Download as pdf
Download as pdf
You are on page 1of 4
Department of Public Works & riighways Contract 1D: 20100020 Contract Name: Network Development — Construction of By-Pass and Diversion Roads, Tacloban City By-Pass Road Extension, Tacloban City Contract: Tacloban City Location of the Republic ofthe Philippines DEPARTMENT OF PUBLIC WORKS & HIGHWAYS, REGIONAL OFFICE VIIT Baras, Palo, Leyte CONTRACT AGREEMENT KNOW ALL MEN BY THESE PRESENTS: ‘This CONTRACT AGREEMENT, made this day of FEB_19 2020 2029, by and between: The GOI MENT OF iE REP LIC OF Center, Baras, Palo, Leyte, hereinafter referred to as the "PROCURING ENTITY”; EZIONES CONSTRUCTION, INC., a corporation organized and existing under and by virtue of laws of the Republic of the Philippines, with main office address at Sitio Buchasan, Bray. i= PHILIPPINES through the Department of Public Works and Highways (DPWH) represented herein by NERIE D. BUENO, Regional Director, duly authorized for this purpose, with main office address at Government Kawayan, Catarman, Northern Samar, represented herein by GILDA U. QUIDILLA, duly authorized for this purpose, hereinafter referred to as the “CONTRACTOR” WITNESSETH: WHEREAS, the PROCURING ENTITY is desirous that the CONTRACTOR execute the Works under 20100020 — Network Development - Construction of By-Pass and Diversion Roads, Tacloban City By-Pass Road Extension, Tacioban City, hereinafter called “the Works” and the PROCURING ENTITY has accepted the Calculated Bid of the CONTRACTOR for the execution and completion of the Works at the calculated unit bid prices tabulated below, or 2 total Contract price of ONE HUNDRED USAND FOUR HUNDRED FI! EIGHT PESOS AND 16/100 (P179,359,458.16) with a Contract Duration of Four Hundred (400) calendar days, and the remedying of any defects therein. SEVENTY NINE MILLION THREE HUNDRED FIFTY a = Y _The calculated unit bid prices: 25 [iremno, /pescairrion Tee [omen] ES | aouNT | 3.22 | omen GENERAL REQUIREMENTS Pz (Baio) | wscelaneow Suney and Sang (oi isan 200 56 [es | Project Bilboard / Signboard Each | 2.00) 5,968.27 11,936.54 2 2 [aay | ocupatoral ster end Henth Powram [Us [1.00 | @65761.20 [693 78120 3B] [88 _| Mooiizavon / Demobitzaton Ls. | 4.00 | 189,840.00 | 189,840.00 $58 (Gis [envionmenta! Menagement end Honorng | Month [2350 | 4,002.00 4432.00) 25 [eawrivonx “S532 Teach [ cern and Gang a a IT 102(2) | Surplus Common Excavation ‘Cum. | 9,118.00 166.74 1,520,335.32, 102(3)a | Surplus Rock Excavation, Soft ‘Cu.m. | 8,781.00 (239.74 2,105,156.94 102(3)b | Suplus Rock Excavation, Hard ‘Cum. | 129,387.00 | 1,276.22. 165,126,277.14 | g 103(1)c | Structure Excavation (Hard Rock) ‘Cum. | 1,292.00 1,050.93 1,357,801.56 | 5 £05(i)a | Subgrade Preperation (Common Matera) | Sqm.| 3,050.00 | 19.49 7046850 5 £10 —_[ Deep Sol Mining Cum.[_ i273 | 7.22005 | 650,113.99 £3 5 SUBBASE AND BASE COURSE 22 °°«6g 200(i) | Aggregate Subbase Couse [eum [aoc [251330 | an so ss OR SURFACE COURSE a - ee 300(1) | Gravel Surface Course Gum, [3220 | i,74605 [5622281 BE 28 p> jas] cnet oss [som | wre | 2rss | zoisosa7 a PO prance bbe Paorec oN STRUCTURES ze = B _|500G)85| Pipe Culverts, 1220mm dia., Class T-RCPC_| LM. | 96.00 7,363.33 706,875.68 ge 33. [500(3)b1 | Lined Canal, Rectangular, Concrete. LM. | 69.97 | 21,408.61 | _1,497,960.44 g [uO | Cote bes, Concrete Each_| 6.00 | 389,979.73_| 2,339,87838 a £ “2. INFRS1-2016 —DPwH- Page of 4 Department of Public Works & nighways Contract 1D: 20100020 Contract Name: Network Development — Construction of By-Pass and Diversion Roads, Tacloban City By-Pass Road Extension, Tacloban City ‘Tacloban Ci Location of MISCELLANEOUS STRUCTORES @o0(8) | Curb and Gute, Cast n-ace [ow [peso ana | —ara7ara7 TOTAL = P179,359,458.16 NOW, THEREFORE, for and consideration of the foregoing premises, the parties hereto agree 58 . 3 as follows: §@ 1. In this CONTRACT AGREEMENT, words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract hereinafter z é referred to. S52. The following documents shall be attached, deemed to form, and be read and construed Bee ‘as part of this CONTRACT AGREEMENT, and shall be interpreted in the following order of priority: a. This Contract Agreement b. Documents forming part of the Contract Agreement: as 5 (1) Notice of Award (NOA) with the Contractor's signed “conforme” 2 i 4 @ Contractor's Bid in the Form of Bid, including its Technical and Financial 3 2 Proposals, as calculated by the Procuring Entity and conformed to by the 3 5 Contractor through the NOA. 6 (3) Bidding Documents with Bulletins (4) Specifications (8) Drawings Be (© Special Conditions of Contract (SCC) 5 2 @ General Conditions of Contract (GCC) 2 : 5 (8) Performance Security FA 8 (9) _ Integrity Pledge under Department Order No. 86, series of 2013 é g 8 (10) Other Documents (2) Construction Methods (b) Construction Schedule in the Form of PERT/CPM Diagram or Precedence Diagram and Bar Chart with S-Curve, or other approved tools of project scheduling, and Cash Flow. (© Manpower Schedule (@ Equipment Utilization Schedule (© Construction Safety and Health Program initially approved by the Head of the Procuring Entity (f) Contractor's All Risk Insurance (CARI) - —-DPWH- INFR-51-2016 Pagezof a Department of Public Works & Highways Contract 1D: 20100020 Contract Name: Network Development — Construction of By-Pass and Diversion Roads, Tacloban City By-Pass Road Extension, Tacoban Clty Location of th A slippage of more than thirty (30) day In consideration of the payments to be made by the PROCURING ENTITY to the CONTRACTOR as hereinafter mentioned, the CONTRACTOR hereby covenants with the PROCURING ENTITY to execute and compiete the Works and remedy any defects therein in conformity with the provisions of this CONTRACT AGREEMENT in all respects. In consideration of the execution and completion of the Works by the CONTRACTOR, the PROCURING ENTITY hereby covenants to pay the CONTRACTOR the unit prices in the RACTOR’s Calculated Bid, as appiied to the actual quantities accomplished as certified by the PROCURING ENTITY under the provisions of this CONTRACT AGREEMENT, at the times and in the manner prescribed by this CONTRACT AGREEMENT. 3 original schedule wou! non-payment, the cancellation of the contract, blacklisting of the erring contractor, and the entry of a new contractor who will finish the project. IN WITNESS WHEREOF, the parties hereto set their respective hands on the day, month and year first above written. REPUBLIC OF THE PHILIPPINES EZJONES CONSTRUCTION, INC. DEPARTMENT OF PUBLIC WORKS & HIGHWAYS (DPWH) PROCURING ENTITY: CONTRACTOR: Rept ited by: D. BUENO LDA U. QUIDILLA al Director Authorized Managing Officer \ Accountant IV WITNESSED BY: ACKNOWLEDGMENT . en —_—_ oPWH- INFR-51-2016 Page sof & Department of Public Works & Highways Contract 1D: 20100020 Contract Name: Network Development — Construction of By-Pass and Diversion Roads, Tacioban City By-Pass Road Extension, Tacloban City Location of the Contract: Tacloban City | REPUBLIC OF THE PHILIPPINES) pa ee BEFORE ME, a Notary Public for and in TAAODAN ATU . personally appeared EZJONES CONSTRUCTION, INC., represented by GILDA U. QUIDILLA, with ID No. ‘TRY 1-G86-iK4-007, and DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS, represented by REGIONAL DIRECTOR NERIE D. BUENO, with ID No. $034_ whom T have identified through ‘competent evidence of identify and who represented to me that their signature on the foregoing instrument was voluntarily affixed by them for the purposes stated in the instrument and who dediared that they have executed the foregoing instrument as their free and voluntary act and deed. Construction Division plementing Office/End-User hy This instrument consists of only four (4) pages, induding this page in which this is written, duly signed by the parties on each and every page hereof. FEB 19 2000 : WITNESS MY HAND AND SEAL this z frosty Cem, Philippines. a ‘As avalailty of Funds: nt Bg BZ ona: SZ Baste. é rane: dzh Ska B2 a. sie zs 925 SESE ER Cemeepaieg nse tay, mate te etn ae ee a8 ha - be attached with this CONTRACT AGREEMENT). INFR-S1-2016

You might also like