Professional Documents
Culture Documents
Technical Analysis For Electrical Design
Technical Analysis For Electrical Design
Technical Analysis For Electrical Design
BARBARA PANGASINAN
2-STOREY RESIDENTIAL
LOREZCO RESIDENCE
ELECTRICAL
TECHNICAL ANALYSIS
SYSTEM ONE LINE DIAGRAM
U1
1000 kVAsc
4.2 kA
Bus SU
0.24 kV
0A
T1
75 kVA
Bus SE
0.24 kV
Cable SE
20 m
CU 2-1/C 1
ECB
0.24 kV
100 A
10 kA
Bus MFDR
0.24 kV
Cable MFDR
6m
CU
2-1/C 1
MCB
0.24 kV
100 A
10 kA
Bus4
0.24 kV
54.8 A 36.4 A
U1
1000 kVAsc
Bus SU ( a)
240 V
T1
75 kVA
[0.019 kW,0.036 kvar]
Bus SE ( a)
239 V
Cable SE
20 m
CU 2-1/C 1
0.966 V Vd(a)
[0.043 kW,0.015 kvar(a)]
ECB
0.24 kV
100 A
10 kA
( a)
Bus MFDR
238 V
Cable MFDR
6m 0.29 V Vd(a)
CU
2-1/C 1 [0.013 kW,0.005 kvar(a)]
MCB
0.24 kV
100 A
10 kA
( a)
Bus4 238 V
( a)
238 V
( a) 238 V
PPA LOADS PPB LOADS
13142 VA 8738 VA
Contract: SN:
Number of Buses: 1 0 3 4
Cable/
XFMR2 XFMR3 Reactor Line Impedance Tie PD Total
Busway
Number of Branches: 1 0 0 0 2 0 0 3
System Frequency: 60 Hz
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Apply Individual
Temperature Correction Adjustments /Global Degree C
Cable / Busway
Length ohms/1000 ft per Conductor
ID Phase MVA Prim. kV Sec. kV % Z1 % Z0 X1/R1 X0/R0 % Tol. + 5% - 5% Prim. Sec. %Z1 %Z0 Type Angle
T1 Phase A 0.075 0.240 0.240 2.60 1.92 0 0 0 0 0 2.6000
Project: 2-STOREY ETAP Page: 6
RESIDENCIAL 19.0.1C
Location: STA. BARBARA, Date: 08-12-2023
Branch Connections
Impedance
Lumped Load Rating % Load Loading X/R Ratio (Machine Base) Grounding
ID MVA kV MTR STAT MW Mvar X"/R X'/R %R % X" % X' Conn. Type Amp.
PPA LOADS 0.013 0.240 10 40 0.001 0.001 2.38 5.95 8.403 20.00 50.00
PPB LOADS 0.009 0.240 10 40 0.001 0.001 2.38 5.95 8.403 20.00 50.00
* Bus1 0.240 A 100.00 0.0 0.009 0.007 0.000 0.000 Bus3 A 0.009 0.007 45.3 -36.9 80.0
N 45.3
Bus2 0.240 A 99.26 0.0 0.000 0.000 0.000 0.000 Bus3 A -0.009 -0.006 45.3 143.1 80.0
N 45.3
N 45.3
Bus3 0.240 A 99.66 -0.1 0.000 0.000 0.000 0.000 Bus2 A 0.009 0.006 45.3 -36.9 80.1
N 45.3
N 45.3
Bus4 0.240 A 99.14 0.0 0.000 0.000 0.009 0.006 Bus2 A -0.009 -0.006 45.3 143.1 80.0
N 45.3
* Indicates a voltage regulated bus (voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
+ The power flows across center-tap transformers correspond to the phases of the From side.
Project: 2-STOREY ETAP Page: 10
RESIDENCIAL 19.0.1C
Location: STA. BARBARA, Date: 08-12-2023
* Indicates operating load of a bus exceeds the bus critical limit ( 100.00 % times the continuous rating).
Project: 2-STOREY ETAP Page: 11
RESIDENCIAL 19.0.1C
Location: STA. BARBARA, Date: 08-12-2023
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Conn. Type Phase (Amp) Amp % MVA MVA % MVA %
Vd Amperes
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop in Buried
ID Phase MW Mvar MW Mvar kW kvar From To in Vmag Winding
Cable1 A 0.009 0.006 -0.009 -0.006 0.0 0.0 99.7 99.3 0.4
Cable4 A 0.009 0.006 -0.009 -0.006 0.0 0.0 99.3 99.1 0.1
0.1 0.1
Project: 2-STOREY ETAP Page: 13
RESIDENCIAL 19.0.1C
Location: STA. BARBARA, Date: 08-12-2023
% Alert Settings
Critical
Loading
Bus 100.0
Reactor 100.0
Line 100.0
Transformer 100.0
Panel 100.0
Generator 100.0
Inverter/Charger 100.0
Bus Voltage
OverVoltage 105.0
UnderVoltage 95.0
Generator Excitation
OverExcited (Q Max.) 100.0
% Alert Settings
Critical
Bus Voltage
Line Voltage Unbalanced Rate (LVUR) 3.0
Branch Current
Line Current Unbalanced Rate (LIUR) 3.0
B 0.000 0.000
C 0.000 0.000
Number of Iterations: 2
One-Line Diagram - OLV1 (Short-Circuit Analysis)
U1
1000 kVAsc
T1
75 kVA
Contract: SN:
Short-Circuit Analysis
ANSI Standard
Number of Buses: 1 0 3 4
Line/Cable/
XFMR2 XFMR3 Reactor Busway Impedance Tie PD Total
Number of Branches: 1 0 0 2 0 0 3
Number of Machines: 0 1 0 0 2 3
Contract: SN:
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Apply Individual
Temperature Correction Adjustments /Global Degree C
Contract: SN:
3-Phase & 1-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)
Bus SU 0.240 Bus SU Cable Bus 4.167 5.0 1.253 5.220 9.036
Bus SE 0.240 Bus SE Bus 3.118 3.6 1.163 3.625 6.259
Bus MFDR 0.240 Bus MFDR Bus 2.620 2.0 1.040 2.725 4.455
Bus4 0.240 Bus4 Bus 2.485 1.8 1.027 2.553 4.101
For 1-Phase 3-Wire systems (fed from center-tap transformers), the calculated momentary duty for panel’s main and feeder protective devices are based on max . of 1-pole and 2-pole faults.
Contract: SN:
3-Phase & 1-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)
For 1-Phase 3-Wire systems (fed from center-tap transformers), the calculated interrupting duty for panel’s main and feeder protective devices are based on max . of 1-pole and 2-pole faults.