Jembatan Jatiroto
7.3
11.5
7.3
26.0
BACKUP VOLUME
Nama Jembatan : JATIROTO
Item Pekerjaan : ASPAL HRS WC
Lebar Lebar Jarak Luas Tebal
No. LOKASI
(m) rata2(m) (m) (m2) (m)
7.50
1 7.25 25.00 181.3 0.04
7.00
7.00
2 7.00 41.00 287.0 0.04
7.00
7.00
3 7.25 25.00 181.3 0.04
7.50
BJ Volume
(ton) (ton)
2.28 16.5
2.28 26.2
2.28 16.5
59.2
NO URAIAN PEKERJAAN
PARAPET
3 2.90m
1.10m
TROTOAR
4
TIANG SANDARAN
5
JUMLAH SUBTOTAL
JUMLAH TOTAL
RJAAN PANJANG
VOLUME 1 : 0.4 X
` VOLUME 2 : 2.9 X
VOLUME 3 : 0.4 X
1.10m
VOLUME 1 : 0.16 +
0.00m
VOLUME 2 : 3.14 X
BTOTAL
OTAL
PERHITUNGAN VOLUME
1.1 X 2 = 0.88
1.1 X 2 = 6.38
2.9 = 1.16
4.0 BUAH
2.0 BUAH
30.00 BUAH
PEKERJAAN BETON
PEKERJAAN BETON
VOLUME SATUAN KET.
25.520 m2 BETON
PLAT
INJAK
43.524 m2 BETON
PENUNJANG
PASANGAN
21.390 m2 BETON
26.1876 m2
90.434 m2