Gandhi Bridge

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

Sabarmati River Front Development Corporation Limited

Page 51

SECTION VI BILL OF QUANTITIES Stretch - 01 ( West Side - Between Gandhi Bridge to Ellis Bride )
Construction of Diaphragm Wall with Reinforced Anchor slab, and Special Fill for Guide bund for a length of 1965 m in River Sabarmati for the Sabarmati River Front Development Project in Ahmedabad

SUMMARY SHEET
Sr. No. Amount

Sub Section : 6.1 Diaphragm Wall Sub Section : 6.2 Special Fill for Guide Bund Sub Section : 6.3 Concrete for Anchor slab Sub Section : 6.4 RCC Hume pipe & Box culvert Total (Rs.) (In words)

Note :

Bidders may bid for one or both the stretches, but in separate B.O.Q.

Signature of Bidder

Sabarmati River Front Development Corporation Limited

Page 52

SUB SECTION : 6.1 DIAPHRAGM WALL BILL OF QUANTITIES Stretch - 01 ( West Side - Between Gandhi Bridge to Ellis Bride )
Sr. No. 1 Description of Item Qty Unit Rate (In Rs.) In Figures In Words Construction of 600 mm thick diaphragm wall from constructed earthen bund above water level in R.C.C.grade M-30 of various depth. The rate includes construction of guide wall 1200 mm deep in R.C.C.grade M-20 of 100 mm thickness made from lightly reinforced concrete. Grabbing & Trenching for diaphragm wall shall be carried out in all type of soil / sand / gravel by adopting approved method. Concreting in batching plant, the cost of reinforcement for diaphragm wall and earthen bund will be paid under saperate item. The contractor's rate should include the cost of following items a Site clearance before starting the work and after completion of work including survey work. b Construction of guide wall in M20 grade concrete, including Earthwork in Excavation and or Backfilling. Demolishing and stacking of unused material of guide wall after completion of the diaphragm wall as directed by the Engineer.cost of reinforcement in guide wall. c Trenching by approved trenching equipment upto desired depth in all sorts of soil except hard and soft Rock. d Concreting by tremmie in controlled concrete M30 grade including cost of all materials, bentonite, labourers, tools, plants, and equipments etc. complete. e Overflowing of contaminated concrete of 0.6 m height(equivalent volume 0.36 m above cutoff level and similutenious finishing the concrete at cutoff level in green state(Chipping or dismentaling of contaminated concrete is not allowed instead of equivalent overflowing concrete is suggested). 28000 m Amount (in Rs. )

Sabarmati River Front Development Corporation Limited f Filling and compacting contaminated concrete below reinforced earth wall as shown in the drawing in green state only. g The earthen bund is proposed to be constructed above water level and construction of diaphragm wall is to be carried out in dry condition from constructed earthen bund.The cost of construction of earthen bund is to be paid saperately as per item no. 6.2(2 and 3). However contractor expecting any dewatering for construction of diaphragm wall same should be included in the item. The cost of dewatering would not be payable to contractor. h The cost of reinforcement of diaphragm wall will be paid separately. i The quoted rate shall cover costs towards extra concrete consumed due to voids, pockets, bulges, side collapse of earth faces etc.The wall shall be measured as per drawing dimensions and paid for only such square metre of concrete calculated from these measurements. j providing and fixing 100 mm dia PVC pipe having capacity of 6 Kg/cm2 at 1.5 m c/c in grid pattern in Diaphragm wall as shown in the drawing. k providing and fixing steel shuttering from top of bund to river bed level during concreting of Diaphragm wall towards River side for form finish surface of diaphragm wall upto riverbed (Removable form work,Methodology to be decided by the contractor). 2 Supplying, erecting, placing, lowering in position by suitable method HYSD(TMT ) Fe 415 reinforcement confirming to IS 1786 of all categories for diaphragm wall at all levels including cutting to required length bending, providing hooks if any, overlapping, binding with 18 gauge annealed wires, welding if any laying in position to ensure proper cover specified during concreting etc complete as directed. Laps, chairs, hooks for lifting, spacers shall not be measured and paid for. 1008 M.ton

Page 53

Total (Rs.)

Sabarmati River Front Development Corporation Limited

Page 54

SUB SECTION : 6.2 SPECIAL FILL FOR GUIDE BUND BILL OF QUANTITIES Stretch - 01 ( West Side - Between Gandhi Bridge to Ellis Bride )
Sr. Description of Item No. 1 Cleaning and grubbing , removing and disposing of all materials such as trees, bushes, shrubs, stumps, roots, grass, weeds, top organic soil, garbage, solid waste of any thickness, rubbish etc., which in the opinion of the Engineer are unsuitable for incorporation in the works, from the area of river front and disposing as instructed engineer incharge including all lift and lead and as per specification. 2 Embankment construction under water: Backfilling is to be placed under water, only acceptable granular material having angle of internal friction more than 30 degree shall be used unless otherwise approved by the Engineer. Acceptable granular material shall consist of graded, hard durable particles with maximum particle size not exceeding 75 mm. The material should be nonplastic having uniformity coefficient of not less than 10. The material placed in open water shall be deposited by end tipping without compaction. Qty 1750 Unit m Rate (In Rs.) In Figures In Words Amount (in Rs. )

346000

Backfilling above the water table with selected granular materials from selected excavated / selected borrow area at OMC to 95 % proctor density by using vibratory roller for compaction as per the specifications, drawings and as directed by the Engineer Excavation for foundation in sand, gravel clay soft soils and murrum etc including strutting and dewatering as necessary and disposing or using excavated stuff in embankment as directed.

86450

2750

Total (Rs.)

Sabarmati River Front Development Corporation Limited

Page 55

SUB SECTION : 6.3 CONCRETE for ANCHOR SLAB BILL OF QUANTITIES


Sr. Description of Item No. 1 Providing and laying of plain cement concrete of P.C.C.M15 grade as per the specifications below anchor slab as per drawing and as directed by the Engineer. Rate shall include cost of formwork if any. 2 Supplying, erecting, placing, lowering in position by suitable method HYSD(TMT ) Fe 415 reinforcement confirming to IS 1786 of all categories for anchor slab and cut off wall at all levels including cutting to required length bending, providing hooks if any, overlapping, binding with 18 gauge annealed wires, welding if any laying in position to ensure proper cover specified during concreting etc complete as directed. Laps, chairs, hooks for lifting, spacers shall not be measured and paid for. 3 Providing and laying of cement concrete of R.C.C.M25 grade as per the specifications for anchor slab and cutoff as per drawing and as directed by the Engineer. Rate shall include cost of formwork but exclude cost of reinforcement. Qty 2950 Unit m Rate (In Rs.) In Figures In Words Amount (in Rs. )

185

Mton

7370

Total (Rs.)

Sabarmati River Front Development Corporation Limited

Page 56

SUB SECTION : 6.4 RCC HUME PIPE & DRAINAGE BOX CULVERT BILL OF QUANTITIES Stretch - 01 ( West Side - Between Gandhi Bridge to Ellis Bride )
Sr. Description of Item No. 1 Excavation for foundation in sand, gravel clay soft soils and murrum etc including strutting and dewatering as necessary and disposing or using excavated stuff in embankment as directed. 2 Providing and laying of plain cement concrete of P.C.C.M15 grade as per the specifications below box culvert as per drawing and as directed by the Engineer. Rate shall include cost of formwork if any. 3 Supplying, erecting, placing, lowering in position by suitable method HYSD(TMT ) Fe 415 reinforcement confirming to IS 1786 of all categories for box culvert at all levels including cutting to required length bending, providing hooks if any, overlapping, binding with 18 gauge annealed wires, welding if any laying in position to ensure proper cover specified during concreting etc complete as directed. Laps, chairs, hooks for lifting, spacers shall not be measured and paid for. 4 Providing and laying of cement concrete of R.C.C.M25 grade as per the specifications for box culvert as per drawing and as directed by the Engineer. Rate shall include cost of formwork but exclude cost of reinforcement. 5 Providing and laying of R.C.C. Hume pipes of NP3 type confirming to IS 458 as per the specifications and as per drawing and as directed by the Engineer in-charge. (a) 1800 mm dia. Pipe (a) 250 mm dia. Pipe Qty 1575 Unit m Rate (In Rs.) In Figures In Words Amount (in Rs. )

80

42

Mton

555

190 675

rmt rmt Total (Rs.)

Sabarmati River Front Development Corporation Limited Page 57 Note : 1 Item for which no rate or price has been entered in will not be paid for by the employer when executed and shall be deemed covered by the other rates and prices in the bill of quantities. 2 Unit rates and prices shall be quoted by the bidder in Indian Rupee. 3 Where there is a discrepancy between the rate in figures and words, the rates in words will govern. 4 No extra payment shall be paid for material testing, concrete testing of structure and any other tests as required. 5 The octroi amount paid on the material by the contractor will be reimbersed on actuals. 6 The royalty exemption is expected from government of gujarat.The contractor unit rate shall exclud all royalties, however any royalities paid by contractor will be reiembersed as actual. 7 The unidentified utilities shall be shifted or reconstructed as per prevailng S.O.R rates of Ahmedabad Municipal Corporation.

You might also like