• In this sense, the Consultant has identified immediate interventions that are
recommended to be executed in the short term to improve the protection of the
properties, the security of the intervention area and the impact on the community.
• For medium and long-term interventions, more detailed studies are
recommended, including the preparation of a comprehensive plan or
Master Plan for a more comprehensive use of all ANDE properties and the
dry bed of the Acaray river.
Basic Zoning of the Property
the Acaray Dam
Protection and Security Project
of the Property, the Dam and the Central
hydroelectric
• The Preliminary Design or Project Profile seeks to strengthen the protection and
security of the Hydroelectric Power Plant and the natural forests that surround it,
which are very important assets of ANDE and it is essential to care for, protect and
enhance them.
• In this preliminary design, a Lighting Project, installation of Security Cameras,
Perimeter Fence and Monitoring Center of the ANDE properties adjacent to the
Acaray Hydroelectric Power Plant is initially proposed.
• Through these actions, it is expected to achieve beneficial impacts for both the
community and the environment immediately. The execution of these actions
will contribute to improve the safety of the Dam and the Hydroelectric Power
Station and to the preservation and care of the existing forests, preserving the
green mass that is still within the perimeter.
Project of Valorization and Zone
of Tourist, Academic and
Recreational Activities
• This Component proposes interventions in a complementary way to the actions
described in the previous point. These interventions will contribute to
converting the area of the dam and surrounding natural spaces into an area
that allows the development of tourist and recreational activities. It will have a
specialized surveillance system and state-of-the-art technology.
• The proposed activities will also be useful to generate a permanent "social
control" that will be generated from the visits and use of the place by the
community itself. It is the users themselves and the community who are going
to monitor and care for the place, they will alert the authorities about irregular
situations or attempts to depredation of natural forests.
• This will also allow a planned and organized visit to the Acaray Dam and the
recreational and tourist use of the forests and certain places of the Lake of the
Dam that make up the property.
PROPOSAL FOR THE 5 AREAS OF THE
PARK OF THE CENTRAL ACARAY
Zone 1 / Access – Arrival – Viewpoint
Zone 2 / Administration – Machines
Zone 3 / Reservoir Lake.
Zone 4 / Peru Avenue.
Zone 5 / Paraná River.
Zone 1 / Access – Arrival – Viewpoint
The proposed interventions are mainly located in the Dam sector, where in fact there is currently
some basic infrastructure and there are some scheduled visits.
Project Components:
to. Access Portico and Security Box
b. Main paved vehicular access from the Super Highway / 200 m
c. Parking for cars and buses for tourists and locals made of gravel or cobblestones with absorbent
soil without cover or possibly with a roof with photovoltaic panels / 48 places
d. Interpretation Center for Water and Clean Energies / 400 m2 covered
and. Restaurant and Canteen (to be concessioned) / 150 m2 covered
F. Public Restrooms / 20 m2 covered
g. Viewpoint on 4 levels of terraces with stairs and ramps with cobblestone, concrete, steel and wood structure
Project Components:
to. Perimeter Wired with Lighting System, Security Camera Systems and Signage / To be
defined.
b. Improvement of the Access Portico, Security Box and Signal
Zone 3 / Reservoir Lake.
This sector is located next to the Itaipu Zoo and on the banks of the Lake of the Reservoir,
which gives it a high potential for use. The connection of the Acaray Dam with the Itaipu
Reserve through the pedestrian paths is what we would call the “Energy Path”.
Project Components:
to. Wooden, metal or cobblestone pedestrian paths (to be defined) / 4,800 ml
b. Viewpoints over the Lake / To be defined
c. Signage and Infographics
d. Lighting system with artifacts at ground level, at medium height and at a high height with LED
type artifacts / To be defined
and. Security Camera System attached to the lighting system / To be defined
F. Perimeter Wired with Lighting System, Security Camera Systems and Signage / To be
defined
Zone 4 / Peru Avenue.
This sector is divided into two parts by the recently built Avenida República del Perú. The
Avenue has become a place that is widely used and frequented by the local community, which
uses it mainly for recreational purposes. For this reason, the place has a high potential for use
mainly for recreational purposes.
Project Components:
to. Wooden, metal or cobblestone pedestrian paths (to be defined) / 6,000 ml
b. Viewpoints over the Acaray River / To be defined
c. Signage and Infographics
d. Lighting system with artifacts at ground level, at medium height and at a high height with LED
type artifacts / To be defined
and. Security Camera System attached to the lighting system / To be defined
F. Perimeter Wired with Lighting System, Security Camera Systems and Signage / To be
defined
g. Secondary Access and Parking / To be defined
Zone 5 / Paraná River.
This sector is located between the Superhighway and the Paraná River. It has an extraordinary view over
the river bed, which gives it great potential for use as a Park and Viewpoint.
Project Components:
to. Wooden, metal or cobblestone pedestrian paths (to be defined) / 3,500 ml
b. Viewpoints over the Paraná River / To be defined
c. Signage and Infographics
d. Lighting system with artifacts at ground level, at medium height and at a high height with LED
type artifacts / To be defined
and. Security Camera System attached to the lighting system / To be defined
F. Perimeter Wired with Lighting System, Security Camera Systems and Signage / To be
defined
g. Secondary Access and Parking / To be defined
PROJECT IMPACTS
• All thevegetation is intended to be preserved, limiting construction to areas where there
are no significant trees. The adaptation of what was built to the pre-existing vegetation
allows the entire complex to expose the set of native plants as a natural reserve. This, in
turn, creates research and educational opportunities that can be linked to complementary
programmes.
• There are no permanent negative impacts after the work is completed. On the
contrary, the project intends to become a referenceintervention in similar
situations.
• The positive impacts cover the wide spectrum of benefits that a work of this magnitude entails
in an area such as the one established.The protection and consolidation of the area
Through the lighting, the perimeter fence, the security cameras and the proposed services,
they transform the current virgin and undeveloped reality of the area.
• The group ofcomplementary programs, asheInterpretation Center, the renewable energy
demonstration plants, the restaurant, the statue of the Virgin and the viewpoints increase
the flow of people, transforming the landscape into the protagonist of ascenario in which
every citizen can experience and enjoy.
• The topographic use for these architectural projects in this type of placesIt favors the local
economy, the visibility of the entities involved, and the sustainable development of
the natural and built environment.
COST ESTIMATE
Zone 1 Cost Estimate*
- Access gate + Security booth (50 m2) = US$ 17,500
- Parking for cars and buses for tourists and locals on gravel or paving stones with
absorbent soil without cover (50 places / 2700 m2) = US$ 35,000
- Landscape, Water and Clean Energy Interpretation Center (400 m2 covered) = US$
320,000
- Restaurant and Canteen (150 m2 covered) = US$ 120,000
- Public Restrooms (20 m2 covered) = US$ 16,000
- Viewpoint on 4 levels of terraces with reinforced concrete stairs and ramps = US$
290,000
- Signage and Infographics = US$ 20,000
- Lighting system with ground-level, mid-height and high-height fixtures (80 LED-type
fixtures) = US$30,000
- Metallic perimeter fence with lighting system, security camera systems, electric fence
and signage (1820 linear meters) = US$ 91,000
* NOTE: The estimated prices are referential and are subject to variation based on the
designs and materials chosen once they are in the Executive Project Preparation stage.
Startup Project
Zones 1 and 3
• A Start-up Project is proposed for Zones 1 and 3. Zone 1 is where the
Acaray Dam is located and where some primary interventions already exist
such as access, vehicular roads, parking lots, terrace leveling, etc., and the
Zone 3 is the sector of the ANDE reserve that connects with the Itaipu Zoo
and is on the shores of the Reservoir Lake.
• The components of this Project are: Access Gate and Security Box, Main
pedestrian and vehicular access, Parking for cars and buses, Interpretation
Center for Water and Clean Energies, Restaurant and Canteen, Public
Restrooms, Viewpoint on 4 terrace levels with stairs and ramps, Signage
and Infographics, Lighting System, Security Camera System, Routes, Trails
and Viewpoints and Perimeter Wired with Lighting Systems, Security
Cameras and Signage, Statue of the Virgin.
• In a complementary way, the installation of the renewable energy
demonstration plant is proposed in the space of zone 1, using part of the
Interpretation Center as a control room for the plant and the energy
produced in it as a power source for the work. The plant will consist of
solar, wind, battery and hydrogen systems.
Startup Project
Zones 1 and 3
Project Architecture
Start Zones 1
SCADA system
NCRE Demonstration Plant
• For the sizing of the plants, it was previously necessary to supply 100% of the
demand for lighting of the 15,000 meters of pedestrian walkways, 16 viewpoints
and 35 signage and information points, which are designed in the architectural
project, in addition to access to the park.
• The final distribution of the load to be fed by the demonstration plants will be
reviewed once the start-up project has been defined.
NCRE Demonstration Plant
Monument to the Virgin Mary
Helper of the Acaray
• This monument can give rise to serving as a refuge
of Faith to a God who protects us and that his
mother Mary cares for us.
• With the fusion of tourist and academic activity with the
religious and historical, of what the Virgin represents
and the construction of the Acaray dam, it will be able to
offer the country a unique tourist and educational
experience.
• With this attraction, every May 24, the feast of the Patron
Virgin Mary Help of Christians of Central Acaray will have
even more relevance and importance, and may arouse
the interest of thousands of devotees nationally and
internationally.
Monument to the Virgin Mary
Helper of the Acaray
* NOTE: The estimated prices are referential and are subject to variation based
on the designs and materials chosen once they are in the Executive Project
Preparation stage.