Cooling Load Schedule
TOTAL
TOTAL TOTAL ROOM SUPPLY RETURN COOLING
FLOOR CEILING NO OF SENSIBLE LATENT COOLING AIR AIR COIL
AREA HEIGHT PERSON COOLING LOAD COOLING LOAD VOLUME VOLUME LOAD
(m²) (m) S (kcal/hr) LOAD (kcal/hr) (kcal/hr) (m³/hr) (m³/hr) (TR)
114 2.7 25 11559 1550 13109 6371 6064 14
92 3 5 7633 310 7943 3786 3509 8
90 3 15 6391 930 7321 2774 2494 6
6 3 5 1523 310 1833 756 738 1
54 3 30 5157 1860 7017 2238 2078 5
9 3 5 1040 310 1350 516 490 1
150 2.7 40 16393 2480 18873 8132 7727 17
32 3 5 3648 310 3958 1810 1717 4
100 3 20 7018 1240 8258 3481 3171 8
301 2.7 50 31889 3100 34989 15818 15006 33
139 2.7 25 8950 310 9260 3744 3368 9
19 2.7 2 2178 124 2302 945 893 2
14 2.7 2 2161 124 2285 1072 1033 2
61 2.7 10 6293 620 6913 3121 2957 7
258 3 170 27677 10540 38217 15254 14480 33
62 2.7 15 7346 930 8276 3644 3477 8
95 2.7 10 7847 620 8467 3892 3637 8
14 2.7 3 1824 186 2010 905 866 2
70 3 20 6771 1240 8011 3359 3149 7
265 3 50 23327 3100 26427 12856 12088 28
196 3 30 19184 1860 21044 9516 8988 20
53 3 20 5980 1240 7220 2596 2443 6
102 3 15 10728 930 11658 5322 5027 11
57 3 10 6439 620 7059 3194 3029 7
62 3 10 6947 620 7567 3446 3258 7
24 3 5 2359 310 2669 1300 1231 3
AIR CHANGES
PER HOUR
(times/hr)
21
14
10
19
14
19
20
19
11
19
10
18
28
19
20
22
15
23
16
17
18
17
18
19
18
19