Pembangunan Jalan Tol

Probolinggo - Banyuwangi Paket 2


STA. 09+000 - 20+200
REKAPITULASI SANDCONE TEST
MATERIAL : COMMON BORROW

JMF LAPANGAN
LOKASI
NO TANGGAL STA - STA STA LAYER JALUR Keterangan
/ ZONA OMC MDD
0MC MDD KEPADATAN
1 12 Juni 2023 0+100 - 0+200 0+150 IC A R 19.22 1.495 23.5 1.426 95.4%
2 0+160 IC A R 19.22 1.495 22.0 1.526 102.1%
3 0+165 IC A R 19.22 1.495 19.5 1.482 99.1%
4 13 Juni 2023 0+100 - 0+200 0+125 IC A R 19.22 1.495 16.5 1.460 97.7%
5 0+200 IC A R 19.22 1.495 21.0 1.453 97.2%
6 16 Juni 2023 0+200 - 0+275 0+250 IC A R 19.22 1.495 15.8 1.547 103.5%
7 16 Juni 2023 0+100 - 0+275 0+125 IC A L 19.22 1.495 17.0 1.478 98.9%
8 0+175 IC A L 19.22 1.495 15.5 1.459 97.6%
9 0+225 IC A L 19.22 1.495 19.0 1.421 95.1%
10 0+275 IC A L 19.22 1.495 20.9 1.451 97.1%
11 19 Juni 2023 0+275 - 0+300 0+280 IC A R 19.22 1.495 17.1 1.470 98.3%
12 19 Juni 2023 0+100 - 0+290 0+150 IC 1 R 19.22 1.495 19.7 1.451 97.1%
13 0+200 IC 1 R 19.22 1.495 18.1 1.473 98.5%
14 0+250 IC 1 R 19.22 1.495 20.0 1.493 99.9%
15 0+290 IC 1 R 19.22 1.495 17.5 1.437 96.1%
16 19 Juni 2023 0+100 - 0+275 0+115 IC 1 L 19.22 1.495 16.3 1.490 99.7%
17 0+165 IC 1 L 19.22 1.495 19.0 1.489 99.6%
18 0+215 IC 1 L 19.22 1.495 17.7 1.442 96.5%
19 0+265 IC 1 L 19.22 1.495 18.8 1.466 98.1%
20 20 Juni 2023 0+100 - 0+250 0+125 IC 2 L 19.22 1.495 16.3 1.437 96.1%
21 0+150 IC 2 L 19.22 1.495 20.9 1.429 95.6%
22 0+200 IC 2 L 19.22 1.495 20.7 1.475 98.7%
23 0+250 IC 2 L 19.22 1.495 16.7 1.438 96.2%
24 20 Juni 2023 0+100 - 0+300 0+125 IC 2 R 19.22 1.495 21.9 1.452 97.1%
25 0+175 IC 2 R 19.22 1.495 20.5 1.463 97.9%
26 0+225 IC 2 R 19.22 1.495 18.7 1.448 96.9%
27 0+275 IC 2 R 19.22 1.495 16.3 1.426 95.4%
28 22 Juni 2023 0+100 - 0+200 0+110 IC 3 R 19.22 1.495 20.5 1.449 96.9%
29 0+165 IC 3 R 19.22 1.495 20.2 1.469 98.3%
30 24 Juni 2023 0+325 - 0+400 00+350 IC A R 21.38 1.685 19.7 1.658 98.4%
31 00+375 IC A L 21.38 1.685 20.0 1.634 97.0%
32 24 Juni 2023 0+200 - 0+300 00+225 IC 3 R 19.22 1.495 20.0 1.444 96.6%
33 00+275 IC 3 R 19.22 1.495 18.6 1.453 97.2%
34 27 Juni 2023 0+125 - 0+275 00+160 IC 3 L 19.22 1.495 17.4 1.431 95.7% Re-Test
35 00+210 IC 3 L 19.22 1.495 18.9 1.468 98.2%
36 00+260 IC 3 L 19.22 1.495 15.4 1.498 100.2%
37 28 Juni 2023 0+150 - 0+300 00+175 IC 4 R 19.22 1.495 18.8 1.449 96.9%
38 0+225 IC 4 R 19.22 1.495 20.4 1.457 97.5%
39 0+275 IC 4 R 19.22 1.495 18.8 1.458 97.5%

Diketahui Oleh : Diperiksa Oleh : Diajukan Oleh :


PT Jasamarga Probolinggo Banyuwangi PT Multi Phi Beta PT HKI-ACSET-NK, KSO

(..............................) (................................) (...............................)


Pembangunan Jalan Tol
Probolinggo - Banyuwangi Paket 2
STA. 09+000 - 20+200
REKAPITULASI SANDCONE TEST
MATERIAL : COMMON BORROW

Laporan Bulan : UPDATE 15 AGUSTUS


LOKASI JMF LAPANGAN
NO TANGGAL STA - STA STA LAYER JALUR Keterangan
/ ZONA OMC MDD 0MC MDD KEPADATAN
1 01 Agustus 2023 0+325 - 0+475 00+340 IC 4 R 19.22 1.495 16.6 1.436 96.1% Profrolling OK
2 00+395 IC 4 R 19.22 1.495 16.4 1.451 97.1% Profrolling OK
3 00+460 IC 4 R 19.22 1.495 16.8 1.449 96.9% Profrolling OK
4 01 Agustus 2023 0+325 - 0+475 00+335 IC 4 L 17.50 1.720 14.8 1.659 96.5% Profrolling OK
5 00+380 IC 4 L 17.50 1.720 14.2 1.658 96.4% Profrolling OK
6 00+425 IC 4 L 17.50 1.720 14.6 1.682 97.8% Profrolling OK
7 01 Agustus 2023 0+475 - 0+525 00+500 IC 3 R 17.50 1.720 14.2 1.657 96.3%
8 01 Agustus 2023 0+475 - 0+525 00+515 IC 2 L 17.50 1.720 14.3 1.656 96.3% Profrolling OK
9 02 Agustus 2023 0+200 - 0+300 00+250 IC 9 R 19.20 1.550 18.2 1.499 96.7%
10 00+275 IC 9 R 19.20 1.550 17.8 1.505 97.1%
11 02 Agustus 2023 0+200 - 0+275 00+225 IC 9 L 19.20 1.550 18.2 1.486 95.9%
12 02 Agustus 2023 0+275 - 0+300 00+285 IC 8 L 19.20 1.550 18.2 1.500 96.8%
13 03 Agustus 2023 4+428 (RAMP 4 ) 04+248 IC 1 BC 19.22 1.495 17.7 1.443 96.5% BC = RAMP 4
14 04+248 IC 1 BC 19.22 1.495 16.6 1.437 96.1% BC = RAMP 4
15 04 Agustus 2023 4+428 (RAMP 4 ) 04+248 IC 2 BC 19.22 1.495 17.6 1.444 96.6% BC = RAMP 4
16 04+248 IC 2 BC 19.22 1.495 17.6 1.447 96.8% BC = RAMP 4
17 05 Agustus 2023 1+340 (RAMP 1 ) 01+340 IC 1 BC 21.38 1.685 18.8 1.637 97.2% BC = RAMP 1
18 01+340 IC 1 BC 21.38 1.685 20.2 1.645 97.6% BC = RAMP 1
19 05 Agustus 2023 1+340 (RAMP 1 ) 01+340 IC 2 BC 21.38 1.685 19.1 1.614 95.8% BC = RAMP 1
20 01+340 IC 2 BC 21.38 1.685 20.0 1.622 96.3% BC = RAMP 1
21 05 Agustus 2023 0+950 - 0+975 00+960 IC I R 17.50 1.720 15.8 1.663 96.7%
22 06 Agustus 2023 0+475 - 0+525 00+485 IC 4 R 17.50 1.720 16.4 1.663 96.7%
23 06 Agustus 2023 0+325 - 0+475 00+350 IC 5 R 17.50 1.720 15.9 1.680 97.7%
24 00+400 IC 5 R 17.50 1.720 16.9 1.649 95.9% Re-Test
25 00+455 IC 5 R 17.50 1.720 15.3 1.655 96.2%
26 06 Agustus 2023 0+475 - 0+525 00+500 IC 3 L 17.50 1.720 16.4 1.663 96.7%
27 07 Agustus 2023 0+975 - 1+175 01+000 IC G R 17.50 1.720 15.9 1.648 95.8%
28 01+050 IC G R 17.50 1.720 14.8 1.670 97.1%
29 01+100 IC G R 17.50 1.720 15.6 1.665 96.8%
30 01+152 IC G R 17.50 1.720 16.2 1.649 95.9%
31 07 Agustus 2023 0+325 - 0+475 00+350 IC 5 L 19.22 1.495 17.2 1.446 96.7%
32 00+400 IC 5 L 19.22 1.495 18.6 1.432 95.8%
33 00+415 IC 5 L 19.22 1.495 19.5 1.426 95.4%
34 07 Agustus 2023 1+400 - 1+525 01+455 IC J R 17.50 1.720 16.1 1.672 97.2%
35 01+500 IC J R 17.50 1.720 15.0 1.644 95.6%
36 08 Agustus 2023 0+975 - 1+175 00+985 IC F R 21.38 1.685 19.2 1.631 96.8%
37 01+030 IC F R 21.38 1.685 18.7 1.613 95.7%
38 01+090 IC F R 21.38 1.685 20.4 1.643 97.5%
39 01+145 IC F R 21.38 1.685 19.5 1.638 97.2%
40 09 Agustus 2023 0+975 - 1+175 00+995 IC E R 21.38 1.685 18.3 1.629 96.7%
41 01+045 IC E R 21.38 1.685 18.9 1.641 97.4%
42 01+105 IC E R 21.38 1.685 19.7 1.607 95.4%
43 01+165 IC E R 21.38 1.685 20.1 1.624 96.4%
44 09 Agustus 2023 0+950 - 0+975 00+965 IC H R 21.38 1.685 20.1 1.624 96.4%
45 09 Agustus 2023 0+950 - 0+975 00+960 IC G R 21.38 1.685 19.4 1.638 97.2%
46 09 Agustus 2023 0+475 - 0+525 00+500 IC 4 L 19.20 1.550 18.4 1.499 96.7%
47 09 Agustus 2023 1+400 - 1+525 01+425 IC I R 21.38 1.685 19.0 1.646 97.7%
48 01+500 IC I R 21.38 1.685 19.0 1.636 97.1%
49 09 Agustus 2023 0+325 - 0+475 00+350 IC 6 L 19.20 1.550 17.3 1.510 97.4%
50 00+400 IC 6 L 19.20 1.550 18.1 1.500 96.8%
51 00+450 IC 6 L 19.20 1.550 17.2 1.485 95.8%
52 10 Agustus 2023 0+325 - 0+475 00+350 IC 6 R 19.20 1.550 18.7 1.493 96.3%
53 00+400 IC 6 R 19.20 1.550 19.8 1.493 96.3%
54 00+450 IC 6 R 19.20 1.550 18.5 1.516 97.8%
55 10 Agustus 2023 0+975 - 1+175 01+000 IC D R 21.38 1.685 19.8 1.626 96.5%
56 01+050 IC D R 21.38 1.685 18.8 1.614 95.8%
57 01+100 IC D R 21.38 1.685 20.7 1.643 97.5%
58 01+150 IC D R 21.38 1.685 19.5 1.631 96.8%
59 10 Agustus 2023 1+400 - 1+525 01+425 IC H R 21.38 1.685 19.4 1.636 97.1%
Pembangunan Jalan Tol
Probolinggo - Banyuwangi Paket 2
STA. 09+000 - 20+200
REKAPITULASI SANDCONE TEST
MATERIAL : COMMON BORROW

Laporan Bulan : UPDATE 15 AGUSTUS


LOKASI JMF LAPANGAN
NO TANGGAL STA - STA STA LAYER JALUR Keterangan
/ ZONA OMC MDD 0MC MDD KEPADATAN
60 01+475 IC H R 21.38 1.685 13.1 1.624 96.4%
61 10 Agustus 2023 0+950 - 0+975 00+960 IC F R 19.22 1.495 19.5 1.434 95.9%
62 11 Agustus 2023 0+475 - 0+525 00+505 IC 5 L 18.46 1.706 15.4 1.651 96.8%
63 11 Agustus 2023 1+758 1+758 IC 1 BC 19.20 1.550 17.9 1.500 96.8% BC
64 1+758 IC 1 BC 19.20 1.550 17.1 1.492 96.3%
65 12 Agustus 2023 1+758 1+758 IC 2 BC 19.20 1.550 18.9 1.483 95.7% BC
66 1+758 IC 2 BC 19.20 1.550 17.0 1.490 96.1%
67 13 Agustus 2023 1+758 1+758 IC 3 BC 19.20 1.550 17.0 1.491 96.2% BC
68 1+758 IC 3 BC 19.20 1.550 18.2 1.486 95.9%
69 13 Agustus 2023 1+758 1+758 IC 4 BC 19.20 1.550 18.0 1.525 98.4% BC
70 1+758 IC 4 BC 19.20 1.550 18.2 1.496 96.5%
71 14 Agustus 2023 1+400 - 1+525 01+425 IC F R 19.20 1.550 17.5 1.499 96.7% Profrolling OK
72 01+500 IC F R 19.20 1.550 18.4 1.510 97.4% Profrolling OK
73 14 Agustus 2023 0+475 - 0+525 00+500 IC 6 L 18.46 1.706 16.4 1.662 97.4% Profrolling OK
74 14 Agustus 2023 0+475 - 0+525 00+500 IC 5 R 19.20 1.550 17.5 1.510 97.4%
75 14 Agustus 2023 0+400 - 0+475 00+400 IC 7 R 19.20 1.550 17.4 1.499 96.7%
76 00+450 IC 7 R 19.20 1.550 18.9 1.489 96.1%
77 14 Agustus 2023 0+400 - 0+475 00+425 IC 8 L 18.46 1.706 16.4 1.663 97.5%
78 00+475 IC 8 L 18.46 1.706 17.4 1.649 96.7%
79 14 Agustus 2023 0+950 - 0+975 00+960 IC E R 19.20 1.550 17.4 1.500 96.8%
80 14 Agustus 2023 0+950 - 0+975 00+955 IC D R 19.20 1.550 18.4 1.510 97.4%
81 14 Agustus 2023 0+975 - 1+175 01+000 IC C R 19.20 1.550 17.5 1.527 98.5%
82 01+050 IC C R 19.20 1.550 18.7 1.490 96.1%
83 01+100 IC C R 19.20 1.550 17.4 1.510 97.4%
84 01+150 IC C R 19.20 1.550 18.4 1.482 95.6%
85 15 Agustus 2023 0+975 - 1+175 01+000 IC B R 19.20 1.550 18.1 1.499 96.7%
86 01+050 IC B R 19.20 1.550 16.3 1.514 97.7%
87 01+100 IC B R 19.20 1.550 17.0 1.531 98.8%
88 01+150 IC B R 19.20 1.550 18.5 1.505 97.1%
89 15 Agustus 2023 0+950 - 0+975 00+970 IC C R 19.20 1.550 20.2 1.497 96.6%

Diketahui Oleh : Diperiksa Oleh : Diajukan Oleh :


PT Jasamarga Probolinggo Banyuwangi PT Multi Phi Beta PT HKI-ACSET-NK, KSO

(...............................) (................................) (...............................)


Pembangunan Jalan Tol
Probolinggo - Banyuwangi Paket 2
STA. 09+000 - 20+200
REKAPITULASI SANDCONE TEST
MATERIAL : COMMON BORROW

UPDATE : 27 Juli 2023


LOKASI JMF LAPANGAN
NO TANGGAL STA - STA STA LAYER JALUR Keterangan
/ ZONA OMC MDD 0MC MDD KEPADATAN
1 01 Juli 2023 0+150 - 0+250 00+175 IC 4 L 19.22 1.495 19.0 1.447 96.8% Profrolling OK
2 00+200 IC 4 L 19.22 1.495 20.5 1.452 97.1% Profrolling OK
3 04 Juli 2023 0+150 - 0+300 00+170 IC 5 R 19.22 1.495 18.5 1.445 96.7%
4 00+230 IC 5 R 19.22 1.495 17.3 1.449 96.9%
5 00+280 IC 5 R 19.22 1.495 17.8 1.465 98.0%
6 04 Juli 2023 0+275 - 0+300 00+280 IC 1 L 19.22 1.495 19.5 1.449 96.9%
7 04 Juli 2023 0+250 - 0+275 00+265 IC 4 L 19.22 1.495 18.8 1.455 97.3% Profrolling OK
8 05 Juli 2023 0+150 - 0+275 00+165 IC 5 L 19.22 1.495 19.2 1.474 98.6% Re-Test
9 00+225 IC 5 L 19.22 1.495 19.1 1.472 98.5%
10 00+265 IC 5 L 19.22 1.495 18.1 1.44 96.3% Re-Test
11 05 Juli 2023 0+275 - 0+300 00+285 IC 2 L 19.22 1.495 17.5 1.437 96.1% Re-Test
12 10 Juli 2023 0+150 - 0+300 00+175 IC 6 R 19.20 1.550 17.5 1.507 97.2% Profrolling OK
13 00+225 IC 6 R 19.20 1.550 18.2 1.507 97.2% Profrolling OK
14 00+275 IC 6 R 19.20 1.550 16.6 1.481 95.5% Profrolling OK
15 10 Juli 2023 0+400 - 0+425 00+415 IC C L 21.38 1.685 19.8 1.609 95.5%
16 00+435 IC C R 21.38 1.685 18.9 1.602 95.1%
17 10 Juli 2023 0+275 - 0+300 00+285 IC 3 L 19.20 1.550 20.8 1.503 97.0%
18 11 Juli 2023 0+275 - 0+300 00+280 IC 4 L 19.20 1.550 18.1 1.502 96.9% Profrolling OK
19 11 Juli 2023 0+425 - 0+475 00+430 IC A R 21.38 1.685 21.35 1.651 98.0%
20 11 Juli 2023 0+150 - 0+225 00+180 IC 6 L 19.20 1.550 16.5 1.498 96.6% Profrolling OK
21 11 Juli 2023 0+250 - 0+300 00+275 IC 7 R 19.22 1.495 20.9 1.459 97.6%
22 11 Juli 2023 0+400 - 0+425 00+410 IC B L 21.38 1.685 19.42 1.636 97.1%
23 00+415 IC B R 21.38 1.685 19.57 1.625 96.4%
24 12 Juli 2023 0+917 0+917 IC 1 BC 21.38 1.685 18.8 1.647 97.7% BC = Box Culvert
25 IC 1 BC 21.38 1.685 19.7 1.651 98.0%
26 12 Juli 2023 0+917 0+917 IC 2 BC 19.22 1.495 22.0 1.492 99.8% BC = Box Culvert
27 IC 2 BC 19.22 1.495 22.7 1.475 98.7%
28 12 Juli 2023 0+325 - 0+400 00+340 IC 1 R 21.38 1.685 18.80 1.641 97.4%
29 00+390 IC 1 R 21.38 1.685 19.30 1.621 96.2%
30 12 Juli 2023 0+200 - 0+250 00+215 IC 7 R 19.22 1.495 17.80 1.460 97.7%
31 12 Juli 2023 0+250 - 0+275 00+260 IC 6 L 19.22 1.495 20.30 1.477 98.8% Profrolling OK
32 0+250 - 0+275 00+280 IC 5 L 20.22 1.495 19.70 1.461 97.7%
33 13 Juli 2023 0+200 - 0+250 00+235 IC 6 L 19.22 1.495 20.00 1.444 96.6% Profrolling OK
34 13 Juli 2023 0+400 - 0+425 00+420 IC A R 21.38 1.685 18.40 1.628 96.6%
35 13 Juli 2023 0+400 - 0+450 00+450 IC 1 R 21.38 1.685 19.70 1.623 96.3%
36 13 Juli 2023 0+150 - 0+200 00+165 IC 7B R 19.22 1.495 18.40 1.502 100.5%
37 13 Juli 2023 0+425 - 0+525 00+490 IC A L 21.38 1.685 18.20 1.630 96.7%
38 00+515 IC A R 21.38 1.685 19.20 1.603 95.1%
39 13 Juli 2023 0+917 0+917 IC 3 19.22 1.495 18.5 1.462 97.8% BC = Box Culvert
40 IC 3 19.22 1.495 17.9 1.453 97.2%
41 13 Juli 2023 0+917 0+917 IC 4 19.22 1.495 19.9 1.460 97.7% BC = Box Culvert
42 IC 4 19.22 1.495 18.2 1.465 98.0%
43 15 Juli 2023 0+450 - 0+475 00+415 IC 1 R 21.38 1.685 19.3 1.626 96.5%
44 0+400 - 0+425 00+420 IC 1 L 21.38 1.685 18.8 1.631 96.8%
45 16 Juli 2023 0+450 - 0+525 00+505 IC 1 L 21.38 1.685 20.1 1.647 97.7%
46 0+475 - 0+525 00+480 IC 1 R 21.38 1.685 19.1 1.632 96.9%
47 18 Juli 2023 0+175 - 0+275 00+200 IC 7 L 19.22 1.495 17.7 1.434 95.9%
48 00+250 IC 7 L 19.22 1.495 20.1 1.428 95.5%
49 18 Juli 2023 0+275 - 0+300 00+280 IC 6 L 19.22 1.495 17.4 1.440 96.3% Profrolling OK
50 20 Juli 2023 0+325 - 0+475 00+350 IC 2 R 21.38 1.685 19.8 1.641 97.4% Profrolling OK
51 00+400 IC 2 R 21.38 1.685 18.1 1.620 96.1% Profrolling OK
52 00+450 IC 2 R 21.38 1.685 18.9 1.630 96.7% Profrolling OK
53 23 Juli 2023 0+175 - 0+300 00+180 IC 8 R 19.22 1.495 20.3 1.431 95.7% Profrolling OK
54 00+227 IC 8 R 19.22 1.495 17.5 1.438 96.2% Profrolling OK
55 00+276 IC 8 R 19.22 1.495 18.8 1.453 97.2% Profrolling OK
56 23 Juli 2023 0+175 - 0+250 00+190 IC 8 L 19.20 1.550 16.1 1.525 98.4% Profrolling OK
57 00+230 IC 8 L 19.20 1.550 17.8 1.502 96.9% Profrolling OK
58 23 Juli 2023 0+275 - 0+300 00+280 IC 7 L 19.20 1.550 16.8 1.490 96.1%
59 25 Juli 2023 0+325 - 0+475 00+330 IC 2 L 21.38 1.685 18.4 1.630 96.7% Profrolling OK
60 00+380 IC 2 L 21.38 1.685 19.3 1.631 96.8% Profrolling OK
61 00+465 IC 2 L 21.38 1.685 18.9 1.632 96.9% Profrolling OK
62 25 Juli 2023 0+325 - 0+475 00+340 IC 3 R 19.22 1.495 18.1 1.463 97.9%
63 00+390 IC 3 R 19.22 1.495 18.6 1.428 95.5%
64 00+465 IC 3 R 19.22 1.495 16.9 1.462 97.8%
Pembangunan Jalan Tol
Probolinggo - Banyuwangi Paket 2
STA. 09+000 - 20+200
REKAPITULASI SANDCONE TEST
MATERIAL : COMMON BORROW

UPDATE : 27 Juli 2023


LOKASI JMF LAPANGAN
NO TANGGAL STA - STA STA LAYER JALUR Keterangan
/ ZONA OMC MDD 0MC MDD KEPADATAN
65 26 Juli 2023 0+975 - 1+175 00+980 IC I R 17.50 1.720 18.7 1.655 96.2%
66 01+030 IC I R 17.50 1.720 17.9 1.677 97.5%
67 01+120 IC I R 17.50 1.720 15.5 1.663 96.7%
68 01+170 IC I R 17.50 1.720 16.2 1.675 97.4%
69 26 Juli 2023 0+475 - 0+525 00+501 IC 2 R 17.50 1.720 16.8 1.663 96.7%
70 26 Juli 2023 1 + 194 01+194 IC 1 BC 21.38 1.685 18.5 1.628 96.6% BC = Box Culvert
71 01+194 IC 1 BC 21.38 1.685 18.6 1.642 97.4%
72 27 Juli 2023 1 + 194 01+194 IC 2 BC 21.38 1.685 19.1 1.662 98.6% BC = Box Culvert
73 01+194 IC 2 BC 21.38 1.685 18.3 1.635 97.0%
74 28 Juli 2023 1 + 194 01+194 IC 3 BC 19.22 1.495 17.1 1.464 97.9% BC = Box Culvert
75 01+194 IC 3 BC 19.22 1.495 18.1 1.453 97.2%
76 29 Juli 2023 1 + 194 01+194 IC 4 BC 17.50 1.720 16.4 1.819 105.8% BC = Box Culvert
77 01+194 IC 4 BC 17.50 1.720 16.6 1.749 101.7%
78 29 Juli 2023 1 + 194 01+194 IC 5 BC 17.50 1.720 16.6 1.692 98.4% BC = Box Culvert
79 01+194 IC 5 BC 17.50 1.720 16.2 1.698 98.7%
80 31 Juli 2023 0+325 - 0+475 00+350 IC 3 L 17.50 1.720 16.4 1.653 96.1%
81 00+400 IC 3 L 17.50 1.720 17.2 1.648 95.8%
82 00+450 IC 3 L 17.50 1.720 16.1 1.699 98.8%
83 31 Juli 2023 1+000 - 1+175 01+050 IC H R 17.50 1.720 15.9 1.670 97.1%
84 01+100 IC H R 17.50 1.720 16.2 1.660 96.5%
85 01+150 IC H R 17.50 1.720 16.8 1.678 97.6%

Diketahui Oleh : Diperiksa Oleh : Diajukan Oleh :


PT Jasamarga Probolinggo Banyuwangi PT Multi Phi Beta PT HKI-ACSET-NK, KSO

(................................) (.................................) (................................)


Pembangunan Jalan Tol
Probolinggo - Banyuwangi Paket 2
STA. 09+000 - 20+200
REKAPITULASI SANDCONE TEST
MATERIAL : COMMON BORROW

UPDATE : 28 Juni 2023


JMF LAPANGAN
LOKASI
NO TANGGAL STA - STA STA LAYER JALUR MDD Keterangan
/ ZONA OMC MDD
0MC MDD KOREKSI KEPADATAN
1 24 Juni 2023 0+325 - 0+400 00+350 A R 21.38 1.685 19.7 1.658 98.4% CBM
2 00+375 A L 21.38 1.685 20.0 1.634 97.0% CBM
3 24 Juni 2023 0+200 - 0+300 00+225 3 R 19.22 1.495 20.0 1.444 96.6% CBM
4 00+275 3 R 19.22 1.495 18.6 1.453 97.2% CBM
5 27 Juni 2023 0+125 - 0+275 00+160 3 L 19.22 1.495 17.4 1.431 95.7% CBM
6 00+210 3 L 19.22 1.495 18.9 1.468 98.2% CBM
7 00+260 3 L 19.22 1.495 15.4 1.498 100.2% CBM
8 28 Juni 2023 0+150 - 0+300 00+175 4 R 19.22 1.495 18.8 1.449 96.9% CBM
9 0+225 4 R 19.22 1.495 20.4 1.457 97.5% CBM
10 0+275 4 R 19.22 1.495 18.8 1.458 97.5% CBM

30
31
32
33
34
35

Diketahui Oleh : Diperiksa Oleh : Diajukan Oleh :


PT Jasamarga Probolinggo Banyuwangi PT Multi Phi Beta PT HKI-ACSET-NK, KSO

(....................................) (....................................) (....................................)