SMA (2-period)

Month Demand (At) Forecast (Ft) (At-Ft)^2


1 2000 2100 10000
2 2100 2000 10000
3 1500 2050 302500
4 1400 1800 160000
5 1300 1450 22500
6 1600 1350 62500
7 1550 1450 10000
MSE 82500

Exponential Smoothing with Trend α = 0.8


β = 0.4
F1 = 2100
T1 = 0

Month Demand (At) Ft=Ft-1 + α(At-1 - Ft-1) Tt= β(Ft - Ft-1) + (1-β)Tt-1 FIT (At-FIT)^2
1 2000 2100 0 2100 10000
2 2100 2020 -32 1988 12544
3 1500 2084 6.4 2090.4 348572.16
4 1400 1616.8 -183.04 1433.76 1139.7376
5 1300 1443.36 -179.2 1264.16 1284.5056
6 1600 1328.672 -153.3952 1175.277 180389.79662
7 1550 1545.7344 -5.21215999999997 1540.522 89.827934618
MSE 79145.71825

→ Since the MSE of the Exponential Smoothing with Trend method is lower than that of the SMA method , the Exponential Sm
method , the Exponential Smoothing with Trend method's forecasts are more accurate.  