BACKUP VOLUME COULD MILLING

Item Pekerjaan Could Milling


Lebar Lebar Jarak Luas Tebal
No. LOKASI
(m) rata2(m) (m) (m2) (m)
7.50
1 7.25 25.00 181.3 0.04
7.00
7.00
2 7.00 41.00 287.0 0.04
7.00
7.00
3 7.25 25.00 181.3 0.04
7.50
Volume
(m3)

7.3

11.5

7.3

26.0
BACKUP VOLUME
Nama Jembatan : JATIROTO
Item Pekerjaan : ASPAL HRS WC
Lebar Lebar Jarak Luas Tebal
No. LOKASI
(m) rata2(m) (m) (m2) (m)
7.50
1 7.25 25.00 181.3 0.04
7.00
7.00
2 7.00 41.00 287.0 0.04
7.00
7.00
3 7.25 25.00 181.3 0.04
7.50
BJ Volume
(ton) (ton)

2.28 16.5

2.28 26.2

2.28 16.5

59.2
NO URAIAN PEKERJAAN
PARAPET
3 2.90m

1.10m

TROTOAR
4

TIANG SANDARAN
5

JUMLAH SUBTOTAL

JUMLAH TOTAL
RJAAN PANJANG

VOLUME 1 : 0.4 X
` VOLUME 2 : 2.9 X
VOLUME 3 : 0.4 X
1.10m

0.00m VOLUME 1 : 0.2 X


VOLUME 2 : 0.1 X

VOLUME 1 : 0.16 +
0.00m

VOLUME 2 : 3.14 X

BTOTAL

OTAL
PERHITUNGAN VOLUME

1.1 X 2 = 0.88
1.1 X 2 = 6.38
2.9 = 1.16

4.0 BUAH

41.85 X 2.0 = 16.7


41.85 X 2.0 = 5.0

2.0 BUAH

0.15 X 2.00 X 1.15 = 0.713

30.00 BUAH

0.075 X 27.80 = 6.55


4.00 BUAH

PEKERJAAN BETON

PEKERJAAN BETON
VOLUME SATUAN KET.

25.520 m2 BETON
PLAT
INJAK

43.524 m2 BETON
PENUNJANG
PASANGAN

21.390 m2 BETON

26.1876 m2

90.434 m2