Project Name: Birla Estates Author:

Project No: P-250374 Checked By:


Part of Project: Roof Rain water Date:
Stage: Detail Design Rev:

Roof rain water


Sl. No. Description TOWER-01 TOWER-02
Total Roof area in sqmt 1090 1100
Rainfall Intensity 100 100
Proposed pipe dia in mm 100 100
Roof area per pipe as per table 23 84 84
Co-efficient of Roughness 1.44 1.44
Design Roof area for PVC pipe
121 121
No of vertical down take pipe required as
per table 23 10 10
Proposed vertical rain water Pipes 11 11

Considering 200mm dia pipe 200 x 2nos mm


for vertical down takes 11

Rainfall intensity (I) 100 mm/hr


Pipe Dia (d) 200 mm
Area RA 475 m^2
Multiplying Factor 1.44
ACTUAL 686 m^2
SGT
NK
01.10.2021
00

Units Remarks
sqmt
mm/hr
mm
sqmt
Nil
sqmt

nos
Nos
Project Name: Birla Estates Author: SGT
Project No: P-250374 Checked By: NK
Part of Project: Car Park Sump-Pit Date: 8/21/2023
Stage: Detail Design Rev: 00
PARKING SUMP PIT CALCULATION
Sl. No. Description Value Units
1 Car Parking area comes under Moderate Hazard as per NBC
2 AMAO as per IS 15105 360 sqm
3 Design Density of Sprinkler 5 l/min/m2
4 Total flow of water 1800 LPM
5 Design duration of Sprinkler operation is 60 min
6 Proposed Storage parking sump pit duration 10 min
7 Total volume of Storage parking sump required 18000 lit
8 Proposed Storage capacity of sump pit 9000 lit
9 Requiered nos of Storage parking oil interceptor 2 nos
Proposed nos of Storage parking oil interceptor 2 nos

Tank size
Width 2.2 m
Depth 2.2 m
Height 2m
Volume 9680 m^3
Considering 50% Filled 4840 m^3
Project Name: Birla Estates
Project No: P-250374
Part of Project: Pump flow Rate
Stage: Detail Design

WWSP-B1-01/02
Basement oil interceptor transfer pump
Pump flow Rate
Water to discharge
To be empty in 10min
Discharge
Say

Proposed Pumps

Flow of each Pump

Discharge Dia of pipe


Continuity equation
Dia of pipe

Say of dia (Pump pipe size)

Continuity equation
Dia of pipe

Say of dia (Transfer pipe size)


WWSP-B1-03/04
Basement oil interceptor transfer pump
Pump flow Rate
Water to discharge
To be empty in 10min
Discharge
Say

Proposed Pumps

Flow of each Pump

Discharge Dia of pipe


Continuity equation
Dia of pipe

Say of dia (Pump pipe size)

Continuity equation
Dia of pipe

Say of dia (Transfer pipe size)


SWSP-B1-07/08
STP sump pit transfer pump
Pump flow Rate
Water to discharge
To be empty in 10 hr
Discharge
Say

Proposed Pumps

Flow of each Pump

Discharge Dia of pipe


Continuity equation
Dia of pipe

Say of dia (Pump pipe size)

Continuity equation
Dia of pipe

Say of dia (Transfer pipe size)

RWTP-B1-05/06
Basement Pump Room Sump Pit
Pump flow Rate
Water to discharge
To be empty in 6 hr
Discharge
Say

Proposed Pumps

Flow of each Pump

Discharge Dia of pipe


Continuity equation
Dia of pipe

Say of dia (Pump pipe size)


Continuity equation
Dia of pipe

Say of dia (Transfer pipe size)

PSP-B1-01/02
Portable pump for lifts sump pits
Pumps Capacity 0.5 L/s
Author: SGT
Checked By: NK
Date: 8/21/2023
Rev: 00

9000 Litre
10 min
15.00 LPS
15.00 LPS
0.015 m3/sec
1 Nos
1 No.
7.5 lps
0.0075 m3/sec

Q= AV m3/sec
0.080 mt
80.06 mm
80 mm

Q= AV m3/sec
0.103 mt
103.00 mm
100 mm

9000 Litre
10 min
15.00 LPS
15.00 LPS
0.015 m3/sec
1 Nos
1 No.
7.5 lps
0.0075 m3/sec

Q= AV m3/sec
0.080 mt
80.06 mm
80 mm

Q= AV m3/sec
0.103 mt
103.00 mm
100 mm

120 CUM
10 Hr
3.33 LPS
4.00 LPS
0.004 m3/sec
1 Nos
1 No.
2 lps
0.002 m3/sec

Q= AV m3/sec
0.041 mt
41.34 mm
50 mm

Q= AV m3/sec
0.053 mt
53.19 mm
65 mm

250 CUM
6 Hr
11.57 LPS
12.00 LPS
0.012 m3/sec
1 Nos
1 No.
6 lps
0.006 m3/sec

Q= AV m3/sec
0.072 mt
71.61 mm
80 mm
Q= AV m3/sec
0.092 mt
92.13 mm
100 mm
each sump capacity

Duty
Assist

v=1.5 m/sec

v=1.8 m/sec

each sump capacity

Duty
Assist

v=1.5 m/sec
v=1.8 m/sec

Duty
Assist

v=1.5 m/sec

v=1.8 m/sec

(One water tank)

Duty
Assist

v=1.5 m/sec
v=1.8 m/sec

You might also like