DI SEMENANJUNG MALAYSIA
ZON TENGAH - TIMUR
NEGERI PAHANG DARUL MAKMUR
Prepared By :
ROADCARE (M) SDN. BHD
P3 - TEMERLOH AREA
NO. 14, JALAN SUDIRMAN 5
28000 TEMERLOH
PAHANG DARUL MAKMUR
SST 6% 46,052.15
……………………………. …………………………
ROADCARE ( M ) SDN. BHD.
KERJA MEMBAIKPULIH PERMUKAAN JALAN DENGAN KAEDAH MILL & PAVE (FMA) DAN LAIN-LAIN KERJA BERKAITAN DI
LALUAN FT02, SEKSYEN 220.00 - 222.00 JALAN KUALA LUMPUR - KUANTAN, DAERAH TEMERLOH, PAHANG DARUL MAKMUR
SLK/PHG/BP029/2023
1.1.1 e / Page 1 of Pavement and Shoulder Milling of existing pavement surface including clean and remove all debris to
receive new surface overlay :-
i) Not exceeding 50mm depth from existing surface m² 7.70 3,305.60 25,453.12
ii) 51mm - 100mm depth from existing surface m² 12.20 3,900.00 47,580.00
1.1.2 e / Page 3 of Pavement and Shoulder Supply and apply bituminous prime coat uniformly Including cleaning the m² 1.60 3,900.00 6,240.00
surface of pavement cleaning prior to application.
1.1.3 f / Page 3 of Pavement and Shoulder Supply,lay and compact asphaltic concrete 28 binder course (AC 28). m3 578.70 234.00 135,415.80
1.1.4 a / Page 2 of Pavement and Shoulder Supply and apply bituminous tack coat uniformly to surface of binder course m² 1.50 7,205.60 10,808.40
including cleaning the surface of pavement prior to application.
1.1.5 1/1 Supply, lay, spread, level and compact fiber mastic apshalt in compliance with m3 1,171.00 360.28 421,887.88
the latest standards specifications and/or technical instructions including all
testings as notified in writing by the government.
1.2 ADDITTIONAL
…………………………..
ROADCARE ( M ) SDN. BHD.
KERJA MEMBAIKPULIH PERMUKAAN JALAN DENGAN KAEDAH MILL & PAVE (FMA) DAN LAIN-LAIN KERJA BERKAITAN DI
LALUAN FT02, SEKSYEN 220.00 - 222.00 JALAN KUALA LUMPUR - KUANTAN, DAERAH TEMERLOH, PAHANG DARUL MAKMUR
SLK/PHG/BP029/2023
2.1.1 a/1 Prepare and apply 2.0mm thermo - plastic road markings of sizes 100mm to m2 80.00 276.15 22,092.00
150mm wide single continuous edge line marking as specified in specification
JKR/SPJ/2012-S6 / BS EN 1436
2.1.2 c/1 Ditto intermittent center line and lane marking of 100mm wide m2 80.00 184.10 14,728.00
2.1.3 f/1 Ditto but continuous stop line of 300mm wide m2 80.00 - -
2.1.4 g/1 Ditto 300mm width chevron hatching for merging / diverging traffic and cross m2 86.00 - -
hatching
2.1.5 h/1 Prepare and apply Transverse yellow thermoplastic of 5.0 mm thick and
600mm wide as specified in specification
JKR/SPJ/2012-S6 BS EN 1436 m2 142.00 - -
Notes :
All quantities are provisional and subject to
remeasurement.
………………………….. …………………………
STRIP MAP
ROUTE NO : FT02 ROUTE NAME : JALAN KUALA LUMPUR - KUANTAN Page 1
LHS
RHS
…………………………………… ……………………………………………….
ROUTE NO : FT02 ROUTE NAME : JALAN KUALA LUMPUR - KUANTAN PAGE 3
221.00 222.00
100 200 300 400 500 600 700 800 900 1000
ROADMARKING
Section Roadmarking Total Quantity
Edge Lane marking Double Yellow Arrow Stop Hatching Edge Lane marking Double Yellow Arrow Stop Hatching
Line Inter 4.5m Inter 1m Single Line Line bar Double Line Chevron Line Inter 4.5m Inter 1m Single Line Bar (m2) Line
Item Start End (m) 100mm 100mm 100mm Straight Line 100mm 100mm Line (Gx3.49) (m2) (m2)
( no ) ( no ) (m) (m) Turning (m) (m) (m2) (m2) (m2) (m2) (m2) (m2) (Gx1.55) (Hx0.15) ( I x0.15)
(A) (B) (C) (D) (E) (F) (Nos) (G) (H) (I) (Ax0.15) Bx4.5x0.1 (Cx0.15) (Dx0.1) (Ex0.1x2) (Fx0.6) (Gx1.34) (Hx0.3) ( I x0.3)
……………………………… ………………………………………….......