Shamshan Area Boundary Wall Sand Filling cum 1 284.196 0.75 0.075 15.98603
PCC cum 1 284.196 0.6 0.075 12.78882
Foundation
1 Stone Masonary
Superstructure
2 Backfilling Remaining
Used
Cement
Required
3 Material
Stone Dust Used
Steel Used
Site to Site
Used
Site to Outside
4 Tractor
Required for Backfilling
For Plantation
Used
Required for Backfilling
5 JCB Dressing
For Cultivtation of School Play Area
For Plantation
Used
M15
6 PCC Required
M25 Used
Used
Labour Charge for Maintainance
Required for 6 month maintainance
Total Cost
Excavation
CRICKET GROUND
531
1536
43682
111530
2552927
186.4 1 1 186.4
9947.0
49.296
17.276
13.6275
Sl. No. Items Units Qty. Rate Amount
Total 3139102
Add 10 % Overhead 313910
Total 3453012