Concept & Exclusive - Standard Procedure 2021
Concept & Exclusive - Standard Procedure 2021
Note:
Look for dying brands such as Cherry Mobile, Myphone,
Zenfone
Store Expansion
Key Accounts & Channel Teams | Retail Team
If new space from mall, offer to current kiosk dealer. If they decline, offer to new
dealer.
HQ PM for Expansion
DCM (Danielle)
Details needed: Approvers
Note: For concept stores, AIoT Channel Manager for CKE needs to
approve. So use Endorsement Request for Concept Stores
Attachments:
Floor plan / location sketch
Actual photo of location
CKE Dealership Agreement
What is a Turnover kit?
Blow Up Plan
Turnover kit
- Includes a Blow Up Plan and Storefront
Design Criteria. These documents must
be sent to HQ artist as guide in creating a
Storefront Design Criteria
store design.
Blow Up Plan – reflects floor layout and
measurement. Does not show columns so
an ocular must still be done.
1 Source vendors Project Manager sources construction vendors based on actual situation (highly cooperated and high quality as criteria, chain store construction Project Manager (HQ) /
experience are preferred). Procurement
2 Review vendors vendor provides previous construction projects collection as appraisement material for region Project Manager or Head to review; Confidentiality Agreement Project Manager (HQ) /
Select 3-4 vendors per area for alternatives, sign Confidentiality Agreement, provide stores rendering and construction drawing templates and ask for Procurement
PM / Procurement
quotation
PM has right to recommend and commend contractor
3 Introduce vendors Select 1-3 vendors based on the BOQ and qualification, contractor's warranty, Leadtime, projects Procurement
4 Endorsement Letter CKE Project Manager for expansion will seek for the occupancy of area for new space Endorsement Letter 1-2 Weeks
5 Lease Offer CKE Project Manger for expansion will endorse a lease offer for the malls and to confirm for space availability. PM should tap PM in Merchandising Lease Offer CKE PM Expansion 1-2 Weeks
that the area is now available for ocular design
Sales Team
6 Onsite Investigation Before design submitting, vendor or officer in charge needs to send professionals to conduct detailed onsite investigation and measurement Design for Project Regional Retail Manager (RRM) 2 Days*
(including but not limited to: storefront height, store height, store interior size, pillar size, bearing wall marking, etc. ) Photos of every views and output (Template) Concept or
store floor plan(CAD files if necessary). Service Center
7 Design Submitting Region PIC (RRM) fills stores Design Information Form accordingly based on actual measurement results, and ensures the information valid and Regional Retail Manager (RRM) 1-3 Days
accurate. Region store PIC provides stores design information to HQ liaison, who will then pass the information to HQ designer.
8 Drawings Confirmation (Merchandising) HQ PM confirm with Designer from HQ if the design is okay to for approval. It should be on Philippines Visual Standard Image 2021 Visual Image 2021 Store Designer / Mall Admin 3-5 Days
HQ / Region
9 Ocular Visit PM and Technical Team will visit all areas with upcoming project. Exemption if the store are from VISMIN area and only 40SQM below. Preparation for drawings Project Manager (HQ) / Technical 1-3 Days
+ Tenant’s Info Team
10 Blueprint + Project Department Request 3 days after ocular visit, PM should able to get the drawing plan for submission in mall review, continuously do DPR Drawing Plan + DPR Project Manager (HQ) 1-2 Days
12 Canvassing canvass project BOQ provided by vendor. (In the early stage of cooperation, it is necessary to check clearly item by item based on market conditions. Canvass Sheet Procurement / Project Manager 5 Days
In the later period, check the consistency of unit price and total amount and communicate with vendor if there’s any problem)
Send the audited quotation to store retailers (if any) to confirm.
12 Awarding for the Project Contractor chosen will email and submit necessary files: As Built Plan, Plans, Gantt Chart Gantt Chart Procurement / Project Manager 2 Days
Procurement/ HQ
13 Billings & Payment Upon awarding of project, contractor must send billing or SOA asap so that contractor can process for release Payment Voucher Procurement / Finance Team 5 Days
14 Construction Contract Signing After quotation confirmation, store owner and vendor sign stores Construction Agreement, and store owner shall pay all kinds of payments on time Construction Agreement Procurement 1 Day
according to the contract requirements. (vice versa)
15 Preparation of Permits Contractor, realme or dealer should process this application before of mobilization of one area. Contractor / Dealer / PM 1-2 Weeks
Construction
16 Onsite Construction After signing the contract, vendor conducts construction according to the contract. Punch List PM + RETAIL 20-25 Days
RRM / PM needs to schedule stores Constructing Calendar to arrange stores construction visit.
1.Request Invitation
via email to mall
admin for intent of
ocular visit Procurement should
Upon awarding of
3D Visual from 2. PM & Technical 1. Admin / Engr. Procurement will start the inform PM/AJ about Discuss the necessary
project, contractor Contractor will prepare the necessary Monday, Wednesday &
Merchandising will Team will conduct Dept review for PM will engage in outsourcing of contractor the awarded details e.g. working hours
must send billing or files & documents before they can Friday is the standard
Description make a visual their inspection in set of drawing request with the BOM on the said project based contractor and give
SOA asap so that
allowed by mall (closing
start the mobilization as per local submission of report any
design based on the Luzon Area & plan / blueprint come from consultant on the contractor invite details if they can to opening), SOW
contractor can government needed and malls. related info
guidelines provided Premium Store provided. for the ocular- proceed with initial allowed
process for release
whichever area pre-requisite
need to be ocular
3. Some store atleast
need asbuilt plan if it
cannot visit the area
Admin + Contractor + PM
Personnel- In PM + Technical Team RRM + PM = Procurement Team + Mall Admin + Dealer + Contractor +
3D Visual Artist PM Procurement Team Procurement Team + RRM Contractor + PM
Charge + Admin Procurement Team Finance Team Region Team: RSM / KA / RKA
Design Ocular Approval of Project Canvassing Awarding for Billings & Pre-Construction General Turn Over /
Request Inspection Drawing Plan Request & Bidding the Project Payment Meeting Requirements Construction
Inspection
3 DAYS 3 DAYS 7 DAYS 2 DAYS 5 DAYS 2 DAYS 10 DAYS 2 DAYS 14 DAYS 25 DAYS 5 DAYS
• Contractor must turn • CKE Program • Coordination with Head for new
over the inline / visual concept
exclusive with proper • Ribbon Cutting • 2D / 3D Designer mock up
“Endorsement” in display and design
region
• HQ Department Implementation
and Set Up
• E.G Keys, Door
Installation, CCTV Set- • Allocation and conceptualize of
Up, Speaker Set Up new products
Fill up the concept store
application form
Important:
Feedback for the drawing plan via PDF
but some areas required of presence of
Ar. For the drawing plans.
How to request for inline store
(construction / dress up)
To filed by PM
Choose either construction or renovation request based on
ocular result
Fill in the necessary details. Submit.
Construction /
PROJECT FLOW CHART Renovation Retail Store
Endorsement Letter
Tenant’s Info
Signed by landlord
Ocular Visit
Pre-Construction Demolition /
Bidding & Awarding CARI / Gen Requirements
Meeting Mobilization
Activities / Opening
Pre-construction Meeting
Who attends it and why?
Contractor representative /
Construction Team & PM Owner
Handle overall project Submit blueprint plans & CARI
Coordinate between mall, Process government and mall
contractor and dealer permits
General
Requirements
OBO (Office
SOA/ CON OCCUPA
of the
REQUIREM
Building Drawing Notated BLDG WORKING BOND BOARD NCY
CARI (STATEMENT
ENTS
Official) Plan Plans PERMIT PERMIT UP PERMIT
OF ACCOUNT)
Permit
3 Days 3 Days 1 Month 1-2 Weeks 4 Days 3 Days
3 days 3 Days
but claim stub NO CONTRACTOR CONTRACTOR
CONTRACTOR DEALER SIDE
is ok (1 day) FREQUENCY SIDE
SIDE DETAILS SIDE
DEALER SIDE
21-60 Days for Processing
*can do simultaneously
1. Pre-requisite of prior construction are: CARI, CONSTRUCTION BOND, SECURITY BOND, (SOA), BLDG. PERMIT, BOARD UP,
BLUEPRINT (10SET)
2. Requirement includes the following; Health Certs / Rapid Test by LGU
3. BLDG PERMIT includes the following: 2303 / TAX CERT, SEC CERTS, AUTHORIZATION LETTER, OWNER / DEALER INFO VALID ID’S,
CEDULA, COMPANY REGISTER NAME, BLUEPRINT; PIC or Owner will in charge for all of this
4. DRAWING PLAN Timeline is from agreed contract until notated plans from mall
4. CONSTRUCTION BOND / SOA will shoulder by dealer
5. CONSTRUCTION WILL NOT START AS LONG THE GENERAL REQUIREMENTS ARE NOT DONE especially the pre-requisite
GENERAL DOCUMENTS
MALL OBO
REQUIRMENTS
MEDICAL
CERTIFICATE
VALID ID’S
Construction Process
Circuit
project
1. The time limit for store construction will be influenced by elements like store area, season, located city, etc;
2. In general, first-time-cooperated construction companies tend to have a longer construction time, which can be improved after
several times of cooperation;
3. Construction company shall give a detailed construction schedule when decorating each store;
4. Different construction company has different constructing sequence and different time spent at construction projects;
5. PM Construction needs to focus on: construction budget, construction timeline, inspection & acceptance.
Storefront facade
Luminous logo
Tempered glass
Form of main storefront facade materials
Technique
Material Picture Specification Unit Ref. Brand
requirements
According to According to
Luminous logo Unit realme
construction drawing construction drawing
White aluminum
Panel Thickness: 3mm;
plastic composite ㎡ Genify Smooth, tight and
Aluminum Thickness:
panel (matte) seamless splicing
0.20mm
Down lights
Ceilings
(plasterboard)
A/C
Recessed
Tracking light
Steel-wire twined on
Light-gage steel Thickness: 0.8mm Square meters Local common brand extension bolts leads light-
gage steel to frame the
ceiling foundation
LED strip lights 5W/m One strip Philips Color temperature: 6500K
List of Luminaires
Color temperature
Material Picture Specification Unit Ref. Brand
requirements
3W
Emergency lamp Unit OMNI / FIREFLY 4000k
CCTV:
① CCTV consists of hardware (camera, monitoring host, hard disk, computer host
and display) and software (smartphone APP, computer software, cloud service
platform).
computer and monitor the store through a registered account. (E.g., Hikvision:
Depends on camera
Applicable to numbers, camera
Combo A- store with sales storage and retail price
CCTV DVR
CCTV set area>50㎡ in different countries.
DVR: 4-15(Model: Hikvision DS-7608NI-I2 )
Please refer to local price
Hard drive: 2TB-3TB(Model: Hikvision ST6000VX0023)
of Hikvision.
Notes: choose appropriate camera storage according to the camera
number, basically no less than 3 cameras and storage no less than 2TB
Hard drive
CCTV:
① Provide 2 surveillance options according to store area,
and select appropriate Combo according to the actual
area;
② Reserve cam area on the ceiling that ensures no-dead-
end coverage;
③ Reserve video record for at least 7 days.
CCTV example
Ceiling Cases
Need a
new
ceiling
Status: Raw ceiling without plasterboard cover, unable Status: old and stained ceiling, poor appearance;
to install luminaires; Ceiling is too high to install standard parts;
Solution: redo the ceiling with plasterboard. Solution: redo the ceiling with plasterboard and adjust the height.
(An store in the mall needs to meet the requirements of
the mall)
After redoing the ceiling, its height from the floor should be no less than 2.8meters (3-3.5 meters is preferred).
Wall surface
Wood grain composite White latex paint wall
Aluminum Steel
leather surface
1. Cover the whole wall surface and column (if there is any)with 9mm plywood board and plasterboard.
3. Sand the wall surface with sandpaper at least 2 times to ensure a even surface without bumps.
4. Grout the gaps in the joints of plasterboards to avoid cracks after the natural stone coating dries.
Main material of wall surface-1
Steel-wire twined on
Local common brand is extension bolts leads light-
Plasterboard 12mm 1220*2440mm/each
suggested gage steel to frame the
ceiling foundation
Technique
Material Picture Specification Unit Ref. Price (PHP) Ref. Brand
requirements
Pave 9mm plywood
board first, and then
Local common brand attach plasterboard on
Marine Plyboard 9mm 1220*2440mm/each
is suggested the steel frame and for
the aiot framing.
Door closer
If customers can see the warehouse door, then the color needs to be consistent with the wall
surface and it should be as concealed as possible;
If customers can’t see the warehouse door, the color of the warehouse door is not mandatory.
Warehouse door specification
Techniques
Material Picture Specification Unit Ref. Price (RMB) Brand
requirements
Steel-wire twined on
extension bolts leads
Local common brand
Plasterboard 12mm 1220*2440mm/each light-gage steel to
is suggested
frame the ceiling
foundation
90/㎡
Light-gage steel Thickness: 0.8mm Square meters Local common brand Plasterboard attached
is suggested on light-gage steel
28/㎡
Two-layer latex paint,
HEX
White latex paint Square meters Nippon/Dulux /Davies even surface, and no
#FFFFFF
discoloration
Main material of background wall-2
Technique
Material Picture Specification Unit Brand
requirements
1. The bonding between the floor tiles and the base should be firm
and free of bulge.
Status: Old floor tiles, discoloration; Status: Old floor tiles, discoloration; Status: Floor tiles are relatively new and
Solution: change the floor tile to the Solution: change the floor tile to the meet color and material requirements;
standard. standard. Solution: Keep the floor tile but grout and
beautify them.
Technique
Material Picture Specification Unit Brand
requirements
CW Depot
Notes:
1. The wiring layout of lights must be placed according to the drawings.
2. Use separate circuit and switch to control A/C, logo light, cashier and plug socket.
3. Reserve telephone lines (if any), network cables, power cables, power amplifier audio line stores and ground sockets in
the ground of cashier area.
4. All the wires must be concealed.
5. Wires should be branded e.g Phelps Dodge
Power Construction Specification-distribution box
Fire sprinkler
Smoke detector
Form of Extinguishing equipment
Technique
Material Picture Specification Unit Brand
requirements
Hang on concealed
Local common brand
Extinguisher Kg Kg wall or inner-
is suggested
warehouse
Perspective Design: Preliminary
Notes:
1. Actual Design given by owner to be passed in mall admin; all visible changes are need to give a comments
2. Design should only have at least minimal changes
Construction / Drawing Plan
Notes:
1.Proposal drawing pass to mall admin / Engr. Dept, for evaluation
2. Set of drawings or two-dimensional diagrams used to describe a place or object, or to communicate building or
fabrication instructions. Usually plans are drawn or printed on paper
3. Take 1-2 Weeks to review this drawing plan and revision
As-Built Plan
Notes:
1. refers to a drawing that shows the EXISTING dimensions and conditions of a building, space, or area same with the drawing plan,
2. Difference between on them this is already APPROVED by Engineering department
3. opposed to a drawing plan which shows the intended or proposed layout of the building
4. Signed with Engineer and Architect for both party
5. Requirement needs of the client for their reference
Stores Construction Acceptance
Storefront facade The overall requirement/effect/size/technique of storefront facade should comply with the drawings.
Ceiling The overall requirement/effect/size/technique of ceiling should comply with the drawings.
Floor should be clean and color-consistent. The joints and periphery should be smooth, the width and depth of the
Floor
joints consistent. The floor tiles should be free of quality defects such as cracks, corners and corrugation.
Wall surface The overall requirement/effect/size/technique of wall surface should comply with the drawings.
Light box/Logo should meet the requirements of the drawings (construction drawings / production drawings). All
Electricity/equipment
lights work normally.
Extinguishing equipment Sprinkler/smoke detection should meet the requirements of the mall (if required)
Who of region/agent should be responsible for liaison in the process of store construction?
company
EXCLUSIVE STORE
How to open an
exclusive store
District Channel / KA / Channel Team KA / Channel Team District Channel FILES RETAIL PERSONNEL Procurement PM + RRM
Retail Manager Manager
Endorsement Letter
Compilation Files
Project Request
Dress Up / Installation
Location
If near entrance/escalator: 80% of it can be converted to realme
If location is far from entrance/escalator: 50-60% of it can be converted to realme
Side
Choose the side visible to more people. If oppo is on that side, we choose the side near
entrance, opposite oppo. Always choose entrance/front side.
Request for store design
Workflow with HQ
Note: Include the measurement e.g height, width, length special structure
Negotiate with dealer
• Inform RRM for approved proposal and •Inform RRM for approved proposal files needed
RAM files needed KAM
If Sidestreet, store must have SOW If Mall, store must have SOW
•Carpet + Nosing •Carpet + Nosing
Architectural Architectural
Works works
•Egress / Dismantling of Existing Materials in other brand •Egress / Dismantling of Existing Materials in other brand and mobilization
Other Works
Other
Works
Note: Kindly take notes if dealer as for special request or need to make an
additional works
EXCLUSIVE PROJECT OPERATION- DRESS UP / INSTALLATION
Project Project Canvassing Awarding for Billings & Purchasing Mall / Building of Dress Up /
Request Request & Bidding the Project Payment Agreement Permits Installation
RRM Contractor PM
Lightbox
Size: 0.8M x 0.30M
All size of cabinets made in china has its own rail that can detach anytime
Positioning of IOT Products for 1.2M Accessories- Exclusive & Concept
Lightbox
Size: 1.20M x 0.300M
All size of cabinets made in china has its own rail that can detach anytime
Positioning of IOT Products for 1.2M Accessories- Exclusive & Concept
All size of cabinets made in china has its own rail that can detach anytime
MOCK UP DISPLAY FOR 2.4M Accessories
POSITIONING IOT FOR 3.0
单击此处编辑母版标题样式
MOCK UP FOR 1.2M rv2- Accessories (Right)
Hook (1)
Holes: #9
Size: NA
Items: Band (2) , toothbrush, cable, powerbank (2)
Positioning: Low Price or ROI
Hook (2)
Holes: #10
Size: NA
Items: band, Buds Air, Buds Neo, Buds Q, Bud
Classic
Positioning: Low Price or ROI High Class
Shelve (1)
Holes: #8
Size: 28cm (W) x 28.5 (H)
Items: Buds Q, small products display
Positioning: TBD
Shelve (2)
Holes: #10
Size: 28cm (W) x 30cm (H)
Items: Toothbrush, Power bank, bud classic
Positioning: Hygiene and emergency products
Shelve (3)
Holes: NA
Size: 30cm (W) x 33cm (H)
Items: Weighing Scale, Wireless Bud
Positioning: Big Products
(Left) (Right)
MOCK UP FOR 1.2M for 1.2M rv2- Lifestyle (Left)
Hook (1)
Holes: #9
Size: NA
Items: Adventurer Bagpack
Positioning:
Shelve (1)
Holes: #8
Size: 28cm (W) x 28.5 (H)
Items: Buds Q, small products display
Positioning: TBD
Shelve (2)
Holes: #10
Size: 28cm (W) x 30cm (H)
Items: Toothbrush, Power bank, bud classic
Positioning: Hygiene and emergency products
Shelve (3)
Holes: NA
Size: 30cm (W) x 33cm (H)
Items: Weighing Scale, Wireless Bud
Positioning: Big Products
Lifetsyle Cabinet should be always nearby in cashier wall
MOCK UP FOR 3.6M Accessories
MOCK UP FOR 2M Mounted Table rev1
(Left) (Right)
Door Entrance Stock Room
Info: Some of the concept has 1, 2 or 3 table ideal type is 2 every store, always place
big product on the left side beside of the door entrance since this not easily get
caught and security alarm.
MOCK UP FOR 1.2M Mounted Table rv1
(Left) (Right)
Door Entrance Stock Room
Info: Some of the concept has 1, 2 or 3 table ideal type is 2 every store, always place big product on the
left side beside of the door entrance since this not easily get caught and security alarm.
Positioning of Luggage for 60SQM above
Middle Column:
Size: NA
Items: Bag
Materials: Polypropylene Positioning: Necessity
# of Rows: 5 rows
Dimensions: ??
First Column:
Size: NA
Items Luggage
Materials: Polycarbonate Positioning: Long Items
# of Rows: 5 rows
Dimensions: ??
Positioning of Luggage Platform for 59SQM below
Middle Column:
Size: NA
Items: Bag
Materials: Polypropylene Positioning: Neccesity
# of Rows: 3 rows
Dimensions: ??
First Column:
Size: NA
Items Luggage
Materials: Polycarbonate Positioning: Long Items
# of Rows: 3 rows
Dimensions: ??
Before declaring or posting to the National Retail Development Group, DRM, RRM, or should submit the photos & videos to
Project Manager (PM) to check if it is compliant to retail image standards before the soft opening begins
MEMO FOR OPERATION (Completion Report)- Exclusive
POP & POSM should have enough stocks per store. Make sure to request the quantity per materials needed for every store and
update on the group if the POP/POSM are already received prior to the opening of the store. (OSM List will depends on the
perspective design)
MEMO FOR OPERATION (Completion Files)
Complete files be attached in one folder send to the Project Manager (PM) or
attach in Dingtalk if needed before the execution begins.
CONCEPT STORE
❖ Photos (6 Minimum); Front Store, Right View, Left View, Equiangular View, Ceiling View,
Floor View, Stockroom EXCLUSIVE STORE
❖ Clear Copies of Blow-Up Plan & Floor Plan ❖ Photos (4 Minimum); Front Store, Occupy Location, Photos with Dimension
❖ Design Concept ❖ Agreements (CKE Dealership - Contracts)
❖ Award Notice of Dealer or Sign Agreement ❖ Sign & Approved Plans & Perspective Plan
❖ Dealer’s Info (RKA) and Mall’s Info (Officer-In-Charge) ❖ ROI or SO of the store if applicable
❖ Competitor Sell Out if applicable ❖ Additional Notes for Dress Up / Installation
❖ ROI of the store if applicable
❖ Additional Notes
OSM FIFO SYSTEMNATIONWIDE
单击此处编辑母版标题样式
202101-001
MEMO FOR OPERATION (FIFO of OSM and Proper Storage)