This document outlines the project schedule for a gas processing facility project in Aceh, Indonesia over 420 days. It includes 30 days for preparation of facilities, 105 days for detailed engineering design, 280 days for procurement, 249 days for construction, 244 days for installation, and 127 days for commissioning. The commissioning phase includes 60 days for mechanical completion and as-built drawings, and 62 days for start-up and testing of electrical, instrumentation control, utility, and gas processing systems.
This document outlines the project schedule for a gas processing facility project in Aceh, Indonesia over 420 days. It includes 30 days for preparation of facilities, 105 days for detailed engineering design, 280 days for procurement, 249 days for construction, 244 days for installation, and 127 days for commissioning. The commissioning phase includes 60 days for mechanical completion and as-built drawings, and 62 days for start-up and testing of electrical, instrumentation control, utility, and gas processing systems.
This document outlines the project schedule for a gas processing facility project in Aceh, Indonesia over 420 days. It includes 30 days for preparation of facilities, 105 days for detailed engineering design, 280 days for procurement, 249 days for construction, 244 days for installation, and 127 days for commissioning. The commissioning phase includes 60 days for mechanical completion and as-built drawings, and 62 days for start-up and testing of electrical, instrumentation control, utility, and gas processing systems.
This document outlines the project schedule for a gas processing facility project in Aceh, Indonesia over 420 days. It includes 30 days for preparation of facilities, 105 days for detailed engineering design, 280 days for procurement, 249 days for construction, 244 days for installation, and 127 days for commissioning. The commissioning phase includes 60 days for mechanical completion and as-built drawings, and 62 days for start-up and testing of electrical, instrumentation control, utility, and gas processing systems.
JASA SEWA GAS PROCESSING FACILITY KAPASITAS 45 MMSCFD - LHOKSUKON, ACEH NO. TENDER : 5188-369-PGE ID WBS Task Name Duration M12 M13 M14 M15 W49 W50 W51 W52 W53 W54 W55 W56 W57 W58 W59 W60 W61 W62 1 1 PROJECT MASTER SCHEDULE 420 days 2 1.1 CONTRACT AWARD 0 days 3 1.2 PREPARATION FACILITIES 30 days 4 1.3 DETAIL ENGINEERING DESIGN 105 days 1210 1.4 PROCUREMENT 280 days 2512 1.5 CONSTRUCTION 249 days 2708 1.6 INSTALLATION 244 days 2861 1.7 COMMISSIONING 127 days 2862 1.7.1 MDR (incld. As Built Drawing) 60 days 2863 1.7.2 Start-Up & Commissioning 62 days 2864 1.7.2.1 Electrical System 13 days 2865 1.7.2.1.1 Grounding 2 days 2866 1.7.2.1.2 Emergency Diesel Generator 1 day 2867 1.7.2.1.3 Power Transformers 1 day 2868 1.7.2.1.4 MV Switchgear 1 day 2869 1.7.2.1.5 LV Switchgear and MCC 2 days 2870 1.7.2.1.6 Variable Frequency Drive (VFD) 1 day 2871 1.7.2.1.7 Lighting & Small Power Panel 3 days 2872 1.7.2.1.8 UPS System 2 days 2873 1.7.2.1.9 Cathodic Protection 1 day 2874 1.7.2.2 Instrument Control System 13 days 2875 1.7.2.2.1 Integrated Control and Safety System3(ICSS) days 2876 1.7.2.2.2 Field Instrument 7 days 2877 1.7.2.2.3 Metering System 2 days 2878 1.7.2.2.4 Electrical Power System Interface 3 days 2879 1.7.2.2.5 Telecommunication System 2 days 2880 1.7.2.2.5.1 CCTV System 1 day 2881 1.7.2.2.5.2 GA System 1 day 2882 1.7.2.3 Utilities 7 days 2883 1.7.2.3.1 Fire Water System 2 days 2884 1.7.2.3.2 Instrument Air And Utility Air System1 day 2885 1.7.2.3.3 Nitrogen Generation 1 day 2886 1.7.2.3.4 Water Treatment Package 1 day 2887 1.7.2.3.5 Open Drain And Waste Water Treatment 1 day 2888 1.7.2.3.6 Closed Drain System 1 day 2889 1.7.2.4 Gas Processing 29 days