RCA ENG-HRA-22-00XX RA Wellpad-A Raw Water FT Re-Range and Hart Configuration
RCA ENG-HRA-22-00XX RA Wellpad-A Raw Water FT Re-Range and Hart Configuration
Likelihood Descriptions & Index Low = Manage by routine procedures, Risk Is tolerable
(with confirmed safeguards)
Medium = Opportunity to realise average rate of return with certainty pusue with
existing plans.
Acceptable after review of the operation
Legend Managers' attention is required to address the risk management
High = Additional long term risk reduction required with ALARP region and required
management decision
Near term opportunity with above average rate of return; pusue diligently
GM/VPs' to address the risk management
Likelihood Descriptions Likelihood Indices
Extreme = Unacceptable and Intolerable limit, change process or work method
and urgent action is required to address the risk Detailed research and planning
required; high payoff potential; pursue opportunity aggressively
Requires Board of Directors attention and continuousely monitor
Safety First Aid Injury. Medical Treatment Injury. Single Lost Time Injury or Fatality/death or 3 or
Multiple Fatality(s)/death
(Acute Injuries) Nuisance value. Restricted Work Injury 3 MTI in one incident more people hospitalized
Isolated and personal a) Rumour demonstration a) Rumour demonstration a) Demonstration > 21 National and/or
complaint. < 20 persons > 20 persons persons or with violent International media
b) Real Demonstration < b) Real Demonstration intent (blockage access) interest (Negative
10 persons 10-20 persons & High level of concern or implications), major
c) New-negative interest from local demonstration offences
implication (sosmed) community and local
External goverment.
Relation/Community b) New-negative
implication (lokal media)
c) Impacted with
continuation operational
business process
Process loss less than Process >$,500 - $25,000 Process >$ 25,000 - Un-planned shut down Un-planned shut down
<$,500 or recoverable $200,000 or Power Plant caused Process loss caused Process loss
Operational process upset trip >$200,000 -$500,000 >$500,000
Minor technical/legal Required internal Regulator warning Major breach of regulation Operation suspended,
compliance issue unlikely investigation resulting in investigation revoke of industrial
to attract a regulatory by regulator. license
Legal Compliance response. Civil/Legal proceeding
resulting in fines/penalties
Financial $ 10,000,000 -
$ 0 - $ 500 $ 500 - $ 1,000,000 $ 1,000,000 - $10,000,000 >$50,000,000
(Project/Operation) $50,000,000
Major
Property Damage <$,500 <$500-$25,000 $25,000-$200,000
>$200,000-$500,000
Catastrophic >$500,000
RISK ASSESSMEN
DEPARTMENT: PREPARED BY: REVIEWED BY
DESCRIPTION OF WORK TO BE DONE: Wellpad-A Raw Water FT (ML01GAC20CF502) Re-range and HART Configuration
AFFECTED GROUP:
INITIAL RATINGS
NO ACTIVITY HAZARD
L C R
A Persiapan Awal Peker
B Pelaksanaan Pekerj
Ergonomis 2 2 5
Download New
6 Configuration ke Ergonomis 2 2 5
Controller
B PENYELESAIAN PEKERJAAN H
Ergonomis 2 2 5
NOTE:
* L= Likelihood; C= Concequence; R= Risk; RR= Residual Risk
* Don't forget to adjust the existing format
RISK REGISTER NO:
ASSESSMENT ENG-HRA-22-00XX
New Revised
✘
Area Authority
Abrasive
High Risk Electrical
Blasting
Energy Isolation Excavation Permit
HIGH: EXTREME:
ration Additional long term risk reduction required Unacceptable and Intolerable limit: Requires Board of Directors
with ALARP region and required attention and continuousely monitor
management decision (GM and/or VPs')
ASSIGNED
RESIDUAL RATINGS
HAZARD CONTROLS PERSON
L C RR
Persiapan Awal Pekerjaan
Pelaksanaan Pekerjaan
- Gunakan Seragam standard yang nyaman saat bekerja
- Lakukan Streching ringan sebelum memulai pekerjaan
1 1 1
- Posisikan badan, kaki dan tangan senyaman mungkin saat
melakukan pekerjaan
- Gunakan Seragam standard yang nyaman saat bekerja
- Lakukan Streching ringan sebelum memulai pekerjaan
- Mengatur kecerahan layar yang sesuai dengan mata
1 1 1
- Pastikan jarak monitor ke mata lebih dari 50cm
- Posisikan badan, kaki dan tangan senyaman mungkin saat
melakukan pekerjaan
20 July 2022
STATUS