Concreting Barge BG.

Kiong Nguong 106


Rev-1
Unit Price (IDR) Total Price (IDR)
No Item Unit Q'ty Total Amount
Material Labour Material Labour

1 Cleaning deck 18x30 mtr m2 540,00 - - - - -

2 Install wire mesh M8 2 layer + stick weld to deck floor m2 540,00 - - - - -

3 Concreting Floor K300 200 mm thk m3 108,00 3.233.823,75 - 349.252.965,00 - 349.252.965,00

4 Formwork m2 19,20 - - - - -

Stopper plate 10 mm thk around concrete deck 200 mm high


5 m' 96,00 by owner - - - -
(cutting from stock material at Cita Sabut)

TOTAL PENJUMLAHAN HARGA DILUAR PPN & Pph ( A ) 349.252.965,00 - 349.252.965,00

Pph 5% ( B ) - -

PPN 11% ( C ) 38.417.826,15 -

TOTAL PENJUMLAHAN HARGA KESELURUHAN ( D = A+B+C ) 387.670.791,15 -

TOTAL PENJUMLAHAN HARGA KESELURUHAN ( E ) 387.670.791,15