Firewater Design Basis

You might also like

Download as pdf
Download as pdf
You are on page 1of 91
») FEED REPORT Doc No, 332389-0000-40ES-0012 |SNC+LAVALIN: Title REFINERY UPGRADE PROJECT Unit 5800 — Fire Water System Date: April 2009 Revision No.: PB_| Section 8.0 Page 1 of 39 8.0 FIRE WATER SYSTEM 84 Design Basis The design basis is covered under a separate attached document 332389 - 5800-41-EB-0004 titled "UPGRADES TO FIREWATER SYSTEM FOR NEW UNITS". It addresses the firewater requirements for the various units, the hydrant and monitor coverage proposed for the units, sizing of the new pumps, post, indicator valves, foam lines and fire water lines to be added, fire water lines to be relocated and to be demolished. 8.1.1 Processing Objective Not Applicable 44932389140 - ENG\4O - ENGIRA - Misc Reports & Forms\FEED REPORTIVOLUME 12 - UTILITIES - Fire Wetor System\Alex FEED BOOK SECTION 8.0 - Fie Wator System Rev PB. doc » FEED REPORT Doc No. 332389-0000-40ES-0012 | SNC+LAVALIN. Title REFINERY UPGRADE PROJECT Unit 5800 — Fire Water System Date: April 2009 Revision No.: PB Section 8.0 Page 2 of 39 8.1.2 Throughput Not Applicable 18883236940 - ENGWO-ENG\RA - Mlec Reports & Forms\FEED REPORTIVOLUME 12 - UTILITIESIS- Fire Water ‘Syslem\Alex FEED BOOK SECTION 6.0- Fire Water Syslem Rev PB. do ) FEED REPORT Plessayan Doc No. 332389-0000-40ES-0012 |SNC+LAVALIN Title REFINERY UPGRADE PROJECT Unit 5800 — Fire Water System Date: April 2009 Revision No.: PB | Section 8.0 Page 3 of 39 8.1.3 Turndown Not Applicable 44932089140 - ENGMO - ENGIRA - Misc Repotts & Forms\FEED REPORTIVOLUME 12 - UTILITIES - Fire Water ‘SystemAlex FEED BOOK SECTION 8.0 - Fit Water System Rev PB doc ) FEED REPORT Doc No. 332389-0000-40ES-0012 | SNC+LAVALIN Title REFINERY UPGRADE PROJECT Unit §800 — Fire Water System Date: April 2009 Revision No.: PB | Section 8.0 Page 4 of 39 8.1.4 Feed Composition Not Applicable 2199238040 - ENGMO- ENGIRA - Misc Reports & Forms\FEED REPORTIVOLUME 12 - UTILITIES - Fire Water ‘SysiemAlex FEED BOOK SECTION 8.0 - Fie Water System Rev PB doc ») FEED REPORT Doc No. 332389-0000-40ES-0012 SNC+LAVALIN | ___ : Title | REFINERY UPGRADE PROJECT ca Unit 5800 — Fire Water System Date: April 2009 Revision No.: PB_| Section 8.0 [Page 5 of 39 8.1.5 Integration Drawing 332389 5800 41D1 0001 shows the existing underground piping layout, and the proposed modifications. Four new 3000 gpm fire pumps (two electric motor driven and two diesel engines driven) will be installed at the existing Auxilliary pump station south of TK-101. The existing pump(s) will be removed. A new electric jockey pump will be installed at the existing main fire pump station south of TK=111. The fire pump(s) at the main fire pump station (south of TK-111) will remain connected to the underground fire water distribution system and will be used to supply wash water, -JA832380\M0 - ENG\O- ENG\RA - Mice Repotts & Forms\FEED REPORTIVOLUME 12 -UTILITIESIS - Fire Wator ‘Systom\Alex FEED BOOK SECTION 8.0 - Fre Water System Rev PB doc PROCESS Page: 1 7 [| i TITLE : UPGRADES TO FIRE WATER SYSTEM FOR NEW UNITS Design Bi Ravision Prepared By Toate | Reviewed By [bate] Projed’ [Client ApprovedTDate Approved by WT 07-08-00 oy WW/5-Sep-07 GA, WW, AH 31-Mar-09} GA, ‘AH/2B-Apr-08. '932889-6800-41EB.0004 -FIRE WATER REQUIREMENTS PD - xls - Revindx. => [Glert PETROUAM [Contac No. 35367 —] Re Che 7p GA [SNC + L.AWALLEN prijecl REFIERY UPGRADE PROJECT ‘UPGRADES TO FIRE WATER SYSTEM FOR NEW UNTS | DESIGN BASIS Page Ccianen a. — 9828055600 - 4168 - 0008 jim [UPGRADES TO FIRE WATER GYSTEMFOR NEW UNITS joasecrwve To determine the fre wate equemens ante pprades req othe exsing system For nw fc, wa prong adequate wale for ating ute and eauement faerHO0 [NFPA stars fr calelstng wale requeements franks Exon tandard for deioeling feo waar rou uta Berey Water Gams REFERENCES NFPA, 1, 25,20, Evert DP 30-4 Petojam Rene Frater Facity Pet Plan Petejae DoslgnSases and Tank soedule entey Water Goma Sofas DESIGN NPUTASSUMPTIONS 4 Refinery eapacty (000 Baro) 2 Proces areas Mas amas aes of 9°X 230 ‘3 Pevojam requested Pat 6000 gpm be avalabl atTark 118 4 Inesrata the new ssa wh ha existag yam 5 um decker pressure a £25 pe) (0 Pressure at fe most remote aes (LPG) {00 pl 7 Provide re pctacan oth DCU area { Datuge system ore igh pressure pups cesigned at 0.8 opr. CONFRRATION REGURED Tew ES 1 2]. a] x a]x six e| x 7x a} [CONCLUSIONS |] tat gpm ise on ti iaest ge te condogeney (he OMT — 2 £000 gpm frank 118 based on P'S request 8 6000 gem for DCU area TONFRNATION REGURED——] TEES ro 382389, 5800-41E8-0004 -FIRE WATER REQUIREMENTS PD - 3's DB » SNC LAVALIN. DESIGN SHEET No: ___332989-5000-41EB -0008 fre: [eon pero Project Narr REFINERY UPGRADE PROJECT JUPGRADES TOFIRE WATER SYSTEMFORNEWUNITS — fEMeO a Package No: [eas a) Discptne Proeass|Pago: 3 of 7 Prepared by Date hasta Date_| Approved Dato__[_ Rev. Ne. WiWoolnougi [| PEapedS & Alen =D [Tank Wate eReqiirements massa ay oo = JAssumptions: Foam Water Requirement: Cone Reof tanks application rate of 0.10 gpm? NFPA 11 Floating Roof tanks application rate 0.3 gprrvi?_— NFPA 11 Deluge system for pumps ata rate of 03 gpmit? NFPA 11 Cooling water for burning Water to" cooling Cooling waterfor burning tank: Tank dlameter(s) oe adjacent eke) et exposed tank up20 250 20-58 250 58-80 500 s-t10 750 110-130 750 130-140 009 140.160 1000 Tank Requirement: ‘Tank Roof Type “Tank Roof Arex ‘Total Fre Water Requirement Petiojam Water Requirement - Based on Capacly Petrojam Refinery Capacity 50,000 BPD [Acplying the general rate of 2,000 gpm per 20, 009 BPD to a maximum of 10,000 gpm [Roquirement: 15,000 apm industry used capaci: JExon 0.34(90"230) 6210 gpm |For normal stacking no more than 8000 gpm Fite Water requirement for the DCU area. INFPA 11 01 gpnut2 Jaron 57000 2 |For normal stacking no more than. 5700 ‘opm Petrojam Requested: 9000» gpm '382989-5800-41EB-0004 -FIRE WATER REQUIREMENTS PD - xlo-Calos, ) Nowany. i ae Engineers & Constructors DESIGN SHEET aig 1332989 -6800- 4188-0004 FTiTLe: PETROJAWE —_| REFINERY UPGRADE PROJECT [Project No.: ‘35258 WASTEWATER TREATMENT PLANT PRELIINARY DESIGN [Poee NG hee aaa iscstine: Pisces [Pacer 8 of 7 Prepared by Date Checked by Dato Approved by Dato” | Rev. No. Wiliam Wooinough [28-Apr-08 G.Aien PD, r =a [To adequately cover the area ofa new unit hydrant win fixed montor wl be requred and paced a G0 [The assumed rate of discharge from each hydrant is 780 gpm ‘Soe layout $32369-6800-41D1-0001 Flee Water Rea: 6,000 gpm Note the design new units the DHT (high pressure over a 1000 psljoparating pressure 1,500 psi 6000 gpm lectric motor driven each 3000 gpm, @ 125 psl, 350 hp 2 pumps, diesel driven each 8000 gpm, @ 126 psi, 370 hp {Jockey pump elecrle matar driven 125 gpm, @ 126 ps.15 hp. Fire Water pumping for Tank 118: 9,000 gpm Operating Pressure 100 pst ’3 purnps @ 3000 gom (2 electric, 4 diesel crven and 1 pump on standby) Fire water pumping: 3,000 gpmicach loischarge Pressure 125 psi Isc 1 Eloctie Pumps: lEiconcy for electric moter and pump 70% hp (GPMHEAD"SG)(3980"EFFICENCY) 3128 350 hp Diesel Engine Driven Pump '382989-5800-41E8.0004 -FIRE WATER REQUIREMENTS PD - xis-Cales. er ; , ere co ee | ees oe | hoe (GPM*HEAD*SG)(3860°EFFICENCY) | = eel DESIGN SHEET No. 392389 - 5800- 4168-0004 rrTue: Tine, [Gient PEYROUA UPGRADES TO FIRE WATER SYSTEM FOR NEWUNITS [Project Nama Project No Package No, [Ase 505) [Disciline: Prowss|Page: 6 of 7 Prepared) Dai Cheekea Dale. Fppaved Dale Rev. No ‘A Habe 5: Aor 8 Ale PO lNores ‘The veiociy in the pipe network wil be restricted fo be less than or equal fo 40 us, 10 protect the. ting system that was installed in the mid 1960s, 2 Pumps are to be FM approved and labeled 43 The request from Petrojam to be able to convey 9,000 gpm to tank 118, 9,000 gpm tothe Delayed Coker Unit, ‘6000 gpm to tank S-3, and to ensure adequate coverage for existing tanks requring more than 2000 gpm, was, addresses and will require that some existing pipes be replaced with larger ciameter pipes. nes changed to 10": AB, BC Lines changed to 12": DE, LM, 4, RS, TU, WW, XY, VX. New Lines 10°: IK'OP, PM, QR, A1BI, E1P2, P261, P202, Q2F1, B2C2, 6202, D212, 2p, Jake, Kala, L2N2, N22, U2V2, W2L, Jockey Pump Manifold New Lines 42": xwe New Lines 20": Pump Manifold (See layout drawing 332389-5800-41DD-0001) Relocated Lines 10% FG, 82-72 Demolished Lines 10° DIR2, A2I2, B2G2, H2I2, MAU2, WU ‘There are now three lines taking water from the manifolds (tho now line is ine XW2), Because ofthe addtional ie existing two lines (ines VX and XY) need to bs replaced by 12" pipes rather than by 18" pes, 4 90 new fre hydrants, 47 new monitors (including 12 elevated monitors to cover the Delayed Coker Unit), and [1 new PlVs wil be instalied. {5 The pumps wil be installed at Auxillary pump sump. {© The operating pressure athe hydrants wil be a minimum of 100 pel. 7 The system will be upgraded to supply the foam, and cooling water at any unit or tank with a minimum pressure of 100 psi 8 Bontiey Water Gems Program was used lo model the system to supply the fre water demand ‘at each unit wath a minimum pressure of 100 3 the most remote hydrant {9 Fire water requirements for DCU area based on calculation sheet 3 = 0000 gpm, 382989-5800-41E8-0004 -FIRE WATER REQUIREMENTS PD - xls - NotesGuidelines DESIGN SHEET fire’ JUPGRADES TO THE FIRE WATER SYSTEM FOR NEW UNITS. Fi Dai checked ‘Artis | 00-06-28 IFIRE WATER LAYOUT ‘No, 982080 5800- 4168-0004 [Stent ETROIAN [Project ftane:_REFINERY UPGRADE PROJECT Project No: 32588 [Package No: [areas 6800 Diseptne: Process Pager 7 —ot 7 Dare evn. WELL#2 weyers 60 p67 NeW LowDRALORY | | ESS) KINGSTON gMINISTRAT iB Cy saan" |e crue | (ors: Gag station = Fa) STREET here 5 Foran i = fu eons ET ESS OMEN ED TK-B ih /ASOLINE Tes enOseNe LEGEND: 1K-208 OFFICE Q ——_HvoRANT WITH FED MontroR v sila sronsce. rus © wovror awostes ° MONTOR (FIXED) seclguty lo ; [ ° FRE HYDRANT CRE | sbleon-28 Mow acento wore 00 Bois = = casas re waren ne ip crue BS ew one ware une ER MAIN ELEC, pee ‘SUB. SS #2 — DUSTING LOCATION OF RELOCATED PIPE ys tae) ap ut re wate ine 10 8 revoven Ie MICSTOMGE tah = foas tatera coef TORE tutus A nove. ennircaron wear PUP AOE = Eu_Tk-125. WATER | GLenoING eaNIEOLO il Tepe Billed Sols Eck reco hySte-370-0 \ rain eTa7a-0" RS om l A> SA lhe CAFETERIA 54215 Ble Tes lew ney EFDA 008 eas TK-188 poe. FOAM LATERAL | isn f2e00 afte | u Ha5-o EH Sedede! as | : 3 warenouse | 106, 4 fer ROSEN xISHING +7 Bee Ti waved fl Beh Tera is rwestsraeey S| voor 8 gan RON, Pee Leg foros ea ase “ELEC. bud 85." yl ruta Fae ‘WORKSHOP | +1372" sai SED FOR FEED, Exist ot s pe | ogvoss27 | (PREVIOUSLY SUED AS SEPARATOR t 4 H 332389-5800-4100-0001) aw Fe ia beac cove ar - Is 13a 0 | 0903/23 | ISSUED FOR CLENT REVIEW mow] ae =k @ Eee ST ee ; i . Bra ELEY, SUB, $5 4 Pc | osvo2/i2 | ISSUED FOR INTERNAL REVIEW an] ww | vo rel20 ct RELEASED FOR CLIENT REVIEW Ti PB | 08/10/09 AND INFORMATION ‘Sc | ww | wD Eusrig east | EN a ETHANOL TAKS. alas euealos ain mi tl EDaNDL 07/08/13 | tssuco FOR TERNAL REVEW 0 | ww | wo ql fev. ied 5 for] oare DESCRIPTION ey | cn | app | cuient zi THs _ORAWNG 1S THE PROPERTY OF SHOHLAVAD ING ANO THE USE AND COPYING THEREDF IS ») SINCoLAVA LIN | weer ts Mert Sn Sete tt ae] 8 COMED EXCEPT AS EXPRESSLY PROVOED i PROWECT NO, EA osc. | ooc. | prawn — | Revision . ages, 332389 5800 [41 | D1 {| 0001 | PE PETROJAM LIMITED | so — \T08 |rx-210_ new a] * g REFINERY UPGRADE PROJECT é Te PETROJAM REFINERY UPGRADE e Pe i UTILITIES i Bil Ea sg 00 we oo MODIFICATIONS TO FIRE WATER SYSTEM 6 {cation & 4 ScAE w sect ix-ago | | asi POhe) eran walk oud 9 58-4101-0001 okey, Puy 2 eu 3 ps5 eo SFILES SUSERS. Format ‘0° Sheot )) FEED REPORT Doc No. 332389-0000-40ES-0012 SNC+LAVALIN Title REFINERY UPGRADE PROJECT Unit 5800 — Fire Water System Date: April 2009 Revision No.: PB | Section 8.0 Page 6 of 39 8.1.6 Process and Equipment Guidelines Not Applicable .11852380W40 - ENGWO - ENGIRA - Misc Ropors & Forms\FEED REPORTIVOLUME 12 - UTILITIES\S - Fre Water ‘SystemiAlox FEED BOOK SECTION 80 - Fre Water System Rev PB.soc ») FEED REPORT Doc No. 332389-0000-40ES-0012 Title REFINERY UPGRADE PROJECT. Unit 8600 ~ Fire Water System Date: Apri 2009 Revision No.: PB | Section 8.0 Page 7 of 39 8.1.7, Battery Limit Conditions Not Applicable .JN3823800 - ENG\4D - ENGIRA - Misc Reports & Forms\PEED REPORTIVOLUME 12 - UTILITIES - Fite Weter ‘System\Alex FEED BOOK SECTION &.0 - Fre Water Systom Rev PB.doc » FEED REPORT Doc No, 332389-0000-40ES-0012, SNC+LAVALIN Title REFINERY UPGRADE PROJECT Unit 5800 — Fire Water System Date: April 2009 Revision No.: PB_| Section 8.0 Page 8 of 39 8.2 PROCESS DESIGN Not Applicable 8.2.1 Process Description Not Applicable -J193236940 - ENGO - ENGIRA - Misc Reports & FormsiFSED REPORTWVOLUME 12 - UTILITIES - Fire Water ‘System\Alox FEED BOOK SECTION 8.0 - Fra Water System Rev PB.doc » FEED REPORT Doc No, 332389-0000-40ES-0012 \SNC+LAVALIN Title REFINERY UPGRADE PROJECT. Unit 5800 — Fire Water System Date: April 2009 Revision No.: PB | Section 8.0 Page 9 of 39 8.2.2 Process Flow Diagrams Not Applicable 5339238040 - ENGMO - ENGIRA - Mise Reports & Forms\FEED REPORTWVOLUME 12 - UTILITIES - Fire ‘Water SystomiAlex FEED BOOK SECTION 8.0 - Fire Weter System Rev PS doe ) FEED REPORT (D| peTROIA i Doc No. 332389-0000-40ES-0012 = SNC+LAVALIN Title REFINERY UPGRADE PROJECT Unit 5800 — Fire Water System Date: April 2009 Revision No.: PB | Section 8.0 Page 10 of 39 | 8.2.3 Stream Property Table Not Applicable 18992989140 - ENGMO - ENGIRA - Misc Reports & Forms\FEED REPORTWOLUME 12 - UTILITIESIB - Systemitlex FEED BOOK SECTION 80 - Fre Water System Rev PE. coe Water ) FEED REPORT RETRO Doc No. 332389-0000-40ES-0012 |SNC+LAVALIN: Title REFINERY UPGRADE PROJECT Unit 5800 — Fire Water System Date: April 2000 Revision No.: PB | Section 8.0 Page 11 of 38 8.2.4 P&ID See drawings 332389 5800 41D1 0043 and 332389 5800 41D1 0057 follow. 418932089140 - ENGMO - ENGIRA Misc Repos & Forms\FEED REPORTWVOLUME 12 - UTILITIES\S - Fie Watar SystemiAiex FEED BOOK SECTION 80 - Fre Water Sysiom Rov PB doc ) FEED REPORT ip aon Doc No, 332389-0000-40ES-0012 |SNC+LAVALIN. = Title REFINERY UPGRADE PROJECT Unit 6800 — Fire Water System Date: April 2009 Revision No.: PB | Section 8.0 Page 12 of 39 8.2.5 Material Selection Diagram Buried piping will be the same specification, piping class MS-1 as the existing ductile iron piping. The above ground pump station piping will be alloy 254 SMO (UNSS31254) piping class U1A2. 11888258840 - ENG\O - ENGIRA - Misc Reports & Forms\FEED REPORTIVOLUME 12 - UTILITIES'S - Fre Water ‘Systom\Alex FEED BOOK SECTION 8.0 - Fire Wetor Systom Rev PB doe ) FEED REPORT 5 5 Doc No. 332389-0000-40ES-0012 SNC*LAVALIN | _ Eas ae Title REFINERY UPGRADE PROJECT Unit 5800 ~ Fire Water System [Date: April 2009, Revision No.: PB | Section 8.0 Page 13 of 39 8.2.6 Plot Plan Modifications to the existing fire water system is shown on drawing 332389 5800 41 D1 0001 in section 8.1.5 Proposed inlet modifications, pump arrangement and piping at the existing Auxiliary pump station (south of TK-101) is shown on drawing 332389 5800 46 D1 DK 0001 and 0002. This arrangement shows four 3000 gpm fire water pumps. The jockey pump will be installed at the main fire water pump station south of TK- 114. Arrangement drawings will be prepared when details of the existing intake structure becomes available 41888238040 - ENGMO - ENGIRA - Misc Reports & Forms\FEED REPORTVOLUME 12 - UTILITIES'S - Fo Water ‘System\Alox FEED BOOK SECTION 80 - Fire Water System Rev PB.doc FEED REPORT Doc No, 332389-0000-40ES-0012 Title REFINERY UPGRADE PROJECT Unit 5800 — Fire Water System Date: April 2009 Revision No.: PB | Section 8.0 Page 14 of 39, 8.2.7 Catalyst & Chemicals Not Applicable 138932389340 - ENGMO - ENGIRA - Misc Reporis & Forms\FEED REPORTIVOLUME 12 - UTILITIESIS - Fe Water ‘ystemilex FEED BOOK SECTION 8.0 Fire Water System Rev PB.doo FEED REPORT Doc No, 332389-0000-40ES-0012 |SNC+LAVALIN Title REFINERY UPGRADE PROJECT Unit 5800 — Fire Water System Date: _ April 2009 Revision No.: PB | Section 6.0 Page 15 of 39 8.2.8 Utilities Not Applicable 11859298940 - ENGWO - ENGIRA - tise Ropors & Forms\FEED REPORTVOLUME 12 - UTILITIESSS - Fre Weter ‘SystemAlex FEED BOOK SECTION 8 0- Fira Water System Rev PB doc > +LAVALIN FEED REPORT Doc No. 332389-0000-40ES-0012 Title REFINERY UPGRADE PROJECT Unit 5800 — Fire Water System Date: April 2009 Revision No.: PB _| Section 8.0 Page 16 of 39 8.2.9 Environmental, Health & Safoty Not Applicable 41982380440 - ENGMO - ENGIRA - Mise Reports & Forms\FEED REPORTIVOLUME 12 - UTILITIES\8 - Fre Weter ‘System\Alex FEED BOOK SECTION 6.0 - Fre Water System Rev PB.doc ) FEED REPORT Doc No. 332389-0000-40ES-0012 LSNC+LAVALIN | ____ : Title “___| REFINERY UPGRADE PROJECT Unit 5800 — Fire Water System Date: April 2008 Revision No.: PB | Section 8.0 Page 17 of 38 8.3 EQUIPMENT DESIGN 8.3.1 Equipment List The equipment numbers and data for the new pumps are as follows: 58-P-01A, Electric motor driven vertical turbine fire water pump 3000 gpm @ 285 ff, 350 HP. 58-P-018 Electric motor driven vertical turbine fire water pump 3000 gpm @ 285 ft, 350 HP. 58-P-01C Diesel Engine driven vertical turbine fire water pump 3000 gpm @ 285 ft, 380 HP. 58-P-01D Diesel Engine driven vertical turbine fire water pump 3000 gpm @ 285 ft, 380 HP. 58-P-04 Electric motor driven jockey fire water pump 120 gpm @ 285 ft, 15 HP. .#3932989¥0 - ENG\O - ENGIRA - Misc Reports & Forms\FEED REPORTVOLUME 12 - UTILITIES\B - Fire Waler SystemiAlex FEED BOOK SECTION 60 - Fre Water System Rev PB.doc ) FEED REPORT 7 Doc No. 332389-0000-40ES-0012 LSNC+LAVALI Title REFINERY UPGRADE PROJECT Unit 5800 ~ Fire Water System Date: April 2009 Revision No.: PB | Section 8.0 Page 18 of 39 8.3.2. Equipment Design Basis Not applicable, 418992386)40 - ENGMO ~ ENGIRA - Misc Reports & Forms\FEED REPORTVOLUME 12 - UTILITIES'S - Fie Water ‘System\Alex FEED BOOK SECTION 80 - Fire Water Systom Rev PB.dee FEED REPORT Doc No. 332389-0000-40ES-0012 |SNC* LAVALIN: Title REFINERY UPGRADE PROJECT cy Unit 5800 — Fire Water System [Date: April 2009 Revision No.: PB | Section 8.0 [Page 19 of 30 8.3.3 Equipment Datasheets Not applicable. -§8902369440 - ENGMO - ENGIRA - Misc Reports & Forms\FEED REPORTIVOLUME 12 - UTILITIESIS - Fire Water ‘System\Alex FEED BOOK SECTION &0- Fite Water Syetom Rev PB.doe ) FEED REPORT le REFINERY UPGRADE PROJECT _ ae i] Unit 5600~Fire Water System : is Date: April 2009 Revision No.: PB | Section 8.0 Page 20 of 39 8.4 INSTRUMENTATION DESIGN 8.4.1. Instrument Index and |/O Index (Preliminary) The Instrument Index and I/O List for instruments outside of the Fire Water Package follow. 1899298840 - ENG\d0 - ENGIRA - Misc Reports & Forms\FEED REPORTIVOLUME 12 - UTILITIES\S - Fe Water ‘System\Alex FEED BOOK SECTION 8 0- Fro Water Syelem Rev PB.doe Design File: p:\332389\civil\5000\332389-58004 1DD004 3.dgn APPLJ 11:24:10 4/30/2009 TOWARD TANK 18, scsi tnntazetaa] COMMON TROUBLE COMMON / (ea | conwon 0038) TROUBLE oy coMMoN TROUBLE NOTE NOTE 3 an Dow, | evectric Pune | | CONTROLLER | set @ HOLD PSIG 10" -58-WF -U1A2-0007 18"-58-WF -U1A2-0001 FIRE WATER P, 58-PK. KAGE, ! ee 40" TEST HEADER 12'-58-WF -UIA2-0003 10". ELECTRIC PUMP CONTROLLER SET @ HOLD PSIG / st 12"-58-WF-U1A2-0004 DIESEL PUMP CONTROLLER SET @ HOLD PSIG @) ali . 10" WF TEST HEAD C/W 4 x 29" T q chy HOSE CONNS. xe | DIESEL PUMP | CONTROLLER SET @ HOLD PSIG B= WF -UIA2-0005 12 ‘ g Let) \_/ FILL/VENT XA XA 0055) Ni DSA, ie R07 (xa 0076 S. ; a. FUEL TANK \— NOTE 2 ++ GAL t FIRE WATER PUMPS. CONTROL PANEL NOTE 1 1 x eee se 7" oraN : ! PSV) ' \ T@ ; eve ela cio! P50, () : ( YY ) ' HOLD PSI SET a ' 58-P-O1A type vou! 58-P-O1B pype vce 58-P-01C pcnateae “Yse-P-00 v i : 1 i 1 iS i etet fea gels «| ome a p rH ° CI ae : aq ! | i L 58-P-O01A FIRE WATER PUMP. FLOW, GPM: 3000 DIFF. HEAD, FT: 285 MOTOR, HP: 350 FIRE WATER PUMP SUMP KINGSTON HARBOUR AUXILLARY PUMP STATION 58-P-01B FIRE WATER PUMP FLOW, GPM: 3000 DIFF. HEAD, FT: 285 MOTOR, HP: 350 58-P-O1C FIRE WATER PUMP FLOW, GPM: 3000. DIFF. HEAD, FT: 28: MOTOR, Hi 80 2" SUPPLY (CW) TO DIESEL ENGINE (ENGINE COOLING WATER) 2" SUPPLY (CW) TO DIESEL ENGINE (ENGINE COOLING WATER) sicencer }2 Extey sicencer }S™ eee eee 58-P-O1D FIRE WATER PUMP FLOW, GPM: 3000 DIFF. HEAD, FT: 285 MOTOR, HP: 380 ‘COMMON TROUBLE COMMON TROUBLE, OTE 3 COMMON TROUBLE COMMON TROUBLE OTE 3 NOTES: 1. CONTROL PANEL WILL BE PART 3. LOCATED IN THE GUARDHOUSE 2.Ye" CHECK VALVE C/W 9" ORIFICE OF FIRE WATER PUMP PACKAGE po | 09/04/30 pa | ovossav DATE DESCRIPTION ay | cHx ») SNCLAVALIN : Tas Deanne Ge PRO-CT 0, Rem 332389 (P| PETROJAM LIMITED | REFINERY UPGRADE PROJECT Tite FIRE WATER FIRE WATER SUPPLY PIPING & INSTRUMENTATION ~ AUXILLARY PUMP STATION DIAGRAM DATE OW NO, REVSEN Nuweee o 58-4101-0043 Format 0° Sheet Sie ul NOTE 2 SET @ HOLD PSIG FIRE WATER PACKAGE 58-PK-O01 eee ee PUMP CONTROLLER SET @ HOLD PsiC 1A2-0001 La, NOTE 3 3°-88-WE @) a5 TOWARD EAST Fa) common Keo9s) TROUBLE ‘COMMON TROUBLE NOTE 1 & 3 x 6 z 3 3 8 3 | 2 3} ¥ 4 $ 3 8 s 3 é) 8 ‘I 2 i 3 a 8 2 7 g 8 3 32 5 8s 2 B q| 52 qi BS g ss 5 ag 5 3S A 28 z ‘a> , a 3 a 5 oo a oo a aes 5 az FIRE. WATER_ PUMP FLOW, GPM: DIFF. HEAD, FT: MOTOR, HP: KINGSTON HARBOUR MAIN PUMP STATION EXISTING FIRE WATER PUMPS FIRE WATER PUMP FLOW, GPM: DIFF. HEAD, FT: MOTOR, HP: ° FIRE_ WATER PUMP FLOW, GPM: DIFF. HEAD, FT: MOTOR, HP: 58-P-04 FIRE WATER JOCKEY PUMP. FLOW, GPM: 120 DIFF. HEAD, FT: 285 MOTOR, HP: 15, Notes: 1.LOCATED AT THE GUARDHOUSE 2. EXISTING FIRE WATER SYSTEM TO BE CONFIRMED BY PETROJAM 3.Ye" CHECK VALVE C/W Yao" ORIFICE re | avvoer30-| sueo For Fee ea | osrozas | ssuen For mrennat Review AT ow | Rev BBY] oare ey | cr | are | cuient ae an 5800 i | 0057 | PB 41} Di | 7 | PETROJAM LIMITED | REFINERY UPGRADE PROJECT Tie FIRE WATER FIRE WATER SUPPLY - MAIN PUMP STATION PIPING & INSTRUMENTATION DIAGRAM ate wo No 58-41D1-0057 GC INSTRUMENT LIST ‘SERVICE DESCRIPTION Paid LINE / EQUIP, LOCATION Toop [JUNCTION BOX] INSTALL oWG.aaDs- | TIANUFACTURER | SUPPLIER. eae 050. DRAWING Mo. prawnc | prawns | orawina | PROG. | PNEU. | ELECT. PURCHASE ORDER Ne, v8 REMARKS Tyee 2009-04-20 REVISION bs] ae = ®) SNC-LAVALIN PA] 20000487 FORINTERNAL REVIEW ea] s00n040 FOR FEED PACKAGE feieerrereoun cares LOCATION: KINGSTON JAMAICA PROJECT: RESWERY UPGRADE PROJECT INSTRUMENT LIST FIRE WATER SYSTEM PAGIECT He 332389 -JN832380140 - ENGMS - IAC\EL - ENG ListInstumantat n Uist AREA 5800 xs]INSTR-LIST Fras omavana 1s THE PROPERTY OF SNC-AVALIN JsconronsreD, AND TEE USE AND COPYING THEREOF 18 Jsuasect 10 THE TERWS OF THE AGREENEXT UNDER acer Was PREPARED. HS DRAVONG WAY NOT BE lcorsep exccPTas ExPRESSLY PROVIDED THEAEHL By nae PREPARED Ve STENCEL [oneoKeD WARODELLEDONNE | soonoNe APPROVED FRANRHERVAS | _AOSOTe ‘we.coxe [Sema | _REVISON 5800 48EL, (0001 -392880-5800-48E1-0001 Eo PB SHEET 1 of2 2000-04-29) INSTRUMENT LIST ‘JN892899140 - ENG\48 -IACIEL - ENG ListeInstrumantation List AREA 5800. xis)NSTR-LIST jaev] Tac Ne. SERVICE DESCRIPTION Los. | Palo UievEGU. | LOCATION | LOOP [JUNCTION BOX] INSTALL OWG. ane. | MANUFACTURER ] SUPPLIER | DATASHT. | PURCHASE | U0 REMARKS DRAWING Ho. prawn | onawnc | onawic | proc, | pwev. [etect. <0. | onoERM. | TYPE [se Pat ot AJPUNPSe-ROIADISCHARGELOW PRESSURE | DOS | sam0;OD.9 Ei (o) [Fao secon Pur cone [os PAL coi [PUMP Ss.P-01A DISCHARGE LOW PRESSURE | PAL | ee-7010049 | GUARDHOUSE PML : [es _xA 001 _AlPUMI sn-P-01A CONTROLLER GONIMON TROUBLE | DOS | SeaiD40048 : DI [ou eneceat Rove cowrnaan 658 _XA C01 B|PUMPS=-POIACONTROLLERCOMWON TROUBLE | PNL | Se-4iD‘cO%a | GUAROHOUSE PHL jou erceot rave conTROWLER a los. AS 002 _A|PUNP SSP-O1AMOTOR STARTISTOP DCS SWITCH | OCS | G8-4701-0008 BOTA Cow [rre-c-ucron cra Ps os HS 002 B/PUNPSSPOIAMOTOR STARTISTOP LOCAL swirch| F | sB.41DI-000 | _SBPOIA = rere wImTnLs wees 6 [se HS 002 O|PUMP 88-P-01A MOTOR HOM LOCAL SWITCH F_| seaiwi00@ | separ =__freere wrmernis wveise PB [6s XL_-002 [PUMP SBPOIANOTOR STATUS LOGALINDICATION| —F | Ge-A10100% | __BBPOTA = [ieee wimernis avi Po |se- PAL -0o3 A|PUMP s0-P-O1BDISGHARGELOW PRESSURE | DOS | seW1D1000 = FROM sePkeot PUNE CONTROLER Pe [ee PAL 008 B/PUMPS8 POIBDRCHARGE LOW PRESSURE | PNL | sB-iD‘o0N | GUARONOUSEPNL = FRow ee oot MP CONTROLLER 8 oe: XA 00a _A|PUMP 69 016 CONTROLLER COMMON TROUBLE | OOS | €8-4701-008 = 1 Fnowes Peon rawr cowrnoLEn 6 [se XA -005 6 [PUP s8P-OTB CONTROLLER COMMON TROUBLE | PNL | 68-1101-0049 | GUARDHOUSEPNL = ROUSE For Fane CONTROLER Ps |s8- HS 004 AJPUNPEE-POIE MOTOR STARTISTOP OCS EWITGH| DGS | seaiDI0Na | Pore ‘GoM [rire c Wore STAs Pa [5s HS oot _S|FUMPSePoIs MOTOR STARTISIOP LOCAL SWITCH] F | SesiD10oa | SPOT = vr eurmernis eves [58H 004 [PUMP 68P-DIBMOTORHOIRLOCAL SWITCH F_) sein SEOs = [Pee wrRTns SFE ps [is XL-004 [PUMP eBPOTBMOTOR STATUS LOGALINDIGATION| F | —S8.1010019 Poe ~ jre ener oF ee a [se- Pal 00s AJPUMPas-POICDISCHARGELOW PRESSURE | DOS | sB41D10049 7 Di_roMssrcoor a comnoien Pa [ss PAL 00s @|PUMP s8P-0(C DISCHARGE LOW PRESSURE | PNL | G8-41D1.0049 | GUAROHOUSE NL ~_ FRoMas roo rine conmoUsn [52 XA 00s _A/PUMP s8P-o1G CONTROLLER COMMON TROUBLE | GS | Se-nD1-one8 = 01 Rowserkonc rime comnOLER pe [se xa 00s B|PUMP s=-P.oiC CONTROLLER COMMON TROUBLE| PNL | seP.0¢ DISCHARGE LOW PRESSUNE| PNL | SB4iD1-0067 | GUARDBOUSE PNL 7 Rowse pcan par come Pass. XA 009 AliOCWEY UMP sar-o4CONTROUERCOMVONTROUBLE| OS | Ge-41D1-0057 = D1 prousseKecz Powe COMTROMLER Ps XA 008 BliocKeY Puue se.pos CoMTROLLER CoMWON TnOUsLE| PN | sB-410100s7 | GUARDNOUBE PNL Frouserone ru CONTREMLER Pa [58 _HS 10 _A)PUMP ee-PosMOTOR STARTESTOP OCSEWITON | DOS | Se-iDIOO57 sO COM [rive voroRGTRe >a [be HS_-010_B[PuvP sePos MOTOR STARTSTOPLOCAL SwrTCH| F | sea1DI-a05r ‘s5P-04 7 Reo wan TAR BrELES | Pass _Hs 010 clPuve s0.°.04 WOTOR HIM LOCAL SWETCH | searoro0sr ‘SEP. To frveere umn ora, rE 5 [f= XL_010 [PUMP S204 MOTOR STATUS LOCAL INDICATION | F _| Se-ADIOO57 BPO [Ree ctumoraia are 882889-5800-48EL.0001 SHEET Zot. 2009-04-29 /O LIST UNIT 5800 FIRE WATER SYSTEM LEGEND: a ANALOG INPUT 20. ANALoo oureur ms BURNER MANAGEMENT SYSTEM com ‘COMMUNICATION MODULE 0s. DISTRIBUTED CONTROL SYSTEM a1 vGTALINEUT bx DEVICE NET COMMUNICATION , po DicrTaL OUTPUT fe FleLo POWERED ms MoUs COMMUNICATION °8 PROFIBUS COMMUNICATION Puc ‘PROGRAMMABLE LOGIC CONTROLLER RTD. To IPUT sr SYSTEM POWERED eK “THERMOOOUPLE INPUT TYPE” 2 PETROJAM LIMITED a NOTES {PR fi/woTons vo REPRESENT THE FOLLOWING: REVISION Inev] _DATE DESCRIPTION By | cK PA] 2008-0427 FORINTERNAL REVIEW es_[ woo [FH [P| 20000420 P E “po | Fe | FORFEEDPACKAGE | ES ra FH z I JsraTus FOR(READY, RUNNING, AUTO, FAULT) SOFTWARE SHFTCH FORISTART, STOP, Jvavaut0) woo soos ©) SNC-LAVALIN (CLIENT;PETROJAM LIMITED LOCATION:KINGSTON JAMAICA PROJECT: REFINERY UPGRADE PROJECT nis DRAWINGS THE PROPERTY OF BNOLAVALIN |sconPoRATED, AND THE USE AND COPYING THEREOF IS [susvect 10 THe TERNS OF TH AGREEMENT UNDER |wezcn rr was prerARen. THs DRAWING HAY NOT BE Icone> excerr As EXPRESSLY PROVIDED THEREIN, oY Nae oar INPUT OUTPUT LIST pRcPare wesrecn | mmone FIRE WATER SYSTEM eGR TARO DEIE DOANE | emu | APPROVED eo | PRIESTS, mex | owa.cone [sent | _REVISON i 332388 5800 aBEL (0002, PB | -J8882980\40 - ENG\4a -IRCIEL - ENG LisisINPUT OUTPUT LIST FOR AREA S800: 2s]-0 COVER SHEET 882989_5800_48E1_0002 PAGE 1 of 2 2008-04.29 INPUT / OUTPUT LIST FOR FIRE WATER SYSTEM UNIT 5800 “SIGNAL MOBULE] POWER | VOLTAGE | PANEL Wo. | CAROF | 10 EQUIPHENT Tyee | Tee | FPP a FETA P| 7A_ FRE WATER PONE WOTOR eo : DUO ENOL | oie rie wares Pome woToR. DN cow D11300 EMOTE P[k ine WATER JOGKEY POMP NOTOR “Aor a5 see WSTET loos cowmmOMen [SorTWARE CONFIG Des mOGATORS [socTwaRE CONG. ‘anus |SoRTWATE CORALS: live K THEAMOGOUBLE NPUTS TO FEL TOMOWLES DOS) FIELD INSTHUMENTS ANALOG INPUTS TO FEL VO MODULES: [se STRUTENTS ANALOG OUTBUTS FROM FELD TO MODULES (BG [Feo WSTRUMENTS DIGITAL NPUTS TO FELD WO MODULES (OCS) FEL NSTRIENTS DIGITAL GUTPUTS PROM FIELD TO MODULES (60S) '982389_6800_48EL_0002 PAGE 2 of2 -JA832989140 - ENGVES -IAC\EL - ENG Lists INPUT OUTPUT LIST FOR AREA 5800.xls|SHEET 1 ED) FEED REPORT Ee Doc No. 332389-0000-40ES-0012 SNC+LAVALIN Title REFINERY UPGRADE PROJECT Unit 800 - Fire Water System Date: April 2009 Revision No. PB | Section 6.0 Page 21 of 38 8.4.2 Instrument Process Data Sheets Not applicable. N832380M0 - ENGMO - ENGIRA - Misc Repos & Forms\FEED REPORTIVOLUME 12 - UTILITIESIS - Fire Walor ‘Systom\Alex FEED BOOK SECTION 8.0- Fie Water System Rov PB.doo ) FEED REPORT Doe No. 332389-0000-40ES-0012 SNC+LAVALIN. Title REFINERY UPGRADE PROJECT Unit §800 - Fire Water System Date: April 2009 Revision No.: PB _| Section 8.0 Page 22 of 39 8.4.3 Process Control Philosophy The fire pump system will be in automatic (standby mode). In automatic or standby mode the system is ready to accept any manual or automatic signal to start pumps. Each pump will be controlled by its own controller so any manual signal (ie.: start push buttons) will start that specific pump only. Automatic signals are individually interpreted by each controller and will start their pump depending on the design of each panel. Signal for remote startistop will be connected in each panel via the ABB DCS system (communication in PROFIBUS) from the control room, guard house, fire alarms, and weekly exercise test cycles. The jockey pump controller will start the pump when a preset low pressure is detected by its integral pressure switch that is piped to the system pipe header. The jockey pump will be stopped by the pressure switch after it brings the system back up to the preset high pressure. A minimum run timer is included to ensure the pump runs a few minutes to avoid frequent starts and stops. If the system pressure falls and the jockey pump cannot build it back up, one of the electric fire pumps will start. if the pressure continues to fall, the other electric pump will start, followed by the diesel pumps. The pumps will start on their set points and they will have a timer to delay their start by 15 to 30 seconds to allow earlier started pumps time to build up pressure. Diese! pumps will start in a power failure when pressure falls to their set point. As an option, the diese! pumps_can_be started ona power failure regardless of the system pressure. The fire pump controller will automatically shut down the fire pump when the higher set pressure is achieved, after a minimum run time (30 minutes on a diesel, 1 minute per 10 HP on an electric). 13888238940 - ENGMO - ENGIRA - Misc Reports & Forms\FEED REPORTIVOLUME 12 UTILITIES - Fire Water ‘System\Alex FEED BOOK SECTION 8.0 - Fite Water System Rev P8.d0° ») FEED REPORT (0) ah Doc No. 332389-0000-40ES-0012 SNC+LAVALIN Title REFINERY UPGRADE PROJECT Unit 5800 — Fire Water System Date:_April 2009 Revision No.: PB _| Section 8.0 Page 23 of 39 8.5 ELECTRICAL DESIGN 8.5.1 Electrical Load List The Electrical Load List for the Fire Water System follows. -51832080M0 - ENGMO - ENGIRA - Misc Reports & Forms|FEED REPORTWOLUME 12 - UTILITIES\B - Fite Water ‘Systemlex FEED BOOK SECTION 8.0- Fire Water Syetem Rev PB.coe SES ae ee » : a ae oan ant =— per gee ee oe |cuiewr: paTROUAN LTD. sor: VO 3. St aoe oe ee — as — ET Se ee Baer ese EQUIPMENT. DESCRIPTION IRAWNG ‘rmunronuea | senona | nce Sone cammeete asm Toncaiwea | erase [ainensT | BNET Ganseraeg [ eomater_[ssovonet mass ie teen feet iiseotoas | eevestar [ ewonsi| easiat Faia” Pisa nua wang creatar [none saz 2 “ole Loed Tie Sheet Celatned Power Fett The sheet Power Demend- Ths Shest “sg bE a LISTE NNT | roms FEED REPORT Doc No. 332389-0000-40ES-0012 INERY UPGRADE PROJECT Ait cesses serseeesr te ‘ire Water System Date: April 2009 Revision No.: PB | Section 8.0 Page 24 of 39 8.5.2 Electrical Equipment List The major equipment for the Fire Water System would be two 350HP pumps and one 15HP Jockey pump. 68-P-01A and 01B will be fed from the 4.16Kv MCC located at the Cooling Water Sub-Station and 58-P-04 which is Jockey pump will be fed from 480V. MCC in the Cooling Water Sub-Station. .J8332580\0 - ENGWO - ENGIRA - Mise Reports & Forms\FEED REPORTIVOLUME 12 UTILITIESYS - Fe Water ‘System\Alex FEED BOOK SECTION 8.0 - Fre Water System Rev PB.doc FEED REPORT Doc No. 332389-0000-40ES-0012 [Date: April 2009 Revision No.: PB | Section 8.0 Page 25 of 39 8.5.3 Electrical Single Line Diagram The single line diagram for Fire Water loads will be integrated with both 4.16Kv and 480V Cooling Water single line diagram. {IA3a2989M40 - ENG\O - ENGIRA - Mise Reports & Forms\FEED REPORTIVOLUME 12 - UTILITIESIS - Fie Water 'System\Alex FEED BOOK SECTION 8.0 - Fre Weter Syatom Rev PB.doc » SNC+ LAVAL FEED REPORT Doc No. 332389-0000-40ES-0012 REFINERY UPG ROJECT 5800 — Fire Water System | Date: April 2009 Revision No.: PB | Section 8.0 Page 26 of 39 8.5.4 Electrical Clas: Not applicable cation Drawing 51932999140 - ENG\O - ENGIRA - Msc Reports & Forms\FEED REPORTWOLUME 12 - UTILTIES\S - Fire Weter ‘Systemlex FEED BOOK SECTION 6.0 Fir Water Sysiem Rev PS. doc. » FEED REPORT Doc No, 332389-0000-40ES-0012 LSNC+LAVALIN. Title REFINERY UPGRADE PROJECT. Unit 800 ~ Fire Water System Date: April 2009 Revision No.: PB_| Section 8.0 [Page 27 of 39 8.5.5 Lighting Lighting is generally designed per section 3.4 of Electrical Design Criteria Document # 332389-8000-47EC-0001 Rev. PC ‘The number of lighting fixtures has been determined based on lighting level identified in Section 3.4.1 of design criteria. This is the basis for the capital cost estimate. 8.5.6 Grounding Grounding is generally designed per section 3.7 of Electrical Design Criteria Document # 332389-8000-47EC-0001 Rev. PC The main ground conductor in the loop is #4/0 AWG. Size of equipment grounding & bonding conductor is consistent with Table 250.122 NEC. This is the basis for the capital cost estimate. .41982580\0 - ENG\4O - ENGIRA - Misc Roports & Forms\FEED REPORTIVOLUME 12 - UTILITIESIS - Fite Water ‘System\Alex FEED BOOK SECTION 8.0 - Fre Welor Syetom Rev PE.doe FEED REPORT PETROJA Doc No. 332389-0000-40ES-0012 Title REFINERY UPGRADE PROJECT Unit ‘5800 - Fire Water System Date: April 2009 Revision No.: PB_| Section 8.0 Page 28 of 39 86 PIPING 8.6.1 Piping Line List 1883238040 - ENGMO - ENGIRA - Mise Roports & Forms\FEED REPORTIVOLUME 12 - UTILITIESIS- Fire Water ‘Systom\Alex FEED BOOK SECTION 6.0 - Fre Water System Rev PB.doe FEED REPORT Doc No. 332389-0000-40ES-0012 | Title, _____ | REFINERY UPGRADE PROJECT [Unit 5800 - Fire Water System Date: April 2009 Revision No.: PB | Section 8.0 Page 29 of 39 J 8.6.2 Tie-Point List Relocations and connections to the existing system is shown on drawing 332389 5800 41 D1 0001 see section 8.1.5 43329200 - ENGMO - ENGIRA.- Misc Roports & Forms\FEED REPORTWOLUME 12 UTILITIESIG - Fire Water ‘SystemiAlex FEED BOOK SECTION 6.0 - Fire Water System Rev PB,doc FEED REPORT Doc No. 332389-0000-40ES-0012 Title REFINERY UPGRADE PROJECT Unit 5800 — Fire Water System Date: April 2009 Revision No.: PB_| Section 8.0 Page 30 of 39 8.6.3 Piping Sketches Piping arrangement for the new pumps at the Auxiliary pump station is shown on drawings 332389 5800 46 D1 DK 0001 and 0002. 4899298040 - ENG\E - ENGIRA - Mise Reports & Forms\FEED REPORTIVOLUME 12- UTILITIESIB - Fire Water ‘SystemiAlex FEED BOOK SECTION 6.0 - Fire Water System Rev PB. doc sort -\58D0 ~ Fir Join.Bond.gef MEMAB P:A322389\plot plor 14:27:43 23/04/2009 Drawing File: P:\332389\piot plan\5800 - Fire Water Intake\332389-5800-46DK0001.dwg MCMAB PLANT NORTH TRUE NORTH PREVAILING WIND 30’-0” PROPOSED NEW EQUIP. CANOPY FUEL TANK, 560 USC DOUBLE WALL PROPOSED NEW EQUIP. CANOPY PROPOSED NEW EQUIP, PAD FIRE WATER PUMP —} PEERLESS MODEL 18HXBF, 3 STAGE VERTICAL TURBINE | RIGHT ANGLE GEAR DRIVE Wi, yy M7 ng BY r WV PUMP CONTROLLERS. TP. 2 e EXIST. EQUIP, PAD —, i SS ro Be oEwOUSsHED | SS 5 Seta oe aac SAN ANN j i \ - | \) DISCH. TEE asseyoyfy wir} | | QI RECT acTING RELIEF vale | pues | ELeeTRIC. MOTOR DRNEH WASTE CONE | in : J FIRE WATER PUMPS oe S He | 2 | | | 1 th | | | | poaaanaaat SS \ I | | | TEST HEADER IN \ 7 | | Cf 4x 21/2 | BOP EL. 4 17-0" 27'-4" EXIST. INTAKE STRUCTURE O/A DIM ae 10°-4" 18" FIREWATER HOR. TO U/G FIRE LOOP EXIST. SEAWATER INTAKE STRUCTURE [~ 10°-0” “ERST. EQUIP, PAD TO BE DEMOLISHED 15°-6" KINGSTON HARBOUR 4 EXIST, INTAKE STRUCTURE 0/4) NeW 27" DIA. PVC INTAKE PIPE 27" DIA. PVC INTAKE PIPE EXIST. PROPOSED INTAKE STRUCTURE ADDITION PLAN SCALE : 3fe'st'-0" EXIST. FIREWATER INTAKE STRUCTURE & NEW PUMPS & PIPING CANOPY PROPOSED NEW EQUIP. NOTES. NAY Ly dd? PB ISSUED FOR CLIENT REVIEW n2u] 8y | FH PA ISSUED FOR INTERNAL REVIEW NZM | BM fe. 6 OEScRPTION ay | cn | ape | cuenr TS Gtawve 8 ne FeOneTy cr eNe-Ln eyo he stake orm mea » SNC*LAVALIN Sint oe oF ne EE ee Tie eg ay note coPED exer as Seer row ween PROJECT NO aA ose. voc. | prance | Rewsow 332389 5800 | 46 | DK | 0001 PB —— SS i | (PD) PETROJAM LIMITED Lu : ll REFINERY UPGRADE PROJECT Tie [FIRE WATER EFIREWATER INTAKE STRUCTURE EPROPOSED EQUIPMENT & PIPING LAYOUT ate one wo none 58-46DK—-0001 23/04/2089 2:27:25 PM \\TOROZ\PLOTTING\OUEUEN TOS.PD Format 'D’ Sheet Size: Drawing File: P:\332389\plot plan\$800 - Fire Water Intake\332389-5800-46DK0002.dwg_ 14:28:02 23/04/2009 MCMAB = KINGSTON HARBOUR | 12'-4" SILENCER WITH FLEX & WEATHER CAP SUPPORTED FROM ROOF VENT 18"e FIREWATER HOR TO U/G FIRE WATER LOOP 10" TEST UNE PIPING TO TEST HEADER FLEXIBLE EXHAUST OUTLET — 12°9 DISCH. TEE ASSY. W/ RELIEF VALVE it ul i FUEL TANK, 580 USG 7 DOUBLE WALL i 4------ a} BATTERY RACK EXIST, (REF.) s-1 REF. MEAN SEA LEVEL NEW 27” DIA. PC SEAWATER INTAKE PIPE __ GRADE LEVEL coLuMN SECTIONAL ELEVATION SOALE : VIEW LOOKING. WEST i/s'=1 INTAKE PIT | ‘SUCTION a | | | | | | | | | | | | | | 2-0" | 1'-9" | 6'-7" 10'-2" paiere | 27-4" EXIST. (REF) \_ DIESEL ENGINE, 550 BHP © 1800 RPM CLARKE MODEL JX6H-UFSO.UL/UM UNIVERSAL JOINT DRIVE SHAFT FIRE WATER PUMP PEERLESS MODEL 18HXGF, 3 STAGE VERTICAL TURBINE RIGHT ANGLE GEAR bu df PB | 09/04/22 | ISSUED FOR CLIENT REVIEW NZM] BM | FH Pa_| 09/03/30 | ISSUED FOR INTERNAL REVIEW nzu | 8M Ret | oate DESCRIPTION ay | cc | ape | cuent ©) SNC*LAVALIN WN, AND THE USE AAD COPYING THEREOF IS SUBET 10 THE TERUS OF THE AGREEMENT UNDER HH WAS PREPARED [PHS ORAWNG 'UAY NOT GE COPED EXCEPT AS EXPRESSLY PROWOED THEREM, PROLECT No. ME ose, | 000, pees | Reysion 532389 5800 | 46 | DK | 0002 PB (| PETROJAM LIMITED REFINERY UPGRADE PROJECT Wie L FIRE WATER [FIREWATER INTAKE STRUCTURE [PROPOSED RECONSTRUCTION, EQUIPMENT & PIPING LAYOUT ate we No, Reuse NuMcR 58-46DK-—0002 Format 0! Shact Size FEED REPORT Doc No. 332389-0000-40ES-0012 REFINERY UPGRADE PROJECT Unit 5800 — Fire Water System Date: April 2009 Revision No.: PB Section 8.0 Page 31 of 39 8.6.4. Piping Stress Analysis Not Applicable -J8932389440 - ENGI4O - ENGIRA- Misc Reports & Fomms\FEED REPORTOLUME 12 - UTIUITIESIS- Fira Water SystemAlex FEED BOOK SECTION 8.0 - Fite Waler System Rev PB doo, » FEED REPORT : April2009 __| Revision No.: PB | Section 8.0 Doc No. 332389-0000-40ES-0012 REFINERY UPGRADE PROJECT 5800 — Fire Water Syst Page 32 of 39 Civil Engineering The existing Auxillary pump station intake will be expanded to house the two electric and two diesel pumps with controllers, diesel storage tank and other associated equipment, A second 27" PVC intake pipe will also be required to supply the additional flow rate. The arrangement is shown on drawing 332389 5800 46 D1 DK 0001 and 0002 see section 8.6.3 43983238640 - ENG\O - ENGIRA - Mise Reports & Forms\FEED REPORTIVOLUME 12 - UTILITIESI® - Fire Water ‘SystemWiox FEED BOOK SECTION 8.0 - Fire Weler Systam Rev PB.doc ») FEED REPORT Doc No. 332389-0000-40ES-0012 | SNC+LAVALIN. Title REFINERY UPGRADE PROJECT. Unit 5800 — Fire Water System Date: April 2009 Revision No.: PB_| Section 8.0 [Page 33 of 39 8.7.1 Site Preparation Not applicable ‘JN892888440 « ENGWO - ENGIRA - Misc Reports & Forms\FEED REPORTIVOLUME 12 - UTILITIESIS- Fire Water SystomiAlex FEED BOOK SECTION 8.0 - Fre Water Systam Rev PB doc FEED REPORT Doc No. 332389-0000-40ES-0012 SNC+LAVALIN. # Title REFINERY UPGRADE PROJECT Unit ‘5800 ~ Fire Water System Date: April 2009 Revision No.: PB [ Section 8.0 Page 34 of 39 8.7.2 Oily Water Sewers Not applicable 488238640 - ENGMO - ENG\RA - Mise Reports & Foms\FEED REPORTIVOLUME 12 - UTILITIES - Fire Water System\Alex FEED BOOK SECTION 80 - Fre Waler System Rev PB doc » FEED REPORT Doc No. 332389-0000-40ES-0012 7 IN. Title REFINERY UPGRADE PROJECT Unit 5800—Fire Water System Date: April 2008 Revision No.: PB_| Section 8.0 [Page 36 of 39 8.7.3 Storm Water Sewers Not applicable -J1992988M0 - ENGMO - ENG\RA - Misc Reports & Founs\FEED REPORTWOLUME 12 - UTILITIESIB- Fre Water ‘System\Alex FEED BOOK SECTION 8.0 - Fa Water System Rev PB dos, » FEED REPORT Doc No. 332389-0000-40ES-0012 Stein FEED BOOK SECTION Bo Wale Sytem Rev PB dos *LAN Title REFINERY UPGRADE PROJECT Unit 5800 — Fire Water System Date: April 2009 Revision No.: PB | Section 8.0 Page 36 of 39 8.7.4 Firewater Not Applicable | |§8992989140 - ENGMO - ENGIRA - Misc Reports & Forms\FEED REPORTIVOLUME 12 - UTILITIES\B - Fire Water | | » FEED REPORT Doc No. 332389-0000-40ES-0012 LSNC+ LAVALD a | Title ef REFINERY UPGRADE PROJECT Unit '§800 = Fire Water System Date: April 2009 Revision No.: PB_| Section 8.0 Page 37 of 39 88 Structural Engineering 8.8.1 Major structural sketches Structural sketches for the Fire Water System follow. 18892386W0 - ENGMO - ENGIRA - Misc Reports & Forms\FEED REPORTOLUME 12 - UTILITIES\S - Fie Water ‘System\Alex FEED BOOK SECTION 8.0 Fite Waler System Rev PB.doc SNC*LAVALIN, » Engineers & Constructors REGISTER OF DESIGN CALCULATIONS DISCIPLINE: STRUCTURAL (42 CONCRETE,43 STEEL) CLIENT: _Petrojam Limited AREA No.: 5800 PROJECTNo.: 392389 STEEL / CONCRETE : PROJECTNAME: Refinery Upgrade INDEX OF CONTENTS ‘CALCULATION NO. DESCRIPTION PAGE Nos. '982388-5800-42EB-0001 Intake pit and Canopy Foundations 112 Canopy ~ Stee! structure 123 '382389-5800-43E8-0001 ‘APPROVED BY - NAME SIGNATURE DATE APR. 30/09 TITLE : CHIEF STRUCTURAL ENGINEER VOLUME NO, OR LEAD ENGINEER - STRUCTURAL (Pe hace GADocuments and Sottings\pstemsiDesktop\1300-42-Register of Design Cales.doo ‘50430 )) sNousann, Engineers & Constructors DESIGN SHEET TITLE: ‘Client: Petrojam Ltd, Projecto 339380 Fire Water Project Name: Refinery Upgrade Package No. Areas 5800 Document No.: 237299 600042e6.0001 | Discipline: STRUCTURAL Page fof 12 Propared By Date Checked By_] Date ‘Approved By | Date Rev. No. M. Patel ‘Apr 09. ite | APB 95/09 | 7 Contents Bill of Material- Concrete P.2 Intake Pit Pian P83 Foundation sketches and Cales P42 Brief ‘Design Criteria Destar Criteria: Structural= Spec No. 332389:8000-42EC-0001 Software! Reference: FR So Seay fom a Se = ee 6a as are a = Pee eer are exer ae oe Sha SPS aps wpe = Elen ata Mat lwienl ct | wy beta atta f ne Srke [wg RE me penn | mu [ewes mu [eomol sears Yates] AE depaon 906 sete fan abl ton emammes erie ze, “ioe seomaseamimees-tamwnn sme Fl innweaag rn -BLRONOD“"TwnaL¥H 40 TIE NITWAVI-ONS @ Project Name: RefineryUpgrade » SNC+LAVALIN Client Name: PETROJAM LTD. Design Calculation Sheet BE |S of hie.do, oF Preject Ne, Page No. Pet & Iie cm Br! Qe EN.022-¥L5 Rev 02 A 29"h PIPE i 3 » [Bl 2 © 13) 3 ee sk oe os [ge a} ee lslea PAISO 9001 Documentallnle FORJASIENIEN-O24a REV 2 Design Calculation Sheet XLS.xés Sheott Re Project Name: RefinaryUpgrade » SNC+LAVALIN Client Name: PETROJAM LTD. Ror A of fe Dates fog Ava, 30, [Project No. [Page No. Rev. No. Prin & Inials Design Calculation Sheet APEASBW- HE Werte Checked By Date ke aR EB - SOOY TED rit &lnials M. Patel (Eatevaton rte: DociNe Prepared By: ENO22.XLS Rev 02 PASO G00t Documentation\e FORMSIENIEN-072a REV 2 Design Calculation SheotXLS.xis. Sheet! Project Name: RefineryUpgrade » SNC+LAVALIN: Client Name: PETROJAM LTD. Design Calculation Sheet Sof Te wn 30/e9 332388 reject, Page Ne. Print & nts fe, é i. a Sele 9 iB) =[— & eee Bh pee eg iS |e aide gE lajee PASO £001 Documentation'e FORMSIENIEN-072a REV 2 Design Calculation ShestXLS.xi8. Shoett Project Name: RefineryUpgrade Client Namo: PETROJAM LTD. » SNC+LAVALIN Design Calculation Sheet Sof 12 TDS Sofo4 oa he. Project No. Page No. Print & Initiale Aeea: SROV- Hee waren, TG SER-DEB- STV) Print & Initiale 1M. Patel [Calculation Tie: DoeNe: Prepared By EN-022XLS Rev 02 'PAlSO 9001 Dooumentationlc FORMS\ENIEN-022 REV 2 Design Celouatlon Sheet-XLS.xls Sheett Project Name: RefineryUpgrade » 33230. =| of 12 Ey oooh Client Name: PETROJAM LTD. rajeet No, Page Ne. Re. Design Calculation Sheet tae Prin & tits Checke By: April’08 Date: Print & tals M, Patel ‘ LU | z ay Prepared By: EN-022.XLS Rev 02 PASO 8001 Documentationle FORMSIENIEN-022a REV 2 Design Calculation Sheet XLS.xisShestt Sof 1h 332308 Date: {rege EN-022X1S Rev 02 Avk, 30/69 Project Name: RefineryUpgrade Client Name: PETROJAM LTD. Project No. Print &Intiis Page NO. Rev. No. big = 4 t Ch doe by Design Calculation Sheet Fl Ce-MEL Dale! Aopril'08 ACEH: SZ - Pt &Iniats MW. Patel » SNC+LAVALIN Calculation Title Prepared DosiNe: By P2iso 2001 Bocumentationc FORMSIENKEN-022a REV 2 Dasign Calculation SheetXLS.x Sheelt Project Name: RefineryUpgrade » SNC+LAVALIN Client Name: PETROJAM LTD. Design Calculation Sheet Sao Sot tf Wer Project [Page No. Prin &Inale Wea Stim. Ree Wetkee, 3a0300 -SUbe-42EB- GUO Doane: EN-022XLS Rev 02 PAVS0 9001 Dosumentetionic FORMSIENKEN-022a REV 2 Design Calculation SheetXiS.xis Sheet Project Name: RefineryUpgrade » SNC+LAVALIN Client Name: PETROJAM LTD. Design Calculation Sheet aaa Jor j= Date Prejeck Na, Page No. Rev. No. Print & nals EA, S00 HE Wee Bazan - CWO. 42 EB SRY a3 = : | paeceeeeeeee ieseeeanea eens 8, le 7 7 a = Bese al~ 7 eee es EN.022-XL8 Rev 02 PAISO $001 Documentationic FORMSIENIEN-022a REV 2 Design Calculation Sheet XLSx48. Sheott Project Name: RefinoryUpgrade Cllent Name: PETROJAM LTD. » SNC+LAVALIN Design Calculation Sheet . Se ee ee Cee eee a ee remeet Sis ibang an ecu en SS 2] | |Z SP eeeece rE HEH eee w Checked py Tee WTR. Dale! ER ATES. SUV) TE Mean Se00 Print & nits Mi Patel Calataion Te ‘Bact Prepared by ENO22.XLS Rov 02 Sx Shoot! wo PN'SO 9001 Documentalonis FORMSIENIEN-022a REV 2 Design Caleulaton Shest Project Name: RefineryUpgrade » SNC+LAVALIN Client Namo: PETROJAM LTD. Design Calculation Sheet 332388 Yoo 22, 30/09 Date: Projecto. Page No. Rev. No. Print & Ials Been: Stoo - Hee wate Galcaton ite ae |. “lae la|é le oe ia) se EN-022XLS Rev 02 PASO 8001 Documentaionis FORMS\ENIEN-022a REV 2 Design Calculation Sheet-XLS.xls Shoot! SNC-LAVALIN, g Engincers & Constructors DESIGN SHEET Project No 339380) TITLE: Fire Water Package No ‘Aroat 5800 Dosunanl Nox Sea MOSES! | Discipline: STRUCTURAL Paget Prepared By Date Checked BY | ‘Approved By | Bato Date ~M, Patel ‘Apr 08 WS [APR 20755 C 7 Contents Bill of Material- Steel PL 2 Canopy structure design PL 3-16 Reference drawings PLAT - 23 Heese ee eseseecee eee ee eee Brief Desigir Criteria: Design Criteria Structural~ Spec No; 33289-8000-42EC-0001 Software: StaadPro 2008, Research Engineers International, California, 2008 Reference: a) a t ss t Sa] t t 9 t = z Fas rT — TGERE| Boyne = me | oer oem snesny — Noudtioeza som¥e eet 20 eee rouse a sais wancons ~ symeuwe soe NITVAVI-ONS @ Project Name: RefineryUpgrade » SNC+LAVALIN: Client Name: PETROJAM LTD. Design Calculation Sheet S| | 3 Z|7| | & eM jas = \e|gle 2 aig = Keen Ser Hee Water yazaso - SEED- Pein & Iniale (Gaicalaton Tito: By: 96 EB- Soo) Dale ”Teheckod Apsil'09 i Patel Dos: Prepared EN022-XLS Rev 02 PASO 9001 Documentationle FORMSIENIEN-022a REV 2 Dasign Calculation SheetX.S.xls. Sheatt 2b ZBB ‘last PETROJAM LIMITED. sre SL'E0'20'De SMORLIAA 64 le CML 2501 e2oen0e ARON Hs GLIA VIWORISa vero val BOVYOSN ARENISY on sor T “SAUBET ON a oa SERS Pl ta | ES ase was -heazes, becoming 21 20:20'02 swopuinn oy os avELS esr eneenae ecmut d LINN NVOULSd amp BOWwOUN AMSNISERL concer 9'60:20'02 emoPUI 14 Oke aY¥LS GEa0 GOO AYOE omsmne PEIN an EOUED onl GSINTNVTOMISd aan ECCT Ming CONE SING te ou BavwOsN AMBNLSTA ocr oa esezee (ag wy- nas ~ lates, ist SY ELD SMOPLIAAAO) 1g VYIS 601 sarznage gm Ke x ; BE60 BOOZWAYEOE ouynoing] PISIHEM SULACOUED op, | GRUIWTWPOULSd wana POE Fs 60S TLV = Gea ata = i, fe : Coupee devin) “Yt ol + VaKe 56:60 BOR AY-OS awe] _PSIORM MAI AAOUED oy a 91°00-20'02 SHopUAA so Olds. Ea ON ALIN NWrOUISa sro POET FW oie Eines TEL te BQWuOEN AVENLISY ws or a zeleb soma) Ou82ee, | Vows -engs -TRezes, ne . S2a8D.?r0. + Version 2007 atid 03 + Propetatary Progran of * Research Enginears, Intl * Datex APR 30, 2009 * wines 9:39:47 USER 1D: SNC-Lavelin dnc. 2. STAAD SEACE NeU? FILE: Canopy-Fize water.STD 2. START JOB INFORMATION 3, ENGINEER DATS 13-APR-09 4) OB AMIE REPINERY UPGRADE 5. JOB CLIENT PETROJAY LINTZED 6. goa No 332989 1] ENGINEER NAME M,PATEL 8) END JOR INFORMATION 8. supor wEDTH 78 10. Ser m5 UNIT FEST KTP soni COORDINATES 43.75 0 0; 2 16.00 0 OF 3 32.585 0 0 4 3.75 0 jo 238 Thursday, Aprit 30, 2009, 11400 aM B22 ~ Bayo “eer -sv| PAGE WO. 12; § 16.08 0 12 14. 6 31,585 0.22; 73.75 0 28) 6 16.08 0 287 9 31.585 0 28; 11 16.08 15.397 0 ‘31.505 14,997 0; 1¢ 16.08 15.397 12; 15 31.5 s.08 15.397 287 18 31.585 14.997 2a; 39 3.7 as 12 ae. 17 ana a8. 25 26 2 32 aa. 34 22. 39 23. 48 55 1,25 24.9159 267 56 1.25 8 25. RYDER sNCEDENCES a6 48-22-38; 3-339; 4440; 8S Ts 66 AT, 43,75 14,997 12; 26 7.96 15.1303 12; 27 12.87 19.955 15.297 12; 29 23.035 15.297 32; 30 27. 3.75 14,997 20; 32 7,86 15.1303 28; 33 11.97 439.955 15,297 207 95 23.035 15.197 287 36 27. 31,585 9 07 03.75 8 12s 41 32.585 8 12; 43 5 14.997 12 5 14.997 0; 20 7.86 15.1303 0 halg7 15.2637 0) 22 29.955 15.297 07 25 23.835 15.197 Oy 24 27.71 15,097 0 15.2637 12 71 15.097 12 15.2637 28 71 15.097 28; 38 16.08 8 0 16.08 8 28; 44 31.585 8 28 3.75 € 0; 49 3.75 @ 287 53 1.25 14.9259 07 54 1.25 14,9159 12 57 1.28 8 12; 88 1.25 8 28 ee 2018 a7 20. 11 1h 22; 19 14 28; 2517 347 16 53 54; 17 11 14; 18 12 257 19 54 557 28. 91.15 18; 22 19 207 23 20 21s 24 2L 11; 25 22 23; 26 23 247 27 24 127 28 25 26 29, 2 26 27; 30 27 14; 31 20 297 32 29 307 33 30 15; 34 32 32; 35 32 397 26 93:17 30. 37 34 35; 36 35 36 39.36 18) 40 19 257 41 25 32) 42 20 267 43 26 327 44 21.27 31, 45 27 33; 6 22 207 47 28 347 48 23 29; 49 29 35; S024 30; 51 30 367 52 4 15 32, 93 3 25; 5¢ 3 157 55 6 127 56 48 19; 57 38 11) $8 39 127 59 40 75; 60 41 15 33, 61 49 31; 62 49 177 63 44 18) 64 56 51; 85 57 58; 67 43 44; 68 46 41; 69 41 99 34. 70 39 38; 72 38 48) 73 49 437 77 36 537 7057 S4; 79 5855; 8D $3 197 82 54 25 38. 62 55 317 3 56 48; 84 57 407 85 58 49 36, DEFINE MATERIAT, START 31, ISOTROPIC STEEL 38. E 4.17R+005 39) FOrsscH 0.3 40. DENSITY 0.489024 Gr \Wokesh\stasdFilee\Cenopy-Fire Weber, and Page 7 of 113 Wwe Thursday, April 30, 2009, 11:00 AM 2 Stan Space == PAGE WO. BR239]~ Sku -~43E2- 6vD) 41, ALPHA 6.56-006 42, DAMP 0.03 43, BUD DEFINE MATERIAL 44, MEABER PROPERTY RUIERICANT 45. 1.30 9 S6 70 63 TABLE S? W9K28 46. 11 15 22 70 27 34 10 39 80 82 TABLE SP w12x25 47, 16 18 20 21 41 42 45 47 49 SL IRBER 97 w10x22 48. 13 28 20 39 01 TABLE ST w12K26 49, §2 70 55 TABLE LD 140305 SP 0.031 50. €2 70 65 TABLE ST nexi5 51, 64 65 67 TO 71 73 77 TO 79 TABLE Sr cOxi2 52) 17 40 42 44 46 48 50 TABLE 57 WBxIS 53. CONSTANTS 54, BETA 90 MEME 64 65 67 70 71 72 5S. MATERIAL STEEL ALL 56. SUPPORTS 57. 170 9 Pruneo 58, MEMBER TENSION 59) §2 70 55 60, MEMBER RELEASE G1, 16 18 29 21 40 TO 51 64 65 67 TO 72 73 START MY ME 62, 16 18 19 21 40 TO 51 54 65 67 70.72.79 END My ME 63, SIAVE 2x MASTER 19 JOINT 11 12 15 37 18 53 95 64. DEFINE TBC 2006, G5. 98 1 81 0.4 1 1.25 EX 9 RE 3 SCLASS 4 TL 8 FA 0.9 BV 2.4 K 0.75 + EQUIV. SEISMIC LOMDS AS PER TBC 2006 + 4+ PARIMGTERS CONSIDERED FOR SUBSEQUENT LOAD GENERATION * + s8= 1.000 51 = 0.400 FA= 0.900 FY= 2.400, . + sps = 0.600 sot = 0.640 66. OELEWEIGET 2 67. MEMBER WEIGH? 68, 27 20 40 £0 51 UNT -0.08 69, 16 18 19 21 UNI ~0.0¢ 70. DEFINE wInD 30RD ma. nee 1 72. <} STARD PRO GENERATED DATA DO NOP MODIEY 11! 73. ASCE-7-2002;PARAMS 155,000 MPH 0 2 1.0 0.000 FF 0,000 Fr 0.009 FT 1 ~ Fa Ftes000-Pr30-000-Pr-30-000-PR-2-000-0.020 9 = 75, 0.0 0 0 0.860 1.000 1.000 0.850 0 ~ 76. 0.0 0 0.887 0,800 0.550 7. 1> BRD GENERATED DATA BLOCK 78. WNP 0.056228 0.056228 0.0562629 0.0562957 0.562294 0.0563629 0,0563963 - 79, 0.0564295 0.0564627 0.0564957 0,0565285 0,0565613 0.0565939 0.056264 - 20, 00566567 0.0436952 NEI 0 25 15.0769 18.2538 15.2308 19.3077 15.3846 ~ 81, 15.4615 15.5385 15.6154 15.6923 15.7692 15.8462 15.9231 16 25 82, TBE 2 83, END GENERATED DATA BLOCK 89, INP 0.032486 0.031486 0.03152 0.0315538 0,0325874 0.0326209 0,0316543 - Gr \ttokegh\SteadFites\Canopy-Fize Water. en Page 2 of 113 \ op 23 Thursday, Aprit 30, 2009, 11:00 ant ‘SHARD SEACE TREN 8 oa aggy SED" ASS = 6o\, 90. 0.031688 0.0317207 0,0317537 0.031786 0.0318193 0.0318519 0.0318044 - 91, 0.0319168 HBLG 0 18 15.0769 18.1538 15,2308 15.3077 15.3046 — 52, 1.4615 15.5385 15,6186 15.6923 15.7692 15.8461 19.9291 16 93. OAD 1 LOADFYEE SEISUIC TITLE SEISMIC TW +X DIRECTION 94. IBC LOAD X 1 95. PERFOR ANALYSIS PROBLEM STATISTICS Novara oF gonums/ummenenismens/sureoRTs = 47/77/9 SOLVER USED IS THE TH-CORE ADVANCED SOLVER OTAE PRNIGRE JOND CASES = 1, TORAL DEGREES OF FREEDOM = 254 4 Y8C 2006 SEISMIC TOAD ALONG X + * + cr = 0.035 cu= 1.400 . + ene PeRtO0s = * «tan 0.272 5 = 0.457 Taser = 0.000 . + ma PERIOD USED (x = 0.381 ‘ + ca mins + Town = 0,010 URPER = 0.700 + + ueap Factor 3.000 + © DESIGN BASE SHEAR = 1.000 X 0.250 X aD + . = 7.95 xP + **START ITERATION 10. 2 ‘sepraR? ITERATION HO 3 s+xore-tension/Conpression converged after 3 iterations, Case 1 96, cHance 97 TOAD 2-DOAD2vPR_OBIGMEC—BUTEE-SEISUIC-1N-+7_peRECEEON 8. TBC TOAD 2 2 99, PERFOR ANALYSTS Gi btukesh \Staadriles\Canopy-Fire Woter.an) Page ofS FREE RO. ya of 23 shursday, April 30, 2009, 11:00"aIf a SBABAR- SAHD~ ABER GH) ‘SEAAD SAGE + rac 2006 sarsurc Loa ALONG Z + © er= 0.035 Cus 1.400 . + ome Penton : . «ta = 0.272 7 = 0,193 Tuser = 0,000 * ‘= TIME PERTOD USED (z) = 0.193 * + ce LETS : LOWER = 0.010 UPPER = 1.379 * + roap FacTOR = 1.000 * + DESIGN BASE SHEAR 31000 x 0.250 x a # . = 7.95 KIP * #*S9ART ETERATION HO. 2 ssxore-tension/Compression converged after 2 iterations, Casen 2 100. CHANGE fod. LORD 3 LOADIYPE SEISWIC TITLE SEISUTC DV -X DIRECTION 202, 1BC OAD X 1. 103, PRRFORIS ANALYSIS © TRC 2006 SEISMIC LOAD ALONG X * «crm 0,035 cus 1.400 * + pn Penton : * Stas 0.272 T= 0,467 Tusar = 0.000 * emi PERIOD USED (7) = 0.381 * * Ce GMETS : LOWER = 0.010 UPPER = 0.700 ‘ + voap FACTOR = 4.000 * + DEeIGN BASH SHEAR = -1.000 X 0,750 x 31.79 + . = =1.95 KI * *STARE_ITERATION NO. 2 s+START ITERATION NO. 3 3 iterations, cases 3 +torE-rension/Compression converged after tod, cHnNcE 105. YoAD 4 Loaotres TDR SEISMIC IN ~2 DIRECTTON ‘Gr |ilukesh \StaadPiles \Canopy-Fire water.an) Page # of 113 \A of zy Thorsday, April 30, 2009, 11:00 'ate BRAY ~ SSro~ 4BES- 50) ‘GERAD SPACE == PAGE NO. 106, IHC LOAD 2-1. 107. PERFORM ANADYSIS TRC 2006 SEISMIC LORD ALONG Z cr= 0,035 cu= 1.400 wine PERIODS = fa = 0,272 2 = 0.193 Tusor = 9.000 + em PeRTOD Useo (2) = 0,293 cs LIMITS : LOWER 0.010 UPZER = 1.979 LOAD FACTOR = -1,000 DESIGN EASE SUBAR = 1.000 X 0,250 x 1.95. KIP ‘> +START XTERATION NO. 2 sexona-oneion/Cenpreasion converged after 2 iterations, Case~ — & 108, Hance 4108. LORD 5 LOADTYPE NONE TITLE DEAD LOAD 110, SeLEWeTGH? ¥ -2 111. NENBER LORD 112. 17 19 20 40 70 51 UN ¥ -0.08 aa! 16 18 19 22 unr y ~0.04 314, LORD 6 LOADEYPE WMD TTTDE WIND IN 4X DIRECTION 115. MEMBER LOAD 16. 16 19 unr Gy 0.068, 17. 40 20 45 UNE GY 0.145 118, 46 To 51 UNT GY 0.073, 11g. 18 21 uNr ay 0.037 120. 17 20 unr 6¥ 0.109 321, 16 19 64 65 UNE Gx 0.072 222] 18 21 62 69 UNI Gx 0.052 123, WIND ZoaD 1 TYPE 2 XR 0 32 YR 0 6 ZR O 30 OPEN 126. JOAD 7 LOADTEEE WIND TITLE WIND IN ~Z DIRECTION 28. mmwaeR LOAD 126.19 21 un ay 0.072 - 127, 20 41 43 45 47 49 52 UNE GY 0.145 128. 17 40 42-44 46 48 50 UNT Gr 0.018 129. 16 18 usr oy 0,039 130, 15 34 70 39 87.73 82 85 UNx Gr 0.072 331, 11 15 22 10 27 34 70 39 67 70 71 73 80 2 83 85 UNE GZ -0.052 132, WIND LOAD 2 -1 TyPE 2 xR O32 YR 0 8 ZR 0 30 OPEN Wi Whakeah \StaacFiles\Conopy-Fire Water. ani gage 6 of 113 ‘STAAD SPACE <= mace NO. aaa. at 135. 136. a7 aaa. 139. Lo. wa. 142. 143) ast aus! aa6 aa. uae ass) 150, asi. 152. 253 286 ass 156. as? ase. 159. 160. asa, ez. ass 164 165, ase. a7, 168 6s ano. mn. a2. 15 2g Thursday, apes) 30, 2009, 11:00 bus LOAD @ KOADEYER LIVE T2TLE LIVE LORD MEUBER LOAD 17 18 20 40 70 S1 UNI ¥ ~0.125 16 18 19 22 unr ¥ ~0.0625 LOAD COMBINATIONS USING ALLONABLE STRE8S DESIGN “PRR ASCE 1-05 CHAPTER 2 LOAD COMB 10 DEAD LOAD 51.0 ORD COWn 11 DEAD LOAD + LIVE LOAD 51.0 81.0 LORD COMB'12 DEAD LOAD + LIVE 10RD + WIND TOAD TH X DIR 51.0 8 0.15 6 0.75, WORD COMB 13 DEAD LOAD + DIVE OAD + WIND LOAD IN ~2 DIR 52,0 8.0.75 7 0.75 LORD COMB’ 14 DEAD LOAD + LIVE LonD + SEISMIC LOND IN X DIR 5 2.0 1 0.525 8 0.75 LORD COuB2§ DEAD’ LOAD + LIVE LORD + SEISWIC LOAD IM Z OTR 5 1,02 0.525 € 0.75 {LORD COMB'16 DEAD’ LOAD + LIVE LORD + SBTSNTC WORD TH ~X DIR 5 1,03 0.525 6 0.75 {Lond Coun’ 17 DEAD LOAD + LIVE LOAD + SEISMIC LOAD TH ~2 DIR 51.0 40.525 8 0.75 +608 UPLIFT CONDITIONS OND COMB 20 DEAD LOAD + WIND ZoAD IN X DIR 50.6 62.0 ORD COMB’ 22 DEAD LOAD + WIND LOAD IN ~2 DIR 50.671.0 ORD COMB’ 22 DEAD LOAD + SEISMIC LORD IN X DIR 5 0,610.7 LORD COMA’ 23 DEAD LOD + SEISMIC TOAD IN 2 DIR 5 0,620.7 EON} COME’ 24 DEAD LOAD + SEISHIC LOAD IN x DIR 50.6307 LOkD COMB’ 25 DEAD LOAD + SEISMIC LOAD IN ~Z DIR 50.6 40.7 PERFORM AIEALYSIS ‘eSTART ITERATION WO. 2 S*START ITERATION 10. 3 BBB ~ TeWo- ABs 600\ ‘snot Tension/Corpression converged after 3 iterations, Cas S#SEARE IPERATION HO. 2 G:\ukeah \Staaarilas\Cenapy-rire Water.an Page 6 oF 113, {6 Sha 2 Thursday, APEiI 30, 2009, 1 ‘SHARD SPACE = PAGE NO. 222 2322B{- St - 422-600 \ SOBEL TAKE-OFF PROFILE mwori(eEEs) —— WETGHT(RTP ) sr wex28 136.27 3.615 st w1ZK26 91.04 21365 st wloxze 168.00 3.703 st wex15. 84.00, 226? 1p 140305 16.83 aoa er cexa1 132.42 2520 st wexis 1.50 on3 ORAL = 13.875 seeseeseseee END OF DATA FROM INTERNAL STORAGE seetessersee asi, PINISH Aeseseeanes nD OF THE STAAD.Pro RON ##+HHHELEE see pati= APR 30,2009 ‘TIME 9:39:48 #454 C\ukesh |Staaailles\canopy-Fire Water. ant Poge lit of 113 PRARR- CEO - 4288-5 CRD fete wears Brstage eugihe dy'ven Ete foams sus, Base, Rise ante che Vp es VERTICAL TURBINE FIRE PUMPS SECTION 1630 ‘Types MAF, LDF, MBF, MCF, MDF, HXBF Page 2.1 May 24, 2004 Note 1: This drawing describes a Vertical Turbine Fire Pump with Above Ground Discharge Head Casting, Treaded Open Line Shaft Column, Right angle gear having bolted down ratchet. Note 2: Column length U dimension is 10 Inches minimum and 50 feet maximum, Note 3: All dimensions are in inches unless otherwise noted. Note 4: Submergence Zis minimum for proper priming and/or operation at 150% of design capacity, based on sea level elevation and a maximum water temperature of 85°F. per NFPA Pamphiet No. 20. Note 5: Length R may be adjusted plus or minus 3/8 Inch. Note 6: Tapped hole AD Is to be connected by the customer fo opening marked Raw Water Inlet on the engine outline drawing. Weights: (13? Base Two Stage Pump _ 2687 5 Right Angle Gear «sh. 2200 ‘stianue- noted Additional Stages on) feo gest Additonal Column 186 it Feet 4 CE catecmetnimn Total 5343 EE Ege Gree p= 187 (b. seo loner kO4 7 ae SE aR Pa Ba Assen Se ra | ir | “Fouatecone cide] Ge vaya fag, TE ate ee es a fave} ier [ope jos pee i a = i 5 un in-frame} sf rep | | ts ni apie bases [epi 2 ST eee | ep tee die PY TE] a Sa Si Gent tow | ter ‘it fs [eee ee | - I a a [tae z ahaa eee % ‘BIE ta as $ fam pate os sae nate # Lem [eor—[ cae Siar a = {ea_[es [9 r ne aaa a [am pem a nae En Re z 2a fem a rca ae 2 shapes ay cites — pone ine Inn Saat Cert se ie Ppt Tas wr Son Sait Fat Cattatte — “ORRRT—— Corsten By aio Pomp OULUiod OULCLEIe OFM Aovond —— RENAie FATA! DYE theo canay tne ctor sty aeveeae Aidioneh Column > B mapae” porter te” se pHa ts Bur Bur’ x 549 les > 18t lbs AAR. Sewo-42ta-ows) eh Poorioss Purp Company VERTICAL TURBINE FIRE PUMPS SECTION 1630 Strep, snare ‘Types MAF, LOF, MBF, MCF, MDF, HXBF Page2.1 gestage Kester Driven May 24, 2008 Note 1; This drawing describes a Vertical Turbine Fire Pump with Above Ground Discharge Head Casting, Treaded Open ans Cun, ay Line Shaft Column, Right angle gear having bolted down Oven ratchet. Note 2: Column length U dimension is 10 Inches minimum and 60 feot maximum. Note 3: Alldimensions are in inches unless otherwise noted. Note 4: Suimergence Z is minimum for proper priming ‘and/or operation at 150% of design capacity, based on sea javelelevaton and a xm water temperature of 2° F- por NEPA Pamphlet No 2, Note 6: Leneth R may be adustd pls or minus 3/8 inch, I Note 6: Tapped hole ADis tobe connected by te customer Coming Dnt Fea MH wien to opening marked Raw Water Infet on the engine outline st eter raving. ce Wolghts: (i) Basie Two Stage Pump 2655" baad L Right Angle Gear th ae wow | ‘Additonal Stagos we) L000 Ny +—! Additional Column : Feet TE ratnctes nim Total 2497 5 AA Tbe edkgsse yy 181 Mb one lontly Foet a OEE RT I a | TT pean es a We | "fewstoneee sity | oon iss a sabe pe pa a epee tae step aa at See bee ie eee teat ta eae te Lear earn ta ot Be ob Pewee te por — peg —t pa este eee Peto Da bo rere Sa [ae wee BL rae | Se Soe eat | | ea [eee] saw | it - es -[} - ae as : a mo foie z eae] ee eas = ote ae eet a tae t fas pee test — ar ‘Se oes t ee eer ee t Span_pae trae Ener te # Se Lastfas t-te Caer “ene pote ime Tote Sei oie seo Ta meted eos 7 a lea Cekettr “Gippaa Ooneiicen Fy ae inp DULLES UCL OFMAgwond RITA! Brae eee oe ptdihone® Cesumn: Ra TEM axe te ays! > dog! acu! x Sq7 tbs /pp = (>2 Loe Bs22e4. SEO 4S ows) \A_ 2 fe. Venooe_, we a Cerio FR TET L Pbmp ships 46. DK 10001, } Shio ay - ‘espobs xi i HARBOUR PLAN a ren Sana © PPR UYOUT Sho +7 = 'Sovp “2 Sha gees 7 ng’ is Sanaa = =e Ea 322345, Stop-436R-on) Zo 2 ES: f= KINGSTON HARBOUR, ew 4 sNoLavALIN ann a 33238: 5800 [46 {DK |o002 | Pa! way, BOs Yaw Br26 9 (ee tie e| PETROJAM LIMITED REWER? UPORDE PRONECT EPR WATER eee SSS SSID canoe «mw wet = or = ten20) stone ede Stouts @. 8 ‘un ions badass agora een Wadd on) [one ate Conan Voto | aetee es ! ae! : Pte 84 ones saree UA (asta - Mies ae : See oat \ SECTION 6-6 seurwfute pa] © soeeeemteesnresoee eas fey : i Soro PRAGUE ie Shee ae ~S0TIN Ee seunsvibiot I Saeeeeee > Bago Pe toer | Saeco eK meena) pact fener oem | Meenas Penne ane uy fe pibiiiir Syed = eh eee a an ee aeeeeara rune Lizsepewee | PAT wo wlll ones Etre) ey iacasp i g [these se or a et Apaumsaitee 9 etneteoe ka wcsemee RR F H | ts Ef oveutareu a “er ler 2 yg | |stew |e sere ase FLAY § oa ant C pee ie eee a 1 —tpeataseete Ve daentae Mes emer Soeeet eee aaa: [Pesala bea eee ae SECTION ae PLAN sipwhe_garonesver law fit ee a rom Reger i 7 25, etn eta i a i ator hongeee — Pare, Pant) Hosea! chews Poa Bk i eee _ fe * — Fest) cad, I | | | tatoae feos) Site Pablaken) — : ies ome aloa.@ Bee sifou.eweleCun3d) | . oes pares ee sate op stone setts) oo FE BRS TERS oe) Hees Sor eee : % BIH mie eet] watts = | aie m Eee 2) erase ramecre, ou sone fowweoes ‘ sayin, com ewa soem | |e oo ure as acre? NC Ei Jone] 7 at SECTION Ana seus: rilefot sesies tte ECTION B-B }OJAM LIMITE PETR ED. RECONSTRUCTION OF FIREWATER INTAKE STRUCTURE. REINFORCEMENT DETAILS ~ PLAN @ SECTIONS [PETROJAM LIMITED swaaeremssawenim Foie: fafa Hal RECONSTRUCTION OF FIREWATER REINFORCEMENT DETAILS coarac ots 02 INTAKE STRUCTURE PLAN & SECTIONS eto Sten 0 “Testine eve OREN SOW Feared Shee ONE EGEND HIBDEN Lise DETAIL * 3 scaue: Heshot NEW concHeTe LUNE 32.2325 - SeNb- 4SeR- 655, 22 of 73 NERS aes) whggens mane edt axcung, nett tuennpee + te hi iS E usahte! Sea s DETAIL™ 2. saursitfnt-ot Stee —ANGHon_woLr FINNS FoR OESEL ENGINE 2 eect co mmemtc ad Miocene [ty ARRAS Date, matic Aes eyes ipnoe Gir oxen nea" RON OF OD NTRS STETO at Z, mine rec ins, Goran Pon, eh L_ELEVATION A-A_ seaureypls (of PETROJAM LIMITED ( RECONSTRUCTION | OF FIREWATER; INTAK: PLAN, SECTIONAL ELEVATION AND DETAILS. % PLAN, SECTIONAL ELEVATION AND DETAILS csron yamarca _ | AS SHOWN = Ty ‘88¢ 701] bee] 3328 SEM GReS- owe 2% of 2% MEAN sea ceven iget went . rare ie ~ Swarm : EVATION scate de even (onu, ea) cur off Fan Pia HE Et Coo iwi! ; not ht ie! [ ek Uae srnensee ee ee ee. Ny seaceet r i pes eae SECTION B-B seuedfaitch of Ea i: i ee ! ERNFDRCNS SHEET rR, Fine wate Eg eens re TOTAL STEEL PER AUCION Biock=He@] TOTAL STs. Fon & eo Blze w HH Hifeatusectes oy [crpeneteee Hie tees Be ee | — ato eavecten (on Tee bred Ewes ao Foe en TT Al owes wn ae st teomene — 1] hy heen xe + a : 7 PETROJAM LIMITE ; aaa osble secon lee? RECONSTRUCTION oF FIREWATER gesreemes —/ i oe i ia ise Cae eet MEE es le ERONT ELEVATION gested —Eup_SLEvATION. el ‘ EPRRAE OR cou ETON oo abt os idk SR gE Ey ELEVATION, guowne Renn PLAN, ELEVATION rary Twin zr 2, PVC PIPE AND ANGHOR »ORTS PETROJAM LIMITED Tannen =r oma er]alos RECONSTRUCTION OF FIREWATER PLAN ELEVATION AND DETAILS costhimcaens eiowe 03 INTAKE STRUCTURE TieesieT ») FEED REPORT Doc No. 332389-0000-40ES-0012 |SNC+LAVALIN eee Title REFINERY UPGRADE PROJECT Unit 5800 — Fire Water System Date: April 2009 Revision No.: PB | Section 8.0 Page 38 of 39 8.9 PHA Summary Not Applicable 4433298940 - ENGMO - ENGIRA - Misc Reports & Forms\FEED REPORTIVOLUME 12 - UTILITIESIS - Fite Water ‘SystemiAlex FEED BOOK SECTION 8.0- Fie Water Systam Rev PB.doc ») FEED REPORT Doc No. 332389-0000-40ES-0012 | SNC+LAVALIN Title REFINERY UPGRADE PROJECT +e Unit 5800 — Fire Water System sae eeecaat Date: April 2009 Revision No.: PB | Section 8.0 L Page 39 of 39 8.10 ENVIRONMENTAL CONSIDERATIONS Not Applicable 14488238840 - ENGWO - ENGIRA - Wisc Reports & Forms\FEED REPORTIVOLUME 12 - UTILITIES - Fire Water ‘System'Alex FEED BOOK SECTION £.0 - Fro Water System Rav PB doo

You might also like