BACKFILLING
After completion of the tests and acceptance by NEOM, backfilling shall commence using
1
similar excavated material.
2 Care shall be taken to remove bolder, vegetations and any other deleterious materials.
3 Minimum Thickness required for backfilling as per IFC /Shop drawing or project specifications.
4 Warning tape should be placed on the sand cover followed by as per the drawing.
Catch basin installation will be as per the manufacturer's instruction or as per the Engineer's
1
recommendation.
2 Before Installation of the catch basins, the team will prepare the location
A lifting permit required as per the work and Safety rule must follow as per the NEOM Safety
3
requirement.
6 Prior to install the catch basin the bedding must be compacted to 90%.
8 The roof should be constructed with the catch basin cover frame imbedded in it.
9 The catch basin cover must be installed after the installation of the pipe
7 RESOURCES
Project Manager
Construction
Manager
Regular training is required during the Project
QC Manager
with refreshment;
Environmental
3. Competent Operator Training
Manager
Foreman
Operators
Skilled /
Unskilledlabors
Page 17ofof
Page 15 22 34
NEOM - 10 SPINE INFRASTRUCTURE
Contract No. 4200000031
Contract Name SAMA-Site Preparation Framework 3
WO 022 Enabling Works for Logistics Facilities(L3) – Coastal Desert East
Region_Method Statement for Installation and Testing of
Reinforcement Pipes of Storm Water Piping
5 Vibrator Roller
6 Shovel
7 Power tools
8 Hand tools
D. CHEMICALS REQUIRED:
Item MSDS Reason for Use
Page 7 22
Page 115of of 34
NEOM - 10 SPINE INFRASTRUCTURE
Contract No. 4200000031
Contract Name SAMA-Site Preparation Framework 3
WO 022 Enabling Works for Logistics Facilities(L3) – Coastal Desert East
Region_Method Statement for Installation and Testing of
Reinforcement Pipes of Storm Water Piping
E. TASK SPICIFIC PPE REQUIRED: (Refer control measures from Risk Assessment)
Item Reason for use
Hard Hat Protection from falling object
Dust Mask (N95) Protection against dust and fumes
Safety Vest Visibility when working in the site
Goggles / Face Shield Eye protection during working in the site
Leather Gloves Hand protection during working in the site
Gum Boots with Steel Feet Protection
Toe
Ear Plug / Muff For ear protection
Welfare Facility Shelter, Drinking water, Portable toilet, etc.
“Note that all works require mandatory PPE as follows Hardhat, gloves, safety glasses, safety
boots, hi-visibility vest.”
09 PERMITS:
Permit Type Issued By Additional Information (Reference No. etc)
11. APPENDICES: