0+120

1 2 3 4 5 6 7 8 9 10 11 12

AL MAIDAN
A 53

TS-SK003
A A

AL MAIDAN
ST.
ALI 54

AL FUROUSIYA
AL MASZHABIYA ST.
BIN
E:221186.9414

AL MAQROUN ST
SIM
JAS

AL SUWAIMRA
N:390690.9858 B B
55
FRL: 23.73
EHV CONCRETE TILE

B B

0
0+10
24
3
A

C C

0.50
0.55
0.80
1.00
1.25
0.55
JUNCTION-6
0.20

N
0
0+08

D 0.60 D

AID A 0 18SEPT22 FOR REVIEW AND APPROVAL PFP MD BA


LIMIT

Rev. Date Revision Details Drawn Chkd. Appd.

E
E

M 45° 0.15
0.55
0.80
1.15

45°
1.70
OF W

L
Consultant:
0.60
A
45°
0.15 0.15
45°
F 0.20 F
Contractor:
0.15 2.02 0.15
O

0.15 0.15
RKS

0.05
Project Name:

0.15 0.25 0.15 RIW FOR JUNCTIONS & ROUNDABOUTS
IN VARIOUS AREAS OF
0.15 GREATER DOHA PHASE - 8
G G

PROJECT CODE
0.25 IA 2018 C 080 G
STATUS
SKETCH DRAWING
0.15 Drawing Title:

0.05 0.23 TSE PIPE CROSS SECTION DETAIL


MUAITHER NORTH STREET

SHEET 19 OF 19
H Drawn: PHILIP P. Checked: MOSTAFA D. H

Designed: Approved:
CONCRETE PROTECTION DETAIL Date:
MOSTAFA D.

SEPTEMBER 2022 Scale:


BORHAN A.

@A1 1:2000
Drawing Number: Revision:
TSE LINE PROFILE IA 2018 C 080 G-BCC-TS-SK003 0