Culture Documents
Rev-1 RAB Concrete BG Kiong Nguong (23 Juni 2023)
Rev-1 RAB Concrete BG Kiong Nguong (23 Juni 2023)
Rev-1 RAB Concrete BG Kiong Nguong (23 Juni 2023)
2 Install wire mesh M8 2 layer + stick weld to deck floor m2 540,00 353.937,92 127.026,79 191.126.478,57 68.594.464,29 259.720.942,86 120.690.000,00
3 Concreting Floor K300 200 mm thk m3 108,00 2.867.386,25 186.293,75 309.677.715,00 20.119.725,00 329.797.440,00 20.952.000,00
TOTAL PENJUMLAHAN HARGA DILUAR PPN & Pph ( A ) 508.587.633,57 123.354.737,86 631.942.371,43 165.582.000,00