Download as pdf
Download as pdf
You are on page 1of 1
al state Afar National Region: ‘aterprise (Qafar Agattinoh Rakaakayth Doo! sign and Supervision Works F me neak ' eke mene Hane aI Xiizaayin kee Lowsis Taamoomih Interpiraayia necvs tener PE CEN (usb. lass? Afar water works construction enterprise Samara Reference: - Construction of 7-Irrigation Project ‘Subject: 25% variation approval ment with Ministry of peace on the It can be recalled that our enterprise has signed contract agreet struction of 7- date 01/04/2011 E.C for conduct supervision and contract administration for co irrigation projects (Hida ,wa’ama ,kuhulta ,baduli dewe and intiaso irrigation project). However the client has been instructed us to approve variation up to 25% latter issued on date with 30/09/2013 ref no o2/mh 24//20/314 ‘Accordingly, we kindly approve 25% of total project cost and we have attached —----pages You requested variation and proceed based on the document. Ministry of Peace Addis ababa Afar water irrigation and energy bureau af ~~ed Mohammed: Vice Manager samara © Office of the General manager © Office of depute manager © Supervision & Contract admi/co/ process AfDSWE Radi neh gacisan waqdi ni jawaabih ixxit le Please Quote Ou Refi. When Replying AhP9 PND LAAN doe Bre dswe@gmail.com

You might also like