The document contains details for reinforced concrete structures including stairs, parapets, arches, walls, ramps, and waterproofing membranes for a beach parking facility. Many of the details are missing information such as structural calculations, material takeoffs, architectural coordination, and insulation details. Consistent comments request the missing documentation to ensure the structural designs meet requirements and coordinate with the architectural designs.
The document contains details for reinforced concrete structures including stairs, parapets, arches, walls, ramps, and waterproofing membranes for a beach parking facility. Many of the details are missing information such as structural calculations, material takeoffs, architectural coordination, and insulation details. Consistent comments request the missing documentation to ensure the structural designs meet requirements and coordinate with the architectural designs.
The document contains details for reinforced concrete structures including stairs, parapets, arches, walls, ramps, and waterproofing membranes for a beach parking facility. Many of the details are missing information such as structural calculations, material takeoffs, architectural coordination, and insulation details. Consistent comments request the missing documentation to ensure the structural designs meet requirements and coordinate with the architectural designs.
The document contains details for reinforced concrete structures including stairs, parapets, arches, walls, ramps, and waterproofing membranes for a beach parking facility. Many of the details are missing information such as structural calculations, material takeoffs, architectural coordination, and insulation details. Consistent comments request the missing documentation to ensure the structural designs meet requirements and coordinate with the architectural designs.
SPL-Z3-BP0R0-IC-ST-QSS-001077 R.C for Stairs for Beach Parking 60% Part02 1-Missing take off PDF sheet. 2-Shall provide Arch release if available to SPL-Z3-BP0R0-IC-ST-QSS-001078 R.C for Stairs for Beach Parking 60% Part04 confrim all stair and lands levels did not make SPL-Z3-BP0R0-IC-ST-QSS-001079 R.C for Stairs for Beach Parking 60% Part06 conflict with arch drawings. SPL-Z3-BP0R0-IC-ST-QSS-001080 R.C for Stairs for Beach Parking 60% Part07 SPL-Z3-BP0R0-IC-ST-QSS-001081 R.C 150 mm Parapets BP Part 1 Roof Floor SPL-Z3-BP0R0-IC-ST-QSS-001082 R.C 150 mm Parapets BP Part 2 Roof Floor SPL-Z3-BP0R0-IC-ST-QSS-001083 R.C 150 mm Parapets BP Part 3 Roof Floor 1-Missing take off PDF sheet. 2-Shall provide Arch release if available to SPL-Z3-BP0R0-IC-ST-QSS-001084 R.C 150 mm Parapets BP Part 4 Roof Floor confirm all parpet level is consistent with SPL-Z3-BP0R0-IC-ST-QSS-001085 R.C 150 mm Parapets BP Part 5 Roof Floor elevations. SPL-Z3-BP0R0-IC-ST-QSS-001086 R.C 150 mm Parapets BP Part 6 Roof Floor SPL-Z3-BP0R0-IC-ST-QSS-001087 R.C 150 mm Parapets BP Part 7 Roof Floor SPL-Z3-BP0R0-IC-ST-QSS-001088 R.C 120 mm Parapets BP Part 1 Roof Floor SPL-Z3-BP0R0-IC-ST-QSS-001089 R.C 120 mm Parapets BP Part 2 Roof Floor SPL-Z3-BP0R0-IC-ST-QSS-001090 R.C 120 mm Parapets BP Part 3 Roof Floor 1-Missing take off PDF sheet. 2-Shall provide Arch release if available to SPL-Z3-BP0R0-IC-ST-QSS-001091 R.C 120 mm Parapets BP Part 4 Roof Floor confirm all parpet level is consistent with SPL-Z3-BP0R0-IC-ST-QSS-001092 R.C 120 mm Parapets BP Part 5 Roof Floor elevations. SPL-Z3-BP0R0-IC-ST-QSS-001093 R.C 120 mm Parapets BP Part 6 Roof Floor SPL-Z3-BP0R0-IC-ST-QSS-001094 R.C 120 mm Parapets BP Part 7 Roof Floor SPL-Z3-BP0R0-IC-ST-QSS-001095 R.C for Arches For BP Part 01 SPL-Z3-BP0R0-IC-ST-QSS-001096 R.C for Arches For BP Part 02 SPL-Z3-BP0R0-IC-ST-QSS-001097 R.C for Arches For BP Part 03 1-Missing take off PDF sheet. SPL-Z3-BP0R0-IC-ST-QSS-001098 R.C for Arches For BP Part 04 2-Shall provide Arch release if available. SPL-Z3-BP0R0-IC-ST-QSS-001099 R.C for Arches For BP Part 05 SPL-Z3-BP0R0-IC-ST-QSS-001100 R.C for Arches For BP Part 06 SPL-Z3-BP0R0-IC-ST-QSS-001101 R.C for Arches For BP Part 07 SPL-Z3-BP0R0-IC-ST-QSS-001102 R.C for Walls for BP at Part 01 from (Axe 1-7) 1-Missing take off PDF sheet. SPL-Z3-BP0R0-IC-ST-QSS-001103 R.C for Walls for BP at Part 02 from (Axe 7-12) 2-Shall provide Arch release if available. 3-All Vertical element should provide column SPL-Z3-BP0R0-IC-ST-QSS-001104 R.C for Walls for BP at Part 04 from (Axe 018-21) and axis approved SHD SPL-Z3-BP0R0-IC-ST-QSS-001105 R.C for Walls for BP at Part 06 from (Axe 29-31) 4-Attachment inconsistent with submittal SPL-Z3-BP0R0-IC-ST-QSS-001106 R.C for Walls for BP at Part 07 from (Axe 35-37) SPL-Z3-BP0R0-IC-ST-QSS-001107 R.C for Ramps for BP Part 01 SPL-Z3-BP0R0-IC-ST-QSS-001108 R.C for Ramps for BP Part 02 1-Missing take off PDF sheet. 2-Shall provide Arch release if available. SPL-Z3-BP0R0-IC-ST-QSS-001109 R.C for Ramps for BP Part 04 3-All Vertical element should provide column SPL-Z3-BP0R0-IC-ST-QSS-001110 R.C for Ramps for BP Part 06 and axis approved SHD SPL-Z3-BP0R0-IC-ST-QSS-001111 R.C for Ramps for BP Part 07 SPL-Z3-BP0R0-IC-ST-QSS-001112 Horizontal membrane under connecting slab Beach Parking Part 1 SPL-Z3-BP0R0-IC-ST-QSS-001113 Horizontal membrane under connecting slab Beach Parking Part 2 SPL-Z3-BP0R0-IC-ST-QSS-001114 Horizontal membrane under connecting slab Beach Parking Part 3 1-Missing CAD working files. SPL-Z3-BP0R0-IC-ST-QSS-001115 Horizontal membrane under connecting slab Beach Parking Part 4 2-Approved insulation detail is missing SPL-Z3-BP0R0-IC-ST-QSS-001116 Horizontal membrane under connecting slab Beach Parking Part 5 SPL-Z3-BP0R0-IC-ST-QSS-001117 Horizontal membrane under connecting slab Beach Parking Part 6 SPL-Z3-BP0R0-IC-ST-QSS-001118 Horizontal membrane under connecting slab Beach Parking Part 7 SPL-Z3-BP0R0-IC-ST-QSS-001119 Vertical Memebrane for Pile cap Sides Beach Parking Part 1 SPL-Z3-BP0R0-IC-ST-QSS-001120 Vertical Memebrane for Pile cap Sides Beach Parking Part 2 SPL-Z3-BP0R0-IC-ST-QSS-001121 Vertical Memebrane for Pile cap Sides Beach Parking Part 3 1-Missing CAD working files. SPL-Z3-BP0R0-IC-ST-QSS-001122 Vertical Memebrane for Pile cap Sides Beach Parking Part 4 2-Approved insulation detail is missing SPL-Z3-BP0R0-IC-ST-QSS-001123 Vertical Memebrane for Pile cap Sides Beach Parking Part 5 SPL-Z3-BP0R0-IC-ST-QSS-001124 Vertical Memebrane for Pile cap Sides Beach Parking Part 6 SPL-Z3-BP0R0-IC-ST-QSS-001125 Vertical Memebrane for Pile cap Sides Beach Parking Part 7