducing startup fuel con- from 40 deg F to around 10 deg F
proper heating. Each of the 18 or so sumption and auxiliary power. during that time.
heating zones has t/cs installed on A case study attests to the value n Differential expansion limits never
the heating wires to double check that of this warming system for a 100-hr were exceeded, and the turbine
restart was normal and comparable
to previous starts.

Solid particle erosion on combined-


cycle units, Independent Turbine
Consulting
This case study reviews main-stop-
valve damage on a D11 steam turbine,
discovered during the spring 2020 out-
age and determined to be related to
solid particle erosion (SPE). It covers
discovery of the problem, investigation
(including the sources of the particles),
and solution—including mitigation
strategies. The nominal 200-MW tur-
bine, an integral part of a 2 × 1 combined
cycle, was approximately 10 years old
and had accumulated about 53,000
hours of service and nearly 600 starts.
Severe SPE was found on the valve
2. Upgraded N2 packing can help maximize the value and extend the life of stems as shown in Fig 5. Exfoliation of
your steam turbine HRSG tube material was the source of
COMBINED CYCLE JOURNAL, Number 71 (2022) 75
STEAM TURBINE USERS GROUP

crack existed prior to rotor teardown


and inspection.
Repairs described were success-
ful and the rotor and diaphragms
returned to the plant on schedule.
There were no major issues on reas-
sembly and restart was described as
“smooth.” Following one test run that
revealed vibrations were better than
pre-outage and upwards of 10 MW
was recovered, the unit was released
for service.
The second turbine, rated a nomi-
nal 500 MW, also gave no indication
of issues during operation. However, a
shop visit for inspection was motivated
by previous corrective work on HP/
IP rotor cracks requiring major weld
repair as well as borescope inspec-
3. Advanced rotor straightening method developed by Ethos Energy is a tion results that showed nozzle-block
proven technique that has been used successfully on more than 150 rotors, retention hardware was failing and
some with bows exceeding 200 mils foreign objects were lodged in the first

4. Single-layer insulation and step-protection system from Arnold is installed at left. All electrical connections, center and
right, are moved away from the casing

6. Drop-in solutions
have been performed
by Doosan in more
than 30 locations
worldwide
Solid particle erosion
in Houston—includ-
5. Damage to main stop valve for a ing gas- and steam-
D11 steam turbine, discovered during turbine component
an outage, was attributed to solid par- repair, rotor inspection
ticle erosion and assessment, weld-
ing, heavy mechanical
the particles. Solution: Improve water work, parts, onsite ser-
chemistry. vices, etc.
Guidelines for dealing with the The meat of the presentation is reaction-stage stationary blading.
aftermath of SPE are covered in GE’s two detailed rotor-repair case studies Indications were characterized, a
Technical Information Letter 1739. with many drawings and photos to machining plan developed, and geo-
make them easy to understand and metric mods performed before final
Repair approaches for aging steam- expand your knowledge of the pro- NDT of the complete rotor. Planned
turbine rotors, Doosan Turbomachin- cesses involved. Both rotors began repair schedule was maintained and
ery Services commercial baseload operation in the unit reassembly and restart were gen-
Come up to speed on Doosan’s capa- second half of the 1960s and had been erally smooth.
bilities by accessing this presentation. transitioned to peaking service.
It begins with a short overview on The first case is about a 360-deg Steam-turbine valves, MD&A
the parent company’s activities in the circumferential crack in the midspan Presentation is a primer on the
power industry and beyond. Highlights balance-weight groove of a nominal inspection, repair, and reassembly
include drop-in replacements for major 400-MW unit—confirmed by mag parti- of steam-turbine valves that offers
steam-turbine sections, such as the cle inspection with follow-on ultrasonic guidance on specific repairs, as well
HP/IP, as shown in Fig 6. inspection to estimate crack depth and as repair options, for several types
Next is a review of Doosan Tur- develop a repair approach. There had of steamers serving in combined-
bomachinery Services’ capabilities been no operational indication this cycle plants (Fig 7). Strainer baskets,
76 COMBINED CYCLE JOURNAL, Number 71 (2022)
control-valve seats, and steam chests
and their rebuild are covered. This
slide deck is worth reviewing each 2021 OEM presentations
time valve inspection and repair are
required. GE Day was Thursday, August 26. It Power Users website. Access them
opened with an hour pre- on the OEM’s MyDashboard website
sentation by Mike Jones at https://mydashboard.gepower.com.
and Matt Foreman on Siemens Energy participated in
recent Technical Infor- the STUG meeting with the following
mation Letters and top three presentations on Wednesday
issues. L-0 fleet lessons morning (August 25):
learned was next with n “Improving capability and flexibility
Jason Crowe at the podi- of existing combined-cycle power-
um. Dave Welch followed plants through plant assessments,”
with two presentations Jim Badgerow.
after the break: “Proactive n “Applying advanced digital appli-
maintenance to prepare cations to empowering traditional
for increased cyclic opera- fossil power stations to operate with
tion” and “Rotor end-of- the demands of the ‘new normal’ in
life/assessment.” Crowe the ever-changing North American
concluded the morning power market,” Galen George.
program with “Alignment n “Blade erosion reduction strate-
and clearances.” gies,” Steve Radke.
Welch started the Only the third presentation is
afternoon with a presen- available in the STUG sector of the
tation on turbine valve Power Users website. For the first
maintenance. Jason two, go to the Siemens’ Customer
Bowers was next with Extranet Portal (https://siemens.
“Upgrade experience: ASP force.com/cep). If your organization
and next-gen valve.” Open owns and/or operates Siemens power-
discussion followed until generation equipment and you do
the session concluded at not have access to that portal, use
the afternoon break. the link to request it. Or contact the
7. Repair of steam-turbine valves is an MD&A The GE presentations Siemens representative for your com-
specialty are not available on the pany/plant.
COMBINED CYCLE JOURNAL, Number 71 (2022) 77
Legacy Turbine Users Group

T
he 7EA Users Group has been include the following: Issues identified
serving owner/operators of across the fleet during recent inspec- Steering committee, 2022
GE Model 7EA, A, B, C, and tions, rotor-blade/stator-vane clashing, Dale Anderson, East Kentucky
E gas turbines for more than in-situ compressor- and turbine-blade Power Co-op
a quarter of a century. Today, the OEM blending advancements, new TILs, and Joshua Coots, Duke Energy
refers to this group of units collectively generator robotic inspections. Tracy Dreymala, EthosEnergy
as 7E, which can be confusing to some. Presentations by vendors take up Group, San Jacinto Peakers
Rumor has it that the naming conven- most of the time remaining until the Jeff Hansen, Old Dominion Electric
tion will be clarified at the 2022 con- vendor fair—covering anti-condensa- Co-op
ference, August 29 to September 1, at tion measures for metal-enclosed bus, Guy LeBlanc, IHI Power Services
the San Antonio Marriott Rivercenter. 7EA root-cause analysis process, and Corp
A bit of history. The first two Frame exhaust-frame mods and upgrades. Tony Ostlund, Puget Sound Energy
7 package power plants (PPP)—the Tuesday, August 30. The 7EA meet- Mike Vonallmen, Clarksdale Public
lingo used by GE decades ago for its ing traditionally has been one to focus Utilities
gas turbine/generators “packaged” on presentations by vendors. Those Lane Watson, FM Global Chemical
for rapid deployment where power participating this year: PSM, Sulzer, Operations
was needed—were ordered by Long MD&A, GTC Control Solutions, SVI
Island Lighting Co and installed in the Industrial/SVI Dynamics, AP4 Group, repair facility. This is the same tour
summer of 1971—one at the utility’s Veracity Technology Solutions, AGT that was offered on Monday.
West Babylon plant, the other at its Services Inc, and National Breaker
Shoreham Plant (a/k/a Wading River).
The nominal 52-MW distillate-fired
Services.
The topics: Hydrogen combustion 2021 user
units were still in standby service and
equipped with their original Mark I
in B/E-class gas turbines, no-leak
seal for the DLN primary fuel nozzle, presentations
Speedtronic™ control systems when rotor life assessment, lessons learned
the editors contacted National Grid, during controls upgrades, common Lessons from the field: Circuit-break-
the current asset owner, last year. problems with exhaust systems and er maintenance practices
Today, there are roughly 1200 silencers—a case study, OEM versus Breaker events profiled in this slide
7Es (new GE designation) in service non-OEM controls, quantifying cor- deck include the following:
worldwide—three-quarters of them rosion pitting using advanced NDE, 1. New breaker failure at a 7E simple-
are 7EAs. 7EA generators and how minors turn cycle plant.
into majors, reducing thermal stress 2. Vacuum-bottle failure at a hydro

2022 on GACs.
Wednesday, August 31, is GE Day,
plant.
3. Catastrophic breaker overheating.

conference featuring presentations and breakout


sessions until the gavel comes down at
4. Single-pole failure of a 115-kV
breaker.
overview 5 p.m. The breakout roundtables cover
the waterfront: cogeneration, peakers,
The takeaways from these events
provide valuable “lessons learned.” For
Monday, August 29. Owner/opera- repairs, controls and software, asset the first, the presenters’ experience
tors attending the 7EA meeting have management for casings and rotors, confirmed that modern relaying can be
two options for the opening morn- field services, generator recommenda- of considerable helping to speed-up the
ing’s training sessions: Tour MD&A’s tions, accessories and balance-of-plant troubleshooting time after an electri-
gas-turbine parts manufacturing and tips, repairs/field services. cal trip. The second showed vacuum
repair facility (transportation provided Thursday, September 1. Vendor bottles have a finite life. More specifi-
if you reserve a seat at the registration presentations on extending the ser- cally, dc hipot/bottle integrity tests do
desk) or participate in a short course on vice lives of gas-turbine components, not give an indication of future life.
legacy engines designed both for new- and full-rejuvenation heat treatment Takeaway from No. 3, illustrated
comers as well as experienced users of GTD111DS, are included among with circuit and logic diagrams, and
who could benefit from a refresher. several user presentations and round- photos of damage: Breaker forced-
The afternoon session kicks off with table discussions not firmed up at cooling apparatus is important if it’s
Mike Hoogsteden’s (director of field press time. The meeting concludes applied. Action items: Act on alarms,
services for Advanced Turbine Sup- at noon for all not interested in join- check runback levels, maintain cool-
port) not-to-miss annual presentation, ing the MD&A tour of the company’s ing fans, and correct failing switches.
“State of the 7EA fleet.” Key topics gas-turbine parts manufacturing and Important: Spare breakers can be a
78 COMBINED CYCLE JOURNAL, Number 71 (2022)
life-saver.
High-side/substation breaker reli-
ability is critical, attendees were told.
Ensure the plant, or transmission util-
ity, is providing proper maintenance
and upgrades.
Review your Generation Intercon-
nection Agreement regarding respon-
sibilities, if your plant has one. In any
case, proper and regular maintenance
must be performed on all components
to ensure reliability.
Guidance on the maintenance
required is provided, along with the
timing of tests, what good results look
like, and data interpretation. Bear in
mind that roughly half of all breaker
performance failures are attributed to
lubricant degradation, improper selec-
tion, and/or misapplication.
A lunch-and-learn session in the
plant break room might be in order to
familiarize staff with breaker assem-
bly and components, troubleshooting,
spare parts, the importance of proper
bolt torquing, and where to find the
breaker manuals when they’re needed.

In-situ fuel-nozzle flow testing


Presenters describe positive results
in using a portable air-flow test stand
(PATS), a/k/a portable flow bench, to
conduct fuel-nozzle testing in-situ
rather than removing fuel nozzles from
the gas turbine and sending them to a
shop for that purpose. Important point:
This owner has a fleet of well over a
hundred gas turbines.
The PATS was said to provide a
direct measurement of the engine’s
fuel-nozzle characteristics, with the
ability to isolate the problem to a single
combustor position/circuit and possibly
eliminating fuel-nozzle flow as a cause
of the issue being dealt with. Several
slides describe how PATS works and
the infrastructure support required
to conduct testing—for example, more
than 80 cfm of clean, dry air.
Case studies are summarized for
the following engines:
n 501FD2 (DLN)—high blade-path
spreads, with cold spot.
n 7F (DLN 2.6)—high exhaust
spreads after an outage, with cold environment). company’s director of field services,
spot. n Not all combustion issues can be which is of significant value to plant
n 7EA—high exhaust spreads after solved with flow testing. personnel for its many illustrations,
a liquid-fuel run, with cold spot. n Easier when fuel-nozzle flow targets highlighted GE Technical Informa-
n 7EA (DLN 1)—high exhaust spreads are available to compare to “spec.” tion Letters (TIL) users should become
after an outage, with no hot/cold familiar with, in particular—including
spot.
In closing, the speakers shared 2021 vendor the following:
n TIL-1854, “Compressor Rotor Stag-
what challenges colleagues might
encounter with in-situ flow testing, presentations es 2 and 3 Tip Loss,” suggests
blending and tipping to mitigate
including these: the impact on availability and reli-
n Access to air of the quantity and What we are seeing in the 7EA fleet ability of Row 2 and/or R3 tip loss.
quality required. during our inspections, Advanced n TIL-1884, “7EA R1/S1 Inspection
n Possible limitations of PATS given Turbine Support Recommendations,” addresses the
ambient-air characteristics where The 2021 version of this annual need to inspect R1 and S1 airfoils
used (not a controlled repair-shop presentation by Mike Hoogsteden, the for possible damage caused by
COMBINED CYCLE JOURNAL, Number 71 (2022) 79
clashing—the unwanted contact informs users on the need to moni- saving thousands of vanes (Fig 1).
between the leading edges of S1 tor the condition of compressor The pinning technique, developed
stator-vane tips and the trailing shims and correction actions avail- by Rodger Anderson, who began his
edges of rotor blades in the platform able to mitigate the risks of migrat- career as a member of GE Frame 7
area. ing shims. compressor design team, has been the
n TIL-1980, “7EA S1 Suction Side subject of several CCJ articles over the
Inspection Recommendations,” Compressor stator-vane looseness: years. What to look for during your
advises users to inspect for crack What to look for and what to do, CTTS next compressor inspection in terms
indications on S1 vanes made of (a/k/a Core Tech) of shim migration and vane looseness/
Type-403 stainless steel, regardless Pinning is a relatively low-cost and damage is described in the slide deck
of whether clashing damage is in quick solution for gas-turbine owner/ along with the likely causes.
evidence on S1 and R1 airfoils or operators challenged by compressor
not. stator-vane looseness. More than 200 Emergency rotor support services—a
n TIL1562-R1, “Heavy-Duty Gas engines have been “pinned” in the last case study, Sulzer
Turbine Shim Migration and Loss,” 20 years, avoiding engine damage and The borescope inspection of a sim-
ple-cycle 7F unit revealed severe dam-
age in compressor rows 14 through
the exit guide vanes (Fig 2 left). The
owner/operator needed the unit back
in service ASAP. Slides detail the
steps taken to assure proper correc-
tive action—from inspection to rotor
disassembly to parts replacement
with shop-manufactured components
to reassembly (Fig 2 right) to rotor
balancing to preparation for shipment
to the plant—in only 36 days.
Details presented in the slides pro-
vide a valuable learning experience for
the plant team.
The second part of the presentation
gives details on Sulzer’s capabilities,
1. Loose ring segments in compressor stages S17, EGV1, and EGV2 are repair history, shop capabilities, rotor
secured as shown using spring pin dampeners life assessments, and field services.
80 COMBINED CYCLE JOURNAL, Number 71 (2022)
inspections to satisfy the requirements shallow surface discontinuities which
Analysis of inspection protocols for of TIL-1884 (see first item above). The experts believe were caused by one or
S-1/R-1 clashing, Veracity Technology units were equipped with C450 sta- more of the following: environmental
Solutions tors, which exhibited signs of corrosion conditions, possible stress corrosion
The goal of an inspection protocol lockup in the lower half after nearly cracking, and high-cycle fatigue (from
should be to provide the highest sensi- 11,000 fired hours and 2000 starts. An stator lockup in the vane carrier).
tivity for flaw detection and determine eddy-current inspection was specified; Conclusions: The use of traditional
an inspection frequency that gives the a fluorescent penetration inspection penetrant methods may not be effec-
inspector the most opportunities to was conducted as well to validate the tive for detecting the types of cracks
detect a flaw before the defect becomes findings. found. Only after the stators were
catastrophic. Many indications were identified removed and sent to the shop did the
In the example given, two units and are shown in the slides. Analysis inspection team identify all of the
were undergoing their annual NDE revealed the cracks emanated from flaws using its proprietary inspection

2. Compressor damage as-found is at left. Repaired, stacked, stretched compressor rotor is married to the repaired tur-
bine rotor at right. A unit rotor balance was done before progressive blade/balancing of the turbine section
COMBINED CYCLE JOURNAL, Number 71 (2022) 81
CCGT / HRSG Chemistry Experts

+ Cycle Chemistry Audits


+ New Project Specifications
+ FAC Management
+ Chemistry Investigations
+ Cycle Chemistry Training

www.thermalchemistry.com
+64 21 843 762
info@thermalchemistry.com
NEW ZEALAND

technique. presentation is a good place to start. It up? And even if they were, the upper
It’s important to note that swap- focuses on controls mods, generally far portion of the duct remains out of sight.
ping out of the C403 stainless-steel less costly than hardware changes, to The presentation begins with a list
stators installed on older machines consider. Example: Control mods can of critical bus-duct components: Flex/
with C450 components recommended enable the transition from normal to bolted connections (current carrying),
by the OEM may not provide the level fast starts (Fig 3). expansion bellows/joints, insulators
of asset protection desired. The bottom and mountings, seal-off bushings,
line: It’s imperative to be diligent on Bus maintenance in action, RMS grounding, and insulated joints. Fig
your inspection protocol. Energy 4 shows some of the damage one can
Bus duct is relatively easy to main- expect without a rigorous monitoring/
Getting your 7EA ready for increased tain. Keep it dry, clean, and cool, the inspection plan.
run time, Emerson RMS Energy experts say, and your Monitoring equipment/techniques
If you’re looking for a checklist of problems will be minimal. But how suggested include these: Thermocou-
action items to improve the run times many plant personnel do you see ples and infra-view camera to moni-
of your units, reading through this walking around outside and looking tor components remotely and initiate
100 alarms. Electromagnetic signature
analysis (EMSA) is a valuable online
Warm
Crank up Acceleration diagnostic technology that can support
80
maintenance decisions based on real-
Fast start
time operating conditions. It can save
Speed, %

60 critical shutdown time by eliminating


Fire on the need for offline testing.
40 Several case studies with before/
after photos are instructive.
Normal start
20 The GTC quick solutions package,
GTC Control Solutions
0 Five case studies encompass this
1 2 3 4 5 6 7 8 9 10 11 12
Approximate time, min presentation; four are explained below.
The first describes a single point of
3. Controls modifications reduced a normal 12-min start to about 8 minutes failure. Problem: A high differential
fairly easily for the 7EA example shown: start to purge speed now is less than among ambient-temperature ther-
half a minute, the purge 1.5 minutes, ignition and warmup to reach 25% speed mocouples (t/cs) was causing a “not
less than half a minute, acceleration from 25% to 100% about five minutes, and ready to start” situation. There were
synchronization about half a minute two compounding issues: The first was
82 COMBINED CYCLE JOURNAL, Number 71 (2022)
sub-optimal location of the t/cs. This ISO 9001
second: A “no high differential” was a Certified Quality
start permissive—that is, a high dif- Management
ferential would result in a “not ready Systems
to start” condition.
The fix: Two t/cs were relocated to
prevent erroneous temperature mea-
surements. Plus, the “no high differ-
ential logic” as a permissive to start
EMERGENCY OR PLANNED OUTAGE?
National Electric Coil’s Generator Services
was changed to “two out of three t/cs Group will be at your site day or night,
failed.” The latter assures that if one helping you get your generator back online
t/c fails, operators receive an alarm as quickly as possible.
but will still remain ready to start; two
failed t/cs interrupt the start sequence. Our team of generator engineers, project
Case 2 involved an LM5000, which managers, logistics expeditors and experienced Rotors
has two speed pick-ups per shaft. site technicians are ready to help Inspections & Testing
Originally, the “Hi-Select” determined you determine the best short- New or Refurbished Windings
speed. Thus, one failed hi-detector and long-term options for • Copper or Aluminum
trips the unit. Solution was to check returning your unit • Any Cooling Design
inputs and reject “out-of-limit” values. to service. • Any Profile: C, E or other
Case 3 involved an LM2500 with Full-Service Balance Pit
very hot starts. Over-temperature trips Stators • Overspeed Testing
occurred during startups. Diagnostic Inspections & Testing
• Running Electrical Tests
Winding Manufacturing
alarms indicated a loss of P2 pressure • Thermal Sensitivity Testing
Rewinds & Overhauls
feedback. Solution was a logic change • Vibration Analysis
Core Restacks
to “IF on temperature control during
Rewedges
startup THEN trip.” Generator Engineering Design
Repairs
Case 4 described problems with a • OEM TILs
7B gas turbine equipped with torque Up
• Uprates
converter, jaw clutch, and limit switch • Upgrades
that experienced starting difficulty. Call Us Today! 614-488-1151x105 or 724-787-4967
Clutch disengaged at 47% speed;
Email Us at necservice@national-electric-coil.com
however, logic required clutch to
remain engaged until 50% speed. See www.national-electric-coil.com for more about NEC and its services and products.
Torque converter degradation was the
problem and the logic was changed to sions and LEC-NextGen combustion Recall that low-emission com-
permit clutch disengagement below systems and refreshes your recollec- bustors are sized for optimum NOx
50% speed. tion of its inlet bleed heat and exhaust emissions at baseload and “lean-out”
bleed solutions. as load is reduced; CO spikes as the
Gas-turbine operability challenges PSM’s latest turndown solution— Minimum Emissions Compliant Load
in an unstable grid environment, Sequential Fuel Injection (SFI)—spe- (MECL) is approached. With SFI, the
EthosEnergy cifically engineered for 7E (that is, main/head-end combustor is sized for
Please find a precis of this presen- Models 7B through 7EA) LEC and CO at MECL, and SFI fuel is added
tation on p 29. DLN 1 combustion systems is the proportionally as load is increased
presentation’s focus. SFI is said to from MECL to baseload (up to 15%
7EA turndown solutions: How low can leverage prior sequential combus- of the total).
we go? PSM tion experience with the company’s SFI fuel reacts with hot excess air
Presentation is a good review of FlameSheet™ product, to achieve from the main/head-end combustor,
PSM’s tools for extending engine turn- comparable results with SFI without holding the temperature rise in check,
down. It begins with a review of the major changes to existing combustion thereby minimizing NOx production
company’s LEC-III™ ultra-low emis- hardware (Fig 5). while also maintaining low CO.

4. Some things to look for when troubleshooting bus duct: Cracked laminations caused by vibration or air flow (left),
damaged flex braids caused by rubbing and/or abuse (center), and damage attributed to improper bolting and/or lack of
maintenance at connection points (right)
COMBINED CYCLE JOURNAL, Number 71 (2022) 83
7EA USERS GROUP
MAIN/HEAD-END COMBUSTOR MAIN/HEAD-END COMBUSTOR
(100% of fuel) (85-90% of fuel)
SFI injectors

5. PSM’s Sequential Fuel Injection solution completed full-scale validation testing in 2020 and achieved a significantly
greater reduction in turndown compared to LEC-III results. Diagram at left explains operation from startup to MECL (about
35% baseload with IBH), at the right MECL to baseload

6. Distribution-grid plate that failed (left) was replaced with one of new design to facilitate installation (right). It was
delivered to the site within three days of taking field measurements

Remote operations for simple-cycle dard tests and inspections—electrical, It maintains an on-going R&D program
GT sites, Emerson mechanical, and visual—that plant focused on advancing the science of
Lots of things to think about if your personnel should be familiar with lubricant management.
simple-cycle unit is not yet equipped to avoid operational surprises and Peter Dufresne’s goal was to help
for remote operation. Presentation’s to assure the highest level of equip- owner/operators see the value in
stated goal is to help users leverage ment reliability possible. He provided treating their lubricants as an asset,
digital transformation to save O&M examples of both bad and good test rather than as a consumable, and to
and increase earnings. results, and offered recommendations understand and use the tools at their
and corrective actions to achieve the disposal to manage that asset. Here’s
Using flow net modeling to optimize stated objective. an “executive summary” of the plan
fuel-nozzle calibration and flow test- Here’s the lineup of components he suggests users follow. Details are
ing, Trinity Turbine Technology Clark recommends inspecting: in the 49-slide PowerPoint.
New ideas for optimizing combus- Stator winding: Endwinding sup- n Complete oil analysis done to ASTM
tion-system air and gas mixing to port system, wedge system, gas-gap standards.
reduce emissions and temperature baffle studs, rubber baffles, and bush- • Track and monitor rates of addi-
spreads. Results have been promising; ing box for hydrogen-cooled machines. tive consumption.
work continues. Stator core: Tightness, iron migra- • Predict end of lubricant life well
tion, damaged/overheated laminations, in advance.
Emergency material and design sup- and vent duct blockage. n Use a conditioning system to man-
port, Schock Manufacturing Field (rotor): Cleanliness, arcing age oxidation.
Slide deck focuses on Schock Manu- between wedges, hot spots on tooth tip • Eliminate potential for varnish
facturing’s ability to respond quick- at wedge joints, retaining-ring condi- and reduce rates of additive con-
ly to customer problems—such as tion, borescope survey under retain- sumption.
expansion-joint blowout, exhaust-liner ing rings, collector-ring condition, fan n Purchase high-quality oils from a
sheet failure, diverter damper seat damage, and copper dusting. reputable manufacturer/supplier.
and landing-bar failures, failed trash This is a good presentation, in the • Consider an annual 5% top-up.
screens, stack corrosion, failure of opinion of the editors, for a lunch-and-
silencer panels, etc (Fig 6). Customer learn in the plant break room. Details Other presentations available on the
testimonials are included. are at a minimum, photographs are Power Users website from the 2021
excellent. conference include these:
Generator testing: What the tests Predictive analytics to improve gas-
mean and how they are resolved, Considerations for the fleet manage- turbine power forecasting and main-
AGT Services ment of gas-turbine lubricants, EPT tenance practices, Camfil
Jamie Clark, well known to owner/ Clean Oil
operators for his meaningful presen- EPT Clean Oil specializes in ion- Breaking down the run-to-failure strat-
tations at user-group meetings, had a exchange-based lubricant treatments egy: Why proactive bus-duct mainte-
simple objective here: Identify stan- and oil testing in critical applications. nance is critical, Electrical Builders
84 COMBINED CYCLE JOURNAL, Number 71 (2022)
Legacy Turbine Users Group Steering committee, 2022
Michael Adix, Motiva Enterprises
Kevin Campbell, Chevron
Robert Chapman, Chevron
Jonathan LaGrone, Formosa Plas-
tics Corp USA
Doug Leonard, ExxonMobil Technol-
ogy and Engineering
Mike Wenschlag, Chevron, El
Segundo Refinery
Zahi Youwakim, Indorama Ventures,
Port Neches Operations
Steering committee advisers:
Jeff Gillis, ExxonMobil retired

T
John F D Peterson, BASF retired

he 6B is a familiar GE gas tur- experience and the path forward, and Important to note is that copies of
bine in cogeneration systems rotor life extension. each slide deck and an unedited record-
at process plants where staff The afternoon program consists of ing of each discussion are available to
typically is challenged to keep three breakout sessions designed for registered users. These are superior
legacy assets operating on a low O&M maximum interaction between users training aids for O&M personnel, both
budget, often without the support of a and GE’s experts. Each session fea- experienced hands who might benefit
corporate engineering staff. The pre- tures three of the following discussion from a refresher as well as newcomers.
sentations and discussions at annual topics running in parallel: Combus- Highlights of the compressor round-
meetings of this users group provide tion technology Q&A, rotor end-of-life table include the value of hydrophobic
know-how and proven solutions to help discussion, generator and excitation HEPA filters to engine performance,
owner/operators achieve that goal. maintenance, maintenance interval the need know the nature of blade
These engines also are found in extension Q&A, repair technology deposits and before you water-wash
simple- and combined-cycle arrange- updates, and controls, upgrades, and to avoid pitting corrosion, and when
ments for electricity production only. instrumentation. to/when not to fog.
In fact, the first Frame 6 (Model A, Wednesday, August 31. The morn- A highlight of the I&C presentation
which preceded the 6B) was com- ing program features roundtables and was what to know before you consider
missioned July 15, 1979 at Montana user presentations on the air inlet sec- upgrading from a Mark IV to Mark VIe
Dakota Utilities Co’s Glendive Power tion of the engine and the compressor. control system. It’s a big undertaking,
Plant. The 41-MW, dual-fuel-capable, Between the roundtables is a vendor despite what you may have heard to
simple-cycle unit was still in service presentation, “Mobil™ Solvancer®: the contrary. Space constraints may
a year ago. Improving turbine reliability and be a challenge difficult to overcome.
reducing the cost of operation through Support documentation focusing on

2022 advanced technologies.”


Combustion and turbine sessions
O&M safety available from the OEM
is highlighted in the sidebar.
conference are in the afternoon, along with ven-
dor presentations on the current and
Two vendor presentations are
available on the Power Users website,
overview future capabilities of the 6B burning
hydrogen, and combustion system
both concerning generators:
n “Generator cycling concerns,” W
Monday, August 29. The morning optimization. Howard Moudy, National Electric
training session is a short course on Thursday, September 1. Two round- Coil. Presentation’s primary intent
Frame 6B engine details that impact table sessions (I&C and generator/ is to develop awareness of cycling-
operation and maintenance. Present- exciter) and two vendor presentations related concerns and affected com-
ers are John F D Peterson, PE, and (“Combating the effects of increased ponents. It covers speed and load
Zahi Youwakim, two long-term mem- cycling” and “Rewinding HV generator cycling.
bers of the Frame 6B steering commit- stators”) conclude the meeting by noon. n “When a robot won’t fit,” Jamie
tee; Peterson, now retired, was one of Clark, AGT Services Inc. Focus

2021 virtual
the group’s founders. The program is is on generator minor inspection
designed both for newcomers as well techniques and their limitations.
as experienced users who could benefit
from a refresher. The afternoon pro- meeting The third leg of the Frame 6B con-
ference stool, conducted by the OEM
gram opens with a safety roundtable on the second day of the meeting con-
and accompanying case histories. A No formal user presentations were on sisted of four sessions, each running
presentation on gas-turbine train the 2021 virtual conference agenda. about 30 minutes. The subjects: Covid
alignment is next, with the Turbine Rather, users shared their experiences experience, condition-based parts
Auxiliaries Session to follow. The lat- via four roundtable discussion forums: management, decarbonization, and
ter runs until the meeting concludes compressor, I&C, combustion, and compressor and hot-gas-path Q&A.
for the day at 5 p.m. The vendor fair turbine, each chaired by a member of The highly experienced presenters
opens at 5:30. the steering committee. You can access included the following:
Tuesday, August 30, is GE Day. The these and other presentations cleared n Patrick McConnell, EHS leader for
morning presentations: Fleet updates, for release in the Frame 6 section of North America.
monitoring and diagnostics to increase the Power Users website (www.pow- n Patrick Bowling, parts life chief
reliability, interval extensions, refresh- erusers.org) under the “Conference engineer.
er on combustion technology, hydrogen Archives” tab. n Mike Cocca, Alberto Schirmer, and
86 COMBINED CYCLE JOURNAL, Number 71 (2022)
FRAME 6B USERS GROUP

Safety TILs affecting 6B gas turbines


TIL-2101, Modification of manual ring upgrade. containing methylene chloride.
lever hoist for safe rotor removal. 1700, Potential gas-leak hazard dur- 1556, Security measures against
2044, Dry flame sensor false flame ing offline water washes. logic forcing.
indication while turbine is offline. 1633, Load-coupling pressure during 1554, Signage requirements for
2028, Control settings for GE Reuter disassembly. enclosures protected by CO2 fire
Stokes flame sensors. 1628, E- and B-class gas-turbine protection.
2025, GE Reuter Stokes FTD325 dry shell inspection. 1537-1, High gas flow at startup—
flame sensors, false flame indication. 1612, Temperature degradation of Lratiohy logic sequence.
1986, Braid-lined flexible metal-hose turbine-compartment light fixtures. 1522-R1, Fire-protection-system
failures. 1585-R1, Proper use and care of flex- upgrades for select gas turbines.
1918, 6B Riverhawk load-coupling ible metal hoses. 1520-1, High hydrogen purge recom-
hardware and tooling safety con- 1577, Precautions for air-inlet filter- mendations.
cern. house ladder hatches. 1429-R1, Accessory and fuel-gas-
1838, Environmentally induced 1576-R1, Gas-turbine rotor inspec- module compression-fitting oil
catalytic-bead gas-leak sensor tions. leaks.
degradation. 1574, 6B standard combustion fuel- 1368-2, Recommended fire-preven-
1793, Arsenic and heavy-metal mate- nozzle body cracking. tion measures for air-inlet filter
rial handling guidelines. 1573, Fire-protection-system wiring houses.
1713, 6B, 6FA, 6FA+E, and 9E false- verification. 1275-1R2, Excessive fuel flow at
start drain system recommenda- 1566-R2, Hazardous-gas detection startup.
tions. system recommendations. 1159-2, Precautions for working in or
1709, 6B load-coupling recommenda- 1565, Safety precautions to follow near the turbine compartment or
tions. while working on VGVs. fuel handling system of an operat-
1707, Outer-crossfire-tube packing- 1557, Temperature-regulation valves ing gas turbine.

Paul Daiber, each a senior applica- (scheduled) maintenance was the are integrated with condition-based
tion engineer. focus. That transitioned to predictive maintenance/prognostics.
n Kevin Elward, 6B system engineer. maintenance, incorporating reliabil- Repairs were the next topic. Compo-
n Mihir Lal, 6B senior combustion ity- and condition-based maintenance, nents may not be repairable, partially
system engineer. plus prognostics/diagnostics (real-time repairable, or fully repairable. The
The Covid presentation explained M&D). Intelligent health management goal is to make repairs that extend
why customers would experience far is on the horizon, whereby controls component life. ccj
fewer disruptions related to the dis-
ease in the future. Reasons include
continual refinement of travel best
practices, conducting in-person meet-
ings only when necessary, and more
rigid sub-crew separation.
The speaker stressed that the com-
pany’s primary goal is to keep employ-
ees and customers safe, relying on GE
Health Services to continuously moni-
tor indicators that encourage better
work habits. Priority Two is to improve
the OEM’s ability to execute outages in
more timely fashion. Minimizing the
number of cross-border deployments
and reducing quarantine time by way
of judicious resource assignments will
help in this regard.
The Covid pause enabled manage-
ment and staff to rethink how business
was being conducted and to improve
safety and work processes. For exam-
ple, FieldCore now mandates that
employees not take a call while driving.
The use of two 10-hr shifts instead of
12-hr shifts promotes good health by
avoiding the need for in-person shift
turnover. Also, strict tool control pro-
cedures have been implemented with a
requirement that all tools be sanitized
before their return to the field.
Bowling began his presentation by
reviewing the evolution of mainte-
nance practices since the 1930s when
reactive maintenance was practiced.
From about 1960 to 1985 preventive
COMBINED CYCLE JOURNAL, Number 71 (2022) 87
HEAT-RECOVERY STEAM GENERATORS

Shock waves deep-clean


HRSG tube bundles
T
wenty years ago, few people baffles, which one astute attendee detonation, say Barreto and Wise, are
probably thought that a tube asked about. If sky-climber ports are avoiding scaffolding or sky climbers
cleaning technique for HRSGs not available for rig support, they and providing the capability to deep
attached to gas-fired turbines must be added, although Barreto clean “every square foot of the heat-
would be adapted from those used for noted he’s only encountered one unit transfer surface.” Tube sections are
solid-fuel boilers. Yet that’s where that was not so equipped. Another subjected to the shock waves from
we are today. Carl Wise, Thompson attendee wondered if the blasts would the lanes on both the upstream and
Industrial Services, and Vince Barreto, dislodge material on the ID side of the downstream sides.
PowerPlus Cleaning Systems, showed tube and the answer was “no”; the Several case studies were presented
attendees at the HRSG Forum Supplier shock wave energy does not reflect with dramatic total tonnages of mate-
Workshop, last fall, that such a system through the tube wall. rial removed, several inches of differ-
can be elegantly designed and operated Two of the key benefits of this tech- ential pressure restored, and 1-2 MW
even if it’s dislodging and removing nique over dry-ice blasting and open of output recovered. ccj
tons of material stuck
on HRSG tubes. Directionally focused, rapidly
The technology, repeated shock waves penetrate into
originally called Pow- and around tube bundles to dislodge
erWave+ when intro- material on tube and fin surfaces. Rig
duced by GE in 2006 is moved remotely between the lanes.
as an online system Results are verified with subsequent
for solid-fuel boilers, borescope inspections
was converted from
a sound-wave- to a
shock-wave-based pro-
cess, then acquired
by PowerPlus in 2014
and adapted to offline
cleaning. Simply,
the acoustic driver
attached to a sound
horn, was replaced
with a combustion tube
to create a pulsed deto-
nation cleaning device.
PowerPlus calls
it Extraction Pres-
sure Impulse Clean-
ing (EPIC). While
the recording of the
Forum presentation
gives more details
about the technology,
what you really want
to experience are the
videos, available at
https://HRSGforum.
com/recordings, which
show how the device
is engineered into a
“navigation rig,” temporarily installed
in the lanes between the tube bundles,
and moved remotely from location to
location while a technician monitors
the cleaning on a 50-in. screen.
The rig is arranged for the HRSG
being cleaned, which can be vertical
or horizontal, and can accommodate
88 COMBINED CYCLE JOURNAL, Number 71 (2022)
Legacy Turbine Users Group

T The
he GE Frame 5 is likely the Machinery Vibration Solutions.
most popular gas turbine ever n Combustion-system optimization,
produced for power and indus- Sulzer. importance
of Frame 5
trial applications. The first unit n Methods to improve operational
in this model series shipped 65 years performance of gas turbines, Schock
ago from the OEM’s Schenectady (NY)
shops and Frame 5s are still being built
Manufacturing.
Tuesday, August 30. The morning inspections
today—albeit by manufacturing associ- program features one vendor presen-
ates abroad and at ratings about two tation, “Decarbonization: Hydrogen Frame 5s are, in a manner of speak-
and a half times those of the 12-MW and the current gas-turbine install ing, “beasts,” and many don’t run very
models installed in the late 1950s and base” (PSM), and three roundtables often. But that doesn’t mean they are
early 1960s. (compressor, combustion, and turbine; immune to the problems found in
Although more than 3000 of these safety and I&C; and auxiliaries and more advanced machines that stop/
machines have been sold over the generator). start regularly and run at higher
years, the editors cannot find records Baker Hughes conducts the after- temperatures.
of any formal user group meeting con- noon program. Technical content In fact, sitting idle may not be a
ducted since the millennium with the includes the following: Frame 5 his- good thing at all. Consider the call to
Frame 5 as its focus. torical perspective, service engineer- CCJ’s offices a few years back from a
Power Users believes this engine ing (stats, TILs, lessons learned, out- user responsible for a Frame 5 at the
has value as a critical peaking asset age optimization), Houston Service end of a sub-transmission line to pro-
and is supporting the launch of the Center and the BH repair network, vide grid support if needed. The unit
Frame 5 Users Group as part of its turbine upgrades, certified renewed was located in a remote area subject to
Mega Event at the San Antonio Mar- equipment, LT-16 brownfield replace- very high humidity for several months
riott Rivercenter, August 29 to Sep- ment of legacy Frame 5s, hydrogen annually. It was started remotely each
tember 1. fuel capabilities, and additive manu- month and run for an hour to prove it
facturing. would operate if called upon.

2022
Wednesday, August 31. The final One day the unit failed to start.
day of this user-group meeting features The caller said he found the exhaust

conference three very practical training work-


shops: generators (Jamie Clark, AGT
section had collapsed and wanted to
know if the editors could point him to

overview Services Inc), controls (Abel Rochwarg-


er, GTC Control Solutions), and tur-
a vendor that could help. The exhaust
section had “rusted to death” over the
bine rotor (Paul Tucker, FIRST). Each years and could no longer support its
Monday, August 29. The morning runs for an hour and three-quarters. own weight.
training session is a short course on User presentations and roundtable Enter Mike Hoogsteden, director
GE legacy engine details impacting discussions fill the remaining time on of field services for Advanced Turbine
O&M. Presenters/discussion leaders topics such as maintenance strategies Support, an industry leader in the con-
are two highly experienced power/ and equipment aging. duct of borescope inspections to deter-
process engineers—John F D Peterson, Thursday, September 1. No Frame mine the condition of gas turbines and
PE, and Zahi Youwakim. 5 program is scheduled. Attendees are other assets. He is well known in the
In the afternoon, the following ven- welcome to attend any of the other user-group community for insightful
dor presentations are scheduled: user-group sessions. presentations on fleet-wide inspection
n The Frame 5’s future as a critical results that can help owner/operators
peaking asset, Allied Power Group. avoid emerging issues or at least be
n Wet low-emissions technology to Steering committee, 2022 better prepared to deal with them
comply with New York State’s NOx Josh Edlinger, Eastern Generation (see 7EA Users Group article in CCJ
abatement program for Frame 5 Shannon Lau, Suncor Energy No. 70, p 78).
turbines, Petrotech. Logan Quave, Indorama Ventures Hoogsteden is not on the Frame 5
n Machine alignment, Cascade agenda (but he is the opening speaker
COMBINED CYCLE JOURNAL, Number 71 (2022) 89
FRAME 5 USERS GROUP

1. The thin ligament at the 10th-stage extraction slot may be weakest point in the Frame 5 compressor (left). It is sus-
ceptible to cracking, which can cause major damage if it occurs. Photo at right shows how: The hook portion of the casing
simply “peels” away, allowing vanes to work free and go downsream

2. Inlet guide vanes, pressure side 3. A section of the inner shroud is 4. Two S0 vanes liberated at the 6
shown, were liberated from the tip missing (arrow). Note the impact dam- o’clock position
shroud (arrow) age to the trailing edges of the inlet
guide vanes (suction side)

5. A ninth-stage rotor blade also lib- 6. Debris was found on several com- 7. Impact damage and material loss
erated from Engine B bustion caps was found on several first-stage buck-
ets in the turbine section
on the 7EA program Monday after- current inspection of all IGVs (fixed EC inspection, contact your service
noon and all San Antonio user reg- and variable) and the stage S0 or S1 provider. A couple of things Hoogst-
istrants can attend), so the editors stator vanes (first row of vanes). The eden recommends: (1) For the com-
asked him to share some highlights EC scan would identify any cracks bustion section inspections, provide
of what Advanced Turbine Support in the vanes. access to every other one of the 10
inspectors were seeing in the Frame Another location for a careful cans via removal of the fuel nozzles;
5 fleet. inspection is at the ninth-stage hook- (2) gain access to the second row of
He began by saying a large major- fit, where component separation can turbine blades by availing access into
ity of Frame 5 operators don’t perform be an issue. Recall that the thin liga- the stack.
semi-annual inspections, as do the ment at the 10th-stage extraction slot Hoogsteden then provided a flavor
large gas turbines running regularly. forms the hook that holds one side of of what might be found with a bore-
Depending on the run profile, a full the ninth-stage stator vanes in place. scope by sharing findings from three
compressor/combustion/turbine bore- It is susceptible to cracking that could recent Frame 5 inspections. Engine
scope inspection every one to two allow one or more vanes to work free A was a Model M, B a Model P, and
years probably makes best sense for and go downstream causing major C a Model N.
many of these units. compressor damage (Fig 1). Engine A. The inlet section was
Also recommended, and depend- If you are unfamiliar with how best found in relatively good condition, but
ing on unit designation, is an eddy- to prepare for a Frame 5 borescope/ there was rust and debris on the inlet
90 COMBINED CYCLE JOURNAL, Number 71 (2022)
8. Engine C was found with dings on 9. Stator-vane hook-fit separation in 10. Corrosion and material loss in
13 R0 rotor blades the ninth stage ranged from 32 to 68 the exhaust section was significant
mils between the case material and
vanes

floor. Inspector’s recommendation was Engine B. Rust and debris was pressor section was through the
to prep the floor for a two-part epoxy found on the inlet floor of this unit inlet bellmouth and the ninth-stage
coating capable of withstanding regu- as it was in Engine A. Inspectors air extraction, (2) to the combustion
lar water immersion. accessed the compressor section liners via fuel nozzles and crossfire
The compressor section, accessed through the inlet bellmouth, finding tubes, and (3) to the turbine section
through the inlet bellmouth initially two stage S0 stator vanes had liber- by way of the combustion liners and
and later through the removed upper ated at the 6 o’clock position (Fig 4) exhaust section.
case, revealed partial liberation of the along with one R9 rotor blade (Fig 5). Impact damage was found at the
IGV tip shroud, causing significant Result: Extensive damage throughout leading edges of 13 R0 rotor blades
downstream damage (Figs 2 and 3). the compressor. (Fig 8), the debris causing minor
An engineering review was recom- Combustion liners were accessed damage throughout the compressor.
mended before repairing and restart- through the fuel nozzles, the turbine Stator-vane hook-fit separation was
ing the unit. section via the liners and exhaust evident in stage 9, where the gap
The combustion section was in good section. The combustion section was between the case material and sta-
condition; water wash residue was found in good condition except for tor vanes ranged from 32 to 68 mils
visible on the hardware. Combustion some debris found in the combustion- (Fig 9).
liners were accessed through the fuel cap air slots (Fig 6). Impact damage The combustion and turbine sec-
nozzles in cans 3 and 7. and material loss was suffered by a tions were in good condition; however,
The turbine section, accessed via majority of the first-stage turbine there was inner-barrel corrosion with
the combustion liners, also was in buckets (Fig 7). Condition of the material loss and cracking in the
good condition. The exhaust section exhaust section was “good.” exhaust-section diffuser vanes (Fig
was not inspected. Engine C. Access (1) to the com- 10). ccj

COMBINED CYCLE Journal CCJ No. 71 (2022)

Index to advertisers Filter-Doc Corp.................................47 Services Corp..............................62


Advanced Filtration Concepts..........37 Generator Technical Forum..............77 Power Users, Forum........................85
Advanced Turbine Support LLC.......15 Groome Industrial Service Group.........25 Power Users, Umbrella
AGT Services Inc...............................8 HRSG Forum....................................71 Organization.................................53

AGTSI...............................................99 HRST Inc..........................................58 Reuter-Stokes..................................44

Arnold Group.......... 4-5, 11, 45, 61, 73 Indeck Power Equipment.................52 Schock Manufacturing......................43
C.C.Jensen.......................................75 JASC................................................13 Shell.................................................35
CCJ Generator Training...................83 KinetiClean (Groome).....................100 SVI Industrial....................................21
Chanute Manufacturing......................9 MD&A ................................................2 Taylor’s Industrial Coatings..............46
Crown Electric..................................27 Millennium Power.......................20, 59
TesTex..............................................55
Cust-O-Fab Specialty Mitsubishi Power..............................33
Thermal Chemistry...........................82
Services LLC................................65 Mitten Manufacturing........................49
Thompson Industrial Services..........82
Cutsforth Inc................................50-51 Mobile Excitation Services...............22
Trinity Turbine Technology...............81
Donaldson Company Inc..................64 National Breaker Services................27
TTS Energy Services.......................79
Doosan Turbomachinery Services.......17 National Electric Coil........................83
Umicore Catalyst USA Inc................19
EMW filtertechnik GmbH..................80 Noxco...............................................31
EthosEnergy Group.....................38-39 PIC (Precision Iceblast Corp)...........55 ValvTechnologies..............................42

ExxonMobil.......................................41 Power and Industrial Zokman Products Inc.......................29


COMBINED CYCLE JOURNAL, Number 71 (2022) 91
BIOGRAPHICAL SKETCH: CLYDE V MAUGHAN

Coming of age with the


electric power industry 80

Editor’s note: It’s unusual for someone He’s certainly not as fast afoot as he development of the industry 75
to contribute productively to a given was a decade ago, but still gets outside he served—certainly a rarity.
profession for seven decades and still the assisted living facility where he now God, country, family,
be a go-to person when challenging resides to tend a community raspberry and pr ofe s s ion ar e the
questions arise. After all, that someone patch and flower bed. pillars upon which the 70
must be nearing the century mark in So, you ask, “Who is this Clyde guy Maughan family was built.
age, when physical and mental capa- anyway, and why does he warrant They are deeply religious
bilities likely are in decline. a biographical sketch in CCJ?” The people and have served
Generator expert Clyde V Maughan, editors believe Clyde, our most prolific their church in many con- 65
who turned 96 in July, faced the chal- contributor over the last dozen years or structive capacities over
lenges of age realistically and four so, is a unique individual whose life the years. Clyde is a navy
years ago closed his consulting busi- experiences can offer valuable lessons veteran very respectful of
ness, which he had been dialing back for others. the immense sacrifices 60
for years. However, The Clyde, as he He was born in 1926, several years made by classmates,

ses
is known to close associates, still takes before the fledgling electric-power and others, during

ne los
calls from the CCJ editors to help us industry turned 50 and more than a WWII. He and wife
55
avoid making inaccurate statements— decade before the Maughan family Norma, who recently

and li
to the degree possible. farm had an electrical connection to passed, raised a fami-
The electrical (and mechanical) central-station power. Clyde gradu- ly of six—productive

nsfers
engineer remains sharp as a tack men- ated from the University of Idaho with citizens all. Finally, 50
tally, despite two strokes over the years. a degree in electrical engineering after Clyde always has

ny tra
serving in the US Navy, was hired by been beyond gener-
GE in 1950, and proceeded to spend ous in sharing his

ompa
his entire professional career tethered technical know- 45
to generators. how with all those

Intrac
Thus, Clyde’s life and career pro- in the industry
gression have been in lock-step with the who asked for
advice. 40

Energy generated and distributed, billion kWh


35

30
oads

25
Railr

Power
20
Clyde V Maughan is a member of Before electricity everyone in farm
the Greatest Generation—those who families labored, generally from the
experienced the depression, survived time they could walk. Here’s Clyde,
WWII, and contributed to the coun- the last of nine children, age four, 15
try’s economic development for the feeding the animals
benefit of all

1. The dramatic growth in electric produc- 10


tion during the industry’s first two generations
(refer to Fig 2) tracks an eˣ success curve.
Data are provided until 1926, the year Clyde Light 5
Maughan was born

0
1882 1885 1890 1895 1900 1905 1910 1915 1920 1925
Year
92 COMBINED CYCLE JOURNAL, Number 71 (2022)
BIOGRAPHICAL SKETCH: CLYDE V MAUGHAN
2. The electric-
power industry in 1882 1907 1932 1957 1982 2007 2022 2032
the US began, most Electricity sales, billion kWh – 5.9 77.5 561 2125 3765 4116 NA
w o u l d a g r e e , o n Installed capacity, GW – NA 34.1 129.1 649.5 995 1144 NA
Sept 4, 1882 with the Residential customers, million – NA 19.8 46.8 85 125 137 NA
opening of the Edi- Capital expenditures, million $* – NA 260 4050 30,270 70,000 140,000 NA
son Electric Illuminat- *For investor-owned utilities only, primarily data from Electrical World magazine
ing Co of New York’s
generating plant at Pearl Street in lower Gen 3, 1932-1957: First commercial development of the 501F gas turbine,
Manhattan. Electricity for lighting was nuclear generating plant (Shipping- National Energy Policy Act allows
its primary purpose, as the company’s port), first US generating plant pow- access to electric-utility transmission
name implies. ered by a gas turbine (Belle Isle), first lines, long-term service agreements
The industry’s development is dis- mass-produced digital computer (Uni- (LTSAs) introduced, gas-turbine
played in 25-year increments, typically vac I), fluorescent lighting introduced, bubble of 1999-2004 adds 200,000
considered a generation in human WWII, Clyde Maughan graduates from MW to the grid, Enron goes bank-
terms. Some highlights of each gen- Univ of Idaho (BSEE) and joins GE, rupt, Western Turbine Users (WTUI)
eration are presented below to offer first supercritical steam unit (Philo), incorporates to serve owner/operators
perspective. GE Frame 5 gas turbine introduced, of GE aeroderivative gas turbines,
Gen 1, 1882-1907: First true central gas-turbine powered trains begin ser- LM6000 and LMS100 aero engines
station, polyphase electric system, vice (Union Pacific). introduced, 18/18 (chromium/man-
induction motor, first hydroelectric Gen 4, 1957-1982: DOE formed, Arab ganese) steel retaining rings recom-
plant, first steam-turbine-powered gen- oil embargos, Clean Air Act becomes mended to replace 18/5 rings, Clyde
erating station, first US diesel installa- law, EPA formed, Clean Water Act, first Maughan retires from GE after more
tion, General Electric Co incorporated. GE Frame 7 (model A) goes commer- than 35 years of service and launches
Gen 2, 1907-1932: ASME Boiler Code cial (West Babylon), first GE Frame 6 Maughan Generator Consultants.
adopted, Panama Canal opens as the (Glendive), first Westinghouse 501D Gen 6, 2007-2022 (2032): Carbon
world’s largest electrical installation, gas turbine enters service, first GE capture and sequestration added to
the Great Depression begins, tungsten electronic GT control system—Speed- the industry’s lexicon, Fukushima
filament lamp introduced, WWI, USN tronic™ Mark I—introduced, Three accident, generation of electricity pro-
launches first electrically propelled ship, Mile Island accident, Public Utility duced from wind and solar sources
asphalt/mica insulation systems devel- Regulatory Policies Act opens the gen- ramps up at a pace reminiscent of
oped for generators, appliance inven- eration market to non-utility entities, electric growth during Generations
tions included washing machine, vacu- LM2500 and LM5000 aeroderivative 1 and 2 as described in Fig 1, Clyde
um cleaner, and household refrigerator, engines introduced by GE for land Maughan retires from consulting,
Clyde Maughan born into a world with and marine service, improved genera- WTUI and the 7F Users Group expand
limited access to electric power, the tor insulation systems (polyester first, rapidly to become the largest organi-
industry’s technical giants who created then epoxy) gain acceptance. zations worldwide supporting owner/
the electric-power industry fade away Gen 5, 1982-2007: Westinghouse operators of GE aeros and 7F frame
(see accompanying sidebar). and Mitsubishi begin collaboration on engines, respectively.

C
lyde V Maughan was deliv- in urban areas. Life on the farm was “But it was dangerous. I remember
ered in the Lava Hot Springs much different. In fact, rural living my father talking about the gas storage
(Idaho) hospital July 5, 1926, in that era would be difficult for most tank being on fire one evening while
unusual in that day, his eight folks under about 65 today to fathom. he was preparing the generator for
older siblings having been born at Clyde reflected: Farming through operation. He put the lid back on the
home. The inventors, engineers, and the ages changed very slowly. Little tank and the fire went out. It must
businessmen who pioneered electric- mechanization occurred in farming have been winter. Otherwise, the shed,
power development got started long the fields until the development of the barn, cows, and hay all would have
before Clyde came along and electric steel plow in the mid-19th century (the been lost. . .and maybe my father.”
use was expanding rapidly at the time Maughans migrated to the US from The Rural Electrification Act of 1936
of his birth (Fig 1)—during what CCJ England in the 1840s), and the devel- was the game-changer. Within two
calls the industry’s second generation. opment of quality lightweight gasoline years, the Maughan farm was supplied
In this article, the editors chart the engines in the early 20th century. with electricity from the grid, with the
industry’s growth in 25-year incre- Clyde recalls that the power supply following among the benefits:
ments, typically considered a genera- for the farm during his childhood was n Milking machine. Clyde remembers
tion in human terms (Fig 2). a Delco 24-V system, probably the only that well, recalling, “You have no
Gen 1 and Gen 2 (1882-1932) were one in the community. It consisted of idea how cold your seven-year-old
defined by the tremendous progress a small gas engine and dc generator, hands could get milking in a drafty
made by gifted scientists in the dis- and a bank of wet-cell batteries. He barn on a windy winter morning.”
covery and understanding of the fun- remembers this system as marginal n More eggs. Lights in the henhouse
damental principles of electric power in every respect: “It could power only kept the laying hens awake 12
generation, and by outstanding engi- three or four small lightbulbs when hours a day to increase egg produc-
neers in the design and manufacture the engine ran, but the batteries soon tion.
of generators and their prime movers ‘died’ when the engine stopped.” n Electric stove. He remembers how
capable of producing large quantities Continuing, “In the evening my happy his mother was when an elec-
of bulk electric power (see Leaders father knew just how much gasoline tric stove was installed; however,
sidebar). to put in the tank to drive the engine a it never did function as advertised
Electricity use during the industry’s selected amount of time with two bulbs and required patience to use it.
first 50 years was promoted primarily burning in the house 100 yards away. n Water pump. Hand pumping of
COMBINED CYCLE JOURNAL, Number 71 (2022) 93
BIOGRAPHICAL SKETCH: CLYDE V MAUGHAN

Leaders of the electrical revolution


Pioneers in the development of equip-
ment and systems to produce and
distribute electricity for lighting and
myriad other uses included gifted
inventors, engineers, and business-
men. Most were deeply involved in
technology development prior to the
electric-power industry’s first genera-
tion, as defined by Fig 1 in the main
text—including the inventions of Dr
Charles Francis Brush in dynamo-
powered arc lighting and of Thomas
Alva Edison in incandescent lighting.
The industry giants selected by the

Case Western Reserve University


editors for this compendium all had
made their significant contributions
to electrification before the end of the
industry’s second generation. The
thousands of engineers who followed
them took their inventions to the next
level—true commercialism—refining
ideas and machines to increase out-
put, reliability, efficiency, safety, etc. A. Brain trust. Elihu Thomson, Frank J Sprague, Brush, Elmer A Sperry, and
Edwin W Rice Jr (l to r), PhD’s all, celebrate the 50th anniversary of a pioneer
Brush, Dr Charles Francis Brush dynamo in April 1928
1849-1929
This gifted Ohio farm boy was said to
have been building batteries, static Edison, Thomas Alva 1847-1931 Insull was a pioneer in bringing effi-
electricity machines, and electro- A prolific inventor in many fields, he cient central-station power to small sub-
magnets before entering high school. laid the foundation for the electric- urban and rural communities, and built
Brush is credited with the develop- utility industry with his Pearl Street a large integrated electric system in the
ment of a superior dynamo and arc- generating station and its associated Midwest. In the witch-hunting atmo-
lighting system, one widely adopted electric system (Fig B). sphere that followed the great depres-
for street lighting and commercial sion, he was accused of mail fraud and
installations (Fig A). His Brush Electric Insull, Samuel 1859-1938 other illegalities, but was acquitted.
Co was purchased in 1889 by com- Edison hired Insull, shortly before
petitor Thomson-Houston Electric Co, Pearl Street began commercial opera- Rice, Dr Edwin Wilbur 1862-1935
which merged with the Edison Gen- tion, to manage his personal and Starting as an assistant to Elihu
eral Electric Co in 1892 to form GE. business affairs. Later he became an Thomson, Rice became plant
executive of many Edison companies. superintendent of the Thomson-
Coffin, Charles Albert 1844-1926 After Edison’s merger with Thomson- Houston Electric Co, and later tech-
Coffin’s business acumen, coupled Houston Electric Co, Insull left to nical director of General Electric Co
with the engineering talent of Elihu become president of Chicago Edison after those companies merged. He
Thomson and Edwin J Houston, Co. His talents were immediately became president of GE in 1913,
enabled the trio to launch the Thom- apparent in the progressive expan- following Coffin’s retirement. Rice,
son-Houston Electric Co as a com- sion of that system, in development of who was awarded more than 100
petitor to Edison’s, with which later rational rate structures, in advanced patents in his career, was said to
merged to form GE. Coffin was Gen- methods of marketing both electricity have had a special talent for indus-
eral Electric Co’s first president. and securities, and in public policy. trial organization and management,

water for the home and barn was only 6 in. of water. First one to bathe Life was put on hold during the depres-
eliminated, and indoor plumbing obviously had the cleanest water. sion and war. Both impacted electric-
replaced the outhouse. Home heat was supplied by a wood- power development—the former cur-
n Homework could be done with burning stove in the kitchen and a tailing it, the latter expanding it (Figs
decent light, which was safer than wood-fired radiant heater in the living 3 and 4).
candles and conducive to higher room. That was it. Farm work was never-ending and
grades. The foregoing slice of history may the depression brought lean times. The
Clyde was on a roll in remember- help one better understand why it’s family struggled with debt and some
ing the inconveniences of yesterday difficult to get Clyde or others of his mediocre crops during those years,
without electric power. Although the generation to complain much about like most others, yet Clyde says he
family farm was about 1200 acres, he anything and why he dedicated his never felt “poor.” The Maughans had
says, only about 20% of that land was life’s work to improving both the reli- a house and were warm, had adequate
good for planting the crops required to ability/availability of electric generation clothing, and good food. Many others
sustain the large family. equipment and the well-being of others. were not so fortunate. Plus, all the
Before hot water was available from children learned how to play a musi-
the tap, bathing of children was done Depression and WWII cal instrument. Clyde’s specialty was
in a 3-ft-diam tub in the kitchen with the French horn.
94 COMBINED CYCLE JOURNAL, Number 71 (2022)
BIOGRAPHICAL SKETCH: CLYDE V MAUGHAN

C. Steinmetz rarely was seen without

General Electric Co
his signature cigar. Here while relaxing
one can only assume his incredible
mind was running through equations
of importance
B. Thomas Alva Edison (left) and Dr Charles Proteus Steinmetz examine
porcelain insulators during Edison’s last visit to Steinmetz at GE’s Schenectady used in the development of lead/acid
works. The year was 1922 batteries. Perhaps Sperry is best
known as the father of modern navi-
gation technology, starting the Sperry
and in directing the inventive skills devised new and simplified mathemat- Gyroscope Co in 1910 to pursue that
of others. ics for analysis of ac circuits, and was line of business.
awarded over 200 patents. The Wizard
Sprague, Dr Frank Julian of Schenectady worked for GE from its Tesla, Nikola 1856-1943
1857-1934 beginning until his death. Inventor of the polyphase induction
A pioneer in the design of electric motor and the ac system within which
motors, Sprague invented the con- Sperry, Dr Elmer Ambrose it operates, a pioneer in high-frequen-
stant-speed electric motor (according 1860-1930 cy research.
to Who’s Who in 1928) and made The Sperry Electric Machinery Mining
important contributions to the develop- Co was founded in 1888 to deliver Thomson, Elihu 1853-1936
ment of electric railways and elevators. power, and machinery designed Teacher, scientist, inventor, engineer-
A graduate of the United States Naval and built by the company, into deep ing statesman, he built the Thomson-
Academy, he founded the Sprague coal mines to increase fuel produc- Houston Electric Co and contributed to
Electric Railway and Motor Co in 1889. tion. Two years later, the electrical successor GE.
engineer and inventor, launched the
Steinmetz, Dr Charles Proteus Sperry Electric Railway Co. Lessons Westinghouse, George 1846-1914
1865-1923 learned from that business helped Inventor of the air brake so important
He is recognized for his contributions him equip cities in the Pennsylvania/ to railway safety, pioneer in natural-
to three major fields of ac systems Ohio region with electric trolleys gas distribution, early proponent of ac
theory: hysteresis, steady-state analy- capable of navigating hilly terrain. He electrical systems (Edison favored dc
sis, and transients (Fig C). Steinmetz also designed an electric automobile systems), and electrical-industry entre-
derived the law of hysteresis loss, which led to patenting ideas later preneur of genius and vision.

The first tractor, bought in 1929, Portfolio growth was not something and opted for the aviation electri-
had iron wheels and was “pretty use- folks of that time were concerned cian’s school in Florida, moving to a
less” on hills. A Farmall F30, pur- with—or even heard of. Growth, naval gunnery school in Jacksonville
chased at the end of the depression, financial or otherwise, was a chal- after completing that course of study.
“could do real work.” Still, plowing, lenge. Clyde’s father bought the farm Clyde says he must have been a good
seeding, and cultivating the crops, in 1917 figuring he could pay for it in turret repairman given his promotion
and care of the pigs, cows, chickens, three years. He might have, had there to Aviation Electrician’s Mate 2/c in
sheep, and work horses, was a full- been three consecutive “good” years. two years. He was discharged from
time effort for everyone in the family. But that was not to be, given the short the USN in July 1946.
Clyde remembers that his dad always growing season for a farm at 5200 ft Returning home, Clyde learned
was planning to give the kids Saturday elevation. It was still in debt when sold that of the nearly three-dozen Lava
afternoons off, but important work in about 1950. boys who had turned 18 from 1938 to
almost always over-rode his good Shortly after graduating high school 1944, at least one-third were killed
intentions. and five days after turning 18, Clyde in the war—a staggering price for a
The only “real” family trip he could enlisted in the US Navy. It was a small rural town to pay. Never having
recall was a visit to Yellowstone at month after D-Day. He did well on been exposed to enemy fire, that real-
about age nine. the aptitude tests during boot camp ity tortured him for years. To honor
COMBINED CYCLE JOURNAL, Number 71 (2022) 95
BIOGRAPHICAL SKETCH: CLYDE V MAUGHAN
300 60

250 50

Generating capacity
Electric generation, billion kWh

Generating capacity, 1000 MW


200 40

150 30

100 20
Electric generation

50 10

0 0 4. Rural electrification, not much more than a goal


1920 1924 1928 1932 1936 1940 1944 1948 when Clyde Maughan was born, accelerated dramati-
Year cally during his early years. Progress was stunted by
3. Growth in both electric generation and installed capac- the depression and rebounded during the war that fol-
ity suffered a setback during the depression years before lowed. The Maughan family farm was connected to the
rebounding dramatically during the WWII years grid in 1937
1100
those who gave their lives ing “waves.” His talents and
to preserve our freedom, he 1000 instincts fit the work well and
helped organize a committee he enjoyed engineering—even
to design, build, and fund a 900 though four years earlier he
Annual sales in relative terms

Appliances
suitable monument. It was hadn’t the faintest idea what
dedicated in September 2000 800 an engineer did and had never
(see Monument sidebar). 700
been in a factory of any sort.
During Gen 3 (1932-1957),
Off to college, 600 power generation was a “glam-
or” business. Large companies
then GE 500
Industrial apparatus
like General Electric were
GI Bill in hand, Clyde able to hire the best of the best
enrolled in the engineering 400 engineers. Clyde recalls how
program at a small college in fortunate he was to be able
300
nearby Logan, transferring to to work with, and listen to,
the University of Idaho after 200 these experts. Among them,
two years. He graduated with he says, were a few “absolute
a Bachelor of Science degree 100 geniuses”—men like:
in Electrical Engineering in n Dean Harrington of GE, a
June 1950 and accepted GE’s 0
1925 1930 1935 1940 1945 brilliant expert in electromag-
offer of employment at its Year netic design.
world-class manufacturing n Dave Willyoung of GE, an
facility in Schenectady, NY. 5. Annual sales of electric appliances amazing man who could create an
It was a good choice given the very increased more than 11-fold from the elegant and simple design to solve
positive impact electric power was time Clyde Maughan was born until he extremely complex problems.
having on the economy (Fig 5). Plus, graduated from the University of Idaho n Neil Kilpatrick of Westinghouse,
sales of electricity had grown five-fold with a degree in electrical engineering who thoroughly understood the
from when Clyde was born to when he and began working for GE. According to huge metallurgical needs of the
joined GE, and gave no indication of NEMA, annual sales of electrical appa- highly stressed rotating compo-
slowing down. ratus jumped five-fold during the same nents and was able to help develop
Clyde squeezed wife Norma (they period metals to meet those needs.
married in August 1947), son Bruce, Of course, he continued, the elec-
and all their belonging into the couple’s populous county in Idaho and had only tric utilities also had some excellent
1949 Plymouth sedan (bought with about 41,000 residents, according to engineers. Among them:
money Norma saved from her job at a the 1950 census—slightly more than n Jim Timperley of AEP, who thor-
bank), and headed east. The trip took the number of people on GE’s Sche- oughly understood generator main-
five days on mostly poor roads. nectady payroll. tenance and led in the application
Moving east was not an easy deci- Clyde recalled that GE tended to of the powerful electromagnetic
sion. Bannock County, where the hire farm boys because of their incli- interference (EMI) testing of these
Maughans lived, was the third most nation for hard work and not mak- machines.
96 COMBINED CYCLE JOURNAL, Number 71 (2022)
BIOGRAPHICAL SKETCH: CLYDE V MAUGHAN

Monument celebrates the lives of those killed in WWII


Almost all of the men between the
ages of 18 and 35 who resided in
Clyde Maughan’s home town of
Lava Hot Springs (LHS) served in
the armed forces during World War
II—11, possibly more, were killed in
action. Their sacrifices were saluted
at the dedication of a monument in
their honor, Sept 30, 2000.
The idea for a monument
resulted from conversations among
graduates of LHS at a reunion in
July 2000. At that time, considerable
media attention was directed at locat-
ing a long-overdue national WWII
memorial on the mall in Washington
(DC). Clyde and his schoolmates
believed recognition at the local level
especially appropriate.
In her opening remarks at the
dedication, the president of the
LHS city council, Irene Bergendorf,
credited Clyde with conceiving and
designing the remembrance. The ad
hoc committee formed to move the of these young men from Lava Hot War II, the small Idaho village of Lava
project to completion before Veter- Springs who gave their lives for their Hot Springs suffered exceptionally
ans Day was supported financially country in World War II, 1941-1945.” high loss of its young men. This mon-
by anonymous contributions from 57 The right-hand stone identifies those ument is dedicated to these valiant
donors. killed. young men. But it is also dedicated to
The left-hand stone at the top Engraved in the large stone at their families and to their friends, who
of the monument (photo) reads, the bottom of the monument is the shared the sorrow of their ultimate
“Dedicated to the sacred memory following dedication: “During World sacrifice.”

n John Demcko of APS, another turbines and electrical systems. The less until you know everything there
engineer with deep knowledge of work was challenging and varied, and is to know about nothing.”
generator maintenance, plus deep well-suited to Clyde’s career goals in Part of his manufacturing assign-
expertise in complex excitation equipment maintenance and repair, ment was to train GE service personnel
systems. but it involved much travel and time to replace stator windings in genera-
“From these men, and others,” away from home. tors without the use of factory wind-
Clyde told the editors, “I was fortu- After four years in San Francisco, it ers to guide them. He wrote detailed
nate to accumulate massive amounts was back to Schenectady in generator instructions, trained the crews and
of knowledge on generator design, application engineering. Three years their supervisors, and rewound more
operation, and maintenance, which I later he was assigned to turbine/gen- than three dozen large generators
have tried to pass on to others.” erator manufacturing, becoming the without incident, in the process sav-
Clyde’s first permanent job with first generator engineer to work in ing the company millions of dollars.
GE, following the obligatory first that group. There Clyde spent four Next stop was back to engineering
year of three-month rotating assign- years training field-service personnel for eight years to work on the devel-
ments, was in large turbine/generators and helping to improve manufacturing opment of high-voltage insulation
(more than 50,000 hp), with a focus on procedures. systems. The following 12 years were
generator engineering. During that It was at this time that he learned spent in product service, before retir-
assignment, he wrote the first version how difficult it can be to bring about ing in 1986.
of what became a common generator change in a large corporation. Case in During Clyde’s 36 years with GE,
evaluation test. In the early 2000s that point: A gremlin caused an insulation electricity sales in the US increased
document (with minor revision) was defect that was not being repaired cor- more than eight-fold. In sum, he had 11
still in use by GE. rectly because lab studies had come up jobs in engineering, manufacturing, and
Although the young couple’s goal with a wrong answer. Clyde spent “a field service. Plus, he earned a Master’s
was to return to near where their couple of frustrating years off and on Degree in Mechanical Engineering.
families resided after two or three trying with limited success to explain The knowledge and experience gained
years, Clyde accepted a position in a correct answer to those responsible proved invaluable to the consulting
GE’s field service engineering group for repairs.” business he would soon start.
in San Francisco—at that time (end The problem was still around a few
of 1953), at least, a location preferable years ago, he says, adding facetiously Consulting?
to Schenectady. that he considers himself the most
Field-service assignments were knowledgeable person in the world on While working for GE, Clyde had never
varied, as you might imagine, includ- this particular problem. This caused considered consulting after retirement,
ing work on both large stationary him to recall the following aphorism: and he never had heard of anyone
turbine/generators and shipboard “Know more and more about less and retiring and becoming a consultant.
COMBINED CYCLE JOURNAL, Number 71 (2022) 97
BIOGRAPHICAL SKETCH: CLYDE V MAUGHAN

His plan was to take care of the farm Watching the game clock as the consultant friends, he launched the
he and Norma had purchased about 25 1990s drew to close, Clyde added Generator Users Group in 2015, now
miles from their home and “fix toasters another goal to his career plan: Help incorporated in the Power Users port-
for little old ladies.” train the next generation of genera- folio. Learn more at powerusers.org.
That idea didn’t last long. About two tor repair personnel. The foundation His latest effort to facilitate the
months later he received a call from of this effort is his 240-page book on sharing of information on generators
a user having problems with a small generator maintenance, aptly entitled, at no cost to owner/operators was to
steam turbine. A former GE colleague “Maintenance of Turbine-Driven Gen- promote the value of remote technical
had suggested that he call Clyde to erators.” The editors are not aware of a support during generator inspections
get to the root cause of the failure. comparable handbook written by some- and maintenance. It’s not a panacea,
The rewards of that engagement, both one with Clyde’s depth of experience but can conserve personnel resources
professional and financial, encouraged and knowledge. You can access this and improve balance sheets. To illus-
him to pursue a second career in con- valuable reference work at ccj-online. trate: Clyde figurers he made about
sulting. He wound up working from com or in the Resource Center for the 450 onsite visits in his consulting
half to three-quarters of his time for International Generator Technical career and that half of those could
the next couple of decades for Maughan Community (GeneratorTechnicalFo- have been done well offsite with pres-
Generator Consultants (MGC). rum.org). ent technology.
Every turbine/generator engi- He knew relatively few people Continuing, he says, with still bet-
neer understands “baseload,” and for would curl up with his handbook to ter audio visual and communications
Clyde’s blossoming business that was learn what they needed to know to technology, perhaps three-quarters,
a retainer contract from GE for about improve the performance of their gen- or more, of these jobs could have been
half his time. He expected six months erators. So, he developed an in-person done well remotely. There are many
of work from the OEM, but that turned seminar incorporating about 1500 variables in this “equation,” but cer-
into six years. The balance of his avail- slides for clients in North America, tainly in the future many onsite visits
able time was spent on utility consult- Asia, Middle East, and South Africa. can and will be replaced with remote
ing assignments. The added value of having Clyde onsite assistance. Finally, the outcome of the
For the OEM, his first assignment was the Q&A, which typically took onsite-to-offsite transition will depend
was to train and equip field engineers half or more of the seminar hours. He a great deal on participation by all
having generator responsibilities. He conducted about three dozen of these affected parties. Dig deeper by reading
began this program with 24 untrained seminars over the years, reaching more the Guest Commentary in CCJ No. 64
service personnel and built a team of than a thousand participants. (2020), p 3.
72 “pretty-well trained” engineers. In What about the owner/operators Clyde’s retirement in Gen 6 came
the process he also rewrote all of GE’s not able to afford a custom seminar as renewables were gaining favor.
rewind instructions—about 400 pages or want to read the handbook? Clyde Interestingly, generators connected
of documentation. partnered with CCJ’s General Man- to the latest wind turbines have about
During his post-retirement time ager Scott Schwieger to record a series the same output as the most advanced
with the OEM, Clyde was involved in of seven webinars, which, like the steam turbines did a century ago; PV
the correction of numerous significant handbook, are available at ccj-online. panels, of course do not rotate. Renew-
engineering and manufacturing prob- com or in the Resource Center for the ables generation at the end of 2021 was
lems. He considers this period in his International Generator Technical more than 14 times that at the begin-
work career “exceptional, enjoyable, Community (GeneratorTechnicalFo- ning of Gen 6 in 2007—growth rates
and rewarding.” rum.org). Here’s the lineup for “Gen- in kilowatt-hour sales are reminiscent
Looking back, Clyde remembers erator Monitoring, Inspection, and of those at the beginning of the electric
doing well over 300 non-GE consulting Maintenance”: power industry. ccj
jobs—some routine, others unique and n Impact of generator design on reli-
quite interesting—during his second ability.
career. These gigs lasted from a few n Problems relating to operation.
days to about two years and involved n Failure modes and root causes.
work on all types/sizes of old and new n Monitoring capability and limita-
generators, from all manufacturers in tions.
the western world and Asia, at hydro,
fossil-fired, and nuclear stations.
n Inspection basic principles.
n Test options and risks.
Monitoring,
During his consulting career, Clyde n Maintenance basic approaches. Inspection,
Maintenance
resisted involvement in legal disputes, Technical papers, are, of course,
which he believes pretty much a waste another way to reach those wanting to
of an engineering mind. Two caveats learn. Clyde, an IEEE Fellow, has pre-
for this work: MGC would focus on sented at nearly three-dozen generator
finding the facts but not on “winning maintenance conferences during his
the case.” Legal work was billed at a years as a consultant. Many of those Online training on-demandat NO COST
20% premium over engineering hours. have been repurposed as articles in Access the complete course on
Regarding bias, he had this to say: CCJ. You can search for these on the generator monitoring, inspection, and
“I always tried to be unbiased in my CCJ website via its keyword search maintenance, conducted by Clyde
work. I mostly worked for utility cus- function or access all of his technical Maughan, president, Maughan
tomers, and I told them that I would papers in the Clyde Maughan section Generator Consultants LLC, at
not use what I learned while working of the IGTC Resource Center at Gen- www.ccj-online.com/onscreen. The
with manufacturers against those ven- eratorTechnicalForum.org. program is divided into manageable
dors. After all, I had worked 36 years The large number of gas-turbine one-hour segments.
for a manufacturer, and that’s where user groups and no generator user
my allegiance lies. That never seemed group puzzled Clyde, so with help from www.ccj-online.com/onscreen
to bother anyone.” NV Energy, CCJ, OEMs, and several
98 COMBINED CYCLE JOURNAL, Number 71 (2022)
The most ef fective way
to clean a HRSG

KinetiClean is safer and faster


with the deepest cleaning effect
of any method currently used to clean HRSG fin tubes.

Before Groome’s patented technology uses a proven


Kinetic Shockwave cleaning method to remove
After unwanted foulant. An innovative and automated
air system then distributes high-pressure,
high-volume air to liberate remaining debris.

• No manual tube movement


• Minimal-to-no scaffolding
• Other projects can continue in tandem
• No additional moisture
• Highly-trained and fully-licensed
professionals manage explosive process

| (800) 505-6100

You might also like