Each quantity surveying submittal should contain four main files: a takeoff sheet in PDF and Excel formats, working drawings, and a compressed folder of attachments. Attachments should include approved details, shop drawings, and architectural releases to confirm consistency across disciplines. Linked PDF submittals and grouping related items together is also recommended to streamline the review process.
Each quantity surveying submittal should contain four main files: a takeoff sheet in PDF and Excel formats, working drawings, and a compressed folder of attachments. Attachments should include approved details, shop drawings, and architectural releases to confirm consistency across disciplines. Linked PDF submittals and grouping related items together is also recommended to streamline the review process.
Each quantity surveying submittal should contain four main files: a takeoff sheet in PDF and Excel formats, working drawings, and a compressed folder of attachments. Attachments should include approved details, shop drawings, and architectural releases to confirm consistency across disciplines. Linked PDF submittals and grouping related items together is also recommended to streamline the review process.
1- Each submittal should contain 4 main files which are:
XXXX (TAKE OFF SHEET).PDF XXXX (TAKE OFF SHEET). XLXS XXXX (WORKING FILES).DWG XXXX (ATTACHMENTS).RAR 2- For attachment, kindly consider all related files should be attached to make a consistent submittal to avoid any confusion for all but not limit: Any approved Detail or Method which describes the methodology of implement the item if available. For vertical elements, should provide approved columns and axis drawings. For Frames and Arches (non-structural) should provide any architectural release if available. For Slabs should provide Slab edge and Builders work release if available For Parapet Should Provide architectural release to confirm levels are consistent with elevations if available. For Stairs should Provide architectural release to confirm levels are matched with architectural levels if available. 3- For attachments kindly consider Linked PROCOOR PDF file for each approved submittal. 4- For attachments kindly note that no need to attach submitted drawing we only need approved related shop drawings. 5- For any submittal such as waterproofing and insulation which contains many steps and material, it’s preferable to be gathered on one submittal, no need to separate each step as separated submittals 6- It’s Preferable in take offs sheets to refer to other related take offs such as (Slabs and beams, connecting slabs and pile cap).