Professional Documents
Culture Documents
Tse and Ehv-Ts-Sk003
Tse and Ehv-Ts-Sk003
Tse and Ehv-Ts-Sk003
1 2 3 4 5 6 7 8 9 10 11 12
AL MAIDAN
A 53
TS-SK003
A A
AL MAIDAN
ST.
ALI 54
AL FUROUSIYA
AL MASZHABIYA ST.
BIN
E:221186.9414
AL MAQROUN ST
SIM
JAS
AL SUWAIMRA
N:390690.9858 B B
55
FRL: 23.73
EHV CONCRETE TILE
B B
0
0+10
24
3
A
C C
0.50
0.55
0.80
1.00
1.25
0.55
JUNCTION-6
0.20
N
0
0+08
D 0.60 D
E
E
M 45° 0.15
0.55
0.80
1.15
45°
1.70
OF W
L
Consultant:
0.60
A
45°
0.15 0.15
45°
F 0.20 F
Contractor:
0.15 2.02 0.15
O
0.15 0.15
RKS
0.05
Project Name:
▼
0.15 0.25 0.15 RIW FOR JUNCTIONS & ROUNDABOUTS
IN VARIOUS AREAS OF
0.15 GREATER DOHA PHASE - 8
G G
PROJECT CODE
0.25 IA 2018 C 080 G
STATUS
SKETCH DRAWING
0.15 Drawing Title:
SHEET 19 OF 19
H Drawn: PHILIP P. Checked: MOSTAFA D. H
Designed: Approved:
CONCRETE PROTECTION DETAIL Date:
MOSTAFA D.
@A1 1:2000
Drawing Number: Revision:
TSE LINE PROFILE IA 2018 C 080 G-BCC-TS-SK003 0
1 2 3 4 5 6 7 8 9 10 11 12