Above Ground Chilled Water Pipe Insulation

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

MVL USA INC, QATAR

TRANS-REGIONAL LOGISTICS COMPLEX

Activity Hazard Analysis (AHA)


Above ground Chilled Water Pipe
Activity/Work Task: Overall Risk Assessment Code (RAC) (Use highest code) L
Installation/Insulation
Project Location: AUAB Risk Assessment Code (RAC) Matrix
Contract Number: W912ER-21-C-0005 Severity Probability
Date Prepared: 15-01-2023 Frequent Likely Occasional Seldom Unlikely
Prepared by LAWRENCE OMISAKIN Catastrophic E E H H M
(Name/Title): (HSEM) Critical E H H M L
Marginal H M M L L
Reviewed by (Title): PRAMOD (PM)
Negligible M L L L L
- Notes: Operatives must have completed the Project HSE Step 1: Review each “Hazard” with identified safety “Controls” and determine RAC (See
Induction, and other applicable trainings prior to above)
deployment. “Probability” is the likelihood to cause an incident, near miss, or
- Pre-task instructions will be conducted every start of shift accident and identified as: Frequent, Likely, Occasional, Seldom or RAC Chart
and at each new task. Unlikely.
- Effective measures shall be implemented when working “Severity” is the outcome/degree if an incident, near miss, or accident E = Extremely High Risk
under extreme weather conditions; prevent heat did occur and identified as: Catastrophic, Critical, Marginal, or H = High Risk
stress/hypothermia. Negligible
M = Moderate Risk
Step 2: Identify the RAC (Probability/Severity) as E, H, M, or L for
Minimum PPE Requirements: each “Hazard” on AHA. Annotate the overall highest RAC at the top L = Low Risk
- Hard hat, Safety Glasses, Safety boots, High-visibility vests of AHA.
Specific PPE are indicated in this AHA where required

Page 1 of 3
Step Description of Hazard Risk Control Measures/ Responsible
No. Task Step level Preventive Measures Party
1  Securely fasten all materials stored or stacked against falling or sliding
 Proper cribbing under material
 Store in proper area
Tripping / Falling EM 385-1-1 SEC.
Falling Objects/ Sprains / Strains  Material will not be lifted above or over personnel 14.A.01,02.AND
Unloading / Storage of
Back Injury L  Use adequate manpower and/or equipment to deliver materials to their locations 03.Supervisor/safe
Material
Tripping / Falling  Use proper lifting procedures ty Officer
Eye Injury  Orderly housekeeping shall be maintained
 Materials, tools and chemicals labeled and stored properly

 Dust and eye protection shall be utilized during moving and cutting of materials

2 Material Handling Sprains / Strains  Use adequate manpower and/or equipment to deliver materials to their locations
Back Injury  Use proper lifting procedures SEC.14 A.04
Tripping / Falling  Orderly housekeeping shall be maintained a,b,c.d 14.A.05
Eye Injury Supervisor/safety
 Materials, tools and chemicals labeled and stored properly
 Dust and eye protection shall be utilized during moving and cutting of materials Officer

4 Chilled Water Pipe Eye Injury L  Eye protection shall be utilized during cutting of material
Installation/insulation Bodily Injury  Clearly define cutting area to insure against injury to personnel entering work area
Falling Objects  Use proper lifting procedures Supervisor/safety
Cuts / Scraps
 Use proper equipment to install materials Officer
Eye Injury
Bodily Injury  Material will not be lifted above or over personnel

5 Improper Handling & Eye/Body Injury, Medium  Product name and hazards signs must be marked on the containers.
Use of Chemical Asphyxiation,  Adequate ventilation must be ensured / provided in the work area.
Dermatitis,  Do not use COSHH containers for other items or vice-versa.
Allergy,  Proper equipments / device (funnel / pump) must be used to prevent spillage while Site Engineer,
Material Damage, Fatality, transferring to other containers.
Burn,  Do not leave balance materials in the work place, to be sent back to store at the end of Supervisor
each shift.
 Spillages if any must be cleaned immediately. Safety Officer
 Required PPE’s as per MSDS and RA must be used.

Soil contamination, Environmental  Proper disposal facility / area to be provided to avoid environmental pollution. Site Engineer,
Improper disposal Medium
6. Pollution.  All COSHH items / empty containers must be disposed as per MSDS and complied
with Local Authorities regulations. Supervisor

7. Use of Hand tools Improper selection of hand tools. Low  Hand tools should be visually inspected for defects, prior to use. Supervisor/safety
Damaged and Defective Hand  Never use damaged, blunt or broken tools to avoid injury. Officer Sec.05.A
tools.  Select right tools for right Job 13.A
Hand injuries  Ensure no Homemade or makeshift tools to be used at site
Pinch point  Remove from service any tool that shows signs of damage or defect
Ergonomics  Ensure Hand tools are Stored in accordance with the manufacturer’s instructions.
 Ensure hands are not in direct line of fire while working with hand tools
Repetitive strain injury
Ensure appropriate PPE at all times.

Page 2 of 3
8 Work at Height Falling from height (Injury/  Ensure all Safety harness are inspected and color coded
Site Engineer,
Scaffolding, or safety fatality)  Supervisor to ensure appropriate working platforms be in place
work individual Fire  Inspector to ensure the scaffold is appropriate and following the specification as per Activity
platform…) Falling Object (Injury) the load capacity Supervisor & HSE
M  Ensure the scaffold tag is signed by the
Sec.21.A.01,a.A.0
 competent scaffold inspector
5,

9 Working on mobile Medium


 STARRT card briefing must before start the activity
Work at height  Ensure the PTW in place and comply the procedure.
scaffolding  Fall form height  Ensure proper working platform with complete fall protection
 Falling objects  Ensure Full body harness and 100% Tie off
 Over loading  Ensure the scaffold platform is properly erected with "Safe to use" tag.
 Protruding objects  Ensure castor wheels are locked Electrical
Access & egress  Hand tools must be secured/tethered Engineer/ Safety
 Work materials strictly not allowed to be stored on platform except for working Officer
tools Sec.21.A.01,a.A.0
 Ensure avoid over reaching and climb on handrail. 5,
 Ensure unauthorized person not allowed to modify the scaffolding and if needed
to any changes then must be modified by trained and certified scaffolder.
 Ensure safe access to the working platform
 Scaffold access must be free from obstruction
 Ensure sufficient illumination in work area

10 Emergency procedure No available notice boards posted at L  Established Contact for key personnel for Emergency Situation Safety Officer/
the sites  Ensure ALL are aware & understood the Emergency Procedure & Plan during Supervisor
formwork installation works. Sec. 03. A. 01, a,
Lack of responsible person in case  Ensuring the First Aid kits box is available at all time. b, c. 03.A.02 a, b,
of emergency situation.  Stand-by Certified First Aider (if works commencing at the night shift operation) c, 03. D.02,
 Trained First Aider Team to be arranged & deployed before commencing works.
Missing emergency vehicle  Emergency vehicle must be standby should in case of emergency need
 Ensure adequate training among emergency rescue team
Unavailability of First Aider

11. Heat exhaustion, Heat stroke,  Ensure to instruct workers to replace fluids being used from the body by taking Safety Officer/
Working in climate Dehydration, Personal injuries due appropriate drinking water Supervisor
Weather to high temperature, Burn, Tiredness  Ensure appropriate dress code in cold/hot weather Sec.06.J
 Management Team must ensure that all working and testing crew/personnel should 01,02,03.06.1.06
follow client safety instructions and respond to their safety policy a, b,
 Ensure close monitoring by the activity supervisor and assigned safety
L  Ensure proper site timing while working as approved by the Site Management Team.

12. General Overcrowded and congested work Low  Site of works to be kept neat and tidy at all times.
Housekeeping of site platforms  Keep the area organized and tidy at all times.
 Waste to be immediately placed into waste containers
 / Receptacles. Supervisor/safety
 Store all materials securely and tidy. Officer sec.2.A 2
 Ensure all work areas are properly lit. B.01,02 &
 Wear appropriate footwear and clothing to prevent
 Segregation of materials

Page 3 of 3