1. SURVEY
Scope of Work
a) Field Work, Site Mapping, Site Measurement, Erecting of Pillars, Trans-versing.
b) Lodging of Documents with the appropriate authorities.
c) Logistics and Accommodation.
TOTAL = N62,400,000
2. SOIL TEST
Scope of Work
a) Laboratory Analysis.
b) Soil/Sediment Control Sample Analysis.
c) Desktop Studies, Data Analysis, Report Writing, Review and Report Production.
d) GIS Support.
e) Field Survey, Personnel, Logistics and Field Work, etc.
TOTAL = N12,506,000
3. FENCING
Scope of Work
a) Erecting of Concrete Pillars and 9 inches Blocks for the fencing of the sides and back fencing =
N310,000,000
b) Erecting of Concrete Basements for Barbed Wire/Chain Link Fence for the front side =
N46,000,000
TOTAL = 356,000,000
Scope of Work
a) Procurement of 4pcs of 20feet Potter-cabins at N4,000,000
N4,000,000 x 4 = N16,000,000
b) Casting of Basement for Potter-cabins N5,000,000
TOTAL = N21,000,000
5. TEMPORARY OFFICES
Scope of Work
a) Procurement of 4pcs of 40feet Potter-cabins at N7,000,000
N7,000,000 x 4 = N28,000,000
Casting of Basement for 40feet Potter-cabins at N8,000,000
TOTAL = N36,000,000
TOTAL = $6,181,053.73
TOTAL = $9,112,255.05
8. TOYOTA HILUX
TOTAL = N380,000,000
TOTAL = N215,000,000
TOTAL = N72,000,000
TOTAL = N14,000,000
12. STORE
TOTAL = N18,000,000