479500 479600

±
(

5912855

2772900

Legend
DUCTS
EXISTING
STRUCTURES

JRC12
(
Other Structures
E: 479535.810511
MANHOLE EXISTING
N: 2772873.135796
"
)
"
)
5910117

JRC12
E: 479553.256303
N: 2772860.847814
"
)

NOTES:
1. This NOC is for Trial Trenches Only. Construction
NOC must be obtained at a relevant time with
drawings showing E.I.T.C./du's existing network.
2. E.I.T.C./du's network exists as shown and must
be protected at all times.
3. Works near E.I.T.C./du's existing network must be
JRC12 carried out under E.I.T.C./du Supervision. Pls.
E: 479506.847261 contact Mr. Shernan on 052-9091704 or Mr. Enrico
N: 2772836.15135 on 055-2288426 or Mr. Ibrahim on 0556426496
"
) JRC12 prior to commencement of works.
4. Trial Trenches must be verified by E.I.T.C./du's
E: 479513.219014
Representative.
) N: 2772831.317084
" 5910114 5. Extreme care must be taken to avoid any damages
to E.I.T.C./du's existing LIVE network.
6. Only manual excavation must be used in carrying
out trial trenches.
7. E.I.T.C./du's CH/MH must be kept free from any
excavation/construction materials and reasonable
access must be maintained at all times.
479,516, 2,772,817 8. Please refer to the enclosed General Conditions.

479,537, 2,772,812

5910302

2772800
479,554, 2,772,799

NOC-01042023-2019

5910302 TRIAL TRENCHES ONLY

Emirates Integrated Telecommunications Company


(EITC)
DRAWN BY: LeahV APPD BY: A. ALMULLA

SCALE (A3):1:600 DATE: 4/3/2023

DRAWING NO: NOC-01042023-2019


0 5 10 20 30 40 Coordinate System: WGS 1984 Dubai Local TM

Meters
Projection: Transverse MercatorWGS 1984
THIS DRAWING IS A PROPERTY OF du NO PART OR WHOLE SHOULD BE
REPRODUCED OR COPIED WITHOUT PRIOR PERMISSION FROM AUTHORITY.
Outside Plant and Civil Infrastructure Utility Crossing
1. The Contractor/Consultant shall submit proposed detail cross section/
Works General Conditions and method of statement for crossing EITC (du) infrastructure, protection is to
be provided in the crossing area.
Specifications 2. No heavy machineries or vibration equipment shall be used near and
over EITC (du) infrastructure.

NOC General Conditions Deep excavation works Conditions


1. Corridors allocated to EITC (du) must be reserved and kept free for EITC 1. The Contractor/Consultant shall submit proposed detail/method of
(du) use only, as per RTA approved/standard ROW cross sections or as statement for protection to be provided for existing EITC (du) services
per main community developer. and is subject to EITC (du) approval prior to the execution of the work.
2. Use of EITC (du) corridor or any deviation from the RTA approved/ 2. Strict coordination with the EITC (du) fiber maintenance team should be
standard ROW cross sections or as per main community developer established prior to starting any implementation/construction works.
affecting EITC (du) allocated corridor must be requested officially and 3. EITC (du) infrastructure shall be protected at all times to avoid any
EITC (du) stamp must reflect on the approved drawing. interruption in du network.
3. In case other services are found laid in EITC (du) approved corridor
without prior approval, the same shall be relocated at the cost of the
owner of the other services found within EITC (du) corridor. Road works and hard landscaping
4. The location of EITC (du) services as given on the NOC are approximate Conditions
and the Contractor is obliged to determine the exact location by 1. The Consultant/Contractor is advised to liaise with any Consultant/
cautious manual excavation prior to commencing work activities. Contractor who is/will be engaged with other projects of EITC (du) in the
5. The highest safety precautions are to be adopted while working in the area.
vicinity of EITC (du) services to ensure safety of EITC (du) services to avoid 2. The Contractor/Consultant shall submit proposed detail/method
any consequential action. statement for protection to be provided for existing EITC (du) services
6. Strictly only manual excavation should be done in the vicinity of EITC and is subject to EITC (du) approval prior to the execution of the work.
(du) services and no machine excavation is allowed. 3. Any existing EITC (du) ducts that are likely to lie under new vehicle roads
7. If any difficulty is experienced in locating the EITC (du) service at site should be encased by concrete with a minimum of 150 mm cover all
then EITC (du) shall be contacted for assistance. around the existing ducts and cables.
8. In addition to trial excavation to locate our existing network marked in 4. EITC (du) manholes/chambers must in all cases be away from the
our NOC drawings, the Contractor should make more trial excavation asphalt/carriageway and reasonable access must be maintained at all
across the working area in order to ensure that no other services exists times.
at site. EITC (du) existing services, if any, located by such excavations 5. EITC (du) chamber/manhole cover levels must be adjusted to suit the
shall be recorded in the as-built drawings. final ground/road level. In case EITC (du) manhole(s) covers need to be
9. After exposing EITC (du) services in accordance with this NOC, the raised/lowered due to proposed works, then EITC (du) should be notified
Contractor should contact EITC (du) for inspection and verification. of the details. A separate NOC must be submitted/obtained for the
10. Only EITC (du) reserves the right to open manholes and excavate for same.
any maintenance work and to lay new cables or to grant permission for 6. EITC (du) will not be held responsible for any cost implication for
such acts within EITC (du) corridor. manhole cover modification due to changes in approved road levels.
11. EITC (du) services should be adequately protected and supported 7. Strict coordination with the EITC (du) fiber maintenance team should be
during excavation. established prior to starting any implementation/construction works.
12. No equipment/foundations/fence posts/road signs etc. should be
placed over the existing EITC (du) services (cables/manholes).
13. EITC (du) existing underground cables/ducts are laid at depth of Relocation and Deviation works Conditions
approximately 1.2 meters from the existing ground level. If for any reason 1. Betterment cost approval must be obtained from EITC (du) prior to
the ground level is to be raised /lowered due to proposed ramps/earth commencement of any betterment works.
filling/earth cutting, then the cables/ducts should be raised/lowered 2. Shop drawings shall be approved by EITC (du) prior to the
accordingly to maintain the standard depth of EITC (du) services which commencement of the works. Material approval must also be obtained
is 1.2 meters from the finished ground level. from EITC (du) prior to construction works.
14. The Consultant and/or Contractor shall indemnify and keep EITC 3. All proposed civil works (diversion/betterment) are to be carried out by
indemnified and harmless from any and all, but not limited to, claims, the Road Contractor under EITC (du) supervision and as per the shop
actions, demands, suits or proceedings, losses, damages, charges, fines, drawing/construction drawing approved by EITC (du).
expenses, liabilities, compensation, penalty, repair costs of any nature 4. Reinstatement of original surface conditions to be done up on
or kind, however it arises and whether it is present or future, fixed or completion of works.
unascertained, actual or contingent that may be suffered or incurred 5. As-built drawings must be forwarded to EITC (du) upon completion of
by EITC arising from or in connection with, but not limited to: works. All newly constructed EITC (du) network are to be tested and
a) Consultant and/or Contractor’s breach of the NOC General Conditions proved to EITC (du) standard in the presence of EITC (du) site
and/or any other requirements and instructions of EITC, and/or representative after the completion of the Contractor’s activities in that
b) any damage to, interruption of, or degradation in the performance of, area.
EITC’s networks, equipment, systems and platforms; and/or 6. EITC (du) will not be held responsible for any cost implication for
c) any third party claim associated with the acts or omissions of the infrastructure relocation works due to changes in road design/ right of
Consultant and/or Contractor. way.
EITC reserves the right to take action to recover any and all losses incurred
by EITC as mentioned in this Clause 14 and that Consultant and/or
Contractor failed to pay to EITC.
NOC Inspection Request and Site Verification
To Schedule a site visit, inspection / verification please contact EITC (du)
15. The Contractor is obliged to inform EITC (du) immediately of any
Maintenance Team, in Dubai and Northern Emirates, contact Shernan
damages to EITC (du) services. Contact EITC (du) the Service Operations
Serrano / +971554360024, and in AUH, Al Ain & Western Region, contact
Center on Hot Line No. +971 4 3602200.
Gregorio Rasing / +971581783960. for escalation you may contact
16. Whenever EITC (du) live cable exists, works are to be done under EITC
Enrico Julao / +971552288426, or Ibrahim Fauzi / +971556426496
(du) supervision. Notification prior to commencement of any works
where EITC (du) live cable exists must be provided to EITC (du). Contact
For any queries regarding the NOC, please contact us on:
EITC (du) the Service Operations Center on Hot Line No. +971 4 3602200.
Dubai and Northern Emirates NOC Help Desk – +971 4 3915018
17. A copy of NOC approval obtained from EITC (du) must always be
AUH/Al Ain /Western Region NOC Help Desk – +971 2 2344486
available at site.