NEOM - 10 SPINE INFRASTRUCTURE

Contract No. 4200000031


Contract Name SAMA-Site Preparation Framework 3
WO 022 Enabling Works for Logistics Facilities(L3) – Coastal Desert East
Region_Method Statement for Installation and Testing of
Reinforcement Pipes of Storm Water Piping

BACKFILLING

After completion of the tests and acceptance by NEOM, backfilling shall commence using
1
similar excavated material.

2 Care shall be taken to remove bolder, vegetations and any other deleterious materials.

3 Minimum Thickness required for backfilling as per IFC /Shop drawing or project specifications.

4 Warning tape should be placed on the sand cover followed by as per the drawing.

5 Backfilled, compacted by layers to reach subgrade level.

CATCH BASIN FRAME & GRATE COVER INSTALLATION:

Catch basin installation will be as per the manufacturer's instruction or as per the Engineer's
1
recommendation.

2 Before Installation of the catch basins, the team will prepare the location

A lifting permit required as per the work and Safety rule must follow as per the NEOM Safety
3
requirement.

4 Catch basin shall be installed by using a boom truck or crane.

5 Level will be as per the approved drawing.

6 Prior to install the catch basin the bedding must be compacted to 90%.

7 Lean concrete should be done as per IFC drawings.

8 The roof should be constructed with the catch basin cover frame imbedded in it.

9 The catch basin cover must be installed after the installation of the pipe

14-159000-0000100201-MAH-MEC-MST-000003 REV.03 Page 15ofof


Page 14 30 34
NEOM - 10 SPINE INFRASTRUCTURE
Contract No. 4200000031
Contract Name SAMA-Site Preparation Framework 3
WO 022 Enabling Works for Logistics Facilities(L3) – Coastal Desert East
Region_Method Statement for Installation and Testing of
Reinforcement Pipes of Storm Water Piping

7 RESOURCES

Title No. Required Task Specific Training Required (if applicable)

Project Manager

Construction
Manager
Regular training is required during the Project
QC Manager
with refreshment;

QC Engineers 1. Safety Induction

Safety Manager 2. Safety Training

Environmental
3. Competent Operator Training
Manager

Site Engineer 4. Project Driving Rules

Chief Land Surveyor 5. Accident and Emergencies

Safety Officers 6. Breakdown Procedure

Survey Team 7. Working at Height

Foreman

Operators

Skilled /
Unskilledlabors

3rd Party Technician

Page 17ofof
Page 15 22 34
NEOM - 10 SPINE INFRASTRUCTURE
Contract No. 4200000031
Contract Name SAMA-Site Preparation Framework 3
WO 022 Enabling Works for Logistics Facilities(L3) – Coastal Desert East
Region_Method Statement for Installation and Testing of
Reinforcement Pipes of Storm Water Piping

B. PLANT AND EQUIPMENT:


Item Specific Requirements
Water Tankers ;
Excavator
1. Equipment Registration
Plate Compactor
2. Vehicle Insurance
Boom Truck 3. MVPI (Vehicles)
Diesel Tanker
Service Vehicle
Survey Equipment
NOTE: For all Equipment’s shall be complied all requirement as follows; Inspection Checklist,
Equipment Registration, Vehicle insurance, MVPI (vehicles), Driving License.

C. MATERIAL AND TOOLS:


S. N Item

1 General tools (Measuring tape, Hammer, Sprit level)


2 Crane
3 Excavator
4 Safety Equipment (Signs, Cones, Warning Tape &PPE)

5 Vibrator Roller
6 Shovel
7 Power tools
8 Hand tools

D. CHEMICALS REQUIRED:
Item MSDS Reason for Use

Lubricant Required For Joining of Pipes

Page 7 22
Page 115of of 34
NEOM - 10 SPINE INFRASTRUCTURE
Contract No. 4200000031
Contract Name SAMA-Site Preparation Framework 3
WO 022 Enabling Works for Logistics Facilities(L3) – Coastal Desert East
Region_Method Statement for Installation and Testing of
Reinforcement Pipes of Storm Water Piping

E. TASK SPICIFIC PPE REQUIRED: (Refer control measures from Risk Assessment)
Item Reason for use
Hard Hat Protection from falling object
Dust Mask (N95) Protection against dust and fumes
Safety Vest Visibility when working in the site
Goggles / Face Shield Eye protection during working in the site
Leather Gloves Hand protection during working in the site
Gum Boots with Steel Feet Protection
Toe
Ear Plug / Muff For ear protection
Welfare Facility Shelter, Drinking water, Portable toilet, etc.

“Note that all works require mandatory PPE as follows Hardhat, gloves, safety glasses, safety
boots, hi-visibility vest.”

7. INTERFACES – Other sites, work activities, general public etc.:


Interfacing party or activity Description of Interface

Governmental parties Coordinate to governmental parties before start of works for


existing utilities rerouting of existing cables & other Services. (if applicable)

09 PERMITS:
Permit Type Issued By Additional Information (Reference No. etc)

To conduct the topographical survey verification of


Notice to Proceed NEOM existing ground condition, and provide layout and
stacking.

Excavation/ Dig Permit NEOM If Necessary

Document No. 10-600000-4200000031-SAM-MEC-MST-000001 – Rev. 01


Page
Page 1168 of 34
of 22
NEOM - 10 SPINE INFRASTRUCTURE
Contract No. 4200000031
Contract Name SAMA-Site Preparation Framework 3
WO 022 Enabling Works for Logistics Facilities(L3) – Coastal Desert East
Region_Method Statement for Installation and Testing of
Reinforcement Pipes of Storm Water Piping

10 REFERENCES DRAWINGS / SPECIFICATION / OTHER:


Permit Type Additional Information (Reference No. etc)

IFC Drawings 10-600000-4200000001-ESC-STR-DRG-009147-B


Section 334100 STORM UTILITY DRAINAGE PIPING
Section 312000 EARTH MOVING
Section 311000 SITE CLEARING

11. APPENDICES:

11.1. RISK ASSESSMENT

Document No. 10-600000-4200000031-SAM-MEC-MST-000001 – Rev. 01


Page
Page 1169 of 34
of 22