REKAPITULASI KEBUTUHAN MATERIAL

HARGA
NO. URAIAN SAT VOLUME TOTAL HARGA KET
SATUAN
1 Batu Belah M3 13,000 500.000,00 6.500.000,000

2 Semen Zak 57,000 58.000,00 3.306.000,000

3 Besi Polos Dia. 10 mm Btg 10,000 88.000,00 880.000,000

4 Besi Polos Dia. 8 mm Btg 11,000 57.000,00 627.000,000

4 Besi Polos Dia. 6 mm Btg 2,000 40.000,00 80.000,000

5 Kawat Bendrat Kg 11,929 25.000,00 298.220,000


6 Multipleks 9mm Lbr 6,000 100.000,00 600.000,000

7 Bata Ringan/ Hebel Bh 88,000 13.800,00 1.214.400,000

8 Kayu Kaso 5/7 Btg 35,000 37.800,00 1.323.000,000

9 Kayu Balok 5/10 Btg 15,000 54.000,00 810.000,000


10 Seng Galvalum (0,25 x 300 x 80 ) Lbr 8,000 120.000,00 960.000,000

11 Seng Galvalum (0,25 x 400 x 80 ) Lbr 9,000 160.000,00 1.440.000,000

12 Pintu PvC Unit 2,000 600.000,00 1.200.000,000


13 Kloset Jongkok Unit 2,000 170.000,00 340.000,000

14 Keramik Lantai Toilet Dos 8,000 75.000,00 600.000,000

20.178.620,000

REKAPITULASI KEBUTUHAN TENAGA

HARGA
NO. URAIAN SAT VOLUME TOTAL HARGA KET
SATUAN
1 Pekerja 3,00 Org Hari 14,000 150.000,00 6.300.000,000

2 Tukang 2,00 Org Hari 14,000 200.000,00 5.600.000,000

11.900.000,000