.D
A B C D E
A 745 4,395 4,395 4,395 4,395
_
745
1 2 A
.B
200
435 2,500 435
300 245 4,395 4,395 4,395 4,395 745
60 60
150 450 2,050 450 150
18,465 +0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0
425
200 20 20
480
[-470.0] Foundation Plates' Top ▼ ▼ Foundation Plates' Top [-470.0]
300 450 3,945 450 3,945 450 3,945 450 3,940 450 200 305
B [-480.0] Columns/Pedestals' Top ▼ ▼ Columns/Pedestals' Top [-480.0] B
60 150
65
65
65
65
150
150
500
500
65
150
60
150
900
2 2
450
450
150
285
350
2,500
2,500
.A .A [-1,730.0] Blinding Footing Top ▼
2,500
3,370
3,070
2,050
2,050
3,070
3,370
C ▼ Blinding Footing Top [-1,730.0] C
100
[-1,830.0] Excavation 01 (Footings) ▼ 3,700 ▼ Excavation 01 (Footings)[-1,830.0]
1 1
450
450
GENERAL LAYOUT SCALE 1:25
150
150
150
500
500
150
60
150
150
DETAILING ALL STRUCTURAL MEMBERS: FOOTINGS | COLUMNS/PEDESTALS | RETAINING WALL | SIDE WALL | MANHOLE PIT & COVER | EDGE PROTECTION | MANHOLE PLATE | FOUNDATION PLATE
60
65
215
65
65
65
D D
600
150
750
20 20
200 450 3,945 450 3,945 450 1,530 150 600 150 1,515 450 3,940 450 200
18,465
.B
E 4,395 4,395 4,395 4,395 E
_
.D
A B C D E
2 1
435 2,500 1,185
H H
150 60 450 2,050 450 60 900
+0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0
480
[-470.0] Foundation Plates' Top ▼ ▼ Foundation Plates' Top [-470.0]
[-480.0] Columns/Pedestals' Top ▼ ▼ Columns/Pedestals' Top [-480.0]
I I
900
2,080
Slope: 1:100
[-1,380.0] Footings' Top ▼
350
▼ [-1,480.0] Excavation 02 (Mass conc Slab)
[-1,730.0] Blinding Footing Top ▼
1,025
100
[-1,830.0] Excavation 01 (Footings) ▼ ▼ Footings' Top [-2,080.0]
J GENERAL LAYOUT SCALE 1:40 J
DETAILING ALL STRUCTURAL MEMBERS: FOOTINGS | COLUMNS/PEDESTALS | RETAINING WALL | SIDE WALL | MANHOLE PIT & COVER | EDGE PROTECTION | MANHOLE PLATE | FOUNDATION PLATE
350
▼ Blinding Footing Top [-2,430.0]
A B C D _ E
100
100
20
445 4,395 4,395 4,395 4,395 440 20 950 2,370 1,000 ▼ Excavation 01 (Footings)[-2,530.0]
200 450 3,945 450 3,945 225 225 3,945 450 3,940 450 200
+0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0
200
[-470.0] Foundation Plates' Top ▼ 4,340 300
▼ Foundation Plates' Top [-470.0]
K [-480.0] Columns/Pedestals' Top ▼ ▼ Columns/Pedestals' Top [-480.0]
GENERAL LAYOUT SCALE 1:25 K
DETAILING ALL STRUCTURAL MEMBERS: FOOTINGS | COLUMNS/PEDESTALS | RETAINING WALL | SIDE WALL | MANHOLE PIT & COVER | EDGE PROTECTION | MANHOLE PLATE | FOUNDATION PLATE
1,500 2,890 1,500 2,895 1,500 Slope: 1:100 2,895 Slope: 1:100 1,500 2,890 1,500
[-1,380.0] Footings' Top ▼ ▼ Footings' Top [-1,380.0]
[-1,730.0] Blinding Footing Top ▼ [-1,480.0] Excavation 02 (Mass conc Slab) ▼ [-1,480.0] Excavation 02 (Mass conc Slab) ▼ [-1,480.0] Excavation 02 (Mass conc Slab) ▼ [-1,480.0] Excavation 02 (Mass conc Slab) ▼ ▼ Blinding Footing Top [-1,730.0]
[-1,830.0] Excavation 01 (Footings) ▼ 1,700 2,690 1,700 2,695 1,700 2,695 1,700 2,690 1,700 ▼ Excavation 01 (Footings)[-1,830.0]
_
L STRUCTURAL LAYOUT_ SECTION VIEW 'A'-'A' L
GENERAL LAYOUT SCALE 1:40
DETAILING ALL STRUCTURAL MEMBERS: FOOTINGS | COLUMNS/PEDESTALS | RETAINING WALL | SIDE WALL | MANHOLE PIT & COVER | EDGE PROTECTION | MANHOLE PLATE | FOUNDATION PLATE
M M
N N
STRUCTURAL LAYOUT_ BASIC 3D CUTOUT VIEW [Cut Plane: Section 'D' -'D']
GENERAL LAYOUT SCALE : N/A
DETAILING ALL STRUCTURAL MEMBERS: FOOTINGS | COLUMNS/PEDESTALS | RETAINING WALL | SIDE WALL | MANHOLE PIT & COVER | EDGE PROTECTION | MANHOLE PLATE | FOUNDATION PLATE
O Project Name: DRURY'S WEIGHBRIDGE STRUCTURE [CIVIL WORKS] No. Description Date O
CONTRACTOR: DEUB ENGINEERING STRUCTURAL ENGINEERS: Essae Digitronics Pvt Ltd
GENERAL NOTES SPECIFIC NOTES Sign : DESIGN STAGE: CONSTRUCTION References :TSD-CV-STDR-42
1. This drawing is ONLY for construction references 1. FOUNDATIONS 2. CONCRETE MIXES 3. REINFORCEMENT 4. MINIMUM COVER TO REINF. IN 5. ABBREVIATIONS 6. OTHER NOTES Designed by : Verified : Approved : File : Date : Rev. Date:
P 2. Original Structural drawings by Essae supersedes this They shall generally be taken 1200mm min. below existing ground level Reinforced concrete to have a (a) Ribbed bars (>500N/mm²) to be Ribbed cold formed (a) Foundations = 50mm M.C = Mass Concrete All dimensions to be confirmed on site. D.E.S __ __ 10401 OCT.2022 CLIENT: DRURY AGRO PROCESSING LTD P
construction drawing incase of any Clarification. after removal of organic layer and all excavations to be confirmed by min. works cube strength of bars to BS4449 / IS:1786 and are marked "T" on these dwgs (b) Beams = 30mm R.C = Reinforced Concrete
CONSTRUCTION DRAWING: LOCATION: KAMPALA - UGANDA
TITLE:
CONSTRUCTION DRAWINGS: GENERAL OVERVIEW
3. This drawing is STRICTLY copyrighted to the designer. the Engineer before concrete blinding is laid. 25N/mm² at 28 days with 20mm (b) Any Mild steel bars (250N/mm²) marked "R" on these (c) Columns/ Pedestals = 40mm T = Top This drawing must be read in FOOTINGS, COLUMNS/PEDESTALS, RETAINING WALL
2. The designer takes no obligation for any faults and errors Weak pockets of bearing strata to be dug out and filled with 1:4:8 max. aggregate size dwgs to be round bars to BS4483 (d) Retaining Wall = 25mm B = Bottom conjunction with the original Structural FOUNDATION GUIDE DETAILS Dwg No.: 10401DWB/CD/01.01
in the Structural design on this project. Essae's Civil EXCAVATIONS & REINFORCED CONCRETE DETAILS: Revision:Sheet:
mass concrete. (c) Structural steel shall confirm to IS: 2062 drawings from Essae. Project No.:
Structural Drawings (STD-CV-STDR-42) takes precedence. [REFER TO INDICATED TITLES] 10401DWB/CD 00 01 of 05 A0 Scale AS INDICATED
GSPublisherVersion 0.0.100.100
1 2 3 4 5 6 7 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
.D
A B C D E
A
1 2 A
.B
600 2,500 600
65
65
65
65
-1.830
600
600
Excavation
-1.830
950
950
950
Bottom
1,830
2 Excavation
Bottom -1.830 -1.830 2
Excavation Excavation
Bottom Bottom
2,620
-1.830 -1.480 -1.830
-1.480 3,700
2,500
3,700
1,670
1,670
1,670
3,700
2,500
C .A -1.830 -1.480 Excavation -1.830 Excavation Excavation -1.830 .A C
Excavation
Excavation Excavation Bottom
Bottom
Excavation
Bottom Bottom -1.480 Excavation
Bottom Bottom Bottom Excavation Bottom
Bottom
[-1,830.0] Excavation 01 (Footings) ▼ 3,700 ▼ Excavation 01 (Footings)[-1,830.0]
700
1,015
Excavation
1 Excavation
1
950
950
-1.830 -1.830 Bottom Bottom -1.830 EARTHWORKS SCALE 1:25
600
600
Excavation Excavation SLOPE RATIO, EXTERNAL MEASUREMENTS & LEVEL OF PRECISION FOR ONSITE EXCAVATION MAY DEFER DEPENDING ON GROUND CONDITIONS AND APPLICABLE WORK METHODS
315
Excavation
Bottom Bottom
65
65
Bottom
D D
685
685
-2.530
Excavation
Bottom
1,700 2,690 1,700 2,695 1,700 1,055 600 1,040 1,700 2,690 1,700
19,270
.B
E 845 4,395 4,395 4,395 4,395 845 E
A B C D E
.D
SPECIFIC EXCAVATION LAYOUT_ FLOOR PLAN
EARTHWORKS SCALE 1:40
SLOPE RATIO, EXTERNAL MEASUREMENTS & LEVEL OF PRECISION FOR ONSITE EXCAVATION MAY DEFER DEPENDING ON GROUND CONDITIONS AND APPLICABLE WORK METHODS
F F
G SPECIFIC EXCAVATION LAYOUT_ BASIC 3D CUTOUT VIEW [Cut Plane: Grid 'B'] G
EARTHWORKS SCALE : N/A
SLOPE RATIO, EXTERNAL MEASUREMENTS & LEVEL OF PRECISION FOR ONSITE EXCAVATION MAY DEFER DEPENDING ON GROUND CONDITIONS AND APPLICABLE WORK METHODS
2 1
2,500
H H
+0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0
1,480
1,480
I 4,320 I
1,830
2,530
350
SPECIFIC EXCAVATION LAYOUT_ BASIC ISOMETRIC TOP VIEW
1,050
[-1,830.0] Excavation 01 (Footings) ▼
J EARTHWORKS SCALE 1:40 J
SLOPE RATIO, EXTERNAL MEASUREMENTS & LEVEL OF PRECISION FOR ONSITE EXCAVATION MAY DEFER DEPENDING ON GROUND CONDITIONS AND APPLICABLE WORK METHODS
A B C D E
4,395 4,395 4,395 4,395
950 2,370 1,000 ▼ Excavation 01 (Footings)[-2,530.0]
19,270
+0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0
1,480
1,480
1,480
1,480
1,480
1,830
1,830
1,830
1,830
SLOPE RATIO, EXTERNAL MEASUREMENTS & LEVEL OF PRECISION FOR ONSITE EXCAVATION MAY DEFER DEPENDING ON GROUND CONDITIONS AND APPLICABLE WORK METHODS
350
350
[-1,830.0] Excavation 01 (Footings) ▼ 1,700 2,690 1,700 2,695 1,700 2,695 1,700 2,690 1,700 ▼ Excavation 01 (Footings)[-1,830.0]
M M
N N
SPECIFIC EXCAVATION LAYOUT_ BASIC 3D CUTOUT VIEW [Cut Plane: Section 'D' -'D']
EARTHWORKS SCALE : N/A
SLOPE RATIO, EXTERNAL MEASUREMENTS & LEVEL OF PRECISION FOR ONSITE EXCAVATION MAY DEFER DEPENDING ON GROUND CONDITIONS AND APPLICABLE WORK METHODS
O Project Name: DRURY'S WEIGHBRIDGE STRUCTURE [CIVIL WORKS] No. Description Date O
CONTRACTOR: DEUB ENGINEERING STRUCTURAL ENGINEERS: Essae Digitronics Pvt Ltd
GENERAL NOTES SPECIFIC NOTES Sign : DESIGN STAGE: CONSTRUCTION References :TSD-CV-STDR-42
1. This drawing is ONLY for construction references 1. FOUNDATIONS 2. CONCRETE MIXES 3. REINFORCEMENT 4. MINIMUM COVER TO REINF. IN 5. ABBREVIATIONS 6. OTHER NOTES Designed by : Verified : Approved : File : Date : Rev. Date:
P 2. Original Structural drawings by Essae supersedes this They shall generally be taken 1200mm min. below existing ground level Reinforced concrete to have a (a) Ribbed bars (>500N/mm²) to be Ribbed cold formed (a) Foundations = 50mm M.C = Mass Concrete All dimensions to be confirmed on site. D.E.S __ __ 10401 OCT.2022 CLIENT: DRURY AGRO PROCESSING LTD P
construction drawing incase of any Clarification. after removal of organic layer and all excavations to be confirmed by min. works cube strength of bars to BS4449 / IS:1786 and are marked "T" on these dwgs (b) Beams = 30mm R.C = Reinforced Concrete
CONSTRUCTION DRAWING: LOCATION: KAMPALA - UGANDA
TITLE:
CONSTRUCTION DRAWINGS: EARTH WORKS
3. This drawing is STRICTLY copyrighted to the designer. the Engineer before concrete blinding is laid. 25N/mm² at 28 days with 20mm (b) Any Mild steel bars (250N/mm²) marked "R" on these (c) Columns/ Pedestals = 40mm T = Top This drawing must be read in BASIC GUIDING PARAMETERS FOR EXCAVATIONS
2. The designer takes no obligation for any faults and errors Weak pockets of bearing strata to be dug out and filled with 1:4:8 max. aggregate size dwgs to be round bars to BS4483 (d) Retaining Wall = 25mm B = Bottom conjunction with the original Structural FOUNDATION GUIDE DETAILS Dwg No.: 10401DWB/CD/01.02
in the Structural design on this project. Essae's Civil EXCAVATIONS & REINFORCED CONCRETE DETAILS: Revision:Sheet:
mass concrete. (c) Structural steel shall confirm to IS: 2062 drawings from Essae. Project No.:
Structural Drawings (STD-CV-STDR-42) takes precedence. [REFER TO INDICATED TITLES] 10401DWB/CD 00 02 of 05 A0 Scale AS INDICATED
GSPublisherVersion 0.0.100.100
1 2 3 4 5 6 7 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
.D
A B C D E
A
1 2 A
.B
600 2,500 600
24xØ8/147 top
28xØ10/100 top
28xØ10/100 top
28xØ10/100 top
28xØ10/100 top
28xØ10/100 top
28xØ10/100 top
28xØ10/100 top
28xØ10/100 top
5xØ8/150 top
5xØ8/150 top
5xØ8/150 top
5xØ8/150 top
5xØ8/150 top
5xØ8/150 top
5xØ8/150 top
5xØ8/150 top
+0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0
19,270
l=1.50m
l=2.95m
l=2.95m
l=2.95m
l=2.95m
l=2.95m
l=2.95m
l=2.95m
l=2.95m
l=0.80m
l=0.80m
l=0.80m
l=0.80m
l=0.80m
l=0.80m
l=0.80m
l=0.80m
1,700 2,690 1,700 2,695 1,700 2,695 1,700 2,690 1,700
B B
11
11
11
11
1
11
11
11
11
10
10
10
10
10
10
10
10
65
65
65
65
65
-1.730
600
600
Blinding
-1.730 -1.730 -1.730
1,730
950
950
950
950
950
Blinding Blinding
1,830
2 Top
Top
Blinding
Top
Top 2
24xØ8/147 top 24xØ8/147 top
24xØ8/147 top 1 1
1 l=1.50m 35xØ10/100 top l=1.50m
3
24xØ8/147 top
1 -1.730 3
35xØ10/100 top l=1.50m
3
35xØ10/100 top l=1.50m
2
-1.730 top 3 35xØ10/100 top
10xØ8/150 -1.730 3
35xØ10/100 top
l=1.50m l=1.50m l=1.50m 15xØ10/96 top Blinding
l=3.50m l=1.50m l=1.50m
Blinding -1.730 -1.730 Blinding
2,500
3,700
1,670
1,670
1,670
1,670
1,670
3,700
2,500
.A 4 .A
C Top 15xØ10/96 top Blinding 15xØ10/96 top Blinding
l=3.50m
5xØ8/150 top
Top
15xØ10/96 top Top 15xØ10/96 top [-1,730.0] Blinding Footing Top ▼ ▼ Blinding Footing Top [-1,730.0]
C
4 10xØ8/150 top Top 4 12 5xØ8/150 top 4 4
10xØ8/150 top l=3.50m 2 l=3.50m Top l=1.25m l=3.50m l=3.50m
2 12
l=3.50m 10xØ8/150 top l=1.25m
100
l=3.50m 5xØ8/150 top
2 12 3,700 ▼ Excavation 01 (Footings)[-1,830.0]
l=3.50m 1,055 l=1.25m600 1,04012 5xØ8/150 top [-1,830.0] Excavation 01 (Footings) ▼
5xØ8/150 top l=1.25m
285
950
950
950
950
950
Blinding Blinding Blinding
Top
Blinding
Top Top
Top
CONC. BLINDING & BASIC REINFORCEMENT OVERVIEW SCALE 1:25
600
600
Top PLAIN CONCRETE BLINDING & BASIC REINFORCEMENT FOR: FOOTINGS OF THE COLUMNS/PEDESTALS, RETAINING & SIDE WALLS, MANHOLE PIT. Reinforcement details exclude cover and rebar layer spacers.
65
1065
65
65
1,000
D -2.430 D
10
10
10
10
10
10
10
10
10
11
11
11
11
11
11
685
2
Blinding
28xØ10/100 top
28xØ10/100 top
28xØ10/100 top
28xØ10/100 top
12xØ10/100 top
12xØ10/100 top
12xØ10/100 top
28xØ10/100 top
28xØ10/100 top
l=0.80m
l=0.80m
l=0.80m
l=0.80m
l=0.80m
l=0.80m
l=0.80m
l=0.80m
l=0.80m
l=0.80m
5xØ8/150 top
5xØ8/150 top
5xØ8/150 top
l=2.95m
l=2.95m
l=2.95m
5xØ8/150 top
5xØ8/150 top
5xØ8/150 top
l=2.95m
l=2.95m
l=2.95m
10xØ8/150 top
l=3.50m
Top
13
10
10
5xØ8/150 top
l=0.90m
9xØ10/100 top
9xØ10/100 top
l=0.80m
l=0.80m
1,700 2,690 1,700 2,695 1,700 1,055 600 1,040 1,700 2,690 1,700
.B
E E
A B C D E
.D
STRUCTURAL LAYOUT_ FLOOR PLAN
CONC. BLINDING & BASIC REINFORCEMENT OVERVIEW SCALE 1:40
PLAIN CONCRETE BLINDING & BASIC REINFORCEMENT FOR: FOOTINGS OF THE COLUMNS/PEDESTALS, RETAINING & SIDE WALLS, MANHOLE PIT. Reinforcement details exclude cover and rebar layer spacers.
F F
2 1
2,500
H H
+0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0
1,480
1,480
I I
1,830
2,530
350
[-1,730.0] Blinding Footing Top ▼
1,050
[-1,830.0] Excavation 01 (Footings) ▼
J CONC. BLINDING & BASIC REINFORCEMENT OVERVIEW SCALE 1:40 J
PLAIN CONCRETE BLINDING & BASIC REINFORCEMENT FOR: FOOTINGS OF THE COLUMNS/PEDESTALS, RETAINING & SIDE WALLS, MANHOLE PIT. Reinforcement details exclude cover and rebar layer spacers.
▼ Blinding Footing Top [-2,430.0]
A B C D E
4,395 4,395 4,395 4,395 950 2,370 1,000 ▼ Excavation 01 (Footings)[-2,530.0]
+0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0
1,480
1,480
1,480
1,480
1,480
PLAIN CONCRETE BLINDING & BASIC REINFORCEMENT FOR: FOOTINGS OF THE COLUMNS/PEDESTALS, RETAINING & SIDE WALLS, MANHOLE PIT. Reinforcement details exclude cover and rebar layer spacers.
1,730
1,730
1,830
1,830
1,830
1,830
350
350
350
[-1,730.0] Blinding Footing Top ▼ ▼ Blinding Footing Top [-1,730.0]
100
100
[-1,830.0] Excavation 01 (Footings) ▼ 1,700 2,690 1,700 2,695 1,700 2,695 1,700 2,690 1,700 ▼ Excavation 01 (Footings)[-1,830.0]
M M
N N
STRUCTURAL LAYOUT_ BASIC 3D CUTOUT VIEW [Cut Plane: Section 'D' -'D']
CONC. BLINDING & BASIC REINFORCEMENT OVERVIEW SCALE : N/A
PLAIN CONCRETE BLINDING & BASIC REINFORCEMENT FOR: FOOTINGS OF THE COLUMNS/PEDESTALS, RETAINING & SIDE WALLS, MANHOLE PIT. Reinforcement details exclude cover and rebar layer spacers.
O Project Name: DRURY'S WEIGHBRIDGE STRUCTURE [CIVIL WORKS] No. Description Date O
CONTRACTOR: DEUB ENGINEERING STRUCTURAL ENGINEERS: Essae Digitronics Pvt Ltd
GENERAL NOTES SPECIFIC NOTES Sign : DESIGN STAGE: CONSTRUCTION References :TSD-CV-STDR-42
1. This drawing is ONLY for construction references 1. FOUNDATIONS 2. CONCRETE MIXES 3. REINFORCEMENT 4. MINIMUM COVER TO REINF. IN 5. ABBREVIATIONS 6. OTHER NOTES Designed by : Verified : Approved : File : Date : Rev. Date:
P 2. Original Structural drawings by Essae supersedes this They shall generally be taken 1200mm min. below existing ground level Reinforced concrete to have a (a) Ribbed bars (>500N/mm²) to be Ribbed cold formed (a) Foundations = 50mm M.C = Mass Concrete All dimensions to be confirmed on site. D.E.S __ __ 10401 OCT.2022 CLIENT: DRURY AGRO PROCESSING LTD P
construction drawing incase of any Clarification. after removal of organic layer and all excavations to be confirmed by min. works cube strength of bars to BS4449 / IS:1786 and are marked "T" on these dwgs (b) Beams = 30mm R.C = Reinforced Concrete
CONSTRUCTION DRAWING: LOCATION: KAMPALA - UGANDA
TITLE:
CONSTRUCTION DRAWINGS: BLINDING & REBAR
3. This drawing is STRICTLY copyrighted to the designer. the Engineer before concrete blinding is laid. 25N/mm² at 28 days with 20mm (b) Any Mild steel bars (250N/mm²) marked "R" on these (c) Columns/ Pedestals = 40mm T = Top This drawing must be read in FOOTING'S BLINDING & REINFORCEMENT
2. The designer takes no obligation for any faults and errors Weak pockets of bearing strata to be dug out and filled with 1:4:8 max. aggregate size dwgs to be round bars to BS4483 (d) Retaining Wall = 25mm B = Bottom conjunction with the original Structural FOUNDATION GUIDE DETAILS Dwg No.: 10401DWB/CD/01.03
in the Structural design on this project. Essae's Civil EXCAVATIONS & REINFORCED CONCRETE DETAILS: Revision:Sheet:
mass concrete. (c) Structural steel shall confirm to IS: 2062 drawings from Essae. Project No.:
Structural Drawings (STD-CV-STDR-42) takes precedence. [REFER TO INDICATED TITLES] 10401DWB/CD 00 03 of 05 A0 Scale AS INDICATED
GSPublisherVersion 0.0.100.100
1 2 3 4 5 6 7 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
.D
A B C D E
A _ 1 2 A
.B
9xØ8/150 top 123xØ10/150 top
745 4,395 15
l=18.48m
4,395 8
l=2.00m
4,395 4,395 745 600 2,500 600
9xØ8/150 top
15
l=18.48m 14
123xØ10/150 top 5
19,070 l=1.90m
3xØ16/175 top
2xØ16/150 top
2xØ16/150 top
3xØ16/175 top
3xØ16/175 top
2xØ16/150 top
2xØ16/150 top
3xØ16/175 top
2xØ16/150 top
2xØ16/150 top
3xØ16/175 top
3xØ16/175 top
2xØ16/150 top
2xØ16/150 top
3xØ16/175 top
3xØ16/175 top
2xØ16/150 top
2xØ16/150 top
3xØ16/175 top
+0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0
1,500 2,890 1,500 2,895 1,500 2,895 1,500 2,890 1,500
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
520 450 3,945 450 3,945 450 3,945 450 3,940 450 525
425
[-470.0] Foundation Plates' Top ▼ ▼ Foundation Plates' Top [-470.0]
B 520 450 530 2,890 525 450 525 2,895 525 450 525 2,895 525 450 525 2,890 525 450 525 [-480.0] Columns/Pedestals' Top ▼ ▼ Columns/Pedestals' Top [-480.0] B
5
275
275
275
275
500
500
1,830
11xØ8/100 top 11xØ8/100 top 11xØ8/100 top 11xØ8/100 top 11xØ8/100 top
815
815
815
815
6 6 6 6 6
2 2
450
450
450
450
450
9xØ8/150 top l=1.70m l=1.70m l=1.70m l=1.70m l=1.70m
9
l=3.42m
11xØ8/100 top 11xØ8/100 top 11xØ8/100 top 11xØ8/100 top 11xØ8/100 top
9xØ8/150 top 7 7 7 -1.387 -1.382 7 7
9 l=1.30m l=1.30m l=1.30m
-1.384 l=1.30m 9xØ8/150 top l=1.30m
l=3.42m 9 [-1,380.0] Footings' Top ▼ ▼ Footings' Top [-1,380.0]
Mass Conc Slab's Top l=3.42m
With a Slop of 1:100
9xØ8/150 top
-1.380 -1.380
Towards Manhole
-1.380 -1.380 9 -1.380
-1.380 l=3.42m
2,500
2,500
.A -1.380 -1.380 -1.391 .A [-1,730.0] Blinding Footing Top ▼
3,500
2,050
1,870
3,500
2,050
1,870
3,500
2,050
1,870
1,870
2,050
3,500
2,050
3,500
C Mass Conc
-1.392 RC Footing Mass Conc RC Footing ▼ Blinding Footing Top [-1,730.0] C
RC Footing
RC Footing Mass Conc RC Footing
Slab's Top Top 23xØ10/149
Slab's Top top Top
Top Top 8
Top Slab's Top
11xØ8/100 top l=2.00m
7
l=1.30m
-1.398
[-1,830.0] Excavation 01 (Footings) ▼ 3,700 ▼ Excavation 01 (Footings)[-1,830.0]
11xØ8/100 top 11xØ8/100 top 11xØ8/100 23xØ10/149
top top
8 11xØ8/100 top
7 7 11xØ8/100 top -1.387 -1.384 7 l=2.00m 7
l=1.30m l=1.30m 6 l=1.30m l=1.30m
l=1.70m
23xØ10/149 top
l=2.00m
8 6
11xØ8/100 top
l=1.70m
6
11xØ8/100 top
l=1.70m
-1.400
6
11xØ8/100 top
l=1.70m
6
11xØ8/100 top
l=1.70m STRUCTURAL LAYOUT_ SECTION VIEW 'B'-'B'
591
1 1
450
450
450
450
450
RC FOOTERS & BASIC REINFORCEMENT OVERVIEW SCALE 1:25
815
815
815
-1.403
500
500
23xØ10/149 top
8 REINFORCED CONCRETE FOOTERS & BASIC VERTICAL REINFORCEMENT FOR: COLUMNS/PEDESTALS, RETAINING & SIDE WALLS, MANHOLE PIT. Reinforcement details exclude cover and rebar layer spacers.
l=2.00m
275
275
224
275
l=1.55m 275
D D
5
5
5
1,155 600 1,140
2xØ16/150 top
l=1.55m
3xØ16/175 top
l=1.55m
5
3xØ16/175 top
2xØ16/150 top
2xØ16/150 top
3xØ16/175 top
3xØ16/175 top
2xØ16/150 top
2xØ16/150 top
3xØ16/175 top
2xØ16/150 top
3xØ16/175 top
2xØ16/150 top
2xØ16/150 top
3xØ16/175 top
2xØ16/150 top
2xØ16/150 top
3xØ16/175 top
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
l=1.55m
3xØ16/175 top
l=1.55m
1,500 2,890 1,500 2,895 1,500 2,895 1,500 2,890 1,500
.B
9xØ8/150 top 75xØ10/149 top l=2.25m 5xØ10/15045xØ10/150
top top 9xØ8/150 top
E 16 8 3xØ10/150 top 18 14 17 E
l=11.18m l=2.00m 19 14xØ8/150 top l=2.70m l=1.90m l=6.77m
l=2.60m 21
l=1.95m _
.D
A B C 18
6xØ10/150 top
l=2.70m
D E
2 1
2,500
H H
+0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0
1,480
1,480
I I
1,830
Slope: 1:100
2,530
[-1,380.0] Footings' Top ▼
350
STRUCTURAL LAYOUT_ BASIC ISOMETRIC TOP VIEW
[-1,730.0] Blinding Footing Top ▼
1,050
J [-1,830.0] Excavation 01 (Footings) ▼ ▼ Footings' Top [-2,080.0] J
REINFORCED CONCRETE FOOTERS & BASIC VERTICAL REINFORCEMENT FOR: COLUMNS/PEDESTALS, RETAINING & SIDE WALLS, MANHOLE PIT. Reinforcement details exclude cover and rebar layer spacers.
A B C D _ E
4,395 4,395 4,395 4,395 950 2,370 1,000 ▼ Excavation 01 (Footings)[-2,530.0]
200
[-470.0] Foundation Plates' Top ▼ 4,340 300
▼ Foundation Plates' Top [-470.0]
[-480.0] Columns/Pedestals' Top ▼ ▼ Columns/Pedestals' Top [-480.0]
REINFORCED CONCRETE FOOTERS & BASIC VERTICAL REINFORCEMENT FOR: COLUMNS/PEDESTALS, RETAINING & SIDE WALLS, MANHOLE PIT. Reinforcement details exclude cover and rebar layer spacers.
1,480
1,480
1,480
1,480
1,480
1,480
1,830
1,830
1,830
1,830
Slope: 1:100 Slope: 1:100
[-1,380.0] Footings' Top ▼ ▼ Footings' Top [-1,380.0]
350
350
350
[-1,730.0] Blinding Footing Top ▼ [-1,480.0] Excavation 02 (Mass conc Slab) ▼ [-1,480.0] Excavation 02 (Mass conc Slab) ▼ [-1,480.0] Excavation 02 (Mass conc Slab) ▼ [-1,480.0] Excavation 02 (Mass conc Slab) ▼ ▼ Blinding Footing Top [-1,730.0]
[-1,830.0] Excavation 01 (Footings) ▼ 1,700 2,690 1,700 2,695 1,700 2,695 1,700 2,690 1,700 ▼ Excavation 01 (Footings)[-1,830.0]
M M
N N
STRUCTURAL LAYOUT_ BASIC 3D CUTOUT VIEW [Cut Plane: Section 'D' -'D']
RC FOOTERS & BASIC REINFORCEMENT OVERVIEW SCALE : N/A
REINFORCED CONCRETE FOOTERS & BASIC VERTICAL REINFORCEMENT FOR: COLUMNS/PEDESTALS, RETAINING & SIDE WALLS, MANHOLE PIT. Reinforcement details exclude cover and rebar layer spacers.
O Project Name: DRURY'S WEIGHBRIDGE STRUCTURE [CIVIL WORKS] No. Description Date O
CONTRACTOR: DEUB ENGINEERING STRUCTURAL ENGINEERS: Essae Digitronics Pvt Ltd
GENERAL NOTES SPECIFIC NOTES Sign : DESIGN STAGE: CONSTRUCTION References :TSD-CV-STDR-42
1. This drawing is ONLY for construction references 1. FOUNDATIONS 2. CONCRETE MIXES 3. REINFORCEMENT 4. MINIMUM COVER TO REINF. IN 5. ABBREVIATIONS 6. OTHER NOTES Designed by : Verified : Approved : File : Date : Rev. Date:
P 2. Original Structural drawings by Essae supersedes this They shall generally be taken 1200mm min. below existing ground level Reinforced concrete to have a (a) Ribbed bars (>500N/mm²) to be Ribbed cold formed (a) Foundations = 50mm M.C = Mass Concrete All dimensions to be confirmed on site. D.E.S __ __ 10401 OCT.2022 CLIENT: DRURY AGRO PROCESSING LTD P
construction drawing incase of any Clarification. after removal of organic layer and all excavations to be confirmed by min. works cube strength of bars to BS4449 / IS:1786 and are marked "T" on these dwgs (b) Beams = 30mm R.C = Reinforced Concrete
CONSTRUCTION DRAWING: LOCATION: KAMPALA - UGANDA
TITLE:
CONSTRUCTION DRAWINGS: FOOTINGS & REBAR
3. This drawing is STRICTLY copyrighted to the designer. the Engineer before concrete blinding is laid. 25N/mm² at 28 days with 20mm (b) Any Mild steel bars (250N/mm²) marked "R" on these (c) Columns/ Pedestals = 40mm T = Top This drawing must be read in FOOTING & VERTICAL REINFORCEMENT
2. The designer takes no obligation for any faults and errors Weak pockets of bearing strata to be dug out and filled with 1:4:8 max. aggregate size dwgs to be round bars to BS4483 (d) Retaining Wall = 25mm B = Bottom conjunction with the original Structural FOUNDATION GUIDE DETAILS Dwg No.: 10401DWB/CD/01.04
in the Structural design on this project. Essae's Civil EXCAVATIONS & REINFORCED CONCRETE DETAILS: Revision:Sheet:
mass concrete. (c) Structural steel shall confirm to IS: 2062 drawings from Essae. Project No.:
Structural Drawings (STD-CV-STDR-42) takes precedence. [REFER TO INDICATED TITLES] 10401DWB/CD 00 04 of 05 A0 Scale AS INDICATED
GSPublisherVersion 0.0.100.100
1 2 3 4 5 6 7 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
.D
A B C D E
A 745 4,395 4,395 4,395 4,395
_
745
1 2 A
.B
200 435 2,500 435
300 245 4,395 4,395 4,395 4,395 5 745
60 60
150 450 2,050 450 150
18,465 +0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0
425
200 20 20
480
[-470.0] Foundation Plates' Top ▼ ▼ Foundation Plates' Top [-470.0]
300 450 3,945 450 3,945 450 3,945 450 3,940 450 200 305
B [-480.0] Columns/Pedestals' Top ▼ ▼ Columns/Pedestals' Top [-480.0] B
60 150
65
65
65
65
150
150
500
500
65
150
60
150
2 2
900
450
450
285
150
65 60 450 2,050 450 60 150
350
2,500
2,500
.A .A
2,500
3,370
3,070
2,050
2,050
3,070
3,370
C [-1,730.0] Blinding Footing Top ▼ ▼ Blinding Footing Top [-1,730.0] C
100
[-1,830.0] Excavation 01 (Footings) ▼ 3,700 ▼ Excavation 01 (Footings)[-1,830.0]
1 1
450
450
GENERAL OVERVIEW LAYOUT SCALE 1:25
150
150
150
500
500
150
60
150
150
DETAILING ALL ELEMENTS: FOOTINGS | COLUMNS/PEDESTALS | RETAINING WALL | SIDE WALL | MANHOLE PIT & COVER | EDGE PROTECTION | MANHOLE PLATE | FOUNDATION PLATE
60
65
215
65
65
65
D D
600
150
750
20 20
200 450 3,945 450 3,945 450 1,530 150 600 150 1,515 450 3,940 450 200
18,465
.B
E 4,395 4,395 4,395 4,395
E
_
.D
A B C D E
.D
A B C D E
_
445 4,395 4,395 4,395 4,395 440
.B
200 195
245 200 3,995 200 200 3,995 200 200 3,995 200 200 3,990 205 245
45 45
200 400 3,995 400 3,995 400 3,995 400 3,990 400 200
150
45
185
185
125
500
65
335
2 1
435
60
125
100
2 2
45 110
200
100
200
200
125
125
125
435 2,500 1,185
H H
150 60 450 2,050 450 60 900
+0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0
2,500
2,500
.A .A
2,300
2,300
2,050
2,050
2,300
3,370
2,175
480
[-470.0] Foundation Plates' Top ▼ ▼ Foundation Plates' Top [-470.0]
45
125
100
200
200
200
1 1
45 110
200
100
125
125
435
I I
185
500
335
60
900
125
185
2,080
60
150
150
65
900
Slope: 1:100
[-1,380.0] Footings' Top ▼
350
900 ▼ [-1,480.0] Excavation 02 (Mass conc Slab)
[-1,730.0] Blinding Footing Top ▼
1,025
100
J STRUCTURAL LAYOUT_ FLOOR PLAN [-1,830.0] Excavation 01 (Footings) ▼ ▼ Footings' Top [-2,080.0]
J
350
FOUNDATION PLATES SCALE 1:40
▼ Blinding Footing Top [-2,430.0]
DETAILING : FOUNDATION PLATE, COLUMNS/PEDESTALS | RETAINING WALL | SIDE WALL | MANHOLE PIT & COVER | EDGE PROTECTION | MANHOLE PLATE
A B C D _ E
100
100
950 2,370 1,000 ▼ Excavation 01 (Footings)[-2,530.0]
20
445 4,395 4,395 4,395 4,395 440 20
200 450 3,945 450 3,945 225 225 3,945 450 3,940 450 200
STRUCTURAL LAYOUT_ SECTION VIEW 'D'-'D'
+0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0
200
[-470.0] Foundation Plates' Top ▼ 4,340 300
▼ Foundation Plates' Top [-470.0]
[-480.0] Columns/Pedestals' Top ▼ ▼ Columns/Pedestals' Top [-480.0]
DETAILING ALL ELEMENTS: FOOTINGS | COLUMNS/PEDESTALS | RETAINING WALL | SIDE WALL | MANHOLE PIT & COVER | EDGE PROTECTION | MANHOLE PLATE | FOUNDATION PLATE
1,500 2,890 1,500 2,895 1,500 Slope: 1:100 2,895 Slope: 1:100 1,500 2,890 1,500
[-1,380.0] Footings' Top ▼ ▼ Footings' Top [-1,380.0]
[-1,730.0] Blinding Footing Top ▼ [-1,480.0] Excavation 02 (Mass conc Slab) ▼ [-1,480.0] Excavation 02 (Mass conc Slab) ▼ [-1,480.0] Excavation 02 (Mass conc Slab) ▼ [-1,480.0] Excavation 02 (Mass conc Slab) ▼ ▼ Blinding Footing Top [-1,730.0]
[-1,830.0] Excavation 01 (Footings) ▼ 1,700 2,690 1,700 2,695 1,700 2,695 1,700 2,690 1,700 ▼ Excavation 01 (Footings)[-1,830.0]
M M
N N
STRUCTURAL LAYOUT_ BASIC 3D CUTOUT VIEW [Cut Plane: Section 'D' -'D']
GENERAL OVERVIEW LAYOUT SCALE : N/A
DETAILING ALL ELEMENTS: FOOTINGS | COLUMNS/PEDESTALS | RETAINING WALL | SIDE WALL | MANHOLE PIT & COVER | EDGE PROTECTION | MANHOLE PLATE | FOUNDATION PLATE
O Project Name: DRURY'S WEIGHBRIDGE STRUCTURE [CIVIL WORKS] No. Description Date O
CONTRACTOR: DEUB ENGINEERING STRUCTURAL ENGINEERS: Essae Digitronics Pvt Ltd
GENERAL NOTES SPECIFIC NOTES Sign : DESIGN STAGE: CONSTRUCTION References :TSD-CV-STDR-42
1. This drawing is ONLY for construction references 1. FOUNDATIONS 2. CONCRETE MIXES 3. REINFORCEMENT 4. MINIMUM COVER TO REINF. IN 5. ABBREVIATIONS 6. OTHER NOTES Designed by : Verified : Approved : File : Date : Rev. Date:
P 2. Original Structural drawings by Essae supersedes this They shall generally be taken 1200mm min. below existing ground level Reinforced concrete to have a (a) Ribbed bars (>500N/mm²) to be Ribbed cold formed (a) Foundations = 50mm M.C = Mass Concrete All dimensions to be confirmed on site. D.E.S __ __ 10401 OCT.2022 CLIENT: DRURY AGRO PROCESSING LTD P
construction drawing incase of any Clarification. after removal of organic layer and all excavations to be confirmed by min. works cube strength of bars to BS4449 / IS:1786 and are marked "T" on these dwgs (b) Beams = 30mm R.C = Reinforced Concrete
CONSTRUCTION DRAWING: LOCATION: KAMPALA - UGANDA
TITLE:
CONSTRUCTION DRAWINGS: FOUNDATION PLATES
3. This drawing is STRICTLY copyrighted to the designer. the Engineer before concrete blinding is laid. 25N/mm² at 28 days with 20mm (b) Any Mild steel bars (250N/mm²) marked "R" on these (c) Columns/ Pedestals = 40mm T = Top This drawing must be read in FOUNDATION PLATES & RETAINING WALL LAYOUT
2. The designer takes no obligation for any faults and errors Weak pockets of bearing strata to be dug out and filled with 1:4:8 max. aggregate size dwgs to be round bars to BS4483 (d) Retaining Wall = 25mm B = Bottom conjunction with the original Structural FOUNDATION GUIDE DETAILS Dwg No.: 10401DWB/CD/01.05
in the Structural design on this project. Essae's Civil EXCAVATIONS & REINFORCED CONCRETE DETAILS: Revision:Sheet:
mass concrete. (c) Structural steel shall confirm to IS: 2062 drawings from Essae. Project No.:
Structural Drawings (STD-CV-STDR-42) takes precedence. [REFER TO INDICATED TITLES] 10401DWB/CD 00 05 of 05 A0 Scale AS INDICATED
GSPublisherVersion 0.0.100.100
1 2 3 4 5 6 7 10 11 12 13 14 15 16