DIMENSI HARGA SATUAN JUMLAH HARGA

NO LOKASI JENIS STRUKTUR SAT. KUANTITAS


Panjang Lebar Tinggi DC PENAWARAN DC PENAWARAN
1 19+710.00 Box Under pass M3 68.20 6.50 4.60 1699.95 8,004,721 9,605,665 13,607,650,747 16,329,180,897
2 20+040.00 Jembatan Utama M2 40.80 30.90 6.50 1260.72 24,934,013 32,381,835 31,434,808,716 40,824,426,904
20+630.00 Box Under pass/Jembatan
3 Utama M3 20.00 26.80 7.00 536.00 24,934,013 32,381,835 13,364,630,903 17,356,663,510

4 21+030.00 Jembatan Utama M2 25.60 26.90 7.00 688.64 24,934,013 32,381,835 17,170,558,628 22,299,426,790
5 21+190.00 Box Under pass M3 50.20 10.00 5.10 1635.32 8,004,721 9,605,665 13,090,241,604 15,708,289,925
6 21+455.00 Box Under pass M2 57.40 6.50 4.60 1430.75 8,004,721 9,605,665 11,452,773,503 13,743,328,203
7 21+550.00 Box Under pass M3 49.90 3.50 3.00 1071.25 8,004,721 9,605,665 8,575,082,777 10,290,099,333
8 21+750.00 Box Under pass M2 40.95 6.50 4.60 1020.72 8,004,721 9,605,665 8,170,576,218 9,804,691,462
9 22+128.00 Box Under pass M3 40.10 10.00 5.10 1306.30 8,004,721 9,605,665 10,456,547,576 12,547,857,091
10 22+780.00 Box Under pass M2 44.20 5.50 4.00 948.89 8,004,721 9,605,665 7,595,564,304 9,114,677,164
11 23+040.00 Box Under pass M3 44.60 6.50 4.60 1111.70 8,004,721 9,605,665 8,898,844,917 10,678,613,900
12 23+075.00 Jembatan Utama M2 30.60 26.90 4.60 823.14 24,934,013 32,381,835 20,524,183,361 26,654,783,585
13 23+520.00 Box Under pass M3 42.40 5.00 4.00 910.24 8,004,721 9,605,665 7,286,242,680 8,743,491,217
14 23+695.00 Box Under pass M3 49.80 5.00 4.00 1069.11 8,004,721 9,605,665 8,557,898,243 10,269,477,891
15 24+015.00 Box Under pass M3 39.60 10.00 5.10 1290.01 8,004,721 9,605,665 10,326,166,683 12,391,400,020
16 24+250.00 Box Under pass M3 50.40 5.00 4.00 1081.99 8,004,721 9,605,665 8,661,005,450 10,393,206,540
17 24+425.00 Jembatan Utama M2 25.60 26.90 6.00 688.64 24,934,013 32,381,835 17,170,558,628 22,299,426,790
18 24+535.00 Jembatan Utama M2 35.60 26.90 6.00 957.64 24,934,013 32,381,835 23,877,808,093 31,010,140,380
19 24+800.00 Box Under pass M3 40.30 6.50 4.60 1004.52 8,004,721 9,605,665 8,040,884,532 9,649,061,439
20 25+290.00 Box Under pass M3 47.50 6.50 4.60 1183.99 8,004,721 9,605,665 9,477,469,362 11,372,963,234
21 25+540.00 Box Under pass M3 75.60 10.00 5.00 2462.75 8,004,721 9,605,665 19,713,590,941 23,656,309,129
22 26+075.00 Box Under pass M3 33.90 6.50 4.60 844.99 8,004,721 9,605,665 6,763,920,239 8,116,704,287
23 27+900.00 ELEVATED. Paiton M2 495.93 33.10 32.00 16415.28 35,413,035 38,954,338 581,314,990,464 639,446,489,511
24 28+575.00 ELEVATED. Paiton M2 229.47 33.10 32.00 7595.46 35,413,035 38,954,338 268,978,184,143 295,876,002,557
25 29+300.00 ELEVATED. Paiton M2 179.10 33.10 3.00 5928.21 35,413,035 38,954,338 209,935,907,874 230,929,498,662
26 31+635.00 Box Under pass M3 37.60 9.00 5.10 1224.86 8,004,721 9,605,665 9,804,643,114 11,765,571,736
27 31+710.00 Box Under pass M3 60.00 10.00 4.00 1954.56 8,004,721 9,605,665 15,645,707,096 18,774,848,515
28 32+265.00 Box Under pass M3 33.10 6.50 4.60 825.05 8,004,721 9,605,665 6,604,299,703 7,925,159,643
29 32+650.00 Box Under pass M3 33.10 6.50 4.60 825.05 8,004,721 9,605,665 6,604,299,703 7,925,159,643
30 33+065.00 Box Under pass M3 48.70 6.50 4.60 1213.90 8,004,721 9,605,665 9,716,900,167 11,660,280,200
31 33+270.00 Box Under pass M3 41.22 6.50 4.60 1027.45 8,004,721 9,605,665 8,224,448,150 9,869,337,779
32 36+027.50 Box Under pass M3 35.40 10.00 5.10 1153.19 8,004,721 9,605,665 9,230,967,187 11,077,160,624
33 37+605.00 Over Pass M2 34.60 6.50 4.60 224.90 24,934,013 32,381,835 5,607,659,496 7,282,674,671
34 37+885.00 Box Under pass M3 85.60 7.32 7.00 2788.51 8,004,721 9,605,665 22,321,208,791 26,785,450,549
35 38+070.00 Box Under pass M3 44.30 6.50 4.60 1104.22 8,004,721 9,605,665 8,838,987,216 10,606,784,659
36 38+262.50 Box Under pass M3 75.12 10.00 5.00 2447.11 8,004,721 9,605,665 19,588,425,284 23,506,110,341
37 38+407.00 Box Under pass M3 36.50 3.50 3.00 783.58 8,004,721 9,605,665 6,272,355,138 7,526,826,165
38 39+300.00 Box Under pass M3 33.50 6.50 4.60 835.02 8,004,721 9,605,665 6,684,109,971 8,020,931,965
39 32+265.00 Box Under pass M3 33.10 6.50 4.60 825.05 8,004,721 9,605,665 6,604,299,703 7,925,159,643
40 32+650.00 Box Under pass M3 33.10 6.50 4.60 825.05 8,004,721 9,605,665 6,604,299,703 7,925,159,643
41 33+065.00 Box Under pass M3 48.70 6.50 4.60 1213.90 8,004,721 9,605,665 9,716,900,167 11,660,280,200
42 33+270.00 Box Under pass M3 41.22 6.50 4.60 1027.45 8,004,721 9,605,665 8,224,448,150 9,869,337,779
43 36+027.50 Box Under pass M3 35.40 10.00 5.10 1153.19 8,004,721 9,605,665 9,230,967,187 11,077,160,624
44 37+605.00 Box Under pass M3 34.60 6.50 4.60 862.44 8,004,721 9,605,665 6,903,588,209 8,284,305,851
45 37+885.00 Box Under pass M3 85.60 7.32 7.00 2788.51 8,004,721 9,605,665 22,321,208,791 26,785,450,549
46 38+070.00 Box Under pass M3 44.30 6.50 4.60 1104.22 8,004,721 9,605,665 8,838,987,216 10,606,784,659
47 38+262.50 Box Under pass M3 75.12 10.00 5.00 2447.11 8,004,721 9,605,665 19,588,425,284 23,506,110,341
48 38+407.00 Box Under pass M3 36.50 3.50 3.00 783.58 8,004,721 9,605,665 6,272,355,138 7,526,826,165
49 39+300.00 Box Under pass M3 33.50 6.50 4.60 835.02 8,004,721 9,605,665 6,684,109,971 8,020,931,965
50 39+500.00 Box Under pass M3 43.15 10.00 5.00 1405.65 8,004,721 9,605,665 11,251,871,020 13,502,245,224
51 40+400.00 Box Under pass M3 35.50 9.00 5.10 1156.45 8,004,721 9,605,665 9,257,043,365 11,108,452,038
52 40+550.00 Jembatan Utama M2 40.80 26.90 5.10 1097.52 24,934,013 32,381,835 27,365,577,814 35,539,711,447
53 40+910.00 Box Under pass M3 33.33 9.00 5.10 1085.76 8,004,721 9,605,665 8,691,190,292 10,429,428,350
54 41+053.00 Box Under pass M3 33.30 9.00 5.10 1084.78 8,004,721 9,605,665 8,683,367,438 10,420,040,926
55 41+200.00 Box Under pass M3 34.10 9.00 5.10 1110.84 8,004,721 9,605,665 8,891,976,866 10,670,372,240
56 41+355.00 Jembatan Utama M2 30.60 26.90 11.00 823.14 24,934,013 32,381,835 20,524,183,361 26,654,783,585
57 41+430.00 Box Under pass M3 33.10 9.00 5.10 1078.27 8,004,721 9,605,665 8,631,215,081 10,357,458,098
58 41+462.50 Box Under pass M3 34.10 9.00 5.10 1110.84 8,004,721 9,605,665 8,891,976,866 10,670,372,240
59 41+550.00 Jembatan Utama M2 30.60 26.90 11.00 823.14 24,934,013 32,381,835 20,524,183,361 26,654,783,585
60 41+800.00 Box Under pass M3 33.10 9.00 5.10 1078.27 8,004,721 9,605,665 8,631,215,081 10,357,458,098
61 42+775.00 Box Under pass M3 33.10 10.00 4.60 1078.27 8,004,721 9,605,665 8,631,215,081 10,357,458,098
62 42+812.50 Jembatan Utama M2 16.00 26.90 10.96 430.40 24,934,013 32,381,835 10,731,599,143 13,937,141,744
63 42+990.00 Box Under pass M3 44.20 6.50 4.60 1101.73 8,004,721 9,605,665 8,819,034,648 10,582,841,578
64 43+300.00 Jembatan Utama M2 40.79 26.90 7.60 1097.25 24,934,013 32,381,835 27,358,870,565 35,531,000,733
65 43+425.00 Jembatan Utama M2 60.00 26.90 9.00 1614.00 24,934,013 32,381,835 40,243,496,786 52,264,281,540
66 43+475.00 Box Under pass M3 38.30 10.00 5.10 1247.66 8,004,721 9,605,665 9,987,176,363 11,984,611,636
67 44+275.00 Box Under pass M3 36.70 6.50 4.60 914.78 8,004,721 9,605,665 7,322,592,118 8,787,110,541
68 44+575.00 Jembatan Utama M2 74.22 28.00 10.50 2078.16 24,934,013 32,381,835 51,816,868,203 67,294,634,030
69 44+700.00 Box Under pass M3 33.50 6.50 4.60 835.02 8,004,721 9,605,665 6,684,109,971 8,020,931,965
70 44+980.00 Box Under pass M3 34.60 3.50 3.00 742.79 8,004,721 9,605,665 5,945,848,980 7,135,018,776
71 45+170.00 Box Under pass M3 44.60 3.50 3.00 957.47 8,004,721 9,605,665 7,664,302,442 9,197,162,931
72 46+000.00 Jembatan Utama M2 26.20 29.00 8.00 759.80 24,934,013 32,381,835 18,944,862,985 24,603,718,162
1,936,073,468,951 2,251,481,031,900
1. Jembatan Utama 13 425,568,259,276
2. Box Under pass 54 635,021,443,713
3. Over Pass 1 7,282,674,671
4. ELEVATED. Paiton 3 1,166,251,990,729