Quantity Surveying Requirements

1- Each submittal should contain 4 main files which are:


 XXXX (TAKE OFF SHEET).PDF
 XXXX (TAKE OFF SHEET). XLXS
 XXXX (WORKING FILES).DWG
 XXXX (ATTACHMENTS).RAR
2- For attachment, kindly consider all related files should be attached to make a
consistent submittal to avoid any confusion for all but not limit:
 Any approved Detail or Method which describes the methodology of implement
the item if available.
 For vertical elements, should provide approved columns and axis drawings.
 For Frames and Arches (non-structural) should provide any architectural release if
available.
 For Slabs should provide Slab edge and Builders work release if available
 For Parapet Should Provide architectural release to confirm levels are consistent
with elevations if available.
 For Stairs should Provide architectural release to confirm levels are matched with
architectural levels if available.
3- For attachments kindly consider Linked PROCOOR PDF file for each approved
submittal.
4- For attachments kindly note that no need to attach submitted drawing we only need
approved related shop drawings.
5- For any submittal such as waterproofing and insulation which contains many steps
and material, it’s preferable to be gathered on one submittal, no need to separate
each step as separated submittals
6- It’s Preferable in take offs sheets to refer to other related take offs such as (Slabs and
beams, connecting slabs and pile cap).