PROJECT : CON

SAP
Cost
S No Item No WBS
Code
Code
1 2
A EXCAVATION(OPEN/UNDERGROUND)

1 A101 TUN OE

1_1 A101a TUN EF


2 A102 TUN UE

2_1 A1021 TUN GR

2_2 A1022 TUN FR


2_3 A1023 TUN PR
2_4 A1024 TUN PR1

2_5 A1025 TUN PR2

2_6 A1026 TUN PR3

2_7 A1027 TUN ET


3 A103 TUN EE

4 A104 TUN RM

5 A105 TUN ED

B1 ROCKBOLT AND OTHER STEEL SUPPORT

1 B101

1_1 B1011
1_2 B1012

2 B102

TUN SN
2_1 B1021
3
TUN SN
2_2 B1022
4
TUN SN
2_3 B1023
6
TUN SN
2_4 B1024
9

2_5 B102A

2_7 B102A1

3 B103

3_1 B1031
3_2 B1032
3_3 B1033
3_4 B1034
3A B103A

B103A1

4 B104

4_1 B1041

5 B105

5_1 B1051
5_2 B1052
5_3 B1053

6 B106

7 B107

8 B108
9 B109

10 B110

11 B111

12 B112

13 B113

B113A

B2 SHOTCRETE AND CONCRETE WORK

1 B201

1_1 B 2011
1_2 B 2012
1_3 B 2013
1_4 B 2014
1_5 B 2015
1_6 B 2016
1_7 B 2017

1_8 B 2018

1_9 B2019

1_10 B20110

1_11 B20111

2 B202

2_1 B2021
2_2 B2022
2_3 B2023

2_4 B2024

2_5 B2025

3 B203
3_1 B2031
3_2 B2032

4 B204

5 B205

C DRAINAGE AND MISCELLEANEOUS WORK


1 C101

1_1 C1011
1_2 C1012

2 C102

2_1 C1021
2_2 C1022
2_3 C1023

3 C103

4 C104

5 C105

5_1 C1051
5_2 C1052b
5_3 C1053
5_4 C1054
5_5 C1055
5_6 C1055a
5_7 C1055b
5_8 C1056

6 C106

6_1 C1061
6_2 C1062
6_3 C1063

7 C107

8 C108

9 C109

10 C110

11 C111

11_1 C1111
11_2 C1112
11_3 C1113

12 C112

12_1 C1121
12_2 C1122

13 C113
14 C114

15 C115

16 C116

D GEOTECHNICAL AND INSTRUMENTATION

1 D101

2 D102

3 D103

4 D104

5 D105

6 D106
7 D107

8 D108

9 D109

E APPROACH ROADS TO PORTALS(T12-P1, T12-P2)(approx,2000m long) including nalla crossing, p

1 E101

1_1 E1011

2 E102

3 E103

4 E104

5 E105

6 E106
7 E107

8 E108

8_1 E1081

9 E109

9_1 E1091
9_2 E1092

10 E1010

11 E1011

12 E1012

13 E1013

14 E1014

14_1 E10141
14_2 E10142
15 E1015

15_1 E1015

16 E1016

16_1 E10161

17 E1017

F UNFORESEEN ITEMS OF WORK


1 F101
CS-DHORAJIA PROJECTS
PROJECT : CONSTRUCTION OF TUNNEL T12 & T13 SI
BILL OF QUANTITIES

Description of Items
3
EN/UNDERGROUND)
Valid for all items for Division A1: "Excavation" include plant, logistics, equipment, manpower, materials, auxiliary wo
operational costs. All equipment used shall be suitable to perform the works as per contract and according to the sta
the deployment and use of the appropriate equipment at the various work sites (i.e. for works in open areas, main tu
roads water basins) shall be included in all items.

Excavation to lines and levels as required by the prevailing geotechnical conditions for installation of support as sho
Engineer in portal areas and rescue place sites with limited access to construct berms, surface drains, divert natura
includes:
excavation of all types of ground (soils and rock) by any means of excavation (i.e. digging, blasting).
sequential excavation at limited height and slope support as shown on the drawings resp. as directed by the Engine
conditions. Support elements will be paid separately
cutting of trees, shrubs, roots and other vegetation including loading onto transport, transportation and appropriate d
clearing of loose debris and loosened rock above cuts
appropriate measures for diversion of any waters
loading of excavated material onto transport, ascending and descending handling of excavation and materials, trans
from point of excavation to center of gravity of designated depositing sites and appropriate depositing and compact
complete job as per specification or as directed by the Engineer in charge including handling if required
setting out and demarcation of earthworks and muck deposits
security fencing along top of cut
Measurement and payment shall be for volumes in their solid states as per drawings based on contractor's survay b
shall be submitted to the Engineer for approval prior to excavation.

Earthworks for fills with suitable excavation material. These items include:
Supply of suitable, free draining filling material
Transport of suitable, free draining material to filling site
Selection, segregation, processing and appropriate temporary restoring of excavated material
Placing of the fill material in layers not exceeding 300 mm
Compaction and levelling of the fill material according to standards (RDSO), technical specifications and directed by
Appropriate preparation of the surface (re-cultivation) to lines and levels as a complete job as per specificati
Engineer-in-Charge
Measurement and payment shall be for the volume of fill material in its solid compacted state as
shown on the design drawings.
Underground excavation (Top Heading, Bench, Invert) for main tunnel, adit (vehicular and pedestrian), niches (Elect
and connection of the main tunnel to the adit by all means of excavation (drilling, blasting/ control blasting (wherever
accordance with the New Austrian Tunnelling Method (NATM). This item includes:
Mandatory excavation in sub divisons (Top heading, bench and invert) according to geometries, excavation and sup
described in the technical specifications
in rock the application of smooth blasting techniques with contour hole spacing not exceeding 300 mm
Simultaneous excavation works in top heading, and half sided benching in rail tunnels as per technical specifications
Systematic exploratory drillholes
Appropriate Plant and Equipment with appropriate size specifically selected for the various tunnel sizes and as decla
Face maping & Rock Classification after each blast.
Provision of drainages for all surfaces with vehicular circulation
Provision of adequate lighting and construction ventilation
Temporary backfilling with suitable compactable, free draining material of a minimum thickness of
400 mm for enabling maintenance with grader to facilitate vehicular circulation in tunnel. Complementing the backfill
removal,
transport (independent from distance) and depositing at designated deposit areas.
Profiling and re-profiling of tunnel to achieve the dimensions of approved cross sections
Loading and unloading of excavated material, transportation to muck deposits up to a distance of
2.0 km (one way) from portal head to designated muck deposit areas. (The lead shall always be measured from por
tunnel)
Water inflow up to 50 l/s measured within a distance of 20 m from the tunnel face
Removal and appropriate depositing (i.e. segregation of reinforcement) of non-permanent support measures (i.e. fac
Excavation for trenches, shafts, manholes etc.
Measurement and payment for excavation shall be for volumes in their solid in-situ states measured along the A-Li
specifications. No payment shall be granted if work sequences as shown on design drawings, technical specification

Excavation in Support Class 1

Excavation in Support Class 2


Excavation in Support Class 3
Excavation in Support Class 4

Excavation in Support Class 5

Excavation in Support Class 6

Extra-over for transportation of spoil from excavation in open areas for distances from point of excavation to the cen
km single (one way distance). Measurement and payment will be per cum per km (cum x km). Volumes in cum shall
solid states.
Example: Distance from point of excavation to centre of gravity of muck deposit is 6.0 km. The Quantity excavated is
therefore for 6.0 km minus 2.0 km = 4.0 km times 100 cum.
Extra payment would be for 400 cum KM.
Extra-over for tunnel excavation under excessive water inflow conditions (measured as greater than 50 l/s and confi
excavation face). Accumulation of measured quantities of water inflow is not permitted. Determination of the water q
at 20 m distance to the face by means of a pump and flow meter or other suitable arrangements proposed by the Co
Engineer. Payment as per volume of theoretical tunnel excavation under the respective water

Rehandling of muck as per directions of engineer including loading and transportation at for all leads and lift
Excavation of drain channels inside tunnel with hydraulic hammer for construction drainage trenches in all types of r

OTHER STEEL SUPPORT


All items for: "Rock bolts and other steel support" include plant, logistics, equipment, manpower, time for installation
operational costs. Materials used shall at least meet the minimum requirements of the technical specifications. All eq
properly. The costs associated with using appropriate equipment with suitable size of rock bolting as per drawings a
areas, main tunnel, escape tunnel, side adits, cross passages, roads, location with limited access) shall be included

Supply, drilling, testing and installation of Swellex type rockbolts of the specified length, ultimate load Fy>=200kN (tu
specifications or as directed by Engineer.The rate shall include costs of all materials, labour, equipment, etc. require

Length 3m
Length 4m
SN type rock bolts for tunnel support, slope support, face bolts etc.
Supply, drilling, installation, grouting and testing of SN type rock bolts of specified length L, 200kN minimum ultimate
specifications or as directed by Engineer. Measurement and payment shall be per piece tested and accepted insta
specifications).

Length 3m

Length 4m

Length 6m

Length 9m

Supply, drilling, installation, testing and grouting of fibre glass all thread rock bolts of specified length and ultimate st
approved drawings pand specifications or as directed by Engineer. The rate shall include costs of all material, labou

Length 9m.
Self drilling rock bolts (IBO) for tunnel support, slope support, face bolts etc. Supply, drilling, installation, grouting an
length L, specified minimum ultimate load as per design drawings (Fy=200kN), technical specifications or as directed
mandatory. This item includes:
couplings
sacrificial drilling bits + grouting
Measurement and payment shall be per piece appropriately installed rock bolts (for exact payment details see speci

Length 3 m,
Length 4 m,
Length 6 m,
Length 9 m,
Supply , drilling, installation, testing and grouting of Fibre Glass Self -drilling type rockbolts of the specified length an
KN, as per approved drawings & specifications or as directed by Engineer. The rate shall include costs of all materia
complete job.

Length 9 m,
Pipe Roof Umbrella: Supply, drilling, installation and grouting of self-drilling pipe technology of length up to 18m as p
row, double row, skin-to-skin single row) or as directed by Engineer. The rate shall include costs of all materials like
grouting packers etc., labour, equipments, etc. required for the complete job.
This item includes:
Mobilistaion and demobilsation of all equipment necessary (drilling jumbo equipped with AT- casing system, Symme
to skin single row
the necessary excavation
loading, transport and appropriate depositing of the excavated material
the excess use of inner lining concrete and waterproofing
all auxiliary works and materials necessary
Measurement and payment shall be per meter installed pipe roof pipe as directed and approved by Engineer

Outer diameter 76mm, steel grade S355, wall thickness 6,3mm (Pipe Connection Types = Nipple Coupling)
Supply, drilling hole, installation, testing and grouting of forepoling as per approved drawings & specifications or as d
load. The rate shall include costs of all materials, labour, equipments, etc. required for the complete job.

Self-drilling bolts, Fy >= 200 KN


Reinforcement bars 32mm dia
Steel pipe 40 mm dia - Wall thickness 4 mm
Supply, fabrication, storing and erection of lattice girders . Geometries shall be as shown on design drawings, in tech
These items include:
all necessary elements for connection of lattice girder partitions, such as connection plate, connection bolts and nuts
all auxiliary materials
bearing elements
Minimum steel grade is Fe 500. For underground works, measurement and payment shall be for the theoretical leng
line as shown on design drawings and in the technical specifications.

Supply, cutting, bending, placing, binding steel reinforcement of grade Fe 500 as per approved drawings & specifica
reinforcement of initial and final lining. This shall include straightening, hooking all lead, lift, all auxiliary materials, etc
reinforcement and binding wire).

Supply and placement of welded wire mesh of sizes 150x150x6, 100x100x6 or any other size as directed by Engine
tunnel lining works as shown
on design drawings, specifications or as directed by Engineer. Steel grade minimum Fe500. This item also includes:
Fixing elements and materials
cutting, bending and placement
all auxiliary materials and works necessary
Measurement and payment shall be per square meter for each layer installed and instructed, measured along Paym
mentioned in technical specifications is mandatory but shall not be paid
extra.
Supply, fabrication and erection of steel rib and all accessories including all lead, lift, wastage,storing,drilling holes, f
accessories for joining the steel rib segments as per approved workshop drawings of contractor & specifications or a
costs of all materials, labour, equipment,welding, etc
for the complete job including additional cost for enlargement
of top heading footing.

Permanent anchorage using prestressed bar anchors D32mm, fp 0.1k/fpk = 950/1050 N/mm2, with an average len
grouting and prestress really installed of 200 KN as per approved drawings & specifications or as directed by Engine
labout, equipments, etc. required for the complete job as per drawings, specifications or as directed by the Engineer
per m measured on the drawings.

Special treatment Tube-A-Manchette steel dia int 40mm and ext 50mm for grout injection through sleeves valves @
75mm (Fe 500) at peripheral position, distribution defined as per the decision of Engineer in charge.The rate shall in
grouting of the pipe and ground consolidation injection by TAM
sleeves, etc. required for the complete job.

Special treatment Tube-A-Manchette hard PVC dia int 40mm and ext 50mm for grout injection through sleeves valve
peripheral position, distribution defined as per the decision of Engineer in charge.The rate shall include costs of all m
and ground consolidation injection by TAM sleeves, etc. required for
the complete job.

Supply, drilling and installation of steel micropiles of dia upto 160 mm in vertical position or at an inclination for all kin
approved drawings & specifications or as directed by Engineer. The works include: drilling D200mm, installation of th
up to fulfill the volume drilled no ocupated by the pipe. The rate shall include all labour, materials, connectors, weldin
M35 grade of grout, wastage complete with contractor's own equipment as a complete job as per specifications or a

For Open work

CONCRETE WORK
All items for sprayed concrete and concrete works include procurement, fabrication, transportation, delivery, approp
installation, plant, equipment, logistics and all other operational costs. Materials used shall at least meet the minimu
All equipment used shall be suitable to perform works properly. The costs associated with using appropriate equipm
open areas, main tunnel, escape tunnel, side adits, cross passages, roads, location with limited access) shall be inc

Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as s
specifications and directed by the Engineer. These items include:
sprayed concrete of grade M25 according to Indian Standard
all concrete additives
wastage of sprayed concrete
rebound
application of shotcrete in multiple layers
all auxiliary materials and works
Measurement and payment shall be for the theoretical area or volume as shown on the design drawings in square m
Line (see specifications).

50 mm thick shotcrete lining in tunnel


100 mm thick shotcrete lining in tunnel
150 mm thick shotcrete lining in tunnel
200 mm thick shotcrete lining in tunnel
250 mm thick shotcrete lining in tunnel
300 mm thick shotcrete lining in tunnel
shotcrete lining for overbeak as per technical specification
Sprayed concrete works for filling of cavities not caused by fault of contractor due to unavoidable overbreak which h
exceeds a volume of 2 m³ in each individual case. This item includes:
sprayed concrete of grade M25 according to Indian Standard
wastage of sprayed concrete
rebound
all auxiliary materials and works
Measurement and payment shall be for the volume of sprayed concrete beyond the boundary surface 'A line' actuall

Shotcrete in slope stabilization


Sprayed concrete works for smoothening layer of 30mm and support of the waterproofing membrane complying with
design drawings, in technical specifications or as directed by the Engineer. This item includes:
-sprayed concrete of grade M25 according to Indian Standard, maximum aggregate size 8mm
-wastage of sprayed concrete
-rebound
-all auxiliary materials and works
-washing down with hot water right before installig of waterproofing system (high pressure water jet, minimum press
Measurement and payment shall for the theoretical area as shown on the design drawings in square metres,
measured along Payment-Line

Extra for over item no B201 for supply and mixing of steel fibre double end hooked loose steel fibres of circular cros
ratio equal to 49 conforming to EC- certificate of conformity as per EN14889 and tensile strength more than 1100M
specification and as directed by Engineer
Concrete works for construction of inner lining , inverts etc. as shown on design drawings, in technical specification a
include:
Design Mix Cement Concrete of grade M30, machine mixed, machine vibrated
all concrete additives
Formwork, falsework and scaffolding: number as specified in the contract
formwork carriages (number as specified in the contract) with adjustment facilities for inner-lining construction
Contact grouting between primary and inner lining
All difficulties due to requirements for cable ducts, pipes or similar
All difficulties due to reinforcement installation
All difficulties due to requirements of niches, junctions, cross passages, manholes, widenings etc.
Curing of concrete to ensure concrete quality as described in the specifications
sealing and curing agent
concrete for filling in case of GOB Deformation of Initial Lining (DIL)
Measurement and payment shall be for the theoretical measured volumes of concrete as shown on the design draw

Inner lining of main tunnel, Adit & niches with movable Shutter and / or Radial Formwork
Inner lining of main tunnel, Adit & niches for Invert
Construction , dowel jointed, cement concrete pavement of M30 grade concrete with 43 grade cement, coarse and
size of coarse aggregate not exceeding 25mm, mixed in a batching plant as per approved mix design, transported a
by fixed shuttering, spread, compacted and finished in a continuous operation and texturing, including provision of c
longitudinal joints, joint filler, seperation membrane,sealant primer, joint sealant, debonding strip, dowel bar, tie bar/r
finishing to lines and grades as per drawing. Item rate shall be inclusive of all material, taxes, duties, manpower, equ
Reinforcement will be paid separately under the item of reinforcement.

Manholes as shown on design drawings, in technical specification and as directed by the Engineer. These items inc
-Manufacture of manholes either on-site or off-site
-Design Mix Cement Concrete of grade M30, machine mixed, machine vibrated
Measurement and payment shall be for the theoretical quantity of manholes as shown on the design drawings.
Reinforcement will be paid separately under items of reinforcement.

Providing and installing of drainage gutters with M30 grade concrete within the non-ballast trackbed as shown on
as directed by the Engineer. These items include:
all auxiliary works and materials necessary (bedding etc.) as per drawing
all connections of drainage pipes and therefore necessary types of gutters
casts

Design Mix Cement Concrete M15 in following PCC works including mechanically mixed machine mixed, machine b
specifications & drawings or as directed by Engineer-in charge
For all kinds of structures required (bed, portals, blinding, lean, protection lean concrete)
No-fines porous concrete in tunnel
Design Mix Cement Concrete M35 in RCC works including machine mixed, machine batched, machine vibrated, form
as directed by Engineer-in charge
all concrete additives
Formwork, falsework and scaffolding: number as specified in the contract
formwork carriages (number as specified in the contract) with adjustment facilities for inner-lining construction
Contact grouting between primary and inner lining
All difficulties due to requirements for cable ducts, pipes or similar
All difficulties due to reinforcement installation
All difficulties due to requirements of niches, junctions, cross passages, manholes, widenings etc.
Curing of concrete to ensure concrete quality as described in the specifications
sealing and curing agent
concrete for filling in case of GOB Deformation of Initial Lining (DIL)
Measurement and payment shall be for the theoretical measured volumes of concrete as shown on the design draw

M30 RCC for Cladding Wall. Design mix cement concrete including machine mixed, machine batched, machine vibr
consumables (including additives), tools & plants, equipments, machineries, all lead & lifts, loading, unloading, wasta
form work, shuttering, centering, scaffolding, fixing and removing thereof, levelling, finishing of exposed surfac

MISCELLEANEOUS WORK
All items for drainage works and works for cable ducts include procurement, manufacture, transportation, delivery, a
formwork, plant, equipment, logistics, manpower and all other operational costs. All equipment used shall be suitab
associated with using appropriate equipment at different construction sites (i.e., works in open areas, main tunnel, e
roads) shall be included in all items.

Providing and installing PVC pipes of following diameters in the tunnel as per approved drawings &
specifications or as directed by Engineer.
35mm
50mm
Providing and installation of perforated pipes . The pipes are protected by geotextile membrane as shown on design
directed by the Engineer. These items include:
all connections and valves
protection by geotextile membrane
all necessary equipment (i.e. drilling jumbo equipped with AT-casing system)
other protection to ensure functionality as required locally
Measurement and payment shall be for the actual length measured along the pipe axis in linear metres as confirme

35 mm internal dia PVC pipe


50 mm internal dia PVC pipe
150 mm internal dia PVC pipe (Fully perforated for side drain)
Drilling of different dia holes (diameter 42mm to 62mm) in shotcrete / lining as weep holes / relief holes of required l
in any direction as per approved drawings and specifications or as directed by the Engineer. These items also includ
-drilling through sprayed concrete, walls, reinforcement
-drilling in presence of water
-all measures necessary in soft ground to ensure the stability of the drainage hole
Measurement and payment shall be for the actual length of drainage holes drilled in linear metres.

Drilling of different dia holes (diameter 42mm to 62mm) in rock/ soil of required length in any direction as per approv
the Engineer. These items also include:
drilling through sprayed concrete, walls, reinforcement
drilling in presence of water
all measures necessary in soft ground to ensure the stability of the drainage hole
Measurement and payment shall be for the actual length of drainage holes drilled in linear metres.

Drilling of exploratory holes up to 35m length with specified diameter in any direction as per the technical specificatio
presence of an expert geologist. These items also include:
-drilling through sprayed concrete, walls, reinforcement
-drilling in presence of water
-all measures necessary in soft ground to ensure the stability of the drainage hole
Measurement and payment shall be for the actual length of drainage holes drilled in linear metres.

Horizontal/sub horizontal in all kinds of rock dia, equal or greater than 50mm
Horizontal/sub horizontal in all kinds of soft ground dia, equal or greater than 50mm
Vertical (downwards) in all kinds of rock dia, equal or greater than 50mm
Vertical (downwards) in all kinds of soft ground dia, equal or greater than 50mm
Drilling for installation of monitoring instruments up to 90 mm diameter in all kinds of rock and in any direction, includ
mouth up to diameter of 120 mm
Up to 12m length
Up to 30m length
Drilling for installation of monitoring instruments up to 90 mm diameter in all kinds of soft ground and in any direction
borehole mouth up to diameter of 120 mm (up to 12m length)
Providing and laying of pipes (i.e. collector pipe, connection pipes) of specified diameter as shown on design drawin
the Engineer. Thes items include:
pipe bedding and support, and all materials required for this
all moulded parts
all connections and valves
backfilling if required
protection against environmental influences (e.g. at conncetions from tunnel portal to the waste water basin)
earthwork, rock excavation, support where necessary (in open areas)
Measurement and payment shall be for the actual length measured along the pipe axis in linear metres as confirmed

300 mm dia HDPE main drainage pipe at bottom (main collector pipes)
200 mm dia HDPE main drainage pipe
100 mm dia PVC pipe lateral drainage pipes (connection pipes)
Providing, laying and fixing of Protective Felt (geotextile ) with a minimum weight of 700 g/m2 for protection of the w
finished outer lining surface, including the cost of all materials, labour, equipments, etc. required for the completion o
Engineer

Providing, placing, welding of 2 mm thick PVC or ECB Water Proofing Membrane including the cost of all materials,
completion of job, as per
specifications or as directed by the Engineer

PVC Water stop serrated with central bulb (min. 225mm wide, 8-11mm thick)
Pumping of water by furnishing,transporting,installing the equipment & system including pneumatic pumps as per th
directed by the Engineer.( Note: Payment will be made only for actual use for dewatering as payable as per specifica
the certified Log book for each pump by the Engineer)

Providing and fixing of earthing flat bar of galvanized iron as shown on design drawings, in technical specifications o
These items also include:
all necessary auxiliary works and materials
all necessry works and materials for connection of earthing flat bars
routing to and in niches for provision of sockets etc.
Measurement and payment shall be per metre length shown on design drawings. Extensions for welding shall not be

Longitudinal earthling flat bar, 40 x 4 mm, both sides of the Tunnel,


Transversal earthling flat bar, 40 x 4 mm, Every 250m,
Connection bolt M8 with corresponding nuts and washers
Providing of cable trays/ducts for both cable conduits and fire fighting as shown on design drawings and in technical
-all connections
-all auxiliary works and materials required
Measurement and payment shall be for the actual length installed, measured along tunnel axis, as confirmed by the

Cable Tray/ ducts for conduits dia. 100 mm PVC pipe (2 pipes each tray)
Cable Tray/ ducts for conduits dia. 160 mm PVC pipe - fire fighting supply
Grouting (cement) for ground improvement or filling of voids and cavities using suitable materials and mixtures as ap
in tonnes for the actual quantity of cement used as approved by the Engineer
Delta drain installed at damp areas of the excavation to collect and channelise water infiltration to the provisional or
include costs of all materials, labour, equipments, etc. required for the complete jobas per specificationsor as directe
Charge. Measurement and payment will be per m2 on site measured.

Sand bags installed above steel ribs or lattice girders to fulfill voids during excavation to guarantee permanent conta
shall include costs of all materials, labour, equipments, etc. required for the complete jobas per specificationsor as d
in-Charge. Measurement and payment will be per Tonne on site measured.

Polypropylene Fibres for tunnel lining confirming to technical specifications

AND INSTRUMENTATION
Supply, Installation and monitoring as per approved drawings, calibration/setting, maintenance etc. of the following i
approved supplier (s) / manufacturer(s) for measuring the deformations, loads, pressures etc. on the support in vario
directed by Engineer-in-charge with all
contractors men, material and machinery.

Optical targets (including rods) in the tunnel roof and at wall at selected points along the tunnel roof, at wall and slop
portal to monitor vertical and longitudinal (in tunnel direction) deformation components (3 to 5 nos at each sections)
Engineer-in-charge.

Shotcrete/ Concrete Stress cells NATM style vibrating wire stress cells to measure radial and tangential stresses in
tangential 200Kg/cm^2 and radial 50Kg/cm^2. Accuracy of 0.5%, each cell should be marked with capacity, serial no
similar cable shielded, integral with stress cell for taking observations using the proper readout, Connections/switch/
cell for connecting to readout. The readout should be compatible to vibrating wire stress cell, rechargeable battery o
calibrated with this readout, connector to connect the stress cells, perfectly sealed to make it dust and moisture proo
rechargeable battery

Vibration wire type electrical rock bolt load cell of capacity 25 t of rock bolt load cell including atleast 2 read out units
temperature device range - 450C to 1000C, signal cable 4 core shielded Teflon/PVC or similar cable with PVC pack
lightening protection device alongwith the readout, connector /switch/junction box to be attached to the cable of load
connecting to read out.

Pressure Cells including atleast 2 read out units measuring range 50 Kg/cm^2 vibrating wire type to access the radia
supports from various directions alongwith the readout, switch/junction box to be attached to the PVC / teflon or sim
readout. The readout should be compatible to the vibrating
wire type pressure cell = 0.5%.

Seepage measurement System to measure flow of water from the face of tunnel by using triangular V notch with all-
20lps, including the arrangements for drain etc. Complete
Supply, Installation and monitoring of Multipoint borehole extensometer electronic type (MPBX 3-point) measuring h
and displacement transducers of 0-50 mm range for measuring sub-surface movement in slope for the specified loc
method statement or as directed by Engineer-in-charge complete with S.S./ glass/ carbon fibre connecting rods and
in the boreholes (diameter of boreholes should not less than 76 mm). Sensor: vibrating wire displacement transduce
50mm,accuracy< 0.5% FS,Dial gauge FS=0-50mm resolution 0.01mm.The rate shall include all accessories require
statement.
Supply, fixing and monitoring (as per specifications) of Piezometer (vibrating wire sensors type) as per the drawing o
piezometer shall be designed for water table measurements and measuring pore pressure up to 2MPa with an accu
include all accessories required for installation and as per approved method statement.

Supply, Installation and monitoring of In place inclinometer to measure lateral movement in slope & embankment su
system consisting of following accessories complete in all respect:
Biaxial sensor with SDI-12@ 3 m interval, with pair of wheels for up to 30m depth
Suspension kit with protective cap and placement tubing : 1No.
Spacer assembly for 3 m gage length
Bottom wheel assembly with plug : 1no.
Protective rope to prevent loss of sensor down hole: 1no.
Suspension stainless steel wire rope for positioning sensors: 1 no.
Self aligning ABS tubing, 70mm od, 58 mm id, 3 m length for up to 50m depth.
ABS fixed coupling for 70 mm od. Access tube, 77 mm od x 160 mm length as required for jointing of ABS tubing.
Bottom cap for ABS tubing: 1no.
Dummy probe with 30 m cord: 1no. (Rate excluding Data logger

Data logger for In-place Inclinometer to log data from IPI sensors having
Memoty capacity 2 million data points and communication port to down load data on Laptop/ PC. Real time accuracy

DS TO PORTALS(T12-P1, T12-P2)(approx,2000m long) including nalla crossing, protection work and other ancillary wo
Earthwork in cutting in all kinds of soil and rock including rock requiring use of blasting/ controlled blasting / chiseling
side drains, catch water drains, diversion of nallahs as per technical Specification prescribed in MoRTH, with contrac
plants, equipments, machineries, including all lead & lifts, loading , unloading as
directed by Engineer - in -Charge , etc complete.

In all condition and classifications of soil


Earthwork in formation in embankment by using corporations suitable cut spoils obtained from cuttings and leading,
technical specification prescribed in MoRTH, with contractors men, material, consumables, tools & plants, equipmen
loading , unloading as directed by Engineer - in -Charge , etc. complete.

Cleaning side drains in cuttings by the side of track (Kutcha or Pucca) including disposal of the debris, soil, muck etc
tools & plants, equipments, machineries, including all lead & lifts, loading , unloading as directed by Engineer - in -C

Preparation of sub grade by excavating earth upto 22.5cm depth, dressing to camber and consolidating with power
making good the undulations etc. and disposal of surplus earth with lead upto 50m, as per technical specification pre
material, consumables, tools & plants, equipments, machineries, including all lead & lifts, loading , unloading as dire

Removal of slips beyond theoretical profile and occurred not due to fault of contractor (to be certified by Engineer-in
road construction during the currency of contract, has to be arranged by the contractor by deploying suitable machin

Constructing granular sub base of required compacted thickness as per technical specification prescribed in MoRTH
tools & plants, equipments, machineries, including all lead & lifts, loading , unloading as directed by Engineer - in -C
Constructing Water Bound Macadam base course of required compacted thickness as per technical specification pr
material, consumables, tools & plants, equipments, machineries, all lead & lifts, loading , unloading as directed by E

Supplying & fixing Mandatory/Cautionary/warning/ Informatory retro-reflectorised sign boards as per technical specif
men, material, consumables, tools & plants, equipments, machineries, all lead & lifts, loading , unloading ,as directe

Sign boards of size more than 0.6 sq.m & upto 0.9 sq.m with single post support
Supplying and laying reinforced cement concrete pipes NP2 of various sizes, for culverts on cement concrete levelin
mortar 1:2 as per the drawing and as per specification prescribed in MoRTH, with contractors men, material, consum
all lead & lifts, loading , unloading as directed by Engineer - in -Charge , etc complete. The rate includes Cost of pipe
joining complete and all incidental costs to complete the work as per specification. (Ancillary works such as excavati
masonry shall be paid separately in relevant schedule
items).

600mm dia.
900mm dia.
Random rubble masonry, hammer dressed wherever necessary, in cement and sand 1 :6 in wing wall, toe wall, brea
slope of guide bunds, catch water drains, side drains etc, as per drawing and as per technical specification prescribe
100mm dia. PVC pipe at 1 .Om c/c horizontally and vertically, with contractors men, material, consumables, tools &
lead & lifts, loading ,
unloading ,as directed by Engineer -in -Charge , etc complete.

Providing boulder packing 600mm thick hand packed behind abutments, retaining walls, breast wall, wing walls, etc.
any direction and not less than 30 kg with contractors men, material, consumables, tools & plants, equipments, mac
unloading, as per technical specification prescribed in MoRTH, with contractors men, material, consumables, tools &
lead & lifts, loading ,
unloading as directed by Engineer - in -Charge , etc. complete.

U-PVC Pipe (working Pressure 4 Kg/Sqm) single socketed pipe 110mm dia. for drainag with contractors men, mater
machineries, including all lead & lifts, loading ,
unloading as directed by Engineer - in -Charge , etc. complete.

Providing and laying of knitted of woven crates of size 1 200 mm x 1 200 mm x 6000 mm made of Gl wires of dia. 4.
specification prescribed in MoRTH including supply of stones, placing in position, hand packing , filled with stones/bo
consumables, tools & plants, equipments, machnieries, all lead & lifts, loading, unloading, as
directed by Engineer - in -Charge , etc complete.

Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spr
spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications prescribed
material, consumables, tools & plants, equipments, machnieries, all lead & lifts, loading, unloading, as directed by E

On W.B.M. @ 0.75 Kg/Sqm


On bituminous surface @ 0.50 Kg/Sqm
Providing and laying Dense Bituminous Macadam using crushed stone aggregates of specified grading, premixed w
hot mix to work site by tippers, laying with paver finisher equipped with electronics sensor to the required grade, leve
wheeled, vibratory and tandem rollers as specifications to achieve the desired compaction and density, complete as
contractors men, material, consumables, tools & plants, equipments, machnieries, all lead & lifts, loading, unloading
complete.

65 mm average compacted thickness with bitumen of grade VG-30 @ 5% (Percentage by weight of total mix) and fi
prepared in Batch Type Hot Mix Plant
Providing and laying Bituminous Concrete using crushed stone aggregates of specified grading, premixed with bitum
to work site by tippers, laying with paver finisher equipped with electronics sensor to the required grade, level and al
vibratory and tandem rollers as specifications to achieve the desired compaction and density, complete as specificat
contractors men, material, consumables, tools & plants, equipments, machnieries, all lead & lifts, loading, unloading
Engineer - in -Charge , etc complete.

40 mm compacted thickness with bitumen of grade VG-30 @ 5.5% (Percentage by weight of total mix) and filler @ 2
prepared in Batch Type Hot Mix Plant.
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 m
above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre,
steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal bea
spacer of channel section 150 x 75 x 5 mm, 330 mm long) complete as directed by Engineer - in -Charge

EMS OF WORK
Any other items as per N.F Railways standard schedule of rates (USSOR) not covered in above schedules

Sub Tatal (Schedule A+ Schedule B1+ Schedule B2+ Schedule C + Schedule D + Schedule E + Schedule F=
Add Quoted Percentage @ 4.81% Above
TOTAL VALUE OF WORK=
GST @12%
TOTAL COST INCLUDING GST=
ROUNDING OFF=
Unit BOQ Quantity BOQ Rate (Rs) Original BOQ Amount
4 5 6 7

Cum 184,297.00 ₹ 255.62 ₹ 47,109,999.14

Cum 440.00 ₹ 158.24 ₹ 69,625.60


-

Cum 4,682 ₹ 1,782.68 ₹ 8,346,507.76

Cum 21,949 ₹ 1,782.68 ₹ 39,128,043.32


Cum 109,161 ₹ 1,945.34 ₹ 212,355,259.74
Cum 108,316 ₹ 2,407.88 ₹ 260,811,930.08

Cum 29,940 ₹ 2,557.26 ₹ 76,564,364.40

Cum 15,072 ₹ 2,889.24 ₹ 43,546,625.28

Cum/km 289,120 ₹ 30.99 ₹ 8,959,828.80


Cum 2,750 ₹ 267.80 ₹ 736,450.00

Cum/km 2,750 ₹ 179.27 ₹ 492,992.50

Cum 2,750 ₹ 2,867.24 ₹ 7,884,910.00

TOTAL FOR SCHEDULE A= ₹ 706,006,536.62

Nos 12,709 ₹ 6,002.25 ₹ 76,282,595.25


Nos 220 ₹ 6,953.52 ₹ 1,529,774.40

Nos 4,346 ₹ 1,931.51 ₹ 8,394,342.46

Nos 110 ₹ 2,490.51 ₹ 273,956.10

Nos 30,058 ₹ 3,286.90 ₹ 98,797,640.20

Nos 110 ₹ 6,096.21 ₹ 670,583.10

Nos 829 ₹ 8,385.96 ₹ 6,951,960.84

Nos 110 ₹ 6,605.28 ₹ 726,580.80


Nos 110 ₹ 8,185.03 ₹ 900,353.30
Nos 13,069 ₹ 10,130.04 ₹ 132,389,492.76
Nos 110 ₹ 16,163.98 ₹ 1,778,037.80
Nos 110 ₹ 27,677.70 ₹ 3,044,547.00

meter 9,495 ₹ 7,884.72 ₹ 74,865,416.40

meter 446 ₹ 2,855.46 ₹ 1,273,535.16


meter 8,800 ₹ 643.83 ₹ 5,665,704.00
meter 8,800 ₹ 733.56 ₹ 6,455,328.00

tonne 1,337 ₹ 89,688.76 ₹ 119,913,872.12

tonne 1,026 ₹ 63,136.89 ₹ 64,778,449.14

tonne 109 ₹ 91,561.53 ₹ 9,980,206.77


tonne 492 ₹ 83,817.43 ₹ 41,238,175.56

meter 7,434 ₹ 8,214.53 ₹ 61,066,816.02

meter 1,520 ₹ 10,026.09 ₹ 15,239,656.80

meter 1,311 ₹ 10,012.49 ₹ 13,126,374.39

meter 7,783 ₹ 7,498.31 ₹ 58,359,346.73


TOTAL FOR SCHEDULE FOR B1= ₹ 803,702,745.10

sqm 1,810 ₹ 628.14 ₹ 1,136,933.40


sqm 25,113 ₹ 1,256.27 ₹ 31,548,708.51
sqm 38,012 ₹ 1,884.41 ₹ 71,630,192.92
sqm 440 ₹ 2,512.54 ₹ 1,105,517.60
sqm 42,271 ₹ 3,140.67 ₹ 132,759,261.57
sqm 19,237 ₹ 3,768.81 ₹ 72,500,597.97
cum 14,455 ₹ 12,562.68 ₹ 181,593,539.40

cum 497 ₹ 13,314.55 ₹ 6,617,331.35

cum 1,485 ₹ 13,314.55 ₹ 19,772,106.75

sqm 60,500 ₹ 399.44 ₹ 24,166,120.00

tonne 1,097 ₹ 162,048.81 ₹ 177,767,544.57

cum

cum 28,092 ₹ 8,621.01 ₹ 242,181,412.92


cum 3,599 ₹ 8,621.01 ₹ 31,027,014.99
cum 110 ₹ 9,740.79 ₹ 1,071,486.90

cum 132 ₹ 8,621.01 ₹ 1,137,973.32

cum 110 ₹ 8,621.01 ₹ 948,311.10

cum 945 ₹ 5,619.59 ₹ 5,310,512.55


cum 298 ₹ 5,046.39 ₹ 1,503,824.22

cum 8,932 ₹ 9,139.44 ₹ 81,633,478.08

cum 1,599 ₹ 8,621.01 ₹ 13,784,994.99

TOTAL FOR SCHEDULE FOR B2= ₹ 1,099,196,863.11


meter 275 ₹ 33.05 ₹ 9,088.75
meter 458 ₹ 50.69 ₹ 23,216.02

meter 275 ₹ 163.97 ₹ 45,091.75


meter 62,818 ₹ 160.25 ₹ 10,066,584.50
meter 12,038 ₹ 311.94 ₹ 3,755,133.72

meter 1,144 ₹ 305.42 ₹ 349,400.48

meter 62,818 ₹ 327.55 ₹ 20,576,035.90

meter 4,021 ₹ 1,197.30 ₹ 4,814,343.30


meter 447 ₹ 2,248.53 ₹ 1,005,092.91
meter 458 ₹ 1,502.71 ₹ 688,241.18
meter 44 ₹ 2,937.95 ₹ 129,269.80
meter 275 ₹ 1,197.30 ₹ 329,257.50
meter 275 ₹ 1,797.06 ₹ 494,191.50
meter 121 ₹ 2,248.53 ₹ 272,072.13

meter 13,851 ₹ 3,134.11 ₹ 43,410,557.61


meter 193 ₹ 3,110.62 ₹ 600,349.66
meter 138 ₹ 159.32 ₹ 21,986.16

meter 100,799 ₹ 508.14 ₹ 51,220,003.86

sqm 83,969 ₹ 1,361.34 ₹ 114,310,358.46

meter 8,936 ₹ 508.47 ₹ 4,543,687.92

KWh 1,463,000 ₹ 26.56 ₹ 38,857,280.00

meter 8,936 ₹ 140.96 ₹ 1,259,618.56


meter 165 ₹ 140.96 ₹ 23,258.40
nos 3,574 ₹ 99.17 ₹ 354,433.58

meter 35,834 ₹ 191.44 ₹ 6,860,060.96


meter 28,417 ₹ 315.37 ₹ 8,961,869.29

tonne 6,434 ₹ 10,543.50 ₹ 67,836,879.00


sqm 37,059 ₹ 636.28 ₹ 23,579,900.52

MT 8,042 ₹ 1,231.61 ₹ 9,904,607.62

MT 92 ₹ 196,495.78 ₹ 18,077,611.76
TOTAL FOR SCHEDULE FOR C= ₹ 432,379,482.80

Nos 1,990 ₹ 1,573.29 ₹ 3,130,847.10

Nos 42 ₹ 46,423.25 ₹ 1,949,776.50

Nos 34 ₹ 47,121.45 ₹ 1,602,129.30

Nos 80 ₹ 46,423.25 ₹ 3,713,860.00

Nos 5 ₹ 25,138.80 ₹ 125,694.00

Nos 24 ₹ 47,524.50 ₹ 1,140,588.00


Nos 36 ₹ 10,296.98 ₹ 370,691.28

set 8 ₹ 818,477.50 ₹ 6,547,820.00

set 8 ₹ 459,403.50 ₹ 3,675,228.00

TOTAL FOR SCHEDULE FOR D= ₹ 22,256,634.18

cum

cum 7,329 ₹ 255.62 ₹ 1,873,438.98

cum 8,800 ₹ 92.96 ₹ 818,048.00

cum 1,471 ₹ 153.82 ₹ 226,269.22

Sqm 13,530 ₹ 61.97 ₹ 838,454.10

Cum 1,471 ₹ 100.70 ₹ 148,129.70

Cum 2,200 ₹ 1,976.31 ₹ 4,347,882.00


Cum 2,200 ₹ 3,170.30 ₹ 6,974,660.00

nos 30 ₹ 9,373.04 ₹ 281,191.20

RMT 147 ₹ 3,173.40 ₹ 466,489.80


RMT 440 ₹ 6,158.58 ₹ 2,709,775.20

cum 5,135 ₹ 3,465.62 ₹ 17,795,958.70

cum 1,320 ₹ 1,468.40 ₹ 1,938,288.00

m 1,615 ₹ 214.27 ₹ 346,046.05

cum 1,467 ₹ 1,788.73 ₹ 2,624,066.91

sqm 24,200 ₹ 68.47 ₹ 1,656,974.00


sqm 24,200 ₹ 49.66 ₹ 1,201,772.00
Cum 1,540.00 ₹ 11,253.55 ₹ 17,330,467.00

cum 955.00 ₹ 12,285.31 ₹ 11,732,471.05

RMT 735.00 ₹ 3,799.66 ₹ 2,792,750.10

TOTAL FOR SCHEDULE FOR E= ₹ 76,103,132.01

Rs ₹ 40,000,000.00
TOTAL FOR SCHEDULE FOR E= ₹ 40,000,000.00
₹ 3,179,645,393.82
₹ 152,940,943.44
₹ 3,332,586,337.26
₹ 399,910,360.47
₹ 3,732,496,697.73
₹ 3,732,496,698
134880
CS-DHORAJIA PROJEC
PROJECT : CONSTRUCTION OF TUNNEL T12 & T13

S No Item No

A EXCAVATION(OPEN/UNDERGROUND)

1 A101

1_1 A101a
2 A102

2_1 A1021
2_2 A1022
2_3 A1023
2_4 A1024
2_5 A1025
2_6 A1026

2_7 A1027

3 A103

4 A104
5 A105
CS-DHORAJIA PROJECTS JV
PROJECT : CONSTRUCTION OF TUNNEL T12 & T13 SIVOK- RANGPO RA
BILL OF QUANTITIES

Description of Items

3
EXCAVATION(OPEN/UNDERGROUND)
Valid for all items for Division A1: "Excavation" include plant, logistics, equipment, manpower, materials, auxiliary works
as defined in the specifications and all other operational costs. All equipment used shall be suitable to perform the works
as per contract and according to the state of art technology. The cost associated with the deployment and use of the
appropriate equipment at the various work sites (i.e. for works in open areas, main tunnel, escape tunnel, side adits,
cross passages, roads water basins) shall be included in all items.

Excavation to lines and levels as required by the prevailing geotechnical conditions for installation of support as shown
on the drawings or as directed by the Engineer in portal areas and rescue place sites with limited access to construct
berms, surface drains, divert natural streams, nallah and the like etc. This item includes:
excavation of all types of ground (soils and rock) by any means of excavation (i.e. digging, blasting).
sequential excavation at limited height and slope support as shown on the drawings resp. as directed by the Engineer
following the prevailing geotechnical conditions. Support elements will be paid separately
cutting of trees, shrubs, roots and other vegetation including loading onto transport, transportation and appropriate
depositing, separate from other material
clearing of loose debris and loosened rock above cuts
appropriate measures for diversion of any waters
loading of excavated material onto transport, ascending and descending handling of excavation and materials,
transportation lead up to 2.0 km (one way distance) from point of excavation to center of gravity of designated
depositing sites and appropriate depositing and compaction of the material to lines and levels as a complete job as per
specification or as directed by the Engineer in charge including handling if required
setting out and demarcation of earthworks and muck deposits
security fencing along top of cut
Measurement and payment shall be for volumes in their solid states as per drawings based on contractor's survay before
and after excavation. Contractor's survey shall be submitted to the Engineer for approval prior to excavation.

Earthworks for fills with suitable excavation material. These items include:
Supply of suitable, free draining filling material
Transport of suitable, free draining material to filling site
Selection, segregation, processing and appropriate temporary restoring of excavated material
Placing of the fill material in layers not exceeding 300 mm
Compaction and levelling of the fill material according to standards (RDSO), technical specifications and directed by
Engineer
Appropriate preparation of the surface (re-cultivation) to lines and levels as a complete job as per
specification/as per drawings or as directed by the Engineer-in-Charge
Measurement and payment shall be for the volume of fill material in its solid compacted state as
shown on the design drawings.
Underground excavation (Top Heading, Bench, Invert) for main tunnel, adit (vehicular and pedestrian), niches (Electrical,
Trolley Refuge, turning niche and the like) and connection of the main tunnel to the adit by all means of excavation
(drilling, blasting/ control blasting (wherever required),scaling/ chipping, digging etc) in accordance with the New Austrian
Tunnelling Method (NATM). This item includes:
Mandatory excavation in sub divisons (Top heading, bench and invert) according to geometries, excavation and support
sequence shown on design drawings and as described in the technical specifications
in rock the application of smooth blasting techniques with contour hole spacing not exceeding 300 mm
Simultaneous excavation works in top heading, and half sided benching in rail tunnels as per technical specifications or
as directed by Engineer
Systematic exploratory drillholes
Appropriate Plant and Equipment with appropriate size specifically selected for the various tunnel sizes and as declared
in the technical bid
Face maping & Rock Classification after each blast.
Provision of drainages for all surfaces with vehicular circulation
Provision of adequate lighting and construction ventilation
Temporary backfilling with suitable compactable, free draining material of a minimum thickness of
400 mm for enabling maintenance with grader to facilitate vehicular circulation in tunnel. Complementing the backfill
material throughout the construction period. Its removal,
transport (independent from distance) and depositing at designated deposit areas.
Profiling and re-profiling of tunnel to achieve the dimensions of approved cross sections
Loading and unloading of excavated material, transportation to muck deposits up to a distance of
2.0 km (one way) from portal head to designated muck deposit areas. (The lead shall always be measured from portal
head irrespective of excavation location inside tunnel)
Water inflow up to 50 l/s measured within a distance of 20 m from the tunnel face
Removal and appropriate depositing (i.e. segregation of reinforcement) of non-permanent support measures (i.e. face
sealings, temporary invert arch)
Excavation for trenches, shafts, manholes etc.
Measurement and payment for excavation shall be for volumes in their solid in-situ states measured along the A-Line
as shown on design drawings and in technical specifications. No payment shall be granted if work sequences as shown
on design drawings, technical specifications

Excavation in Support Class 1


Excavation in Support Class 2
Excavation in Support Class 3
Excavation in Support Class 4
Excavation in Support Class 5
Excavation in Support Class 6
Extra-over for transportation of spoil from excavation in open areas for distances from point of excavation to the center of
gravity of muck deposits in excess of 2.0 km single (one way distance). Measurement and payment will be per cum per
km (cum x km). Volumes in cum shall be determined for materials in their original solid states.
Example: Distance from point of excavation to centre of gravity of muck deposit is 6.0 km. The Quantity excavated is 100
cubic metres. Payment under this item is therefore for 6.0 km minus 2.0 km = 4.0 km times 100 cum.
Extra payment would be for 400 cum KM.

Extra-over for tunnel excavation under excessive water inflow conditions (measured as greater than 50 l/s and confirmed
by the Engineer within 20.0m from the excavation face). Accumulation of measured quantities of water inflow is not
permitted. Determination of the water quantities shall be done out of temporary sumps at 20 m distance to the face by
means of a pump and flow meter or other suitable arrangements proposed by the Contractor and approved by the
Engineer. Payment as per volume of theoretical tunnel excavation under the respective water

Rehandling of muck as per directions of engineer including loading and transportation at for all leads and lift
Excavation of drain channels inside tunnel with hydraulic hammer for construction drainage trenches in all types of rock
including disposal of muck as directed
V
OK- RANGPO RAIL PROJECT

Unit BOQ Quantity BOQ Rate (Rs) Original BOQ Amount (Rs Lacs)

4 5 6 7

Cum 184,297.00 ₹ 255.62 ₹ 47,109,999.14

Cum 440.00 ₹ 158.24 ₹ 69,625.60


-

Cum 4,682 ₹ 1,782.68 ₹ 8,346,507.76


Cum 21,949 ₹ 1,782.68 ₹ 39,128,043.32
Cum 109,161 ₹ 1,945.34 ₹ 212,355,259.74
Cum 108,316 ₹ 2,407.88 ₹ 260,811,930.08
Cum 29,940 ₹ 2,557.26 ₹ 76,564,364.40
Cum 15,072 ₹ 2,889.24 ₹ 43,546,625.28

Cum/km 289,120 ₹ 30.99 ₹ 8,959,828.80

Cum 2,750 ₹ 267.80 ₹ 736,450.00

Cum/km 2,750 ₹ 179.27 ₹ 492,992.50


Cum 2,750 ₹ 2,867.24 ₹ 7,884,910.00

TOTAL FOR SCHEDULE A= ₹ 706,006,536.62


CS-DHORAJIA PROJEC
PROJECT : CONSTRUCTION OF TUNNEL T12 & T13

S No Item No

B1 ROCKBOLT AND OTHER STEEL SUPPORT

1 B101

1_1 B1011
1_2 B1012

2 B102

2_1 B1021
2_2 B1022
2_3 B1023
2_4 B1024

2_5 B102A

2_7 B102A1

3 B103

3_1 B1031
3_2 B1032
3_3 B1033
3_4 B1034

3A B103A

B103A1
4 B104

4_1 B1041

5 B105

5_1 B1051
5_2 B1052
5_3 B1053

6 B106

7 B107

8 B108
9 B109

10 B110

11 B111

12 B112

13 B113

B113A
CS-DHORAJIA PROJECTS JV
PROJECT : CONSTRUCTION OF TUNNEL T12 & T13 SIVOK- RANGPO RA
BILL OF QUANTITIES

Description of Items

3
ROCKBOLT AND OTHER STEEL SUPPORT
All items for: "Rock bolts and other steel support" include plant, logistics, equipment, manpower, time for installation,
materials, auxiliary works, and all other operational costs. Materials used shall at least meet the minimum requirements
of the technical specifications. All equipment used shall be suitable to perform works properly. The costs associated with
using appropriate equipment with suitable size of rock bolting as per drawings at different construction sites (i.e., works
in open areas, main tunnel, escape tunnel, side adits, cross passages, roads, location with limited access) shall be
included in all items.

Supply, drilling, testing and installation of Swellex type rockbolts of the specified length, ultimate load Fy>=200kN (tunnel
support) as per approved drawings & specifications or as directed by Engineer.The rate shall include costs of all
materials, labour, equipment, etc. required for the complete job.
Length 3m
Length 4m
SN type rock bolts for tunnel support, slope support, face bolts etc.
Supply, drilling, installation, grouting and testing of SN type rock bolts of specified length L, 200kN minimum ultimate
load as per design drawings, technical specifications or as directed by Engineer. Measurement and payment shall be
per piece tested and accepted installed rock bolt (for exact payment details see specifications).

Length 3m
Length 4m
Length 6m
Length 9m
Supply, drilling, installation, testing and grouting of fibre glass all thread rock bolts of specified length and ultimate
strength Fy>=200KN (for face bolting) as per approved drawings pand specifications or as directed by Engineer. The
rate shall include costs of all material, labour, equipment etc required for the complete job
Length 9m.
Self drilling rock bolts (IBO) for tunnel support, slope support, face bolts etc. Supply, drilling, installation, grouting and
testing of self driling rock bolts of specified length L, specified minimum ultimate load as per design drawings
(Fy=200kN), technical specifications or as directed by Engineer. Drilling with grout flushing is mandatory. This item
includes:
couplings
sacrificial drilling bits + grouting
Measurement and payment shall be per piece appropriately installed rock bolts (for exact payment details see
specifications).

Length 3 m,
Length 4 m,
Length 6 m,
Length 9 m,
Supply , drilling, installation, testing and grouting of Fibre Glass Self -drilling type rockbolts of the specified length and
ultimate strength (for face bolting ), Fy>= 200 KN, as per approved drawings & specifications or as directed by Engineer.
The rate shall include costs of all materials, labour, equipments, etc. required for the complete job.
Length 9 m,
Pipe Roof Umbrella: Supply, drilling, installation and grouting of self-drilling pipe technology of length up to 18m as per
approved drawings & specifications (single row, double row, skin-to-skin single row) or as directed by Engineer. The rate
shall include costs of all materials like starter units, pipes (perforated), drill bits, grouting packers etc., labour,
equipments, etc. required for the complete job.
This item includes:
Mobilistaion and demobilsation of all equipment necessary (drilling jumbo equipped with AT- casing system, Symmetrix
or similar) for single row, double row or skin-to skin single row
the necessary excavation
loading, transport and appropriate depositing of the excavated material
the excess use of inner lining concrete and waterproofing
all auxiliary works and materials necessary
Measurement and payment shall be per meter installed pipe roof pipe as directed and approved by Engineer

Outer diameter 76mm, steel grade S355, wall thickness 6,3mm (Pipe Connection Types = Nipple Coupling)
Supply, drilling hole, installation, testing and grouting of forepoling as per approved drawings & specifications or as
directed by Engineer. 200kN minimum ultimate load. The rate shall include costs of all materials, labour, equipments,
etc. required for the complete job.
Self-drilling bolts, Fy >= 200 KN
Reinforcement bars 32mm dia
Steel pipe 40 mm dia - Wall thickness 4 mm
Supply, fabrication, storing and erection of lattice girders . Geometries shall be as shown on design drawings, in
technical specifications or directed by the Engineer. These items include:
all necessary elements for connection of lattice girder partitions, such as connection plate, connection bolts and nuts etc.
all auxiliary materials
bearing elements
Minimum steel grade is Fe 500. For underground works, measurement and payment shall be for the theoretical length of
lattice girders measured using the Payment line as shown on design drawings and in the technical specifications.

Supply, cutting, bending, placing, binding steel reinforcement of grade Fe 500 as per approved drawings & specifications
or as directed by Engineer, for joint reinforcement of initial and final lining. This shall include straightening, hooking all
lead, lift, all auxiliary materials, etc. (Nothing extra shall be paid for wastage of reinforcement and binding wire).

Supply and placement of welded wire mesh of sizes 150x150x6, 100x100x6 or any other size as directed by Engineer as
reinforcement of sprayed concrete for tunnel lining works as shown
on design drawings, specifications or as directed by Engineer. Steel grade minimum Fe500. This item also includes:
Fixing elements and materials
cutting, bending and placement
all auxiliary materials and works necessary
Measurement and payment shall be per square meter for each layer installed and instructed, measured along Payment
Line (see specifications). Overlapping as mentioned in technical specifications is mandatory but shall not be paid
extra.
Supply, fabrication and erection of steel rib and all accessories including all lead, lift, wastage,storing,drilling holes, fixing
in phases etc. and installation of accessories for joining the steel rib segments as per approved workshop drawings of
contractor & specifications or as directed by Engineer.The rate shall include costs of all materials, labour,
equipment,welding, etc
for the complete job including additional cost for enlargement
of top heading footing.

Permanent anchorage using prestressed bar anchors D32mm, fp 0.1k/fpk = 950/1050 N/mm2, with an average length
of 12 m including drilling, installation, grouting and prestress really installed of 200 KN as per approved drawings &
specifications or as directed by Engineer. The rate shall include costs of all materials, labout, equipments, etc. required
for the complete job as per drawings, specifications or as directed by the Engineer- in- Charge. Measurement and
payment will be per m measured on the drawings.

Special treatment Tube-A-Manchette steel dia int 40mm and ext 50mm for grout injection through sleeves valves @
0.5m, in umbrellas or bottom in any length drill 75mm (Fe 500) at peripheral position, distribution defined as per the
decision of Engineer in charge.The rate shall include costs of all materials, labour, equipment, grouting of the pipe and
ground consolidation injection by TAM
sleeves, etc. required for the complete job.

Special treatment Tube-A-Manchette hard PVC dia int 40mm and ext 50mm for grout injection through sleeves valves @
0.5m, 20m length drill 75mm (Fe 500) at peripheral position, distribution defined as per the decision of Engineer in
charge.The rate shall include costs of all materials, labour, equipment, grouting of the pipe and ground consolidation
injection by TAM sleeves, etc. required for
the complete job.

Supply, drilling and installation of steel micropiles of dia upto 160 mm in vertical position or at an inclination for all kinds
of soil/rock class at any depth and as per approved drawings & specifications or as directed by Engineer. The works
include: drilling D200mm, installation of the pipe and grouting around and inside the pipe up to fulfill the volume drilled no
ocupated by the pipe. The rate shall include all labour, materials, connectors, welding, lead, lift, handling, including
grouting with M35 grade of grout, wastage complete with contractor's own equipment as a complete job as per
specifications or as directed by Engineer-in-Charge.

For Open work


V
OK- RANGPO RAIL PROJECT

Unit BOQ Quantity BOQ Rate (Rs) Original BOQ Amount (Rs Lacs)

4 5 6 7

Nos 12,709 ₹ 6,002.25 ₹ 76,282,595.25


Nos 220 ₹ 6,953.52 ₹ 1,529,774.40

Nos 4,346 ₹ 1,931.51 ₹ 8,394,342.46


Nos 110 ₹ 2,490.51 ₹ 273,956.10
Nos 30,058 ₹ 3,286.90 ₹ 98,797,640.20
Nos 110 ₹ 6,096.21 ₹ 670,583.10

Nos 829 ₹ 8,385.96 ₹ 6,951,960.84

Nos 110 ₹ 6,605.28 ₹ 726,580.80


Nos 110 ₹ 8,185.03 ₹ 900,353.30
Nos 13,069 ₹ 10,130.04 ₹ 132,389,492.76
Nos 110 ₹ 16,163.98 ₹ 1,778,037.80

Nos 110 ₹ 27,677.70 ₹ 3,044,547.00


meter 9,495 ₹ 7,884.72 ₹ 74,865,416.40

meter 446 ₹ 2,855.46 ₹ 1,273,535.16


meter 8,800 ₹ 643.83 ₹ 5,665,704.00
meter 8,800 ₹ 733.56 ₹ 6,455,328.00

tonne 1,337 ₹ 89,688.76 ₹ 119,913,872.12

tonne 1,026 ₹ 63,136.89 ₹ 64,778,449.14

tonne 109 ₹ 91,561.53 ₹ 9,980,206.77


tonne 492 ₹ 83,817.43 ₹ 41,238,175.56

meter 7,434 ₹ 8,214.53 ₹ 61,066,816.02

meter 1,520 ₹ 10,026.09 ₹ 15,239,656.80

meter 1,311 ₹ 10,012.49 ₹ 13,126,374.39

meter 7,783 ₹ 7,498.31 ₹ 58,359,346.73


TOTAL FOR SCHEDULE FOR B1= ₹ 803,702,745.10
CS-DHORAJIA PROJEC
PROJECT : CONSTRUCTION OF TUNNEL T12 & T13

S No Item No

B2 SHOTCRETE AND CONCRETE WORK

1 B201

1_1 B 2011
1_2 B 2012
1_3 B 2013
1_4 B 2014
1_5 B 2015
1_6 B 2016
1_7 B 2017

1_8 B 2018

1_9 B2019
1_10 B20110

1_11 B20111

2 B202

2_1 B2021
2_2 B2022

2_3 B2023

2_4 B2024
2_5 B2025

3 B203

3_1 B2031
3_2 B2032

4 B204

5 B205
CS-DHORAJIA PROJECTS JV
PROJECT : CONSTRUCTION OF TUNNEL T12 & T13 SIVOK- RANGPO RA
BILL OF QUANTITIES

Description of Items

3
SHOTCRETE AND CONCRETE WORK
All items for sprayed concrete and concrete works include procurement, fabrication, transportation, delivery, appropriate
installation and placing material, time for installation, plant, equipment, logistics and all other operational costs.
Materials used shall at least meet the minimum requirements of the technical specifications. All equipment used shall be
suitable to perform works properly. The costs associated with using appropriate equipment at different construction sites
(i.e., works in open areas, main tunnel, escape tunnel, side adits, cross passages, roads, location with limited access)
shall be included in all items.

Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as
shown on design drawings, in technical specifications and directed by the Engineer. These items include:
sprayed concrete of grade M25 according to Indian Standard
all concrete additives
wastage of sprayed concrete
rebound
application of shotcrete in multiple layers
all auxiliary materials and works
Measurement and payment shall be for the theoretical area or volume as shown on the design drawings in square
metres/ cubic meters, measured along Payment-Line (see specifications).

50 mm thick shotcrete lining in tunnel


100 mm thick shotcrete lining in tunnel
150 mm thick shotcrete lining in tunnel
200 mm thick shotcrete lining in tunnel
250 mm thick shotcrete lining in tunnel
300 mm thick shotcrete lining in tunnel
shotcrete lining for overbeak as per technical specification
Sprayed concrete works for filling of cavities not caused by fault of contractor due to unavoidable overbreak which has
been designated as such by the Engineer and exceeds a volume of 2 m³ in each individual case. This item includes:
sprayed concrete of grade M25 according to Indian Standard
wastage of sprayed concrete
rebound
all auxiliary materials and works
Measurement and payment shall be for the volume of sprayed concrete beyond the boundary surface 'A line' actually
used and as approved by the Engineer.

Shotcrete in slope stabilization


Sprayed concrete works for smoothening layer of 30mm and support of the waterproofing membrane complying with the
requirement in planarity as shown on design drawings, in technical specifications or as directed by the Engineer. This
item includes:
-sprayed concrete of grade M25 according to Indian Standard, maximum aggregate size 8mm
-wastage of sprayed concrete
-rebound
-all auxiliary materials and works
-washing down with hot water right before installig of waterproofing system (high pressure water jet, minimum pressure
30 bar)
Measurement and payment shall for the theoretical area as shown on the design drawings in square metres,
measured along Payment-Line

Extra for over item no B201 for supply and mixing of steel fibre double end hooked loose steel fibres of circular cross
section having diameter of 0.75mm and aspect ratio equal to 49 conforming to EC- certificate of conformity as per
EN14889 and tensile strength more than 1100MPa and ultimate strain less than 4% as per specification and as directed
by Engineer
Concrete works for construction of inner lining , inverts etc. as shown on design drawings, in technical specification and
as directed by the Engineer. These items include:
Design Mix Cement Concrete of grade M30, machine mixed, machine vibrated
all concrete additives
Formwork, falsework and scaffolding: number as specified in the contract
formwork carriages (number as specified in the contract) with adjustment facilities for inner-lining construction
Contact grouting between primary and inner lining
All difficulties due to requirements for cable ducts, pipes or similar
All difficulties due to reinforcement installation
All difficulties due to requirements of niches, junctions, cross passages, manholes, widenings etc.
Curing of concrete to ensure concrete quality as described in the specifications
sealing and curing agent
concrete for filling in case of GOB Deformation of Initial Lining (DIL)
Measurement and payment shall be for the theoretical measured volumes of concrete as shown on the design drawings.

Inner lining of main tunnel, Adit & niches with movable Shutter and / or Radial Formwork
Inner lining of main tunnel, Adit & niches for Invert
Construction , dowel jointed, cement concrete pavement of M30 grade concrete with 43 grade cement, coarse and fine
aggregate conforming of IS:383, maximum size of coarse aggregate not exceeding 25mm, mixed in a batching plant as
per approved mix design, transported at site, laid with a fixed form or slip form paver or by fixed shuttering, spread,
compacted and finished in a continuous operation and texturing, including provision of contraction, expansion,
construction and longitudinal joints, joint filler, seperation membrane,sealant primer, joint sealant, debonding strip, dowel
bar, tie bar/rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing. Item rate shall
be inclusive of all material, taxes, duties, manpower, equipment cost, royalties, transportation, etc. Reinforcement will be
paid separately under the item of reinforcement.

Manholes as shown on design drawings, in technical specification and as directed by the Engineer. These items include:
-Manufacture of manholes either on-site or off-site
-Design Mix Cement Concrete of grade M30, machine mixed, machine vibrated
Measurement and payment shall be for the theoretical quantity of manholes as shown on the design drawings.
Reinforcement will be paid separately under items of reinforcement.
Providing and installing of drainage gutters with M30 grade concrete within the non-ballast trackbed as shown on
design drawings, in technical specifications and as directed by the Engineer. These items include:
all auxiliary works and materials necessary (bedding etc.) as per drawing
all connections of drainage pipes and therefore necessary types of gutters
casts

Design Mix Cement Concrete M15 in following PCC works including mechanically mixed machine mixed, machine
batched, machine vibrated, form work, etc as per specifications & drawings or as directed by Engineer-in charge
For all kinds of structures required (bed, portals, blinding, lean, protection lean concrete)
No-fines porous concrete in tunnel
Design Mix Cement Concrete M35 in RCC works including machine mixed, machine batched, machine vibrated, form
work, etc as per specifications & drawings or as directed by Engineer-in charge
all concrete additives
Formwork, falsework and scaffolding: number as specified in the contract
formwork carriages (number as specified in the contract) with adjustment facilities for inner-lining construction
Contact grouting between primary and inner lining
All difficulties due to requirements for cable ducts, pipes or similar
All difficulties due to reinforcement installation
All difficulties due to requirements of niches, junctions, cross passages, manholes, widenings etc.
Curing of concrete to ensure concrete quality as described in the specifications
sealing and curing agent
concrete for filling in case of GOB Deformation of Initial Lining (DIL)
Measurement and payment shall be for the theoretical measured volumes of concrete as shown on the design drawings.

M30 RCC for Cladding Wall. Design mix cement concrete including machine mixed, machine batched, machine vibrated
with contractor's men, material, consumables (including additives), tools & plants, equipments, machineries, all lead &
lifts, loading, unloading, wastages etc complete. The rate includes cost of form work, shuttering, centering,
scaffolding, fixing and removing thereof, levelling, finishing of exposed surfaces, curing etc.
V
OK- RANGPO RAIL PROJECT

Unit BOQ Quantity BOQ Rate (Rs) Original BOQ Amount (Rs Lacs)

4 5 6 7

sqm 1,810 ₹ 628.14 ₹ 1,136,933.40


sqm 25,113 ₹ 1,256.27 ₹ 31,548,708.51
sqm 38,012 ₹ 1,884.41 ₹ 71,630,192.92
sqm 440 ₹ 2,512.54 ₹ 1,105,517.60
sqm 42,271 ₹ 3,140.67 ₹ 132,759,261.57
sqm 19,237 ₹ 3,768.81 ₹ 72,500,597.97
cum 14,455 ₹ 12,562.68 ₹ 181,593,539.40

cum 497 ₹ 13,314.55 ₹ 6,617,331.35

cum 1,485 ₹ 13,314.55 ₹ 19,772,106.75


sqm 60,500 ₹ 399.44 ₹ 24,166,120.00

tonne 1,097 ₹ 162,048.81 ₹ 177,767,544.57

cum

cum 28,092 ₹ 8,621.01 ₹ 242,181,412.92


cum 3,599 ₹ 8,621.01 ₹ 31,027,014.99

cum 110 ₹ 9,740.79 ₹ 1,071,486.90

cum 132 ₹ 8,621.01 ₹ 1,137,973.32


cum 110 ₹ 8,621.01 ₹ 948,311.10

cum 945 ₹ 5,619.59 ₹ 5,310,512.55


cum 298 ₹ 5,046.39 ₹ 1,503,824.22

cum 8,932 ₹ 9,139.44 ₹ 81,633,478.08

cum 1,599 ₹ 8,621.01 ₹ 13,784,994.99

TOTAL FOR SCHEDULE FOR B2= ₹ 1,099,196,863.11


CS-DHORAJIA PROJEC
PROJECT : CONSTRUCTION OF TUNNEL T12 & T13

S No Item No

C DRAINAGE AND MISCELLEANEOUS WORK

1 C101

1_1 C1011
1_2 C1012

2 C102

2_1 C1021
2_2 C1022
2_3 C1023

3 C103

4 C104
5 C105

5_1 C1051
5_2 C1052b
5_3 C1053
5_4 C1054

5_5 C1055

5_6 C1055a
5_7 C1055b

5_8 C1056

6 C106

6_1 C1061
6_2 C1062
6_3 C1063

7 C107

8 C108

9 C109

10 C110
11 C111

11_1 C1111
11_2 C1112
11_3 C1113

12 C112

12_1 C1121
12_2 C1122

13 C113

14 C114

15 C115

16 C116
CS-DHORAJIA PROJECTS JV
PROJECT : CONSTRUCTION OF TUNNEL T12 & T13 SIVOK- RANGPO RA
BILL OF QUANTITIES

Description of Items

3
DRAINAGE AND MISCELLEANEOUS WORK
All items for drainage works and works for cable ducts include procurement, manufacture, transportation, delivery,
appropriate installation and/or placing of material, formwork, plant, equipment, logistics, manpower and all other
operational costs. All equipment used shall be suitable to perform works properly. The costs associated with using
appropriate equipment at different construction sites (i.e., works in open areas, main tunnel, escape tunnel, side adits,
cross passages,
roads) shall be included in all items.

Providing and installing PVC pipes of following diameters in the tunnel as per approved drawings &
specifications or as directed by Engineer.

35mm
50mm
Providing and installation of perforated pipes . The pipes are protected by geotextile membrane as shown on design
drawings, in technical specifications or as directed by the Engineer. These items include:
all connections and valves
protection by geotextile membrane
all necessary equipment (i.e. drilling jumbo equipped with AT-casing system)
other protection to ensure functionality as required locally
Measurement and payment shall be for the actual length measured along the pipe axis in linear metres as confirmed by
the Engineer.

35 mm internal dia PVC pipe


50 mm internal dia PVC pipe
150 mm internal dia PVC pipe (Fully perforated for side drain)
Drilling of different dia holes (diameter 42mm to 62mm) in shotcrete / lining as weep holes / relief holes of required
length including perforated pipes of required dia in any direction as per approved drawings and specifications or as
directed by the Engineer. These items also include:
-drilling through sprayed concrete, walls, reinforcement
-drilling in presence of water
-all measures necessary in soft ground to ensure the stability of the drainage hole
Measurement and payment shall be for the actual length of drainage holes drilled in linear metres.

Drilling of different dia holes (diameter 42mm to 62mm) in rock/ soil of required length in any direction as per approved
drawings and specifications or as directed by the Engineer. These items also include:
drilling through sprayed concrete, walls, reinforcement
drilling in presence of water
all measures necessary in soft ground to ensure the stability of the drainage hole
Measurement and payment shall be for the actual length of drainage holes drilled in linear metres.
Drilling of exploratory holes up to 35m length with specified diameter in any direction as per the technical specifications
and as directed by the Engineer in the presence of an expert geologist. These items also include:
-drilling through sprayed concrete, walls, reinforcement
-drilling in presence of water
-all measures necessary in soft ground to ensure the stability of the drainage hole
Measurement and payment shall be for the actual length of drainage holes drilled in linear metres.

Horizontal/sub horizontal in all kinds of rock dia, equal or greater than 50mm
Horizontal/sub horizontal in all kinds of soft ground dia, equal or greater than 50mm
Vertical (downwards) in all kinds of rock dia, equal or greater than 50mm
Vertical (downwards) in all kinds of soft ground dia, equal or greater than 50mm
Drilling for installation of monitoring instruments up to 90 mm diameter in all kinds of rock and in any direction, including
widening of 500 mm length at the borehole mouth up to diameter of 120 mm
Up to 12m length
Up to 30m length
Drilling for installation of monitoring instruments up to 90 mm diameter in all kinds of soft ground and in any direction,
including widening of 500 mm length at the borehole mouth up to diameter of 120 mm (up to 12m length)
Providing and laying of pipes (i.e. collector pipe, connection pipes) of specified diameter as shown on design drawings,
the technical specifications or as directed by the Engineer. Thes items include:
pipe bedding and support, and all materials required for this
all moulded parts
all connections and valves
backfilling if required
protection against environmental influences (e.g. at conncetions from tunnel portal to the waste water basin)
earthwork, rock excavation, support where necessary (in open areas)
Measurement and payment shall be for the actual length measured along the pipe axis in linear metres as confirmed by
the Engineer.

300 mm dia HDPE main drainage pipe at bottom (main collector pipes)
200 mm dia HDPE main drainage pipe
100 mm dia PVC pipe lateral drainage pipes (connection pipes)
Providing, laying and fixing of Protective Felt (geotextile ) with a minimum weight of 700 g/m2 for protection of the
waterproofing membrane & drainage on the finished outer lining surface, including the cost of all materials, labour,
equipments, etc. required for the completion of job, as per specifications or as directed by the Engineer
Providing, placing, welding of 2 mm thick PVC or ECB Water Proofing Membrane including the cost of all materials,
labour, equipments, testing etc. required for the completion of job, as per
specifications or as directed by the Engineer

PVC Water stop serrated with central bulb (min. 225mm wide, 8-11mm thick)
Pumping of water by furnishing,transporting,installing the equipment & system including pneumatic pumps as per the
requirement and as per specifications and as directed by the Engineer.( Note: Payment will be made only for actual use
for dewatering as payable as per specifications and as per
the certified Log book for each pump by the Engineer)
Providing and fixing of earthing flat bar of galvanized iron as shown on design drawings, in technical specifications or as
directed by the Engineer.
These items also include:
all necessary auxiliary works and materials
all necessry works and materials for connection of earthing flat bars
routing to and in niches for provision of sockets etc.
Measurement and payment shall be per metre length shown on design drawings. Extensions for welding shall not be
paid extra.

Longitudinal earthling flat bar, 40 x 4 mm, both sides of the Tunnel,


Transversal earthling flat bar, 40 x 4 mm, Every 250m,
Connection bolt M8 with corresponding nuts and washers
Providing of cable trays/ducts for both cable conduits and fire fighting as shown on design drawings and in technical
specifications. These items include:
-all connections
-all auxiliary works and materials required
Measurement and payment shall be for the actual length installed, measured along tunnel axis, as confirmed by the
Engineer.

Cable Tray/ ducts for conduits dia. 100 mm PVC pipe (2 pipes each tray)
Cable Tray/ ducts for conduits dia. 160 mm PVC pipe - fire fighting supply
Grouting (cement) for ground improvement or filling of voids and cavities using suitable materials and mixtures as
appropriate. Measurement and payment shall be in tonnes for the actual quantity of cement used as approved by the
Engineer
Delta drain installed at damp areas of the excavation to collect and channelise water infiltration to the provisional or
definitive ground sidedrains. The rate shall include costs of all materials, labour, equipments, etc. required for the
complete jobas per specificationsor as directed by Engineer-in-
Charge. Measurement and payment will be per m2 on site measured.

Sand bags installed above steel ribs or lattice girders to fulfill voids during excavation to guarantee permanent contact
between the lining and the ground. The rate shall include costs of all materials, labour, equipments, etc. required for the
complete jobas per specificationsor as directed by Engineer-
in-Charge. Measurement and payment will be per Tonne on site measured.

Polypropylene Fibres for tunnel lining confirming to technical specifications


V
OK- RANGPO RAIL PROJECT

Unit BOQ Quantity BOQ Rate (Rs) Original BOQ Amount (Rs Lacs)

4 5 6 7

meter 275 ₹ 33.05 ₹ 9,088.75


meter 458 ₹ 50.69 ₹ 23,216.02

meter 275 ₹ 163.97 ₹ 45,091.75


meter 62,818 ₹ 160.25 ₹ 10,066,584.50
meter 12,038 ₹ 311.94 ₹ 3,755,133.72

meter 1,144 ₹ 305.42 ₹ 349,400.48

meter 62,818 ₹ 327.55 ₹ 20,576,035.90


meter 4,021 ₹ 1,197.30 ₹ 4,814,343.30
meter 447 ₹ 2,248.53 ₹ 1,005,092.91
meter 458 ₹ 1,502.71 ₹ 688,241.18
meter 44 ₹ 2,937.95 ₹ 129,269.80

meter 275 ₹ 1,197.30 ₹ 329,257.50


meter 275 ₹ 1,797.06 ₹ 494,191.50

meter 121 ₹ 2,248.53 ₹ 272,072.13

meter 13,851 ₹ 3,134.11 ₹ 43,410,557.61


meter 193 ₹ 3,110.62 ₹ 600,349.66
meter 138 ₹ 159.32 ₹ 21,986.16

meter 100,799 ₹ 508.14 ₹ 51,220,003.86

sqm 83,969 ₹ 1,361.34 ₹ 114,310,358.46

meter 8,936 ₹ 508.47 ₹ 4,543,687.92

KWh 1,463,000 ₹ 26.56 ₹ 38,857,280.00


meter 8,936 ₹ 140.96 ₹ 1,259,618.56
meter 165 ₹ 140.96 ₹ 23,258.40
nos 3,574 ₹ 99.17 ₹ 354,433.58

meter 35,834 ₹ 191.44 ₹ 6,860,060.96


meter 28,417 ₹ 315.37 ₹ 8,961,869.29

tonne 6,434 ₹ 10,543.50 ₹ 67,836,879.00

sqm 37,059 ₹ 636.28 ₹ 23,579,900.52

MT 8,042 ₹ 1,231.61 ₹ 9,904,607.62

MT 92 ₹ 196,495.78 ₹ 18,077,611.76
TOTAL FOR SCHEDULE FOR C= ₹ 432,379,482.80
CS-DHORAJIA PROJEC
PROJECT : CONSTRUCTION OF TUNNEL T12 & T13

S No Item No

D GEOTECHNICAL AND INSTRUMENTATION

1 D101

2 D102

3 D103

4 D104

5 D105

6 D106
7 D107

8 D108

9 D109
CS-DHORAJIA PROJECTS JV
PROJECT : CONSTRUCTION OF TUNNEL T12 & T13 SIVOK- RANGPO RA
BILL OF QUANTITIES

Description of Items

3
GEOTECHNICAL AND INSTRUMENTATION
Supply, Installation and monitoring as per approved drawings, calibration/setting, maintenance etc. of the following
instrument in good working condition from approved supplier (s) / manufacturer(s) for measuring the deformations, loads,
pressures etc. on the support in various tunnels and for seepage measurements as directed by Engineer-in-charge with
all
contractors men, material and machinery.

Optical targets (including rods) in the tunnel roof and at wall at selected points along the tunnel roof, at wall and slopes
at selected points along the tunnel wall or portal to monitor vertical and longitudinal (in tunnel direction) deformation
components (3 to 5 nos at each sections) or as per instruction of
Engineer-in-charge.

Shotcrete/ Concrete Stress cells NATM style vibrating wire stress cells to measure radial and tangential stresses in
shotcrete or concrete. Capacity of stress cells - tangential 200Kg/cm^2 and radial 50Kg/cm^2. Accuracy of 0.5%, each
cell should be marked with capacity, serial no. etc. alongwith the sufficient Teflon / PVC or similar cable shielded, integral
with stress cell for taking observations using the proper readout, Connections/switch/junction box to be attached to the
cable stress cell for connecting to readout. The readout should be compatible to vibrating wire stress cell, rechargeable
battery operated, LCD display, stress cell should be calibrated with this readout, connector to connect the stress cells,
perfectly sealed to make it dust and moisture proof including battery charger and one extra rechargeable battery

Vibration wire type electrical rock bolt load cell of capacity 25 t of rock bolt load cell including atleast 2 read out units,
operating temperature -100 to 550C, built in temperature device range - 450C to 1000C, signal cable 4 core shielded
Teflon/PVC or similar cable with PVC packet water proof, stainless steel materials and with lightening protection device
alongwith the readout, connector /switch/junction box to be attached to the cable of load cell for
connecting to read out.

Pressure Cells including atleast 2 read out units measuring range 50 Kg/cm^2 vibrating wire type to access the radial
support pressure coming on the steel rib supports from various directions alongwith the readout, switch/junction box to
be attached to the PVC / teflon or similar cable of pressure cell forconnecting to readout. The readout should be
compatible to the vibrating
wire type pressure cell = 0.5%.

Seepage measurement System to measure flow of water from the face of tunnel by using triangular V notch with all-
fittings and accessories complete set usage 20lps, including the arrangements for drain etc. Complete
Supply, Installation and monitoring of Multipoint borehole extensometer electronic type (MPBX 3-point) measuring head,
measuring rod (anchor depth: 7, 14 & 20m) and displacement transducers of 0-50 mm range for measuring sub-surface
movement in slope for the specified locations as per drawings and as per approved method statement or as directed by
Engineer-in-charge complete with S.S./ glass/ carbon fibre connecting rods and groutable anchors at different depth up
to 20 m in the boreholes (diameter of boreholes should not less than 76 mm). Sensor: vibrating wire displacement
transducers, range of measurement FS=0-50mm,accuracy< 0.5% FS,Dial gauge FS=0-50mm resolution 0.01mm.The
rate shall include all accessories required for installation and as per approved method statement.
Supply, fixing and monitoring (as per specifications) of Piezometer (vibrating wire sensors type) as per the drawing or as
per directed by Engineer-in- charge. The piezometer shall be designed for water table measurements and measuring
pore pressure up to 2MPa with an accuracy of + /-0.5% of full scale The rate shall include all accessories required for
installation and as per approved method statement.

Supply, Installation and monitoring of In place inclinometer to measure lateral movement in slope & embankment
suitable for depth up to 30 m. Each Inclinometer system consisting of following accessories complete in all respect:
Biaxial sensor with SDI-12@ 3 m interval, with pair of wheels for up to 30m depth
Suspension kit with protective cap and placement tubing : 1No.
Spacer assembly for 3 m gage length
Bottom wheel assembly with plug : 1no.
Protective rope to prevent loss of sensor down hole: 1no.
Suspension stainless steel wire rope for positioning sensors: 1 no.
Self aligning ABS tubing, 70mm od, 58 mm id, 3 m length for up to 50m depth.
ABS fixed coupling for 70 mm od. Access tube, 77 mm od x 160 mm length as required for jointing of ABS tubing.
Bottom cap for ABS tubing: 1no.
Dummy probe with 30 m cord: 1no. (Rate excluding Data logger

Data logger for In-place Inclinometer to log data from IPI sensors having
Memoty capacity 2 million data points and communication port to down load data on Laptop/ PC. Real time accuracy: +/-
1 minute/ year.
V
OK- RANGPO RAIL PROJECT

Unit BOQ Quantity BOQ Rate (Rs) Original BOQ Amount (Rs Lacs)

4 5 6 7

Nos 1,990 ₹ 1,573.29 ₹ 3,130,847.10

Nos 42 ₹ 46,423.25 ₹ 1,949,776.50

Nos 34 ₹ 47,121.45 ₹ 1,602,129.30

Nos 80 ₹ 46,423.25 ₹ 3,713,860.00

Nos 5 ₹ 25,138.80 ₹ 125,694.00

Nos 24 ₹ 47,524.50 ₹ 1,140,588.00


Nos 36 ₹ 10,296.98 ₹ 370,691.28

set 8 ₹ 818,477.50 ₹ 6,547,820.00

set 8 ₹ 459,403.50 ₹ 3,675,228.00

TOTAL FOR SCHEDULE FOR D= ₹ 22,256,634.18


CS-DHORAJIA PROJECTS JV
PROJECT : CONSTRUCTION OF TUNNEL T12 & T13 SIVOK- RANGPO RAIL PROJECT
BILL OF QUANTITIES

S No Item No Description of Items Unit BOQ Quantity BOQ Rate (Rs) Rate Original BOQ Amount (Rs Lacs)

3 4 5 6 7
E APPROACH ROADS TO PORTALS(T12-P1, T12-P2)(approx,2000m long) including nalla crossing, protection work and other ancillary works
Earthwork in cutting in all kinds of soil and rock including rock requiring use of blasting/ controlled blasting /
chiseling where necessary, in cutting for road formation, side drains, catch water drains, diversion of nallahs
as per technical Specification prescribed in MoRTH, with contractors men, material, consumables , tools &
1 E101 plants, equipments, machineries, including all lead & lifts, loading , unloading as cum
directed by Engineer - in -Charge , etc complete.

1_1 E1011 In all condition and classifications of soil cum 7,329 ₹ 255.62 ₹ 204.50 ₹ 1,873,438.98
Earthwork in formation in embankment by using corporations suitable cut spoils obtained from cuttings and
leading, spreading, watering, consolidating etc., as per technical specification prescribed in MoRTH, with
2 E102 contractors men, material, consumables, tools & plants, equipments, machineries, including all lead & lifts, cum 8,800 ₹ 92.96 ₹ 74.37 ₹ 818,048.00
loading , unloading as directed by Engineer - in -Charge , etc. complete.
Cleaning side drains in cuttings by the side of track (Kutcha or Pucca) including disposal of the debris, soil,
3 E103 muck etc. with contractors men, material, consumables, tools & plants, equipments, machineries, including all cum 1,471 ₹ 153.82 ₹ 123.06 ₹ 226,269.22
lead & lifts, loading , unloading as directed by Engineer - in -Charge , etc. complete.
Preparation of sub grade by excavating earth upto 22.5cm depth, dressing to camber and consolidating with
power road roller of 8 to 12 tone capacity including making good the undulations etc. and disposal of surplus
4 E104 earth with lead upto 50m, as per technical specification prescribed in MoRTH, with contractors men, material, Sqm 13,530 ₹ 61.97 ₹ 49.58 ₹ 838,454.10
consumables, tools & plants, equipments, machineries, including all lead & lifts, loading , unloading as
directed by Engineer - in -Charge , etc. complete.
Removal of slips beyond theoretical profile and occurred not due to fault of contractor (to be certified by
5 E105 Engineer-in-charge), during excavation or after approach road construction during the currency of contract, Cum 1,471 ₹ 100.70 ₹ 80.56 ₹ 148,129.70
has to be arranged by the contractor by deploying suitable machineries and men.
Constructing granular sub base of required compacted thickness as per technical specification prescribed in
6 E106 MoRTH, with contractors men, material, consumables, tools & plants, equipments, machineries, including all Cum 2,200 ₹ 1,976.31 ₹ 1,581.05 ₹ 4,347,882.00
lead & lifts, loading , unloading as directed by Engineer - in -Charge , etc complete.
Constructing Water Bound Macadam base course of required compacted thickness as per technical
specification prescribed in MoRTH, with contractors men, material, consumables, tools & plants, equipments,
7 E107 machineries, all lead & lifts, loading , unloading as directed by Engineer - in -Charge , etc complete. Cum 2,200 ₹ 3,170.30 ₹ 2,536.24 ₹ 6,974,660.00

Supplying and laying reinforced cement concrete pipes NP2 of various sizes, for culverts on cement concrete
leveling course including fixing collar with cement mortar 1:2 as per the drawing and as per specification
prescribed in MoRTH, with contractors men, material, consumables, tools & plants, equipments, machineries,
all lead & lifts, loading , unloading as directed by Engineer - in -Charge , etc complete. The rate includes Cost
of pipes, hauling, storing, laying in position , aligning, joining complete and all incidental costs to complete the
9 E109 ₹ 0.00
work as per specification. (Ancillary works such as excavation with back filling, leveling course, concrete and
masonry shall be paid separately in relevant schedule
items).

9_1 E1091 600mm dia. RMT 147 ₹ 3,173.40 ₹ 2,538.72 ₹ 466,489.80


9_2 E1092 900mm dia. RMT 440 ₹ 6,158.58 ₹ 4,926.86 ₹ 2,709,775.20
Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the
bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and
14 E1014 preparing the existing road surface as per specifications prescribed in MoRTH, including all contractors men, ₹ 0.00
material, consumables, tools & plants, equipments, machnieries, all lead & lifts, loading, unloading, as
directed by Engineer - in -Charge , etc complete.
14_1 E10141 On W.B.M. @ 0.75 Kg/Sqm sqm 24,200 ₹ 68.47 ₹ 54.78 ₹ 1,656,974.00
14_2 E10142 On bituminous surface @ 0.50 Kg/Sqm sqm 24,200 ₹ 49.66 ₹ 39.73 ₹ 1,201,772.00
Providing and laying Dense Bituminous Macadam using crushed stone aggregates of specified grading,
premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver
finisher equipped with electronics sensor to the required grade, level and alignment and rolling with smooth
15 E1015 wheeled, vibratory and tandem rollers as specifications to achieve the desired compaction and density, ₹ 0.00
complete as specification prescribed in MoRTH, including all contractors men, material, consumables, tools &
plants, equipments, machnieries, all lead & lifts, loading, unloading, as directed by Engineer - in -Charge , etc
complete.

65 mm average compacted thickness with bitumen of grade VG-30 @ 5% (Percentage by weight of total mix)
15_1 E1015 Cum 1,540.00 ₹ 11,253.55 ₹ 9,002.84 ₹ 17,330,467.00
and filler @ 2% ( (Percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant
Providing and laying Bituminous Concrete using crushed stone aggregates of specified grading, premixed with
bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher
equipped with electronics sensor to the required grade, level and alignment and rolling with smooth wheeled,
vibratory and tandem rollers as specifications to achieve the desired compaction and density, complete as
16 E1016 specification prescribed in MoRTH, including all contractors men, material, consumables, tools & plants, ₹ 0.00
equipments, machnieries, all lead & lifts, loading, unloading, as directed by
Engineer - in -Charge , etc complete.

40 mm compacted thickness with bitumen of grade VG-30 @ 5.5% (Percentage by weight of total mix) and
16_1 E10161 filler @ 2% ( (Percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant. cum 955.00 ₹ 12,285.31 ₹ 9,828.25 ₹ 11,732,471.05

Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising
of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel
vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all
17 E1017 steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, RMT 735.00 ₹ 3,799.66 ₹ 3,039.73 ₹ 2,792,750.10
metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm
long) complete as directed by Engineer - in -Charge

TOTAL FOR SCHEDULE FOR E= ₹ 76,103,132.01


CS-DHORAJIA PROJEC
PROJECT : CONSTRUCTION OF TUNNEL T12 & T13

S No Item No

F UNFORESEEN ITEMS OF WORK


1 F101
CS-DHORAJIA PROJECTS JV
PROJECT : CONSTRUCTION OF TUNNEL T12 & T13 SIVOK- RANGPO RA
BILL OF QUANTITIES

Description of Items

3
UNFORESEEN ITEMS OF WORK
Any other items as per N.F Railways standard schedule of rates (USSOR) not covered in above schedules
V
OK- RANGPO RAIL PROJECT

Unit BOQ Quantity BOQ Rate (Rs) Original BOQ Amount (Rs Lacs)

4 5 6 7

Rs ₹ 40,000,000.00
TOTAL FOR SCHEDULE FOR E= ₹ 40,000,000.00
DHORAJIA CONSTRUCTION PVT LTD.
S.No. Budget Head Group CODE
1 Schedule A A101
A101a
A102
A1021
A1022
A1023
A1024
A1025
A1026
A1027
A103
A104
A105
2 Schedule B1 B101
B1011
B1012
B102
B1021
B1022
B1023
B1024
B102A
B102A1
B103
B1031
B1032
B1033
B1034
B103A
B103A1
B104
B1041
B105
B1051
B1052
B1053
B106
B107
B108
B109
B110
B111
B112
B113
B113A
3 Schedule B2 B201
B 2011
B 2012
B 2013
B 2014
B 2015
B 2016
B 2017
B2018
B2019
B20110
B20111
B202
B2021

B2022
B2023
B2024
B2025
B203
B2031
B2032
B204
B205
4 Schedule C C101
C1011
C1012
C102
C1021
C1022
C1023
C103
C104
C105
C1051
C1052b

C1053
C1054
C1055
C1055a
C1055b
C1056
C106
C1061
C1062
C1063
C107
C108
C109
C110
C111
C1111
C1112
C1113
C112
C1121
C1122
C113
C114
C115
C116
5 Schedule D D101
D102
D103
D104
D105
D106
D107
D108
D109
6 Schedule E E101
E1011
E102
E103
E104
E105
E106
E107

E108

E1081
E109
E1091
E1092
E1010
E1011
E1012
E1013
E1014
E10141
E10142
E1015
E10151
E1016
E10161
E1017

F101
7 Schedule F

DHORAJIA PROJECT LLP


S.No. Budget Head Group CODE
1 Schedule A A101
A101a
A102
A1021
A1022
A1023
A1024
A1025
A1026
A1027
A103
A104
A105
2 Schedule B1 B101
B1011
B1012
B102
B1021
B1022
B1023
B1024
B102A
B102A1
B103
B1031
B1032
B1033
B1034
B103A
B103A1
B104
B1041
B105
B1051
B1052
B1053
B106
B107
B108
B109
B110
B111
B112
B113
B113A
3 Schedule B2 B201
B 2011
B 2012
B 2013
B 2014
B 2015
B 2016
B 2017
B2018
B2019
B20110
B20111
B202
B2021

B2022
B2023
B2024
B2025
B203
B2031
B2032
B204
B205
4 Schedule C C101
C1011
C1012
C102
C1021
C1022
C1023
C103
C104
C105
C1051
C1052b
C1053
C1054
C1055
C1055a
C1055b
C1056
C106
C1061
C1062
C1063
C107
C108
C109
C110
C111
C1111
C1112
C1113
C112
C1121
C1122
C113
C114
C115
C116
5 Schedule D D101
D102
D103
D104
D105
D106
D107
D108
D109
6 Schedule E E101
E1011
E102
E103
E104
E105
E106
E107

E108

E1081
E109
E1091
E1092
E1010
E1011
E1012
E1013
E1014
E10141
E10142
E1015
E10151
E1016
E10161
E1017

F101
7 Schedule F
DHORAJIA CONSTRUCTION PVT LTD.
Budget Head Amount
Open Excavataion ₹ 23,554,999.57
Earthworks for fills ₹ 34,812.80
Underground excavation
Excavation in Support Class 1 ₹ 4,173,253.88
Excavation in Support Class 2 ₹ 19,564,021.66
Excavation in Support Class 3 ₹ 106,177,629.87
Excavation in Support Class 4 ₹ 130,405,965.04
Excavation in Support Class 5 ₹ 38,282,182.20
Excavation in Support Class 6 ₹ 21,773,312.64
Extra-over for transportation ₹ 4,479,914.40
Extra-over for tunnel excavation under excessive water ₹ 368,225.00
Rehandling of muck ₹ 246,496.25
Excavation of drain channels ₹ 3,942,455.00
installation of Swellex type rockbolts
3 m length swellex bolt ₹ 38,141,297.63
4 m length swellex bolt ₹ 764,887.20
SN type rock bolts
Length 3 m SN Bolt ₹ 4,197,171.23
Length 4 m SN Bolt ₹ 136,978.05
Length 6 m SN Bolt ₹ 49,398,820.10
Length 9m SN Bolt ₹ 335,291.55
Installation Fibre glass all thread rock bolts
9 m length fibre glass all thread rock bolts ₹ 3,475,980.42
Installation of Self drilling rock bolts (IBO)
Length 3 m SDA Bolt ₹ 363,290.40
Length 4 m SDA Bolt ₹ 450,176.65
Length 6 m SDA Bolt ₹ 66,194,746.38
Length 9 m SDA Bolt ₹ 889,018.90
Installation of Fibre Glass Self -drilling
Length 9 m fiber glass self drilling ₹ 1,522,273.50
Installation of Pipe Roof Umbrella
Outer diameter 76mm, steel grade S355 ₹ 37,432,708.20
forepoling
Self-drilling bolts, Fy >= 200 KN ₹ 636,767.58
Reinforcement bars 32mm dia ₹ 2,832,852.00
Steel pipe 40 mm dia - Wall thickness 4 mm ₹ 3,227,664.00
Erection of lattice girders ₹ 59,956,936.06
Binding steel reinforcement ₹ 32,389,224.57
Placement of welded wire mesh ₹ 4,990,103.39
Erection of steel rib ₹ 20,619,087.78
Permanent anchorage ₹ 30,533,408.01
Pecial treatment Tube-A-Manchette steel ₹ 7,619,828.40
Special treatment Tube-A-Manchette hard PVC ₹ 6,563,187.20
Supply, drilling and installation of steel micropiles
For Open work ₹ 29,179,673.37
Sprayed concrete
50 mm thick shotcrete lining in tunnel ₹ 568,466.70
100 mm thick shotcrete lining in tunnel ₹ 15,774,354.26
150 mm thick shotcrete lining in tunnel ₹ 35,815,096.46
200 mm thick shotcrete lining in tunnel ₹ 552,758.80
250 mm thick shotcrete lining in tunnel ₹ 66,379,630.79
300 mm thick shotcrete lining in tunnel ₹ 36,250,298.99
Shotcrete lining for overbreak as per technical specification: ₹ 90,796,769.70
Sprayed concrete works for filling of cavities ₹ 3,308,665.68
Shotcrete in slope stabilization ₹ 9,886,053.38
concrete works for smoothening layer ₹ 12,083,060.00
supply and mixing of steel fibre ₹ 88,883,772.29
Concrete works for construction of inner lining
Inner lining of main tunnel, Adit & niches with movable Shutter and / or Radial
Formwork ₹ 121,090,706.46
Inner lining of main tunnel, Adit & niches for Invert ₹ 15,513,507.50
cement concrete pavement of M30 grade ₹ 535,743.45
Design Mix Cement Concrete of grade M30 for man hole ₹ 568,986.66
Providing and installing of drainage gutters with M30 grade concrete ₹ 474,155.55
Design Mix Cement Concrete M15 in following PCC
For all kinds of structures required ₹ 2,655,256.28
No-fines porous concrete in tunnel ₹ 751,912.11
Design Mix Cement Concrete M35 in RCC works ₹ 40,816,739.04
M30 RCC for Cladding Wall. ₹ 6,892,497.50
Providing and installing PVC pipes
35 mm dia PVC pipe ₹ 4,544.38
50 mm dia PVC Pipe ₹ 11,608.01
installation of perforated pipes
35 mm internal dia PVC pipe ₹ 22,545.88
50 mm internal dia PVC pipe ₹ 5,033,606.34
150 mm internal dia PVC pipe (Fully perforated for side drain) ₹ 1,877,566.86
Weep hole in shotcrete ₹ 174,700.24
Drainage hole in rock/soil ₹ 10,288,017.95
Probe hole upto 35 m length
Horizontal/sub horizontal in all kinds of rock dia, equal or greater than 50mm ₹ 2,407,171.65
Horizontal/sub horizontal in all kinds of soft ground dia, equal or greater than 50mm
₹ 502,546.46
Vertical (downwards) in all kinds of rock dia, equal or greater than 50mm ₹ 344,120.59
Vertical (downwards) in all kinds of soft ground dia, equal or greater than 50mm ₹ 64,635.12
installation of monitoring instruments in all kind of rock
Up to 12m length ₹ 164,628.75
Up to 30m length ₹ 247,098.50
installation of monitoring instruments in all kind of soft ground ₹ 136,036.07
Providing and laying of pipes
300 mm dia HDPE main drainage pipe at bottom (main collector pipes) ₹ 21,705,278.81
200 mm dia HDPE main drainage pipe ₹ 300,174.83
100 mm dia PVC pipe lateral drainage pipes (connection pipes) ₹ 10,993.08
Providing, laying and fixing of Protective Felt (geotextile ) ₹ 25,610,001.93
Providing, laying and fixing of Water Proofing Membrane ₹ 57,155,179.23
PVC Water stop serrated with central bulb ₹ 2,271,843.96
Pumping of water ₹ 19,428,640.00
Providing and fixing of earthing flat bar of galvanized iron
Longitudinal earthling flat bar, 40 x 4 mm, both sides of the Tunnel, ₹ 629,809.28
Transversal earthling flat bar, 40 x 4 mm, Every 250m, ₹ 11,629.20
Connection bolt M8 with corresponding nuts and washers ₹ 177,216.79
Providing of cable trays/ducts
Cable Tray/ ducts for conduits dia. 100 mm PVC pipe (2 pipes each tray) ₹ 3,430,030.48
Cable Tray/ ducts for conduits dia. 160 mm PVC pipe - fire fighting supply ₹ 4,480,934.65
Grouting ₹ 33,918,439.50
Delta drain installed at damp areas ₹ 11,789,950.26
Sand bags installed above steel ribs or lattice girders ₹ 4,952,303.81
Polypropylene Fibres for tunnel lining confirming to technical specifications ₹ 9,038,805.88
Optical targets ₹ 1,565,423.55
Shotcrete/ Concrete Stress cells NATM style vibrating wire stress cells ₹ 974,888.25
Vibration wire ₹ 801,064.65
Pressure Cells ₹ 1,856,930.00
Seepage measurement ₹ 62,847.00
Installation and monitoring of Multipoint borehole extensometer ₹ 570,294.00
Supply, fixing and monitoring (as per specifications) of Piezometer ₹ 185,345.64
Supply, Installation and monitoring of In place inclinometer ₹ 3,273,910.00
Data logger for In-place Inclinometer to log data from IPI sensors ₹ 1,837,614.00
Earthwork in cutting in all kinds of soil and rock
In all condition and classifications of soil ₹ 936,719.49
Earthwork in formation in embankment by using corporations suitable cut ₹ 409,024.00
Cleaning side drains in cuttings by the side of track (Kutcha or Pucca) ₹ 113,134.61
Preparation of sub grade by excavating earth upto 22.5cm depth, ₹ 419,227.05
Removal of slips beyond theoretical profile ₹ 74,064.85
Constructing granular sub base ₹ 2,173,941.00
Constructing Water Bound Macadam ₹ 3,487,330.00
Supplying & fixing Mandatory/Cautionary/warning/ Informatory retro-
reflectorised sign boards
Sign boards of size more than 0.6 sq.m & upto 0.9 sq.m with single post support ₹ 140,595.60
Supplying and laying reinforced cement concrete pipes NP2
600mm dia. ₹ 233,244.90
900mm dia. ₹ 1,354,887.60
Random rubble masonry ₹ 8,897,979.35
Providing boulder packing 600mm thick ₹ 969,144.00
U-PVC Pipe (working Pressure 4 Kg/Sqm) single socketed pipe ₹ 173,023.03
Providing and laying of knitted of woven crates ₹ 1,312,033.46
Providing and applying tack coat using hot straight run bitumen of grade VG - 10,
On W.B.M. @ 0.75 Kg/Sqm ₹ 828,487.00
On bituminous surface @ 0.50 Kg/Sqm ₹ 600,886.00
Providing and laying Dense Bituminous Macadam
65 mm average compacted thickness with bitumen of grade VG-30 nt. ₹ 8,665,233.50
Providing and laying Bituminous Concrete using crushed stone aggregates
40 mm compacted thickness with bitumen of grade VG-30 ₹ 5,866,235.53
Type - A, "W" : Metal Beam Crash Barrier ₹ 1,396,375.05
Any other items as per N. F. Railways standard schedule of rates (USSOR) not
covered in above schedules ₹ 20,000,000.00
TOTAL FOR SCHEDULE F
1589823014.08

DHORAJIA PROJECT LLP


Budget Head Amount
Open Excavataion ₹ 23,554,999.57
Earthworks for fills ₹ 34,812.80
Underground excavation
Excavation in Support Class 1 ₹ 4,173,253.88
Excavation in Support Class 2 ₹ 19,564,021.66
Excavation in Support Class 3 ₹ 106,177,629.87
Excavation in Support Class 4 ₹ 130,405,965.04
Excavation in Support Class 5 ₹ 38,282,182.20
Excavation in Support Class 6 ₹ 21,773,312.64
Extra-over for transportation ₹ 4,479,914.40
Extra-over for tunnel excavation under excessive water ₹ 368,225.00
Rehandling of muck ₹ 246,496.25
Excavation of drain channels ₹ 3,942,455.00
installation of Swellex type rockbolts
3 m length swellex bolt ₹ 38,141,297.63
4 m length swellex bolt ₹ 764,887.20
SN type rock bolts
Length 3 m SN Bolt ₹ 4,197,171.23
Length 4 m SN Bolt ₹ 136,978.05
Length 6 m SN Bolt ₹ 49,398,820.10
Length 9m SN Bolt ₹ 335,291.55
Installation Fibre glass all thread rock bolts
9 m length fibre glass all thread rock bolts ₹ 3,475,980.42
Installation of Self drilling rock bolts (IBO)
Length 3 m SDA Bolt ₹ 363,290.40
Length 4 m SDA Bolt ₹ 450,176.65
Length 6 m SDA Bolt ₹ 66,194,746.38
Length 9 m SDA Bolt ₹ 889,018.90
Installation of Fibre Glass Self -drilling
Length 9 m fiber glass self drilling ₹ 1,522,273.50
Installation of Pipe Roof Umbrella
Outer diameter 76mm, steel grade S355 ₹ 37,432,708.20
forepoling
Self-drilling bolts, Fy >= 200 KN ₹ 636,767.58
Reinforcement bars 32mm dia ₹ 2,832,852.00
Steel pipe 40 mm dia - Wall thickness 4 mm ₹ 3,227,664.00
Erection of lattice girders ₹ 59,956,936.06
Binding steel reinforcement ₹ 32,389,224.57
Placement of welded wire mesh ₹ 4,990,103.39
Erection of steel rib ₹ 20,619,087.78
Permanent anchorage ₹ 30,533,408.01
Pecial treatment Tube-A-Manchette steel ₹ 7,619,828.40
Special treatment Tube-A-Manchette hard PVC ₹ 6,563,187.20
Supply, drilling and installation of steel micropiles
For Open work ₹ 29,179,673.37
Sprayed concrete
50 mm thick shotcrete lining in tunnel ₹ 568,466.70
100 mm thick shotcrete lining in tunnel ₹ 15,774,354.26
150 mm thick shotcrete lining in tunnel ₹ 35,815,096.46
200 mm thick shotcrete lining in tunnel ₹ 552,758.80
250 mm thick shotcrete lining in tunnel ₹ 66,379,630.79
300 mm thick shotcrete lining in tunnel ₹ 36,250,298.99
Shotcrete lining for overbreak as per technical specification: ₹ 90,796,769.70
Sprayed concrete works for filling of cavities ₹ 3,308,665.68
Shotcrete in slope stabilization ₹ 9,886,053.38
concrete works for smoothening layer ₹ 12,083,060.00
supply and mixing of steel fibre ₹ 88,883,772.29
Concrete works for construction of inner lining
Inner lining of main tunnel, Adit & niches with movable Shutter and / or Radial
Formwork ₹ 121,090,706.46
Inner lining of main tunnel, Adit & niches for Invert ₹ 15,513,507.50
cement concrete pavement of M30 grade ₹ 535,743.45
Design Mix Cement Concrete of grade M30 for man hole ₹ 568,986.66
Providing and installing of drainage gutters with M30 grade concrete ₹ 474,155.55
Design Mix Cement Concrete M15 in following PCC
For all kinds of structures required ₹ 2,655,256.28
No-fines porous concrete in tunnel ₹ 751,912.11
Design Mix Cement Concrete M35 in RCC works ₹ 40,816,739.04
M30 RCC for Cladding Wall. ₹ 6,892,497.50
Providing and installing PVC pipes
35 mm dia PVC pipe ₹ 4,544.38
50 mm dia PVC Pipe ₹ 11,608.01
installation of perforated pipes
35 mm internal dia PVC pipe ₹ 22,545.88
50 mm internal dia PVC pipe ₹ 5,033,606.34
150 mm internal dia PVC pipe (Fully perforated for side drain) ₹ 1,877,566.86
Weep hole in shotcrete ₹ 174,700.24
Drainage hole in rock/soil ₹ 10,288,017.95
Probe hole upto 35 m length
Horizontal/sub horizontal in all kinds of rock dia, equal or greater than 50mm ₹ 2,407,171.65
Horizontal/sub horizontal in all kinds of soft ground dia, equal or greater than 50mm
₹ 502,546.46
Vertical (downwards) in all kinds of rock dia, equal or greater than 50mm ₹ 344,120.59
Vertical (downwards) in all kinds of soft ground dia, equal or greater than 50mm ₹ 64,635.12
installation of monitoring instruments in all kind of rock
Up to 12m length ₹ 164,628.75
Up to 30m length ₹ 247,098.50
installation of monitoring instruments in all kind of soft ground ₹ 136,036.07
Providing and laying of pipes
300 mm dia HDPE main drainage pipe at bottom (main collector pipes) ₹ 21,705,278.81
200 mm dia HDPE main drainage pipe ₹ 300,174.83
100 mm dia PVC pipe lateral drainage pipes (connection pipes) ₹ 10,993.08
Providing, laying and fixing of Protective Felt (geotextile ) ₹ 25,610,001.93
Providing, laying and fixing of Water Proofing Membrane ₹ 57,155,179.23
PVC Water stop serrated with central bulb ₹ 2,271,843.96
Pumping of water ₹ 19,428,640.00
Providing and fixing of earthing flat bar of galvanized iron
Longitudinal earthling flat bar, 40 x 4 mm, both sides of the Tunnel, ₹ 629,809.28
Transversal earthling flat bar, 40 x 4 mm, Every 250m, ₹ 11,629.20
Connection bolt M8 with corresponding nuts and washers ₹ 177,216.79
Providing of cable trays/ducts
Cable Tray/ ducts for conduits dia. 100 mm PVC pipe (2 pipes each tray) ₹ 3,430,030.48
Cable Tray/ ducts for conduits dia. 160 mm PVC pipe - fire fighting supply ₹ 4,480,934.65
Grouting ₹ 33,918,439.50
Delta drain installed at damp areas ₹ 11,789,950.26
Sand bags installed above steel ribs or lattice girders ₹ 4,952,303.81
Polypropylene Fibres for tunnel lining confirming to technical specifications ₹ 9,038,805.88
Optical targets ₹ 1,565,423.55
Shotcrete/ Concrete Stress cells NATM style vibrating wire stress cells ₹ 974,888.25
Vibration wire ₹ 801,064.65
Pressure Cells ₹ 1,856,930.00
Seepage measurement ₹ 62,847.00
Installation and monitoring of Multipoint borehole extensometer ₹ 570,294.00
Supply, fixing and monitoring (as per specifications) of Piezometer ₹ 185,345.64
Supply, Installation and monitoring of In place inclinometer ₹ 3,273,910.00
Data logger for In-place Inclinometer to log data from IPI sensors ₹ 1,837,614.00
Earthwork in cutting in all kinds of soil and rock
In all condition and classifications of soil ₹ 936,719.49
Earthwork in formation in embankment by using corporations suitable cut ₹ 409,024.00
Cleaning side drains in cuttings by the side of track (Kutcha or Pucca) ₹ 113,134.61
Preparation of sub grade by excavating earth upto 22.5cm depth, ₹ 419,227.05
Removal of slips beyond theoretical profile ₹ 74,064.85
Constructing granular sub base ₹ 2,173,941.00
Constructing Water Bound Macadam ₹ 3,487,330.00
Supplying & fixing Mandatory/Cautionary/warning/ Informatory retro-
reflectorised sign boards
Sign boards of size more than 0.6 sq.m & upto 0.9 sq.m with single post support ₹ 140,595.60
Supplying and laying reinforced cement concrete pipes NP2
600mm dia. ₹ 233,244.90
900mm dia. ₹ 1,354,887.60
Random rubble masonry ₹ 8,897,979.35
Providing boulder packing 600mm thick ₹ 969,144.00
U-PVC Pipe (working Pressure 4 Kg/Sqm) single socketed pipe ₹ 173,023.03
Providing and laying of knitted of woven crates ₹ 1,312,033.46
Providing and applying tack coat using hot straight run bitumen of grade VG - 10,
On W.B.M. @ 0.75 Kg/Sqm ₹ 828,487.00
On bituminous surface @ 0.50 Kg/Sqm ₹ 600,886.00
Providing and laying Dense Bituminous Macadam
65 mm average compacted thickness with bitumen of grade VG-30 nt. ₹ 8,665,233.50
Providing and laying Bituminous Concrete using crushed stone aggregates
40 mm compacted thickness with bitumen of grade VG-30 ₹ 5,866,235.53
Type - A, "W" : Metal Beam Crash Barrier ₹ 1,396,375.05
Any other items as per N. F. Railways standard schedule of rates (USSOR) not
covered in above schedules ₹ 20,000,000.00
TOTAL FOR SCHEDULE F
1589823014.08
CS-DHORAJIA PROJECTS JV
PROJECT : CONSTRUCTION OF TUNNEL T12 & T13 SIVOK- RANGPO RAIL PROJECT
Balance Cost Estimate till Completion
BILL OF QUANTITIES

S No Item No

1 A101

2 A101a
3 A102

4 A1021
5 A1022
6 A1023
7 A1024
8 A1025
9 A1026

10 A1027

11 A103
12 A104

13 A105

14

15 B101

16 B1011
17 B1012

18 B102

19 B1021
20 B1022
21
22

23 B102A

24 B102A1

25 B103

26 B1031
27 B1032
28 B1033
29 B1034

30 B103A

31 B103A1
32 B104

33 B1041

34 B105

35 B1051
36 B1052
37 B1053

38 B106

39 B107

40 B108
41 B109

42 B110

43 B111

44 B112

45 B113

46 B113A

47

48 B201

49 B 2011
50 B 2012
51 B 2013
52 B 2014
53 B 2015
54 B 2016
55 B 2017

56 B 2018

57 B2019

58 B20110

59 B20111

60 B202

61 B2021
62 B2022
63 B2023

64 B2024

65 B2025

66 B203

67 B2031
68 B2032

69 B204

70 B205
71

72 C101

73 C1011
74 C1012

75 C102

76 C1021
77 C1022
78 C1023

79 C103

80 C104

C105

81 C1051
82 C1052b
83 C1053
84 C1054
85 C1055

86 C1055a
87 C1055b

88 C1056

89 C106

90 C1061
91 C1062
92 C1063

93 C107

94 C108

95 C109

96 C110

97 C111

98 C1111
99 C1112
100 C1113

101 C112
102 C1121
103 C1122

104 C113

105 C114

106 C115

107 C116

108

109 D101

110 D102

111 D103

112 D104

113 D105
114 D106

115 D107

116 D108

117 D109

118 E101

119 E1011

120 E102

121 E103

122 E104

123 E105
124 E106

125 E107

126 E108

127 E1081

128 E109

129 E1091
130 E1092

131 E1010

132 E1011

133 E1012

134 E1013

135 E1014

136 E10141
137 E10142

138 E1015

139 E1015

140 E1016

141 E10161

142 E1017
HORAJIA PROJECTS JV
JECT : CONSTRUCTION OF TUNNEL T12 & T13 SIVOK- RANGPO RAIL PROJECT
nce Cost Estimate till Completion
OF QUANTITIES

Description of Items

Valid for all items for Division A1: "Excavation" include plant, logistics, equipment, manpower, materials, auxiliary works
as defined in the specifications and all other operational costs. All equipment used shall be suitable to perform the works
as per contract and according to the state of art technology. The cost associated with the deployment and use of the
appropriate equipment at the various work sites (i.e. for works in open areas, main tunnel, escape tunnel, side adits,
cross passages, roads water basins) shall be included in all items.

Excavation to lines and levels as required by the prevailing geotechnical conditions for installation of support as shown
on the drawings or as directed by the Engineer in portal areas and rescue place sites with limited access to construct
berms, surface drains, divert natural streams, nallah and the like etc. This item includes:
excavation of all types of ground (soils and rock) by any means of excavation (i.e. digging, blasting).
sequential excavation at limited height and slope support as shown on the drawings resp. as directed by the Engineer
following the prevailing geotechnical conditions. Support elements will be paid separately
cutting of trees, shrubs, roots and other vegetation including loading onto transport, transportation and appropriate
depositing, separate from other material
clearing of loose debris and loosened rock above cuts
appropriate measures for diversion of any waters
loading of excavated material onto transport, ascending and descending handling of excavation and materials,
transportation lead up to 2.0 km (one way distance) from point of excavation to center of gravity of designated
depositing sites and appropriate depositing and compaction of the material to lines and levels as a complete job as per
specification or as directed by the Engineer in charge including handling if required
setting out and demarcation of earthworks and muck deposits
security fencing along top of cut
Measurement and payment shall be for volumes in their solid states as per drawings based on contractor's survay before
and after excavation. Contractor's survey shall be submitted to the Engineer for approval prior to excavation.

Earthworks for fills with suitable excavation material. These items include:
Supply of suitable, free draining filling material
Transport of suitable, free draining material to filling site
Selection, segregation, processing and appropriate temporary restoring of excavated material
Placing of the fill material in layers not exceeding 300 mm
Compaction and levelling of the fill material according to standards (RDSO), technical specifications and directed by
Engineer
Appropriate preparation of the surface (re-cultivation) to lines and levels as a complete job as per
specification/as per drawings or as directed by the Engineer-in-Charge
Measurement and payment shall be for the volume of fill material in its solid compacted state as
shown on the design drawings.
Underground excavation (Top Heading, Bench, Invert) for main tunnel, adit (vehicular and pedestrian), niches (Electrical,
Trolley Refuge, turning niche and the like) and connection of the main tunnel to the adit by all means of excavation
(drilling, blasting/ control blasting (wherever required),scaling/ chipping, digging etc) in accordance with the New Austrian
Tunnelling Method (NATM). This item includes:
Mandatory excavation in sub divisons (Top heading, bench and invert) according to geometries, excavation and support
sequence shown on design drawings and as described in the technical specifications
in rock the application of smooth blasting techniques with contour hole spacing not exceeding 300 mm
Simultaneous excavation works in top heading, and half sided benching in rail tunnels as per technical specifications or
as directed by Engineer
Systematic exploratory drillholes
Appropriate Plant and Equipment with appropriate size specifically selected for the various tunnel sizes and as declared
in the technical bid
Face maping & Rock Classification after each blast.
Provision of drainages for all surfaces with vehicular circulation
Provision of adequate lighting and construction ventilation
Temporary backfilling with suitable compactable, free draining material of a minimum thickness of
400 mm for enabling maintenance with grader to facilitate vehicular circulation in tunnel. Complementing the backfill
material throughout the construction period. Its removal,
transport (independent from distance) and depositing at designated deposit areas.
Profiling and re-profiling of tunnel to achieve the dimensions of approved cross sections
Loading and unloading of excavated material, transportation to muck deposits up to a distance of
2.0 km (one way) from portal head to designated muck deposit areas. (The lead shall always be measured from portal
head irrespective of excavation location inside tunnel)
Water inflow up to 50 l/s measured within a distance of 20 m from the tunnel face
Removal and appropriate depositing (i.e. segregation of reinforcement) of non-permanent support measures (i.e. face
sealings, temporary invert arch)
Excavation for trenches, shafts, manholes etc.
Measurement and payment for excavation shall be for volumes in their solid in-situ states measured along the A-Line
as shown on design drawings and in technical specifications. No payment shall be granted if work sequences as shown
on design drawings, technical specifications

Excavation in Support Class 1


Excavation in Support Class 2
Excavation in Support Class 3
Excavation in Support Class 4
Excavation in Support Class 5
Excavation in Support Class 6
Extra-over for transportation of spoil from excavation in open areas for distances from point of excavation to the center of
gravity of muck deposits in excess of 2.0 km single (one way distance). Measurement and payment will be per cum per
km (cum x km). Volumes in cum shall be determined for materials in their original solid states.
Example: Distance from point of excavation to centre of gravity of muck deposit is 6.0 km. The Quantity excavated is 100
cubic metres. Payment under this item is therefore for 6.0 km minus 2.0 km = 4.0 km times 100 cum.
Extra payment would be for 400 cum KM.

Extra-over for tunnel excavation under excessive water inflow conditions (measured as greater than 50 l/s and confirmed
by the Engineer within 20.0m from the excavation face). Accumulation of measured quantities of water inflow is not
permitted. Determination of the water quantities shall be done out of temporary sumps at 20 m distance to the face by
means of a pump and flow meter or other suitable arrangements proposed by the Contractor and approved by the
Engineer. Payment as per volume of theoretical tunnel excavation under the respective water
Rehandling of muck as per directions of engineer including loading and transportation at for all leads and lift
Excavation of drain channels inside tunnel with hydraulic hammer for construction drainage trenches in all types of rock
including disposal of muck as directed

All items for: "Rock bolts and other steel support" include plant, logistics, equipment, manpower, time for installation,
materials, auxiliary works, and all other operational costs. Materials used shall at least meet the minimum requirements
of the technical specifications. All equipment used shall be suitable to perform works properly. The costs associated with
using appropriate equipment with suitable size of rock bolting as per drawings at different construction sites (i.e., works
in open areas, main tunnel, escape tunnel, side adits, cross passages, roads, location with limited access) shall be
included in all items.

Supply, drilling, testing and installation of Swellex type rockbolts of the specified length, ultimate load Fy>=200kN (tunnel
support) as per approved drawings & specifications or as directed by Engineer.The rate shall include costs of all
materials, labour, equipment, etc. required for the complete job.
Length 3m
Length 4m
SN type rock bolts for tunnel support, slope support, face bolts etc.
Supply, drilling, installation, grouting and testing of SN type rock bolts of specified length L, 200kN minimum ultimate
load as per design drawings, technical specifications or as directed by Engineer. Measurement and payment shall be
per piece tested and accepted installed rock bolt (for exact payment details see specifications).

Providing & fixing of SN type Rock Bolts 3 m Long of 25 ,mm dia MS bar
Providing & fixing of SN type Rock Bolts 4 m Longof 25 ,mm dia MS bar
Providing & fixing of SN type Rock Bolts 6 m Long of 25 ,mm dia MS bar
Providing & fixing of SN type Rock Bolts 9 m Long of 25 ,mm dia MS bar
Supply, drilling, installation, testing and grouting of fibre glass all thread rock bolts of specified length and ultimate
strength Fy>=200KN (for face bolting) as per approved drawings pand specifications or as directed by Engineer. The
rate shall include costs of all material, labour, equipment etc required for the complete job
Length 9m.
Self drilling rock bolts (IBO) for tunnel support, slope support, face bolts etc. Supply, drilling, installation, grouting and
testing of self driling rock bolts of specified length L, specified minimum ultimate load as per design drawings
(Fy=200kN), technical specifications or as directed by Engineer. Drilling with grout flushing is mandatory. This item
includes:
couplings
sacrificial drilling bits + grouting
Measurement and payment shall be per piece appropriately installed rock bolts (for exact payment details see
specifications).

Length 3 m,
Length 4 m,
Length 6 m,
Length 9 m,
Supply , drilling, installation, testing and grouting of Fibre Glass Self -drilling type rockbolts of the specified length and
ultimate strength (for face bolting ), Fy>= 200 KN, as per approved drawings & specifications or as directed by Engineer.
The rate shall include costs of all materials, labour, equipments, etc. required for the complete job.
Length 9 m,
Pipe Roof Umbrella: Supply, drilling, installation and grouting of self-drilling pipe technology of length up to 18m as per
approved drawings & specifications (single row, double row, skin-to-skin single row) or as directed by Engineer. The rate
shall include costs of all materials like starter units, pipes (perforated), drill bits, grouting packers etc., labour,
equipments, etc. required for the complete job.
This item includes:
Mobilistaion and demobilsation of all equipment necessary (drilling jumbo equipped with AT- casing system, Symmetrix
or similar) for single row, double row or skin-to skin single row
the necessary excavation
loading, transport and appropriate depositing of the excavated material
the excess use of inner lining concrete and waterproofing
all auxiliary works and materials necessary
Measurement and payment shall be per meter installed pipe roof pipe as directed and approved by Engineer

Outer diameter 76mm, steel grade S355, wall thickness 6,3mm (Pipe Connection Types = Nipple Coupling)
Supply, drilling hole, installation, testing and grouting of forepoling as per approved drawings & specifications or as
directed by Engineer. 200kN minimum ultimate load. The rate shall include costs of all materials, labour, equipments,
etc. required for the complete job.
Self-drilling bolts, Fy >= 200 KN
Reinforcement bars 32mm dia
Steel pipe 40 mm dia - Wall thickness 4 mm
Supply, fabrication, storing and erection of lattice girders . Geometries shall be as shown on design drawings, in
technical specifications or directed by the Engineer. These items include:
all necessary elements for connection of lattice girder partitions, such as connection plate, connection bolts and nuts etc.
all auxiliary materials
bearing elements
Minimum steel grade is Fe 500. For underground works, measurement and payment shall be for the theoretical length of
lattice girders measured using the Payment line as shown on design drawings and in the technical specifications.

Supply, cutting, bending, placing, binding steel reinforcement of grade Fe 500 as per approved drawings & specifications
or as directed by Engineer, for joint reinforcement of initial and final lining. This shall include straightening, hooking all
lead, lift, all auxiliary materials, etc. (Nothing extra shall be paid for wastage of reinforcement and binding wire).

Supply and placement of welded wire mesh of sizes 150x150x6, 100x100x6 or any other size as directed by Engineer as
reinforcement of sprayed concrete for tunnel lining works as shown
on design drawings, specifications or as directed by Engineer. Steel grade minimum Fe500. This item also includes:
Fixing elements and materials
cutting, bending and placement
all auxiliary materials and works necessary
Measurement and payment shall be per square meter for each layer installed and instructed, measured along Payment
Line (see specifications). Overlapping as mentioned in technical specifications is mandatory but shall not be paid
extra.
Supply, fabrication and erection of steel rib and all accessories including all lead, lift, wastage,storing,drilling holes, fixing
in phases etc. and installation of accessories for joining the steel rib segments as per approved workshop drawings of
contractor & specifications or as directed by Engineer.The rate shall include costs of all materials, labour,
equipment,welding, etc
for the complete job including additional cost for enlargement
of top heading footing.

Permanent anchorage using prestressed bar anchors D32mm, fp 0.1k/fpk = 950/1050 N/mm2, with an average length
of 12 m including drilling, installation, grouting and prestress really installed of 200 KN as per approved drawings &
specifications or as directed by Engineer. The rate shall include costs of all materials, labout, equipments, etc. required
for the complete job as per drawings, specifications or as directed by the Engineer- in- Charge. Measurement and
payment will be per m measured on the drawings.

Special treatment Tube-A-Manchette steel dia int 40mm and ext 50mm for grout injection through sleeves valves @
0.5m, in umbrellas or bottom in any length drill 75mm (Fe 500) at peripheral position, distribution defined as per the
decision of Engineer in charge.The rate shall include costs of all materials, labour, equipment, grouting of the pipe and
ground consolidation injection by TAM
sleeves, etc. required for the complete job.

Special treatment Tube-A-Manchette hard PVC dia int 40mm and ext 50mm for grout injection through sleeves valves @
0.5m, 20m length drill 75mm (Fe 500) at peripheral position, distribution defined as per the decision of Engineer in
charge.The rate shall include costs of all materials, labour, equipment, grouting of the pipe and ground consolidation
injection by TAM sleeves, etc. required for
the complete job.

Supply, drilling and installation of steel micropiles of dia upto 160 mm in vertical position or at an inclination for all kinds
of soil/rock class at any depth and as per approved drawings & specifications or as directed by Engineer. The works
include: drilling D200mm, installation of the pipe and grouting around and inside the pipe up to fulfill the volume drilled no
ocupated by the pipe. The rate shall include all labour, materials, connectors, welding, lead, lift, handling, including
grouting with M35 grade of grout, wastage complete with contractor's own equipment as a complete job as per
specifications or as directed by Engineer-in-Charge.

For Open work


All items for sprayed concrete and concrete works include procurement, fabrication, transportation, delivery, appropriate
installation and placing material, time for installation, plant, equipment, logistics and all other operational costs.
Materials used shall at least meet the minimum requirements of the technical specifications. All equipment used shall be
suitable to perform works properly. The costs associated with using appropriate equipment at different construction sites
(i.e., works in open areas, main tunnel, escape tunnel, side adits, cross passages, roads, location with limited access)
shall be included in all items.

Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as
shown on design drawings, in technical specifications and directed by the Engineer. These items include:
sprayed concrete of grade M25 according to Indian Standard
all concrete additives
wastage of sprayed concrete
rebound
application of shotcrete in multiple layers
all auxiliary materials and works
Measurement and payment shall be for the theoretical area or volume as shown on the design drawings in square
metres/ cubic meters, measured along Payment-Line (see specifications).

50 mm thick shotcrete lining in tunnel


100 mm thick shotcrete lining in tunnel
150 mm thick shotcrete lining in tunnel
200 mm thick shotcrete lining in tunnel
250 mm thick shotcrete lining in tunnel
300 mm thick shotcrete lining in tunnel
shotcrete lining for overbeak as per technical specification
Sprayed concrete works for filling of cavities not caused by fault of contractor due to unavoidable overbreak which has
been designated as such by the Engineer and exceeds a volume of 2 m³ in each individual case. This item includes:
sprayed concrete of grade M25 according to Indian Standard
wastage of sprayed concrete
rebound
all auxiliary materials and works
Measurement and payment shall be for the volume of sprayed concrete beyond the boundary surface 'A line' actually
used and as approved by the Engineer.

Shotcrete in slope stabilization


Sprayed concrete works for smoothening layer of 30mm and support of the waterproofing membrane complying with the
requirement in planarity as shown on design drawings, in technical specifications or as directed by the Engineer. This
item includes:
sprayed concrete of grade M25 according to Indian Standard, maximum aggregate size 8mm
wastage of sprayed concrete
rebound
all auxiliary materials and works
washing down with hot water right before installig of waterproofing system (high pressure water jet, minimum pressure
30 bar)
Measurement and payment shall for the theoretical area as shown on the design drawings in square metres,
measured along Payment-Line

Extra for over item no B201 for supply and mixing of steel fibre double end hooked loose steel fibres of circular cross
section having diameter of 0.75mm and aspect ratio equal to 49 conforming to EC- certificate of conformity as per
EN14889 and tensile strength more than 1100MPa and ultimate strain less than 4% as per specification and as directed
by Engineer
Concrete works for construction of inner lining , inverts etc. as shown on design drawings, in technical specification and
as directed by the Engineer. These items include:
Design Mix Cement Concrete of grade M30, machine mixed, machine vibrated
all concrete additives
Formwork, falsework and scaffolding: number as specified in the contract
formwork carriages (number as specified in the contract) with adjustment facilities for inner-lining construction
Contact grouting between primary and inner lining
All difficulties due to requirements for cable ducts, pipes or similar
All difficulties due to reinforcement installation
All difficulties due to requirements of niches, junctions, cross passages, manholes, widenings etc.
Curing of concrete to ensure concrete quality as described in the specifications
sealing and curing agent
concrete for filling in case of GOB Deformation of Initial Lining (DIL)
Measurement and payment shall be for the theoretical measured volumes of concrete as shown on the design drawings.

Inner lining of main tunnel, Adit & niches with movable Shutter and / or Radial Formwork
Inner lining of main tunnel, Adit & niches for Invert
Construction , dowel jointed, cement concrete pavement of M30 grade concrete with 43 grade cement, coarse and fine
aggregate conforming of IS:383, maximum size of coarse aggregate not exceeding 25mm, mixed in a batching plant as
per approved mix design, transported at site, laid with a fixed form or slip form paver or by fixed shuttering, spread,
compacted and finished in a continuous operation and texturing, including provision of contraction, expansion,
construction and longitudinal joints, joint filler, seperation membrane,sealant primer, joint sealant, debonding strip, dowel
bar, tie bar/rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing. Item rate shall
be inclusive of all material, taxes, duties, manpower, equipment cost, royalties, transportation, etc. Reinforcement will be
paid separately under the item of reinforcement.

Manholes as shown on design drawings, in technical specification and as directed by the Engineer. These items include:
Manufacture of manholes either on-site or off-site
Design Mix Cement Concrete of grade M30, machine mixed, machine vibrated
Measurement and payment shall be for the theoretical quantity of manholes as shown on the design drawings.
Reinforcement will be paid separately under items of reinforcement.

Providing and installing of drainage gutters with M30 grade concrete within the non-ballast trackbed as shown on
design drawings, in technical specifications and as directed by the Engineer. These items include:
all auxiliary works and materials necessary (bedding etc.) as per drawing
all connections of drainage pipes and therefore necessary types of gutters
casts

Design Mix Cement Concrete M15 in following PCC works including mechanically mixed machine mixed, machine
batched, machine vibrated, form work, etc as per specifications & drawings or as directed by Engineer-in charge
For all kinds of structures required (bed, portals, blinding, lean, protection lean concrete)
No-fines porous concrete in tunnel
Design Mix Cement Concrete M35 in RCC works including machine mixed, machine batched, machine vibrated, form
work, etc as per specifications & drawings or as directed by Engineer-in charge
all concrete additives
Formwork, falsework and scaffolding: number as specified in the contract
formwork carriages (number as specified in the contract) with adjustment facilities for inner-lining construction
Contact grouting between primary and inner lining
All difficulties due to requirements for cable ducts, pipes or similar
All difficulties due to reinforcement installation
All difficulties due to requirements of niches, junctions, cross passages, manholes, widenings etc.
Curing of concrete to ensure concrete quality as described in the specifications
sealing and curing agent
concrete for filling in case of GOB Deformation of Initial Lining (DIL)
Measurement and payment shall be for the theoretical measured volumes of concrete as shown on the design drawings.

M30 RCC for Cladding Wall. Design mix cement concrete including machine mixed, machine batched, machine vibrated
with contractor's men, material, consumables (including additives), tools & plants, equipments, machineries, all lead &
lifts, loading, unloading, wastages etc complete. The rate includes cost of form work, shuttering, centering,
scaffolding, fixing and removing thereof, levelling, finishing of exposed surfaces, curing etc.
All items for drainage works and works for cable ducts include procurement, manufacture, transportation, delivery,
appropriate installation and/or placing of material, formwork, plant, equipment, logistics, manpower and all other
operational costs. All equipment used shall be suitable to perform works properly. The costs associated with using
appropriate equipment at different construction sites (i.e., works in open areas, main tunnel, escape tunnel, side adits,
cross passages,
roads) shall be included in all items.

Providing and installing PVC pipes of following diameters in the tunnel as per approved drawings &
specifications or as directed by Engineer.

35mm
50mm
Providing and installation of perforated pipes . The pipes are protected by geotextile membrane as shown on design
drawings, in technical specifications or as directed by the Engineer. These items include:
all connections and valves
protection by geotextile membrane
all necessary equipment (i.e. drilling jumbo equipped with AT-casing system)
other protection to ensure functionality as required locally
Measurement and payment shall be for the actual length measured along the pipe axis in linear metres as confirmed by
the Engineer.

35 mm internal dia PVC pipe


50 mm internal dia PVC pipe
150 mm internal dia PVC pipe (Fully perforated for side drain)
Drilling of different dia holes (diameter 42mm to 62mm) in shotcrete / lining as weep holes / relief holes of required
length including perforated pipes of required dia in any direction as per approved drawings and specifications or as
directed by the Engineer. These items also include:
drilling through sprayed concrete, walls, reinforcement
drilling in presence of water
all measures necessary in soft ground to ensure the stability of the drainage hole
Measurement and payment shall be for the actual length of drainage holes drilled in linear metres.

Drilling of different dia holes (diameter 42mm to 62mm) in rock/ soil of required length in any direction as per approved
drawings and specifications or as directed by the Engineer. These items also include:
drilling through sprayed concrete, walls, reinforcement
drilling in presence of water
all measures necessary in soft ground to ensure the stability of the drainage hole
Measurement and payment shall be for the actual length of drainage holes drilled in linear metres.

Drilling of exploratory holes up to 35m length with specified diameter in any direction as per the technical specifications
and as directed by the Engineer in the presence of an expert geologist. These items also include:
drilling through sprayed concrete, walls, reinforcement
drilling in presence of water
all measures necessary in soft ground to ensure the stability of the drainage hole
Measurement and payment shall be for the actual length of drainage holes drilled in linear metres.

Horizontal/sub horizontal in all kinds of rock dia, equal or greater than 50mm
Horizontal/sub horizontal in all kinds of soft ground dia, equal or greater than 50mm
Vertical (downwards) in all kinds of rock dia, equal or greater than 50mm
Vertical (downwards) in all kinds of soft ground dia, equal or greater than 50mm
Drilling for installation of monitoring instruments up to 90 mm diameter in all kinds of rock and in any direction, including
widening of 500 mm length at the borehole mouth up to diameter of 120 mm
Up to 12m length
Up to 30m length
Drilling for installation of monitoring instruments up to 90 mm diameter in all kinds of soft ground and in any direction,
including widening of 500 mm length at the borehole mouth up to diameter of 120 mm (up to 12m length)
Providing and laying of pipes (i.e. collector pipe, connection pipes) of specified diameter as shown on design drawings,
the technical specifications or as directed by the Engineer. Thes items include:
pipe bedding and support, and all materials required for this
all moulded parts
all connections and valves
backfilling if required
protection against environmental influences (e.g. at conncetions from tunnel portal to the waste water basin)
earthwork, rock excavation, support where necessary (in open areas)
Measurement and payment shall be for the actual length measured along the pipe axis in linear metres as confirmed by
the Engineer.

300 mm dia HDPE main drainage pipe at bottom (main collector pipes)
200 mm dia HDPE main drainage pipe
100 mm dia PVC pipe lateral drainage pipes (connection pipes)
Providing, laying and fixing of Protective Felt (geotextile ) with a minimum weight of 700 g/m2 for protection of the
waterproofing membrane & drainage on the finished outer lining surface, including the cost of all materials, labour,
equipments, etc. required for the completion of job, as per specifications or as directed by the Engineer
Providing, placing, welding of 2 mm thick PVC or ECB Water Proofing Membrane including the cost of all materials,
labour, equipments, testing etc. required for the completion of job, as per
specifications or as directed by the Engineer

PVC Water stop serrated with central bulb (min. 225mm wide, 8-11mm thick)
Pumping of water by furnishing,transporting,installing the equipment & system including pneumatic pumps as per the
requirement and as per specifications and as directed by the Engineer.( Note: Payment will be made only for actual use
for dewatering as payable as per specifications and as per
the certified Log book for each pump by the Engineer)

Providing and fixing of earthing flat bar of galvanized iron as shown on design drawings, in technical specifications or as
directed by the Engineer.
These items also include:
all necessary auxiliary works and materials
all necessry works and materials for connection of earthing flat bars
routing to and in niches for provision of sockets etc.
Measurement and payment shall be per metre length shown on design drawings. Extensions for welding shall not be
paid extra.

Longitudinal earthling flat bar, 40 x 4 mm, both sides of the Tunnel,


Transversal earthling flat bar, 40 x 4 mm, Every 250m,
Connection bolt M8 with corresponding nuts and washers
Providing of cable trays/ducts for both cable conduits and fire fighting as shown on design drawings and in technical
specifications. These items include:
all connections
all auxiliary works and materials required
Measurement and payment shall be for the actual length installed, measured along tunnel axis, as confirmed by the
Engineer.
Cable Tray/ ducts for conduits dia. 100 mm PVC pipe (2 pipes each tray)
Cable Tray/ ducts for conduits dia. 160 mm PVC pipe - fire fighting supply
Grouting (cement) for ground improvement or filling of voids and cavities using suitable materials and mixtures as
appropriate. Measurement and payment shall be in tonnes for the actual quantity of cement used as approved by the
Engineer
Delta drain installed at damp areas of the excavation to collect and channelise water infiltration to the provisional or
definitive ground sidedrains. The rate shall include costs of all materials, labour, equipments, etc. required for the
complete jobas per specificationsor as directed by Engineer-in-
Charge. Measurement and payment will be per m2 on site measured.

Sand bags installed above steel ribs or lattice girders to fulfill voids during excavation to guarantee permanent contact
between the lining and the ground. The rate shall include costs of all materials, labour, equipments, etc. required for the
complete jobas per specificationsor as directed by Engineer-
in-Charge. Measurement and payment will be per Tonne on site measured.

Polypropylene Fibres for tunnel lining confirming to technical specifications


Supply, Installation and monitoring as per approved drawings, calibration/setting, maintenance etc. of the following
instrument in good working condition from approved supplier (s) / manufacturer(s) for measuring the deformations, loads,
pressures etc. on the support in various tunnels and for seepage measurements as directed by Engineer-in-charge with
all
contractors men, material and machinery.

Optical targets (including rods) in the tunnel roof and at wall at selected points along the tunnel roof, at wall and slopes
at selected points along the tunnel wall or portal to monitor vertical and longitudinal (in tunnel direction) deformation
components (3 to 5 nos at each sections) or as per instruction of
Engineer-in-charge.

Shotcrete/ Concrete Stress cells NATM style vibrating wire stress cells to measure radial and tangential stresses in
shotcrete or concrete. Capacity of stress cells - tangential 200Kg/cm^2 and radial 50Kg/cm^2. Accuracy of 0.5%, each
cell should be marked with capacity, serial no. etc. alongwith the sufficient Teflon / PVC or similar cable shielded, integral
with stress cell for taking observations using the proper readout, Connections/switch/junction box to be attached to the
cable stress cell for connecting to readout. The readout should be compatible to vibrating wire stress cell, rechargeable
battery operated, LCD display, stress cell should be calibrated with this readout, connector to connect the stress cells,
perfectly sealed to make it dust and moisture proof including battery charger and one extra rechargeable battery

Vibration wire type electrical rock bolt load cell of capacity 25 t of rock bolt load cell including atleast 2 read out units,
operating temperature -100 to 550C, built in temperature device range - 450C to 1000C, signal cable 4 core shielded
Teflon/PVC or similar cable with PVC packet water proof, stainless steel materials and with lightening protection device
alongwith the readout, connector /switch/junction box to be attached to the cable of load cell for
connecting to read out.

Pressure Cells including atleast 2 read out units measuring range 50 Kg/cm^2 vibrating wire type to access the radial
support pressure coming on the steel rib supports from various directions alongwith the readout, switch/junction box to
be attached to the PVC / teflon or similar cable of pressure cell forconnecting to readout. The readout should be
compatible to the vibrating
wire type pressure cell = 0.5%.

Seepage measurement System to measure flow of water from the face of tunnel by using triangular V notch with all-
fittings and accessories complete set usage 20lps, including the arrangements for drain etc. Complete
Supply, Installation and monitoring of Multipoint borehole extensometer electronic type (MPBX 3-point) measuring head,
measuring rod (anchor depth: 7, 14 & 20m) and displacement transducers of 0-50 mm range for measuring sub-surface
movement in slope for the specified locations as per drawings and as per approved method statement or as directed by
Engineer-in-charge complete with S.S./ glass/ carbon fibre connecting rods and groutable anchors at different depth up
to 20 m in the boreholes (diameter of boreholes should not less than 76 mm). Sensor: vibrating wire displacement
transducers, range of measurement FS=0-50mm,accuracy< 0.5% FS,Dial gauge FS=0-50mm resolution 0.01mm.The
rate shall include all accessories required for installation and as per approved method statement.

Supply, fixing and monitoring (as per specifications) of Piezometer (vibrating wire sensors type) as per the drawing or as
per directed by Engineer-in- charge. The piezometer shall be designed for water table measurements and measuring
pore pressure up to 2MPa with an accuracy of + /-0.5% of full scale The rate shall include all accessories required for
installation and as per approved method statement.
Supply, Installation and monitoring of In place inclinometer to measure lateral movement in slope & embankment
suitable for depth up to 30 m. Each Inclinometer system consisting of following accessories complete in all respect:
Biaxial sensor with SDI-12@ 3 m interval, with pair of wheels for up to 30m depth
Suspension kit with protective cap and placement tubing : 1No.
Spacer assembly for 3 m gage length
Bottom wheel assembly with plug : 1no.
Protective rope to prevent loss of sensor down hole: 1no.
Suspension stainless steel wire rope for positioning sensors: 1 no.
Self aligning ABS tubing, 70mm od, 58 mm id, 3 m length for up to 50m depth.
ABS fixed coupling for 70 mm od. Access tube, 77 mm od x 160 mm length as required for jointing of ABS tubing.
Bottom cap for ABS tubing: 1no.
Dummy probe with 30 m cord: 1no. (Rate excluding Data logger

Data logger for In-place Inclinometer to log data from IPI sensors having
Memoty capacity 2 million data points and communication port to down load data on Laptop/ PC. Real time accuracy: +/-
1 minute/ year.

Earthwork in cutting in all kinds of soil and rock including rock requiring use of blasting/ controlled blasting / chiseling
where necessary, in cutting for road formation, side drains, catch water drains, diversion of nallahs as per technical
Specification prescribed in MoRTH, with contractors men, material, consumables , tools & plants, equipments,
machineries, including all lead & lifts, loading , unloading as
directed by Engineer - in -Charge , etc complete.

In all condition and classifications of soil


Earthwork in formation in embankment by using corporations suitable cut spoils obtained from cuttings and leading,
spreading, watering, consolidating etc., as per technical specification prescribed in MoRTH, with contractors men,
material, consumables, tools & plants, equipments, machineries, including all lead & lifts, loading , unloading as directed
by Engineer - in -Charge , etc. complete.
Cleaning side drains in cuttings by the side of track (Kutcha or Pucca) including disposal of the debris, soil, muck etc.
with contractors men, material, consumables, tools & plants, equipments, machineries, including all lead & lifts, loading ,
unloading as directed by Engineer - in -Charge , etc. complete.
Preparation of sub grade by excavating earth upto 22.5cm depth, dressing to camber and consolidating with power road
roller of 8 to 12 tone capacity including making good the undulations etc. and disposal of surplus earth with lead upto
50m, as per technical specification prescribed in MoRTH, with contractors men, material, consumables, tools & plants,
equipments, machineries, including all lead & lifts, loading , unloading as directed by Engineer - in -Charge , etc.
complete.

Removal of slips beyond theoretical profile and occurred not due to fault of contractor (to be certified by Engineer-in-
charge), during excavation or after approach road construction during the currency of contract, has to be arranged by the
contractor by deploying suitable machineries and men.
Constructing granular sub base of required compacted thickness as per technical specification prescribed in MoRTH,
with contractors men, material, consumables, tools & plants, equipments, machineries, including all lead & lifts, loading ,
unloading as directed by Engineer - in -Charge , etc complete.
Constructing Water Bound Macadam base course of required compacted thickness as per technical specification
prescribed in MoRTH, with contractors men, material, consumables, tools & plants, equipments, machineries, all lead &
lifts, loading , unloading as directed by Engineer - in -Charge , etc complete.
Supplying & fixing Mandatory/Cautionary/warning/ Informatory retro-reflectorised sign boards as per technical
specification prescribed in MoRTH , with contractors men, material, consumables, tools & plants, equipments,
machineries, all lead & lifts, loading , unloading ,as directed by Engineer - in - Charge , etc complete.
Sign boards of size more than 0.6 sq.m & upto 0.9 sq.m with single post support
Supplying and laying reinforced cement concrete pipes NP2 of various sizes, for culverts on cement concrete leveling
course including fixing collar with cement mortar 1:2 as per the drawing and as per specification prescribed in MoRTH,
with contractors men, material, consumables, tools & plants, equipments, machineries, all lead & lifts, loading , unloading
as directed by Engineer - in -Charge , etc complete. The rate includes Cost of pipes, hauling, storing, laying in position ,
aligning, joining complete and all incidental costs to complete the work as per specification. (Ancillary works such as
excavation with back filling, leveling course, concrete and masonry shall be paid separately in relevant schedule
items).

600mm dia.
900mm dia.
Random rubble masonry, hammer dressed wherever necessary, in cement and sand 1 :6 in wing wall, toe wall, breast
wall, retaining wall, curtain wall, parapet wall, slope of guide bunds, catch water drains, side drains etc, as per drawing
and as per technical specification prescribed in MoRTH including providing weep holes of 100mm dia. PVC pipe at
1 .Om c/c horizontally and vertically, with contractors men, material, consumables, tools & plants, equipments,
machineries, including all lead & lifts, loading ,
unloading ,as directed by Engineer -in -Charge , etc complete.

Providing boulder packing 600mm thick hand packed behind abutments, retaining walls, breast wall, wing walls, etc. as
per drawing with stone not less than 15cm in any direction and not less than 30 kg with contractors men, material,
consumables, tools & plants, equipments, machineries, including all lead & lifts, loading , unloading, as per technical
specification prescribed in MoRTH, with contractors men, material, consumables, tools & plants, equipments,
machineries, including all lead & lifts, loading ,
unloading as directed by Engineer - in -Charge , etc. complete.

U-PVC Pipe (working Pressure 4 Kg/Sqm) single socketed pipe 110mm dia. for drainag with contractors men, material,
consumables, tools & plants, equipments, machineries, including all lead & lifts, loading ,
unloading as directed by Engineer - in -Charge , etc. complete.

Providing and laying of knitted of woven crates of size 1 200 mm x 1 200 mm x 6000 mm made of Gl wires of dia. 4.0
mm as per drawing and as per technical specification prescribed in MoRTH including supply of stones, placing in
position, hand packing , filled with stones/boulders, with all contractors men, material, consumables, tools & plants,
equipments, machnieries, all lead & lifts, loading, unloading, as
directed by Engineer - in -Charge , etc complete.

Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen,
spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing
road surface as per specifications prescribed in MoRTH, including all contractors men, material, consumables, tools &
plants, equipments, machnieries, all lead & lifts, loading, unloading, as directed by Engineer - in -Charge , etc complete.

On W.B.M. @ 0.75 Kg/Sqm


On bituminous surface @ 0.50 Kg/Sqm
Providing and laying Dense Bituminous Macadam using crushed stone aggregates of specified grading, premixed with
bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with
electronics sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem
rollers as specifications to achieve the desired compaction and density, complete as specification prescribed in MoRTH,
including all contractors men, material, consumables, tools & plants, equipments, machnieries, all lead & lifts, loading,
unloading, as directed by Engineer - in -Charge , etc complete.

65 mm average compacted thickness with bitumen of grade VG-30 @ 5% (Percentage by weight of total mix) and filler
@ 2% ( (Percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant
Providing and laying Bituminous Concrete using crushed stone aggregates of specified grading, premixed with
bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with
electronics sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem
rollers as specifications to achieve the desired compaction and density, complete as specification prescribed in MoRTH,
including all contractors men, material, consumables, tools & plants, equipments, machnieries, all lead & lifts, loading,
unloading, as directed by
Engineer - in -Charge , etc complete.

40 mm compacted thickness with bitumen of grade VG-30 @ 5.5% (Percentage by weight of total mix) and filler @ 2%
( (Percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant.
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm
thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x
75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be
galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical
post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long) complete as directed by Engineer - in -Charge
Unit BOQ Quantity BOQ Rate (Rs) Original BOQ Amount (Rs Lacs)

4 5 6 7
30,925

Cum 184,297.00 ₹ 255.62 ₹ 47,109,999.14

Cum 440.00 ₹ 158.24 ₹ 69,625.60


-

Cum 4,682 ₹ 1,782.68 ₹ 8,346,507.76


Cum 21,949 ₹ 1,782.68 ₹ 39,128,043.32
Cum 109,161 ₹ 1,945.34 ₹ 212,355,259.74
Cum 108,316 ₹ 2,407.88 ₹ 260,811,930.08
Cum 29,940 ₹ 2,557.26 ₹ 76,564,364.40
Cum 15,072 ₹ 2,889.24 ₹ 43,546,625.28

Cum/km 289,120 ₹ 30.99 ₹ 8,959,828.80

Cum 2,750 ₹ 267.80 ₹ 736,450.00


Cum/km 2,750 ₹ 179.27 ₹ 492,992.50 5%
Cum 2,750 ₹ 2,867.24 ₹ 7,884,910.00

₹ 706,006,536.62

Nos 12,709 ₹ 6,002.25 ₹ 76,282,595.25


Nos 220 ₹ 6,953.52 ₹ 1,529,774.40

Nos 4,346 ₹ 1,931.51 ₹ 8,394,342.46


Nos 110 ₹ 2,490.51 ₹ 273,956.10
Nos 30,058 ₹ 3,286.90 ₹ 98,797,640.20
Nos 110 ₹ 6,096.21 ₹ 670,583.10

Nos

Nos 829 ₹ 8,385.96 ₹ 6,951,960.84

Nos 110 ₹ 6,605.28 ₹ 726,580.80


Nos 110 ₹ 8,185.03 ₹ 900,353.30
Nos 13,069 ₹ 10,130.04 ₹ 132,389,492.76
Nos 110 ₹ 16,163.98 ₹ 1,778,037.80

Nos 110 ₹ 27,677.70 ₹ 3,044,547.00


meter 9,495 ₹ 7,884.72 ₹ 74,865,416.40

meter

meter 446 ₹ 2,855.46 ₹ 1,273,535.16


meter 8,800 ₹ 643.83 ₹ 5,665,704.00
meter 8,800 ₹ 733.56 ₹ 6,455,328.00

tonne 1,337 ₹ 89,688.76 ₹ 1,199.14

tonne 1,026 ₹ 63,136.89 ₹ 647.78

tonne 109 ₹ 91,561.53 ₹ 99.80


tonne 492 ₹ 83,817.43 ₹ 412.38

meter 7,434 ₹ 8,214.53 ₹ 610.67

meter 1,520 ₹ 10,026.09 ₹ 152.40

meter 1,311 ₹ 10,012.49 ₹ 131.26

meter 7,783 ₹ 7,498.31 ₹ 583.59

sqm 1,810 ₹ 628.14 ₹ 11.37


sqm 25,113 ₹ 1,256.27 ₹ 315.49
sqm 38,012 ₹ 1,884.41 ₹ 716.30
sqm 440 ₹ 2,512.54 ₹ 11.06
sqm 42,271 ₹ 3,140.67 ₹ 1,327.59
sqm 19,237 ₹ 3,768.81 ₹ 725.01
cum 14,455 ₹ 12,562.68 ₹ 1,815.94

cum 497 ₹ 13,314.55 ₹ 6,617,331.35

cum 1,485 ₹ 13,314.55 ₹ 19,772,106.75

sqm 60,500 ₹ 399.44 ₹ 24,166,120.00

tonne 1,097 ₹ 162,048.81 ₹ 177,767,544.57

cum

cum 28,092 ₹ 8,621.01 ₹ 242,181,412.92


cum 3,599 ₹ 8,621.01 ₹ 31,027,014.99
cum 110 ₹ 9,740.79 ₹ 1,071,486.90

cum 132 ₹ 8,621.01 ₹ 1,137,973.32

cum 110 ₹ 8,621.01 ₹ 948,311.10

cum
cum 945 ₹ 5,619.59 ₹ 5,310,512.55
cum 298 ₹ 5,046.39 ₹ 1,503,824.22

cum 8,932 ₹ 9,139.44 ₹ 81,633,478.08

cum 1,599 ₹ 8,621.01 ₹ 13,784,994.99

₹ 1,026,930,719.09
meter 275 ₹ 33.05 ₹ 9,088.75
meter 458 ₹ 50.69 ₹ 23,216.02

meter 275 ₹ 163.97 ₹ 45,091.75


meter 62,818 ₹ 160.25 ₹ 10,066,584.50
meter 12,038 ₹ 311.94 ₹ 3,755,133.72

meter 1,144 ₹ 305.42 ₹ 349,400.48

meter 62,818 ₹ 327.55 ₹ 20,576,035.90

meter 4,021 ₹ 1,197.30 ₹ 4,814,343.30


meter 447 ₹ 2,248.53 ₹ 1,005,092.91
meter 458 ₹ 1,502.71 ₹ 688,241.18
meter 44 ₹ 2,937.95 ₹ 129,269.80
meter 275 ₹ 1,197.30 ₹ 329,257.50
meter 275 ₹ 1,797.06 ₹ 494,191.50

meter 121 ₹ 2,248.53 ₹ 272,072.13

meter 13,851 ₹ 3,134.11 ₹ 43,410,557.61


meter 193 ₹ 3,110.62 ₹ 600,349.66
meter 138 ₹ 159.32 ₹ 21,986.16

meter 100,799 ₹ 508.14 ₹ 51,220,003.86

sqm 83,969 ₹ 1,361.34 ₹ 114,310,358.46

meter 8,936 ₹ 508.47 ₹ 4,543,687.92

KWh 1,463,000 ₹ 26.56 ₹ 38,857,280.00

meter 8,936 ₹ 140.96 ₹ 1,259,618.56


meter 165 ₹ 140.96 ₹ 23,258.40
nos 3,574 ₹ 99.17 ₹ 354,433.58
meter 35,834 ₹ 191.44 ₹ 6,860,060.96
meter 28,417 ₹ 315.37 ₹ 8,961,869.29

tonne 6,434 ₹ 10,543.50 ₹ 67,836,879.00

sqm 37,059 ₹ 636.28 ₹ 23,579,900.52

MT 8,042 ₹ 1,231.61 ₹ 9,904,607.62

MT 92 ₹ 196,495.78 ₹ 18,077,611.76

Nos 1,990 ₹ 1,573.29 ₹ 3,130,847.10

Nos 42 ₹ 46,423.25 ₹ 1,949,776.50

Nos 34 ₹ 47,121.45 ₹ 1,602,129.30

Nos 80 ₹ 46,423.25 ₹ 3,713,860.00

Nos 5 ₹ 25,138.80 ₹ 125,694.00


Nos 24 ₹ 47,524.50 ₹ 1,140,588.00

Nos 36 ₹ 10,296.98 ₹ 370,691.28

set 8 ₹ 818,477.50 ₹ 6,547,820.00

set 8 ₹ 459,403.50 ₹ 3,675,228.00

cum

cum 7,329 ₹ 255.62 ₹ 1,873,438.98

cum 8,800 ₹ 92.96 ₹ 818,048.00

cum 1,471 ₹ 153.82 ₹ 226,269.22

Sqm 13,530 ₹ 61.97 ₹ 838,454.10

Cum 1,471 ₹ 100.70 ₹ 148,129.70


Cum 2,200 ₹ 1,976.31 ₹ 4,347,882.00

Cum 2,200 ₹ 3,170.30 ₹ 6,974,660.00

nos 30 ₹ 9,373.04 ₹ 281,191.20

RMT 147 ₹ 3,173.40 ₹ 466,489.80


RMT 440 ₹ 6,158.58 ₹ 2,709,775.20

cum 5,135 ₹ 3,465.62 ₹ 17,795,958.70

cum 1,320 ₹ 1,468.40 ₹ 1,938,288.00

m 1,615 ₹ 214.27 ₹ 346,046.05

cum 1,467 ₹ 1,788.73 ₹ 2,624,066.91

sqm 24,200 ₹ 68.47 ₹ 1,656,974.00


sqm 24,200 ₹ 49.66 ₹ 1,201,772.00

Cum 1,540.00 ₹ 11,253.55 ₹ 17,330,467.00

cum 955.00 ₹ 12,285.31 ₹ 11,732,471.05

RMT 735.00 ₹ 3,799.66 ₹ 2,792,750.10

₹ 3,996,613,760.40
₹ 40,000,000.00
₹ 4,036,613,760.40
8.9635 ₹ 170.31
CS-DHORAJIA PROJECTS JV
PROJECT : CONSTRUCTION OF TUNNEL T12 & T13 SIVOK- RANGPO RAIL PROJECT
BILL OF QUANTITIES

S No Item No Description of Items Unit BOQ Quantity BOQ Rate (Rs) Rate

3 4 5 6
E APPROACH ROADS TO PORTALS(T12-P1, T12-P2)(approx,2000m long) including nalla crossing, protection work and other ancillary works
Earthwork in formation in embankment by using corporations suitable cut spoils obtained from cuttings and leading,
spreading, watering, consolidating etc., as per technical specification prescribed in MoRTH, with contractors men,
2 E102 material, consumables, tools & plants, equipments, machineries, including all lead & lifts, loading , unloading as directed cum 8,800 ₹ 92.96 ₹ 74.37
by Engineer - in -Charge , etc. complete.
Cleaning side drains in cuttings by the side of track (Kutcha or Pucca) including disposal of the debris, soil, muck etc.
3 E103 with contractors men, material, consumables, tools & plants, equipments, machineries, including all lead & lifts, loading , cum 1,471 ₹ 153.82 ₹ 123.06
unloading as directed by Engineer - in -Charge , etc. complete.
Preparation of sub grade by excavating earth upto 22.5cm depth, dressing to camber and consolidating with power road
roller of 8 to 12 tone capacity including making good the undulations etc. and disposal of surplus earth with lead upto
4 E104 50m, as per technical specification prescribed in MoRTH, with contractors men, material, consumables, tools & plants, Sqm 13,530 ₹ 61.97 ₹ 49.58
equipments, machineries, including all lead & lifts, loading , unloading as directed by Engineer - in -Charge , etc.
complete.

Removal of slips beyond theoretical profile and occurred not due to fault of contractor (to be certified by Engineer-in-
5 E105 charge), during excavation or after approach road construction during the currency of contract, has to be arranged by the Cum 1,471 ₹ 100.70 ₹ 80.56
contractor by deploying suitable machineries and men.
Constructing granular sub base of required compacted thickness as per technical specification prescribed in MoRTH,
6 E106 with contractors men, material, consumables, tools & plants, equipments, machineries, including all lead & lifts, loading , Cum 2,200 ₹ 1,976.31 ₹ 1,581.05
unloading as directed by Engineer - in -Charge , etc complete.
Constructing Water Bound Macadam base course of required compacted thickness as per technical specification
7 E107 prescribed in MoRTH, with contractors men, material, consumables, tools & plants, equipments, machineries, all lead & Cum 2,200 ₹ 3,170.30 ₹ 2,536.24
lifts, loading , unloading as directed by Engineer - in -Charge , etc complete.
Supplying & fixing Mandatory/Cautionary/warning/ Informatory retro-reflectorised sign boards as per technical
8 E108 specification prescribed in MoRTH , with contractors men, material, consumables, tools & plants, equipments,
machineries, all lead & lifts, loading , unloading ,as directed by Engineer - in - Charge , etc complete.
Supplying and laying reinforced cement concrete pipes NP2 of various sizes, for culverts on cement concrete leveling
course including fixing collar with cement mortar 1:2 as per the drawing and as per specification prescribed in MoRTH,
with contractors men, material, consumables, tools & plants, equipments, machineries, all lead & lifts, loading , unloading
as directed by Engineer - in -Charge , etc complete. The rate includes Cost of pipes, hauling, storing, laying in position ,
9 E109 aligning, joining complete and all incidental costs to complete the work as per specification. (Ancillary works such as
excavation with back filling, leveling course, concrete and masonry shall be paid separately in relevant schedule
items).

9_1 E1091 600mm dia. RMT 147 ₹ 3,173.40 ₹ 2,538.72


9_2 E1092 900mm dia. RMT 440 ₹ 6,158.58 ₹ 4,926.86
U-PVC Pipe (working Pressure 4 Kg/Sqm) single socketed pipe 110mm dia. for drainag with contractors men, material,
consumables, tools & plants, equipments, machineries, including all lead & lifts, loading ,
12 E1012 unloading as directed by Engineer - in -Charge , etc. complete. m 1,615 ₹ 214.27 ₹ 171.42

Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen,
spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing
14 E1014 road surface as per specifications prescribed in MoRTH, including all contractors men, material, consumables, tools &
plants, equipments, machnieries, all lead & lifts, loading, unloading, as directed by Engineer - in -Charge , etc complete.

14_1 E10141 On W.B.M. @ 0.75 Kg/Sqm sqm 24,200 ₹ 68.47 ₹ 54.78


14_2 E10142 On bituminous surface @ 0.50 Kg/Sqm sqm 24,200 ₹ 49.66 ₹ 39.73
Providing and laying Dense Bituminous Macadam using crushed stone aggregates of specified grading, premixed with
bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with
electronics sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem
15 E1015 rollers as specifications to achieve the desired compaction and density, complete as specification prescribed in MoRTH,
including all contractors men, material, consumables, tools & plants, equipments, machnieries, all lead & lifts, loading,
unloading, as directed by Engineer - in -Charge , etc complete.

65 mm average compacted thickness with bitumen of grade VG-30 @ 5% (Percentage by weight of total mix) and filler
15_1 E1015 @ 2% ( (Percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant Cum 1,540.00 ₹ 11,253.55 ₹ 9,002.84
Providing and laying Bituminous Concrete using crushed stone aggregates of specified grading, premixed with
bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with
electronics sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem
rollers as specifications to achieve the desired compaction and density, complete as specification prescribed in MoRTH,
16 E1016 including all contractors men, material, consumables, tools & plants, equipments, machnieries, all lead & lifts, loading,
unloading, as directed by
Engineer - in -Charge , etc complete.

40 mm compacted thickness with bitumen of grade VG-30 @ 5.5% (Percentage by weight of total mix) and filler @ 2%
16_1 E10161 ( (Percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant. cum 955.00 ₹ 12,285.31 ₹ 9,828.25

Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm
thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x
75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be
17 E1017 galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical RMT 735.00 ₹ 3,799.66 ₹ 3,039.73
post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long) complete as directed by Engineer - in -Charge

TOTAL FOR SCHEDULE FOR E=


CS-DHORAJIA PROJECTS JV
PROJECT : CONSTRUCTION OF TUNNEL T12 & T13 SIVOK- RANGPO RAIL PROJECT
BILL OF QUANTITIES

S No Item No Description of Items Unit BOQ Quantity BOQ Rate (Rs) Rate Original BOQ Amount (Rs Lacs)

3 4 5 6 7
E APPROACH ROADS TO PORTALS(T12-P1, T12-P2)(approx,2000m long) including nalla crossing, protection work and other ancillary works
Earthwork in cutting in all kinds of soil and rock including rock requiring use of blasting/ controlled blasting /
chiseling where necessary, in cutting for road formation, side drains, catch water drains, diversion of nallahs
as per technical Specification prescribed in MoRTH, with contractors men, material, consumables , tools &
1 E101 plants, equipments, machineries, including all lead & lifts, loading , unloading as cum
directed by Engineer - in -Charge , etc complete.

1_1 E1011 In all condition and classifications of soil cum 7,329 ₹ 255.62 ₹ 204.50 ₹ 1,873,438.98
Earthwork in formation in embankment by using corporations suitable cut spoils obtained from cuttings and
leading, spreading, watering, consolidating etc., as per technical specification prescribed in MoRTH, with
2 E102 contractors men, material, consumables, tools & plants, equipments, machineries, including all lead & lifts, cum 8,800 ₹ 92.96 ₹ 74.37 ₹ 818,048.00
loading , unloading as directed by Engineer - in -Charge , etc. complete.
Preparation of sub grade by excavating earth upto 22.5cm depth, dressing to camber and consolidating with
power road roller of 8 to 12 tone capacity including making good the undulations etc. and disposal of surplus
4 E104 earth with lead upto 50m, as per technical specification prescribed in MoRTH, with contractors men, material, Sqm 13,530 ₹ 61.97 ₹ 49.58 ₹ 838,454.10
consumables, tools & plants, equipments, machineries, including all lead & lifts, loading , unloading as
directed by Engineer - in -Charge , etc. complete.
Removal of slips beyond theoretical profile and occurred not due to fault of contractor (to be certified by
5 E105 Engineer-in-charge), during excavation or after approach road construction during the currency of contract, Cum 1,471 ₹ 100.70 ₹ 80.56 ₹ 148,129.70
has to be arranged by the contractor by deploying suitable machineries and men.
Constructing granular sub base of required compacted thickness as per technical specification prescribed in
6 E106 MoRTH, with contractors men, material, consumables, tools & plants, equipments, machineries, including all Cum 2,200 ₹ 1,976.31 ₹ 1,581.05 ₹ 4,347,882.00
lead & lifts, loading , unloading as directed by Engineer - in -Charge , etc complete.
Constructing Water Bound Macadam base course of required compacted thickness as per technical
specification prescribed in MoRTH, with contractors men, material, consumables, tools & plants, equipments,
7 E107 machineries, all lead & lifts, loading , unloading as directed by Engineer - in -Charge , etc complete. Cum 2,200 ₹ 3,170.30 ₹ 2,536.24 ₹ 6,974,660.00

Supplying and laying reinforced cement concrete pipes NP2 of various sizes, for culverts on cement concrete
leveling course including fixing collar with cement mortar 1:2 as per the drawing and as per specification
prescribed in MoRTH, with contractors men, material, consumables, tools & plants, equipments, machineries,
all lead & lifts, loading , unloading as directed by Engineer - in -Charge , etc complete. The rate includes Cost
of pipes, hauling, storing, laying in position , aligning, joining complete and all incidental costs to complete the
9 E109 ₹ 0.00
work as per specification. (Ancillary works such as excavation with back filling, leveling course, concrete and
masonry shall be paid separately in relevant schedule
items).

9_1 E1091 600mm dia. RMT 147 ₹ 3,173.40 ₹ 2,538.72 ₹ 466,489.80


9_2 E1092 900mm dia. RMT 440 ₹ 6,158.58 ₹ 4,926.86 ₹ 2,709,775.20
Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the
bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and
14 E1014 preparing the existing road surface as per specifications prescribed in MoRTH, including all contractors men, ₹ 0.00
material, consumables, tools & plants, equipments, machnieries, all lead & lifts, loading, unloading, as
directed by Engineer - in -Charge , etc complete.
14_1 E10141 On W.B.M. @ 0.75 Kg/Sqm sqm 24,200 ₹ 68.47 ₹ 54.78 ₹ 1,656,974.00
14_2 E10142 On bituminous surface @ 0.50 Kg/Sqm sqm 24,200 ₹ 49.66 ₹ 39.73 ₹ 1,201,772.00
Providing and laying Dense Bituminous Macadam using crushed stone aggregates of specified grading,
premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver
finisher equipped with electronics sensor to the required grade, level and alignment and rolling with smooth
15 E1015 wheeled, vibratory and tandem rollers as specifications to achieve the desired compaction and density, ₹ 0.00
complete as specification prescribed in MoRTH, including all contractors men, material, consumables, tools &
plants, equipments, machnieries, all lead & lifts, loading, unloading, as directed by Engineer - in -Charge , etc
complete.

65 mm average compacted thickness with bitumen of grade VG-30 @ 5% (Percentage by weight of total mix)
15_1 E1015 Cum 1,540.00 ₹ 11,253.55 ₹ 9,002.84 ₹ 17,330,467.00
and filler @ 2% ( (Percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant
Providing and laying Bituminous Concrete using crushed stone aggregates of specified grading, premixed with
bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher
equipped with electronics sensor to the required grade, level and alignment and rolling with smooth wheeled,
vibratory and tandem rollers as specifications to achieve the desired compaction and density, complete as
16 E1016 specification prescribed in MoRTH, including all contractors men, material, consumables, tools & plants, ₹ 0.00
equipments, machnieries, all lead & lifts, loading, unloading, as directed by
Engineer - in -Charge , etc complete.

40 mm compacted thickness with bitumen of grade VG-30 @ 5.5% (Percentage by weight of total mix) and
16_1 E10161 filler @ 2% ( (Percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant. cum 955.00 ₹ 12,285.31 ₹ 9,828.25 ₹ 11,732,471.05

Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising
of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel
vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all
17 E1017 steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, RMT 735.00 ₹ 3,799.66 ₹ 3,039.73 ₹ 2,792,750.10
metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm
long) complete as directed by Engineer - in -Charge

TOTAL FOR SCHEDULE FOR E= ₹ 76,103,132.01

You might also like