4-laning of Ambala-Kala Amb section of NH-72 (Part of New NH-344 from Ambala Ring road (Design Chainage (-)

0+800 to Shahzadpur and Part of New NH-7 from Shahzadpur to Kala Amb (HR/HP Border) (Design Chainage 33+015)) in the state of Haryana and Punjab (Design Length 33.815 Km) on Hybrid Annuity mode under NH(O).

CLIENT : NATIONAL HIGHWAYS AUTHORITY OF INDIA


CONCESSIONAIRE : AMBALA KALA AMB HIGHWAY PRIVATE LTD
INDEPENDENT ENGINEER : M/S Highway Engineering Consultant in Association with M/S Infratech Civil Solution & Consultant.
EPC CONTRACTOR : DCC INFRA PROJECTS LTD

SUMMARY OF CONCRETE DESIGN MIXES NH-72


Weight of CA & FA Aggregates Compressive Strength
Reference of Approval Letter's Brand Cement Flyash Total Dosages of Admixture WATER Proportion of Aggregates Blending Proportion of C/A Designed Slump ( in mm)
Grade of (in Kgs) Mpa
S. No Purpose Content Cementitious
Concrete
(in Kgs) (Kg)
AKHPL's IE's Admixture Cement % (in Kgs) % (in Kgs) W/C Ratio (in Kgs) C.A (%) F.A (%) 20 mm 10 mm 20mm 10mm Sand Total Initial 60 Min's 90 Min's 120 Min's 7 Days 28 Days

Cement-Ultratech OPC 43 grade,Coarse Aggregates-Doiwala Crusher,Fine Aggregate-Doiwala crusher,Flyash-Yamunanagar,Admixture-Rheoplast

ULTRATECH
1 M-15 PCC 003/D:01.08.23 Rheoplast 192 30 82 274 0.60% 1.644 0.55 151 62% 38% 60% 40% 735 490 739 1964 120 100 70 35 18.34 26.10
OPC 43

ULTRATECH
2 M-25 RCC 003/D:01.08.23 Rheoplast 259 25 86 345 0.85% 2.933 0.41 142 62% 38% 60% 40% 720 480 724 1924 Collapse 150 130 100 28.87 37.47
OPC 43

ULTRATECH
3 M-30 RCC 003/D:01.08.23 Rheoplast 281 25 94 375 0.75% 2.810 0.40 150 62% 38% 60% 40% 701 467 705 1873 Collapse 160 130 110 32.70 43.54
OPC 43

ULTRATECH
4 M-35 RCC 003/D:01.08.23 Rheoplast 312 20 78 390 0.70% 2.730 0.36 140 62% 38% 60% 40% 708 472 712 1892 Collapse 160 130 110 36.54 48.66
OPC 43

ULTRATECH
5 M-35 PILE 003/D:01.08.23 Rheoplast 324 20 81 405 0.75% 3.038 0.41 166 62% 38% 60% 40% 677 452 681 1810 Collapse Collapse 200 160 36.89 48.63
OPC 43

ULTRATECH
6 M-40 RCC 003/D:01.08.23 Rheoplast 334 20 84 418 0.70% 2.926 0.35 146 62% 38% 60% 40% 693 462 696 1851 Collapse 160 130 100 40.19 53.73
OPC 43

Cement-Ultratech OPC 43 grade,Coarse Aggregates-Doiwala Crusher,Fine Aggregate-Doiwala crusher,Flyash-Yamunanagar,Admixture-Bestech


ULTRATECH
7 M-15 PCC 048/D:27.06.23 04/D:27.07.23 Bestech 192 30% 82 274 0.65 1.755 0.55 151.00 62% 38% 60% 40% 735 490 739 1964 110 mm 90 mm 60 mm 30 mm 19.11 26.97
OPC 43

ULTRATECH
8 M-20 PCC 058/D:04.07.23 Bestech 197 30% 85 282 0.80 2.260 0.46 130.00 62% 38% 60% 40% 752 502 757 2011 150 mm 120 mm 90 mm 65 mm 23.70 32.80
OPC 43

ULTRATECH
9 M-25 RCC 048/D:27.06.23 04/D:27.07.23 Bestech 259 25% 86 345 0.75 2.588 0.41 142.00 62% 38% 60% 40% 720 480 724 1924 Collapse 150 mm 120 mm 100 mm 28.66 37.84
OPC 43

ULTRATECH
10 M-30 RCC 048/D:27.06.23 04/D:27.07.23 Bestech 281 25% 94 375 0.80 3.000 0.40 150.00 62% 38% 60% 40% 701 467 705 1873 Collapse 180 mm 150 mm 120 mm 31.71 43.51
OPC 43

ULTRATECH
11 M-35 RCC 048/D:27.06.23 04/D:27.07.23 Bestech 312 20% 78 390 0.70 2.730 0.36 140.00 62% 38% 60% 40% 708 472 712 1892 Collapse 160 mm 130 mm 110 mm 35.94 48.57
OPC 43

ULTRATECH
12 M-35 PILE 048/D:27.06.23 04/D:27.07.23 Bestech 324 20% 81 405 0.75 3.038 0.41 166.00 62% 38% 60% 40% 677 452 681 1810 Collapse Collapse 190 mm 160 mm 36.04 49.46
OPC 43

ULTRATECH
13 M-40 RCC 048/D:27.06.23 04/D:27.07.23 Bestech 334 20% 84 418 0.75 3.135 0.35 146.00 62% 38% 60% 40% 692 462 696 1850 Collapse 150 mm 120 mm 100 mm 40.33 53.08
OPC 43

Cement-Ultratech OPC 43 grade,Coarse Aggregates-Doiwala Crusher,Fine Aggregate-Doiwala crusher,Flyash-Yamunanagar,Admixture-Durabuild


ULTRATECH
14 M-15 PCC 005/D:01.08.23 Durabuild 192 30% 82 274 0.65 1.781 0.55 151.00 62% 38% 60% 40% 735 490 739 1964 110 80 60 35 19.33 27.41
OPC 43

ULTRATECH
15 M-25 RCC 005/D:01.08.23 Durabuild 259 25% 86 345 0.75 2.588 0.41 142.00 62% 38% 60% 40% 720 480 724 1924 Collapse 150 120 90 28.96 37.82
OPC 43

ULTRATECH
16 M-30 RCC 005/D:01.08.23 Durabuild 281 25% 94 375 0.80 3.000 0.40 150.00 62% 38% 60% 40% 701 467 705 1873 Collapse 180 150 120 32.36 44.06
OPC 43

ULTRATECH
17 M-35 RCC 005/D:01.08.23 Durabuild 312 20% 78 390 0.75 2.925 0.36 140.00 62% 38% 60% 40% 708 472 712 1892 Collapse 170 140 110 36.20 49.29
OPC 43

ULTRATECH
18 M-35 PILE 005/D:01.08.23 Durabuild 324 20% 81 405 0.75 3.038 0.41 166.00 62% 38% 60% 40% 677 452 681 1810 Collapse Collapse Collapse 170 37.07 50.11
OPC 43

ULTRATECH
19 M-40 RCC 005/D:01.08.23 Durabuild 334 20% 84 418 0.75 3.135 0.35 146.00 62% 38% 60% 40% 692 462 696 1850 Collapse 160 130 110 40.79 54.08
OPC 43

Cement-Ultratech OPC 43 grade,Coarse Aggregates-Doiwala Crusher,Fine Aggregate-Doiwala crusher,Admixture-Bestech


ULTRATECH
20 M-15 PCC 047/D:27.06.23 03/D:27.07.23 Bestech 250 - - - 0.65 1.630 0.55 138.00 62% 38% 60% 40% 767 511 771 2049 140 mm 120 mm 90 mm 40 mm 19.15 26.81
OPC 43

ULTRATECH
21 M-20 PCC 059/D:04.07.23 Bestech 270 - - - 0.80 2.160 0.48 130.00 62% 38% 60% 40% 768 512 772 2052 Collapse 140 mm 100 mm 70 mm 23.98 33.57
OPC 43

ULTRATECH
22 M-25 RCC 047/D:27.06.23 03/D:27.07.23 Bestech 345 - - - 0.80 2.760 0.42 145.00 62% 38% 60% 40% 729 486 733 1948 Collapse 150 mm 130 mm 110 mm 28.39 37.65
OPC 43

ULTRATECH
23 M-30 RCC 047/D:27.06.23 03/D:27.07.23 Bestech 370 - - - 0.80 2.960 0.40 148.00 62% 38% 60% 40% 718 478 721 1917 Collapse 160 mm 130 mm 100 mm 32.41 43.41
OPC 43

ULTRATECH
24 M-35 RCC 047/D:27.06.23 03/D:27.07.23 Bestech 390 - - - 0.80 3.120 0.38 148.00 62% 38% 60% 40% 711 474 715 1900 Collapse 160 mm 130 mm 120 mm 36.65 48.30
OPC 43

ULTRATECH
25 M-35 PILE 047/D:27.06.23 03/D:27.07.23 Bestech 405 - - - 0.70 2.835 0.41 166.00 62% 38% 60% 40% 689 459 692 1840 Collapse Collapse 200 mm 170 mm 37.49 49.10
OPC 43

ULTRATECH
26 M-40 RCC 047/D:27.06.23 03/D:27.07.23 Bestech 414 - - - 0.80 3.312 0.36 149.00 62% 38% 60% 40% 702 468 706 1876 Collapse 150 mm 120 mm 90 mm 40.16 53.62
OPC 43

Cement-Ultratech OPC 43 grade,Coarse Aggregates-Doiwala Crusher,Fine Aggregate-Doiwala crusher,Admixture-Durabuild


ULTRATECH
27 M-15 PCC 006/D:01.08.23 Durabuild 250 - - - 0.65 1.630 0.55 138.00 62% 38% 60% 40% 767 511 771 2049 150 120 80 40 19.42 27.72
OPC 43

ULTRATECH
28 M-25 RCC 006/D:01.08.23 Durabuild 345 - - - 0.80 2.760 0.42 145.00 62% 38% 60% 40% 729 486 733 1948 Collapse 160 140 120 28.83 37.81
OPC 43

ULTRATECH
29 M-30 RCC 006/D:01.08.23 Durabuild 370 - - - 0.80 2.960 0.40 148.00 62% 38% 60% 40% 718 478 721 1917 Collapse 160 140 105 32.83 44.60
OPC 43

ULTRATECH
30 M-35 RCC 006/D:01.08.23 Durabuild 390 - - - 0.80 3.120 0.38 148.00 62% 38% 60% 40% 711 474 715 1900 Collapse 160 140 115 37.40 49.23
OPC 43

ULTRATECH
31 M-35 PILE 006/D:01.08.23 Durabuild 405 - - - 0.75 3.038 0.41 166.00 62% 38% 60% 40% 688 459 692 1839 Collapse Collapse 190 160 37.86 50.05
OPC 43
ULTRATECH
32 M-40 RCC 006/D:01.08.23 Durabuild 414 - - - 0.80 3.312 0.36 149.00 62% 38% 60% 40% 702 468 706 1876 Collapse 170 130 100 41.19 54.18
OPC 43

EPC CONTRACTOR REPRESENTATIVE CONCESSIONAIRE REPRESENTATIVE INDEPENDENT ENGINEER REPRESENTATIVE


4-laning of Ambala-Kala Amb section of NH-72 (Part of New NH-344 from Ambala Ring road (Design Chainage (-) 0+800 to Shahzadpur and Part of New NH-7 from Shahzadpur to Kala Amb (HR/HP Border) (Design Chainage 33+015)) in the state of Haryana and Punjab (Design Length 33.815 Km) on Hybrid Annuity mode under NH(O).

CLIENT : NATIONAL HIGHWAYS AUTHORITY OF INDIA


CONCESSIONAIRE : AMBALA KALA AMB HIGHWAY PRIVATE LTD
INDEPENDENT ENGINEER : M/S Highway Engineering Consultant in Association with M/S Infratech Civil Solution & Consultant.
EPC CONTRACTOR : DCC INFRA PROJECTS LTD

SUMMARY OF CONCRETE DESIGN MIXES NH-72


Weight of CA & FA Aggregates Compressive Strength
Reference of Approval Letter's Brand Cement Flyash Total Dosages of Admixture WATER Proportion of Aggregates Blending Proportion of C/A Designed Slump ( in mm)
Grade of (in Kgs) Mpa
S. No Purpose Content Cementitious
Concrete
(in Kgs) (Kg)
AKHPL's IE's Admixture Cement % (in Kgs) % (in Kgs) W/C Ratio (in Kgs) C.A (%) F.A (%) 20 mm 10 mm 20mm 10mm Sand Total Initial 60 Min's 90 Min's 120 Min's 7 Days 28 Days

Cement-Nuvoco OPC 43 grade,Coarse Aggregates-Doiwala Crusher,Fine Aggregate-Doiwala crusher,Flyash-Yamunanagar,Admixture-Bestech


NUVOCO OPC
33 M-15 PCC 049/D:27.06.23 05/D:27.07.23 Bestech 202 28% 78 280 0.65 1.820 0.55 154.00 62% 38% 60% 40% 730 487 734 1951 140 mm 110 mm 80 mm 40 mm 19.81 27.39
43

NUVOCO OPC
34 M-25 RCC 049/D:27.06.23 05/D:27.07.23 Bestech 266 25% 89 355 0.75 2.663 0.40 142.00 62% 38% 60% 40% 716 477 720 1913 Collapse 150 mm 130 mm 100 mm 28.87 37.86
43

NUVOCO OPC
35 M-30 RCC 049/D:27.06.23 05/D:27.07.23 Bestech 291 25% 97 388 0.75 2.910 0.40 155.00 62% 38% 60% 40% 691 461 695 1847 Collapse 160 mm 130 mm 110 mm 32.85 44.10
43

NUVOCO OPC
36 M-35 RCC 049/D:27.06.23 05/D:27.07.23 Bestech 318 20% 80 398 0.75 2.985 0.36 143.00 62% 38% 60% 40% 702 468 706 1876 Collapse 150 mm 120 mm 95 mm 36.77 49.37
43

NUVOCO OPC
37 M-35 PILE 049/D:27.06.23 05/D:27.07.23 Bestech 333 20% 83 416 0.75 3.120 0.41 171.00 62% 38% 60% 40% 669 446 673 1788 Collapse Collapse 200 mm 170 mm 37.22 49.75
43

NUVOCO OPC
38 M-40 RCC 049/D:27.06.23 05/D:27.07.23 Bestech 339 20% 85 424 0.80 3.392 0.35 148.00 62% 38% 60% 40% 688 459 692 1839 Collapse 150 mm 120 mm 100 mm 40.76 54.10
43

Cement-Nuvoco OPC 43 grade,Coarse Aggregates-Doiwala Crusher,Fine Aggregate-Doiwala crusher,Flyash-Yamunanagar,Admixture-Rheoplast


NUVOCO OPC
39 M-15 PCC 050/D:27.06.23 06/D:27.07.23 Rheoplast 202 28% 78 280 0.60 1.680 0.55 154.00 62% 38% 60% 40% 730 487 734 1951 140 mm 110 mm 70 mm 35 mm 19.72 27.03
43

NUVOCO OPC
40 M-25 RCC 050/D:27.06.23 06/D:27.07.23 Rheoplast 266 25% 89 355 0.70 2.485 0.40 142.00 62% 38% 60% 40% 716 478 720 1914 Collapse Collapse 140 mm 110 mm 28.84 37.76
43

NUVOCO OPC
41 M-30 RCC 050/D:27.06.23 06/D:27.07.23 Rheoplast 291 25% 97 388 0.75 2.910 0.40 155.00 62% 38% 60% 40% 691 461 695 1847 Collapse Collapse 150 mm 120 mm 32.32 44.07
43

NUVOCO OPC
42 M-35 RCC 050/D:27.06.23 06/D:27.07.23 Rheoplast 318 20% 80 398 0.75 2.985 0.36 143.00 62% 38% 60% 40% 702 468 706 1876 Collapse Collapse 130 mm 100 mm 36.52 49.16
43

NUVOCO OPC
43 M-35 PILE 050/D:27.06.23 06/D:27.07.23 Rheoplast 333 20% 83 416 0.75 3.120 0.41 171.00 62% 38% 60% 40% 669 446 673 1788 Collapse Collapse 180 mm 160 mm 37.04 49.73
43

NUVOCO OPC
44 M-40 RCC 050/D:27.06.23 06/D:27.07.23 Rheoplast 339 20% 85 424 0.80 3.392 0.35 148.00 62% 38% 60% 40% 688 459 692 1839 Collapse Collapse 150 mm 120 mm 40.64 54.40
43

Cement-Nuvoco OPC 43 grade,Coarse Aggregates-Doiwala Crusher,Fine Aggregate-Doiwala crusher,Flyash-Yamunanagar,Admixture-Durabuild


NUVOCO OPC
45 M-15 PCC 009/D:02.08.23 Durabuild 202 28% 78 280 0.65 1.820 0.55 154.00 62% 38% 60% 40% 730 487 734 1951 150 120 80 40 19.70 27.88
43

NUVOCO OPC
46 M-25 RCC 009/D:02.08.23 Durabuild 266 25% 89 355 0.75 2.663 0.40 142.00 62% 38% 60% 40% 716 477 720 1913 Collapse 160 130 100 28.66 38.07
43

NUVOCO OPC
47 M-30 RCC 009/D:02.08.23 Durabuild 291 25% 97 388 0.75 2.910 0.40 155.00 62% 38% 60% 40% 691 461 695 1847 Collapse 170 140 120 33.07 44.27
43

NUVOCO OPC
48 M-35 RCC 009/D:02.08.23 Durabuild 318 20% 80 398 0.75 2.985 0.36 143.00 62% 38% 60% 40% 702 468 706 1876 Collapse 160 130 110 36.93 49.85
43

NUVOCO OPC
49 M-35 PILE 009/D:02.08.23 Durabuild 333 20% 83 416 0.75 3.120 0.41 171.00 62% 38% 60% 40% 669 446 673 1788 Collapse Collapse 190 160 37.40 49.75
43

NUVOCO OPC
50 M-40 RCC 009/D:02.08.23 Durabuild 339 20% 85 424 0.80 3.392 0.35 148.00 62% 38% 60% 40% 688 459 692 1839 Collapse 160 130 110 40.65 54.08
43

Cement-Nuvoco OPC 43 grade,Coarse Aggregates-Doiwala Crusher,Crusher Sand-Doiwala crusher,Flyash-Yamunanagar,Admixture-Bestech


NUVOCO OPC
51 M-15 PCC 018/D:07.08.23 Bestech 202 28% 78 280 0.75 2.138 0.55 157.00 62% 38% 60% 40% 725 484 737 1946 140 110 70 40 19.90 27.46
43

NUVOCO OPC
52 M-25 RCC 018/D:07.08.23 Bestech 274 25% 91 365 0.80 2.920 0.40 146.00 62% 38% 60% 40% 709 472 720 1901 Collapse 160 130 100 28.83 38.01
43

NUVOCO OPC
53 M-30 RCC 018/D:07.08.23 Bestech 296 25% 99 395 0.90 3.560 0.40 158.00 62% 38% 60% 40% 685 457 696 1838 Collapse 170 140 110 32.78 44.37
43

NUVOCO OPC
54 M-35 RCC 018/D:07.08.23 Bestech 318 20% 80 398 0.90 3.582 0.36 143.00 62% 38% 60% 40% 702 468 706 1876 Collapse 160 130 95 37.51 49.73
43

NUVOCO OPC
55 M-35 PILE 018/D:07.08.23 Bestech 336 20% 84 420 0.85 3.570 0.41 172.00 62% 38% 60% 40% 665 444 676 1785 Collapse Collapse 190 170 37.44 50.06
43

NUVOCO OPC
56 M-40 RCC 018/D:07.08.23 Bestech 336 20% 84 420 0.95 3.990 0.35 147.00 62% 38% 60% 40% 690 460 701 1851 Collapse 160 130 100 40.81 54.35
43

Cement-Nuvoco OPC 43 grade,Coarse Aggregates-Doiwala Crusher,Crusher Sand-Doiwala crusher,Flyash-Yamunanagar,Admixture-Durabuild


NUVOCO OPC
57 M-15 PCC 021/D:07.08.23 Durabuild 205 28% 80 285 0.70 1.995 0.55 157.00 62% 38% 60% 40% 726 484 737 1947 150 120 80 40 20.01 27.85
43

NUVOCO OPC
58 M-25 RCC 021/D:07.08.23 Durabuild 274 25% 91 365 0.80 2.920 0.40 146.00 62% 38% 60% 40% 709 472 720 1901 Collapse 160 130 110 28.97 38.19
43

NUVOCO OPC
59 M-30 RCC 021/D:07.08.23 Durabuild 296 25% 99 395 0.90 3.560 0.40 158.00 62% 38% 60% 40% 685 457 696 1838 Collapse 180 150 120 33.30 44.42
43

NUVOCO OPC
60 M-35 RCC 021/D:07.08.23 Durabuild 318 20% 80 398 0.95 3.848 0.36 146.00 62% 38% 60% 40% 697 464 708 1869 Collapse 170 140 110 37.31 49.93
43

NUVOCO OPC
61 M-35 PILE 021/D:07.08.23 Durabuild 336 20% 84 420 0.90 3.780 0.41 172.00 62% 38% 60% 40% 665 444 676 1785 Collapse Collapse 190 160 37.58 50.47
43

NUVOCO OPC
62 M-40 RCC 021/D:07.08.23 Durabuild 344 20% 86 430 1.00 4.300 0.35 151.00 62% 38% 60% 40% 683 455 694 1832 Collapse 170 140 110 41.04 54.70
43

EPC CONTRACTOR REPRESENTATIVE CONCESSIONAIRE REPRESENTATIVE INDEPENDENT ENGINEER REPRESENTATIVE


4-laning of Ambala-Kala Amb section of NH-72 (Part of New NH-344 from Ambala Ring road (Design Chainage (-) 0+800 to Shahzadpur and Part of New NH-7 from Shahzadpur to Kala Amb (HR/HP Border) (Design Chainage 33+015)) in the state of Haryana and Punjab (Design Length 33.815 Km) on Hybrid Annuity mode under NH(O).

CLIENT : NATIONAL HIGHWAYS AUTHORITY OF INDIA


CONCESSIONAIRE : AMBALA KALA AMB HIGHWAY PRIVATE LTD
INDEPENDENT ENGINEER : M/S Highway Engineering Consultant in Association with M/S Infratech Civil Solution & Consultant.
EPC CONTRACTOR : DCC INFRA PROJECTS LTD

SUMMARY OF CONCRETE DESIGN MIXES NH-72


Weight of CA & FA Aggregates Compressive Strength
Reference of Approval Letter's Brand Cement Flyash Total Dosages of Admixture WATER Proportion of Aggregates Blending Proportion of C/A Designed Slump ( in mm)
Grade of (in Kgs) Mpa
S. No Purpose Content Cementitious
Concrete
(in Kgs) (Kg)
AKHPL's IE's Admixture Cement % (in Kgs) % (in Kgs) W/C Ratio (in Kgs) C.A (%) F.A (%) 20 mm 10 mm 20mm 10mm Sand Total Initial 60 Min's 90 Min's 120 Min's 7 Days 28 Days

Cement-Nuvoco OPC 43 grade,Coarse Aggregates-Doiwala Crusher,Fine Aggregate-Doiwala crusher,Admixture-Bestech


NUVOCO OPC
63 M-15 PCC 004/D:01.08.23 Bestech 265 - - - 0.65 1.720 0.55 146.00 62% 38% 60% 40% 754 503 758 2015 160 mm 120 mm 80 mm 40 mm 19.68 27.66
43

NUVOCO OPC
64 M-25 RCC 004/D:01.08.23 Bestech 354 - - - 0.80 2.830 0.42 149.00 62% 38% 60% 40% 722 481 726 1929 Collapse 160 mm 130 mm 100 mm 28.50 38.30
43

NUVOCO OPC
65 M-30 RCC 004/D:01.08.23 Bestech 378 - - - 0.75 2.840 0.40 151.00 62% 38% 60% 40% 712 475 716 1903 Collapse 160 mm 130 mm 100 mm 32.62 43.77
43

NUVOCO OPC
66 M-35 RCC 004/D:01.08.23 Bestech 395 - - - 0.80 3.160 0.38 150.00 62% 38% 60% 40% 707 472 711 1890 Collapse 150 mm 120 mm 100 mm 36.96 49.59
43

NUVOCO OPC
67 M-35 PILE 004/D:01.08.23 Bestech 416 - - - 0.80 3.328 0.41 171.00 62% 38% 60% 40% 680 453 684 1817 Collapse Collapse 190 mm 160 mm 37.68 49.73
43

NUVOCO OPC
68 M-40 RCC 004/D:01.08.23 Bestech 422 - - - 0.80 3.376 0.36 152.00 62% 38% 60% 40% 697 465 701 1863 Collapse 160 mm 130 mm 100 mm 40.86 54.41
43

Cement-Nuvoco OPC 43 grade,Coarse Aggregates-Doiwala Crusher,Fine Aggregate-Doiwala crusher,Admixture-Durabuild


NUVOCO OPC
69 M-15 PCC 010/D:02.08.23 Durabuild 265 - - - 0.65 1.720 0.55 146.00 62% 38% 60% 40% 754 503 758 2015 150 120 90 40 19.79 27.67
43
NUVOCO OPC
70 M-25 RCC 010/D:02.08.23 Durabuild 354 - - - 0.75 2.660 0.42 149.00 62% 38% 60% 40% 722 481 726 1929 Collapse 140 120 95 28.73 38.01
43
NUVOCO OPC
71 M-30 RCC 010/D:02.08.23 Durabuild 378 - - - 0.80 3.020 0.40 151.00 62% 38% 60% 40% 712 475 716 1903 Collapse 160 130 100 32.53 44.43
43
NUVOCO OPC
72 M-35 RCC 010/D:02.08.23 Durabuild 395 - - - 0.80 3.160 0.38 150.00 62% 38% 60% 40% 707 472 711 1890 Collapse 160 130 100 37.50 49.84
43
NUVOCO OPC
73 M-35 PILE 010/D:02.08.23 Durabuild 416 - - - 0.80 3.328 0.41 171.00 62% 38% 60% 40% 680 453 684 1817 Collapse Collapse 200 170 37.81 50.40
43
NUVOCO OPC
74 M-40 RCC 010/D:02.08.23 Durabuild 422 - - - 0.80 3.376 0.36 152.00 62% 38% 60% 40% 697 465 701 1863 Collapse 180 140 120 40.77 54.26
43

Cement-Nuvoco OPC 43 grade,Coarse Aggregates-Doiwala Crusher,Crusher Sand-Doiwala crusher,Admixture-Durabuild


NUVOCO OPC
75 M-15 PCC 020/D:07.08.23 Durabuild 270 - - - 0.80 2.160 0.55 149.00 62% 38% 60% 40% 749 500 761 2010 150 120 80 40 19.87 27.77
43
NUVOCO OPC
76 M-25 RCC 020/D:07.08.23 Durabuild 360 - - - 0.85 3.060 0.42 151.00 62% 38% 60% 40% 717 478 729 1924 Collapse 140 120 100 28.53 38.00
43
NUVOCO OPC
77 M-30 RCC 020/D:07.08.23 Durabuild 385 - - - 0.95 3.660 0.40 154.00 62% 38% 60% 40% 706 471 717 1894 Collapse 160 130 100 32.58 44.44
43
NUVOCO OPC
78 M-35 RCC 020/D:07.08.23 Durabuild 400 - - - 1.00 4.000 0.38 152.00 62% 38% 60% 40% 703 469 714 1886 Collapse 170 140 110 37.94 49.81
43
NUVOCO OPC
79 M-35 PILE 020/D:07.08.23 Durabuild 420 - - - 0.90 3.780 0.41 172.00 62% 38% 60% 40% 677 451 688 1816 Collapse Collapse 190 160 37.90 50.22
43
NUVOCO OPC
80 M-40 RCC 020/D:07.08.23 Durabuild 425 - - - 0.90 3.825 0.36 153.00 62% 38% 60% 40% 694 463 703 1860 Collapse 170 150 120 40.41 54.22
43

Cement-Nuvoco OPC 43 grade,Coarse Aggregates-Doiwala Crusher,Crusher Sand-Doiwala crusher,Admixture-Bestech


NUVOCO OPC
81 M-15 PCC 019/D:07.08.23 Bestech 270 - - - 0.75 2.025 0.55 146.00 62% 38% 60% 40% 750 500 761 2011 160 130 90 40 19.95 28.23
43
NUVOCO OPC
82 M-25 RCC 019/D:07.08.23 Bestech 360 - - - 0.85 3.060 0.42 151.00 62% 38% 60% 40% 717 478 729 1924 Collapse 150 120 95 28.47 38.02
43
NUVOCO OPC
83 M-30 RCC 019/D:07.08.23 Bestech 385 - - - 0.90 3.470 0.40 154.00 62% 38% 60% 40% 706 471 717 1894 Collapse 170 140 110 32.81 44.56
43
NUVOCO OPC
84 M-35 RCC 019/D:07.08.23 Bestech 400 - - - 0.95 3.800 0.38 152.00 62% 38% 60% 40% 703 469 714 1886 Collapse 170 140 110 37.50 50.01
43
NUVOCO OPC
85 M-35 PILE 019/D:07.08.23 Bestech 420 - - - 0.80 3.360 0.41 172.00 62% 38% 60% 40% 677 452 688 1817 Collapse Collapse 200 170 37.62 50.34
43
NUVOCO OPC
86 M-40 RCC 019/D:07.08.23 Bestech 425 - - - 0.90 3.825 0.36 153.00 62% 38% 60% 40% 694 463 703 1860 Collapse 170 140 120 41.07 54.50
43