BOQ For Dhorajia Const

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 151

CHECK – LIST

Name of Contractor/Supplier-:CS- Dhorajia JV, C-25, Trezure Enclave, Nr. Aryaman Bungalows, Thaltej-Shilaj Road, Thaltej,
1- Ahmedabad, Sujarat-380059

Name of work: Construction of Two no. Tunnel T-12( Between Km 37+097 to Km 38+531 approx.) and T-13 (between Km
2- 38+775 to Km 41+403 approx) on Sivok (West Bengal) to Rangpo (Sikkim) New Single line BG Railway Line Project.

3- LOA No.: IRCON/CC/TN/SR-2046/Const/T12&T13/12/1937. dated.05.10.202


4- Bill No.-11th RA.

S.
ITEM YES NO Remarks
No.
With Ref. to bill
1 Measurement has been entered by the authorized person. √ no.CSDCCJV/T12&13/Siteoffice/2021/RAB-11 Dated:
01.12.2021

Bill has been certified with reference to approved LOA/Work


2 Order/M.B./GRN

Bill is properly signed by the claimant or by his Authorized


3
Representative

With Ref. to bill


Bill is certified and recommended for payment by the
4
Authorized Officer/Staff
√ no.CSDCCJV/T12&13/Siteoffice/2021/RAB-11 Dated:
01.12.2021. and endorsed & instructed by JGM/C-V

Validity of the LOA/Work Order/Supply Order has been


5
checked

Required time extension for the completion of work has been


6 given by the Competent Authority/Time extension further not - - NA
required

With Ref. to bill


Necessary certificate for completion of work/supply has been
7
recorded with respect to the terms of LOA/Work/Supply Order
√ no.CSDCCJV/T12&13/Siteoffice/2021/RAB-11
Dated: 01.12.2021

Value of the bill/quantity is not exceeded to the permissible


8 limit. Certified variation statement with approval is enclosed √
along with the bill.

Circulars issued by Corp. office regarding test check,


9 technical check, other statutory formalities etc are checked √
and complied.
Extra items included in the bill have already been approved
10
before entering into the Measurement Book

Certificate that Secured/Mobilization Advance paid to the


11 contractor has been recovered, as per the terms and - N.A
conditions of contract, in the bill.

Entry has been made in DMTR/Stock Register and entry has


12 - N.A
been authenticated by the concerned Staff/Officer.

Material consumption statement for steel, cement or any


13 - N.A
other item is to be enclosed with bill.
Compliance of above checklist is ensured before sending for payments to Account Division.

Verified By

Name &
Designation
of Officer

AM/ACC.

Controlling Officer

GM/PH
On Account Bill-11

Total BOQ Qty For


S.No. Item No. Desription of item Unit Rate Amount for Dhorajia Const.
Dhorajia Const.

A - EXCAVATION (OPEN/UNDER GROUND)


Valid for all items for Division A1: "Excavation" include plant, logistics, equipment, manpower,
materials, auxiliary works as defined in the specifications and all other operational costs. All equipment used
shall be suitable
Excavation to linestoand perform
levelsthe works asbyper
as required the contract
prevailingand accordingconditions
geotechnical to the state of art technology.
for installation of support
The cost associated
as shown on the drawings with the
or as deployment
directed byand use of the
the Engineer appropriate
in portal equipment
areas and rescue atplacethesites
various
withwork
limited 0 0
sites (i.e.
access for worksberms,
to construct in open areas,
surface maindivert
drains, tunnel, escape
natural tunnel,
streams, side
nallah andadits, cross
the like etc.passages,
This item roads
includes:
-water basins)ofshall
excavation be included
all types of ground in all items.
(soils and rock) by any means of excavation (i.e. digging, blasting).
- sequential excavation at limited height and slope support as shown on the drawings resp. as
directed by the Engineer following the prevailing geotechnical conditions. Support elements will be paid
separately
- cutting of trees, shrubs, roots and other vegetation including loading onto transport,
transportation and appropriate depositing, separate from other material
- clearing of loose debris and loosened rock above cuts
1 A101 - appropriate measures for diversion of any waters cum 92148.5 ₹ 255.62 23554999.57
- loading of excavated material onto transport, ascending and descending handling of excavation and
materials, transportation lead up to 2.0 km (one way distance) from point of excavation to center of gravity
of designated depositing sites and appropriate depositing and compaction of the material to lines and
levels as a complete job as per specification or as directed by the Engineer in charge including
handling if required
-Earthworks
setting out forandfills
demarcation
with suitable of earthworks
excavationand muck These
material. deposits items include:
securityoffencing
- Supply suitable,along
freetop of cut filling material
draining
-Measurement and payment
Transport of suitable, shall be
free draining for volumes
material to filling in
sitetheir solid states as per drawings based on
contractor´s survey before
- Selection, segregation, and afterandexcavation.
processing appropriateContractor´s survey shall
temporary restoring be submitted
of excavated materialto the Engineer
1_1 A101a -for approval
Placing of theprior to excavation.
fill material in layers not exceeding 300 mm cum 220 ₹ 158.24 34812.8
- Compaction and levelling of the fill material according to standards (RDSO), technical specifications and
directed by Engineer
- Appropriate preparation of the surface (re-cultivation) to lines and levels as a complete job as per
specification/as per drawings or as directed by the Engineer-in-Charge
Measurement and
Underground payment shall
excavation (Topbe Heading,
for the volume
Bench, of fillInvert)
materialfor
in itsmain
solid tunnel,
compacted aditstate as shownand
(vehicular
on the designniches
pedestrian), drawings.
(Electrical, Trolley Refuge, turning niche and the like) and connection of the main tunnel
to the adit by all means of excavation (drilling, blasting/ control blasting (wherever
required),scaling/ chipping, digging etc) in accordance with the New Austrian Tunnelling Method
(NATM). This item includes:
- Mandatory excavation in sub divisons (Top heading, bench and invert) according to geometries,
2 A102 excavation and support sequence shown on design drawings and as described in the technical 0 0
specifications
- in rock the application of smooth blasting techniques with contour hole spacing not exceeding 300
mm
- Simultaneous excavation works in top heading, and half sided benching in rail tunnels as per
technical specifications or as directed by Engineer
- Systematic exploratory drillholes
- Appropriate Plant and Equipment with appropriate size specifically selected for the various tunnel
2_1 A1021 Excavation in Support Class 1
sizes and as declared in the technical bid cum 2341 ₹ 1,782.68 4173253.88
2_2 A1022 -Excavation
Face maping in Support
& Rock Class 2
Classification after each blast. cum 10974.5 ₹ 1,782.68 19564021.66
2_3 A1023 -Excavation
Provision of in drainages
Support Class for all3 surfaces with vehicular circulation cum 54580.5 ₹ 1,945.34 106177629.87
- Provision of adequate lighting and construction ventilation
2_4 A1024 Excavation in Support Class 4
- Temporary backfilling with suitable compactable, free draining material of a minimum thickness of cum 54158 ₹ 2,407.88 130405965.04
2_5 A1025 400 Excavation
mm in forSupport
enabling Class 5
maintenance with grader to facilitate vehicular circulation in tunnel. cum 14970 ₹ 2,557.26 38282182.2
2_6 A1026 Complementing
Excavation in Support the backfill
Classmaterial
6 throughout the construction period. Its removal, cum 7536 ₹ 2,889.24 21773312.64
transport (independent from distance) and depositing at designated deposit areas.
- Profiling and re-profiling of tunnel to achieve the dimensions of approved cross sections Page 2 of 151
- Loading and unloading of excavated material, transportation to muck deposits up to a distance of 2.0 km
(one way) from portal head to designated muck deposit areas. (The lead shall always be measured from
On Account Bill-11

Total BOQ Qty For


S.No. Item No. Desription of item Unit Rate Amount for Dhorajia Const.
Dhorajia Const.

Extra-over for transportation of spoil from excavation in open areas for distances from point of
excavation to the center of gravity of muck deposits in excess of 2.0 km single (one way distance).
Measurement and payment will be per cum per km (cum x km). Volumes in cum shall be determined for
materials in their original solid states.
A1027 Example: Distance from point of excavation to centre of gravity of muck deposit is 6.0 km. The
cum/
2_7 144560 ₹ 30.99 4479914.4
Quantity excavated is 100 cubic metres. Payment under this item is therefore for 6.0 km minus 2.0 km km
= 4.0 km times 100 cum.
Extra payment would be for 400 cum KM.

Extra-over for tunnel excavation under excessive water inflow conditions (measured as greater than 50 l/s
and confirmed by the Engineer within 20.0m from the excavation face). Accumulation of measured
quantities of water inflow is not permitted. Determination of the water quantities shall be done out of
3 A103 temporary sumps at 20 m distance to the face by means of a pump and flow meter or other suitable cum 1375 ₹ 267.80 368225
arrangements proposed by the Contractor and approved by the Engineer. Payment as
per volume of theoretical tunnel excavation under the respective water inflow.

4 A104 Rehandling of muck as per directions of engineer including loading and transportation at for all leads cum/
and lift 1375 ₹ 179.27 246496.25
km
Excavation of drain channels inside tunnel with hydraulic hammer for construction drainage trenches in all
5 A105 types of rock including disposal of muck as directed cum 1375 ₹ 2,867.24 3942455
TOTAL FOR SCHEDULE A 0
B1- ROCK BOLTS AND OTHER STEEL SUPPORTS ETC. 0
All items for: "Rock bolts and other steel support" include plant, logistics, equipment, manpower, time for
installation, materials, auxiliary works, and all other operational costs. Materials used shall at least meet the
minimum requirements of the technical specifications. All equipment used shall be suitable to perform works
properly. The costs associated with using appropriate equipment with suitable size of rock bolting as per 0
drawings at different construction sites (i.e., works in open areas, main tunnel, escape tunnel, side adits,
cross passages, roads, location with limited access) shall be included in all items.

Supply, drilling, testing and installation of Swellex type rockbolts of the specified length, ultimate load
1 B101 Fy>=200kN (tunnel support) as per approved drawings & specifications or as directed by Engineer.The rate 0
shall include costs of all materials, labour, equipment, etc. required for the complete job.
1_1 B1011 Length 3m nos. 6,355 ₹ 6,002.25 38141297.63
1_2 B1012 Length 4m nos. 110 ₹ 6,953.52 764887.2
SN type rock bolts for tunnel support, slope support, face bolts etc.
Supply, drilling, installation, grouting and testing of SN type rock bolts of specified length L, 200kN minimum
2 B102 ultimate load as per design drawings, technical specifications or as directed by Engineer. Measurement 0 0
and payment shall be per piece tested and accepted installed rock bolt (for exact payment details see
specifications).

2_1 B1021 Length 3 m nos. 2,173 ₹ 1,931.51 4197171.23


2_2 B1022 Length 4 m nos. 55 ₹ 2,490.51 136978.05
2_3 B1023 Length 6 m nos. 15,029 ₹ 3,286.90 49398820.1
2_4 B1024 Length 9m nos. 55 ₹ 6,096.21 335291.55

Page 3 of 151
On Account Bill-11

Total BOQ Qty For


S.No. Item No. Desription of item Unit Rate Amount for Dhorajia Const.
Dhorajia Const.

Supply, drilling, installation, trsting and grouting of fibre glass all thread rock bolts of specified length and
ultimate strength Fy>=200KN (for face bolting) as per approved drawings pand specifications or as directed
2_6 B102A by Engineer. The rate shall include costs of all material, labour, equipment etc required for the complete job 0 0

2_7 B102A1 Length 9m. nos. 415 ₹ 8,385.96 3475980.42


Self drilling rock bolts (IBO) for tunnel support, slope support, face bolts etc. Supply, drilling, installation,
grouting and testing of self driling rock bolts of specified length L, specified minimum ultimate load as per
design drawings (Fy=200kN), technical specifications or as directed by Engineer. Drilling with grout flushing
is mandatory. This item includes:
3 B103 - couplings 0 0
- sacrificial drilling bits + grouting
Measurement and payment shall be per piece appropriately installed rock bolts (for exact payment details see
specifications).

3_1 B1031 Length 3 m, nos. 55 ₹ 6,605.28 363290.4


3_2 B1032 Length 4 m, nos. 55 ₹ 8,185.03 450176.65
3_3 B1033 Length 6 m, nos. 6,535 ₹ 10,130.04 66194746.38
3_4 B1034 Length 9 m, nos. 55 ₹ 16,163.98 889018.9
Supply , drilling, installation, testing and grouting of Fibre Glass Self -drilling type rockbolts of the specified
length and ultimate strength (for face bolting ), Fy>= 200 KN, as per approved drawings & specifications or as
3A B103A directed by Engineer. The rate shall include costs of all materials, labour, equipments, etc. required for the 0 0
complete job.

B103A1 Length 9 m, Nos 55 ₹ 27,677.70 1522273.5


Pipe Roof Umbrella: Supply, drilling, installation and grouting of self-drilling pipe technology of length up to
18m as per approved drawings & specifications (single row, double row, skin-to-skin single row) or as directed
by Engineer. The rate shall include costs of all materials like starter units, pipes (perforated), drill bits, grouting
packers etc., labour, equipments, etc. required for the complete job. This item includes:
- Mobilistaion and demobilsation of all equipment necessary (drilling jumbo equipped with AT-casing
4 B104 system, Symmetrix or similar) for single row, double row or skin-to skin single row 0 0
- the necessary excavation
- loading, transport and appropriate depositing of the excavated material
- the excess use of inner lining concrete and waterproofing
- all auxiliary works and materials necessary
Measurement and payment shall be per meter installed pipe roof pipe as directed and approved by the
Engineer.
Outer diameter 76mm, steel grade S355, wall thickness 6,3mm (Pipe Connection Types = Nipple Coupling)
4_1 B1041 meter 4,748 ₹ 7,884.72 37432708.2
Supply, drilling hole, installation, testing and grouting of forepoling as per approved drawings &
5 B105 specifications or as directed by Engineer. 200kN minimum ultimate load. The rate shall include costs of all 0 0
materials, labour, equipments, etc. required for the complete job.
5_1 B1051 Self-drilling bolts, Fy >= 200 KN meter 223 ₹ 2,855.46 636767.58
5_2 B1052 Reinforcement bars 32mm dia meter 4,400 ₹ 643.83 2832852
5_3 B1053 Steel pipe 40 mm dia - Wall thickness 4 mm meter 4,400 ₹ 733.56 3227664
Page 4 of 151
On Account Bill-11

Total BOQ Qty For


S.No. Item No. Desription of item Unit Rate Amount for Dhorajia Const.
Dhorajia Const.

Supply, fabrication, storing and erection of lattice girders . Geometries shall be as shown on design
drawings, in technical specifications or directed by the Engineer. These items include:
- all necessary elements for connection of lattice girder partitions, such as connection plate, connection bolts
and nuts etc.
- all auxiliary materials
6 B106 - bearing elements tonne 669 ₹ 89,688.76 59956936.06
Minimum steel grade is Fe 500. For underground works, measurement and payment shall be for the
theoretical length of lattice girders measured using the Payment line as shown on design drawings and in the
technical specifications.

Supply, cutting, bending, placing, binding steel reinforcement of grade Fe 500 as per approved drawings &
specifications or as directed by Engineer, for joint reinforcement of initial and final lining. This shall include
7 B107 straightening, hooking all lead, lift, all auxiliary materials, etc. (Nothing extra shall be paid for wastage of tonne 513 ₹ 63,136.89 32389224.57
reinforcement and binding wire).
Supply and placement of welded wire mesh of sizes 150x150x6, 100x100x6 or any other size as directed
by Engineer as reinforcement of sprayed concrete for tunnel lining works as shown
on design drawings, specifications or as directed by Engineer. Steel grade minimum Fe500. This item also
includes:
- Fixing elements and materials
- cutting, bending and placement
8 B108 - all auxiliary materials and works necessary tonne 55 ₹ 91,561.53 4990103.39
Measurement and payment shall be per square meter for each layer installed and instructed, measured along
Payment Line (see specifications). Overlapping as mentioned in technical specifications is mandatory but
shall not be paid
extra.

Supply, fabrication and erection of steel rib and all accessories including all lead, lift, wastage,storing,drilling
holes, fixing in phases etc. and installation of accessories for joining the steel rib segments as per approved
workshop drawings of contractor & specifications or as directed by Engineer.The rate shall include costs of all
9 B109 materials, labour, equipment,welding, etc tonne 246 ₹ 83,817.43 20619087.78
for the complete job including additional cost for enlargement
of top heading footing.

Permanent anchorage using prestressed bar anchors D32mm, fp 0.1k/fpk = 950/1050 N/mm2, with an
average length of 12 m including drilling, installation, grouting and prestress really installed of 200 KN as per
approved drawings & specifications or as directed by Engineer. The rate shall include costs of all materials,
10 B110 labout, equipments, etc. required for the complete job as per drawings, specifications or as directed by the m 3,717 ₹ 8,214.53 30533408.01
Engineer- in- Charge. Measurement and payment will be per m measured on the drawings.

Special treatment Tube-A-Manchette steel dia int 40mm and ext 50mm for grout injection through sleeves
valves @ 0.5m, in umbrellas or bottom in any length drill 75mm (Fe 500) at peripheral position, distribution
defined as per the decision of Engineer in charge.The rate shall include costs of all materials, labour,
11 B111 equipment, grouting of the pipe and ground consolidation injection by TAM meter 760 ₹ 10,026.09 7619828.4
sleeves, etc. required for the complete job.

Page 5 of 151
On Account Bill-11

Total BOQ Qty For


S.No. Item No. Desription of item Unit Rate Amount for Dhorajia Const.
Dhorajia Const.

Special treatment Tube-A-Manchette hard PVC dia int 40mm and ext 50mm for grout injection through
sleeves valves @ 0.5m, 20m length drill 75mm (Fe 500) at peripheral position, distribution defined as per the
decision of Engineer in charge.The rate shall include costs of all materials, labour, equipment, grouting of the
12 B112 pipe and ground consolidation injection by TAM sleeves, etc. required for meter 656 ₹ 10,012.49 6563187.2
the complete job.

Supply, drilling and installation of steel micropiles of dia upto 160 mm in vertical position or at an inclination for
all kinds of soil/rock class at any depth and as per approved drawings & specifications or as directed by
Engineer. The works include: drilling D200mm, installation of the pipe and grouting around and inside the pipe
up to fulfill the volume drilled no ocupated by the pipe. The rate shall include all labour, materials, connectors,
13 B113
welding, lead, lift, handling, including grouting with M35 grade of grout, wastage complete with contractor's 0 0
own equipment as a complete job as per specifications or as directed by Engineer-in-Charge.

B113A For Open work meter 3,892 ₹ 7,498.31 29179673.37


TOTAL FOR SCHEDULE B1 0
B2 SHOTCRETE AND CONCRETE WORKS 0
All items for sprayed concrete and concrete works include procurement, fabrication, transportation,
delivery, appropriate installation and placing material, time for installation, plant, equipment, logistics and all
other operational costs. Materials used shall at least meet the minimum requirements of the technical
specifications. All equipment used shall be suitable to perform works properly. The costs associated with
using appropriate equipment at different construction sites (i.e., works in open areas, main tunnel, escape 0 0
tunnel, side adits, cross passages, roads, location with limited access) shall be included in all items.

Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical
thickness as shown on design drawings, in technical specifications and directed by the Engineer. These items
include:
- sprayed concrete of grade M25 according to Indian Standard
- all concrete additives
- wastage of sprayed concrete
1 B201 - rebound 0 0
- application of shotcrete in multiple layers
- all auxiliary materials and works
Measurement and payment shall be for the theoretical area or volume as shown on the design drawings in
square metres/ cubic meters, measured along Payment-Line (see specifications).

1_1 B 2011 50 mm thick shotcrete lining in tunnel sqm 905 ₹ 628.14 568466.7
1_2 B 2012 100 mm thick shotcrete lining in tunnel sqm 12556.5 ₹ 1,256.27 15774354.26
1_3 B 2013 150 mm thick shotcrete lining in tunnel sqm 19006 ₹ 1,884.41 35815096.46
1_4 B 2014 200 mm thick shotcrete lining in tunnel sqm 220 ₹ 2,512.54 552758.8
1_5 B 2015 250 mm thick shotcrete lining in tunnel sqm 21135.5 ₹ 3,140.67 66379630.79
1_6 B 2016 300 mm thick shotcrete lining in tunnel sqm 9618.5 ₹ 3,768.81 36250298.99
1_7 B 2017 Shotcrete lining for overbreak as per technical specification: cum 7227.5 ₹ 12,562.68 90796769.7
Page 6 of 151
On Account Bill-11

Total BOQ Qty For


S.No. Item No. Desription of item Unit Rate Amount for Dhorajia Const.
Dhorajia Const.

Sprayed concrete works for filling of cavities not caused by fault of contractor due to unavoidable
overbreak which has been designated as such by the Engineer and exceeds a volume of 2 m³ in each
individual case. This item includes:
1_8 B2018 - sprayed concrete of grade M25 according to Indian Standard cum 248.5 ₹ 13,314.55 3308665.68
- wastage of sprayed concrete
- rebound
- all auxiliary materials and works
1_9 B2019 Shotcrete
Measurement in slope stabilization
and payment shall be for the volume of sprayed concrete beyond the boundary surface 'A line' cum 742.5 ₹ 13,314.55 9886053.38
actually used
Sprayed and as
concrete approved
works by the Engineer.
for smoothening layer of 30mm and support of the waterproofing membrane
complying with the requirement in planarity as shown on design drawings, in technical specifications or as
directed by the Engineer. This item includes:
- sprayed concrete of grade M25 according to Indian Standard, maximum aggregate size 8mm
- wastage of sprayed concrete
- rebound
- all auxiliary materials and works
1_10 B20110 - washing down with hot water right before installig of waterproofing system(high pressure water jet, sqm 30250 ₹ 399.44 12083060
minimum
pressure 30 bar)
Measurement and payment shall for the theoretical area as shown on the design drawings in square
metres,
measured along Payment-Line

Extra for over item no B201 for supply and mixing of steel fibre double end hooked loose steel fibres of
circular cross section having diameter of 0.75mm and aspect ratio equal to 49 conforming to EC-
1_11 B20111 certificate of conformity as per EN14889 and tensile strength more than 1100MPa and ultimate strain less tonne 548.5 ₹ 162,048.81 88883772.29
than 4% as per specification and as directed by Engineer
Concrete works for construction of inner lining , inverts etc. as shown on design drawings, in technical
specification and as directed by the Engineer. These items include:
- Design Mix Cement Concrete of grade M30, machine mixed, machine vibrated
- all concrete additives
- Formwork, falsework and scaffolding: number as specified in the contract
- formwork carriages (number as specified in the contract) with adjustment facilities for inner-lining
construction
2 B202 - Contact grouting between primary and inner lining 0 0
- All difficulties due to requirements for cable ducts, pipes or similar
- All difficulties due to reinforcement installation
- All difficulties due to requirements of niches, junctions, cross passages, manholes, widenings etc.
- Curing of concrete to ensure concrete quality as described in the specifications
- sealing and curing agent
- concrete for filling in case of GOB Deformation of Initial Lining (DIL)
Measurement and payment shall be for the theoretical measured volumes of concrete as shown on the
2_1 B2021 designed
Inner lining drawing.
of main tunnel, Adit & niches with movable Shutter and / or Radial Formwork cum 14046 ₹ 8,621.01 121090706.46
2_2 B2022 Inner lining of main tunnel, Adit & niches for Invert cum 1799.5 ₹ 8,621.01 15513507.5

Page 7 of 151
On Account Bill-11

Total BOQ Qty For


S.No. Item No. Desription of item Unit Rate Amount for Dhorajia Const.
Dhorajia Const.

Construction , dowel jointed, cement concrete pavement of M30 grade concrete with 43 grade
cement, coarse and fine aggregate conforming of IS:383, maximum size of coarse aggregate not
exceeding 25mm, mixed in a batching plant as per approved mix design, transported at site, laid with a fixed
form or slip form paver or by fixed shuttering, spread, compacted and finished in a continuous
2_3 B2023 operation and texturing, including provision of contraction, expansion, construction and longitudinal joints, joint cum 55 ₹ 9,740.79 535743.45
filler, seperation membrane,sealant primer, joint sealant, debonding strip, dowel bar, tie bar/rod,
admixtures as approved, curing compound, finishing to lines and grades as per drawing. Item rate shall be
inclusive of all material, taxes, duties, manpower, equipment cost, royalties, transportation, etc.
Reinforcement will be paid separately under the item of reinforcement.

Manholes as shown on design drawings, in technical specification and as directed by the Engineer. These
items include:
-Manufacture of manholes either on-site or off-site
-Design Mix Cement Concrete of grade M30, machine mixed, machine vibrated
2_4 B2024 Measurement and payment shall be for the theoretical quantity of manholes as shown on the design cum 66 ₹ 8,621.01 568986.66
drawings.
Reinforcement will be paid separately under items of reinforcement.

Providing and installing of drainage gutters with M30 grade concrete within the non-ballast trackbed as
shown on design drawings, in technical specifications and as directed by the Engineer. These items include:
-all auxiliary works and materials necessary (bedding etc.) as per drawing
-all connections of drainage pipes and therefore necessary types of gutters
2_5 B2025
-casts cum 55 ₹ 8,621.01 474155.55

Design Mix Cement Concrete M15 in following PCC works including mechanically mixed machine
mixed, machine batched, machine vibrated, form work, etc as per specifications & drawings or as
3 B203 directed by Engineer-in charge 0 0

3_1 B2031 For all kinds of structures required (bed, portals, blinding, lean, protection lean concrete) cum 472.5 ₹ 5,619.59 2655256.28
3_2 B2032 No-fines porous concrete in tunnel cum 149 ₹ 5,046.39 751912.11

Page 8 of 151
On Account Bill-11

Total BOQ Qty For


S.No. Item No. Desription of item Unit Rate Amount for Dhorajia Const.
Dhorajia Const.

Design Mix Cement Concrete M35 in RCC works including machine mixed, machine batched, machine
vibrated, form work, etc as per specifications & drawings or as directed by Engineer-in charge
all concrete additives
- Formwork, falsework and scaffolding: number as specified in the contract
- formwork carriages (number as specified in the contract) with adjustment facilities for inner-lining
construction
- Contact grouting between primary and inner lining
- All difficulties due to requirements for cable ducts, pipes or similar
- All difficulties due to reinforcement installation
4 B204
- All difficulties due to requirements of niches, junctions, cross passages, manholes, widenings etc.
Cum 4466 ₹ 9,139.44 40816739.04
- Curing of concrete to ensure concrete quality as described in the specifications
- sealing and curing agent
- concrete for filling in case of GOB Deformation of Initial Lining (DIL)
Measurement and payment shall be for the theoretical measured volumes of concrete as shown on the dsign
Drawing

M30 RCC for Cladding Wall. Design mix cement concrete including machine mixed, machine batched,
machine vibrated with contractor's men, material, consumables (including additives), tools & plants,
5 B205 equipments, machineries, all lead & lifts, loading, unloading, wastages etc complete. The rate includes cost cum 799.5 ₹ 8,621.01 6892497.5
of form work, shuttering, centering, scaffolding, fixing and removing thereof, levelling, finishing of
exposed surfaces, curing etc.

TOTAL FOR SCHEDULE B2 0


C-DRAINAGE & MISCELLANEOUS WORKS 0
All items for drainage works and works for cable ducts include procurement, manufacture,
transportation, delivery, appropriate installation and/or placing of material, formwork, plant, equipment,
logistics, manpower and all other operational costs. All equipment used shall be suitable to perform works
properly. The costs associated with using appropriate equipment at different construction sites (i.e., works in
open areas, main tunnel, escape tunnel, side adits, cross passages, roads) shall be included in all 0 0
items.

Providing and installing PVC pipes of following diameters in the tunnel as per approved drawings &
1 C101 specifications or as directed by Engineer. 0 0

1_1 C1011 35mm meter 137.5 ₹ 33.05 4544.38


1_2 C1012 50mm meter 229 ₹ 50.69 11608.01

Page 9 of 151
On Account Bill-11

Total BOQ Qty For


S.No. Item No. Desription of item Unit Rate Amount for Dhorajia Const.
Dhorajia Const.

Providing and installation of perforated pipes . The pipes are protected by geotextile membrane as shown on
design drawings, in technical specifications or as directed by the Engineer. These items include:
- all connections and valves
- protection by geotextile membrane
- all necessary equipment (i.e. drilling jumbo equipped with AT-casing system)
2 C102 - other protection to ensure functionality as required locally meter 0 0
Measurement and payment shall be for the actual length measured along the pipe axis in
linear metres as confirmed by the Engineer.

2_1 C1021 35 mm internal dia PVC pipe meter 137.5 ₹ 163.97 22545.88
2_2 C1022 50 mm internal dia PVC pipe meter 31409 ₹ 160.26 5033606.34
2_3 C1023 150 mm internal dia PVC pipe (Fully perforated for side drain) meter 6019 ₹ 311.94 1877566.86
Drilling of different dia holes (diameter 42mm to 62mm) in shotcrete / lining as weep holes / relief holes of
required length including perforated pipes of required dia in any direction as per approved drawings and
specifications or as directed by the Engineer. These items also include:
- drilling through sprayed concrete, walls, reinforcement
3 C103
- drilling in presence of water meter 572 ₹ 305.42 174700.24
- all measures necessary in soft ground to ensure the stability of the drainage hole
Measurement and payment shall be for the actual length of drainage holes drilled in linear metres.

Drilling of different dia holes (diameter 42mm to 62mm) in rock/ soil of required length in any direction as per
approved drawings and specifications or as directed by the Engineer. These items also include:
- drilling through sprayed concrete, walls, reinforcement
- drilling in presence of water
4 C104 - all measures necessary in soft ground to ensure the stability of the drainage hole meter 31409 ₹ 327.55 10288017.95
Measurement and payment shall be for the actual length of drainage holes drilled in linear metres.

Drilling of exploratory holes up to 35m length with specified diameter in any direction as per the
technical specifications and as directed by the Engineer in the presence of an expert geologist. These
items also include:
- drilling through sprayed concrete, walls, reinforcement
5 C105
- drilling in presence of water 0 0
- all measures necessary in soft ground to ensure the stability of the drainage hole
Measurement and payment shall be for the actual length of drainage holes drilled in linear metres.

5_1 C1051 Horizontal/sub horizontal in all kinds of rock dia, equal or greater than 50mm meter 2010.5 ₹ 1,197.30 2407171.65
5_2 C1052b Horizontal/sub horizontal in all kinds of soft ground dia, equal or greater than 50mm meter 223.5 ₹ 2,248.53 502546.46
5_3 C1053 Vertical (downwards) in all kinds of rock dia, equal or greater than 50mm meter 229 ₹ 1,502.71 344120.59
5_4 C1054 Vertical (downwards) in all kinds of soft ground dia, equal or greater than 50mm meter 22 ₹ 2,937.96 64635.12
Drilling for installation of monitoring instruments up to 90 mm diameter in all kinds of rock and in any
5_5 C1055 direction, including widening of 500 mm length at the borehole mouth up to diameter of 120 mm 0 0
5_6 C1055a Up to 12m length meter 137.5 ₹ 1,197.30 164628.75
5_7 C1055b Up to 30m length meter 137.5 ₹ 1,797.08 247098.5
Page 10 of 151
On Account Bill-11

Total BOQ Qty For


S.No. Item No. Desription of item Unit Rate Amount for Dhorajia Const.
Dhorajia Const.

Drilling for installation of monitoring instruments up to 90 mm diameter in all kinds of soft ground and in
any direction, including widening of 500 mm length at the borehole mouth up to diameter of 120 mm (up to
5_8 C1056 12m length) meter 60.5 ₹ 2,248.53 136036.07

Providing and laying of pipes (i.e. collector pipe, connection pipes) of specified diameter as shown on
design drawings, the technical specifications or as directed by the Engineer. Thes items include:
- pipe bedding and support, and all materials required for this
- all moulded parts
- all connections and valves
- backfilling if required
6 C106 - protection against environmental influences (e.g. at conncetions from tunnel portal to the waste water basin) 0 0
- earthwork, rock excavation, support where necessary (in open areas)
Measurement and payment shall be for the actual length measured along the pipe axis in linear metres as
confirmed by the Engineer.

6_1 C1061 300 mm dia HDPE main drainage pipe at bottom (main collector pipes) meter 6925.5 ₹ 3,134.11 21705278.81
6_2 C1062 200 mm dia HDPE main drainage pipe meter 96.5 ₹ 3,110.62 300174.83
6_3 C1063 100 mm dia PVC pipe lateral drainage pipes (connection pipes) meter 69 ₹ 159.32 10993.08
Providing, laying and fixing of Protective Felt (geotextile ) with a minimum weight of 700 g/m2 for protection
of the waterproofing membrane & drainage on the finished outer lining surface, including the cost of all
7 C107 materials, labour, equipments, etc. required for the completion of job, as per specifications or as sqm 50399.5 ₹ 508.14 25610001.93
directed by the Engineer

Providing, placing, welding of 2 mm thick PVC or ECB Water Proofing Membrane including the cost of all
8 C108 materials, labour, equipments, testing etc. required for the completion of job, as per specifications or as sqm 41984.5 ₹ 1,361.34 57155179.23
directed by the Engineer

9 C109 PVC Water stop serrated with central bulb (min. 225mm wide, 8-11mm thick) meter 4468 ₹ 508.47 2271843.96
Pumping of water by furnishing,transporting,installing the equipment & system including pneumatic pumps
as per the requirement and as per specifications and as directed by the Engineer.( Note: Payment will be
10 C110 made only for actual use for dewatering as payable as per specifications and as per the certified KWh 731500 ₹ 26.56 19428640
Log book for each pump by the Engineer)

Providing and fixing of earthing flat bar of galvanized iron as shown on design drawings, in technical
specifications or as directed by the Engineer.
These items also include:
- all necessary auxiliary works and materials
11 C111 - all necessry works and materials for connection of earthing flat bars 0 0
- routing to and in niches for provision of sockets etc.
Measurement and payment shall be per metre length shown on design drawings. Extensions for welding shall
not be paid extra.

11_1 C1111 Longitudinal earthling flat bar, 40 x 4 mm, both sides of the Tunnel, meter 4468 ₹ 140.96 629809.28
Page 11 of 151
On Account Bill-11

Total BOQ Qty For


S.No. Item No. Desription of item Unit Rate Amount for Dhorajia Const.
Dhorajia Const.

11_2 C1112 Transversal earthling flat bar, 40 x 4 mm, Every 250m, meter 82.5 ₹ 140.96 11629.2
11_3 C1113 Connection bolt M8 with corresponding nuts and washers nos 1787 ₹ 99.17 177216.79
Providing of cable trays/ducts for both cable conduits and fire fighting as shown on design drawings and in
technical specifications. These items include:
-all connections
-all auxiliary works and materials required
12 C112
Measurement and payment shall be for the actual length installed, measured along tunnel axis, as confirmed 0 0
by the Engineer.

12_1 C1121 Cable Tray/ ducts for conduits dia. 100 mm PVC pipe (2 pipes each tray) meter 17917 ₹ 191.44 3430030.48
12_2 C1122 Cable Tray/ ducts for conduits dia. 160 mm PVC pipe - fire fighting supply meter 14208.5 ₹ 315.37 4480934.65
Grouting (cement) for ground improvement or filling of voids and cavities using suitable materials and
mixtures as appropriate. Measurement and payment shall be in tonnes for the actual quantity of cement used
13 C113 as approved by the Engineer tonne 3217 ₹ 10,543.50 33918439.5

Delta drain installed at damp areas of the excavation to collect and channelise water infiltration to the
provisional or definitive ground sidedrains. The rate shall include costs of all materials, labour, equipments,
14 C114 etc. required for the complete jobas per specificationsor as directed by Engineer-in-Charge. Measurement and sqm 18529.5 ₹ 636.28 11789950.26
payment will be per m2 on site measured.
Sand bags installed above steel ribs or lattice girders to fulfill voids during excavation to guarantee permanent
contact between the lining and the ground. The rate shall include costs of all materials, labour, equipments,
15 C115 etc. required for the complete jobas per specificationsor as directed by Engineer-in-Charge. Measurement and MT 4021 ₹ 1,231.61 4952303.81
payment will be per Tonne on site measured.
16 C116 Polypropylene Fibres for tunnel lining confirming to technical specifications MT 46 ₹ 196,495.78 9038805.88
TOTAL OF SCHEDULE C 0
D-GEOTECHNICAL AND INSTRUMENTATION 0
Supply, Installation and monitoring as per approved drawings, calibration/setting,
maintenance etc. of the following instrument in good working condition from approved supplier (s) /
manufacturer(s) for measuring the deformations, loads, pressures etc. on the support in various tunnels and 0 0
for seepage measurements as directed by Engineer-in-charge with all
contractors men, material and machinery.

Optical targets (including rods) in the tunnel roof and at wall at selected points along the tunnel roof,
at wall and slopes at selected points along the tunnel wall or portal to monitor vertical and longitudinal (in
1 D101 tunnel direction) deformation components (3 to 5 nos at each sections) or as per instruction of nos. 995 ₹ 1,573.29 1565423.55
Engineer-in-charge.

Page 12 of 151
On Account Bill-11

Total BOQ Qty For


S.No. Item No. Desription of item Unit Rate Amount for Dhorajia Const.
Dhorajia Const.

Shotcrete/ Concrete Stress cells NATM style vibrating wire stress cells to measure radial and tangential
stresses in shotcrete or concrete. Capacity of stress cells - tangential 200Kg/cm^2 and radial 50Kg/cm^2.
Accuracy of 0.5%, each cell should be marked with capacity, serial no. etc. alongwith the sufficient
Teflon / PVC or similar cable shielded, integral with stress cell for taking observations using the proper
readout, Connections/switch/junction box to be attached to the cable stress cell for connecting to readout. The
2 D102 readout should be compatible to vibrating wire stress cell, rechargeable battery operated, LCD display, nos. 21 ₹ 46,423.25 974888.25
stress cell should be calibrated with this readout, connector to connect the stress cells, perfectly
sealed to make it dust and
moisture proof including battery charger and one extra rechargeable battery.

Vibration wire type electrical rock bolt load cell of capacity 25 t of rock bolt load cell including atleast 2
read out units, operating temperature -100 to 550C, built in temperature device range - 450C to 1000C,
3 D103 signal cable 4 core shielded Teflon/PVC or similar cable with PVC packet water proof, stainless steel nos. 17 ₹ 47,121.45 801064.65
materials and with lightening protection device alongwith the readout, connector /switch/junction box to
be attached to the cable of load cell for connecting to read out.

Pressure Cells including atleast 2 read out units measuring range 50 Kg/cm^2 vibrating wire type to
access the radial support pressure coming on the steel rib supports from various directions alongwith
4 D104 the readout, switch/junction box to be attached to the PVC / teflon or similar cable of pressure cell nos. 40 ₹ 46,423.25 1856930
forconnecting to readout. The readout should be compatible to the vibrating wire type pressure cell = 0.5%.

Seepage measurement System to measure flow of water from the face of tunnel by using triangular nos.
5 D105 V notch with all-fittings and accessories complete set usage 20lps, including the arrangements for drain 2.5 ₹ 25,138.80 62847
etc. complete
Supply, Installation and monitoring of Multipoint borehole extensometer electronic type (MPBX 3-point)
measuring head, measuring rod (anchor depth: 7, 14 & 20m) and displacement transducers of 0-50 mm range
for measuring sub-surface movement in slope for the specified locations as per drawings and as per
approved method statement or as directed by Engineer-in-charge complete with S.S./ glass/ carbon fibre
connecting rods and groutable anchors at different depth up to 20 m in the boreholes (diameter of boreholes
6 D106 should not less than 76 mm). Sensor: vibrating wire displacement transducers, range of measurement FS=0- nos. 12 ₹ 47,524.50 570294
50mm,accuracy< 0.5% FS,Dial gauge FS=0-50mm resolution 0.01mm.The rate shall include all
accessories required for
installation and as per approved method statement.

Supply, fixing and monitoring (as per specifications) of Piezometer (vibrating wire sensors type) as per
the drawing or as per directed by Engineer-in- charge. The piezometer shall be designed for water table
7 D107 measurements and measuring pore pressure up to 2MPa with an accuracy of + /-0.5% of full scale The rate nos. 18 ₹ 10,296.98 185345.64
shall include all accessories required for installation and as per approved method statement.

Page 13 of 151
On Account Bill-11

Total BOQ Qty For


S.No. Item No. Desription of item Unit Rate Amount for Dhorajia Const.
Dhorajia Const.

Supply, Installation and monitoring of In place inclinometer to measure lateral movement in slope &
embankment suitable for depth up to 30 m. Each Inclinometer system consisting of following
accessories complete in all respect:
1. Biaxial sensor with SDI-12@ 3 m interval, with pair of wheels for up to 30m depth
2. Suspension kit with protective cap and placement tubing : 1No.
3. Spacer assembly for 3 m gage length
4. Bottom wheel assembly with plug : 1no.
8 D108 5. Protective rope to prevent loss of sensor down hole: 1no. Set 4 ₹ 818,477.50 3273910
6. Suspension stainless steel wire rope for positioning sensors: 1 no.
7. Self aligning ABS tubing, 70mm od, 58 mm id, 3 m length for up to 50m depth.
8. ABS fixed coupling for 70 mm od. Access tube, 77 mm od x 160 mm length as required for jointing of ABS
tubing.
9. Bottom cap for ABS tubing: 1no.
10. Dummy probe with 30 m cord: 1no. (Rate excluding Data logger)
Data logger for In-place Inclinometer to log data from IPI sensors having Memoty capacity 2 million
9 D109 data points and communication port to down load data on Laptop/ PC. Real time accuracy: +/- 1 minute/ year. Set 4 ₹ 459,403.50 1837614

TOTAL FOR SCHEDULE D 0


E- APPROACH ROAD TO PORTALS (T12-P1,T12-P2,T13-P1,T13-P2)(approx 2000m long) including nallas crossings, protection work and other anciliary works. 0
Earthwork in cutting in all kinds of soil and rock including rock requiring use of blasting/ controlled
blasting / chiseling where necessary, in cutting for road formation, side drains, catch water drains,
diversion of nallahs as per technical Specification prescribed in MoRTH, with contractors men, material,
1 E101
consumables , tools & plants, equipments, machineries, including all lead & lifts, loading , unloading as
0 0
directed by Engineer - in -Charge , etc complete.

1_1 E1011 In all condition and classifications of soil Cum 3664.5 ₹ 255.62 936719.49
Earthwork in formation in embankment by using corporations suitable cut spoils obtained from cuttings and
leading, spreading, watering, consolidating etc., as per technical specification prescribed in MoRTH, with
2 E102 contractors men, material, consumables, tools & plants, equipments, machineries, including all lead & lifts, Cum 4400 ₹ 92.96 409024
loading , unloading as directed by Engineer - in -Charge , etc. complete.
Cleaning side drains in cuttings by the side of track (Kutcha or Pucca) including disposal of the debris, soil,
muck etc. with contractors men, material, consumables, tools & plants, equipments, machineries, including all
3 E103 lead & lifts, loading , unloading as directed by Engineer - in -Charge , etc. complete. Cum 735.5 ₹ 153.82 113134.61

Preparation of sub grade by excavating earth upto 22.5cm depth, dressing to camber and consolidating with
power road roller of 8 to 12 tone capacity including making good the undulations etc. and disposal of surplus
4 E104 earth with lead upto 50m, as per technical specification prescribed in MoRTH, with contractors men, material, Sqm 6765 ₹ 61.97 419227.05
consumables, tools & plants, equipments, machineries, including all lead & lifts, loading , unloading as
directed by Engineer - in -Charge , etc. complete.

Removal of slips beyond theoretical profile and occurred not due to fault of contractor (to be certified by
5 E105 Engineer-in-charge), during excavation or after approach road construction during the currency of Cum 735.5 ₹ 100.70 74064.85
contract, has to be arranged by the contractor by deploying suitable machineries and men.

Page 14 of 151
On Account Bill-11

Total BOQ Qty For


S.No. Item No. Desription of item Unit Rate Amount for Dhorajia Const.
Dhorajia Const.

Constructing granular sub base of required compacted thickness as per technical specification
prescribed in MoRTH, with contractors men, material, consumables, tools & plants, equipments,
6 E106
machineries, including all lead & lifts, loading , unloading as directed by Engineer - in -Charge , etc Cum 1100 ₹ 1,976.31 2173941
complete.
Constructing Water Bound Macadam base course of required compacted thickness as per technical
specification prescribed in MoRTH, with contractors men, material, consumables, tools & plants,
7 E107
equipments, machineries, all lead & lifts, loading , unloading as directed by Engineer - in -Charge , etc Cum 1100 ₹ 3,170.30 3487330
complete.
8 E108 Supplying & fixing Mandatory/Cautionary/warning/ Informatory retro-reflectorised sign boards as per
technical specification prescribed in MoRTH , with contractors men, material, consumables, tools &
plants, equipments, machineries, all lead & lifts, loading , unloading ,as directed by Engineer - in - 0 0
Charge , etc complete.
8_1 E1081 Sign boards of size more than 0.6 sq.m & upto 0.9 sq.m with single post support Nos 15 ₹ 9,373.04 140595.6
Supplying and laying reinforced cement concrete pipes NP2 of various sizes, for culverts on cement
concrete leveling course including fixing collar with cement mortar 1:2 as per the drawing and as per
specification prescribed in MoRTH, with contractors men, material, consumables, tools & plants,
9 E109 equipments, machineries, all lead & lifts, loading , unloading as directed by Engineer - in -Charge , etc 0 0
complete. The rate includes Cost of pipes, hauling, storing, laying in position , aligning, joining complete and
all incidental costs to complete the work as per specification. (Ancillary works such as excavation with back
filling, leveling course, concrete and masonry shall be paid separately in relevant schedule items).
9_1 E1091 600mm dia. RMT 73.5 ₹ 3,173.40 233244.9
9_2 E1092 900mm dia. RMT 220 ₹ 6,158.58 1354887.6
Random rubble masonry, hammer dressed wherever necessary, in cement and sand 1 :6 in wing wall, toe
wall, breast wall, retaining wall, curtain wall, parapet wall, slope of guide bunds, catch water drains, side
drains etc, as per drawing and as per technical specification prescribed in MoRTH including providing
10 E1010 weep holes of 100mm dia. PVC pipe at 1 .Om c/c horizontally and vertically, with contractors men, material, Cum 2567.5 ₹ 3,465.62 8897979.35
consumables, tools & plants, equipments, machineries, including all lead & lifts, loading , unloading ,as
directed by Engineer -in -Charge , etc complete.

Providing boulder packing 600mm thick hand packed behind abutments, retaining walls, breast wall,
wing walls, etc. as per drawing with stone not less than 15cm in any direction and not less than 30 kg with
contractors men, material, consumables, tools & plants, equipments, machineries, including all lead & lifts,
11 E1011 loading , unloading, as per technical specification prescribed in MoRTH, with contractors men, material, Cum 660 ₹ 1,468.40 969144
consumables, tools & plants, equipments, machineries, including all lead & lifts, loading , unloading as
directed by Engineer - in -Charge , etc. complete.

U-PVC Pipe (working Pressure 4 Kg/Sqm) single socketed pipe 110mm dia. for drainag with contractors men,
12 E1012 material, consumables, tools & plants, equipments, machineries, including all lead & lifts, loading , unloading m 807.5 ₹ 214.27 173023.03
as directed by Engineer - in -Charge , etc. complete.
Providing and laying of knitted of woven crates of size 1 200 mm x 1 200 mm x 6000 mm made of Gl wires of
dia. 4.0 mm as per drawing and as per technical specification prescribed in MoRTH including supply of
13 E1013 stones, placing in position, hand packing , filled with stones/boulders, with all contractors men, material, Cum 733.5 ₹ 1,788.73 1312033.46
consumables, tools & plants, equipments, machnieries, all lead & lifts, loading, unloading, as directed by
Engineer - in -Charge , etc complete.

Page 15 of 151
On Account Bill-11

Total BOQ Qty For


S.No. Item No. Desription of item Unit Rate Amount for Dhorajia Const.
Dhorajia Const.

Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the
bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and
14 E1014 preparing the existing road surface as per specifications prescribed in MoRTH, including all 0 0
contractors men, material, consumables, tools & plants, equipments, machnieries, all lead & lifts,
loading, unloading, as directed by Engineer - in -Charge , etc complete.

14_1 E10141 On W.B.M. @ 0.75 Kg/Sqm Sqm 12100 ₹ 68.47 828487


14_2 E10142 On bituminous surface @ 0.50 Kg/Sqm Sqm 12100 ₹ 49.66 600886
Providing and laying Dense Bituminous Macadam using crushed stone aggregates of specified grading,
premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver
15 E1015 finisher equipped with electronics sensor to the required grade, level and alignment and rolling with 0 0
smooth wheeled, vibratory and tandem rollers as specifications to achieve the desired compaction and
density, complete as specification prescribed in MoRTH, including all contractors men, material,
65 mm averagetools
consumables, compacted
& plants,thickness with machnieries,
equipments, bitumen of grade VG-30
all lead @ loading,
& lifts, 5% (Percentage by as
unloading, weight of total
directed by mix)
15_1 E1015 and filler @ 2% ( (Percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant.
Engineer - in -Charge , etc complete.
Cum 770 ₹ 11,253.55 8665233.5
Providing and laying Bituminous Concrete using crushed stone aggregates of specified grading,
premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver
16 E1016 finisher equipped with electronics sensor to the required grade, level and alignment and rolling with 0 0
smooth wheeled, vibratory and tandem rollers as specifications to achieve the desired compaction and
density, complete as specification prescribed in MoRTH, including all contractors men, material,
consumables, tools & plants, equipments, machnieries, all lead & lifts, loading, unloading, as directed by
40 mm compacted thickness with bitumen of grade VG-30 @ 5.5% (Percentage by weight of total mix) and
16_1 E10161 Engineer - in -Charge , etc complete.
filler @ 2% ( (Percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant. Cum 477.5 ₹ 12,285.31 5866235.53
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier
comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on
ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below
17 E1017 ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to RM 367.5 ₹ 3,799.66 1396375.05
IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x
75 x 5 mm, 330 mm long) complete as directed by Engineer - in -Charge.

TOTAL FOR SCHEDULE E 0


F-UNFORSEEN ITEM OF WORKS 0
Any other items as per N. F. Railways standard schedule of rates (USSOR) not covered in above
1 F101
schedules
Rs. 0.5 ₹ 40,000,000.00 20000000
TOTAL FOR SCHEDULE F 0
0
SubTotal From (Schedule A + Schedule B1 + Schedule B2 + Schedule C + Schedule D
1589823014.08
+ Schedule E+ Schedule F)
0
Add Quoted Percentage @ 4.81% above= 16534159.346432

Page 16 of 151
On Account Bill-11

Total BOQ Qty For


S.No. Item No. Desription of item Unit Rate Amount for Dhorajia Const.
Dhorajia Const.

Page 17 of 151
TAX INVOICE
INVOICE NO. CSDCCJV/T12&13/Siteoffice/2021/RAB-011 Job Type Service
INVOICE
05.12.2021
DATE: Period of service 26.10.2021 to 30.11.2021
RA Bill No. 11
State West Bengal Place of servicec Sukhia Khola Kalimpong, West Bengal
Details of Service Receiver Billed To Details of Service Provider Billed from
IRCON INTERNATIONAL LIMITED CS- Dhorajia JV, C-25, Trezure Enclave, Nr. Aryaman Bungalows, Thaltej-Shilaj Road, Thaltej, Ahmedabad, Sujarat-380059
(HO-C-4, District Center,Saket, New Delhi-110017) Contract No. IRCON/2046/Sivok-Rangpo/T12&T13/50
48U, SAIBABA ROAD, NEAR FOOD GODOWN, RANGPO BAZAR, RANGPO, SIKKIM,
Address TIN No.
732132.Rnagpo bazar,Gangtok East
GST IN: 19AAACI0684H12ZI PAN NO: AAPFC7962A

LOA No. IRCON/CC/TN/SR-2046/Const/T12&T13/12/1937. dated.05.10.2020 GSTIN: 19AAPFC7962A1Z7

`
CGST SGST
HSN/SAC As per
Sl.No Product description Bill Amount LOA Amount Taxable Amount
Code LOA Rate Amount Rate Amount

1 Construction of Tunnel T-12 & T13 ₹ 106,346,089.00 4.81% ₹ 5,115,247.00 ₹ 111,461,336.00 6% ₹ 6,687,680.00 6% ₹ 6,687,680.00

₹ 111,461,336.00

Gross Amount before GST


Add CGST 6% ₹ 6,687,680.00
ADD SGST 6% ₹ 6,687,680.00
Bank Details :Yes Bank Common seal
A/C No. :000763400002607 NET AMOUNT ₹ 124,836,696.00
IFS CODE: :YESB0000007
Certified that the particulars given above are true and corrected
Branch: :Ahmedabad
Terms & Conditions:
1.Security deposit to be deducted on taxable value only.
2. TDS to be duducted as per statutory rules.
3. GST will be applicable as per statutory rules.

Page 18
Quantity Amount
Total
Item No. Desription of item Unit
BOQ Qty
Rate Upto previous
Upto Date Bill This Bill Cumulative Upto Previous IPC This IPC
Bill

Excavation to lines and levels as required by the


prevailing geotechnical conditions for installation of
A101 support as shown on the drawings or as directed by cum 184,297 ₹ 255.62 104,010.54 103,849.57 160.97 ₹ 26,587,174.23 ₹ 26,546,027.08 ₹ 41,147.15
the Engineer in portal areas and rescue place sites
with limited access to construct berms, surface drains,
Underground excavation (Top Heading, Bench, 0 00
divert natural streams, nallah and the like etc. This
A102 Invert) for main tunnel, adit (vehicular and - -
item includes:
pedestrian), niches (Electrical, Trolley Refuge, turning
- excavation of all types of ground (soils and rock) by
niche and the like) and connection of the main tunnel
A1023 any
Excavationmeans of excavation (i.e. digging, blasting). 9,792.95 8,539.57 1,253.38 ₹ 19,050,617.35 ₹ 16,612,367.10 ₹ 2,438,250.25
to the aditin Support by all Classmeans3 of excavation cum 109,161 ₹ 1,945.34
A1024 -Excavation
sequentialin excavation
Support Class at limited
4 height and cum 108,316 ₹ 2,407.88 ₹ 54,737,589.60 ₹ 37,282,096.96 ₹ 17,455,492.64
(drilling, blasting/ control blasting (wherever 22,732.69 15,483.37 7,249.32
slope support as shown on the drawings resp. as
A1025 required),scaling/
Excavation in chipping,
Support Class digging etc) in
5 cum 29,940 ₹ 2,557.26 9,187.59 7,641.87 1,545.72 ₹ 23,495,056.40 ₹ 19,542,248.48 3952807.93
directed by the Engineer following the prevailing
accordance with the New Austrian Tunnelling
A1026 geotechnical
Excavation inconditions. Support Class Support 6 elements will be paid cum 15,072 ₹ 2,889.24 6,870.23 5,968.36 901.87 ₹ 19,849,743.33 ₹ 17,244,024.45 ₹ 2,605,718.88
Method (NATM). This item includes:
separately of muck as per directions of engineer
Rehandling cum/
- Mandatory excavation in sub divisons (Top
A104 - cutting loading
including of trees, shrubs, rootsat and
and transportation fortoallother
leads km 2,750 ₹ 179.27 4,269.01 - 4,269.01 ₹ 765,305.42 ₹ 0.00 ₹ 765,305.42
heading, bench and invert) according
vegetation
and lift including loading onto transport,
geometries, excavation and support sequence
All items for: "Rock
transportation bolts and other
and appropriate steel support"
depositing, separate
shown on design drawings and as described in
include
from other plant, logistics, equipment, manpower, time for
material
the technical specifications
installation,
- clearing of materials,
loose debris auxiliary works, and
and loosened rockallabove
other
- in rock the application of smooth blasting - - 0 0 0
operational
cuts costs. Materials used shall at least meet
techniques with contour hole spacing not
the minimum measures
- appropriate requirements of the technical
for diversion of any waters
exceeding 300 mm
specifications.
- loading of excavated All equipment
material used
ontoshall be suitable to
transport,
- Simultaneous excavation works in top heading,
perform
ascending worksand properly.
descending Thehandling
costs associated
of excavation with and
and halfdrilling,
Supply, sided testingbenching and in rail tunnels
installation as per
using
materials, appropriate equipment
transportation lead with 2.0 of
up tosuitable kmSwellex
size
(oneofway rock
technical
type rockbolts specifications
of the or as directed byultimate
Engineer
B101 bolting
distance) as from
per drawings
point ofspecified
at different
excavation length,
construction
to center load
sites
of gravity - - 0 0 0
- Systematic(tunnel
Fy>=200kN exploratorysupport) drillholes
as and
per approved
(i.e.,
of works in open
designated areas,
depositing main
sites tunnel, escapedrawings
appropriate tunnel,
- Appropriate
& specifications Plant
or asand Equipment
directed bythe with appropriate
Engineer.The rate
B1011 side
depositingadits, crossand passages,
compaction roads,
of location
material with limited
to lines ₹ 6,002.25 110.00 - 110.00 ₹ 660,247.50 ₹ 0.00 ₹ 660,247.50
Length
shall 3m
size specifically
include costs selected
of all for the labour,
materials, variousequipment,
tunnel nos. 12,709
B1012 access)
and
Length levels
4mshallasbeaincluded
complete in all
jobitems.
as per specification nos. 220 ₹ 6,953.52 - - 0 0 0
sizes
etc. and
required as declared
for by
the the in the technical
complete bid
job. in charge
or
SN as
type directed
rock bolts for Engineer
tunnel support, slope including
- Face maping & Rock Classification after eachsupport,
blast.
handling
face if
bolts etc. required
- Provision of drainages for all surfaces with vehicular
B102 -Supply,
setting drilling,
out andinstallation,
demarcation of earthworks
grouting and testing of and muckSN - - 0 0 0
circulation
deposits
type rock bolts of specified length L, construction
200kN minimum
- Provision of adequate lighting and
-ultimate
securityload fencingas per along top ofdrawings,
design cut technical
ventilation
B1022 Measurement
Lenth 4 m
specifications and payment
or as directed shall be for volumes nos. 110 ₹ 2,490.51 1,296.00 1,137.00 159.00 ₹ 3,227,700.96 ₹ 2,831,709.87 ₹ 395,991.09
- Temporary backfilling with by Engineer.
suitable compactable,
B1023 in their 6solid
Length
Measurement m material states as pershall
and payment drawings
be per based on
piece tested nos. 30,058 ₹ 3,286.90 2,627.00 2,002.00 625.00 ₹ 8,634,686.30 ₹ 6,580,373.80 ₹ 2,054,312.50
B1024 free draining of a minimum thickness of ₹ 6,096.21 - - 0 0 0
Length
contractor´s
and 9m survey before and after excavation. nos. 110
400 accepted
mm forinstalled enabling rockmaintenance
bolt (for exactwith paymentgrader
Self drilling
Contractor´s
details rock
survey bolts
see specifications). shall (IBO)
be for tunnel support,
submitted to the slope
to facilitate vehicular circulation in tunnel.
support,
Engineerface for bolts etc. Supply,
approval prior todrilling,
excavation.installation,
B103 Complementing the backfill material throughout the - - 0 0 0
grouting and testing of self driling rock bolts of
construction period. Its removal,
specified length L, specified minimum ultimate load as
transport (independent from distance) and depositing
B1031 per
Lengthdesign3 m,drawings (Fy=200kN), technical nos. 110 ₹ 6,605.28 45.00 30.00 15.00 ₹ 297,237.60 ₹ 198,158.40 ₹ 99,079.20
at designated deposit areas.
B1032 specifications
Length 4 m, or as directed by Engineer. Drilling with nos. 110 ₹ 8,185.03 226.00 113.00 113.00 ₹ 1,849,816.78 924908.39 ₹ 924,908.39
- Profiling and re-profiling of tunnel to achieve the
B1033 grout
Lengthflushing
6 m, of is mandatory. This item includes: nos. 13,069 ₹ 10,130.04 3,816.00 3,228.00 588.00 ₹ 38,656,232.64 ₹ 32,699,769.12 ₹ 5,956,463.52
dimensions approved cross sections
- couplings
B1034 -Length
Loading 9 m, and unloading of excavated material, nos. 110 ₹ 16,163.98 1,264.00 1,157.00 107.00 ₹ 20,431,270.72 ₹ 18,701,724.86 ₹ 1,729,545.86
- sacrificial drilling bits + grouting
transportation to muck deposits up to a distance of 2.0
Measurement and payment shall be per piece
km (one way) from portal head to designated muck
appropriately installed rock bolts (for exact payment Page 19 of 151
deposit areas. (The lead shall always be measured
details see specifications).
from portal head irrespective of excavation location
inside tunnel)
Quantity Amount
Total
Item No. Desription of item Unit
BOQ Qty
Rate Upto previous
Upto Date Bill This Bill Cumulative Upto Previous IPC This IPC
Bill

Pipe Roof Umbrella: Supply, drilling, installation and


grouting of self-drilling pipe technology of length up to
B104 18m as per approved drawings & specifications (single - ₹ 0.00 0
row, double row, skin-to-skin single row) or as directed
by Engineer. The rate shall include costs of all
Outer
materials diameter 76mm,
like starter steel
units, grade
pipes S355, wall drill bits,
(perforated),
B1041 thickness
grouting packers 6,3mm etc., (Pipelabour,
Connection Types =etc.
equipments, Nipple meter 9,495 ₹ 7,884.72 6,981.00 6,243.00 738.00 ₹ 55,043,230.32 ₹ 49,224,306.96 ₹ 5,818,923.36
Coupling)
required for the complete job. This item includes:
-Supply,
Mobilistaion
drillingand hole,demobilsation of all and
installation, testing equipment
grouting
necessary
of forepoling (drilling
as per jumbo equipped
approved with AT-casing
drawings &
system, Symmetrix or similar) for single row, double
B105 specifications or as directed by Engineer. 200kN - 0 ₹ 0.00 0
row or skin-to
minimum skin load.
ultimate singleThe rowrate shall include costs of
-allthe necessary
materials, excavation
labour, equipments, etc. required for the
- loading, job.
complete transport and appropriate depositing of the
B1051 excavated
Self-drillingmaterial
bolts, Fy >= 200 KN meter 446 ₹ 2,855.46 19,794.00 15,300.00 4,494.00 ₹ 56,520,975.24 ₹ 43,688,538.00 ₹ 12,832,437.24
- the excess
Supply, use of inner
fabrication, storing lining
and concrete
erection ofand lattice
waterproofing
girders . Geometries shall be as shown on design
- all auxiliary
drawings, works and
in technical materials necessary
specifications or directed by the
B106 Engineer.
Measurement These anditems
payment
include: shall be per meter tonne 1,337 ₹ 89,688.76 90.90 69.49 21.41 ₹ 8,152,708.28 ₹ 6,232,471.93 ₹ 1,920,236.35
installed pipe roof
- all necessary pipe asfor
elements directed and approved
connection by
of lattice girder
the Engineer.
partitions, such as connection plate, connection bolts
and nuts etc.
Supply, cutting,
- all auxiliary bending, placing, binding steel
materials
reinforcement
- bearing elements of grade Fe 500 as per approved
B107 drawings
Minimum & specifications
steel grade is Feor500. as directed by Engineer,
For underground tonne 1,026 ₹ 63,136.89 66.53 58.48 8.05 ₹ 4,200,497.29 ₹ 3,692,245.33 ₹ 508,251.96
for jointmeasurement
works, reinforcementand of initial and final
payment shalllining.
be for This
the
shall include
theoretical straightening,
length hookingmeasured
of lattice girders all lead, lift, all the
using
Supply
auxiliary
Payment and lineplacement
materials,
as shown etc.ofonwelded
(Nothing wire
designextra mesh
shall
drawings be
andof insizes
paid for
the
150x150x6,
wastage
technical of 100x100x6 or any other
reinforcement and binding wire).
specifications. size as directed
B108 by Engineer as reinforcement of sprayed concrete for tonne 109 ₹ 91,561.53 79.54 66.52 13.02 ₹ 7,282,804.10 ₹ 6,090,672.98 ₹ 1,192,131.12
tunnel lining works as shown
on design drawings, specifications or as directed by
Supply,
Engineer. fabrication
Steel grade andminimum
erection of steelThis
Fe500. rib and
itemallalso
accessories
includes: including all lead, lift,
wastage,storing,drilling
- Fixing elements and materials holes, fixing in phases etc. and
B109 installation
- cutting, bendingof accessories
and placementfor joining the steel rib tonne 492 ₹ 83,817.43 158.71 139.48 19.23 ₹ 13,302,664.32 ₹ 11,690,855.14 ₹ 1,611,809.18
segments
- all auxiliary as materials
per approved and workshop drawings of
works necessary
contractor
Measurement & specifications
and paymentorshall as directed by
be per square meter
Engineer.The
for each layer rate shalland
installed include costs ofmeasured
instructed, all materials,
Permanent
labour, anchorage usingetc
equipment,welding, prestressed bar anchors
along
D32mm, Payment
fp 0.1k/fpkLine =(see specifications).
950/1050 N/mm2, cost Overlapping
with an
for
as the complete
mentioned in job including
technical additional
specifications is for
mandatory
B110 average
enlargement
but
length
shall and
not be
of
paid
12 m including drilling, installation, m 7434 ₹ 8,214.53 434.00 289.00 145.00 ₹ 3,565,106.02 ₹ 2,373,999.17 ₹ 1,191,106.85
grouting
of top heading prestress
footing. really installed of 200 KN as
extra.
per approved drawings & specifications or as directed
by Engineer. The rate shall include costs of all
materials, labout, equipments, etc. required for the
complete job as per drawings, specifications or as
directed by the Engineer- in- Charge. Measurement
and payment will be per m measured on the drawings. Page 20 of 151
Quantity Amount
Total
Item No. Desription of item Unit
BOQ Qty
Rate Upto previous
Upto Date Bill This Bill Cumulative Upto Previous IPC This IPC
Bill

Supply, drilling and installation of steel micropiles of


dia upto 160 mm in vertical position or at an inclination
B113 for all kinds of soil/rock class at any depth and as per 0
approved drawings & specifications or as directed by
Engineer. The works include: drilling D200mm,
B113A For Open work
installation of the pipe and grouting around and inside meter 7,783 ₹ 7,498.31 3,036.00 2,004.00 1,032.00 ₹ 22,764,869.16 ₹ 15,026,613.24 ₹ 7,738,255.92
All
the items
pipe upfor
to sprayed concretedrilled
fulfill the volume and no concrete
ocupated works
by
include procurement, fabrication, transportation,
the pipe. The rate shall include all labour, materials,
delivery,
connectors,appropriate
welding, installation and placing
lead, lift, handling, material,
including
time for installation, plant, equipment, logistics
grouting with M35 grade of grout, wastage complete and all
other operationalown
with contractor's costs. Materialsas
equipment used shall at least
a complete job as
meet the minimumorrequirements
per specifications as directed byof Engineer-in-
the technical
specifications.
Charge. All equipment used shall be suitable to
perform works properly. The costs associated with - - 0 0 0
using appropriate equipment at different construction
sites (i.e., works in open areas, main tunnel, escape
tunnel, side adits, cross passages, roads, location with
limited access) shall be included in all items.

Sprayed concrete works for primary lining, face


sealing, headwalls or temporary faces with theoretical
B201 thickness as shown on design drawings, in technical - - 0 0 0
specifications and directed by the Engineer. These
items include:
B 2011 -50sprayed
mm thick concrete of grade
shotcrete lining M25 according to Indian
in tunnel sqm 1,810 ₹ 628.14 30,181.58 24,250.05 5,931.53 ₹ 18,958,257.66 ₹ 15,232,426.41 ₹ 3,725,831.25
B 2012 Standard 25,113 ₹ 1,256.27 - 0 0 ₹ 0.00
100 mm thick shotcrete lining in tunnel sqm
B 2013 - all concrete additives 38,012 ₹ 1,884.41 3,448.88 3,006.49 442.39 ₹ 6,499,103.96 ₹ 5,665,459.82 ₹ 833,644.14
150 mm thick shotcrete lining in tunnel sqm
B 2014 -200 wastage of sprayed concrete
mm thick shotcrete lining in tunnel sqm 440 ₹ 2,512.54 - - 0 0 ₹ 0.00
B 2015 -250rebound
mm thick shotcrete lining in tunnel sqm 42,271 ₹ 3,140.67 10,131.26 7,140.42 2,990.84 ₹ 31,818,944.34 ₹ 22,425,702.88 ₹ 9,393,241.46
B 2016 -300
application
mm thickofshotcrete
shotcretelining
in multiple layers
in tunnel sqm 19,237 ₹ 3,768.81 4,066.41 3,277.96 788.45 ₹ 15,325,526.67 ₹ 12,354,008.43 ₹ 2,971,518.24
- all auxiliary materials and works
Shotcrete lining for overbreak as per technical cum
B 2017 Measurement and payment shall be for the theoretical 14,455 ₹ 12,562.68 1,357.22 - 1,357.22 ₹ 17,050,320.55 ₹ 0.00 ₹ 17,050,320.55
specification:
area or volume as shown on the design drawings in
Sprayed concrete
square metres/ cubicworks
meters,for measured
filling of along
cavities not
caused by fault of contractor
Payment-Line (see specifications). due to unavoidable
B2018 overbreak which has been designated as such by the cum 497.00 ₹ 13,314.55 356.75 615.06 -258.31 ₹ 4,749,965.71 ₹ 8,189,247.12 -₹ 3,439,281.41
Engineer and exceeds a volume of 2 m³ in each
individual case. This item includes:
- sprayed concrete of grade M25 according to Indian
B2019 Shotcrete
Standard in slope stabilization cum 1485 ₹ 13,314.55 1,362.75 1,314.22 48.53 ₹ 18,144,403.01 ₹ 17,498,247.90 ₹ 646,155.11
Extra for over
- wastage item noconcrete
of sprayed B201 for supply and mixing of
B20111 steel fibre double end hooked loose steel fibres of
- rebound tonne 1,097 ₹ 162,048.81 17.29 15.63 1.66 ₹ 2,801,823.92 ₹ 2,532,822.90 ₹ 269,001.02
circular crossmaterials
- all auxiliary section and
having
worksdiameter of 0.75mm
and aspect ratio
Measurement and equal
payment to shall
49 conforming to EC-of
be for the volume
certificate of conformity
sprayed concrete beyondas theper EN14889
boundary and tensile
surface 'A line'
strength
actually more thanas
used and 1100MPa
approved andby ultimate strain less
the Engineer.
than 4% as per specification and as directed by Page 21 of 151
Engineer
Quantity Amount
Total
Item No. Desription of item Unit
BOQ Qty
Rate Upto previous
Upto Date Bill This Bill Cumulative Upto Previous IPC This IPC
Bill

Construction , dowel jointed, cement concrete


pavement of M30 grade concrete with 43 grade
B2023 cement, coarse and fine aggregate conforming of cum 110 ₹ 9,740.79 230.20 230.20 - ₹ 2,242,329.86 ₹ 2,242,329.86 ₹ 0.00
IS:383, maximum size of coarse aggregate not
exceeding 25mm, mixed in a batching plant as per
approved
Design Mix mixCement
design, transported
Concrete M15 at site,in laid with a
following
fixed
PCC form worksorincluding
slip formmechanically
paver or by mixed fixed machine
B203 shuttering, spread, compacted and vibrated,
finished in a - ₹ 0.00 ₹ 0.00 0
mixed, machine batched, machine form
continuous
work, etc as operation and texturing,
per specifications & including
drawingsprovision
or as
of contraction,
directed expansion,
by Engineer-in construction and
charge
For all kinds of structures required (bed, portals, cum 945
B2031 longitudinal joints, joint filler, seperation ₹ 5,619.59 884.59 725.53 159.06 ₹ 4,971,033.12 ₹ 4,077,181.13 ₹ 893,851.99
blinding, lean, protection lean concrete)
membrane,sealant primer, joint sealant, debonding
B2032 strip, dowel
No-fines bar, tie
porous bar/rod,
concrete admixtures as
in tunnel cum 298 ₹ 5,046.39 - - ₹ 0.00 ₹ 0.00 0
M30 RCC for
approved, Cladding
curing Wall. Design
compound, finishingmix cement
to lines and
concrete
grades asincluding machine
per drawing. Itemmixed,
rate shallmachine batched,of
be inclusive
B205 machine
all material,vibrated
taxes, with contractor's
duties, manpower,men, material,
equipment cum 1,599 ₹ 8,621.01 1,102.91 1,032.26 70.65 ₹ 9,508,198.14 ₹ 8,899,123.78 ₹ 609,074.36
consumables
cost, royalties,(including additives),
transportation, etc.tools & plants,
equipments,
Reinforcement machineries,
will be paidall lead & lifts,
separately underloading,
the item
Providing
unloading, and installation
wastages
of reinforcement. of perforated
etc complete. The ratepipes . The
includes
pipes
cost of areform
protected
work, by geotextilecentering,
shuttering, membrane as shown
on design drawings,
scaffolding, fixing and in technical
removingspecifications or as
thereof, levelling,
C102 directed meter - - 0 0 0
finishing by the Engineer.
of exposed These
surfaces, itemsetc.
curing include:
- all connections and valves
- protection by geotextile membrane
C1021 - all necessary equipment (i.e. drilling jumbo equipped ₹ 163.97 - - 0 0 0
35 mm internal dia PVC pipe meter 275
C1022 with AT-casing system) ₹ 160.26 4,213.00 3,710.00 503.00 ₹ 675,175.38 ₹ 594,564.60 ₹ 80,610.78
50 mm internal dia PVC pipe meter 62,818
C1023 -150
other
mmprotection
internal diato ensure
PVC pipe functionality as required
(Fully perforated for meter 12,038 ₹ 311.94 - - 0 0 0
locally
Drilling of different dia holes (diameter 42mm to
side drain)
Measurement
62mm) in shotcrete and /payment
lining as shall
weep be holes for/ relief
the holes
actual
of required length including perforated pipes ofaxis in
length measured along the pipe
C103 linear
requiredmetres
dia inasanyconfirmed
directionby as the
perEngineer.
approved drawings meter 1,144 ₹ 305.42 - - 0 0 0
and specifications or as directed by the Engineer.
These items also include:
- drilling through sprayed concrete, walls,
Drilling
reinforcement of different dia holes (diameter 42mm to
62mm)
- drillingininrock/ soil ofofrequired
presence water length in any direction
C104 as
- allper approved
measures drawingsinand
necessary softspecifications or asthe meter
ground to ensure 62,818 ₹ 327.55 4,213.00 3,710.00 503.00 ₹ 1,379,968.15 ₹ 1,215,210.50 ₹ 164,757.65
directed
stability of bythe
thedrainage
Engineer. These items also include:
hole
-Measurement
drilling through andsprayed
payment concrete,
shall bewalls,
for the actual
reinforcement
Drilling
length of of exploratory
drainage holesinup
holes drilled to metres.
linear 35m length
-with
drilling in presence
specified diameterof water
in any direction as per the
-technical
all measures necessaryand
specifications in soft
asground to ensure
directed by the the
C105 stability of the drainage hole
Engineer in the presence of an expert geologist. - - ₹ 0.00 ₹ 0.00 ₹ 0.00
Measurement
These items also andinclude:
payment shall be for the actual
length
- drilling through sprayeddrilled
of drainage holes in linear
concrete, walls,metres.
reinforcement
C1051 Horizontal/sub
- drilling in presencehorizontal
of waterin all kinds of rock dia, meter 4,021 ₹ 1,197.30 45.00 45.00 - ₹ 53,878.50 ₹ 53,878.50 ₹ 0.00
equal or greater
- all measures than 50mm
necessary in soft ground to ensure the Page 22 of 151
stability of the drainage hole
Measurement and payment shall be for the actual
Quantity Amount
Total
Item No. Desription of item Unit
BOQ Qty
Rate Upto previous
Upto Date Bill This Bill Cumulative Upto Previous IPC This IPC
Bill

C1052b Horizontal/sub horizontal in all kinds of soft ground meter 447 ₹ 2,248.53 15.00 15.00 - ₹ 33,727.95 ₹ 33,727.95 ₹ 0.00
Providing
dia, equal or and laying
greater of pipes
than 50mm (i.e. collector pipe,
connection pipes) of specified diameter as shown on
design drawings, the technical specifications or as
directed by the Engineer. Thes items include:
C106 - pipe bedding and support, and all materials required - - ₹ 0.00 ₹ 0.00 ₹ 0.00
for this
- all moulded parts
- all connections and valves
- backfilling if required
C1063 -100protection
mm dia against
PVC pipe environmental
lateral drainageinfluences
pipes (e.g. at meter 138 ₹ 159.32 72.50 72.50 - ₹ 11,550.70 ₹ 11,550.70 ₹ 0.00
conncetions
Grouting
(connection from tunnel
(cement)
pipes) portal to
for ground the waste water
improvement or filling
basin)
of voids and cavities using suitable materials and
C113 -mixtures
earthwork, rock excavation,
as appropriate. support where
Measurement necessary
and payment tonne 6434 ₹ 10,543.50 1.10 1.10 - ₹ 11,597.85 ₹ 11,597.85 ₹ 0.00
(in open areas)
shall be in tonnes for the actual quantity of cement
Measurement
used as approved and bypayment
theand shall be for the actual
Engineer
Supply,
length measured Installation
along the pipemonitoring
axis in linear as metres per
asapproved
confirmed by drawings, calibration/setting,
the Engineer. - - 0 0 0
maintenance etc. of the following instrument in
good working condition from approved supplier (s) /
manufacturer(s) for measuring the deformations,
Optical targets etc.
loads, pressures (including rods) ininthe
on the support tunnel
various roof
tunnels
and
and for at wall
seepageat selected points along
measurements as the tunnel roof,
directed by
D101 at wall and slopes at selected points along the tunnel nos. 1,990 ₹ 1,573.29 171.00 138.00 33.00 ₹ 269,032.59 ₹ 217,114.02 ₹ 51,918.57
Engineer-in-charge with all
wall or portalmen,
contractors to monitor
material vertical and longitudinal (in
and machinery.
tunnel direction) deformation components (3 to 5 nos
Earthwork in formation
at each sections) or as inperembankment
instruction ofby using
E102 corporations
Engineer-in-charge. suitable cut spoils obtained from cuttings Cum 8,800 ₹ 92.96 2,425.10 2,425.10 - ₹ 225,437.30 ₹ 225,437.30 ₹ 0.00
and leading, spreading, watering, consolidating etc.,
as per technical specification prescribed in MoRTH,
Removal of slipsmen,
with contractors beyond theoretical
material, profile andtools &
consumables,
E105 occurred not due to fault of contractor (to be certified Cum 1,471 ₹ 100.70 3,299.60 3,299.60 - ₹ 332,269.72 ₹ 332,269.72 ₹ 0.00
plants, equipments, machineries, including all lead &
by
lifts,Engineer-in-charge),
loading , unloading as during
directedexcavation
by Engineer or after
- in -
Supplying
approach and laying
road reinforced
construction duringcement concreteof
the currency
Charge , etc. complete.
E109 pipes
contract, NP2 hasoftovarious
be arrangedsizes,byfortheculverts
contractor onby - - 0 0 0
cement
deploying concrete
suitableleveling
machineriescourse andincluding
men. fixing
E1091 collar
600mm with
dia.cement mortar 1:2 as per the drawing RMT 147 ₹ 3,173.40 - - 0 0 0
E1092 and
900mm as per
dia. specification prescribed in MoRTH, with RMT 440 ₹ 6,158.58 32.50 32.50 - ₹ 200,153.85 ₹ 200,153.85 ₹ 0.00
contractors
Random rubble men, material,
masonry, consumables,
hammer tools &
dressed wherever
plants, equipments,
necessary, in cement machineries,
and sand 1 all
:6 lead
in & lifts,
wing wall, toe
E1010 Cum 5,135 ₹ 3,465.62 3,610.06 3,289.25 320.81 ₹ 12,511,096.14 ₹ 11,399,290.59 ₹ 1,111,805.55
loading , unloading
wall, breast as directed
wall, retaining wall, by Engineer
curtain wall, -parapet
in -
Charge
wall, , etcofcomplete.
slope guide bunds, Thecatch
rate includes Cost of
water drains, side
Providing
pipes, etc,boulder
drains hauling, per packing
as storing, laying600mm
drawing as thick
in position
and hand
per, aligning,
technical
E1011 packed behind
joining complete
specification abutments,
prescribed retaining
and all incidental
in MoRTH costs walls,
including breast
to complete Cum 1,320 ₹ 1,468.40 654.99 592.87 62.12 ₹ 961,787.32 ₹ 870,570.31 ₹ 91,217.01
wall,
the wing walls, etc. as per drawing
providing weep holes of 100mm dia. PVC pipesuch
work as per specification. (Ancillarywith stone
works not as
at
less than
excavation
1 .Om c/c15cmwith inback
horizontallyany filling,
direction
and and not
leveling
vertically, less
course,
with than 30
contractors
kg
men, with
concrete contractors men,shall
and consumables,
material, masonry material, consumables,
be paid
tools separatelytools
& plants, in
& plants, schedule
relevant
equipments, equipments, machineries,
items).
machineries, including including
all lead & all lead &
lifts,
lifts,
loadingloading , unloading,
, unloading as perbytechnical
,as directed Engineer -in - Page 23 of 151
specification prescribed in MoRTH, with contractors
Charge , etc complete.
men, material, consumables, tools & plants,
Quantity Amount
Total
Item No. Desription of item Unit
BOQ Qty
Rate Upto previous
Upto Date Bill This Bill Cumulative Upto Previous IPC This IPC
Bill

U-PVC Pipe (working Pressure 4 Kg/Sqm) single


E1012 socketed pipe 110mm dia. for drainag with contractors m 1,615 ₹ 214.27 - - 0 0 0
men, material, consumables, tools & plants,
Providing
equipments, andmachineries,
laying of knitted of woven
including crates
all lead of size
& lifts,
E1013 1 200 mm x 1 200 mm x 6000 mm made of Gl wires of Cum 1,467 ₹ 1,788.73 1,559.52 1,559.52 - ₹ 2,789,560.21 ₹ 2,789,560.21 ₹ 0.00
loading , unloading as directed by Engineer - in -
dia. 4.0 mm
Charge , etc.as per drawing and as per technical
complete.
specification prescribed in MoRTH including supply of TOTAL OF SCHEDULE A ₹ 144,485,486.07 ₹ 117,226,764.07 ₹ 27,258,722.00
stones, placing in position, hand packing , filled with
TOTAL OF SCHEDULE B1 ₹ 244,590,047.19 ₹ 199,956,347.19 ₹ 44,633,700.00
stones/boulders, with all contractors men, material,
consumables, tools & plants, equipments, TOTAL OF SCHEDULE B2 ₹ 132,069,907.23 ₹ 99,116,550.23 ₹ 32,953,357.00
machnieries, all lead & lifts, loading, unloading, as
directed by Engineer - in -Charge , etc complete. TOTAL OF SCHEDULE C ₹ 2,165,898.10 ₹ 1,920,530.10 ₹ 245,368.00
TOTAL OF SCHEDULE D ₹ 269,033.02 ₹ 217,114.02 ₹ 51,919.00
TOTAL OF SCHEDULE E ₹ 17,020,304.98 ₹ 15,817,281.98 ₹ 1,203,023.00
TOTAL OF SCHEDULE F ₹ 0.00 ₹ 0.00 ₹ 0.00
Round off Error -₹ 2,738.12
Total of Schedule Item ₹ 540,597,938.47 ₹ 434,251,849.47 ₹ 106,346,089.00
As per LOA 4.81% ₹ 26,002,760.96 ₹ 20,887,513.96 ₹ 5,115,247.00
Total Above 4.81% ₹ 566,600,699.43 ₹ 455,139,363.43 ₹ 111,461,336.00
GST12% ₹ 67,992,083.61 ₹ 54,616,723.61 ₹ 13,375,360.00
Net Amount ₹ 634,592,783.04 ₹ 509,756,087.04 ₹ 124,836,696.00

Page 24 of 151
Certified that,

Measurements recorded in pages to


of measurement book No 126 Are
1 fully accepted by me/us and I/We do not
have any other claim whatsoever
outstanding against this bill.
Certified that,

That labours employed by me/us have


The quantity billed is not more than the
2 been paid minimum wadges as fixed in 1
quantity actually excuted at site.
similar type of work in the area.

All taxes including Royalty charges, cess No materials has been issued to the
etc.due to the Govt. on the materials contractor for which the cost to be
3 2
used for this work have been fully paid recovered except such as specifically
and no payment is due to them. provided in the agreement /work order

No departmental tools & plants have


All the insurance policies as per
been issued to the contractor other than
4 provisions of the contract have been 3
those for which hire charges have been
taken by me/us and are valid as on date.
recovered.
I/We have extended the provident fund
benefits to the staff engaged by me/us
That the value of the bill /quantity is not
5 and requisites amount of provident fund 4
executed beyond the permissible limit.
has been remitted to the Provident Fund
Commissioner.

That the statutory formalities and


6
guidelines has been complied with.
IRCON INTERNATIONAL LTD

11th
R.A.BILL
Name of work:
Construction of Two no. Tunnel T-12( Between Km 37+097 to Km 38+531 app
and T-13 (between Km 38+775 to Km 41+403 approx) on Sivok (West Bengal
Rangpo (Sikkim) New Single line BG Railway Line Project.

CA No- IRCON/2046/SIVOK-RANGPO/T12&13/50

AGEN
M/s. CS DHORAJ
11th RA BILL

NAME OF WORK - Construction of Two no. Tunnel T-12( Between


Km 37+097 to Km 38+531 approx.) and T-13 (between Km
(i)
38+775 to Km 41+403 approx) on Sivok (West Bengal) to Rangpo
(Sikkim) New Single line BG Railway Line Project.

(ii) Situation of the Work- Tunnel T12-P1,T12-P2,T13-P1 & T13-P2

(iii) Name of Agency - M/s CS-DHORAJIA JV

(iv) CA No- IRCON/2046/SIVOK-RANGPO/T12&13/50

(v) Date of commencement: 20.10.2020

(vi) Date of Schedule Completion: 05.10.2022

(vii) Bill Period: 26.10.2021 to 30.11.2021

(viii) Date of measurement: 30.11.2021

(ix) Actual date of completion- in progress

Contract Value- Rs.373,24,96,051/- ( Three Hundred Seventy


(x) Three crores Twenty Four Lakhs Ninty Six Thousand & Fifty One
Only)

(xi) Time Extension :- N.A.

Letter No :CSDCCJV/T12&T13/siteoffice/2021-22/

Invoice No: CSDCCJV/T12&13/Siteoffice/2021/RAB-11


Executed Qauntity Upto 31st Jan 2021
Sl no Item No Description of Item

Excavation to lines and levels as required by the prevailing geotechnical conditions for installation of support as shown on
the drawings or as directed by the Engineer in portal areas and rescue place sites with limited access to construct berms,
surface drains, divert natural streams, nallah and the like etc. This item includes:
- excavation of all types of ground (soils and rock) by any means of excavation (i.e. digging, blasting).
- sequential excavation at limited height and slope support as shown on the drawings resp. as directed by the
Engineer following the prevailing geotechnical conditions. Support elements will be paid separately
- cutting of trees, shrubs, roots and other vegetation including loading onto transport, transportation and
appropriate depositing, separate from other material
- clearing of loose debris and loosened rock above cuts
1 A101 - appropriate measures for diversion of any waters
- loading of excavated material onto transport, ascending and descending handling of excavation and materials, transportation
lead up to 2.0 km (one way distance) from point of excavation to center of gravity of designated depositing sites and
appropriate depositing and compaction of the material to lines and levels as a complete job as per specification or
as directed by the Engineer in charge including handling if required
- setting out and demarcation of earthworks and muck deposits
- security fencing along top of cut
Measurement and payment shall be for volumes in their solid states as per drawings based on contractor´s survey
before and after excavation. Contractor´s survey shall be submitted to the Engineer for approval prior to excavation.

Average
Location Chainage Length (M) Area (M²) Quantity (M³) Remarks
Area (M²)
T12 P1 Portal Area
1 37,065.00 9.95
2 37,070.00 5.00 25.87 17.91 89.55
3 37,075.00 5.00 44.53 35.2 176.00
4 37,080.00 5.00 64.41 54.47 272.35
5 37,085.00 5.00 90.49 77.45 387.25
6 37,090.00 5.00 138.11 114.3 571.50
7 37,094.00 4.00 195.07 166.59 666.36
8 37,098.87 4.87 4.43 99.75 485.78
9 37,101.87 3.00 65.29 34.86 104.58
10 37,116.00 14.13 0.00 32.65 461.34 3214.71
T13 P1 Portal Area
1 38,811.96 0.00
2 38,806.92 5.03 89.92 44.96 226.33
3 38,803.92 3.00 32.84 61.38 184.14
4 38,797.86 6.06 171.53 102.18 619.62
5 38,794.86 3.00 143.15 157.34 472.02
6 38,790.49 4.37 375.50 259.33 1,132.75
7 38,785.00 5.49 330.58 353.04 1,938.19
8 38,780.00 5.00 262.66 296.62 1,483.10
9 38,775.00 5.00 195.78 229.22 1,146.10
10 38,770.00 5.00 139.00 167.39 836.95
11 38,765.00 5.00 63.60 101.3 506.50
12 38,760.00 5.00 1.52 32.56 162.80 8708.50
T12 P2 Portal Area
1 38,476.43 0.00 0.00
2 38,483.91 7.48 161.96 80.98 605.73
3 38,486.91 3.00 186.95 174.45 523.35
4 38,491.77 4.86 326.02 256.49 1,246.54
5 38,495.00 3.23 315.84 320.93 1,036.60
6 38,505.00 10.00 221.30 268.57 2,685.70
7 38,515.00 10.00 242.08 231.69 2,316.90
8 38,525.00 10.00 112.10 177.09 1,770.90
9 38,535.00 10.00 90.66 101.38 1,013.80
10 38,545.00 10.00 76.46 83.56 835.60
11 38,555.00 10.00 45.57 61.02 610.20 12645.32
T12 P1- Approach Road
From center of road of 12m
0.00 0.00 Span Bridge of Tumlang Khola
1
2 10.00 10 0.00 0.00 0.00
3 20.00 10 0.00 0.00 0.00
4 30.00 10 0.06 0.03 0.30
5 40.00 10 6.66 3.36 33.60
6 50.00 10 9.94 8.30 83.00

Page 28 of 151
Sl no Item No Description of Item

Excavation to lines and levels as required by the prevailing geotechnical conditions for installation of support as shown on
the drawings or as directed by the Engineer in portal areas and rescue place sites with limited access to construct berms,
surface drains, divert natural streams, nallah and the like etc. This item includes:
- excavation of all types of ground (soils and rock) by any means of excavation (i.e. digging, blasting).
- sequential excavation at limited height and slope support as shown on the drawings resp. as directed by the
Engineer following the prevailing geotechnical conditions. Support elements will be paid separately
- cutting of trees, shrubs, roots and other vegetation including loading onto transport, transportation and
appropriate depositing, separate from other material
- clearing of loose debris and loosened rock above cuts
1 A101 - appropriate measures for diversion of any waters
- loading of excavated material onto transport, ascending and descending handling of excavation and materials, transportation
lead up to 2.0 km (one way distance) from point of excavation to center of gravity of designated depositing sites and
appropriate depositing and compaction of the material to lines and levels as a complete job as per specification or
as directed by the Engineer in charge including handling if required
- setting out and demarcation of earthworks and muck deposits
- security fencing along top of cut
Measurement and payment shall be for volumes in their solid states as per drawings based on contractor´s survey
before and after excavation. Contractor´s survey shall be submitted to the Engineer for approval prior to excavation.

Average
Location Chainage Length (M) Area (M²) Quantity (M³) Remarks
Area (M²)
7 60.00 10 14.78 12.36 123.60
8 70.00 10 15.19 14.99 149.90
9 80.00 10 13.96 14.58 145.80
10 90.00 10 16.01 14.98 149.80
11 100.00 10 18.09 17.05 170.50
12 110.00 10 25.22 21.66 216.60
13 120.00 10 9.64 17.43 174.30
14 130.00 10 0.75 5.20 52.00
15 140.00 10 1.54 1.15 11.50
16 150.00 10 1.03 1.29 12.90
17 160.00 10 6.25 3.64 36.40
18 170.00 10 7.65 6.95 69.50
19 180.00 10 6.29 6.97 69.70
20 190.00 10 9.10 7.69 76.90
21 200.00 10 13.96 11.53 115.30
22 210.00 10 15.19 14.58 145.80
23 220.00 10 16.75 15.97 159.70
24 230.00 10 21.17 18.96 189.60
25 240.00 10 18.49 19.83 198.30
26 250.00 10 26.71 22.60 226.00
27 260.00 10 23.29 25.00 250.00
28 270.00 10 33.07 28.18 281.80
29 280.00 10 21.08 27.07 270.70
30 290.00 10 19.12 20.10 201.00
31 300.00 10 14.27 16.69 166.90
32 310.00 10 5.85 10.06 100.60 3,882.00
T12 P2 Approach road
1 0.00 0.00 From Dorajia Site Office Block
2 10.00 10 0.11 0.05 0.50
3 20.00 10 0.00 0.05 0.50
4 30.00 10 0.06 0.03 0.30
5 40.00 10 1.56 0.81 8.10
6 50.00 10 0.47 1.02 10.20
7 60.00 10 2.34 1.40 14.00
8 70.00 10 0.63 1.48 14.80
9 80.00 10 0.79 0.71 7.10
10 90.00 10 2.03 1.41 14.10
11 100.00 10 2.71 2.37 23.70
12 110.00 10 3.44 3.07 30.70
13 120.00 10 5.73 4.58 45.80
14 130.00 10 8.48 7.10 71.00
15 140.00 10 7.83 8.15 81.50
16 150.00 10 10.80 9.31 93.10
17 160.00 10 15.40 13.10 131.00
18 170.00 10 18.38 16.89 168.90

Page 29 of 151
Sl no Item No Description of Item

Excavation to lines and levels as required by the prevailing geotechnical conditions for installation of support as shown on
the drawings or as directed by the Engineer in portal areas and rescue place sites with limited access to construct berms,
surface drains, divert natural streams, nallah and the like etc. This item includes:
- excavation of all types of ground (soils and rock) by any means of excavation (i.e. digging, blasting).
- sequential excavation at limited height and slope support as shown on the drawings resp. as directed by the
Engineer following the prevailing geotechnical conditions. Support elements will be paid separately
- cutting of trees, shrubs, roots and other vegetation including loading onto transport, transportation and
appropriate depositing, separate from other material
- clearing of loose debris and loosened rock above cuts
1 A101 - appropriate measures for diversion of any waters
- loading of excavated material onto transport, ascending and descending handling of excavation and materials, transportation
lead up to 2.0 km (one way distance) from point of excavation to center of gravity of designated depositing sites and
appropriate depositing and compaction of the material to lines and levels as a complete job as per specification or
as directed by the Engineer in charge including handling if required
- setting out and demarcation of earthworks and muck deposits
- security fencing along top of cut
Measurement and payment shall be for volumes in their solid states as per drawings based on contractor´s survey
before and after excavation. Contractor´s survey shall be submitted to the Engineer for approval prior to excavation.

Average
Location Chainage Length (M) Area (M²) Quantity (M³) Remarks
Area (M²)
19 180.00 10 14.18 16.28 162.80
20 190.00 10 10.08 12.13 121.30
21 200.00 10 12.88 11.48 114.80
22 210.00 10 9.62 11.25 112.50
23 220.00 10 13.66 11.64 116.40
24 230.00 10 6.54 10.10 101.00
25 240.00 10 4.03 5.29 52.90
26 250.00 10 5.68 4.86 48.60
27 260.00 10 9.50 7.59 75.90
28 270.00 10 6.21 7.85 78.50
29 280.00 10 8.68 7.44 74.40
30 290.00 10 7.18 7.93 79.30
31 300.00 10 7.37 7.28 72.80
32 310.00 10 9.47 8.42 84.20
33 320.00 10 12.66 11.06 110.60
34 330.00 10 13.32 12.99 129.90
35 340.00 10 11.20 12.26 122.60
36 350.00 10 14.02 12.61 126.10
37 360.00 10 10.10 12.06 120.60
38 370.00 10 17.64 13.87 138.70
39 380.00 10 16.79 17.21 172.10
40 390.00 10 19.88 18.33 183.30
41 400.00 10 15.27 17.57 175.70
42 410.00 10 20.27 17.77 177.70
43 420.00 10 15.45 17.86 178.60
44 430.00 10 14.37 14.91 149.10
45 440.00 10 20.42 17.39 173.90
46 450.00 10 13.02 16.72 167.20
47 460.00 10 6.90 9.96 99.60
48 470.00 10 2.93 4.92 49.20
49 480.00 10 0.00 1.47 14.70
50 490.00 10 2.42 1.21 12.10
51 500.00 10 6.37 4.40 44.00
52 510.00 10 12.45 9.41 94.10
53 520.00 10 7.82 10.14 101.40
54 530.00 10 9.64 8.73 87.30
55 540.00 10 20.21 14.92 149.20
56 550.00 10 31.51 25.86 258.60
57 560.00 10 50.54 41.03 410.30
58 570.00 10 40.22 45.38 453.80
59 580.00 10 20.39 30.31 303.10
60 590.00 10 9.62 15.01 150.10
61 600.00 10 9.64 9.63 96.30
62 610.00 10 16.12 12.88 128.80
63 620.00 10 18.16 17.14 171.40

Page 30 of 151
Sl no Item No Description of Item

Excavation to lines and levels as required by the prevailing geotechnical conditions for installation of support as shown on
the drawings or as directed by the Engineer in portal areas and rescue place sites with limited access to construct berms,
surface drains, divert natural streams, nallah and the like etc. This item includes:
- excavation of all types of ground (soils and rock) by any means of excavation (i.e. digging, blasting).
- sequential excavation at limited height and slope support as shown on the drawings resp. as directed by the
Engineer following the prevailing geotechnical conditions. Support elements will be paid separately
- cutting of trees, shrubs, roots and other vegetation including loading onto transport, transportation and
appropriate depositing, separate from other material
- clearing of loose debris and loosened rock above cuts
1 A101 - appropriate measures for diversion of any waters
- loading of excavated material onto transport, ascending and descending handling of excavation and materials, transportation
lead up to 2.0 km (one way distance) from point of excavation to center of gravity of designated depositing sites and
appropriate depositing and compaction of the material to lines and levels as a complete job as per specification or
as directed by the Engineer in charge including handling if required
- setting out and demarcation of earthworks and muck deposits
- security fencing along top of cut
Measurement and payment shall be for volumes in their solid states as per drawings based on contractor´s survey
before and after excavation. Contractor´s survey shall be submitted to the Engineer for approval prior to excavation.

Average
Location Chainage Length (M) Area (M²) Quantity (M³) Remarks
Area (M²)
64 630.00 10 6.99 12.57 125.70
65 640.00 10 7.63 7.31 73.10
66 650.00 10 12.62 10.13 101.30
67 660.00 10 14.36 13.49 134.90
68 670.00 10 31.62 22.99 229.90
69 680.00 10 13.55 22.58 225.80
70 690.00 10 1.83 7.69 76.90
71 700.00 10 2.56 2.19 21.90
72 710.00 10 22.82 12.69 126.90
73 720.00 10 17.30 20.06 200.60
74 730.00 10 13.61 15.46 154.60
75 740.00 10 8.71 11.16 111.60
76 750.00 10 18.18 13.44 134.40
77 760.00 10 29.11 23.64 236.40
78 770.00 10 9.64 19.37 193.70
79 780.00 10 0.00 4.82 48.20 8,956.70
T13 P1 Approach road
1 0.00 0 0.00 0.00 0.00
2 10.00 10 0.42 0.21 2.10
3 20.00 10 1.60 1.01 10.10
4 30.00 10 0.12 0.86 8.60
5 40.00 10 0.82 0.47 4.70
6 50.00 10 4.28 2.55 25.50
7 60.00 10 6.95 5.62 56.20
8 70.00 10 4.15 5.55 55.50
9 80.00 10 2.54 3.34 33.40
10 90.00 10 3.62 3.08 30.80
11 100.00 10 3.40 3.51 35.10
12 110.00 10 1.68 2.54 25.40
13 120.00 10 1.69 1.69 16.90
14 130.00 10 2.81 2.25 22.50
15 140.00 10 2.23 2.52 25.20
16 150.00 10 3.59 2.91 29.10
17 160.00 10 2.96 3.27 32.70
18 170.00 10 0.51 1.73 17.30
19 180.00 10 0.32 0.41 4.10
20 190.00 10 7.46 3.89 38.90
21 200.00 10 6.63 7.04 70.40
22 210.00 10 0.71 3.67 36.70
23 220.00 10 3.80 2.26 22.60
24 230.00 10 18.99 11.40 114.00
25 240.00 10 17.22 18.11 181.10
26 250.00 10 10.26 13.74 137.40
27 260.00 10 9.04 9.65 96.50
28 270.00 10 8.54 8.79 87.90

Page 31 of 151
Sl no Item No Description of Item

Excavation to lines and levels as required by the prevailing geotechnical conditions for installation of support as shown on
the drawings or as directed by the Engineer in portal areas and rescue place sites with limited access to construct berms,
surface drains, divert natural streams, nallah and the like etc. This item includes:
- excavation of all types of ground (soils and rock) by any means of excavation (i.e. digging, blasting).
- sequential excavation at limited height and slope support as shown on the drawings resp. as directed by the
Engineer following the prevailing geotechnical conditions. Support elements will be paid separately
- cutting of trees, shrubs, roots and other vegetation including loading onto transport, transportation and
appropriate depositing, separate from other material
- clearing of loose debris and loosened rock above cuts
1 A101 - appropriate measures for diversion of any waters
- loading of excavated material onto transport, ascending and descending handling of excavation and materials, transportation
lead up to 2.0 km (one way distance) from point of excavation to center of gravity of designated depositing sites and
appropriate depositing and compaction of the material to lines and levels as a complete job as per specification or
as directed by the Engineer in charge including handling if required
- setting out and demarcation of earthworks and muck deposits
- security fencing along top of cut
Measurement and payment shall be for volumes in their solid states as per drawings based on contractor´s survey
before and after excavation. Contractor´s survey shall be submitted to the Engineer for approval prior to excavation.

Average
Location Chainage Length (M) Area (M²) Quantity (M³) Remarks
Area (M²)
29 280.00 10 5.99 7.27 72.70
30 290.00 10 2.87 4.43 44.30
31 300.00 10 3.51 3.19 31.90
32 310.00 10 8.49 6.00 60.00
33 320.00 10 8.72 8.60 86.00
34 330.00 10 1.25 4.98 49.80
35 340.00 10 13.66 7.45 74.50
36 350.00 10 0.00 6.83 68.30
37 360.00 10 31.54 15.77 157.70
38 370.00 10 17.97 24.75 247.50
39 380.00 10 22.23 20.10 201.00
40 390.00 10 8.06 15.15 151.50
41 400.00 10 6.15 7.10 71.00
42 410.00 10 14.38 10.27 102.70
43 420.00 10 50.48 32.43 324.30
44 430.00 10 42.34 46.41 464.10
45 440.00 10 32.16 37.25 372.50
46 450.00 10 38.02 35.09 350.90
47 460.00 10 38.92 38.47 384.70
48 470.00 10 28.78 33.85 338.50
49 480.00 10 27.06 27.92 279.20 5,153.80
T13 P2 Approach Road
From End Point of Local
0.00 19.99
1 Contractor
2 10.00 10 15.53 17.76 177.60
3 20.00 10 32.43 23.98 239.80
4 30.00 10 39.02 35.72 357.20
5 40.00 10 22.35 30.68 306.80
6 50.00 10 17.64 19.99 199.90
7 60.00 10 50.68 34.16 341.60
8 70.00 10 29.68 40.18 401.80
9 80.00 10 22.97 26.33 263.30
10 90.00 10 5.39 14.18 141.80
11 100.00 10 4.95 5.17 51.70
12 110.00 10 0.00 2.48 24.80
13 120.00 10 6.27 3.14 31.40
14 130.00 10 4.84 5.56 55.60
15 140.00 10 6.88 5.86 58.60
16 150.00 10 6.42 6.65 66.50 2,718.40
Excavation of Foundation for RRM Wall at T13 P1
1 Wall No 1 6.20 Area= 0.78 4.81
2 Wall No 2 8.30 Area= 0.78 6.43
3 Wall No 3 6.10 Area= 0.78 4.73
4 Wall No 4 6.12 Area= 0.78 4.74
5 Wall No 5 5.75 Area= 0.78 4.46 25.16

Page 32 of 151
Sl no Item No Description of Item

Excavation to lines and levels as required by the prevailing geotechnical conditions for installation of support as shown on
the drawings or as directed by the Engineer in portal areas and rescue place sites with limited access to construct berms,
surface drains, divert natural streams, nallah and the like etc. This item includes:
- excavation of all types of ground (soils and rock) by any means of excavation (i.e. digging, blasting).
- sequential excavation at limited height and slope support as shown on the drawings resp. as directed by the
Engineer following the prevailing geotechnical conditions. Support elements will be paid separately
- cutting of trees, shrubs, roots and other vegetation including loading onto transport, transportation and
appropriate depositing, separate from other material
- clearing of loose debris and loosened rock above cuts
1 A101 - appropriate measures for diversion of any waters
- loading of excavated material onto transport, ascending and descending handling of excavation and materials, transportation
lead up to 2.0 km (one way distance) from point of excavation to center of gravity of designated depositing sites and
appropriate depositing and compaction of the material to lines and levels as a complete job as per specification or
as directed by the Engineer in charge including handling if required
- setting out and demarcation of earthworks and muck deposits
- security fencing along top of cut
Measurement and payment shall be for volumes in their solid states as per drawings based on contractor´s survey
before and after excavation. Contractor´s survey shall be submitted to the Engineer for approval prior to excavation.

Average
Location Chainage Length (M) Area (M²) Quantity (M³) Remarks
Area (M²)
Excavation of Foundation for RRM Wall at T12 P1 Portal Area development
1 Wall No G 7.85 Area= 0.52 4.04
2 Wall No H 7.85 Area= 0.52 4.04 8.09
Excavation of Foundation for RRM Wall at T12 P1 Approach Road (Ch-251.5m to 281.0m)
1 Wall No O 8.30 Area= 0.64 5.28
2 Wall No P 8.10 Area= 0.64 5.15
3 Wall No Q 7.40 Area= 0.64 4.71
4 Wall No R 5.70 Area= 0.64 3.63 18.76
Excavation of Foundation for Gabion Wall at T12 P2 Approach Road (Ch-415m to 475.0m & 485.0m to 515.0m)
1 Wall No C 60.00 1.2 0.30 21.60
2 Wall No F 30.50 1.2 0.30 10.98 32.58
Excavation of Foundation for RRM Wall at T12P2 Portal Area Development
1 Wall No A 8.30 1.13 9.37 9.37
Excavation of Foundation for Gabion Wall at T12 P1 Portal Area
1 Wall No L 62.50 1.2 0.30 22.50 22.50
Excavation of Foundation for Gabion Wall at T12 P1 Approach road & River Protection
1 Wall No N 173.20 1.2 0.30 62.35 62.35

TOTAL= 45,458.24

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 45,458.24
Total Quantity Paid Up to Previous RA Bill 0.00
Quantity for This RA Bill 45,458.24

DHORAJIA DHORAJIA DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER

Page 33 of 151
Executed Qauntity from 01.02.2021 to 09.03 2021
Sl no Item No Description of Item

Excavation to lines and levels as required by the prevailing geotechnical conditions for installation of support as shown on
the drawings or as directed by the Engineer in portal areas and rescue place sites with limited access to construct berms,
surface drains, divert natural streams, nallah and the like etc. This item includes:
- excavation of all types of ground (soils and rock) by any means of excavation (i.e. digging, blasting).
- sequential excavation at limited height and slope support as shown on the drawings resp. as directed by the
Engineer following the prevailing geotechnical conditions. Support elements will be paid separately
- cutting of trees, shrubs, roots and other vegetation including loading onto transport, transportation and
appropriate depositing, separate from other material
- clearing of loose debris and loosened rock above cuts
1 A101 - appropriate measures for diversion of any waters
- loading of excavated material onto transport, ascending and descending handling of excavation and materials, transportation
lead up to 2.0 km (one way distance) from point of excavation to center of gravity of designated depositing sites and
appropriate depositing and compaction of the material to lines and levels as a complete job as per specification or
as directed by the Engineer in charge including handling if required
- setting out and demarcation of earthworks and muck deposits
- security fencing along top of cut
Measurement and payment shall be for volumes in their solid states as per drawings based on contractor´s survey
before and after excavation. Contractor´s survey shall be submitted to the Engineer for approval prior to excavation.

Average
Location Chainage Length (M) Area (M²) Quantity (M³) Remarks
Area (M²)

T13 P2 Approach Road


1 150.00 0 6.42 6.42 0.00
2 160.00 10 22.78 14.60 146.00
3 170.00 10 20.53 21.65 216.50
4 180.00 10 34.40 27.46 274.60
5 190.00 10 25.84 30.12 301.20
6 200.00 10 17.11 21.47 214.70
7 210.00 10 26.18 21.64 216.40
8 220.00 10 61.40 43.79 437.90
9 230.00 10 18.97 40.19 401.90
10 240.00 10 12.95 15.96 159.60
11 250.00 10 28.39 20.67 206.70
12 260.00 10 46.50 37.45 374.50
13 270.00 10 53.58 50.04 500.40
14 280.00 10 15.68 34.63 346.30
15 290.00 10 8.29 11.99 119.90
16 300.00 10 22.46 15.37 153.70
17 310.00 10 24.19 23.32 233.20
18 320.00 10 21.76 22.97 229.70
19 330.00 10 35.81 28.78 287.80
20 340.00 10 64.01 49.91 499.10 5320.10
Excavation of Foundation for RRM Wall at T13 P1 (Chainage-403.27m to 411.27m,461.13m to 480.0m,433.0m to 442.47m)
1 Wall No 6 8.00 Area= 1.00 7.96
2 Wall No 7 3.20 Area= 0.78 2.50
3 Wall No 8 4.95 Area= 0.78 3.86
4 Wall No 9 5.80 Area= 0.99 5.74
5 Wall No 10 4.92 Area= 0.99 4.87
6 Wall No 11 5.05 Area= 1.23 6.20
7 Wall No 12 4.42 Area= 1.23 5.43 36.56
Excavation of Foundation for RRM Wall at T12 P1 Approach Road (Ch-190.95m to 251.5m)
1 RRM Wall 5 5.70 Area= 0.78 4.42
2 RRM Wall 6 6.20 Area= 0.78 4.81
3 RRM Wall 7 6.10 Area= 0.78 4.73
4 RRM Wall 8 6.70 Area= 0.78 5.19
5 RRM Wall 9 6.10 Area= 0.78 4.73
6 RRM Wall 10 4.90 Area= 0.78 3.80
7 RRM Wall 11 5.25 Area= 0.78 4.07
8 RRM Wall 12 4.90 Area= 0.78 3.80
9 RRM Wall 13 4.50 Area= 0.78 3.49
10 RRM Wall 14 5.20 Area= 0.78 4.03

Page 34 of 151
Sl no Item No Description of Item

Excavation to lines and levels as required by the prevailing geotechnical conditions for installation of support as shown on
the drawings or as directed by the Engineer in portal areas and rescue place sites with limited access to construct berms,
surface drains, divert natural streams, nallah and the like etc. This item includes:
- excavation of all types of ground (soils and rock) by any means of excavation (i.e. digging, blasting).
- sequential excavation at limited height and slope support as shown on the drawings resp. as directed by the
Engineer following the prevailing geotechnical conditions. Support elements will be paid separately
- cutting of trees, shrubs, roots and other vegetation including loading onto transport, transportation and
appropriate depositing, separate from other material
- clearing of loose debris and loosened rock above cuts
1 A101 - appropriate measures for diversion of any waters
- loading of excavated material onto transport, ascending and descending handling of excavation and materials, transportation
lead up to 2.0 km (one way distance) from point of excavation to center of gravity of designated depositing sites and
appropriate depositing and compaction of the material to lines and levels as a complete job as per specification or
as directed by the Engineer in charge including handling if required
- setting out and demarcation of earthworks and muck deposits
- security fencing along top of cut
Measurement and payment shall be for volumes in their solid states as per drawings based on contractor´s survey
before and after excavation. Contractor´s survey shall be submitted to the Engineer for approval prior to excavation.

Average
Location Chainage Length (M) Area (M²) Quantity (M³) Remarks
Area (M²)

11 RRM Wall 15 5.00 Area= 0.78 3.88 46.93


Excavation of Foundation for RRM Wall at T12 P2 Approach Road (Ch-465m to 500m)
1 RRM Wall 1 0.35 Area= 1.23 0.43
2 RRM Wall 2 5.00 Area= 1.23 6.14
3 RRM Wall 3 5.00 Area= 1.23 6.14
4 RRM Wall 4 5.10 Area= 1.23 6.26
5 RRM Wall 5 5.00 Area= 1.23 6.14
6 RRM Wall 6 5.00 Area= 1.23 6.14
7 RRM Wall 7 5.10 Area= 1.23 6.26
Excavation of Foundation for RRM Wall at T12 P2 Approach Road (Ch-640.0m to 678.30m)
1 RRM Wall 1 5.00 Area= 1.03 5.13
2 RRM Wall 2 4.85 Area= 1.03 4.97
3 RRM Wall 3 5.85 Area= 1.03 6.00
4 RRM Wall 4 5.00 Area= 1.03 5.13
5 RRM Wall 5 5.35 Area= 1.03 5.48
6 RRM Wall 6 5.00 Area= 1.03 5.13
7 RRM Wall 7 5.10 Area= 1.03 5.23
8 RRM Wall 8 5.00 Area= 1.03 5.13
79.69
Excavation of Foundation for RRM Wall at T12P2 Portal Area Development
2 Wall No A 22.15 1.83 40.58 40.58

TOTAL= 5,523.86

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 50,982.10
Total Quantity Paid Up to Previous RA Bill 45,458.24
Quantity for This RA Bill 5,523.86

CS-DHORAJIA JV CS-DHORAJIA JV DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER

Page 35 of 151
Sl no Item No Description of Item

Excavation to lines and levels as required by the prevailing geotechnical conditions for installation of support as shown on
the drawings or as directed by the Engineer in portal areas and rescue place sites with limited access to construct berms,
surface drains, divert natural streams, nallah and the like etc. This item includes:
- excavation of all types of ground (soils and rock) by any means of excavation (i.e. digging, blasting).
- sequential excavation at limited height and slope support as shown on the drawings resp. as directed by the
Engineer following the prevailing geotechnical conditions. Support elements will be paid separately
- cutting of trees, shrubs, roots and other vegetation including loading onto transport, transportation and
appropriate depositing, separate from other material
- clearing of loose debris and loosened rock above cuts
1 A101 - appropriate measures for diversion of any waters
- loading of excavated material onto transport, ascending and descending handling of excavation and materials, transportation
lead up to 2.0 km (one way distance) from point of excavation to center of gravity of designated depositing sites and
appropriate depositing and compaction of the material to lines and levels as a complete job as per specification or
as directed by the Engineer in charge including handling if required
- setting out and demarcation of earthworks and muck deposits
- security fencing along top of cut
Measurement and payment shall be for volumes in their solid states as per drawings based on contractor´s survey
before and after excavation. Contractor´s survey shall be submitted to the Engineer for approval prior to excavation.

Average
Location Chainage Length (M) Area (M²) Quantity (M³) Remarks
Area (M²)

T13 P2 Approach Road


1 340.00 0 64.01 64.01 0.00
2 350.00 10 26.40 45.21 452.10
3 360.00 10 48.13 37.26 372.60
4 370.00 10 52.24 50.18 501.80
5 380.00 10 48.83 50.54 505.40
6 390.00 10 53.03 50.93 509.30
7 400.00 10 61.60 57.32 573.20
8 410.00 10 43.64 52.62 526.20
9 420.00 10 59.30 51.47 514.70
10 430.00 10 37.43 48.36 483.60
11 440.00 10 7.51 22.47 224.70
12 450.00 10 3.11 5.31 53.10
13 460.00 10 5.55 4.33 43.30
TOTAL= 4,760.00
Excavation of Foundation for RRM Wall at T13 P1 (Chainage-230.0m to 288.4m)
1 Wall No 1 A 5.15 Area= 0.88 4.53
2 Wall No 2 A 5.55 Area= 0.88 4.88
3 Wall No 3 A 5.10 Area= 0.88 4.49
4 Wall No 4 A 6.00 Area= 0.88 5.28
5 Wall No 5 A 6.00 Area= 0.88 5.28
6 Wall No 6 A 6.00 Area= 0.88 5.28
7 Wall No 7 A 6.00 Area= 0.88 5.28
8 Wall No 8 A 6.40 Area= 0.88 5.63
40.65
TOTAL= 4,800.65
Detail of Certified Quantity by IRCON
Total Up to date quantity Executed 55,782.75
Total Quantity Paid Up to Previous RA Bill 50,982.10
Quantity for This RA Bill 4,800.65

CS-DHORAJIA JV CS-DHORAJIA JV DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER

Page 36 of 151
Sl no Item No Description of Item
Excavation to lines and levels as required by the prevailing geotechnical conditions for installation of support as shown on the
drawings or as directed by the Engineer in portal areas and rescue place sites with limited access to construct berms, surface
drains, divert natural streams, nallah and the like etc. This item includes:
- excavation of all types of ground (soils and rock) by any means of excavation (i.e. digging, blasting).
- sequential excavation at limited height and slope support as shown on the drawings resp. as directed by the Engineer
following the prevailing geotechnical conditions. Support elements will be paid separately
- cutting of trees, shrubs, roots and other vegetation including loading onto transport, transportation and appropriate
depositing, separate from other material
- clearing of loose debris and loosened rock above cuts
1 A101 - appropriate measures for diversion of any waters
- loading of excavated material onto transport, ascending and descending handling of excavation and materials, transportation lead
up to 2.0 km (one way distance) from point of excavation to center of gravity of designated depositing sites and appropriate
depositing and compaction of the material to lines and levels as a complete job as per specification or as directed by the
Engineer in charge including handling if required
- setting out and demarcation of earthworks and muck deposits
- security fencing along top of cut
Measurement and payment shall be for volumes in their solid states as per drawings based on contractor´s survey before
and after excavation. Contractor´s survey shall be submitted to the Engineer for approval prior to excavation.
Average
Location Chainage Length (M) Area (M²) Quantity (M³) Remarks
Area (M²)

Excavation for RRM Wall at APPROACH ROAD OF T12P2 Chainage (300.0m to350.0m)
1 RRM Wall No B1 11.20 Area= 1.17 13.10
2 RRM Wall No B2 9.40 Area= 1.17 11.00
3 RRM Wall No B3 5.10 Area= 1.17 5.97
4 RRM Wall No B4 5.95 Area= 1.17 6.96
5 RRM Wall No B5 5.95 Area= 1.17 6.96
6 RRM Wall No B6 6.10 Area= 1.17 7.14
7 RRM Wall No B7 6.10 Area= 1.17 7.14

Excavation RRM Wall at APPROACH ROAD OF T12P2 Near Portal


1 RRM Wall No 11 6.25 Area= 1.02 6.38
2 RRM Wall No 12 6.20 Area= 1.02 6.32
3 RRM Wall No 13 3.90 Area= 1.02 3.98
RRM Wall at APPROACH ROAD OF T12P2 (Chainage 623.0m to 640.0m)
1 RRM Wall No -1 8.30 Area= 1.00 8.30
2 RRM Wall No -2 8.70 Area= 1.00 8.70

Excavation for Drain at T12P2


1 Trapezoidal-Type Drain 32.00 Area= 0.58 18.56 Ch-510.0m to 542.0m
2 Trapezoidal-Type Drain 87.00 Area= 0.58 50.46 Ch-300.0m to 387.0m

160.97
TOTAL= 160.97
Detail of Certified Quantity by IRCON
Total Up to date quantity Executed 103,849.57
Total Quantity Paid Up to Previous RA Bill 103,688.60
Quantity for This RA Bill 160.97

CS-DHORAJIA JV CS-DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER

Page 37 of 151
Underground excavation (TopHeading,Bench,Invert) for main tunnel,adit,niches (Elctrical,Trolley Refuge and the like)and connection of the main tunnel to the adit by all
means of excavation (drilling,blasting /control blasting (wherever required) ,digging etc) in accordance with the New Austrian Tunnelling Method (NATM).This item
includes:-Mandatory excavation in sub divisons (Top heading, bench and invert)according to geometries, excavation and support sequence shown on design drawings
and as described in the technical specifications- in rock the application of smooth blasting techniques with contour hole spacing not exceeding 300 mm- Simultaneous
A102 excavation works in top heading, and half sided benching in rail tunnels as per technical specifications or as directed byEngineer- Systematic exploratory drillholes-
Appropriate Plant and Equipment with appropriate size specifically selected for the various tunnel sizes and as declared in the technical bid- Face maping & Rock
Classification after each blast.- Provision of drainages for all surfaces with vehicular circulation- Provision of adequate lighting and construction ventilation-

BOQ ITEM NO. A1026 - Excavation in Support Class-VI

AVERAGE GOB AVERAGE GOB


TUNNEL AREA LENGTH QUANTITY OB AVG OB
CHAINAGE ATSS No. AREA AREA GOB AREA QUANTITY OB QTY REMARKS
METER (sqm) (meter) (cum) AREA AREA
(sqm) (sqm) (sqm) (cum)

PORTAL- T13P1
38,788.50 3.00 T13P1/04 62.21 Full Face R0
38,789.50 4.00 T13P1/05 62.21 62.21 1.00 62.21 - - - - - Full Face R1
38,790.50 5.00 T13P1/06 64.12 63.16 1.00 63.16 - - - - - Full Face R3
38,791.50 6.00 T13P1/07 66.10 65.11 1.00 65.11 - - - - - Full Face R5
38,792.50 7.00 T13P1/08 68.08 67.09 1.00 67.09 - - - - - Full Face R7
38,793.50 8.00 T13P1/09 70.03 69.05 1.00 69.05 - - - - - Full Face R9
38,794.50 9.00 T13P1/10 70.03 70.03 1.00 70.03 - - - - - Full Face R9
38,795.50 10.00 T13P1/11 72.05 71.04 1.00 71.04 - - - - - Full Face R11
38,796.50 11.00 T13P1/12 62.21 67.13 1.00 67.13 9.06 4.53 4.53 2.98 1.49 1.49 Full Face R1
38,797.50 12.00 T13P1/13 64.12 63.16 1.00 63.16 8.31 8.69 8.69 3.47 3.22 3.22 Full Face R3
38,798.50 13.00 T13P1/14 66.10 65.11 1.00 65.11 4.59 6.45 6.45 3.55 3.51 3.51 Full Face R5
38,799.50 14.00 T13P1/15 66.10 66.10 1.00 66.10 1.89 3.24 3.24 1.74 2.65 2.65 Full Face R5
38,800.50 15.00 T13P1/16 68.08 67.09 1.00 67.09 2.32 2.10 2.10 1.99 1.86 1.86 Full Face R7
38,801.50 16.00 T13P1/17 68.08 68.08 1.00 68.08 1.69 2.00 2.00 1.61 1.80 1.80 Full Face R7
38,802.50 17.00 T13P1/18 70.03 69.05 1.00 69.05 3.09 2.39 2.39 3.23 2.42 2.42 Full Face R9
38,803.50 18.00 T13P1/19 70.03 70.03 1.00 70.03 4.02 3.56 3.56 2.86 3.05 3.05 Full Face R9
38,804.50 19.00 T13P1/20 72.05 71.04 1.00 71.04 5.18 4.60 4.60 2.18 2.52 2.52 Full Face R11
38,805.50 20.00 T13P1/21 72.05 72.05 1.00 72.05 2.62 3.90 3.90 2.96 2.57 2.57 Full Face R11
38,806.50 21.00 T13P1/22 72.05 72.05 1.00 72.05 4.68 3.65 3.65 3.04 3.00 3.00 Full Face R11
38,807.50 22.00 T13P1/23 62.21 67.13 1.00 67.13 - 2.34 2.34 1.52 1.52 Full Face R1
47.45 29.61 A
TOTAL= 1,285.71 23.73 14.80 50% of A
TOTAL= 1,309.44

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 3,502.80 Cum
Total Quantity Paid Up to Previous RA Bill 2,193.36 Cum
Quantity for This RA Bill 1,309.44 Cum

CS-DHORAJIA JV CS-DHORAJIA JV DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Self drilling rock bolts (IBO) for tunnel support, slope support, face bolts etc. Supply, drilling, installation,
grouting and testing of self driling rock bolts of specified length L, specified minimum ultimate load as per
design drawings (Fy=200kN), technical specifications or as directed by Engineer. Drilling with grout
flushing is mandatory. This item includes:
B103
- couplings
- sacrificial drilling bits + grouting
Measurement and payment shall be per piece appropriately installed rock bolts (for exact payment details
see specifications).

BOQ ITEM NO. B1033 Length 6 m


ROUND CHAINAGE (m) TUNNEL METER
ATSS NO. Nos QUANTITY (Nos) REMARKS
NO From To From To
T12P1/11 11.00 37,102.00 37,103.00 11.00 12.00 14.00 14.00 T12P1

T12P1/12 12.00 37,103.00 37,104.00 12.00 13.00 14.00 14.00 T12P1

T12P1/13 13.00 37,104.00 37,105.00 13.00 14.00 15.00 15.00 T12P1

T12P1/14 14.00 37,105.00 37,106.00 14.00 15.00 14.00 14.00 T12P1

T12P1/15 15.00 37,106.00 37,107.00 15.00 16.00 15.00 15.00 T12P1

T12P1/16 16.00 37,107.00 37,108.00 16.00 17.00 14.00 14.00 T12P1

T12P1/17 17.00 37,108.00 37,109.00 17.00 18.00 14.00 14.00 T12P1

T12P1/18 18.00 37,109.00 37,110.00 18.00 19.00 15.00 15.00 T12P1

T12P1/19 19.00 37,110.00 37,111.00 19.00 20.00 14.00 14.00 T12P1

T12P1/20 20.00 37,111.00 37,112.00 20.00 21.00 14.00 14.00 T12P1

T12P1/21 21.00 37,112.00 37,113.00 21.00 22.00 14.00 14.00 T12P1

T12P1/22 22.00 37,113.00 37,114.00 22.00 23.00 15.00 15.00 T12P1

T12P1/23 23.00 37,114.00 37,115.00 23.00 24.00 14.00 14.00 T12P1

T12P1/24 24.00 37,115.00 37,116.00 24.00 25.00 14.00 14.00 T12P1

T12P1/25 25.00 37,116.00 37,117.00 25.00 26.00 15.00 15.00 T12P1

T12P1/26 26.00 37,117.00 37,118.00 26.00 27.00 13.00 13.00 T12P1

T12P1/27 27.00 37,118.00 37,119.00 27.00 28.00 14.00 14.00 T12P1

T12P1/28 28.00 37,119.00 37,120.00 28.00 29.00 15.00 15.00 T12P1

T12P1/29 29.00 37,120.00 37,121.00 29.00 30.00 14.00 14.00 T12P1

T12P1/30 30.00 37,121.00 37,122.00 30.00 31.00 15.00 15.00 T12P1

T12P1/31 31.00 37,122.00 37,123.00 31.00 32.00 14.00 14.00 T12P1

T12P1/32 32.00 37,123.00 37,124.00 32.00 33.00 15.00 15.00 T12P1

T12P1/33 33.00 37,124.00 37,125.00 33.00 34.00 14.00 14.00 T12P1

T12P1/34 34.00 37,125.00 37,126.00 34.00 35.00 15.00 15.00 T12P1

T12P1/35 35.00 37,126.00 37,127.00 35.00 36.00 14.00 14.00 T12P1

T12P1/36 36.00 37,127.00 37,128.00 36.00 37.00 15.00 15.00 T12P1

Total= 373.00

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 431.00
Total Quantity Paid Up to Previous RA Bill 58.00
Quantity for This RA Bill 373.00

CS-DHORAJIA JV CS-DHORAJIA JV DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Self drilling rock bolts (IBO) for tunnel support, slope support, face bolts etc. Supply, drilling, installation,
grouting and testing of self driling rock bolts of specified length L, specified minimum ultimate load as per
design drawings (Fy=200kN), technical specifications or as directed by Engineer. Drilling with grout
flushing is mandatory. This item includes:
B103
- couplings
- sacrificial drilling bits + grouting
Measurement and payment shall be per piece appropriately installed rock bolts (for exact payment details
see specifications).

BOQ ITEM NO. B1033 Length 6 m


ROUND CHAINAGE (m) TUNNEL METER
ATSS NO. Nos QUANTITY (Nos) REMARKS
NO From To From To
PORTAL T13P1
T13P1/04 4.00 38,788.50 38,789.50 3.00 4.00 9.00 9.00 T13P1

T13P1/05 5.00 38,789.50 38,790.50 4.00 5.00 7.00 7.00 T13P1

T13P1/06 6.00 38,790.50 38,791.50 5.00 6.00 9.00 9.00 T13P1

T13P1/07 7.00 38,791.50 38,792.50 6.00 7.00 7.00 7.00 T13P1

T13P1/08 8.00 38,792.50 38,793.50 7.00 8.00 9.00 9.00 T13P1

T13P1/09 9.00 38,793.50 38,794.50 8.00 9.00 7.00 7.00 T13P1

T13P1/10 10.00 38,794.50 38,795.50 9.00 10.00 9.00 9.00 T13P1

T13P1/11 11.00 38,795.50 38,796.50 10.00 11.00 7.00 7.00 T13P1

T13P1/12 12.00 38,796.50 38,797.50 11.00 12.00 9.00 9.00 T13P1

T13P1/13 13.00 38,797.50 38,798.50 12.00 13.00 7.00 7.00 T13P1

T13P1/14 14.00 38,798.50 38,799.50 13.00 14.00 9.00 9.00 T13P1

T13P1/15 15.00 38,799.50 38,800.50 14.00 15.00 7.00 7.00 T13P1

T13P1/16 16.00 38,800.50 38,801.50 15.00 16.00 9.00 9.00 T13P1

T13P1/17 17.00 38,801.50 38,802.50 16.00 17.00 7.00 7.00 T13P1

T13P1/18 18.00 38,802.50 38,803.50 17.00 18.00 9.00 9.00 T13P1

T13P1/19 19.00 38,803.50 38,804.50 18.00 19.00 7.00 7.00 T13P1

T13P1/20 20.00 38,804.50 38,805.50 19.00 20.00 9.00 9.00 T13P1

T13P1/21 21.00 38,805.50 38,806.50 20.00 21.00 7.00 7.00 T13P1

T13P1/22 22.00 38,806.50 38,807.50 21.00 22.00 9.00 9.00 T13P1

PORTAL T12P1
T12P1/036 37.00 37,128.80 37,130.30 37.80 39.30 18.00 18.00 T12P1

T12P1/037 38.00 37,130.30 37,131.80 39.30 40.80 19.00 19.00 T12P1

T12P1/038 39.00 37,131.80 37,133.30 40.80 42.30 18.00 18.00 T12P1

T12P1/039 40.00 37,133.30 37,134.80 42.30 43.80 19.00 19.00 T12P1

T12P1/040 41.00 37,134.80 37,136.30 43.80 45.30 18.00 18.00 T12P1

T12P1/041 42.00 37,136.30 37,137.80 45.30 46.80 19.00 19.00 T12P1

T12P1/042 43.00 37,137.80 37,139.50 46.80 48.50 18.00 18.00 T12P1

T12P1/043 44.00 37,139.50 37,141.00 48.50 50.00 19.00 19.00 T12P1

T12P1/044 45.00 37,141.00 37,142.50 50.00 51.50 18.00 18.00 T12P1

T12P1/045 46.00 37,142.50 37,144.00 51.50 53.00 19.00 19.00 T12P1

T12P1/046 47.00 37,144.00 37,145.50 53.00 54.50 18.00 18.00 T12P1

T12P1/047 48.00 37,145.50 37,147.00 54.50 56.00 19.00 19.00 T12P1

T12P1/048 49.00 37,147.00 37,147.00 56.00 57.50 18.00 18.00 T12P1

T12P1/049 50.00 37,148.50 37,150.00 57.50 59.00 19.00 19.00 T12P1

T12P1/050 51.00 37,150.00 37,151.50 59.00 60.50 18.00 18.00 T12P1

T12P1/051 52.00 37,151.50 37,153.00 60.50 62.00 19.00 19.00 T12P1

Total= 449.00

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 880.00
Total Quantity Paid Up to Previous RA Bill 431.00
Quantity for This RA Bill 449.00

CS-DHORAJIA JV CS-DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Underground excavation (TopHeading,Bench,Invert) for main tunnel,adit,niches (Elctrical,Trolley Refuge and the like)and
connection of the main tunnel to the adit by all means of excavation (drilling,blasting /control blasting (wherever
required) ,digging etc) in accordance with the New Austrian Tunnelling Method (NATM).This item includes:-Mandatory
A102 excavation in sub divisons (Top heading, bench and invert)according to geometries, excavation and support sequence
shown on design drawings and as described in the technical specifications- in rock the application of smooth blasting
techniques with contour hole spacing not exceeding 300 mm- Simultaneous excavation works in top heading, and half
sided benching in rail tunnels as per technical specifications or as directed byEngineer- Systematic exploratory drillholes-
Appropriate Plant and Equipment with appropriate size specifically selected for the various tunnel sizes and as declared in
2_3 A1023
the technical Excavation in Support
bid- Face maping & RockClass 3
Classification after each blast.- Provision of drainages for all surfaces with vehicular
circulation- Provision of adequate lighting and construction ventilation-
AVERAGE
TUNNEL AREA LENGTH QUANTITY
CHAINAGE ATSS No. AREA REMARKS
METER (sqm) (meter) (cum)
(sqm)

PORTAL-T12P1 Ress no 5-23/09/2021


37,372.50 281.50 T12P1/199 56.58
37,374.00 283.00 T12P1/200 56.58 56.58 1.50 84.87
37,375.50 284.50 T12P1/201 56.58 56.58 1.50 84.87
37,377.00 286.00 T12P1/202 56.58 56.58 1.50 84.87
37,378.50 287.50 T12P1/203 56.58 56.58 1.50 84.87
37,380.00 289.00 T12P1/204 56.58 56.58 1.50 84.87
37,381.50 290.50 T12P1/205 56.58 56.58 1.50 84.87

37,398.00 307.00 T12P1/216 60.55 60.55 -


37,399.50 308.50 T12P1/217 56.58 58.57 1.50 87.86 Ress no 8-15/11/2021
37,401.00 310.00 T12P1/218 56.58 56.58 1.50 84.87
37,402.50 311.50 T12P1/219 56.58 56.58 1.50 84.87
37,404.00 313.00 T12P1/220 56.58 56.58 1.50 84.87
37,405.50 314.50 T12P1/221 56.58 56.58 1.50 84.87
37,407.00 316.00 T12P1/222 56.58 56.58 1.50 84.87

PORTAL-T12P1 TOOLLEY REFUGE NICHE-2 at CH-37306, TM-215m


OFFSET
4.07 31.41 Ress no 6-12/10/2021
5.07 31.41 31.41 1.00 31.41
6.07 31.41 31.41 1.00 31.41
7.07 31.41 31.41 1.00 31.41
8.12 31.41 31.41 1.05 32.98
104.74 T12P1 GOB as per Annex B
TOTAL= 1,253.38

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 8,539.57 Cum
Total Quantity Paid Up to Previous RA Bill 7,286.19 Cum
Quantity for This RA Bill 1,253.38 Cum

CS-DHORAJIA JV CS-DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Underground excavation (TopHeading,Bench,Invert) for main tunnel,adit,niches (Elctrical,Trolley Refuge and the like)and
connection of the main tunnel to the adit by all means of excavation (drilling,blasting /control blasting (wherever
required) ,digging etc) in accordance with the New Austrian Tunnelling Method (NATM).This item includes:-Mandatory
A102 excavation in sub divisons (Top heading, bench and invert)according to geometries, excavation and support sequence
shown on design drawings and as described in the technical specifications- in rock the application of smooth blasting
techniques with contour hole spacing not exceeding 300 mm- Simultaneous excavation works in top heading, and half
sided benching in rail tunnels as per technical specifications or as directed byEngineer- Systematic exploratory drillholes-
Appropriate Plant and Equipment with appropriate size specifically selected for the various tunnel sizes and as declared in
2_4 A1024
the technical Excavation in Support
bid- Face maping Class
& Rock 4
Classification after each blast.- Provision of drainages for all surfaces with vehicular
circulation- Provision of adequate lighting AVERAGE
and construction ventilation-
TUNNEL AREA LENGTH QUANTITY
CHAINAGE ATSS No. AREA REMARKS
METER (sqm) (meter) (cum)
(sqm)
PORTAL-T13P1
38,932.00 146.50 T13P1/122 60.55
38,933.50 148.00 T13P1/123 60.55 60.55 1.50 90.83 Ress no 4-18/10/2021
38,935.00 149.50 T13P1/124 60.55 60.55 1.50 90.83
38,936.50 151.00 T13P1/125 60.55 60.55 1.50 90.83
38,938.00 152.50 T13P1/126 60.55 60.55 1.50 90.83
38,939.50 154.00 T13P1/127 60.55 60.55 1.50 90.83
38,941.00 155.50 T13P1/128 60.55 60.55 1.50 90.83
38,942.50 157.00 T13P1/129 60.55 60.55 1.50 90.83
38,944.00 158.50 T13P1/130 60.55 60.55 1.50 90.83
38,945.50 160.00 T13P1/131 60.55 60.55 1.50 90.83
38,947.00 161.50 T13P1/132 60.55 60.55 1.50 90.83
38,948.50 163.00 T13P1/133 60.55 60.55 1.50 90.83
38,950.00 164.50 T13P1/134 60.55 60.55 1.50 90.83
38,951.50 166.00 T13P1/135 60.55 60.55 1.50 90.83
38,953.00 167.50 T13P1/136 60.55 60.55 1.50 90.83
38,954.50 169.00 T13P1/137 60.55 60.55 1.50 90.83
38,955.50 170.00 T13P1/138 60.55 60.55 1.00 60.55
38,956.50 171.00 T13P1/139 60.55 60.55 1.00 60.55
38,957.85 172.35 T13P1/140 60.55 60.55 1.35 81.74
38,959.20 173.70 T13P1/141 60.55 60.55 1.35 81.74
38,960.40 174.90 T13P1/142 60.55 60.55 1.20 72.66
38,961.60 176.10 T13P1/143 60.55 60.55 1.20 72.66
38,963.00 177.50 T13P1/144 60.55 60.55 1.40 84.77
38,964.20 178.70 T13P1/145 60.55 60.55 1.20 72.66
38,965.50 180.00 T13P1/146 60.55 60.55 1.30 78.72
38,966.80 181.30 T13P1/147 60.55 60.55 1.30 78.72
38,968.10 182.60 T13P1/148 60.55 60.55 1.30 78.72
38,969.40 183.90 T13P1/149 60.55 60.55 1.30 78.72
38,970.70 185.20 T13P1/150 60.55 60.55 1.30 78.72
38,972.00 186.50 T13P1/151 60.55 60.55 1.30 78.72
38,973.30 187.80 T13P1/152 60.55 60.55 1.30 78.72
38,974.60 189.10 T13P1/153 60.55 60.55 1.30 78.72
38,975.90 190.40 T13P1/154 60.55 60.55 1.30 78.72
38,977.20 191.70 T13P1/155 60.55 60.55 1.30 78.72
38,978.50 193.00 T13P1/156 60.55 60.55 1.30 78.72

PORTAL-T12P1
37,381.50 290.50 T12P1/205 56.58
37,383.00 292.00 T12P1/206 60.55 58.57 1.50 87.86 Ress no 7-06/11/2021
37,384.50 293.50 T12P1/207 60.55 59.23 1.50 88.85
37,386.00 295.00 T12P1/208 60.55 60.55 1.50 90.83
37,387.50 296.50 T12P1/209 60.55 60.55 1.50 90.83
37,389.00 298.00 T12P1/210 60.55 60.55 1.50 90.83
37,390.50 299.50 T12P1/211 60.55 60.55 1.50 90.83
37,392.00 301.00 T12P1/212 60.55 60.55 1.50 90.83
37,393.50 302.50 T12P1/213 60.55 60.55 1.50 90.83
37,395.00 304.00 T12P1/214 60.55 60.55 1.50 90.83
37,396.50 305.50 T12P1/215 60.55 60.55 1.50 90.83
37,398.00 307.00 T12P1/216 60.55 60.55 1.50 90.83

37,407.00 316.00 T12P1/222 56.58 58.56 -


37,408.50 317.50 T12P1/223 60.55 58.56 1.50 87.84 Ress no 7-18/11/2021
37,410.00 319.00 T12P1/224 60.55 60.55 1.50 90.83
Underground excavation (TopHeading,Bench,Invert) for main tunnel,adit,niches (Elctrical,Trolley Refuge and the like)and
connection of the main tunnel to the adit by all means of excavation (drilling,blasting /control blasting (wherever
required) ,digging etc) in accordance with the New Austrian Tunnelling Method (NATM).This item includes:-Mandatory
A102 excavation in sub divisons (Top heading, bench and invert)according to geometries, excavation and support sequence
shown on design drawings and as described in the technical specifications- in rock the application of smooth blasting
techniques with contour hole spacing not exceeding 300 mm- Simultaneous excavation works in top heading, and half
sided benching in rail tunnels as per technical specifications or as directed byEngineer- Systematic exploratory drillholes-
Appropriate Plant and Equipment with appropriate size specifically selected for the various tunnel sizes and as declared in
2_4 A1024
the technical Excavation in Support
bid- Face maping & RockClass 4
Classification after each blast.- Provision of drainages for all surfaces with vehicular
circulation- Provision of adequate lighting AVERAGE
and construction ventilation-
TUNNEL AREA LENGTH QUANTITY
CHAINAGE ATSS No. AREA REMARKS
METER (sqm) (meter) (cum)
(sqm)
37,411.50 320.50 T12P1/225 60.55 60.55 1.50 90.83
37,413.00 322.00 T12P1/226 60.55 60.55 1.50 90.83
37,414.50 323.50 T12P1/227 60.55 60.55 1.50 90.83
37,416.00 325.00 T12P1/228 60.55 60.55 1.50 90.83
37,417.50 326.50 T12P1/229 60.55 60.55 1.50 90.83
37,419.00 328.00 T12P1/230 60.55 60.55 1.50 90.83
37,420.50 329.50 T12P1/231 60.55 60.55 1.50 90.83
37,422.00 331.00 T12P1/232 60.55 60.55 1.50 90.83
37,423.50 332.50 T12P1/233 60.55 60.55 1.50 90.83
37,425.00 334.00 T12P1/234 60.55 60.55 1.50 90.83
37,426.50 335.50 T12P1/235 60.55 60.55 1.50 90.83
37,428.00 337.00 T12P1/236 60.55 60.55 1.50 90.83
37,429.50 338.50 T12P1/237 60.55 60.55 1.50 90.83
37,431.00 340.00 T12P1/238 60.55 60.55 1.50 90.83
37,432.50 341.50 T12P1/239 60.55 60.55 1.50 90.83
37,434.00 343.00 T12P1/240 60.55 60.55 1.50 90.83
37,435.50 344.50 T12P1/241 60.55 60.55 1.50 90.83
37,437.00 346.00 T12P1/242 60.55 60.55 1.50 90.83
37,438.50 347.50 T12P1/243 60.55 60.55 1.50 90.83
37,440.00 349.00 T12P1/244 60.55 60.55 1.50 90.83
37,441.50 350.50 T12P1/245 60.55 60.55 1.50 90.83
37,443.00 352.00 T12P1/246 60.55 60.55 1.50 90.83
37,444.50 353.50 T12P1/247 60.55 60.55 1.50 90.83
37,446.00 355.00 T12P1/248 60.55 60.55 1.50 90.83
37,447.50 356.50 T12P1/249 60.55 60.55 1.50 90.83
37,449.00 358.00 T12P1/250 60.55 60.55 1.50 90.83
37,450.50 359.50 T12P1/251 60.55 60.55 1.50 90.83
37,452.00 361.00 T12P1/252 60.55 60.55 1.50 90.83
37,453.50 362.50 T12P1/253 60.55 60.55 1.50 90.83
37,455.00 364.00 T12P1/254 60.55 60.55 1.50 90.83
37,456.50 365.50 T12P1/255 60.55 60.55 1.50 90.83
37,458.00 367.00 T12P1/256 60.55 60.55 1.50 90.83

PORTAL-T13P1 1st NITCH at CH-38880.0m,TM-94.5m


OFFSET
4.20 32.59 Ress no 5-28/10/2021
4.90 32.59 32.59 0.70 22.81
5.90 32.59 32.59 1.00 32.59
6.90 32.59 32.59 1.00 32.59
8.20 32.59 32.59 1.30 42.37
7,025.47
223.85 T12P1 GOB as per Annex B
TOTAL= 7,249.32

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 15,483.37 Cum
Total Quantity Paid Up to Previous RA Bill 8,234.05 Cum
Quantity for This RA Bill 7,249.32 Cum

CS-DHORAJIA JV CS-DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Underground excavation (TopHeading,Bench,Invert) for main tunnel,adit,niches (Elctrical,Trolley Refuge and the like)and connection of the
main tunnel to the adit by all means of excavation (drilling,blasting /control blasting (wherever required) ,digging etc) in accordance with the
New Austrian Tunnelling Method (NATM).This item includes:-Mandatory excavation in sub divisons (Top heading, bench and
invert)according to geometries, excavation and support sequence shown on design drawings and as described in the technical
specifications- in rock the application of smooth blasting techniques with contour hole spacing not exceeding 300 mm- Simultaneous
A102 excavation works in top heading, and half sided benching in rail tunnels as per technical specifications or as directed byEngineer-
Systematic exploratory drillholes- Appropriate Plant and Equipment with appropriate size specifically selected for the various tunnel sizes
and as declared in the technical bid- Face maping & Rock Classification after each blast.- Provision of drainages for all surfaces with
vehicular circulation- Provision of adequate lighting and construction ventilation-

2_5 A1025 Excavation in Support Class 5

AVERAGE
TUNNEL AREA LENGTH QUANTITY
CHAINAGE ATSS No. AREA REMARKS
METER (sqm) (meter) (cum)
(sqm)

PORTAL-T13P2
41,331.00 15.00 T13P2/15 70.03 Ress no 4-09/10/2021
41,330.00 16.00 T13P2/16 62.63 66.33 1.00 66.33
41,329.00 17.00 T13P2/17 62.63 62.63 1.00 62.63
41,328.00 18.00 T13P2/18 62.63 62.63 1.00 62.63
41,327.00 19.00 T13P2/19 62.63 62.63 1.00 62.63
41,325.50 20.50 T13P2/20 62.63 62.63 1.50 93.95
41,324.00 22.00 T13P2/21 62.63 62.63 1.50 93.95
41,322.50 23.50 T13P2/22 62.63 62.63 1.50 93.95
41,321.00 25.00 T13P2/23 62.63 62.63 1.50 93.95
41,319.50 26.50 T13P2/24 62.63 62.63 1.50 93.95
41,318.00 28.00 T13P2/25 62.63 62.63 1.50 93.95
41,316.50 29.50 T13P2/26 62.63 62.63 1.50 93.95
41,315.00 31.00 T13P2/27 62.63 62.63 1.50 93.95
41,313.50 32.50 T13P2/28 62.63 62.63 1.50 93.95
41,312.00 34.00 T13P2/29 62.63 62.63 1.50 93.95
41,310.50 35.50 T13P2/30 62.63 62.63 1.50 93.95
41,309.00 37.00 T13P2/31 62.63 62.63 1.50 93.95
41,307.50 38.50 T13P2/32 62.63 62.63 1.50 93.95

70.15 T12P1 GOB as per Annex B T12P1


TOTAL= 1,545.72

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 7,641.87 Cum
Total Quantity Paid Up to Previous RA Bill 6,096.15 Cum
Quantity for This RA Bill 1,545.72 Cum

CS-DHORAJIA JV CS-DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Underground excavation (TopHeading,Bench,Invert) for main tunnel,adit,niches (Elctrical,Trolley Refuge and the like)and
connection of the main tunnel to the adit by all means of excavation (drilling,blasting /control blasting (wherever
required) ,digging etc) in accordance with the New Austrian Tunnelling Method (NATM).This item includes:-Mandatory
excavation in sub divisons (Top heading, bench and invert)according to geometries, excavation and support sequence shown
on design drawings and as described in the technical specifications- in rock the application of smooth blasting techniques
A102 with contour hole spacing not exceeding 300 mm- Simultaneous excavation works in top heading, and half sided benching in
rail tunnels as per technical specifications or as directed byEngineer- Systematic exploratory drillholes- Appropriate Plant and
Equipment with appropriate size specifically selected for the various tunnel sizes and as declared in the technical bid- Face
maping & Rock Classification after each blast.- Provision of drainages for all surfaces with vehicular circulation- Provision of
adequate lighting and construction ventilation-

BOQ ITEM NO. A1026 - Excavation in Support Class-VI

AVERAGE
TUNNEL AREA LENGTH QUANTITY
CHAINAGE ATSS No. AREA REMARKS
METER (sqm) (meter) (cum)
(sqm)

TUNNEL-T12P2 Ress no 3-04/08/2021


38,478.40 15.80 T12P1/27 37.58 - Heading 5no incremental
38,477.70 16.50 T12P2/28 38.77 38.18 0.70 26.73 Heading 7no incremental
38,477.00 17.20 T12P2/29 41.85 40.31 0.70 28.22 Heading 11no incremental
38,476.30 17.90 T12P2/30 41.85 41.85 0.70 29.30 Heading 11no incremental
38,475.60 18.60 T12P2/31 41.85 41.85 0.70 29.30 Heading 11no incremental
38,474.90 19.30 T12P2/32 41.85 41.85 0.70 29.30 Heading 11no incremental
38,474.20 20.00 T12P2/33 34.77 38.31 0.70 26.82 Heading 1no incremental
38,473.40 20.80 T12P2/34 35.65 35.21 0.80 28.17 Heading 2no incremental
38,472.60 21.60 T12P2/35 36.01 35.83 0.80 28.66 Heading 3no incremental
38,471.80 22.40 T12P2/36 37.58 36.80 0.80 29.44 Heading 5no incremental
38,471.00 23.20 T12P2/37 38.77 38.18 0.80 30.54 Heading 7no incremental
38,470.20 24.00 T12P2/38 38.77 38.77 0.80 31.02 Heading 7no incremental
38,469.40 24.80 T12P2/39 40.43 39.60 0.80 31.68 Heading 9no incremental
38,468.60 25.60 T12P2/40 41.85 41.14 0.80 32.91 Heading 11no incremental
38,467.80 26.40 T12P2/41 34.77 38.31 0.80 30.65 Heading 1no incremental
38,467.00 27.20 T12P2/42 36.01 35.39 0.80 28.31 Heading 3no incremental

TUNNEL-T13P2 Ress no 3-19/09/2021


41,337.00 9.00 T13P2/9 70.03 9no incremental
41,336.00 10.00 T13P2/10 62.21 66.12 1.00 66.12 1no incremental
41,335.00 11.00 T13P2/11 64.12 63.17 1.00 63.17 3no incremental
41,334.00 12.00 T13P2/12 66.10 65.11 1.00 65.11 5no incremental
41,333.00 13.00 T13P2/13 67.74 66.92 1.00 66.92 7no incremental
41,332.00 14.00 T13P2/14 70.03 68.89 1.00 68.89 9no incremental
41,331.00 15.00 T13P2/15 70.03 70.03 1.00 70.03 9no incremental

60.58 T12P1 GOB as per Annex B

TOTAL= 901.87

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 5,968.36 Cum
Total Quantity Paid Up to Previous RA Bill 5,066.49 Cum
Quantity for This RA Bill 901.87 Cum

CS-DHORAJIA JV CS-DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Rehandling of muck as per directions of engineer including loading and transportation at for all leads
A104
and lift

TUNNEL Total QUANTITY


CHAINAGE ATSS No. Muck Qty REMARKS
METER Lead (cum)
PORTAL-T13P1
T13P1 Portal to A9 Dumping Yard
38+863.0m to 77.5m to 2.8km 4,269.01 4,269.01
2.8km
38+932.0m 146.50

TOTAL= 4,269.01

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 4,269.01 Cum
Total Quantity Paid Up to Previous RA Bill Cum
Quantity for This RA Bill 4,269.01 Cum

CS-DHORAJIA JV CS-DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Geological Over Break
Annex-B

GOB AVERAGE GOB AVERAGE


TUNNEL LENGTH OB AREA OB QTY
CHAINAGE ATSS No. AREA GOB AREA QUANTITY OB AREA REMARKS
METER (meter) (sqm) (cum)
(sqm) (sqm) (cum) (sqm)

T12P1

37,109.00 18.00 T12P1/19 5.249 2.181


37,110.00 19.00 T12P1/017 1.00 2.821 4.040 4.04 1.740 1.960 - CLASS VI
37,111.00 20.00 T12P1/018 1.00 4.146 3.480 3.48 2.006 1.870 - CLASS VI
37,112.00 21.00 T12P1/019 1.00 4.898 4.520 4.52 3.743 2.870 2.87 CLASS VI
37,113.00 22.00 T12P1/020 1.00 - 2.450 2.45 - 1.870 - CLASS VI
37,114.00 23.00 T12P1/021 1.00 - - - - - - CLASS VI
37,115.00 24.00 T12P1/022 1.00 5.428 2.710 2.71 2.545 1.270 - CLASS VI
37,116.00 25.00 T12P1/023 1.00 5.410 5.420 5.42 2.537 2.540 2.54 CLASS VI
37,117.00 26.00 T12P1/024 1.00 - 2.710 2.71 - 1.270 - CLASS VI
37,118.00 27.00 T12P1/025 1.00 - - - - - - CLASS VI
37,119.00 28.00 T12P1/026 1.00 - - - - - - CLASS VI
37,120.20 29.20 T12P1/027 1.20 - - - - - - CLASS VI
37,121.60 30.60 T12P1/028 1.40 1.564 0.780 - 2.089 1.040 - CLASS VI
37,122.00 31.00 T12P1/029 0.40 - 0.780 - - 1.040 - CLASS VI
37,123.00 32.00 T12P1/030 1.00 4.608 2.300 2.30 2.450 1.230 - CLASS VI
37,124.40 33.40 T12P1/031 1.40 6.156 5.380 7.53 3.787 3.120 4.37 CLASS VI
37,125.80 34.30 T12P1/032 0.90 - 3.080 2.77 - 1.890 - CLASS VI
37,126.00 35.00 T12P1/033 0.70 - - - - - - CLASS VI
37,127.30 36.30 T12P1/034 1.30 4.028 2.010 2.61 2.259 1.130 - CLASS VI
40.54 9.78 B
NET TOTAL= 20.27 50% of total 4.89 50% of total B
37,128.80 37.80 T12P1/036 1.664 - 2.082 - CLASS V
37,130.30 39.30 T12P1/037 1.50 - 0.830 - - 1.040 - CLASS V
37,131.80 40.80 T12P1/038 1.50 - - - - - - CLASS V
37,133.30 42.30 T12P1/039 1.50 1.945 0.970 - 1.876 0.940 - CLASS V
37,134.80 43.80 T12P1/040 1.50 2.215 2.080 3.12 1.942 1.910 2.87 CLASS V
37,136.30 45.30 T12P1/041 1.50 - 1.110 - - 0.970 - CLASS V
37,137.80 46.80 T12P1/042 1.50 3.918 1.960 2.94 2.379 1.190 - CLASS V
37,139.50 48.50 T12P1/043 1.70 1.143 2.530 4.30 1.355 1.870 3.18 CLASS V
37,141.00 50.00 T12P1/044 1.50 - 0.570 - - 0.680 - CLASS V
37,142.50 51.50 T12P1/045 1.50 2.729 1.360 2.04 2.289 1.140 - CLASS V
37,144.00 53.00 T12P1/046 1.50 1.865 2.300 3.45 1.844 2.070 3.11 CLASS V
37,145.50 54.50 T12P1/047 1.50 2.405 2.140 3.21 2.436 2.140 3.21 CLASS V
37,147.00 56.00 T12P1/048 1.50 - 1.200 - - 1.220 - CLASS V
37,148.50 57.50 T12P1/049 1.50 - - - - - - CLASS V
37,150.00 59.00 T12P1/050 1.50 - - - - - - CLASS V
37,151.50 60.50 T12P1/051 1.50 3.647 1.820 2.73 3.036 1.520 2.28 CLASS V
37,153.00 62.00 T12P1/052 1.50 - 1.820 2.73 - 1.520 2.28 CLASS V
37,154.50 63.50 T12P1/053 1.50 - - - - - - CLASS V
37,156.00 65.00 T12P1/054 1.50 - - - - - - CLASS V
37,157.50 66.50 T12P1/055 1.50 1.433 0.720 - 1.665 0.830 - CLASS V
37,159.00 68.00 T12P1/056 1.50 - 0.720 - - 0.830 - CLASS V
37,160.50 69.50 T12P1/057 1.50 2.714 1.360 2.04 2.229 1.110 - CLASS V
37,162.00 71.00 T12P1/058 1.50 2.077 2.400 3.60 2.128 2.180 3.27 CLASS V
37,163.50 72.50 T12P1/059 1.50 - 1.040 - - 1.060 - CLASS V
37,165.00 74.00 T12P1/060 1.50 2.782 1.390 2.09 1.763 0.880 - CLASS V
37,166.50 75.50 T12P1/061 1.50 5.469 4.130 6.20 1.671 1.720 2.58 CLASS V
37,168.00 77.00 T12P1/062 1.50 1.451 3.460 5.19 0.915 1.290 - CLASS V
37,169.50 78.50 T12P1/063 1.50 4.559 3.010 4.52 2.309 1.610 2.42 CLASS V
Geological Over Break
Annex-B

GOB AVERAGE GOB AVERAGE


TUNNEL LENGTH OB AREA OB QTY
CHAINAGE ATSS No. AREA GOB AREA QUANTITY OB AREA REMARKS
METER (meter) (sqm) (cum)
(sqm) (sqm) (cum) (sqm)

37,171.00 80.00 T12P1/064 1.50 3.974 4.270 6.41 2.513 2.410 3.62 CLASS V
37,172.50 81.50 T12P1/065 1.50 2.619 3.300 4.95 2.714 2.610 3.92 CLASS V
37,174.00 83.00 T12P1/066 1.50 3.162 2.890 4.34 2.112 2.410 3.62 CLASS V
37,175.50 84.50 T12P1/067 1.50 2.019 2.590 3.89 1.574 1.840 2.76 CLASS V
37,177.00 86.00 T12P1/068 1.50 2.170 2.090 3.14 1.715 1.640 2.46 CLASS V
37,178.50 87.50 T12P1/069 1.50 2.591 2.380 3.57 2.524 2.120 3.18 CLASS V
37,180.00 89.00 T12P1/070 1.50 2.334 2.460 3.69 2.037 2.280 3.42 CLASS V
37,181.50 90.50 T12P1/071 1.50 - 1.170 - - 1.020 - CLASS V
37,183.00 92.00 T12P1/072 1.50 - - - - - - CLASS V
37,184.50 93.50 T12P1/073 1.50 - - - - - - CLASS V
37,186.00 95.00 T12P1/074 1.50 - - - - - - CLASS V
37,187.50 96.50 T12P1/075 1.50 - - - - - - CLASS V
37,189.00 98.00 T12P1/076 1.50 2.405 1.200 - 2.126 1.060 - CLASS V
37,190.50 99.50 T12P1/077 1.50 - 1.200 - - 1.060 - CLASS V
78.15 48.18 B
NET TOTAL= 39.08 50% of total 24.09 50% of total B
37,207.50 116.50 T12P1/089 - - - - - - CLASS IV
37,209.00 118.00 T12P1/090 1.50 2.052 1.030 - 2.473 1.240 - CLASS IV
37,210.50 119.50 T12P1/091 1.50 - 1.030 - - 1.240 - CLASS IV
37,212.00 121.00 T12P1/092 1.50 - - - - - - CLASS IV
37,213.50 122.50 T12P1/093 1.50 3.686 1.840 2.76 2.540 1.270 - CLASS IV
37,215.00 124.00 T12P1/094 1.50 2.409 3.050 4.58 2.705 2.620 3.93 CLASS IV
37,216.50 125.50 T12P1/095 1.50 3.695 3.050 4.58 2.863 2.780 4.17 CLASS IV
37,218.00 127.00 T12P1/096 1.50 4.155 3.930 5.90 2.097 2.480 3.72 CLASS IV
37,219.50 128.50 T12P1/097 1.50 1.877 3.020 4.53 1.825 1.960 2.94 CLASS IV
37,221.00 130.00 T12P1/098 1.50 3.119 2.500 3.75 1.770 1.800 2.70 CLASS IV
37,222.50 131.50 T12P1/099 1.50 3.582 3.350 5.03 1.839 1.800 2.70 CLASS IV
37,224.00 133.00 T12P1/100 1.50 - 1.790 2.69 - 0.920 - CLASS IV
37,225.50 134.50 T12P1/101 1.50 1.674 0.840 - 1.708 0.850 - CLASS IV
37,227.00 136.00 T12P1/102 1.50 - 0.840 - - 0.850 - CLASS IV

37,381.50 290.50 T12P1/205 4.069 5.82 2.142 -


37,383.00 292.00 T12P1/206 1.50 2.635 3.350 5.82 2.074 2.110 3.17 CLASS IV
37,384.50 293.50 T12P1/207 1.50 12.572 7.600 5.82 3.183 2.630 3.95 CLASS IV
37,386.00 295.00 T12P1/208 1.50 11.096 11.830 17.75 2.962 3.070 4.61 CLASS IV
37,387.50 296.50 T12P1/209 1.50 9.638 10.370 15.56 2.546 2.750 4.13 CLASS IV
37,389.00 298.00 T12P1/210 1.50 10.955 10.300 15.45 3.294 2.920 4.38 CLASS IV
37,390.50 299.50 T12P1/211 1.50 9.220 10.090 15.14 2.791 3.040 4.56 CLASS IV
37,392.00 301.00 T12P1/212 1.50 7.246 8.230 12.35 2.413 2.600 3.90 CLASS IV
37,393.50 302.50 T12P1/213 1.50 3.010 5.130 7.70 2.032 2.220 3.33 CLASS IV
37,395.00 304.00 T12P1/214 1.50 2.919 2.960 4.44 2.017 2.020 3.03 CLASS IV
37,396.50 305.50 T12P1/215 1.50 3.916 3.420 5.13 2.000 2.010 3.02 CLASS IV
37,398.00 307.00 T12P1/216 1.50 3.419 3.670 5.51 1.775 1.890 2.84 CLASS IV

37,407.00 316.00 T12P1/222 6.893 2.145


37,408.50 317.50 T12P1/223 1.50 5.296 6.090 9.14 1.789 1.970 2.96 CLASS IV
37,410.00 319.00 T12P1/224 1.50 2.949 4.120 6.18 1.565 1.680 2.52 CLASS IV
37,411.50 320.50 T12P1/225 1.50 3.173 3.060 4.59 2.026 1.800 2.70 CLASS IV
37,413.00 322.00 T12P1/226 1.50 3.689 3.430 5.15 1.668 1.850 2.78 CLASS IV
37,414.50 323.50 T12P1/227 1.50 4.732 4.210 6.32 1.878 1.770 2.66 CLASS IV
37,416.00 325.00 T12P1/228 1.50 5.125 4.930 7.40 2.304 2.090 3.14 CLASS IV
Geological Over Break
Annex-B

GOB AVERAGE GOB AVERAGE


TUNNEL LENGTH OB AREA OB QTY
CHAINAGE ATSS No. AREA GOB AREA QUANTITY OB AREA REMARKS
METER (meter) (sqm) (cum)
(sqm) (sqm) (cum) (sqm)

37,417.50 326.50 T12P1/229 1.50 4.452 4.790 7.19 2.001 2.150 3.23 CLASS IV
37,419.00 328.00 T12P1/230 1.50 4.055 4.250 6.38 1.747 1.870 2.81 CLASS IV
37,420.50 329.50 T12P1/231 1.50 5.799 4.930 7.40 2.023 1.890 2.84 CLASS IV
37,422.00 331.00 T12P1/232 1.50 3.077 4.440 6.66 1.459 1.740 2.61 CLASS IV
37,423.50 332.50 T12P1/233 1.50 3.023 3.050 4.58 1.722 1.590 2.39 CLASS IV
37,425.00 334.00 T12P1/234 1.50 3.194 3.110 4.67 1.794 1.760 2.64 CLASS IV
37,426.50 335.50 T12P1/235 1.50 3.432 3.310 4.97 1.721 1.760 2.64 CLASS IV
37,428.00 337.00 T12P1/236 1.50 3.954 3.690 5.54 1.874 1.800 2.70 CLASS IV
37,429.50 338.50 T12P1/237 1.50 3.660 3.810 5.72 2.036 1.960 2.94 CLASS IV
242.20 102.64 B
NET TOTAL= 121.10 50% of total 51.32 50% of total B
37,324.50 233.50 T12P1/167 3.960 3.960 - 2.336 2.340 - CLASS III
37,326.00 235.00 T12P1/168 1.50 4.064 4.010 6.02 2.608 2.470 3.71 CLASS III
37,327.50 236.50 T12P1/169 1.50 4.259 4.160 6.24 2.247 2.430 3.65 CLASS III

37,338.00 247.00 T12P1/176 3.905 1.927 1.930 - CLASS III


37,339.50 248.50 T12P1/177 1.50 4.880 4.390 6.59 2.061 1.990 2.99 CLASS III
37,341.00 250.00 T12P1/178 1.50 2.672 3.780 5.67 1.880 1.970 2.96 CLASS III
37,342.50 251.50 T12P1/179 1.50 1.890 2.280 3.42 1.569 1.720 2.58 CLASS III
37,344.00 253.00 T12P1/180 1.50 2.694 2.290 3.44 1.789 1.680 2.52 CLASS III
37,345.50 254.50 T12P1/181 1.50 3.318 3.010 4.52 2.058 1.920 2.88 CLASS III
37,347.00 256.00 T12P1/182 1.50 7.069 5.190 7.79 3.008 2.530 3.80 CLASS III
37,348.50 257.50 T12P1/183 1.50 7.096 7.080 10.62 2.745 2.880 4.32 CLASS III
37,350.00 259.00 T12P1/184 1.50 7.084 7.090 10.64 2.285 2.520 3.78 CLASS III
37,351.50 260.50 T12P1/185 1.50 5.600 6.340 9.51 2.167 2.230 3.35 CLASS III
37,353.00 262.00 T12P1/186 1.50 - 2.800 4.20 - 1.080 - CLASS III
37,354.50 263.50 T12P1/187 1.50 - - - - - - CLASS III
37,356.00 265.00 T12P1/188 1.50 4.435 2.220 3.33 2.620 1.310 - CLASS III
37,357.50 266.50 T12P1/189 1.50 3.221 3.830 5.75 2.009 2.310 3.47 CLASS III
37,359.00 268.00 T12P1/190 1.50 - 1.610 2.42 - 1.000 - CLASS III
37,360.50 269.50 T12P1/191 1.50 - - - - - - CLASS III
37,362.00 271.00 T12P1/192 1.50 - - - - - - CLASS III
37,363.50 272.50 T12P1/193 1.50 3.379 1.690 2.54 2.416 1.210 - CLASS III
37,365.00 274.00 T12P1/194 1.50 3.922 3.650 5.48 2.035 2.230 3.35 CLASS III
37,366.50 275.50 T12P1/195 1.50 2.848 3.390 5.09 2.293 2.160 3.24 CLASS III
37,368.00 277.00 T12P1/196 1.50 3.005 2.930 4.40 1.997 2.150 3.23 CLASS III
37,369.50 278.50 T12P1/197 1.50 2.307 2.660 3.99 1.812 1.900 2.85 CLASS III
37,371.00 280.00 T12P1/198 1.50 1.757 2.030 3.05 1.661 1.740 2.61 CLASS III
37,372.50 281.50 T12P1/199 1.50 6.476 4.120 6.18 2.809 2.240 3.36 CLASS III
37,374.00 283.00 T12P1/200 1.50 3.673 5.070 7.61 1.844 2.330 3.50 CLASS III
37,375.50 284.50 T12P1/201 1.50 5.138 4.410 6.62 2.006 1.930 2.90 CLASS III
37,377.00 286.00 T12P1/202 1.50 4.677 4.910 7.37 2.311 2.160 3.24 CLASS III
37,378.50 287.50 T12P1/203 1.50 3.753 4.220 6.33 1.791 2.050 3.08 CLASS III
37,380.00 289.00 T12P1/204 1.50 3.700 3.730 5.60 2.218 2.000 3.00 CLASS III
37,381.50 290.50 T12P1/205 1.50 4.069 3.880 5.82 2.142 2.180 3.27 CLASS III
-
37,398.00 307.00 T12P1/216 3.419 1.775
37,399.50 308.50 T12P1/217 1.50 5.298 4.360 6.54 2.200 1.990 2.99 CLASS III
37,401.00 310.00 T12P1/218 1.50 5.799 5.550 8.33 2.160 2.180 3.27 CLASS III
37,402.50 311.50 T12P1/219 1.50 6.377 6.090 9.14 2.138 2.150 3.23 CLASS III
37,404.00 313.00 T12P1/220 1.50 3.945 5.160 7.74 1.627 1.880 2.82 CLASS III
Geological Over Break
Annex-B

GOB AVERAGE GOB AVERAGE


TUNNEL LENGTH OB AREA OB QTY
CHAINAGE ATSS No. AREA GOB AREA QUANTITY OB AREA REMARKS
METER (meter) (sqm) (cum)
(sqm) (sqm) (cum) (sqm)

37,405.50 314.50 T12P1/221 1.50 4.613 4.280 6.42 1.909 1.770 2.66 CLASS III
37,407.00 316.00 T12P1/222 1.50 6.893 5.750 8.63 2.145 2.030 3.05 CLASS III

4.07 3.091 2.042 T12P1 TROLLEY REFUSE NITCH-2


5.07 1.00 1.798 2.440 2.44 1.334 1.690 - CLASS III
6.07 1.00 - 0.900 - - 0.670 - CLASS III
7.07 1.00 - - - - - - CLASS III
8.12 1.05 1.708 0.850 - 1.164 0.580 - CLASS III

209.48 95.66 A
NET TOTAL= 104.74 50% of total 47.83 50% of total A
T12P2
38,478.40 15.80 T12P2/26 6.20 4.77
38,477.70 16.50 T12P2/27 0.70 - 3.100 2.17 - 2.390 - Geological Over Break in Class VI
38,477.00 17.20 T12P2/28 0.70 7.05 3.530 2.47 2.26 1.130 - Geological Over Break in Class VI
38,476.30 17.90 T12P2/29 0.70 6.99 7.020 4.91 2.45 2.360 - Geological Over Break in Class VI
38,475.60 18.60 T12P2/30 0.70 11.42 9.210 6.45 3.25 2.850 2.00 Geological Over Break in Class VI
38,474.90 19.30 T12P2/31 0.70 9.57 10.500 7.35 3.17 3.210 2.25 Geological Over Break in Class VI
38,474.20 20.00 T12P2/32 0.70 9.70 9.640 6.75 3.14 3.160 2.21 Geological Over Break in Class VI
38,473.40 20.80 T12P2/33 0.80 7.37 8.540 6.83 2.38 2.760 2.21 Geological Over Break in Class VI
38,472.60 21.60 T12P2/34 0.80 - 3.690 2.95 - 1.190 - Geological Over Break in Class VI
38,471.80 22.40 T12P2/35 0.80 - - - - - - Geological Over Break in Class VI
38,471.00 23.20 T12P2/36 0.80 - - - - - - Geological Over Break in Class VI
38,470.20 24.00 T12P2/37 0.80 6.54 3.270 2.62 2.12 1.060 - Geological Over Break in Class VI
38,469.40 24.80 T12P2/38 0.80 6.86 6.700 5.36 2.15 2.140 - Geological Over Break in Class VI
38,468.60 25.60 T12P2/39 0.80 8.31 7.590 6.07 2.68 2.420 - Geological Over Break in Class VI
38,467.80 26.40 T12P2/40 0.80 2.44 5.380 4.30 1.47 2.080 - Geological Over Break in Class VI
38,467.00 27.20 T12P2/41 0.80 4.41 3.430 2.74 2.06 1.770 - Geological Over Break in Class VI
60.97 8.66 B
NET TOTAL= 30.49 50% of total 4.33 50% of total B
T13P1
38,807.50 22.00 T13P1/23 1.764 1.075 Geological Over Break in Class VI
38,808.50 23.00 T13P1/24 1.00 - 0.880 - - 0.540 - Geological Over Break in Class VI
38,809.50 24.00 T13P1/25 1.00 - - - - - - Geological Over Break in Class VI
38,810.50 25.00 T13P1/26 1.00 5.569 2.780 2.78 2.384 1.190 - Geological Over Break in Class VI
38,811.50 26.00 T13P1/27 1.00 3.332 4.450 4.45 1.372 1.880 - Geological Over Break in Class VI
38,812.50 27.00 T13P1/28 1.00 3.223 3.280 3.28 1.512 1.440 - Geological Over Break in Class VI
38,813.50 28.00 T13P1/29 1.00 3.436 3.330 3.33 1.614 1.560 - Geological Over Break in Class VI
38,814.50 29.00 T13P1/30 1.00 3.352 3.390 3.39 1.573 1.590 - Geological Over Break in Class VI
38,815.50 30.00 T13P1/31 1.00 1.445 2.400 2.40 0.926 1.250 - Geological Over Break in Class VI
19.63 - B
NET TOTAL= 9.82 50% of total - 50% of total B

38,815.50 30.00 T13P1/31 1.445 - 0.926 -


38,816.00 31.00 T13P1/32 1.00 3.590 2.520 2.52 1.701 1.310 - Geological Over Break in Class V
38,817.50 32.00 T13P1/33 1.00 - 1.800 - - 0.850 - Geological Over Break in Class V
38,818.50 33.00 T13P1/34 1.00 - - - - - - Geological Over Break in Class V
38,819.50 34.00 T13P1/35 1.00 - - - - - - Geological Over Break in Class V
38,820.50 35.00 T13P1/36 1.00 - - - - - - Geological Over Break in Class V
38,821.50 36.00 T13P1/37 1.00 - - - - - - Geological Over Break in Class V
38,822.50 37.00 T13P1/38 1.00 2.544 1.270 - 2.245 1.120 - Geological Over Break in Class V
38,823.50 38.00 T13P1/39 1.00 - 1.270 - - 1.120 - Geological Over Break in Class V
38,824.50 39.00 T13P1/40 1.00 2.722 1.360 - 1.804 0.900 - Geological Over Break in Class V
38,825.50 40.00 T13P1/41 1.00 3.282 3.000 3.00 2.404 2.100 2.10 Geological Over Break in Class V
38,826.50 41.00 T13P1/42 1.00 3.765 3.520 3.52 1.775 2.090 2.09 Geological Over Break in Class V
38,827.50 42.00 T13P1/43 1.00 3.667 3.720 3.72 1.929 1.850 - Geological Over Break in Class V
Geological Over Break
Annex-B

GOB AVERAGE GOB AVERAGE


TUNNEL LENGTH OB AREA OB QTY
CHAINAGE ATSS No. AREA GOB AREA QUANTITY OB AREA REMARKS
METER (meter) (sqm) (cum)
(sqm) (sqm) (cum) (sqm)

38,828.50 43.00 T13P1/44 1.00 4.481 4.070 4.07 2.101 2.020 2.02 Geological Over Break in Class V
38,829.50 44.00 T13P1/45 1.00 5.000 4.740 4.74 2.369 2.240 2.24 Geological Over Break in Class V
38,830.50 45.00 T13P1/46 1.00 2.944 3.970 3.97 2.233 2.300 2.30 Geological Over Break in Class V
38,831.50 46.00 T13P1/47 1.00 2.685 2.810 2.81 2.118 2.180 2.18 Geological Over Break in Class V
38,832.50 47.00 T13P1/48 1.00 2.201 2.440 2.44 1.764 1.940 - Geological Over Break in Class V
38,833.50 48.00 T13P1/49 1.00 4.594 3.400 3.40 2.547 2.160 2.16 Geological Over Break in Class V
38,834.50 49.00 T13P1/50 1.00 2.176 3.390 3.39 1.275 1.910 - Geological Over Break in Class V
38,835.50 50.00 T13P1/51 1.00 2.652 2.410 2.41 1.610 1.440 - Geological Over Break in Class V
38,836.50 51.00 T13P1/52 1.00 3.088 2.870 2.87 1.883 1.750 - Geological Over Break in Class V
38,837.50 52.00 T13P1/53 1.00 3.576 3.330 3.33 1.934 1.910 - Geological Over Break in Class V
38,838.50 53.00 T13P1/54 1.00 3.344 3.460 3.46 1.487 1.710 - Geological Over Break in Class V
38,839.50 54.00 T13P1/55 1.00 2.245 2.790 2.79 1.861 1.670 - Geological Over Break in Class V
38,840.50 55.00 T13P1/56 1.00 2.878 2.560 2.56 1.974 1.920 - Geological Over Break in Class V
38,841.50 56.00 T13P1/57 1.00 2.496 2.690 2.69 2.126 2.050 2.05 Geological Over Break in Class V
38,842.50 57.00 T13P1/58 1.00 - 1.250 - - 1.060 - Geological Over Break in Class V
38,843.50 58.00 T13P1/59 1.00 2.223 1.110 - 1.610 0.810 - Geological Over Break in Class V
38,844.50 59.00 T13P1/60 1.00 2.653 2.440 2.44 1.822 1.720 - Geological Over Break in Class V
38,845.50 60.00 T13P1/61 1.00 - 1.330 - - 0.910 - Geological Over Break in Class V
38,846.50 61.00 T13P1/62 1.00 1.815 0.910 - 1.517 0.760 - Geological Over Break in Class V
38,847.50 62.00 T13P1/63 1.00 - 0.910 - - 0.760 - Geological Over Break in Class V
38,848.50 63.00 T13P1/64 1.00 - - - - - - Geological Over Break in Class V
38,849.50 64.00 T13P1/65 1.00 - - - - - - Geological Over Break in Class V
38,850.50 65.00 T13P1/66 1.00 1.655 0.830 - 1.577 0.790 - Geological Over Break in Class V
38,851.50 66.00 T13P1/67 1.00 2.356 2.010 2.01 1.557 1.570 - Geological Over Break in Class V
38,852.50 67.00 T13P1/68 1.00 - 1.180 - - 0.780 - Geological Over Break in Class V
38,853.50 68.00 T13P1/69 1.00 - - - - - - Geological Over Break in Class V
62.14 17.14 B
NET TOTAL= 31.07 50% of total 8.57 50% of total B
38,869.00 83.50 T13P1/80 - - - - Geological Over Break in ClassI IV
38,870.50 85.00 T13P1/81 1.50 2.320 1.160 - 1.588 0.790 - Geological Over Break in ClassI IV
38,872.00 86.50 T13P1/82 1.50 4.444 3.380 5.07 1.611 1.600 - Geological Over Break in ClassI IV
38,873.50 88.00 T13P1/83 1.50 - 2.220 3.33 - 0.810 - Geological Over Break in ClassI IV
38,875.00 89.50 T13P1/84 1.50 - - - - - - Geological Over Break in ClassI IV
38,876.50 91.00 T13P1/85 1.50 - - - - - - Geological Over Break in ClassI IV
38,878.00 92.50 T13P1/86 1.50 3.417 1.710 2.57 1.631 0.820 - Geological Over Break in ClassI IV
38,879.50 94.00 T13P1/87 1.50 - 1.710 2.57 - 0.820 - Geological Over Break in ClassI IV
38,881.00 95.50 T13P1/88 1.50 - - - - - - Geological Over Break in ClassI IV
38,891.50 106.00 T13P1/95 - - - - Geological Over Break in ClassI IV
38,893.00 107.50 T13P1/96 1.50 4.190 2.100 3.15 2.453 1.230 - Geological Over Break in ClassI IV
38,894.50 109.00 T13P1/97 1.50 - 2.100 3.15 - 1.230 - Geological Over Break in ClassI IV
38,896.00 110.50 T13P1/98 1.50 - - - - - - Geological Over Break in ClassI IV
38,897.50 112.00 T13P1/99 1.50 4.404 2.200 3.30 1.560 0.780 - Geological Over Break in ClassI IV
38,899.00 113.50 T13P1/100 1.50 3.658 4.030 6.05 1.585 1.570 2.36 Geological Over Break in ClassI IV
38,900.50 115.00 T13P1/101 1.50 2.659 3.160 4.74 1.650 1.620 2.43 Geological Over Break in ClassI IV
38,902.00 116.50 T13P1/102 1.50 1.927 2.290 3.44 1.517 1.580 2.37 Geological Over Break in ClassI IV
38,903.50 118.00 T13P1/103 1.50 3.139 2.530 3.80 2.387 1.950 2.93 Geological Over Break in ClassI IV
38,905.00 119.50 T13P1/104 1.50 5.775 4.460 6.69 2.993 2.690 4.04 Geological Over Break in ClassI IV
38,906.50 121.00 T13P1/105 1.50 2.571 4.170 6.26 2.215 2.600 3.90 Geological Over Break in ClassI IV
38,908.00 122.50 T13P1/106 1.50 3.089 2.830 4.25 2.312 2.260 3.39 Geological Over Break in ClassI IV
38,909.50 124.00 T13P1/107 1.50 3.559 3.320 4.98 1.979 2.150 3.23 Geological Over Break in ClassI IV
38,911.00 125.50 T13P1/108 1.50 4.419 3.990 5.99 2.771 2.380 3.57 Geological Over Break in ClassI IV
38,912.50 127.00 T13P1/109 1.50 4.454 4.440 6.66 3.046 2.910 4.37 Geological Over Break in ClassI IV
38,914.00 128.50 T13P1/110 1.50 7.061 5.760 8.64 3.411 3.230 4.85 Geological Over Break in ClassI IV
38,915.50 130.00 T13P1/111 1.50 9.139 8.100 12.15 3.411 3.410 5.12 Geological Over Break in ClassI IV
38,917.00 131.50 T13P1/112 1.50 4.452 6.800 10.20 1.437 2.420 3.63 Geological Over Break in ClassI IV
Geological Over Break
Annex-B

GOB AVERAGE GOB AVERAGE


TUNNEL LENGTH OB AREA OB QTY
CHAINAGE ATSS No. AREA GOB AREA QUANTITY OB AREA REMARKS
METER (meter) (sqm) (cum)
(sqm) (sqm) (cum) (sqm)

38,918.50 133.00 T13P1/113 1.50 3.755 4.100 6.15 1.528 1.480 2.22 Geological Over Break in ClassI IV
38,920.00 134.50 T13P1/114 1.50 2.960 3.360 5.04 1.428 1.480 2.22 Geological Over Break in ClassI IV
38,921.50 136.00 T13P1/115 1.50 3.840 3.400 5.10 1.522 1.480 2.22 Geological Over Break in ClassI IV
38,923.00 137.50 T13P1/116 1.50 - 1.920 2.88 - 0.760 - Geological Over Break in ClassI IV
38,924.50 139.00 T13P1/117 1.50 - - - - - - Geological Over Break in ClassI IV
38,926.00 140.50 T13P1/118 1.50 2.822 1.410 2.12 1.742 0.870 - Geological Over Break in ClassI IV
38,927.50 142.00 T13P1/119 1.50 - 1.410 2.12 - 0.870 - Geological Over Break in ClassI IV
38,929.00 143.50 T13P1/120 1.50 - - - - - - Geological Over Break in ClassI IV
38,930.50 145.00 T13P1/121 1.50 2.453 1.230 - 1.523 0.760 - Geological Over Break in ClassI IV
38,932.00 146.50 T13P1/122 1.50 2.457 2.460 3.69 1.667 1.600 2.40 Geological Over Break in ClassI IV
38,933.50 148.00 T13P1/123 1.50 - 1.230 - - 0.830 - Geological Over Break in ClassI IV
38,935.00 149.50 T13P1/124 1.50 2.679 1.340 2.01 1.814 0.910 - Geological Over Break in ClassI IV
38,936.50 151.00 T13P1/125 1.50 4.196 3.440 5.16 1.783 1.800 2.70 Geological Over Break in ClassI IV
38,938.00 152.50 T13P1/126 1.50 2.536 3.370 5.06 1.649 1.720 2.58 Geological Over Break in ClassI IV
38,939.50 154.00 T13P1/127 1.50 - 1.270 - - 0.820 - Geological Over Break in ClassI IV
38,941.00 155.50 T13P1/128 1.50 2.302 1.150 - 1.322 0.660 - Geological Over Break in ClassI IV
38,942.50 157.00 T13P1/129 1.50 - 1.150 - - 0.660 - Geological Over Break in ClassI IV
38,944.00 158.50 T13P1/130 1.50 2.714 1.360 2.04 1.689 0.840 - Geological Over Break in ClassI IV
38,945.50 160.00 T13P1/131 1.50 - 1.360 2.04 - 0.840 - Geological Over Break in ClassI IV
38,947.00 161.50 T13P1/132 1.50 - - - - - - Geological Over Break in ClassI IV
38,948.50 163.00 T13P1/133 1.50 2.421 1.210 - 1.403 0.700 - Geological Over Break in ClassI IV
38,950.00 164.50 T13P1/134 1.50 5.345 3.880 5.82 2.019 1.710 2.57 Geological Over Break in ClassI IV
38,951.50 166.00 T13P1/135 1.50 6.498 5.920 8.88 2.018 2.020 3.03 Geological Over Break in ClassI IV
38,953.00 167.50 T13P1/136 1.50 5.748 6.120 9.18 2.680 2.350 3.53 Geological Over Break in ClassI IV
38,954.50 169.00 T13P1/137 1.50 4.803 5.280 7.92 2.727 2.700 4.05 Geological Over Break in ClassI IV
38,955.50 170.00 T13P1/138 1.00 - 2.400 2.40 - 1.360 - Geological Over Break in ClassI IV
38,956.50 171.00 T13P1/139 1.00 - - - - - - Geological Over Break in ClassI IV
38,958.00 172.50 T13P1/140 1.50 - - - - - - Geological Over Break in ClassI IV
38,959.20 173.70 T13P1/141 1.20 - - - - - - Geological Over Break in ClassI IV
38,960.40 174.90 T13P1/142 1.20 3.314 1.660 - 1.778 0.890 - Geological Over Break in ClassI IV
38,961.60 176.10 T13P1/143 1.20 6.903 5.110 6.13 2.929 2.350 2.82 Geological Over Break in ClassI IV
38,963.00 177.50 T13P1/144 1.40 - 3.450 4.83 - 1.460 2.04 Geological Over Break in ClassI IV
38,964.20 178.70 T13P1/145 1.20 2.701 1.350 - 1.733 0.870 - Geological Over Break in ClassI IV

4.20 2.717 1.840 T13P1 TROLLEY REFUSE NITCH-1


4.90 0.70 2.485 2.600 - 1.869 1.850 - Geological Over Break in ClassI IV
5.90 1.00 2.783 2.630 2.63 1.755 1.810 - Geological Over Break in ClassI IV
6.90 1.00 2.648 2.720 2.72 1.401 1.580 - Geological Over Break in ClassI IV
8.20 1.30 4.406 3.530 4.59 1.559 1.480 - Geological Over Break in ClassI IV

205.50 78.53 A
NET TOTAL= 102.75 50% of total 39.27 50% of total A

CS-DHORAJIA JV CS-DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Supply, drilling, testing and installation of Swellex type rockbolts of the specified length, ultimate load Fy>=200kN (tunnel support) as per
1 B101 approved drawings & specifications or as directed by Engineer.The rate shall include costs of all materials, labour, equipment, etc. required
for the complete job.

1_1 B1011 Length 3m

ROUND CHAINAGE (m) TUNNEL METER


Sl no ATSS NO. Nos QUANTITY (Nos) REMARKS
NO From To From To
PORTAL T12P1 RESS-05-23/09/2021

1 T12P1/204 207.00 37,380.00 37,381.50 287.50 289.00 12.00 12.00

2 T12P1/205 208.00 37,381.50 37,383.00 289.00 290.50 11.00 11.00

3 T12P1/216 219.00 37,398.00 37,399.50 305.50 307.00 11.00 11.00

4 T12P1/217 220.00 37,399.50 37,401.00 307.00 308.50 12.00 12.00

5 T12P1/218 221.00 37,401.00 37,402.50 308.50 310.00 11.00 11.00

6 T12P1/219 222.00 37,402.50 37,404.00 310.00 311.50 12.00 12.00

7 T12P1/220 223.00 37,404.00 37,405.50 311.50 313.00 11.00 11.00

8 T12P1/221 224.00 37,405.50 37,407.00 313.00 314.50 12.00 12.00

9 T12P1/222 225.00 37,407.00 37,408.50 314.50 316.00 11.00 11.00

T12P1 TROLLEY REFUSE NITCH -2


T12P1/TRN/02-04 7.07 8.12 7.00 7.00
110.00
Total= 110.00

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 110.00 Nos
Total Quantity Paid Up to Previous RA Bill 0.00 Nos
Quantity for This RA Bill 110.00 Nos

CS-DHORAJIA JV CS-DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
SN type rock bolts for tunnel support, slope support, face bolts etc.
Supply, drilling, installation, grouting and testing of SN type rock bolts of specified length L, 200kN minimum ultimate load as per design
2 B102
drawings, technical specifications or as directed by Engineer. Measurement and payment shall be per piece tested and accepted
installed rock bolt (for exact payment details see specifications).

2_2 B1022 Length 4 m

ROUND CHAINAGE (m) TUNNEL METER


Sl no ATSS NO. Nos QUANTITY (Nos) REMARKS
NO From To From To
PORTAL T13P1 RESS-04-18/10/2021

1 T13P1/136 136.00 38,953.00 38,954.50 167.50 169.00 7.00 7.00

2 T13P1/137 137.00 38,954.50 38,955.50 169.00 170.50 8.00 8.00

3 T13P1/138 138.00 38,955.50 38,957.50 170.00 172.00 7.00 7.00

4 T13P1/139 139.00 38,956.50 38,959.00 171.00 173.50 8.00 8.00

5 T13P1/140 140.00 38,957.85 38,960.50 172.35 175.00 7.00 7.00

6 T13P1/141 141.00 38,959.20 38,962.00 173.70 176.50 8.00 8.00

7 T13P1/142 142.00 38,960.40 38,963.50 174.90 178.00 7.00 7.00

8 T13P1/143 143.00 38,961.60 38,963.05 176.10 177.50 8.00 8.00

9 T13P1/144 144.00 38,963.05 38,964.50 177.50 178.95 7.00 7.00

10 T13P1/145 145.00 38,964.50 38,965.85 178.95 180.30 8.00 8.00

11 T13P1/146 146.00 38,965.85 38,967.20 180.30 181.65 7.00 7.00

12 T13P1/147 147.00 38,967.20 38,968.70 181.65 183.15 8.00 8.00

13 T13P1/148 148.00 38,968.70 38,970.20 183.15 184.65 7.00 7.00

14 T13P1/149 149.00 38,970.20 38,971.60 184.65 186.05 8.00 8.00

15 T13P1/150 150.00 38,971.60 38,973.00 186.05 187.45 7.00 7.00

T12P1 TROLLEY REFUSE NITCH-2 RESS-06-12/10.2021

T12P1/TRN/02-02 5.07 6.07 16.00 16.00


T12P1/TRN/02-03 6.07 7.07 15.00 15.00
T12P1/TRN/02-04 7.07 8.12 16.00 16.00
159.00
Total= 159.00

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 1,137.00 Nos
Total Quantity Paid Up to Previous RA Bill 978.00 Nos
Quantity for This RA Bill 159.00 Nos

CS-DHORAJIA JV CS-DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
SN type rock bolts for tunnel support, slope support, face bolts etc.
Supply, drilling, installation, grouting and testing of SN type rock bolts of specified length L, 200kN minimum ultimate load as per design
2 B102
drawings, technical specifications or as directed by Engineer. Measurement and payment shall be per piece tested and accepted
installed rock bolt (for exact payment details see specifications).

2_3 B1023 Length 6 m

ROUND CHAINAGE (m) TUNNEL METER


Sl no ATSS NO. Nos QUANTITY (Nos) REMARKS
NO From To From To
PORTAL T13P1 Ress no-04-18/10/2021

1 T13P1/122 122.00 38,932.00 38,933.50 146.50 148.00 15.00 15.00

2 T13P1/123 123.00 38,933.50 38,935.00 148.00 149.50 16.00 16.00

3 T13P1/124 124.00 38,935.00 38,936.50 149.50 151.00 15.00 15.00

4 T13P1/125 125.00 38,936.50 38,938.00 151.00 152.50 16.00 16.00

5 T13P1/126 126.00 38,938.00 38,939.50 152.50 154.00 15.00 15.00

6 T13P1/127 127.00 38,939.50 38,941.00 154.00 155.50 16.00 16.00

7 T13P1/128 128.00 38,941.00 38,942.50 155.50 157.00 15.00 15.00

8 T13P1/129 129.00 38,942.50 38,944.00 157.00 158.50 16.00 16.00

9 T13P1/130 130.00 38,944.00 38,945.50 158.50 160.00 15.00 15.00

10 T13P1/131 131.00 38,945.50 38,947.00 160.00 161.50 16.00 16.00

11 T13P1/132 132.00 38,947.00 38,948.50 161.50 163.00 15.00 15.00

12 T13P1/133 133.00 38,948.50 38,950.00 163.00 164.50 16.00 16.00

13 T13P1/134 134.00 38,950.00 38,951.50 164.50 166.00 15.00 15.00

14 T13P1/135 135.00 38,951.50 38,953.00 166.00 167.50 16.00 16.00


PORTAL T12P1 RESS no-05-23/09/2021

1 T12P1/199 202.00 37,372.50 37,374.00 280.00 281.50 11.00 11.00

2 T12P1/200 203.00 37,374.00 37,375.50 281.50 283.00 12.00 12.00

3 T12P1/201 204.00 37,375.50 37,377.00 283.00 284.50 11.00 11.00

4 T12P1/202 205.00 37,377.00 37,378.50 284.50 286.00 12.00 12.00

5 T12P1/203 206.00 37,378.50 37,380.00 286.00 287.50 11.00 11.00

6 T12P1/204 207.00 37,380.00 37,381.50 287.50 289.00 0.00 0.00

7 T12P1/205 208.00 37,381.50 37,383.00 289.00 290.50 0.00 0.00

8 T12P1/206 209.00 37,383.00 37,384.50 290.50 292.00 9.00 9.00 RESS no-7-06/11/2021

9 T12P1/207 210.00 37,384.50 37,386.00 292.00 293.50 10.00 10.00

10 T12P1/208 211.00 37,386.00 37,387.50 293.50 295.00 9.00 9.00

11 T12P1/209 212.00 37,387.50 37,389.00 295.00 296.50 13.00 13.00

12 T12P1/210 213.00 37,389.00 37,390.50 296.50 298.00 12.00 12.00

13 T12P1/211 214.00 37,390.50 37,392.00 298.00 299.50 13.00 13.00

14 T12P1/212 215.00 37,392.00 37,393.50 299.50 301.00 12.00 12.00

15 T12P1/213 216.00 37,393.50 37,395.00 301.00 302.50 13.00 13.00

16 T12P1/214 217.00 37,395.00 37,396.50 302.50 304.00 9.00 9.00

17 T12P1/215 218.00 37,396.50 37,398.00 304.00 305.50 10.00 10.00

25 T12P1/223 226.00 37,408.50 37,410.00 316.00 317.50 12.00 12.00 RESS no-9-18/11/2021

26 T12P1/224 227.00 37,410.00 37,411.50 317.50 319.00 13.00 13.00

27 T12P1/225 228.00 37,411.50 37,413.00 319.00 320.50 12.00 12.00

28 T12P1/226 229.00 37,413.00 37,414.50 320.50 322.00 13.00 13.00

29 T12P1/227 230.00 37,414.50 37,416.00 322.00 323.50 12.00 12.00

30 T12P1/228 231.00 37,416.00 37,417.50 323.50 325.00 13.00 13.00

31 T12P1/229 232.00 37,417.50 37,419.00 325.00 326.50 12.00 12.00

32 T12P1/230 233.00 37,419.00 37,420.50 326.50 328.00 13.00 13.00

33 T12P1/231 234.00 37,420.50 37,422.00 328.00 329.50 12.00 12.00

34 T12P1/232 235.00 37,422.00 37,423.50 329.50 331.00 13.00 13.00

35 T12P1/233 236.00 37,423.50 37,425.00 331.00 332.50 12.00 12.00

36 T12P1/234 237.00 37,425.00 37,426.50 332.50 334.00 13.00 13.00

37 T12P1/235 238.00 37,426.50 37,428.00 334.00 335.50 12.00 12.00

38 T12P1/236 239.00 37,428.00 37,429.50 335.50 337.00 13.00 13.00

39 T12P1/237 240.00 37,429.50 37,431.00 337.00 338.50 12.00 12.00


SN type rock bolts for tunnel support, slope support, face bolts etc.
Supply, drilling, installation, grouting and testing of SN type rock bolts of specified length L, 200kN minimum ultimate load as per design
2 B102
drawings, technical specifications or as directed by Engineer. Measurement and payment shall be per piece tested and accepted
installed rock bolt (for exact payment details see specifications).

2_3 B1023 Length 6 m

ROUND CHAINAGE (m) TUNNEL METER


Sl no ATSS NO. Nos QUANTITY (Nos) REMARKS
NO From To From To
PORTAL T12P1 2nd TROLLY REFUGE NITCH

1.00 4.07 5.07 21.00 21.00 RESS no-6-06/11/2021

PORTAL T13P1 1st TROLLY REFUGE NITCH

1.00 4.20 4.90 8.00 8.00 RESS no-5-28/10/2021

2.00 4.90 5.90 9.00 9.00


3.00 5.90 6.90 8.00 8.00
8.20 8.00 8.00 Face

625.00
Total= 625.00

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 2,002.00 Nos
Total Quantity Paid Up to Previous RA Bill 1,377.00 Nos
Quantity for This RA Bill 625.00 Nos

CS-DHORAJIA JV CS-DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Self drilling rock bolts (IBO) for tunnel support, slope support, face bolts etc. Supply, drilling, installation, grouting and testing of self driling
rock bolts of specified length L, specified minimum ultimate load as per design drawings (Fy=200kN), technical specifications or as
directed by Engineer. Drilling with grout flushing is mandatory. This item includes:
3 B103
- couplings
- sacrificial drilling bits + grouting
Measurement and payment shall be per piece appropriately installed rock bolts (for exact payment details see specifications).

3_2 B1032 Length 4 m,

ROUND CHAINAGE (m) TUNNEL METER


Sl no ATSS NO. Nos QUANTITY (Nos) REMARKS
NO From To From To
PORTAL T13P1 RESS no-4-18/10/2021

1 T13P1/136 136.00 38,953.00 38,954.50 167.50 169.00 8.00 8.00

2 T13P1/137 137.00 38,954.50 38,956.00 169.00 170.50 7.00 7.00

3 T13P1/138 138.00 38,956.00 38,957.50 170.50 172.00 8.00 8.00

4 T13P1/139 139.00 38,957.50 38,959.00 172.00 173.50 7.00 7.00

5 T13P1/140 140.00 38,959.00 38,960.50 173.50 175.00 8.00 8.00

6 T13P1/141 141.00 38,960.50 38,962.00 175.00 176.50 7.00 7.00

7 T13P1/142 142.00 38,962.00 38,963.50 176.50 178.00 8.00 8.00

8 T13P1/143 143.00 38,961.60 38,963.05 176.10 177.50 7.00 7.00

9 T13P1/144 144.00 38,963.05 38,964.50 177.50 178.95 8.00 8.00

10 T13P1/145 145.00 38,964.50 38,965.85 178.95 180.30 7.00 7.00

11 T13P1/146 146.00 38,965.85 38,967.20 180.30 181.65 8.00 8.00

12 T13P1/147 147.00 38,967.20 38,968.70 181.65 183.15 7.00 7.00

13 T13P1/148 148.00 38,968.70 38,970.20 183.15 184.65 8.00 8.00

14 T13P1/149 149.00 38,970.20 38,971.60 184.65 186.05 7.00 7.00

15 T13P1/150 150.00 38,971.60 38,973.00 186.05 187.45 8.00 8.00


113.00
Total= 113.00

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 113.00 Nos
Total Quantity Paid Up to Previous RA Bill Nos
Quantity for This RA Bill 113.00 Nos

CS-DHORAJIA JV CS-DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Self drilling rock bolts (IBO) for tunnel support, slope support, face bolts etc. Supply, drilling, installation, grouting and testing of self driling rock bolts of
specified length L, specified minimum ultimate load as per design drawings (Fy=200kN), technical specifications or as directed by Engineer. Drilling
with grout flushing is mandatory. This item includes:
B103
- couplings
- sacrificial drilling bits + grouting
Measurement and payment shall be per piece appropriately installed rock bolts (for exact payment details see specifications).

BOQ ITEM NO. B1033 Length 6 m


ROUND CHAINAGE (m) TUNNEL METER
ATSS NO. Nos QUANTITY (Nos) REMARKS
NO From To From To
PORTAL T12P2

T12P2/16 16.00 38,484.80 38,484.15 8.70 9.35 5.00 5.00 Ress no 3-04/08/2021

T12P2/17 17.00 38,484.15 38,483.10 9.35 10.40 4.00 4.00

T12P2/18 18.00 38,483.10 38,482.40 10.40 11.10 5.00 5.00

T12P2/19 19.00 38,482.40 38,481.70 11.10 11.80 2.00 2.00

T12P2/20 20.00 38,481.70 38,481.10 11.80 12.40 2.00 2.00

T12P2/21 21.00 38,481.10 38,480.50 12.40 13.00 3.00 3.00

T12P2/22 22.00 38,480.50 38,479.90 13.00 13.60 8.00 8.00

T12P2/23 23.00 38,479.90 38,479.10 13.60 14.40 8.00 8.00

T12P2/24 24.00 38,479.10 38,478.40 14.40 15.10 7.00 7.00

T12P2/25 25.00 38,478.40 38,477.70 15.10 15.80 1.00 1.00

T12P2/26 26.00 38,477.70 38,477.00 15.80 16.50 2.00 2.00

PORTAL T13P1

T13P1/122 122.00 38,932.00 38,933.50 146.50 148.00 3.00 3.00 Ress no-4-18/10/2021

T13P1/123 123.00 38,933.50 38,935.00 148.00 149.50 3.00 3.00

T13P1/124 124.00 38,935.00 38,936.50 149.50 151.00 6.00 6.00

T13P1/125 125.00 38,936.50 38,938.00 151.00 152.50 3.00 3.00

T13P1/126 126.00 38,938.00 38,939.50 152.50 154.00 3.00 3.00

T13P1/127 127.00 38,939.50 38,941.00 154.00 155.50 3.00 3.00

T13P1/128 128.00 38,941.00 38,942.50 155.50 157.00 3.00 3.00

T13P1/129 129.00 38,942.50 38,944.00 157.00 158.50 3.00 3.00

T13P1/130 130.00 38,944.00 38,945.50 158.50 160.00 3.00 3.00

T13P1/131 131.00 38,945.50 38,947.00 160.00 161.50 3.00 3.00

T13P1/132 132.00 38,947.00 38,948.50 161.50 163.00 3.00 3.00

T13P1/133 133.00 38,948.50 38,950.00 163.00 164.50 3.00 3.00

T13P1/134 134.00 38,950.00 38,951.50 164.50 166.00 6.00 6.00

T13P1/135 135.00 38,951.50 38,953.00 166.00 167.50 3.00 3.00

T13P1/136 136.00 38,953.00 38,954.50 167.50 169.00 8.00 8.00

T13P1/137 137.00 38,954.50 38,955.50 169.00 170.00 7.00 7.00

T13P1/138 138.00 38,955.50 38,956.50 170.00 171.00 8.00 8.00

T13P1/139 139.00 38,956.50 38,957.85 171.00 172.35 7.00 7.00

T13P1/140 140.00 38,957.85 38,959.20 172.35 173.70 8.00 8.00

T13P1/141 141.00 38,959.20 38,960.40 173.70 174.90 7.00 7.00

T13P1/142 142.00 38,960.40 38,961.60 174.90 176.10 8.00 8.00

PORTAL T13P2 Ress no-3-19/09/2021

T13P2/07 7.00 41,340.00 41,339.00 6.00 7.00 7.00 7.00

T13P2/08 8.00 41,339.00 41,338.00 7.00 8.00 8.00 8.00

T13P2/09 9.00 41,338.00 41,337.00 8.00 9.00 8.00 8.00

T13P2/10 10.00 41,337.00 41,336.00 9.00 10.00 8.00 8.00

T13P2/11 11.00 41,336.00 41,335.00 10.00 11.00 18.00 18.00


Self drilling rock bolts (IBO) for tunnel support, slope support, face bolts etc. Supply, drilling, installation, grouting and testing of self driling rock bolts of
specified length L, specified minimum ultimate load as per design drawings (Fy=200kN), technical specifications or as directed by Engineer. Drilling
with grout flushing is mandatory. This item includes:
B103
- couplings
- sacrificial drilling bits + grouting
Measurement and payment shall be per piece appropriately installed rock bolts (for exact payment details see specifications).

BOQ ITEM NO. B1033 Length 6 m


T13P2/12 12.00 41,335.00 41,334.00 11.00 12.00 18.00 18.00

T13P2/13 13.00 41,334.00 41,333.00 12.00 13.00 19.00 19.00

T13P2/14 14.00 41,333.00 41,332.00 13.00 14.00 18.00 18.00 RESS no-4-09/11/2021

T13P2/15 15.00 41,332.00 41,331.00 14.00 15.00 19.00 19.00

T13P2/16 16.00 41,331.00 41,330.00 15.00 16.00 18.00 18.00

T13P2/17 17.00 41,330.00 41,329.00 16.00 17.00 18.00 18.00

T13P2/18 18.00 41,329.00 41,328.00 17.00 18.00 19.00 19.00

T13P2/19 19.00 41,328.00 41,327.00 18.00 19.00 18.00 18.00

T13P2/20 20.00 41,327.00 41,325.50 19.00 20.50 19.00 19.00

T13P2/21 21.00 41,325.50 41,324.00 20.50 22.00 18.00 18.00

T13P2/22 22.00 41,324.00 41,322.50 22.00 23.50 18.00 18.00

T13P2/23 23.00 41,322.50 41,321.00 23.50 25.00 19.00 19.00

T13P2/24 24.00 41,321.00 41,319.50 25.00 26.50 18.00 18.00

T13P2/25 25.00 41,319.50 41,318.00 26.50 28.00 19.00 19.00

T13P2/26 26.00 41,318.00 41,316.50 28.00 29.50 18.00 18.00

T13P2/27 27.00 41,316.50 41,315.00 29.50 31.00 19.00 19.00

T13P2/28 28.00 41,315.00 41,313.50 31.00 32.50 18.00 18.00

T13P2/29 29.00 41,313.50 41,312.00 32.50 34.00 19.00 19.00

T13P2/30 30.00 41,312.00 41,310.50 34.00 35.50 18.00 18.00

T13P2 Slope Protection 414.0m 418.0m 41.00 41.00

588.00

Total= 588.00

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 3,228.00 Nos
Total Quantity Paid Up to Previous RA Bill 2,640.00 Nos
Quantity for This RA Bill 588.00 Nos

CS-DHORAJIA JV CS-DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Sl no Item No Description of Item
Self drilling rock bolts (IBO) for tunnel support, slope support, face bolts etc. Supply, drilling, installation, grouting and
testing of self driling rock bolts of specified length L, specified minimum ultimate load as per design drawings (Fy=200kN),
technical specifications or as directed by Engineer. Drilling with grout flushing is mandatory. This item includes:
- couplings
3 B103 - sacrificial drilling bits + grouting
Measurement and payment shall be per piece appropriately installed rock bolts (for exact payment details see
specifications).

3_4 B1034 Length 9 m,

Elevation
QUANTITY
Location Unit No Length REMARKS
From To (No)

379.50 385.00 LHS of Portal No 54 54 T12P2 Slope


408 412 RHS of Portal No 21 21 T13P2
TOTAL= 75
Detail of Certified Quantity by IRCON
Total Up to date quantity Executed 1,125.00
Total Quantity Paid Up to Previous RA Bill 1,050.00
Quantity for This RA Bill 75.00

CS DHORAJIA JV CS DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER

Page 60 of 151
Self drilling rock bolts (IBO) for tunnel support, slope support, face bolts etc. Supply, drilling, installation, grouting
and testing of self driling rock bolts of specified length L, specified minimum ultimate load as per design
drawings (Fy=200kN), technical specifications or as directed by Engineer. Drilling with grout flushing is
mandatory. This item includes:
- couplings
- sacrificial drilling bits + grouting
Measurement and payment shall be per piece appropriately installed rock bolts (for exact payment details see
specifications).

NON SCHEDULE ITEM NO. Length 12 m


ELEVATION RD
ATSS NO. REMARKS
From To From To Nos QUANTITY (Nos)
LOCATION-T12P2
386.0m 38511.00 38530.70 16.00 16.00
LOCATION-T12P2
Capping Beam 2.00 2.00
Runner Beam 1 10.00 10.00
Runner Beam 2 4.00 4.00
Total= 32.00

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 743.00
Total Quantity Paid Up to Previous RA Bill 711.00
Quantity for This RA Bill 32.00

CS-DHORAJIA JV CS-DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Pipe Roof Umbrella: Supply, drilling, installation and grouting of self-drilling pipe technology of length up to 18m as
per approved drawings & specifications (single row, double row, skin-to-skin single row) or as directed by Engineer.
The rate shall include costs of all materials like starter units, pipes (perforated), drill bits, grouting packers etc.,
labour, equipments, etc. required for the complete job. This item includes:
- Mobilistaion and demobilsation of all equipment necessary (drilling jumbo equipped with AT-casing system,
Symmetrix or similar) for single row, double row or skin-to skin single row
- the necessary excavation
B104
- loading, transport and appropriate depositing of the excavated material
- the excess use of inner lining concrete and waterproofing
- all auxiliary works and materials necessary
Measurement and payment shall be per meter installed pipe roof pipe as directed and approved by the Engineer.

BOQ Item No. B1041 - Outer diameter 76mm, steel grade S355, wall thickness 6.3mm

Round LENGTH QUANTITY


Chainage TM ATSS No. No REMARKS
No (meter) (RM)

Tunnel T-13-P1

13 38797.50 13.00 T13P1/13 12 44 528


20 38806.49 22.00 T13P1/22 12 42 504
TOTAL= 1032

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 2,688.00
Total Quantity Paid Up to Previous RA Bill 1,656.00
Quantity for This RA Bill 1,032.00

CS DHORAJIA JV CS DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER

Page 62 of 151
Sl no Item No Description of Item
Supply, drilling hole, installation, testing and grouting of forepoling as per approved drawings & specifications or as
5 B105 directed by Engineer. 200kN minimum ultimate load. The rate shall include costs of all materials, labour, equipments, etc.
required for the complete job.

5_1 B1051 Self-drilling bolts, Fy >= 200 KN

Tunnel Length QUANTITY


Round No Chainage Unit No REMARKS
Metre (m) (Rm)

Tunnel-T13-P1 RESS no-4-18/10/2021


120 38929.00 143.50 m 28 6.00 168.00
122 38932.00 146.50 m 28 6.00 168.00
124 38935.00 149.50 m 25 6.00 150.00
126 38938.00 152.50 m 25 6.00 150.00
128 38941.00 155.50 m 28 6.00 168.00
130 38944.00 158.50 m 25 6.00 150.00
132 38947.00 161.50 m 24 6.00 144.00
134 38950.00 164.50 m 25 6.00 150.00
136 38953.00 167.50 m 23 6.00 138.00
138 38955.50 170.00 m 23 6.00 138.00
140 38957.85 172.35 m 24 6.00 144.00
142 38960.40 174.90 m 25 6.00 150.00
144 38963.05 177.50 m 28 6.00 168.00
146 38965.85 180.30 m 28 6.00 168.00
148 38968.70 183.15 m 28 6.00 168.00
150 38971.60 186.05 m 28 6.00 168.00

Tunnel-T13-P2 RESS no4-09/11/2021


15 41332.00 14.00 m 35 6.00 210.00
18 41329.00 18.00 m 34 6.00 204.00
21 41325.50 20.50 m 36 6.00 216.00
23 41322.50 23.50 m 34 6.00 204.00
26 41318.00 28.00 m 35 6.00 210.00
28 41315.00 31.00 m 36 6.00 216.00
30 41312.00 34.00 m 36 6.00 216.00
41308.70 m 32 6.00 192.00

Tunnel-T12P1
37453.50 364.00 m 28 6.00 168.00
37458.00 368.50 m 28 6.00 168.00
4,494.00
TOTAL= 4,494.00
Detail of Certified Quantity by IRCON
Total Up to date quantity Executed 15,300.00
Total Quantity Paid Up to Previous RA Bill 10,806.00
Quantity for This RA Bill 4,494.00

DHORAJIA DHORAJIA IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER

Page 63 of 151
Pipe Roof Umbrella: Supply, drilling, installation and grouting of self-drilling pipe technology of length up to 18m as
per approved drawings & specifications (single row, double row, skin-to-skin single row) or as directed by Engineer.
The rate shall include costs of all materials like starter units, pipes (perforated), drill bits, grouting packers etc.,
labour, equipments, etc. required for the complete job. This item includes:
- Mobilistaion and demobilsation of all equipment necessary (drilling jumbo equipped with AT-casing system,
Symmetrix or similar) for single row, double row or skin-to skin single row
B104 - the necessary excavation
- loading, transport and appropriate depositing of the excavated material
- the excess use of inner lining concrete and waterproofing
- all auxiliary works and materials necessary
Measurement and payment shall be per meter installed pipe roof pipe as directed and approved by the Engineer.

BOQ Item No. B1041 - Outer diameter 76mm, steel grade S355, wall thickness 6.3mm

Round LENGTH QUANTITY


Chainage TM ATSS No. No REMARKS
No (meter) (RM)

Tunnel T-12P2 RESS no-2-07/08/2021

30 38+474.9m 9 40 360

38 38+468.6m 9 42 378

TOTAL= 738

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 6,243.00
Total Quantity Paid Up to Previous RA Bill 5,505.00
Quantity for This RA Bill 738.00

CS DHORAJIA JV CS DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER

Page 64 of 151
Sl no Item No Description of Item

Supply, fabrication, storing and erection of lattice girders . Geometries shall be as shown on design drawings, in technical specifications or
directed by the Engineer. These items include:
- all necessary elements for connection of lattice girder partitions, such as connection plate, connection bolts and nuts etc.
6 B106 - all auxiliary materials
- bearing elements
Minimum steel grade is Fe 500. For underground works, measurement and payment shall be for the theoretical length of lattice girders
measured using the Payment line as shown on design drawings and in the technical specifications.

ATSS NO ROUND NO Item No Unit Weight Quantity in Kg LG SHAPE/NO Remarks

T12P1-036 to T12P1- Unit weight from


T12P1-052
37 to 53 LG 18 281.14 5,060.52 LG No4
Annexure A

TOTAL IN Kg= 5,060.52


TOTAL IN MT= 5.06
Detail of Certified Quantity by IRCON
Total Up to date quantity Executed 5.06
Total Quantity Paid Up to Previous RA Bill 0.00
Quantity for This RA Bill 5.06

CS DHORAJIA JV CS DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER

Page 65 of 151
Sl no Item No Description of Item

Supply, fabrication, storing and erection of lattice girders . Geometries shall be as shown on design drawings, in technical specifications or
directed by the Engineer. These items include:
- all necessary elements for connection of lattice girder partitions, such as connection plate, connection bolts and nuts etc.
6 B106 - all auxiliary materials
- bearing elements
Minimum steel grade is Fe 500. For underground works, measurement and payment shall be for the theoretical length of lattice girders
measured using the Payment line as shown on design drawings and in the technical specifications.

ATSS NO ROUND NO CHAINAGE Item No Unit Weight Quantity in Kg LG Type Remarks

37+383m
to
T12P1 RESS-7 & 9
37+398m & LG 29 281.14 8,153.06 Pentax 95/16/25
(06/11/2021 & 18/11/2021)
37+408.5m to
37+458m

38+917m to T13P1 RESS no 4-


LG 34 281.14 9,558.76 Pentax 95/16/25
38+964.2m 18/10/2021

41+316.5m to T13P2 RESS no-4-


LG 11 281.14 3,092.54 Pentax 95/16/25
41+330m 9/11/2021

T13P1 TR No-1 RESS no-5-


38+880m LG 3 202.40 607.20 Pentax 95/16/25
28/10/2021

TOTAL IN Kg= 21,411.56


TOTAL IN MT= 21.41
Detail of Certified Quantity by IRCON
Total Up to date quantity Executed 69.49 MT
Total Quantity Paid Up to Previous RA Bill 48.08 MT
Quantity for This RA Bill 21.41 MT

CS DHORAJIA JV CS DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER

Page 66 of 151
Sl no Item No Description of Item

Supply and placement of welded wire mesh of sizes 150x150x6, 100x100x6 or any other size as directed by Engineer as reinforcement of sprayed concrete for tunnel lining
works as shown
on design drawings, specifications or as directed by Engineer. Steel grade minimum Fe500. This item also includes:
- Fixing elements and materials
8 B108 - cutting, bending and placement
- all auxiliary materials and works necessary
Measurement and payment shall be per square meter for each layer installed and instructed, measured along Payment Line (see specifications). Overlapping as mentioned in
technical specifications is mandatory but shall not be paid
extra.

Wt
TUNNEL Avg =@2.96kg/sq
DESCRIPTION ATSS NO ROUND NO Layer CHAINAGE Length Area REMARKS
METER Perimeter m As per IS
1566-1982
PORTAL T12P1
WIRE MESH 150X150X6 T12P1/19 19 2 37,110.00 19.00 1.00 22.18 22.18 131.30 1
WIRE MESH 150X150X6 T12P1/20 20 2 37,111.00 20.00 1.00 21.55 21.55 127.57 3
WIRE MESH 150X150X6 T12P1/21 21 2 37,112.00 21.00 1.00 21.89 21.89 129.57 5
WIRE MESH 150X150X6 T12P1/22 22 2 37,113.00 22.00 1.00 21.89 21.89 129.57 5
WIRE MESH 150X150X6 T12P1/23 23 2 37,114.00 23.00 1.00 21.89 21.89 129.57 5
WIRE MESH 150X150X6 T12P1/24 24 2 37,115.00 24.00 1.00 22.17 22.17 131.22 7
WIRE MESH 150X150X6 T12P1/25 25 2 37,116.00 25.00 1.00 22.43 22.43 132.79 9
WIRE MESH 150X150X6 T12P1/26 26 2 37,117.00 26.00 1.00 22.43 22.43 132.79 9
WIRE MESH 150X150X6 T12P1/27 27 2 37,118.00 27.00 1.00 22.18 22.18 131.30 1
WIRE MESH 150X150X6 T12P1/28 28 2 37,119.00 28.00 1.00 21.55 21.55 127.57 3
WIRE MESH 150X150X6 T12P1/29 29 2 37,120.00 29.00 1.00 21.89 21.89 129.57 5
WIRE MESH 150X150X6 T12P1/30 30 2 37,121.00 30.00 1.00 22.17 22.17 131.22 7
WIRE MESH 150X150X6 T12P1/31 31 2 37,122.00 31.00 1.00 22.43 22.43 132.79 9
WIRE MESH 150X150X6 T12P1/32 32 2 37,123.00 32.00 1.00 22.18 22.18 131.30 1
WIRE MESH 150X150X6 T12P1/33 33 2 37,124.00 33.00 1.00 21.55 21.55 127.57 3
WIRE MESH 150X150X6 T12P1/34 34 2 37,125.00 34.00 1.00 21.89 21.89 129.57 5
WIRE MESH 150X150X6 T12P1/35 35 2 37,126.00 35.00 1.00 22.17 22.17 131.22 7
WIRE MESH 150X150X6 T12P1/36 36 2 37,127.00 36.00 1.00 22.43 22.43 132.79 9
WIRE MESH 150X150X6 T12P1/37 37 2 37,128.00 37.00 1.00 22.18 22.18 131.30 1

Wt
Slope Avg =@2.96kg/sq
Item Unit Layer Offset Width Area REMARKS
Length Length m As per IS
1566-1982
PORTAL T13P1
1 WIRE MESH 150X150X6 Kg 2 15.30 -44.15 0.00 0.00 EL=389.0m to 381.0m
2 WIRE MESH 150X150X6 Kg 2 15.28 15.29 -39.82 4.34 66.32 392.62
3 WIRE MESH 150X150X6 Kg 2 15.95 15.62 -35.23 4.58 71.58 423.76
4 WIRE MESH 150X150X6 Kg 2 15.43 15.69 -33.51 1.72 27.03 160.03
5 WIRE MESH 150X150X6 Kg 2 18.30 16.86 -30.00 3.51 59.16 350.22
6 WIRE MESH 150X150X6 Kg 2 8.99 13.64 -18.15 11.85 161.66 957.01
7 WIRE MESH 150X150X6 Kg 2 9.09 9.04 -15.00 3.15 28.47 168.54
8 WIRE MESH 150X150X6 Kg 2 12.48 10.79 -10.00 5.00 53.93 319.25
9 WIRE MESH 150X150X6 Kg 2 0.00 6.24 -6.00 4.00 24.96 147.76
10 WIRE MESH 150X150X6 Kg 2 9.66 4.83 -5 1.00 4.83 28.58
11 WIRE MESH 150X150X6 Kg 2 9.64 9.65 0.00 5.00 48.25 285.65
12 WIRE MESH 150X150X6 Kg 2 9.68 9.66 5.00 5.00 48.31 286.01
13 WIRE MESH 150X150X6 Kg 2 0.00 4.84 6.10 1.10 5.32 31.52
14 WIRE MESH 150X150X6 Kg 2 9.08 4.54 10.00 3.90 17.71 104.85
15 WIRE MESH 150X150X6 Kg 2 2.68 5.88 11.62 1.62 9.53 56.40
Single Layer
1 WIRE MESH 150X150X6 Kg 1 4.50 4.50 -6.00 0.00 0.00
2 WIRE MESH 150X150X6 Kg 1 4.87 4.69 -5.00 1.00 4.69 13.88
3 WIRE MESH 150X150X6 Kg 1 3.18 4.03 0.00 5.00 20.13 59.58
4 WIRE MESH 150X150X6 Kg 1 5.03 4.10 5.00 5.00 20.52 60.74
5 WIRE MESH 150X150X6 Kg 1 5.10 5.06 6.10 1.10 5.57 16.49

TOTAL WEIGHT IN Kg= 6,343.46


TOTAL WEIGHT IN MT= 6.35

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 17.58
Total Quantity Paid Up to Previous RA Bill 11.23
Quantity for This RA Bill 6.35

CS DHORAJIA JV CS DHORAJIA JV DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Sl no Item No Description of Item

Supply and placement of welded wire mesh of sizes 150x150x6, 100x100x6 or any other size as directed by Engineer as reinforcement of sprayed concrete for tunnel lining works as shown
on design drawings, specifications or as directed by Engineer. Steel grade minimum Fe500. This item also includes:
- Fixing elements and materials
- cutting, bending and placement
8 B108
- all auxiliary materials and works necessary
Measurement and payment shall be per square meter for each layer installed and instructed, measured along Payment Line (see specifications). Overlapping as mentioned in technical
specifications is mandatory but shall not be paid
extra.

Wt
TUNNEL =@2.96kg/sq
Sl no DESCRIPTION ATSS NO ROUND NO Layer CHAINAGE
METER
Length Avg Perimeter Area REMARKS
m As per IS
1566-1982
Portal-T13 P1
1 WIRE MESH 150X150X6 T13P1/04 4 2 38,788.50 3.00 - 21.37 - 0.00
2 WIRE MESH 150X150X6 T13P1/05 5 2 38,789.50 4.00 1.00 21.37 21.37 126.52
3 WIRE MESH 150X150X6 T13P1/06 6 2 38,790.50 5.00 1.00 21.65 21.65 128.16
4 WIRE MESH 150X150X6 T13P1/07 7 2 38,791.50 6.00 1.00 21.93 21.93 129.84
5 WIRE MESH 150X150X6 T13P1/08 8 2 38,792.50 7.00 1.00 22.21 22.21 131.50
6 WIRE MESH 150X150X6 T13P1/09 9 2 38,793.50 8.00 1.00 22.48 22.48 133.06
7 WIRE MESH 150X150X6 T13P1/10 10 2 38,794.50 9.00 1.00 22.48 22.48 133.06
8 WIRE MESH 150X150X6 T13P1/11 11 2 38,795.50 10.00 1.00 22.75 22.75 134.70
9 WIRE MESH 150X150X6 T13P1/12 12 2 38,796.50 11.00 1.00 21.37 21.37 126.52
10 WIRE MESH 150X150X6 T13P1/13 13 2 38,797.50 12.00 1.00 21.65 21.65 128.16
11 WIRE MESH 150X150X6 T13P1/14 14 2 38,798.50 13.00 1.00 22.65 22.65 134.11
12 WIRE MESH 150X150X6 T13P1/15 15 2 38,799.50 14.00 1.00 21.93 21.93 129.84
13 WIRE MESH 150X150X6 T13P1/16 16 2 38,800.50 15.00 1.00 22.21 22.21 131.50
14 WIRE MESH 150X150X6 T13P1/17 17 2 38,801.50 16.00 1.00 22.21 22.21 131.50
15 WIRE MESH 150X150X6 T13P1/18 18 2 38,802.50 17.00 1.00 22.48 22.48 133.06
16 WIRE MESH 150X150X6 T13P1/19 19 2 38,803.50 18.00 1.00 22.48 22.48 133.06
17 WIRE MESH 150X150X6 T13P1/20 20 2 38,804.50 19.00 1.00 22.75 22.75 134.70
18 WIRE MESH 150X150X6 T13P1/21 21 2 38,805.50 20.00 1.00 22.75 22.75 134.70
19 WIRE MESH 150X150X6 T13P1/22 22 2 38,806.50 21.00 1.00 22.75 22.75 134.70
20 WIRE MESH 150X150X6 T13P1/23 23 2 38,807.50 22.00 1.00 21.37 21.37 126.52

Portal-T12 P1
1 WIRE MESH 150X150X6 T12P1/037 37.00 2 37,128.00 37.00 - 21.89 - 0.00 1
2 WIRE MESH 150X150X6 T12P1/036 38.00 2 37,128.80 37.80 0.80 21.67 17.33 102.62
3 WIRE MESH 150X150X6 T12P1/037 39.00 2 37,130.30 39.30 1.50 21.16 31.74 187.91
4 WIRE MESH 150X150X6 T12P1/038 40.00 2 37,131.80 40.80 1.50 21.16 31.74 187.91
5 WIRE MESH 150X150X6 T12P1/039 41.00 2 37,133.30 42.30 1.50 21.16 31.74 187.91
6 WIRE MESH 150X150X6 T12P1/040 42.00 2 37,134.80 43.80 1.50 21.16 31.74 187.91
7 WIRE MESH 150X150X6 T12P1/041 43.00 2 37,136.30 45.30 1.50 21.16 31.74 187.91
8 WIRE MESH 150X150X6 T12P1/042 44.00 2 37,137.80 46.80 1.50 21.16 31.74 187.91
9 WIRE MESH 150X150X6 T12P1/043 45.00 2 37,139.50 48.50 1.70 21.16 35.97 212.96
10 WIRE MESH 150X150X6 T12P1/044 46.00 2 37,141.00 50.00 1.50 21.16 31.74 187.91
11 WIRE MESH 150X150X6 T12P1/045 47.00 2 37,142.50 51.50 1.50 21.16 31.74 187.91
12 WIRE MESH 150X150X6 T12P1/046 48.00 2 37,144.00 53.00 1.50 21.16 31.74 187.91
13 WIRE MESH 150X150X6 T12P1/047 49.00 2 37,145.50 54.50 1.50 21.16 31.74 187.91
14 WIRE MESH 150X150X6 T12P1/048 50.00 2 37,147.00 56.00 1.50 21.16 31.74 187.91
15 WIRE MESH 150X150X6 T12P1/049 51.00 2 37,148.50 57.50 1.50 21.161 31.74 187.91
16 WIRE MESH 150X150X6 T12P1/050 52.00 2 37,150.00 59.00 1.50 21.161 31.74 187.91
17 WIRE MESH 150X150X6 T12P1/051 53.00 2 37,151.50 60.50 1.50 21.161 31.74 187.91
18 WIRE MESH 150X150X6 T12P1/052 54.00 2 37,153.00 62.00 1.50 21.161 31.74 187.91
19 WIRE MESH 150X150X6 T12P1/053 55.00 2 37,154.50 63.50 1.50 21.161 31.74 187.91

Wt
=@2.96kg/sq
Item Unit Layer Slope Length Avg Length Offset Width Area REMARKS
m As per IS
1566-1982
PORTAL T13P1
1 WIRE MESH 150X150X6 Kg 2 8.99 -18.15 0.00 0.00
2 WIRE MESH 150X150X6 Kg 2 8.00 8.49 -20.00 1.85 15.71 93.00 EL=389.55m to 385.50m
3 WIRE MESH 150X150X6 Kg 2 19.13 13.56 -25.00 5.00 67.82 401.47 EL=394.09m to 385.605m
4 WIRE MESH 150X150X6 Kg 2 15.39 17.26 -30.00 5.00 86.29 510.81 EL=392.37m to 386.294m
5 WIRE MESH 150X150X6 Kg 2 11.55 13.47 -35.23 5.23 70.45 417.09 EL=392.271m to 387.064m
6 WIRE MESH 150X150X6 Kg 2 5.96 8.76 -39.82 4.58 40.15 237.67 EL=391.556m to388.612m

PORTAL T13P2
1 WIRE MESH 150X150X6 Kg 2 5.16 25.00 0.00 0.00 EL=429.258m to 430.670m
2 WIRE MESH 150X150X6 Kg 2 9.97 7.57 20.00 5.00 37.84 223.99 EL=429.267m to 432.969m
3 WIRE MESH 150X150X6 Kg 2 13.31 11.64 15.00 5.00 58.21 344.59 EL=429.426m to 436.375m
4 WIRE MESH 150X150X6 Kg 2 12.65 12.98 10.00 5.00 64.91 384.26 EL=429.466m to 436.143m
5 WIRE MESH 150X150X6 Kg 2 12.71 12.68 5.00 5.00 63.41 375.41 EL=429.543m to 436.706m
6 WIRE MESH 150X150X6 Kg 2 10.99 11.85 0.00 5.00 59.26 350.79 EL=428.997m to 435.127m
7 WIRE MESH 150X150X6 Kg 2 9.27 10.13 -5.00 5.00 50.65 299.84 EL=428.892m to 434.112m
8 WIRE MESH 150X150X6 Kg 2 7.14 8.21 -10.00 5.00 41.03 242.87 EL=428.789m to 433.086m

PORTAL T12P1
1 WIRE MESH 150X150X6 Kg 2 16.24 -20.00 0.00 0.00 EL=386.49m to 377.741m
2 WIRE MESH 150X150X6 Kg 2 10.02 13.13 -25.00 5.00 65.63 388.53 EL=386.096m to 380.071m
3 WIRE MESH 150X150X6 Kg 2 3.96 6.99 -30.00 5.00 34.94 206.86 EL=385.805m to 383.116m
Sl no Item No Description of Item

Supply and placement of welded wire mesh of sizes 150x150x6, 100x100x6 or any other size as directed by Engineer as reinforcement of sprayed concrete for tunnel lining works as shown
on design drawings, specifications or as directed by Engineer. Steel grade minimum Fe500. This item also includes:
- Fixing elements and materials
- cutting, bending and placement
8 B108
- all auxiliary materials and works necessary
Measurement and payment shall be per square meter for each layer installed and instructed, measured along Payment Line (see specifications). Overlapping as mentioned in technical
specifications is mandatory but shall not be paid
extra.

T13 P1 Catchment Drain at EL-404.0m Inclined Portion LHS Length Breadth


1 LHS Parepet 16.50 0.60 9.90 29.30
2 RHS Parapet 16.50 0.86 14.19 42.00
3 T13 P1 Catchment Drain at EL-404.0m Inclined Portion LHS 6.20 2.76 17.08 50.56
4 T13 P1 Catchment Drain at EL-404.0m Inclined Portion RHS 9.45 2.78 26.27 77.76
5 T13 P1 Catchment Drain LHS Large section RHS 21.40 2.37 50.72 150.13
6 T13 P1 Catchment Drain LHS Large section RHS 31.55 3.07 96.86 286.70
7 Parapet LHS 21.30 2.10 44.64 132.15
8 Parapet RHS 21.30 0.98 20.77 61.47
9 T13P2 Catchment Drain 28.00 2.80 78.40 232.06
41m-28.5=12.5m (28.5 m Paid
10 T12P2 Catchment Drain 12.50 0.50 6.25 18.50
in RA2)

TOTAL WEIGHT IN Kg= 11,375.16


TOTAL WEIGHT IN MT= 11.38

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 28.96
Total Quantity Paid Up to Previous RA Bill 17.58
Quantity for This RA Bill 11.38

CS DHORAJIA JV CS DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Sl no Item No Description of Item

Supply, fabrication and erection of steel rib and all accessories including all lead, lift, wastage,storing,drilling holes, fixing in phases etc. and
installation of accessories for joining the steel rib segments as per approved workshop drawings of contractor & specifications or as directed by
9 B109 Engineer.The rate shall include costs of all materials, labour, equipment,welding, etc
for the complete job including additional cost for enlargement
of top heading footing.

ATSS NO ROUND NO Item No Unit Weight Quantity in Kg RIB SHAPE/NO Remarks

T13P1 Portal Wt As per RA-


ISMB 250 4 875.504 3502.02 D Shape
02
Item No Weight of 1 set
ISMB 250 4 1,117.01 4,468.04 Incremental RIB no 1

T12P1/20 to ISMB 250 3 1,037.79 3,113.36 Incremental RIB no 3 Weight as per Annexure -1
20to 37
T12P1/37 ISMB 250 5 1,051.62 5,258.12 Incremental RIB no 5 Attached
ISMB 250 3 1,065.71 3,197.12 Incremental RIB no 7
ISMB 250 4 1,079.21 4,316.83 Incremental RIB no 9
TOTAL IN Kg= 23,855.49
T12 P1 Bridge
Total weight
Sl no Item No length Total Length Unit weight Remarks
in Kg
1 ISMB 400X140 5 12.00 60.00 61.50 3,690.00 Spacing @1000mm C/C
2 ISMC 150X75 60 4.54 272.40 16.80 4,576.32 Spacing @250mm C/C
3 a. MS pipe 2' 26 1.00 26.00 4.11 106.86 Vertical
b. MS pipe 2' 2 13.10 26.20 4.11 107.68 Horizontal
4 Base Plate 10 Sqm= 0.002 7850.00 157.00 10mm Base Plate
5 Checqerd plate 1 Sqm= 0.45 7850.00 3,549.64 8mm checqured plate thick
6 Bracings ISA 50x50x6
a. Vertical 48 0.38 18.34 4.50 82.51 ISA 50x50x6
b. ties 48 1.00 48.00 4.50 216.00 ISA 50x50x6
TOTAL IN Kg= 12,486.01
TOTAL 36,341.50
TOTAL IN MT= 36.35
Detail of Certified Quantity by IRCON
Total Up to date quantity Executed 58.59
Total Quantity Paid Up to Previous RA Bill 22.24
Quantity for This RA Bill 36.35

CS DHORAJIA JV CS DHORAJIA JV DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER

Page 70 of 151
BAR BENDING SCHEDULE FOR T13P2 PORTAL REINFORCEMENT
Sl no Item No
Supply, cutting, bending, placing, binding steel reinforcement of grade Fe 500 as per approved drawings & specifications or as directed by Engineer, for
7 B107 joint reinforcement of initial and final lining. This shall include straightening, hooking all lead, lift, all auxiliary materials, etc. (Nothing extra shall be paid for
wastage of reinforcement and binding wire).

No of Cutting
S.NO BAR MARK Shape of bar No's Unit Weight Qty in Kg Remarks
Layer Length
REINFORCEMENT FOR CAPPING BEAM T12P2
0.42m

0.92m 0.92m 2(A+B)+24d


10mm Dia =2(0.42+0.92)X 24+.010=2.9m
No 4 Strriuips 1.00 2.90 150 0.62 269.70 No=( 29.85/0.2)+1= 150No
@200c/c

0.42m

0.42m
0.418m
10mm Dia 0.49m (A+B+C+D+E)+24d
No 5 Strriuips 1.00 2.18 150 0.62 202.74 =(.42+.418+.19+.42+.49)+24*10
@200c/c 0.190m
No=( 29.85/0.2)+1= 150No

0.42m

8 mm Dia 0.42m
Mesh inclined 1.00 0.42 300 0.39 48.91 No=( 29.85/0.1)+1= 300No
@100c/c

8 mm Dia
Mesh horizontal Longer 1.00 30.80 5 0.39 60.06 No=( 0.418/0.1)+1= 5No
@100c/c 12m 6.8m
12m

16mm Dia
No 1 & 2 Horizontal Longer 2.00 30.80 7 1.58 681.30
@150c/c 12m 6.8m
12m

16mm Dia
No 3 Top & Bottom Bar Longer 2.00 3.55 3 1.58 33.65
@150c/c 12m 6.8m
12m
REINFORCEMENT FOR RUNNER BEAM T12P2 st Row

0.16m 0.17m

0.36m
10mm Dia 0.92m
No 9 Strriuips 1.00 0.87m 2.90 128 0.62 230.14
@200c/c

0.42m

0.42m
0.418m
0.49m
10mm Dia
No 10 Strriuips 1.00 2.18 128 0.62 173.00
@200c/c 0.190m
0.42m

8 mm Dia 0.42m
Mesh inclined 1.00 0.42 256 0.39 41.73 No=( 25.45/0.1)+1= 256No
@100c/c

8 mm Dia
Mesh horizontal Longer 1.00 26.50 5 0.89 117.93
@100c/c 12m 2.5m
12m

20mm Dia 2.5m


No 6 Horizontal Longer 1.00 12m 12m 26.50 10 2.47 654.55
@100c/c

16mm Dia 2.5m


No 7 Horizontal Longer 1.00 12m 12m 26.50 10 1.58 418.70
@100c/c

16mm Dia
No 8 Top & Bottom Bar Longer 2.00 12m 12m 2.5m 26.50 3 1.58 251.22
@200c/c

REINFORCEMENT FOR CLADDING WALL T12P2 (Chanage-38511.0m to 38530.7m, EL -386.0m to 388.5m)

12mm Dia 12m


Horizintal 2.00 8.3m 20.30 18 0.89 650.41
@150c/c

Page 71 of 151
BAR BENDING SCHEDULE FOR T13P2 PORTAL REINFORCEMENT
Sl no Item No
Supply, cutting, bending, placing, binding steel reinforcement of grade Fe 500 as per approved drawings & specifications or as directed by Engineer, for
7 B107 joint reinforcement of initial and final lining. This shall include straightening, hooking all lead, lift, all auxiliary materials, etc. (Nothing extra shall be paid for
wastage of reinforcement and binding wire).

No of Cutting
S.NO BAR MARK Shape of bar No's Unit Weight Qty in Kg Remarks
Layer Length

12mm Dia
Vertical 2.00 2.5m 2.80 132 0.89 657.89
@150c/c
0.3m

REINFORCEMENT FOR RUNNER BEAM T12P2 2nd Row


0.16m 0.17m

0.36m
10mm Dia 0.92m
No 9 Strriuips 1.00 0.87m 2.90 51 0.62 91.70
@200c/c

0.42m

0.42m
0.418m
10mm Dia 0.49m
No 10 Strriuips 1.00 2.18 51 0.62 68.93
@200c/c
0.190m
0.42m

0.42m
8 mm Dia
Mesh inclined 1.00 0.42 101 0.39 16.47 No=( 25.45/0.1)+1= 256No
@100c/c

8 mm Dia
Mesh horizontal Longer 1.00 10.0m 10.00 5 0.89 44.50
@100c/c

20mm Dia
No 6 Horizontal Longer 1.00 10m 10.00 10 2.47 247.00
@100c/c

16mm Dia
No 7 Horizontal Longer 1.00 10m 10.00 10 1.58 158.00
@100c/c

16mm Dia
No 8 Top & Bottom Bar Longer 2.00 10.00 3 1.58 94.80
@200c/c 10m

REINFORCEMENT FOR T13P2 PORTAL PARAPET WALL

0.42m
20mm Dia 1.49m
Main Vertical Bar 2.00 2.33 221 2.47 2543.75
@150c/c

0.42m

12m 1.7m
12mm Dia
Horizintal 2.00 1.7m 27.40 6 0.89 292.63
@300c/c
12m

Total in Kg= 8049.71 Kg


Total in MT= 8.05
Detail of Certified Quantity by IRCON
Total Up to date quantity Executed 58.48 MT
Total Quantity Paid Up to Previous RA Bill 50.43 MT
Quantity for This RA Bill 8.05 MT

CS-DHORAJIA JV CS-DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER

Page 72 of 151
Sl no Item No Description of Item
Supply and placement of welded wire mesh of sizes 150x150x6, 100x100x6 or any other size as directed by Engineer as reinforcement of sprayed concrete for tunnel lining works
as shown
on design drawings, specifications or as directed by Engineer. Steel grade minimum Fe500. This item also includes:
- Fixing elements and materials
- cutting, bending and placement
8 B108 - all auxiliary materials and works necessary
Measurement and payment shall be per square meter for each layer installed and instructed, measured along Payment Line (see specifications). Overlapping as mentioned in
technical specifications is mandatory but shall not be paid
extra.

Wt
ROUND Avg =@2.96kg/sqm
Sl no DESCRIPTION ATSS NO Layer CHAINAGE TUNNEL METER Length Area REMARKS
NO Perimeter As per IS 1566-
1982

LOCATION T13P2

RESS no-4-
1 WIRE MESH 150X150X6 T13P2/10 10.00 2 41,337.00 41,336.00 9.00 10.00 1.00 21.48 21.48 127.16 09/11/2021

2 WIRE MESH 150X150X6 T13P2/11 11.00 2 41,336.00 41,335.00 10.00 11.00 1.00 21.48 21.48 127.16

3 WIRE MESH 150X150X6 T13P2/12 12.00 2 41,335.00 41,334.00 11.00 12.00 1.00 21.48 21.48 127.16

4 WIRE MESH 150X150X6 T13P2/13 13.00 2 41,334.00 41,333.00 12.00 13.00 1.00 21.48 21.48 127.16

5 WIRE MESH 150X150X6 T13P2/14 14.00 2 41,333.00 41,332.00 13.00 14.00 1.00 21.48 21.48 127.16

6 WIRE MESH 150X150X6 T13P2/15 15.00 2 41,332.00 41,331.00 14.00 15.00 1.00 21.48 21.48 127.16

7 WIRE MESH 150X150X6 T13P2/16 16.00 2 41,331.00 41,330.00 15.00 16.00 1.00 21.51 21.51 127.31

8 WIRE MESH 150X150X6 T13P2/17 17.00 2 41,330.00 41,329.00 16.00 17.00 1.00 21.51 21.51 127.31

9 WIRE MESH 150X150X6 T13P2/18 18.00 2 41,329.00 41,328.00 17.00 18.00 1.00 21.51 21.51 127.31

10 WIRE MESH 150X150X6 T13P2/19 19.00 2 41,328.00 41,327.00 18.00 19.00 1.00 21.51 21.51 127.31

11 WIRE MESH 150X150X6 T13P2/20 20.00 2 41,327.00 41,325.50 19.00 20.50 1.50 21.51 32.26 190.96

12 WIRE MESH 150X150X6 T13P2/21 21.00 2 41,325.50 41,324.00 20.50 22.00 1.50 21.51 32.26 190.96

13 WIRE MESH 150X150X6 T13P2/22 22.00 2 41,324.00 41,322.50 22.00 23.50 1.50 21.51 32.26 190.96

14 WIRE MESH 150X150X6 T13P2/23 23.00 2 41,322.50 41,321.00 23.50 25.00 1.50 21.51 32.26 190.96

15 WIRE MESH 150X150X6 T13P2/24 24.00 2 41,321.00 41,319.50 25.00 26.50 1.50 21.51 32.26 190.96

16 WIRE MESH 150X150X6 T13P2/25 25.00 2 41,319.50 41,318.00 26.50 28.00 1.50 21.51 32.26 190.96

17 WIRE MESH 150X150X6 T13P2/26 26.00 2 41,318.00 41,316.50 28.00 29.50 1.50 21.51 32.26 190.96

18 WIRE MESH 150X150X6 T13P2/27 27.00 2 41,316.50 41,315.00 29.50 31.00 1.50 21.51 32.26 190.96

19 WIRE MESH 150X150X6 T13P2/28 28.00 2 41,315.00 41,313.50 31.00 32.50 1.50 21.51 32.26 190.96

20 WIRE MESH 150X150X6 T13P2/29 29.00 2 41,313.50 41,312.00 32.50 34.00 1.50 21.51 32.26 190.96

21 WIRE MESH 150X150X6 T13P2/30 30.00 2 41,312.00 41,310.50 34.00 35.50 1.50 21.51 32.26 190.96

22 WIRE MESH 150X150X6 T13P2/31 31.00 2 41,310.50 41,309.00 35.50 37.00 1.50 21.51 32.26 190.96

23 WIRE MESH 150X150X6 T13P2/32 32.00 2 41,309.00 41,307.50 37.00 38.50 1.50 21.51 32.26 190.96

LOCATION T13P1

RESS no-4-
1 WIRE MESH 150X150X6 T13P1/112 112.00 1 38,917.00 38,918.50 131.50 133.00 1.50 21.19 31.78 94.06 18/10/2021

2 WIRE MESH 150X150X6 T13P1/113 113.00 1 38,918.50 38,920.00 133.00 134.50 1.50 21.19 31.78 94.06

3 WIRE MESH 150X150X6 T13P1/114 114.00 1 38,920.00 38,921.50 134.50 136.00 1.50 21.19 31.78 94.06

4 WIRE MESH 150X150X6 T13P1/115 115.00 1 38,921.50 38,923.00 136.00 137.50 1.50 21.19 31.78 94.06

5 WIRE MESH 150X150X6 T13P1/116 116.00 1 38,923.00 38,924.50 137.50 139.00 1.50 21.19 31.78 94.06

6 WIRE MESH 150X150X6 T13P1/117 117.00 1 38,924.50 38,926.00 139.00 140.50 1.50 21.19 31.78 94.06

7 WIRE MESH 150X150X6 T13P1/118 118.00 1 38,926.00 38,927.50 140.50 142.00 1.50 21.19 31.78 94.06

8 WIRE MESH 150X150X6 T13P1/119 119.00 1 38,927.50 38,929.00 142.00 143.50 1.50 21.19 31.78 94.06

9 WIRE MESH 150X150X6 T13P1/120 120.00 1 38,929.00 38,930.50 143.50 145.00 1.50 21.19 31.78 94.06
Sl no Item No Description of Item
Supply and placement of welded wire mesh of sizes 150x150x6, 100x100x6 or any other size as directed by Engineer as reinforcement of sprayed concrete for tunnel lining works
as shown
on design drawings, specifications or as directed by Engineer. Steel grade minimum Fe500. This item also includes:
- Fixing elements and materials
- cutting, bending and placement
8 B108 - all auxiliary materials and works necessary
Measurement and payment shall be per square meter for each layer installed and instructed, measured along Payment Line (see specifications). Overlapping as mentioned in
technical specifications is mandatory but shall not be paid
extra.

10 WIRE MESH 150X150X6 T13P1/121 121.00 1 38,930.50 38,932.00 145.00 146.50 1.50 21.19 31.78 94.06

11 WIRE MESH 150X150X6 T13P1/122 122.00 1 38,932.00 38,933.50 146.50 148.00 1.50 21.19 31.78 94.06

12 WIRE MESH 150X150X6 T13P1/123 123.00 1 38,933.50 38,935.00 148.00 149.50 1.50 21.19 31.78 94.06

13 WIRE MESH 150X150X6 T13P1/124 124.00 1 38,935.00 38,936.50 149.50 151.00 1.50 21.19 31.78 94.06

14 WIRE MESH 150X150X6 T13P1/125 125.00 1 38,936.50 38,938.00 151.00 152.50 1.50 21.19 31.78 94.06

15 WIRE MESH 150X150X6 T13P1/126 126.00 1 38,938.00 38,939.50 152.50 154.00 1.50 21.19 31.78 94.06

16 WIRE MESH 150X150X6 T13P1/127 127.00 1 38,939.50 38,941.00 154.00 155.50 1.50 21.19 31.78 94.06

17 WIRE MESH 150X150X6 T13P1/128 128.00 1 38,941.00 38,942.50 155.50 157.00 1.50 21.19 31.78 94.06

18 WIRE MESH 150X150X6 T13P1/129 129.00 1 38,942.50 38,944.00 157.00 158.50 1.50 21.19 31.78 94.06

19 WIRE MESH 150X150X6 T13P1/130 130.00 1 38,944.00 38,945.50 158.50 160.00 1.50 21.19 31.78 94.06

20 WIRE MESH 150X150X6 T13P1/131 131.00 1 38,945.50 38,947.00 160.00 161.50 1.50 21.19 31.78 94.06

21 WIRE MESH 150X150X6 T13P1/132 132.00 1 38,947.00 38,948.50 161.50 163.00 1.50 21.19 31.78 94.06

22 WIRE MESH 150X150X6 T13P1/133 133.00 1 38,948.50 38,950.00 163.00 164.50 1.50 21.19 31.78 94.06

23 WIRE MESH 150X150X6 T13P1/134 134.00 1 38,950.00 38,951.50 164.50 166.00 1.50 21.19 31.78 94.06

24 WIRE MESH 150X150X6 T13P1/135 135.00 1 38,951.50 38,953.00 166.00 167.50 1.50 21.19 31.78 94.06

25 WIRE MESH 150X150X6 T13P1/136 136.00 1 38,953.00 38,954.50 167.50 169.00 1.50 21.19 31.78 94.06

26 WIRE MESH 150X150X6 T13P1/137 137.00 1 38,954.50 38,955.50 169.00 170.00 1.00 21.19 21.19 62.71

27 WIRE MESH 150X150X6 T13P1/138 138.00 1 38,955.50 38,956.50 170.00 171.00 1.00 21.19 21.19 62.71

28 WIRE MESH 150X150X6 T13P1/139 139.00 1 38,956.50 38,957.85 171.00 172.35 1.35 21.19 28.60 84.66

29 WIRE MESH 150X150X6 T13P1/140 140.00 1 38,957.85 38,959.20 172.35 173.70 1.35 21.19 28.60 84.66

30 WIRE MESH 150X150X6 T13P1/141 141.00 1 38,959.20 38,960.40 173.70 174.90 1.20 21.19 25.42 75.25

31 WIRE MESH 150X150X6 T13P1/142 142.00 1 38,960.40 38,961.60 174.90 176.10 1.20 21.19 25.42 75.25

32 WIRE MESH 150X150X6 T13P1/143 143.00 1 38,961.60 38,963.00 176.10 177.50 1.40 21.19 29.66 87.79

33 WIRE MESH 150X150X6 T13P1/144 144.00 1 38,963.00 38,964.20 177.50 178.70 1.20 21.19 25.42 75.25

34 WIRE MESH 150X150X6 T13P1/145 145.00 1 38,964.20 38,965.50 178.70 180.00 1.30 21.19 27.54 81.52

35 WIRE MESH 150X150X6 T13P1/146 146.00 1 38,965.50 38,966.80 180.00 181.30 1.30 21.19 27.54 81.52

36 WIRE MESH 150X150X6 T13P1/147 147.00 1 38,966.80 38,968.10 181.30 182.60 1.30 21.19 27.54 81.52

37 WIRE MESH 150X150X6 T13P1/148 148.00 1 38,968.10 38,969.40 182.60 183.90 1.30 21.19 27.54 81.52

38 WIRE MESH 150X150X6 T13P1/149 149.00 1 38,969.40 38,970.70 183.90 185.20 1.30 21.19 27.54 81.52

39 WIRE MESH 150X150X6 T13P1/150 150.00 1 38,970.70 38,972.00 185.20 186.50 1.30 21.19 27.54 81.52

40 WIRE MESH 150X150X6 T13P1/151 151.00 1 38,972.00 38,973.30 186.50 187.80 1.30 21.19 27.54 81.52

41 WIRE MESH 150X150X6 T13P1/152 152.00 1 38,973.30 38,974.60 187.80 189.10 1.30 21.19 27.54 81.52

42 WIRE MESH 150X150X6 T13P1/153 153.00 1 38,974.60 38,975.90 189.10 190.40 1.30 21.19 27.54 81.52

43 WIRE MESH 150X150X6 T13P1/154 154.00 1 38,975.90 38,977.20 190.40 191.70 1.30 21.19 27.54 81.52
Sl no Item No Description of Item
Supply and placement of welded wire mesh of sizes 150x150x6, 100x100x6 or any other size as directed by Engineer as reinforcement of sprayed concrete for tunnel lining works
as shown
on design drawings, specifications or as directed by Engineer. Steel grade minimum Fe500. This item also includes:
- Fixing elements and materials
- cutting, bending and placement
8 B108 - all auxiliary materials and works necessary
Measurement and payment shall be per square meter for each layer installed and instructed, measured along Payment Line (see specifications). Overlapping as mentioned in
technical specifications is mandatory but shall not be paid
extra.

44 WIRE MESH 150X150X6 T13P1/155 155.00 1 38,977.20 38,978.50 191.70 193.00 1.30 21.19 27.54 81.52

T12P2

1 WIRE MESH 150X150X6 T12P1/206 209.00 1 37,381.50 37,383.00 290.50 292.00 1.50 21.19 31.78 94.06

2 WIRE MESH 150X150X6 T12P1/207 210.00 1 37,383.00 37,384.50 292.00 293.50 1.50 21.19 31.78 94.06

3 WIRE MESH 150X150X6 T12P1/208 211.00 1 37,384.50 37,386.00 293.50 295.00 1.50 21.19 31.78 94.06

4 WIRE MESH 150X150X6 T12P1/209 212.00 1 37,386.00 37,387.50 295.00 296.50 1.50 21.19 31.78 94.06

5 WIRE MESH 150X150X6 T12P1/210 213.00 1 37,387.50 37,389.00 296.50 298.00 1.50 21.19 31.78 94.06

6 WIRE MESH 150X150X6 T12P1/211 214.00 1 37,389.00 37,390.50 298.00 299.50 1.50 21.19 31.78 94.06

7 WIRE MESH 150X150X6 T12P1/212 215.00 1 37,390.50 37,392.00 299.50 301.00 1.50 21.19 31.78 94.06

8 WIRE MESH 150X150X6 T12P1/213 216.00 1 37,392.00 37,393.50 301.00 302.50 1.50 21.19 31.78 94.06

9 WIRE MESH 150X150X6 T12P1/214 217.00 1 37,393.50 37,395.00 302.50 304.00 1.50 21.19 31.78 94.06

10 WIRE MESH 150X150X6 T12P1/215 218.00 1 37,395.00 37,396.50 304.00 305.50 1.50 21.19 31.78 94.06

11 WIRE MESH 150X150X6 T12P1/216 219.00 1 37,396.50 37,398.00 305.50 307.00 1.50 21.19 31.78 94.06

- -

1 WIRE MESH 150X150X6 T12P1/223 226.00 1 37,407.00 37,408.50 317.50 319.00 1.50 21.19 31.78 94.06

2 WIRE MESH 150X150X6 T12P1/224 227.00 1 37,408.50 37,410.00 319.00 320.50 1.50 21.19 31.78 94.06

3 WIRE MESH 150X150X6 T12P1/225 228.00 1 37,410.00 37,411.50 320.50 322.00 1.50 21.19 31.78 94.06

4 WIRE MESH 150X150X6 T12P1/226 229.00 1 37,411.50 37,413.00 322.00 323.50 1.50 21.19 31.78 94.06

5 WIRE MESH 150X150X6 T12P1/227 230.00 1 37,413.00 37,414.50 323.50 325.00 1.50 21.19 31.78 94.06

6 WIRE MESH 150X150X6 T12P1/228 231.00 1 37,414.50 37,416.00 325.00 326.50 1.50 21.19 31.78 94.06

7 WIRE MESH 150X150X6 T12P1/229 232.00 1 37,416.00 37,417.50 326.50 328.00 1.50 21.19 31.78 94.06

8 WIRE MESH 150X150X6 T12P1/230 233.00 1 37,417.50 37,419.00 328.00 329.50 1.50 21.19 31.78 94.06

9 WIRE MESH 150X150X6 T12P1/231 234.00 1 37,419.00 37,420.50 329.50 331.00 1.50 21.19 31.78 94.06

10 WIRE MESH 150X150X6 T12P1/232 235.00 1 37,420.50 37,422.00 331.00 332.50 1.50 21.19 31.78 94.06

11 WIRE MESH 150X150X6 T12P1/233 236.00 1 37,422.00 37,423.50 332.50 334.00 1.50 21.19 31.78 94.06

12 WIRE MESH 150X150X6 T12P1/234 237.00 1 37,423.50 37,425.00 334.00 335.50 1.50 21.19 31.78 94.06

13 WIRE MESH 150X150X6 T12P1/235 238.00 1 37,425.00 37,426.50 335.50 337.00 1.50 21.19 31.78 94.06

14 WIRE MESH 150X150X6 T12P1/236 239.00 1 37,426.50 37,428.00 337.00 338.50 1.50 21.19 31.78 94.06

15 WIRE MESH 150X150X6 T12P1/237 240.00 1 37,428.00 37,429.50 338.50 340.00 1.50 21.19 31.78 94.06

16 WIRE MESH 150X150X6 T12P1/238 241.00 1 37,429.50 37,431.00 340.00 341.50 1.50 21.19 31.78 94.06

17 WIRE MESH 150X150X6 T12P1/239 242.00 1 37,431.00 37,432.50 341.50 343.00 1.50 21.19 31.78 94.06

18 WIRE MESH 150X150X6 T12P1/240 243.00 1 37,432.50 37,434.00 343.00 344.50 1.50 21.19 31.78 94.06

19 WIRE MESH 150X150X6 T12P1/241 244.00 1 37,434.00 37,435.50 344.50 346.00 1.50 21.19 31.78 94.06

20 WIRE MESH 150X150X6 T12P1/242 245.00 1 37,435.50 37,437.00 346.00 347.50 1.50 21.19 31.78 94.06

21 WIRE MESH 150X150X6 T12P1/243 246.00 1 37,437.00 37,438.50 347.50 349.00 1.50 21.19 31.78 94.06

22 WIRE MESH 150X150X6 T12P1/244 247.00 1 37,438.50 37,440.00 349.00 350.50 1.50 21.19 31.78 94.06
Sl no Item No Description of Item
Supply and placement of welded wire mesh of sizes 150x150x6, 100x100x6 or any other size as directed by Engineer as reinforcement of sprayed concrete for tunnel lining works
as shown
on design drawings, specifications or as directed by Engineer. Steel grade minimum Fe500. This item also includes:
- Fixing elements and materials
- cutting, bending and placement
8 B108 - all auxiliary materials and works necessary
Measurement and payment shall be per square meter for each layer installed and instructed, measured along Payment Line (see specifications). Overlapping as mentioned in
technical specifications is mandatory but shall not be paid
extra.

23 WIRE MESH 150X150X6 T12P1/245 248.00 1 37,440.00 37,441.50 350.50 352.00 1.50 21.19 31.78 94.06

24 WIRE MESH 150X150X6 T12P1/246 249.00 1 37,441.50 37,443.00 352.00 353.50 1.50 21.19 31.78 94.06

25 WIRE MESH 150X150X6 T12P1/247 250.00 1 37,443.00 37,444.50 353.50 355.00 1.50 21.19 31.78 94.06

26 WIRE MESH 150X150X6 T12P1/248 251.00 1 37,444.50 37,446.00 355.00 356.50 1.50 21.19 31.78 94.06

27 WIRE MESH 150X150X6 T12P1/249 252.00 1 37,446.00 37,447.50 356.50 358.00 1.50 21.19 31.78 94.06

28 WIRE MESH 150X150X6 T12P1/250 253.00 1 37,447.50 37,449.00 358.00 359.50 1.50 21.19 31.78 94.06

29 WIRE MESH 150X150X6 T12P1/251 254.00 1 37,449.00 37,450.50 359.50 361.00 1.50 21.19 31.78 94.06

30 WIRE MESH 150X150X6 T12P1/252 255.00 1 37,450.50 37,452.00 361.00 362.50 1.50 21.19 31.78 94.06

31 WIRE MESH 150X150X6 T12P1/253 256.00 1 37,452.00 37,453.50 362.50 364.00 1.50 21.19 31.79 94.08

32 WIRE MESH 150X150X6 T12P1/254 257.00 1 37,453.50 37,455.00 364.00 365.50 1.50 21.19 31.79 94.08

33 WIRE MESH 150X150X6 T12P1/255 258.00 1 37,455.00 37,456.50 365.50 367.00 1.50 21.19 31.79 94.08

34 WIRE MESH 150X150X6 T12P1/256 259.00 1 37,456.50 37,458.00 367.00 368.50 1.50 21.19 31.79 94.08

RESS no-6-
PORTAL T12P1 2nd TROLLY REFUGE NITCH
12/10/2021

1 4.07 5.07 1.00 14.58 14.58 43.16

1 5.07 6.07 1.00 14.58 14.58 43.16

1 6.07 7.07 1.00 14.58 14.58 43.16

1 7.07 8.12 1.05 14.58 15.35 45.44

2 14.66 86.79 Face

RESS no-5-
PORTAL T13P1 1st TROLLY REFUGE NITCH
28/10/2021

1 4.20 4.90 0.70 14.81 10.37 30.69

1 4.90 5.90 1.00 14.81 14.81 43.84

1 5.90 6.90 1.00 14.81 14.81 43.84

1 6.90 8.20 1.30 14.81 19.25 56.99

LOCATION T13P2 ELEVATION

Slope Avg Slope


From TO Chanage Length
Length Length

1 404.79 407.49 4.12 5.00 -

1 404.48 406.95 3.84 3.98 - 5.00 19.90 58.90

1 404.84 407.30 3.70 3.77 (5.00) 5.00 18.85 55.80

1 405.12 407.33 3.67 3.69 (10.00) 5.00 18.43 54.54

1 405.27 407.57 3.22 3.45 (15.00) 5.00 17.23 50.99

1 405.03 407.62 4.09 3.66 (20.00) 5.00 18.28 54.09

1 404.86 407.54 4.27 4.18 (23.50) 3.50 14.63 43.30

LOCATION T12P2 RHS ELEVATION

1 386.12 390.65 5.37 38,535.50 - -


Sl no Item No Description of Item
Supply and placement of welded wire mesh of sizes 150x150x6, 100x100x6 or any other size as directed by Engineer as reinforcement of sprayed concrete for tunnel lining works
as shown
on design drawings, specifications or as directed by Engineer. Steel grade minimum Fe500. This item also includes:
- Fixing elements and materials
- cutting, bending and placement
8 B108 - all auxiliary materials and works necessary
Measurement and payment shall be per square meter for each layer installed and instructed, measured along Payment Line (see specifications). Overlapping as mentioned in
technical specifications is mandatory but shall not be paid
extra.

1 386.05 393.01 8.77 7.07 38,539.32 3.82 27.01 79.94

1 385.94 392.10 9.20 8.99 38,545.52 6.20 55.71 164.89

1 386.04 391.37 7.29 8.25 38,549.02 3.50 28.86 85.42

386.58 388.67 3.13 5.21 38,554.67 5.65 29.44 87.13


1

TOTAL WEIGHT IN Kg= 13,016.03

TOTAL WEIGHT IN MT= 13.02

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 66.52 MT
Total Quantity Paid Up to Previous RA Bill 53.50 MT
Quantity for This RA Bill 13.02 MT

CS DHORAJIA JV CS DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Sl no Item No Description of Item

Supply, fabrication and erection of steel rib and all accessories including all lead, lift, wastage,storing,drilling holes, fixing in phases etc. and
installation of accessories for joining the steel rib segments as per approved workshop drawings of contractor & specifications or as directed by
9 B109 Engineer.The rate shall include costs of all materials, labour, equipment,welding, etc
for the complete job including additional cost for enlargement
of top heading footing.

ATSS NO TM Item No Unit Weight Quantity in Kg RIB SHAPE/NO Remarks

T12P2 RESS no-2-07/08/2021


ISMB 250 2 639.09 1,278.18 Incremental RIB no 1
ISMB 250 1 644.24 644.24 Incremental RIB no 2
ISMB 250 1 643.86 643.86 Incremental RIB no 3
Heading Portion T12P2 Weight
ISMB 250 1 654.23 654.23 Incremental RIB no 5 please refer Annex-1
ISMB 250 3 664.83 1,994.49 Incremental RIB no 7
ISMB 250 1 669.25 669.25 Incremental RIB no 9
ISMB 250 5 683.23 3,416.15 Incremental RIB no 11
T13P2 RESS no-3-19/09/2021
ISMB 250 1 1,117.01 1,117.01 Incremental RIB no 1
ISMB 250 1 1,037.79 1,037.79 Incremental RIB no 3
ISMB 250 1 1,051.62 1,051.62 Incremental RIB no 5 T13P2
ISMB 250 1 1,065.71 1,065.71 Incremental RIB no 7
ISMB 250 2 1,079.20 2,158.40 Incremental RIB no 9
Periphery
Length
Width Thickness Unit weight

Steel
Lagging 12.4 11.40 0.00315 7850.00 3,495.48 T12P2
3.15

TOTAL IN Kg= 19,226.41


TOTAL IN MT= 19.23

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 139.48
Total Quantity Paid Up to Previous RA Bill 120.25
Quantity for This RA Bill 19.23

CS DHORAJIA JV CS DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER

Page 78 of 151
Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as shown on design drawings, in technical
Sl no Item No specifications and directed by the Engineer. These items include: Description of Item
- sprayed concrete of grade M25 according to Indian Standard
- all concrete additives
- wastage of sprayed concrete
1 B201
- rebound
- application of shotcrete in multiple layers
- all auxiliary materials and works
1_1 B 2011 Measurement and payment
50 mm thick shotcrete lining shall be for the theoretical area or volume as shown on the design drawings in square metres/ cubic meters, measured along
in tunnel
Payment-Line (see specifications).
TUNNEL FACE AREA AS PER QUANTITY
DESCRIPTION UNIT CHAINAGE ATSS NO REMARKS
METER PAYLINE (Sqm)

PORTAL T12P1 FACE SEALING


1 Shotcrete 50mm Thk sqm 37,109.00 18.00 T12P1/18 61.89 61.89
2 Shotcrete 50mm Thk sqm 37,110.00 19.00 T12P1/19 63.59 63.59
3 Shotcrete 50mm Thk sqm 37,111.00 20.00 T12P1/20 65.77 65.77
4 Shotcrete 50mm Thk sqm 37,112.00 21.00 T12P1/21 66.57 66.57
5 Shotcrete 50mm Thk sqm 37,113.00 22.00 T12P1/22 65.77 65.77
6 Shotcrete 50mm Thk sqm 37,114.00 23.00 T12P1/23 67.74 67.74
7 Shotcrete 50mm Thk sqm 37,115.00 24.00 T12P1/24 69.69 69.69
8 Shotcrete 50mm Thk sqm 37,116.00 25.00 T12P1/25 69.69 69.69
9 Shotcrete 50mm Thk sqm 37,117.00 26.00 T12P1/26 61.89 61.89
10 Shotcrete 50mm Thk sqm 37,118.00 27.00 T12P1/27 63.59 63.59
11 Shotcrete 50mm Thk sqm 37,119.00 28.00 T12P1/28 65.77 65.77
12 Shotcrete 50mm Thk sqm 37,120.00 29.00 T12P1/29 67.74 67.74
13 Shotcrete 50mm Thk sqm 37,121.00 30.00 T12P1/30 69.69 69.69
14 Shotcrete 50mm Thk sqm 37,122.00 31.00 T12P1/31 61.89 61.89
15 Shotcrete 50mm Thk sqm 37,123.00 32.00 T12P1/32 63.59 63.59
16 Shotcrete 50mm Thk sqm 37,124.00 33.00 T12P1/33 65.77 65.77
17 Shotcrete 50mm Thk sqm 37,125.00 34.00 T12P1/34 67.74 67.74
18 Shotcrete 50mm Thk sqm 37,126.00 35.00 T12P1/35 69.69 69.69
19 Shotcrete 50mm Thk sqm 37,127.00 36.00 T12P1/36 61.89 61.89
20 Shotcrete 50mm Thk sqm 37,128.00 37.00 T12P1/37 63.59 63.59 1313.54
TOTAL= 1313.540

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 2,258.93
Total Quantity Paid Up to Previous RA Bill 945.39
Quantity for This RA Bill 1,313.54

CS DHORAJIA JV CS DHORAJIA JV DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Sl no Item No Description of Item

Supply, fabrication and erection of steel rib and all accessories including all lead, lift, wastage,storing,drilling holes, fixing in phases etc. and
installation of accessories for joining the steel rib segments as per approved workshop drawings of contractor & specifications or as directed by
9 B109 Engineer.The rate shall include costs of all materials, labour, equipment,welding, etc
for the complete job including additional cost for enlargement
of top heading footing.

ATSS NO ROUND NO Item No Unit Weight Quantity in Kg RIB SHAPE/NO Remarks

T12 P1 Bridge
Total weight
Sl no Item No length Total Length Unit weight Remarks
in Kg
1 ISMB 400X140 5 12.00 60.00 61.50 3,690.00 Spacing @1000mm C/C
2 ISMC 150X75 61 6.00 366.00 16.80 6,149.00 Spacing @250mm C/C
a. Sq hollow section
3 18 1.20 21.60 4.07 88.00 Vertical Post
49.5X49.5XX2.9
b. Sq hollow section
4 12.60 50.40 4.07 205.00 Horizontal Railing
49.5X49.5XX2.9
4 Base Plate 10 Sqm= 0.200 78.50 157.00 10mm Base Plate
5 Checqerd plate 1 Sqm= 72.00 62.80 4,521.60 8mm checqured plate thick
6 Bracings ISA 50x50x6
a. Vertical 48 0.38 18.34 4.50 82.51 ISA 50x50x6
b. ties 48 1.00 48.00 4.50 216.00 ISA 50x50x6
-12,486.02 Paid In RA 3 Bridge T12P1
TOTAL IN Kg= 2,623.09 A
TOTAL A IN Kg= 2,623.09
TOTAL A IN MT= 2.62
Detail of Certified Quantity by IRCON
Total Up to date quantity Executed 90.23 MT
Total Quantity Paid Up to Previous RA Bill 87.61 MT
Quantity for This RA Bill 2.62 MT

CS DHORAJIA JV CS DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER

Page 80 of 151
Supply, drilling and installation of steel micropiles of dia upto 160 mm in vertical position or at an
inclination for all kinds of soil/rock class at any depth and as per approved drawings & specifications or
as directed by Engineer. The works include: drilling D200mm, installation of the pipe and grouting
13 B113 around and inside the pipe up to fulfill the volume drilled no ocupated by the pipe. The rate shall
include all labour, materials, connectors, welding, lead, lift, handling, including grouting with M35 grade
of grout, wastage complete with contractor's own equipment as a complete job as per specifications or
as directed by Engineer-in-Charge.

B113A For Open work

LENGTH QUANTITY
ELEVATION No REMARKS
(meter) (RM)

T-12P2
386.00 RHS 18 8 144
24 25 600
12 24 288

TOTAL= 1032

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 2,004.00
Total Quantity Paid Up to Previous RA Bill 972.00
Quantity for This RA Bill 1,032.00

CS DHORAJIA JV CS DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as shown on design drawings, in technical
Sl no Item No specifications and directed by the Engineer. These items include: Description of Item
- sprayed concrete of grade M25 according to Indian Standard
- all concrete additives
- wastage of sprayed concrete
1 B201
- rebound
- application of shotcrete in multiple layers
- all auxiliary materials and works
1_1 B 2011 Measurement and payment
50 mm thick shotcrete lining shall be for the theoretical area or volume as shown on the design drawings in square metres/ cubic meters, measured along
in tunnel
Payment-Line (see specifications).
TUNNEL FACE AREA AS PER QUANTITY
DESCRIPTION UNIT CHAINAGE ATSS NO REMARKS
METER PAYLINE (Sqm)

PORTAL T12P1 FACE SEALING RESS no-5-23/09/2021


1 Shotcrete 50mm Thk sqm 37,374.00 283.00 T12P1/200 56.58 56.58
2 Shotcrete 50mm Thk sqm 37,375.50 284.50 T12P1/201
3 Shotcrete 50mm Thk sqm 37,377.00 286.00 T12P1/202 56.58 56.58
4 Shotcrete 50mm Thk sqm 37,378.50 287.50 T12P1/203
5 Shotcrete 50mm Thk sqm 37,380.00 289.00 T12P1/204 56.58 56.58
6 Shotcrete 50mm Thk sqm 37,381.50 290.50 T12P1/205
7 Shotcrete 50mm Thk sqm 37,383.00 292.00 T12P1/206 60.55 60.55 RESS no-7-6/11/2021
8 Shotcrete 50mm Thk sqm 37,384.50 293.50 T12P1/207 60.55 60.55
9 Shotcrete 50mm Thk sqm 37,386.00 295.00 T12P1/208 60.55 60.55
10 Shotcrete 50mm Thk sqm 37,387.50 296.50 T12P1/209 60.55 60.55
11 Shotcrete 50mm Thk sqm 37,389.00 298.00 T12P1/210 60.55 60.55
12 Shotcrete 50mm Thk sqm 37,390.50 299.50 T12P1/211 60.55 60.55
13 Shotcrete 50mm Thk sqm 37,392.00 301.00 T12P1/212 60.55 60.55
14 Shotcrete 50mm Thk sqm 37,393.50 302.50 T12P1/213 60.55 60.55
15 Shotcrete 50mm Thk sqm 37,395.00 304.00 T12P1/214 60.55 60.55
16 Shotcrete 50mm Thk sqm 37,396.50 305.50 T12P1/215 60.55 60.55
17 Shotcrete 50mm Thk sqm 37,398.00 307.00 T12P1/216 60.55 60.55
18 Shotcrete 50mm Thk sqm 37,399.50 308.50 T12P1/217 56.58 56.58 RESS no-8-1511/2021
19 Shotcrete 50mm Thk sqm 37,401.00 310.00 T12P1/218
20 Shotcrete 50mm Thk sqm 37,402.50 311.50 T12P1/219 56.58 56.58
21 Shotcrete 50mm Thk sqm 37,404.00 313.00 T12P1/220
22 Shotcrete 50mm Thk sqm 37,405.50 314.50 T12P1/221 56.58 56.58
23 Shotcrete 50mm Thk sqm 37,407.00 316.00 T12P1/222
24 Shotcrete 50mm Thk sqm 37,408.50 317.50 T12P1/223 60.55 60.55 RESS no-09-18/11/2021
25 Shotcrete 50mm Thk sqm 37,410.00 319.00 T12P1/224 60.55 60.55
26 Shotcrete 50mm Thk sqm 37,411.50 320.50 T12P1/225 60.55 60.55
27 Shotcrete 50mm Thk sqm 37,413.00 322.00 T12P1/226 60.55 60.55
28 Shotcrete 50mm Thk sqm 37,414.50 323.50 T12P1/227 60.55 60.55
29 Shotcrete 50mm Thk sqm 37,416.00 325.00 T12P1/228 60.55 60.55
30 Shotcrete 50mm Thk sqm 37,417.50 326.50 T12P1/229 60.55 60.55
31 Shotcrete 50mm Thk sqm 37,419.00 328.00 T12P1/230 60.55 60.55
32 Shotcrete 50mm Thk sqm 37,420.50 329.50 T12P1/231 60.55 60.55
33 Shotcrete 50mm Thk sqm 37,422.00 331.00 T12P1/232 60.55 60.55
34 Shotcrete 50mm Thk sqm 37,423.50 332.50 T12P1/233 60.55 60.55
35 Shotcrete 50mm Thk sqm 37,425.00 334.00 T12P1/234 60.55 60.55
36 Shotcrete 50mm Thk sqm 37,426.50 335.50 T12P1/235 60.55 60.55
37 Shotcrete 50mm Thk sqm 37,428.00 337.00 T12P1/236 60.55 60.55
38 Shotcrete 50mm Thk sqm 37,429.50 338.50 T12P1/237 60.55 60.55
39 Shotcrete 50mm Thk sqm 37,431.00 340.00 T12P1/238 60.55 60.55
40 Shotcrete 50mm Thk sqm 37,432.50 341.50 T12P1/239 60.55 60.55
41 Shotcrete 50mm Thk sqm 37,434.00 343.00 T12P1/240 60.55 60.55
42 Shotcrete 50mm Thk sqm 37,435.50 344.50 T12P1/241 60.55 60.55
43 Shotcrete 50mm Thk sqm 37,437.00 346.00 T12P1/242 60.55 60.55
44 Shotcrete 50mm Thk sqm 37,438.50 347.50 T12P1/243 60.55 60.55
45 Shotcrete 50mm Thk sqm 37,440.00 349.00 T12P1/244 60.55 60.55
46 Shotcrete 50mm Thk sqm 37,441.50 350.50 T12P1/245 60.55 60.55
47 Shotcrete 50mm Thk sqm 37,443.00 352.00 T12P1/246 60.55 60.55
48 Shotcrete 50mm Thk sqm 37,444.50 353.50 T12P1/247 60.55 60.55
49 Shotcrete 50mm Thk sqm 37,446.00 355.00 T12P1/248 60.55 60.55
50 Shotcrete 50mm Thk sqm 37,447.50 356.50 T12P1/249 60.55 60.55
51 Shotcrete 50mm Thk sqm 37,449.00 358.00 T12P1/250 60.55 60.55
Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as shown on design drawings, in technical
Sl no Item No specifications and directed by the Engineer. These items include: Description of Item
- sprayed concrete of grade M25 according to Indian Standard
- all concrete additives
- wastage of sprayed concrete
1 B201
- rebound
- application of shotcrete in multiple layers
- all auxiliary materials and works
1_1 B 2011 Measurement and payment
50 mm thick shotcrete lining shall be for the theoretical area or volume as shown on the design drawings in square metres/ cubic meters, measured along
in tunnel
52 Payment-Line
Shotcrete 50mm Thk (see specifications).
sqm 37,450.50 359.50 T12P1/251 60.55 60.55
53 Shotcrete 50mm Thk sqm 37,452.00 361.00 T12P1/252 60.55 60.55
54 Shotcrete 50mm Thk sqm 37,453.50 362.50 T12P1/253 60.55 60.55
55 Shotcrete 50mm Thk sqm 37,455.00 364.00 T12P1/254 60.55 60.55
56 Shotcrete 50mm Thk sqm 37,456.50 365.50 T12P1/255 60.55 60.55
57 Shotcrete 50mm Thk sqm 37,458.00 367.00 T12P1/256 60.55 60.55

3064.23
PORTAL T13P1 FACE SEALING RESS no-4-18/10/2021
1 Shotcrete 50mm Thk sqm 38,933.50 148.00 T13P1/100 60.55 60.55
2 Shotcrete 50mm Thk sqm 38,935.00 149.50 T13P1/101 60.55 60.55
3 Shotcrete 50mm Thk sqm 38,936.50 151.00 T13P1/102 60.55 60.55
4 Shotcrete 50mm Thk sqm 38,938.00 152.50 T13P1/103 60.55 60.55
5 Shotcrete 50mm Thk sqm 38,939.50 154.00 T13P1/104 60.55 60.55
6 Shotcrete 50mm Thk sqm 38,941.00 155.50 T13P1/105 60.55 60.55
7 Shotcrete 50mm Thk sqm 38,942.50 157.00 T13P1/106 60.55 60.55
8 Shotcrete 50mm Thk sqm 38,944.00 158.50 T13P1/107 60.55 60.55
9 Shotcrete 50mm Thk sqm 38,945.50 160.00 T13P1/108 60.55 60.55
10 Shotcrete 50mm Thk sqm 38,947.00 161.50 T13P1/109 60.55 60.55
11 Shotcrete 50mm Thk sqm 38,948.50 163.00 T13P1/110 60.55 60.55
12 Shotcrete 50mm Thk sqm 38,950.00 164.50 T13P1/111 60.55 60.55
13 Shotcrete 50mm Thk sqm 38,951.50 166.00 T13P1/112 60.55 60.55
14 Shotcrete 50mm Thk sqm 38,953.00 167.50 T13P1/113 60.55 60.55
15 Shotcrete 50mm Thk sqm 38,954.50 169.00 T13P1/114 60.55 60.55
16 Shotcrete 50mm Thk sqm 38,955.50 170.00 T13P1/115 60.55 60.55
17 Shotcrete 50mm Thk sqm 38,956.50 171.00 T13P1/116 60.55 60.55
18 Shotcrete 50mm Thk sqm 38,957.85 172.35 T13P1/117 60.55 60.55
19 Shotcrete 50mm Thk sqm 38,959.20 173.70 T13P1/118 60.55 60.55
20 Shotcrete 50mm Thk sqm 38,960.40 174.90 T13P1/119 60.55 60.55
21 Shotcrete 50mm Thk sqm 38,961.60 176.10 T13P1/120 60.55 60.55
1271.55
PORTAL T12P2 FACE SEALING RESS no-2-07/08/2021
1 Shotcrete 50mm Thk sqm 38,477.70 16.50 T12P1/27 38.77 38.77
2 Shotcrete 50mm Thk sqm 38,477.00 17.20 T12P1/28 41.85 41.85
3 Shotcrete 50mm Thk sqm 38,476.30 17.90 T12P1/29 41.85 41.85
4 Shotcrete 50mm Thk sqm 38,475.60 18.60 T12P1/30 41.85 41.85
5 Shotcrete 50mm Thk sqm 38,474.90 19.30 T12P1/31 41.85 41.85
6 Shotcrete 50mm Thk sqm 38,474.20 20.00 T12P1/32 34.77 34.77
7 Shotcrete 50mm Thk sqm 38,473.40 20.80 T12P1/33 35.65 35.65
8 Shotcrete 50mm Thk sqm 38,472.60 21.60 T12P1/34 36.01 36.01
9 Shotcrete 50mm Thk sqm 38,471.80 22.40 T12P1/35 37.58 37.58
10 Shotcrete 50mm Thk sqm 38,471.00 23.20 T12P1/36 38.77 38.77
11 Shotcrete 50mm Thk sqm 38,470.20 24.00 T12P1/37 38.77 38.77
12 Shotcrete 50mm Thk sqm 38,469.40 24.80 T12P1/38 40.43 40.43
13 Shotcrete 50mm Thk sqm 38,468.60 25.60 T12P1/39 41.85 41.85
510.00
PORTAL T13P2 FACE SEALING RESS no-4-09/11/2021
1 Shotcrete 50mm Thk sqm 41,330.00 10.00 T13P1/11 62.21 62.21
2 Shotcrete 50mm Thk sqm 41,329.00 11.00 T13P1/12 64.12 64.12
3 Shotcrete 50mm Thk sqm 41,328.00 12.00 T13P1/13 66.10 66.10
4 Shotcrete 50mm Thk sqm 41,327.00 13.00 T13P1/14 67.74 67.74
5 Shotcrete 50mm Thk sqm 41,325.50 14.50 T13P1/15 70.03 70.03
6 Shotcrete 50mm Thk sqm 41,324.00 16.00 T13P1/16 70.03 70.03
7 Shotcrete 50mm Thk sqm 41,322.50 17.50 T13P1/17 62.32 62.32
8 Shotcrete 50mm Thk sqm 41,321.00 19.00 T13P1/18 62.32 62.32
9 Shotcrete 50mm Thk sqm 41,319.50 20.50 T13P1/19 62.32 62.32
10 Shotcrete 50mm Thk sqm 41,318.00 22.00 T13P1/20 62.32 62.32
11 Shotcrete 50mm Thk sqm 41,316.50 23.50 T13P1/21 62.32 62.32
Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as shown on design drawings, in technical
Sl no Item No specifications and directed by the Engineer. These items include: Description of Item
- sprayed concrete of grade M25 according to Indian Standard
- all concrete additives
- wastage of sprayed concrete
1 B201
- rebound
- application of shotcrete in multiple layers
- all auxiliary materials and works
1_1 B 2011 Measurement and payment
50 mm thick shotcrete lining shall be for the theoretical area or volume as shown on the design drawings in square metres/ cubic meters, measured along
in tunnel
12 Payment-Line
Shotcrete 50mm Thk (see specifications).
sqm 41,315.00 25.00 T13P1/22 62.32 62.32
13 Shotcrete 50mm Thk sqm 41,313.50 26.50 T13P1/23 62.32 62.32
14 Shotcrete 50mm Thk sqm 41,312.00 28.00 T13P1/24 62.32 62.32
15 Shotcrete 50mm Thk sqm 41,310.50 29.50 T13P1/25 62.32 62.32
16 Shotcrete 50mm Thk sqm 41,309.00 31.00 T13P1/26 62.32 62.32
17 Shotcrete 50mm Thk sqm 41,307.50 32.50 T13P1/27 62.32 62.32
1085.75
TOTAL= 5931.530

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 24,250.05
Total Quantity Paid Up to Previous RA Bill 18,318.52
Quantity for This RA Bill 5,931.53

CS DHORAJIA JV CS DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Sl no Item No Description of Item

Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as shown on design drawings, in technical specifications
and directed by the Engineer. These items include:
- sprayed concrete of grade M25 according to Indian Standard
- all concrete additives
- wastage of sprayed concrete
1 B201
- rebound
- application of shotcrete in multiple layers
- all auxiliary materials and works
Measurement and payment shall be for the theoretical area or volume as shown on the design drawings in square metres/ cubic meters, measured along Payment-Line
(see specifications).

1_5 B 2015 250 mm thick shotcrete lining in tunnel

TUNNEL QUANTITY
DESCRIPTION ATSS NO ROUND UNIT CHAINAGE Length Perimeter Area REMARKS
METER (Sqm)
NO

PORTAL T12P1
1 Shotcrete 250mm Thk T12P1/036 37 sqm 37,128.80 37.80 21.69 0.00 0.00
2 Shotcrete 250mm Thk T12P1/037 38 sqm 37,130.30 39.30 1.50 21.19 31.78 31.78
3 Shotcrete 250mm Thk T12P1/038 39 sqm 37,131.80 40.80 1.50 21.19 31.78 31.78
4 Shotcrete 250mm Thk T12P1/039 40 sqm 37,133.30 42.30 1.50 21.19 31.78 31.78
5 Shotcrete 250mm Thk T12P1/040 41 sqm 37,134.80 43.80 1.50 21.19 31.78 31.78
6 Shotcrete 250mm Thk T12P1/041 42 sqm 37,136.30 45.30 1.50 21.19 31.78 31.78
7 Shotcrete 250mm Thk T12P1/042 43 sqm 37,137.80 46.80 1.50 21.19 31.78 31.78
8 Shotcrete 250mm Thk T12P1/043 44 sqm 37,139.50 48.50 1.70 21.19 36.02 36.02
9 Shotcrete 250mm Thk T12P1/044 45 sqm 37,141.00 50.00 1.50 21.19 31.78 31.78
10 Shotcrete 250mm Thk T12P1/045 46 sqm 37,142.50 51.50 1.50 21.19 31.78 31.78
11 Shotcrete 250mm Thk T12P1/046 47 sqm 37,144.00 53.00 1.50 21.19 31.78 31.78
12 Shotcrete 250mm Thk T12P1/047 48 sqm 37,145.50 54.50 1.50 21.19 31.78 31.78
13 Shotcrete 250mm Thk T12P1/048 49 sqm 37,147.00 56.00 1.50 21.19 31.78 31.78
14 Shotcrete 250mm Thk T12P1/049 50 sqm 37,148.50 57.50 1.50 21.19 31.78 31.78
15 Shotcrete 250mm Thk T12P1/050 51 sqm 37,150.00 59.00 1.50 21.19 31.78 31.78
16 Shotcrete 250mm Thk T12P1/051 52 sqm 37,151.50 60.50 1.50 21.19 31.78 31.78
17 Shotcrete 250mm Thk T12P1/052 53 sqm 37,153.00 62.00 1.50 21.19 31.78 31.78
18 Shotcrete 250mm Thk T12P1/053 54 sqm 37,154.50 63.50 1.50 21.19 31.79 31.79

TOTAL= 544.510

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 544.51
Total Quantity Paid Up to Previous RA Bill
Quantity for This RA Bill 544.51

CS DHORAJIA JV CS DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Sl no Item No Description of Item

Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as shown on design drawings, in technical specifications
and directed by the Engineer. These items include:
- sprayed concrete of grade M25 according to Indian Standard
- all concrete additives
- wastage of sprayed concrete
1 B201
- rebound
- application of shotcrete in multiple layers
- all auxiliary materials and works
Measurement and payment shall be for the theoretical area or volume as shown on the design drawings in square metres/ cubic meters, measured along Payment-Line
(see specifications).

1_6 B 2016 300 mm thick shotcrete lining in tunnel

TUNNEL QUANTITY
DESCRIPTION ATSS NO ROUND UNIT CHAINAGE Length Perimeter Area REMARKS
METER (Sqm)
NO

PORTAL T12P1
1 Shotcrete 300mm Thk T12P1/18 18 sqm 37,109.00 18.00 1.00 22.33 22.33 22.33
2 Shotcrete 300mm Thk T12P1/19 19 sqm 37,110.00 19.00 1.00 21.70 21.70 21.70
3 Shotcrete 300mm Thk T12P1/20 20 sqm 37,111.00 20.00 1.00 22.04 22.04 22.04
4 Shotcrete 300mm Thk T12P1/21 21 sqm 37,112.00 21.00 1.00 22.04 22.04 22.04
5 Shotcrete 300mm Thk T12P1/22 22 sqm 37,113.00 22.00 1.00 22.04 22.04 22.04
6 Shotcrete 300mm Thk T12P1/23 23 sqm 37,114.00 23.00 1.00 22.32 22.32 22.32
7 Shotcrete 300mm Thk T12P1/24 24 sqm 37,115.00 24.00 1.00 22.58 22.58 22.58
8 Shotcrete 300mm Thk T12P1/25 25 sqm 37,116.00 25.00 1.00 22.58 22.58 22.58
9 Shotcrete 300mm Thk T12P1/26 26 sqm 37,117.00 26.00 1.00 22.33 22.33 22.33
10 Shotcrete 300mm Thk T12P1/27 27 sqm 37,118.00 27.00 1.00 21.70 21.70 21.70
11 Shotcrete 300mm Thk T12P1/28 28 sqm 37,119.00 28.00 1.00 22.04 22.04 22.04
12 Shotcrete 300mm Thk T12P1/29 29 sqm 37,120.00 29.00 1.00 22.32 22.32 22.32
13 Shotcrete 300mm Thk T12P1/30 30 sqm 37,121.00 30.00 1.00 22.58 22.58 22.58
14 Shotcrete 300mm Thk T12P1/31 31 sqm 37,122.00 31.00 1.00 22.33 22.33 22.33
15 Shotcrete 300mm Thk T12P1/32 32 sqm 37,123.00 32.00 1.00 21.70 21.70 21.70
16 Shotcrete 300mm Thk T12P1/33 33 sqm 37,124.00 33.00 1.00 22.04 22.04 22.04
17 Shotcrete 300mm Thk T12P1/34 34 sqm 37,125.00 34.00 1.00 22.32 22.32 22.32
18 Shotcrete 300mm Thk T12P1/35 35 sqm 37,126.00 35.00 1.00 22.58 22.58 22.58
19 Shotcrete 300mm Thk T12P1/36 36 sqm 37,127.00 36.00 1.00 22.33 22.33 22.33
20 Shotcrete 300mm Thk T12P1/37 37 sqm 37,128.00 37.00 1.00 21.07 21.07 21.07
TOTAL= 442.970

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 748.11
Total Quantity Paid Up to Previous RA Bill 305.14
Quantity for This RA Bill 442.97

CS DHORAJIA JV CS DHORAJIA JV DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Sl no Item No Description of Item

Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as shown on design drawings, in technical specifications and directed by the Engineer.
These items include:
- sprayed concrete of grade M25 according to Indian Standard
- all concrete additives
1 B201 - wastage of sprayed concrete
- rebound
- application of shotcrete in multiple layers
- all auxiliary materials and works
Measurement and payment shall be for the theoretical area or volume as shown on the design drawings in square metres/ cubic meters, measured along Payment-Line (see specifications).

1_3 B 2013 150 mm thick shotcrete lining in tunnel

ROUND QUANTITY
DESCRIPTION ATSS NO UNIT CHAINAGE TUNNEL METER Length Perimeter Area REMARKS
NO (Sqm)

PORTAL T12P1 RESS no5-23/09/2021


1 Shotcrete 150mm Thk T12P1/200 203 sqm 37,372.50 37,374.00 281.50 283.00 1.50 20.48 30.72 30.72 SFRS

2 Shotcrete 150mm Thk T12P1/201 204 sqm 37,374.00 37,375.50 283.00 284.50 1.50 20.48 30.72 30.72 SFRS

3 Shotcrete 150mm Thk T12P1/202 205 sqm 37,375.50 37,377.00 284.50 286.00 1.50 20.48 30.72 30.72 SFRS

4 Shotcrete 150mm Thk T12P1/203 206 sqm 37,377.00 37,378.50 286.00 287.50 1.50 20.48 30.72 30.72 SFRS

5 Shotcrete 150mm Thk T12P1/204 207 sqm 37,378.50 37,380.00 287.50 289.00 1.50 20.48 30.72 30.72 SFRS

6 Shotcrete 150mm Thk T12P1/205 208 sqm 37,380.00 37,381.50 289.00 290.50 1.50 20.48 30.72 30.72 SFRS

RESS no-8-15/11/2021

7 Shotcrete 150mm Thk T12P1/217 211 sqm 37,398.00 37,399.50 307.00 308.50 1.50 20.48 30.72 30.72 SFRS

8 Shotcrete 150mm Thk T12P1/218 212 sqm 37,399.50 37,401.00 308.50 310.00 1.50 20.48 30.72 30.72 SFRS

9 Shotcrete 150mm Thk T12P1/219 213 sqm 37,401.00 37,402.50 310.00 311.50 1.50 20.48 30.72 30.72 SFRS

10 Shotcrete 150mm Thk T12P1/220 214 sqm 37,402.50 37,404.00 311.50 313.00 1.50 20.48 30.72 30.72 SFRS

11 Shotcrete 150mm Thk T12P1/221 215 sqm 37,404.00 37,405.50 313.00 314.50 1.50 20.48 30.72 30.72 SFRS

12 Shotcrete 150mm Thk T12P1/222 216 sqm 37,405.50 37,407.00 314.50 316.00 1.50 20.48 30.72 30.72 SFRS

PORTAL T12P1 2nd TROLLY REFUGE NITCH RESS no-6-12/10/20221


Shotcrete 150mm Thk 1 4.07 5.07 1.00 14.58 14.58 14.58

Shotcrete 150mm Thk 2 5.07 6.07 1.00 14.58 14.58 14.58

Shotcrete 150mm Thk 3 6.07 7.07 1.00 14.58 14.58 14.58

Shotcrete 150mm Thk 4 7.07 8.12 1.05 14.58 15.35 15.35

14.66 14.66
Face
TOTAL= 442.390

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 3,006.49 Sqm
Total Quantity Paid Up to Previous RA Bill 2,564.10 Sqm
Quantity for This RA Bill 442.39 Sqm

CS DHORAJIA JV CS DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Sl no Item No Description of Item

Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as shown on design drawings, in technical specifications and directed by the Engineer.
These items include:
- sprayed concrete of grade M25 according to Indian Standard
- all concrete additives
1 B201 - wastage of sprayed concrete
- rebound
- application of shotcrete in multiple layers
- all auxiliary materials and works
Measurement and payment shall be for the theoretical area or volume as shown on the design drawings in square metres/ cubic meters, measured along Payment-Line (see specifications).

1_5 B 2015 250 mm thick shotcrete lining in tunnel

ROUND QUANTITY
DESCRIPTION ATSS NO UNIT CHAINAGE TUNNEL METER Length Perimeter Area REMARKS
NO (Sqm)

PORTAL T13P1
1 Shotcrete 250mm Thk T13P1/122 99.00 sqm 38,932.00 38,933.50 146.50 148.00 1.50 21.21 31.82 31.82 RESS no-4-18/10/2021

2 Shotcrete 250mm Thk T13P1/123 100.00 sqm 38,933.50 38,935.00 148.00 149.50 1.50 21.21 31.82 31.82

3 Shotcrete 250mm Thk T13P1/124 101.00 sqm 38,935.00 38,936.50 149.50 151.00 1.50 21.21 31.82 31.82

4 Shotcrete 250mm Thk T13P1/125 102.00 sqm 38,936.50 38,938.00 151.00 152.50 1.50 21.21 31.82 31.82

5 Shotcrete 250mm Thk T13P1/126 103.00 sqm 38,938.00 38,939.50 152.50 154.00 1.50 21.21 31.82 31.82

6 Shotcrete 250mm Thk T13P1/127 104.00 sqm 38,939.50 38,941.00 154.00 155.50 1.50 21.21 31.82 31.82

7 Shotcrete 250mm Thk T13P1/128 105.00 sqm 38,941.00 38,942.50 155.50 157.00 1.50 21.21 31.82 31.82

8 Shotcrete 250mm Thk T13P1/129 106.00 sqm 38,942.50 38,944.00 157.00 158.50 1.50 21.21 31.82 31.82

9 Shotcrete 250mm Thk T13P1/130 107.00 sqm 38,944.00 38,945.50 158.50 160.00 1.50 21.21 31.82 31.82

10 Shotcrete 250mm Thk T13P1/131 108.00 sqm 38,945.50 38,947.00 160.00 161.50 1.50 21.21 31.82 31.82

11 Shotcrete 250mm Thk T13P1/132 109.00 sqm 38,947.00 38,948.50 161.50 163.00 1.50 21.21 31.82 31.82

12 Shotcrete 250mm Thk T13P1/133 110.00 sqm 38,948.50 38,950.00 163.00 164.50 1.50 21.21 31.82 31.82

13 Shotcrete 250mm Thk T13P1/134 111.00 sqm 38,950.00 38,951.50 164.50 166.00 1.50 21.21 31.82 31.82

14 Shotcrete 250mm Thk T13P1/135 112.00 sqm 38,951.50 38,953.00 166.00 167.50 1.50 21.21 31.82 31.82

15 Shotcrete 250mm Thk T13P1/136 113.00 sqm 38,953.00 38,954.50 167.50 169.00 1.50 21.21 31.82 31.82

16 Shotcrete 250mm Thk T13P1/137 114.00 sqm 38,954.50 38,955.50 169.00 170.00 1.00 21.21 21.21 21.21

17 Shotcrete 250mm Thk T13P1/138 115.00 sqm 38,955.50 38,956.50 170.00 171.00 1.00 21.21 21.21 21.21

18 Shotcrete 250mm Thk T13P1/139 116.00 sqm 38,956.50 38,957.85 171.00 172.35 1.35 21.21 28.63 28.63

19 Shotcrete 250mm Thk T13P1/140 117.00 sqm 38,957.85 38,959.20 172.35 173.70 1.35 21.21 28.63 28.63

20 Shotcrete 250mm Thk T13P1/141 118.00 sqm 38,959.20 38,960.40 173.70 174.90 1.20 21.21 25.45 25.45

21 Shotcrete 250mm Thk T13P1/142 119.00 sqm 38,960.40 38,961.60 174.90 176.10 1.20 21.21 25.45 25.45

22 Shotcrete 250mm Thk T13P1/143 120.00 sqm 38,961.60 38,963.00 176.10 177.50 1.40 21.21 29.70 29.70

23 Shotcrete 250mm Thk T13P1/144 121.00 sqm 38,963.00 38,964.20 177.50 178.70 1.20 21.21 25.45 25.45

24 Shotcrete 250mm Thk T13P1/145 122.00 sqm 38,964.20 38,965.50 178.70 180.00 1.30 21.21 27.57 27.57

25 Shotcrete 250mm Thk T13P1/146 123.00 sqm 38,965.50 38,966.80 180.00 181.30 1.30 21.21 27.57 27.57

26 Shotcrete 250mm Thk T13P1/147 124.00 sqm 38,966.80 38,968.10 181.30 182.60 1.30 21.21 27.57 27.57

27 Shotcrete 250mm Thk T13P1/148 125.00 sqm 38,968.10 38,969.40 182.60 183.90 1.30 21.21 27.57 27.57

28 Shotcrete 250mm Thk T13P1/149 126.00 sqm 38,969.40 38,970.70 183.90 185.20 1.30 21.21 27.57 27.57

29 Shotcrete 250mm Thk T13P1/150 127.00 sqm 38,970.70 38,972.00 185.20 186.50 1.30 21.21 27.57 27.57

30 Shotcrete 250mm Thk T13P1/151 128.00 sqm 38,972.00 38,973.30 186.50 187.80 1.30 21.21 27.57 27.57

31 Shotcrete 250mm Thk T13P1/152 129.00 sqm 38,973.30 38,974.60 187.80 189.10 1.30 21.21 27.57 27.57

32 Shotcrete 250mm Thk T13P1/153 130.00 sqm 38,974.60 38,975.90 189.10 190.40 1.30 21.21 27.57 27.57

33 Shotcrete 250mm Thk T13P1/154 131.00 sqm 38,975.90 38,977.20 190.40 191.70 1.30 21.21 27.57 27.57

34 Shotcrete 250mm Thk T13P1/155 132.00 sqm 38,977.20 38,978.50 191.70 193.00 1.30 21.21 27.57 27.57

PORTAL T12P1 RESS no-7-06/11/2021

1 Shotcrete 250mm Thk T12P1/206 209.00 sqm 37,381.50 37,384.50 290.50 293.50 3.00 21.21 63.63 63.63

2 Shotcrete 250mm Thk T12P1/207 210.00 sqm 37,384.50 37,386.00 293.50 295.00 1.50 21.21 31.82 31.82
Sl no Item No Description of Item

Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as shown on design drawings, in technical specifications and directed by the Engineer.
These items include:
- sprayed concrete of grade M25 according to Indian Standard
- all concrete additives
1 B201 - wastage of sprayed concrete
- rebound
- application of shotcrete in multiple layers
- all auxiliary materials and works
Measurement and payment shall be for the theoretical area or volume as shown on the design drawings in square metres/ cubic meters, measured along Payment-Line (see specifications).

1_5 B 2015 250 mm thick shotcrete lining in tunnel

ROUND QUANTITY
DESCRIPTION ATSS NO UNIT CHAINAGE TUNNEL METER Length Perimeter Area REMARKS
NO (Sqm)

3 Shotcrete 250mm Thk T12P1/208 211.00 sqm 37,386.00 37,387.50 295.00 296.50 1.50 21.21 31.82 31.82

4 Shotcrete 250mm Thk T12P1/209 212.00 sqm 37,387.50 37,389.00 296.50 298.00 1.50 21.21 31.82 31.82

5 Shotcrete 250mm Thk T12P1/210 213.00 sqm 37,389.00 37,390.50 298.00 299.50 1.50 21.21 31.82 31.82

6 Shotcrete 250mm Thk T12P1/211 214.00 sqm 37,390.50 37,392.00 299.50 301.00 1.50 21.21 31.82 31.82

7 Shotcrete 250mm Thk T12P1/212 215.00 sqm 37,392.00 37,393.50 301.00 302.50 1.50 21.21 31.82 31.82

8 Shotcrete 250mm Thk T12P1/213 216.00 sqm 37,393.50 37,395.00 302.50 304.00 1.50 21.21 31.82 31.82

9 Shotcrete 250mm Thk T12P1/214 217.00 sqm 37,395.00 37,396.50 304.00 305.50 1.50 21.21 31.82 31.82

10 Shotcrete 250mm Thk T12P1/215 218.00 sqm 37,396.50 37,398.00 305.50 307.00 1.50 21.21 31.82 31.82

- RESS no-09-18/11/2021

1 Shotcrete 250mm Thk T12P1/223 226.00 sqm 37,407.00 37,408.50 317.50 319.00 1.50 21.21 31.82 31.82

2 Shotcrete 250mm Thk T12P1/224 227.00 sqm 37,408.50 37,410.00 319.00 320.50 1.50 21.21 31.82 31.82

3 Shotcrete 250mm Thk T12P1/225 228.00 sqm 37,410.00 37,411.50 320.50 322.00 1.50 21.21 31.82 31.82

4 Shotcrete 250mm Thk T12P1/226 229.00 sqm 37,411.50 37,413.00 322.00 323.50 1.50 21.21 31.82 31.82

5 Shotcrete 250mm Thk T12P1/227 230.00 sqm 37,413.00 37,414.50 323.50 325.00 1.50 21.21 31.82 31.82

6 Shotcrete 250mm Thk T12P1/228 231.00 sqm 37,414.50 37,416.00 325.00 326.50 1.50 21.21 31.82 31.82

7 Shotcrete 250mm Thk T12P1/229 232.00 sqm 37,416.00 37,417.50 326.50 328.00 1.50 21.21 31.82 31.82

8 Shotcrete 250mm Thk T12P1/230 233.00 sqm 37,417.50 37,419.00 328.00 329.50 1.50 21.21 31.82 31.82

9 Shotcrete 250mm Thk T12P1/231 234.00 sqm 37,419.00 37,420.50 329.50 331.00 1.50 21.21 31.82 31.82

10 Shotcrete 250mm Thk T12P1/232 235.00 sqm 37,420.50 37,422.00 331.00 332.50 1.50 21.21 31.82 31.82

11 Shotcrete 250mm Thk T12P1/233 236.00 sqm 37,422.00 37,423.50 332.50 334.00 1.50 21.21 31.82 31.82

12 Shotcrete 250mm Thk T12P1/234 237.00 sqm 37,423.50 37,425.00 334.00 335.50 1.50 21.21 31.82 31.82

13 Shotcrete 250mm Thk T12P1/235 238.00 sqm 37,425.00 37,426.50 335.50 337.00 1.50 21.21 31.82 31.82

14 Shotcrete 250mm Thk T12P1/236 239.00 sqm 37,426.50 37,428.00 337.00 338.50 1.50 21.21 31.82 31.82

15 Shotcrete 250mm Thk T12P1/237 240.00 sqm 37,428.00 37,429.50 338.50 340.00 1.50 21.21 31.82 31.82

16 Shotcrete 250mm Thk T12P1/238 241.00 sqm 37,429.50 37,431.00 340.00 341.50 1.50 21.21 31.82 31.82

17 Shotcrete 250mm Thk T12P1/239 242.00 sqm 37,431.00 37,432.50 341.50 343.00 1.50 21.21 31.82 31.82

18 Shotcrete 250mm Thk T12P1/240 243.00 sqm 37,432.50 37,434.00 343.00 344.50 1.50 21.21 31.82 31.82

19 Shotcrete 250mm Thk T12P1/241 244.00 sqm 37,434.00 37,435.50 344.50 346.00 1.50 21.21 31.82 31.82

20 Shotcrete 250mm Thk T12P1/242 245.00 sqm 37,435.50 37,437.00 346.00 347.50 1.50 21.21 31.82 31.82

21 Shotcrete 250mm Thk T12P1/243 246.00 sqm 37,437.00 37,438.50 347.50 349.00 1.50 21.21 31.82 31.82

22 Shotcrete 250mm Thk T12P1/244 247.00 sqm 37,438.50 37,440.00 349.00 350.50 1.50 21.21 31.82 31.82

23 Shotcrete 250mm Thk T12P1/245 248.00 sqm 37,440.00 37,441.50 350.50 352.00 1.50 21.21 31.82 31.82

24 Shotcrete 250mm Thk T12P1/246 249.00 sqm 37,441.50 37,443.00 352.00 353.50 1.50 21.21 31.82 31.82

25 Shotcrete 250mm Thk T12P1/247 250.00 sqm 37,443.00 37,444.50 353.50 355.00 1.50 21.21 31.82 31.82

26 Shotcrete 250mm Thk T12P1/248 251.00 sqm 37,444.50 37,446.00 355.00 356.50 1.50 21.21 31.82 31.82

27 Shotcrete 250mm Thk T12P1/249 252.00 sqm 37,446.00 37,447.50 356.50 358.00 1.50 21.21 31.82 31.82

28 Shotcrete 250mm Thk T12P1/250 253.00 sqm 37,447.50 37,449.00 358.00 359.50 1.50 21.21 31.82 31.82

29 Shotcrete 250mm Thk T12P1/251 254.00 sqm 37,449.00 37,450.50 359.50 361.00 1.50 21.21 31.82 31.82

30 Shotcrete 250mm Thk T12P1/252 255.00 sqm 37,450.50 37,452.00 361.00 362.50 1.50 21.21 31.82 31.82
Sl no Item No Description of Item

Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as shown on design drawings, in technical specifications and directed by the Engineer.
These items include:
- sprayed concrete of grade M25 according to Indian Standard
- all concrete additives
1 B201 - wastage of sprayed concrete
- rebound
- application of shotcrete in multiple layers
- all auxiliary materials and works
Measurement and payment shall be for the theoretical area or volume as shown on the design drawings in square metres/ cubic meters, measured along Payment-Line (see specifications).

1_5 B 2015 250 mm thick shotcrete lining in tunnel

ROUND QUANTITY
DESCRIPTION ATSS NO UNIT CHAINAGE TUNNEL METER Length Perimeter Area REMARKS
NO (Sqm)

31 Shotcrete 250mm Thk T12P1/253 256.00 sqm 37,452.00 37,453.50 362.50 364.00 1.50 21.21 31.82 31.82

32 Shotcrete 250mm Thk T12P1/254 257.00 sqm 37,453.50 37,455.00 364.00 365.50 1.50 21.21 31.82 31.82

33 Shotcrete 250mm Thk T12P1/255 258.00 sqm 37,455.00 37,456.50 365.50 367.00 1.50 21.21 31.82 31.82

34 Shotcrete 250mm Thk T12P1/256 259.00 sqm 37,456.50 37,458.00 367.00 368.50 1.50 21.21 31.82 31.82

PORTAL T13P2 RESS no-4-09/11/2021

Shotcrete 250mm Thk T13P2/15 15.00 41,331.00 41,330.00 15.00 16.00 1.00 21.21 21.21
21.211
Shotcrete 250mm Thk T13P2/16 16.00 41,330.00 41,329.00 16.00 17.00 1.00 21.21 21.21
21.211
Shotcrete 250mm Thk T13P2/17 17.00 41,329.00 41,328.00 17.00 18.00 1.00 21.21 21.21
21.211
Shotcrete 250mm Thk T13P2/18 18.00 41,328.00 41,327.00 18.00 19.00 1.00 21.21 21.21
21.211
Shotcrete 250mm Thk T13P2/19 19.00 41,327.00 41,325.50 19.00 20.50 1.50 31.82 31.82
21.211
Shotcrete 250mm Thk T13P2/20 20.00 41,325.50 41,324.00 20.50 22.00 1.50 31.82 31.82
21.211
Shotcrete 250mm Thk T13P2/21 21.00 41,324.00 41,322.50 22.00 23.50 1.50 31.82 31.82
21.211
Shotcrete 250mm Thk T13P2/22 22.00 41,322.50 41,321.00 23.50 25.00 1.50 31.82 31.82
21.211
Shotcrete 250mm Thk T13P2/23 23.00 41,321.00 41,319.50 25.00 26.50 1.50 31.82 31.82
21.211
Shotcrete 250mm Thk T13P2/24 24.00 41,319.50 41,318.00 26.50 28.00 1.50 31.82 31.82
21.211
Shotcrete 250mm Thk T13P2/25 25.00 41,318.00 41,316.50 28.00 29.50 1.50 31.82 31.82
21.211
Shotcrete 250mm Thk T13P2/26 26.00 41,316.50 41,315.00 29.50 31.00 1.50 31.82 31.82
21.211
Shotcrete 250mm Thk T13P2/27 27.00 41,315.00 41,313.50 31.00 32.50 1.50 31.82 31.82
21.211
Shotcrete 250mm Thk T13P2/28 28.00 41,313.50 41,312.00 32.50 34.00 1.50 31.82 31.82
21.211
Shotcrete 250mm Thk T13P2/29 29.00 41,312.00 41,310.50 34.00 35.50 1.50 31.82 31.82
21.211
Shotcrete 250mm Thk T13P2/30 30.00 41,310.50 41,309.00 35.50 37.00 1.50 31.82 31.82
21.211
Shotcrete 250mm Thk T13P2/31 31.00 41,309.00 41,307.50 37.00 38.50 1.50 31.82 31.82
21.211

PORTAL T13P1 1st TROLLY REFUGE NITCH RESS no-5-28/10/2021


Shotcrete 250mm Thk 4.20 4.90 0.70 10.37 10.37
14.81
Shotcrete 250mm Thk 4.90 5.90 1.00 14.81 14.81
14.81
Shotcrete 250mm Thk 5.90 6.90 1.00 14.81 14.81
14.81
Shotcrete 250mm Thk 6.90 8.20 1.30 19.25 19.25
14.81
Shotcrete 250mm Thk 14.91 14.91

2,990.84
TOTAL= 2990.840

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 7,140.42 Sqm
Total Quantity Paid Up to Previous RA Bill 4,149.58 Sqm
Quantity for This RA Bill 2,990.84 Sqm

CS DHORAJIA JV CS DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Sl no Item No Description of Item

Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as shown on design drawings, in technical specifications and directed by the Engineer.
These items include:
- sprayed concrete of grade M25 according to Indian Standard
- all concrete additives
1 B201 - wastage of sprayed concrete
- rebound
- application of shotcrete in multiple layers
- all auxiliary materials and works
Measurement and payment shall be for the theoretical area or volume as shown on the design drawings in square metres/ cubic meters, measured along Payment-Line (see specifications).

1_6 B 2016 300 mm thick shotcrete lining in tunnel

ROUND QUANTITY
DESCRIPTION ATSS NO UNIT CHAINAGE TUNNEL METER Length Perimeter Area REMARKS
NO (Sqm)

PORTAL T13P2 FROM TO FROM TO


1 Shotcrete 300mm Thk T13P2/10 10 sqm 41,337.00 41,336.00 9.00 10.00 1.00 21.48 21.48 21.48 RESS no-3-19/9/2021
2 Shotcrete 300mm Thk T13P2/11 11 sqm 41,336.00 41,335.00 10.00 11.00 1.00 21.48 21.48 21.48
3 Shotcrete 300mm Thk T13P2/12 12 sqm 41,335.00 41,334.00 11.00 12.00 1.00 21.48 21.48 21.48
4 Shotcrete 300mm Thk T13P2/13 13 sqm 41,334.00 41,333.00 12.00 13.00 1.00 21.48 21.48 21.48
5 Shotcrete 300mm Thk T13P2/14 14 sqm 41,333.00 41,332.00 13.00 14.00 1.00 21.48 21.48 21.48
6 Shotcrete 300mm Thk T13P2/15 15 sqm 41,332.00 41,331.00 14.00 15.00 1.00 21.48 21.48 21.48 RESS no-4-09/11/2021
7 Shotcrete 300mm Thk T13P2/16 16 sqm 41,331.00 41,330.00 15.00 16.00 1.00 21.51 21.51 21.51
8 Shotcrete 300mm Thk T13P2/17 17 sqm 41,330.00 41,329.00 16.00 17.00 1.00 21.51 21.51 21.51
9 Shotcrete 300mm Thk T13P2/18 18 sqm 41,329.00 41,328.00 17.00 18.00 1.00 21.51 21.51 21.51
10 Shotcrete 300mm Thk T13P2/19 19 sqm 41,328.00 41,327.00 18.00 19.00 1.00 21.51 21.51 21.51
11 Shotcrete 300mm Thk T13P2/20 20 sqm 41,327.00 41,325.50 19.00 20.50 1.50 21.51 32.26 32.26
12 Shotcrete 300mm Thk T13P2/21 21 sqm 41,325.50 41,324.00 20.50 22.00 1.50 21.51 32.26 32.26
13 Shotcrete 300mm Thk T13P2/22 22 sqm 41,324.00 41,322.50 22.00 23.50 1.50 21.51 32.26 32.26
14 Shotcrete 300mm Thk T13P2/23 23 sqm 41,322.50 41,321.00 23.50 25.00 1.50 21.51 32.26 32.26
15 Shotcrete 300mm Thk T13P2/24 24 sqm 41,321.00 41,319.50 25.00 26.50 1.50 21.51 32.26 32.26
16 Shotcrete 300mm Thk T13P2/25 25 sqm 41,319.50 41,318.00 26.50 28.00 1.50 21.51 32.26 32.26
17 Shotcrete 300mm Thk T13P2/26 26 sqm 41,318.00 41,316.50 28.00 29.50 1.50 21.51 32.26 32.26
18 Shotcrete 300mm Thk T13P2/27 27 sqm 41,316.50 41,315.00 29.50 31.00 1.50 21.51 32.26 32.26
19 Shotcrete 300mm Thk T13P2/28 28 sqm 41,315.00 41,313.50 31.00 32.50 1.50 21.51 32.26 32.26
20 Shotcrete 300mm Thk T13P2/29 29 sqm 41,313.50 41,312.00 32.50 34.00 1.50 21.51 32.26 32.26
21 Shotcrete 300mm Thk T13P2/30 30 sqm 41,312.00 41,310.50 34.00 35.50 1.50 21.51 32.26 32.26
22 Shotcrete 300mm Thk T13P2/31 31 sqm 41,310.50 41,309.00 35.50 37.00 1.50 21.51 32.26 32.26
23 Shotcrete 300mm Thk T13P2/32 32 sqm 41,309.00 41,307.50 37.00 38.50 1.50 21.51 32.26 32.26

PORTAL T12P2
1 Shotcrete 300mm Thk T12P2/26 26 sqm 38,478.40 38,477.70 15.80 16.50 0.70 15.66 10.96 10.96 RESS no-2-07/08/2021
2 Shotcrete 300mm Thk T12P2/27 27 sqm 38,477.70 38,477.00 16.50 17.20 0.70 16.27 11.39 11.39
3 Shotcrete 300mm Thk T12P2/28 28 sqm 38,477.00 38,476.30 17.20 17.90 0.70 16.27 11.39 11.39
4 Shotcrete 300mm Thk T12P2/29 29 sqm 38,476.30 38,475.60 17.90 18.60 0.70 16.27 11.39 11.39
5 Shotcrete 300mm Thk T12P2/30 30 sqm 38,475.60 38,474.90 18.60 19.30 0.70 16.67 11.67 11.67
6 Shotcrete 300mm Thk T12P2/31 31 sqm 38,474.90 38,474.20 19.30 20.00 0.70 14.34 10.04 10.04
7 Shotcrete 300mm Thk T12P2/32 32 sqm 38,474.20 38,473.40 20.00 20.80 0.80 15.02 12.02 12.02
8 Shotcrete 300mm Thk T12P2/33 33 sqm 38,473.40 38,472.60 20.80 21.60 0.80 15.10 12.08 12.08
9 Shotcrete 300mm Thk T12P2/34 34 sqm 38,472.60 38,471.80 21.60 22.40 0.80 15.42 12.34 12.34
10 Shotcrete 300mm Thk T12P2/35 35 sqm 38,471.80 38,471.00 22.40 23.20 0.80 15.66 12.53 12.53
11 Shotcrete 300mm Thk T12P2/36 36 sqm 38,471.00 38,470.20 23.20 24.00 0.80 15.66 12.53 12.53
12 Shotcrete 300mm Thk T12P2/37 37 sqm 38,470.20 38,469.40 24.00 24.80 0.80 15.99 12.79 12.79
13 Shotcrete 300mm Thk T12P2/38 38 sqm 38,469.40 38,468.60 24.80 25.60 0.80 16.27 13.02 13.02

TOTAL= 788.450

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 3,277.96
Total Quantity Paid Up to Previous RA Bill 2,489.51
Quantity for This RA Bill 788.45

CS DHORAJIA JV CS DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Executed Qauntity from 01.02.2021 to 09.03 2021
Sprayed concrete works for filling of cavities not caused by fault of contractor due to unavoidable overbreak
which has been designated as such by the Engineer and exceeds a volume of 2 m³ in each individual case. This item
includes:
- sprayed concrete of grade M25 according to Indian Standard
- wastage of sprayed concrete
- rebound
B2018 - all auxiliary materials and works
Measurement and payment shall be for the volume of sprayed concrete beyond the boundary surface 'A line' actually
used and as approved by the Engineer.

BOQ ITEM NO. B2018 -

AVERAGE
TUNNEL M25 Area LENGTH QUANTITY
CHAINAGE ATSS No. M25 AREA REMARKS
METER (sqm) (meter) (cum)
(sqm)

LOCATION T12P1

From Annex A 39.43 100 % GOB Qty


4.21 50% OB Qty

TOTAL= 43.64

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 43.64 Cum
Total Quantity Paid Up to Previous RA Bill - Cum
Quantity for This RA Bill 43.64 Cum

CS-DHORAJIA JV CS-DHORAJIA JV DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
B 2017 Shotcrete lining for overbreak as per technical specification:
BOQ ITEM NO. B2018 -
QUANTITY
CHAINAGE REMARKS
(cum)

From Annex B RA 11 570.37 100 % GOB Qty T12P1


128.13 50% OB Qty T12P1

From Annex B 60.97 100 % GOB Qty T12P2


4.33 50% OB Qty T12P2

From Annex B 287.27 100 % GOB Qty T13P1


47.84 50% OB Qty T13P1

RA 2 4.21 OB
39.43 GOB
RA 4 14.80 OB
47.45 GOB
RA 6 1.10 OB
7.74 GOB
RA 8 7.10 OB
12.49 GOB
RA 9 81.36 OB
RA 10 42.63 OB

1,357.22

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 1,357.22 Cum
Total Quantity Paid Up to Previous RA Bill 0 Cum
Quantity for This RA Bill 1,357.22 Cum

IRCON Engineer

CS-DHORAJIA JV CS-DHORAJIA JV IRCON Site in Charge


QSS PROJECT MANAGER
Sprayed concrete works for filling of cavities not caused by fault of contractor due to unavoidable overbreak
which has been designated as such by the Engineer and exceeds a volume of 2 m³ in each individual case. This item
includes:
- sprayed concrete of grade M25 according to Indian Standard
- wastage of sprayed concrete
B2018 - rebound
- all auxiliary materials and works
Measurement and payment shall be for the volume of sprayed concrete beyond the boundary surface 'A line' actually
used and as approved by the Engineer.

BOQ ITEM NO. B2018 -

AVERAGE
TUNNEL M25 Area LENGTH QUANTITY
CHAINAGE ATSS No. M25 AREA REMARKS
METER (sqm) (meter) (cum)
(sqm)

RA 2 -4.21 OB
-39.43 GOB
RA 4 -14.80 OB
-47.45 GOB
RA 6 -1.10 OB
-7.74 GOB
RA 8 -7.10 OB
-12.49 GOB
RA 9 -81.36 OB
RA 10 -42.63 OB
TOTAL= (258.31)

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 356.75 Cum
Total Quantity Paid Up to Previous RA Bill 615.06 Cum
Quantity for This RA Bill -258.31 Cum

CS-DHORAJIA JV CS-DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Sl no Item No Description of Item
1_9 B2019 Shotcrete in slope stabilization

Slope Avg Slope QUANTITY


Location Unit Chanage Length Area Thickness REMARKS
Length Length (Cum)

PORTAL T13P2
1 Shotcrete 150mm Thk 4.12 5.00 0.00 0.15 0.00
2 Shotcrete 150mm Thk Cum 3.84 3.98 0.00 5.00 19.90 0.15 2.99
3 Shotcrete 150mm Thk Cum 3.70 3.77 -5.00 5.00 18.85 0.15 2.83
4 Shotcrete 150mm Thk Cum 3.67 3.69 -10.00 5.00 18.43 0.15 2.76
5 Shotcrete 150mm Thk Cum 3.22 3.45 -15.00 5.00 17.23 0.15 2.58
6 Shotcrete 150mm Thk Cum 4.09 3.66 -20.00 5.00 18.28 0.15 2.74
7 Shotcrete 150mm Thk Cum 4.27 4.18 -23.50 3.50 14.63 0.15 2.19
16.09
PORTAL T12P2RHS SIDE
1 Shotcrete 50mm Thk Cum 5.06 38505.47 0.00
2 Shotcrete 50mm Thk Cum 5.69 5.38 38510.50 5.03 27.04 0.05 1.35
3 Shotcrete 50mm Thk Cum 5.80 5.75 38515.50 5.00 28.73 0.05 1.44
4 Shotcrete 50mm Thk Cum 6.18 5.99 38520.50 5.00 29.95 0.05 1.50
5 Shotcrete 50mm Thk Cum 5.95 6.07 38525.50 5.00 30.33 0.05 1.52
6 Shotcrete 50mm Thk Cum 5.43 5.69 38530.50 5.00 28.45 0.05 1.42
7 Shotcrete 150mm Thk Cum 5.37 5.40 38535.50 5.00 27.00 0.15 4.05
8 Shotcrete 150mm Thk Cum 8.77 7.07 38539.32 3.82 27.01 0.15 4.05
9 Shotcrete 150mm Thk Cum 9.20 8.99 38545.52 6.20 55.71 0.15 8.36
10 Shotcrete 150mm Thk Cum 7.29 8.25 38549.02 3.50 28.86 0.15 4.33
11 Shotcrete 150mm Thk Cum 3.13 5.21 38554.67 5.65 29.44 0.15 4.42

TOTAL= 48.53

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 1,314.22
Total Quantity Paid Up to Previous RA Bill 1,265.69
Quantity for This RA Bill 48.53

CS DHORAJIA JV CS DHORAJIA JV DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Sl no Item No Description of Item
Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as shown on design drawings, in
technical specifications and directed by the Engineer. These items include:
- sprayed concrete of grade M25 according to Indian Standard
- all concrete additives
- wastage of sprayed concrete
1 B201
- rebound
- application of shotcrete in multiple layers
- all auxiliary materials and works
Measurement and payment shall be for the theoretical area or volume as shown on the design drawings in square metres/ cubic meters, measured along
Payment-Line (see specifications).
1_9 B2019 Shotcrete in slope stabilization

Slope Avg Slope QUANTITY


Location Unit Chanage Length Area Thickness REMARKS
Length Length (Cum)

PORTAL T13P1
Shotcrete 250mm Thk Cum 8.00 -18.15
Shotcrete 250mm Thk Cum 8.00 8.00 -20.00 1.85 9.85 0.25 2.46
Shotcrete 250mm Thk Cum 19.19 13.59 -25.00 5.00 18.59 0.25 4.65
Shotcrete 250mm Thk Cum 15.39 17.29 -30.00 5.00 22.29 0.25 5.57
Shotcrete 250mm Thk Cum 11.52 13.45 -35.23 5.23 18.68 0.25 4.67
Shotcrete 250mm Thk Cum 5.96 8.74 -39.82 4.58 13.33 0.25 3.33
PORTAL T13P2
Shotcrete 250mm Thk Cum 5.16 25.00 0.00 0.25 0.00
Shotcrete 250mm Thk Cum 9.97 7.57 20.00 5.00 12.57 0.25 3.14
Shotcrete 250mm Thk Cum 13.31 11.64 15.00 5.00 16.64 0.25 4.16
Shotcrete 250mm Thk Cum 12.65 12.98 10.00 5.00 17.98 0.25 4.50
Shotcrete 250mm Thk Cum 12.71 12.68 5.00 5.00 17.68 0.25 4.42
Shotcrete 250mm Thk Cum 10.99 11.85 0.00 5.00 16.85 0.25 4.21
Shotcrete 250mm Thk Cum 9.27 10.13 -5.00 5.00 15.13 0.25 3.78
Shotcrete 250mm Thk Cum 7.14 8.21 -10.00 5.00 13.21 0.25 3.30
PORTAL T12P1
Shotcrete 250mm Thk Cum 16.24 -14.00 0.00 0.25 0.00
Shotcrete 250mm Thk Cum 16.24 16.24 -20.00 6.00 22.24 0.25 5.56
Shotcrete 250mm Thk Cum 10.02 13.13 -25.00 5.00 18.13 0.25 4.53
Shotcrete 250mm Thk Cum 3.96 6.99 -30.00 5.00 11.99 0.25 3.00

1 T13 P1 Catchment Drain at EL-404.0m Inclined Portion LHS


2 LHS Parepet 16.50 0.12 1.98
3 RHS Parapet 16.50 0.22 3.63
4 T13 P1 Catchment Drain at EL-404.0m Inclined Portion LHS 6.20 0.63 3.90
5 T13 P1 Catchment Drain at EL-404.0m Inclined Portion RHS 21.40 0.47 10.15
6 T13 P1 Catchment Drain at EL-404.0m Inclined Portion RHS 9.45 0.48 4.49
7 T13 P1 Catchment Drain LHS Large section RHS 31.55 1.02 32.28
8 21.30 0.28 5.99
9 21.30 0.58 12.44
10 T13 P2 Catchment Drain 28.00 0.58 16.24
41m-28.5=12.5m (28.5 m
T12P2 Catchment Drain 12.50 0.10 1.25
11 Paid in RA2)
TOTAL= 153.63

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 790.64
Total Quantity Paid Up to Previous RA Bill 637.01
Quantity for This RA Bill 153.63

CS DHORAJIA JV CS DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Sl no Item No Description of Item

Design Mix Cement Concrete M15 in following PCC works including mechanically mixed machine
3 B203 mixed, machine batched, machine vibrated, form work, etc as per specifications & drawings or as directed by
Engineer-in charge

3_1 B2031 For all kinds of structures required (bed, portals, blinding, lean, protection lean concrete)
Location Unit Length Breadth Height Quantity Remarks
APPROACH ROAD T13 P1 (Chainage-230.0m to 288.40m)
RRM Wall 1 A 230.00 235.15 Cum 5.15 1.46 0.10 0.75
RRM Wall 2 A 235.15 240.70 Cum 5.55 1.46 0.10 0.81
RRM Wall 3 A 240.70 245.80 Cum 5.10 1.46 0.10 0.75
RRM Wall 4 A 255.00 261.00 Cum 6.00 1.46 0.10 0.88
RRM Wall 5 A 261.00 267.00 Cum 6.00 1.46 0.10 0.88
RRM Wall 6 A 270.00 276.00 Cum 6.00 1.46 0.10 0.88
RRM Wall 7 A 276.00 282.00 Cum 6.00 1.46 0.10 0.88
RRM Wall 8 A 282.00 288.40 Cum 6.40 1.46 0.10 0.94 6.77
T12P2 Bridge PCC
LHS Cum 7.20 4.00 0.15 4.32
RHS Cum 7.20 4.00 0.15 4.32
TOTAL= 15.41

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 76.25
Total Quantity Paid Up to Previous RA Bill 60.84
Quantity for This RA Bill 15.41

CS-DHORAJIA JV CS DHORAJIA JV DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Sl no Item No Description of Item

Design Mix Cement Concrete M15 in following PCC works including mechanically mixed machine
3 B203 mixed, machine batched, machine vibrated, form work, etc as per specifications & drawings or as directed by
Engineer-in charge

3_1 B2031 For all kinds of structures required (bed, portals, blinding, lean, protection lean concrete)
Location Unit Length Breadth Height Quantity Remarks
PCC for RRM Wall at T12 P1 (Chainage-250.9m to 281.0m RHS)
RRM Wall 1 A 281.00 275.20 Cum 5.80 1.46 0.10 0.85
RRM Wall 2 A 275.20 269.20 Cum 6.00 1.46 0.10 0.88
RRM Wall 3 A 269.20 262.90 Cum 6.30 1.46 0.10 0.92
RRM Wall 4 A 262.90 257.90 Cum 5.00 1.46 0.10 0.73
RRM Wall 5 A 257.90 250.90 Cum 7.00 1.46 0.10 1.02
PCC for RRM Wall at T12 P1 (Chainage-251.5m to 187.3m LHS)
Wall No 16 251.50 246.50 Cum 5.00 1.46 0.10 0.73
Wall No 17 246.50 241.50 Cum 5.00 1.46 0.10 0.73
Wall No 18 241.50 236.50 Cum 5.00 1.46 0.10 0.73
Wall No 19 236.50 231.50 Cum 5.00 1.46 0.10 0.73
Wall No 20 231.50 226.50 Cum 5.00 1.46 0.10 0.73
Wall No 21 226.50 221.80 Cum 4.70 1.46 0.10 0.69
Wall No 22 221.80 216.80 Cum 5.00 1.46 0.10 0.73
Wall No 23 216.80 211.80 Cum 5.00 1.46 0.10 0.73
Wall No 24 211.80 206.80 Cum 5.00 1.46 0.10 0.73
Wall No 25 206.80 201.30 Cum 5.50 1.46 0.10 0.81
Wall No 26 201.30 197.40 Cum 3.90 1.46 0.10 0.57
Wall No 27 197.40 192.40 Cum 5.00 1.46 0.10 0.73
Wall No 28 192.40 187.30 Cum 5.10 1.46 0.10 0.75
PCC for RRM Wall at T13P2 (Chainage-90.0m to 161.55m)
Wall No 1 90.00 95.80 Cum 5.80 2.08 0.10 1.20
Wall No 1 LHS 95.80 101.70 Cum 5.90 2.28 0.10 1.35
Wall No 2 101.70 107.55 Cum 5.85 2.08 0.10 1.21
Wall No 3 107.55 113.55 Cum 6.00 2.08 0.10 1.25
Wall No 4 113.55 119.55 Cum 6.00 2.08 0.10 1.25
Wall No 5 119.55 125.60 Cum 6.05 2.08 0.10 1.26
Wall No 6 125.60 131.60 Cum 6.00 2.08 0.10 1.25
Wall No 7 131.60 137.45 Cum 5.85 2.08 0.10 1.21
Wall No 8 137.45 143.45 Cum 6.00 2.08 0.10 1.25
Wall No 9 143.45 149.65 Cum 6.20 2.08 0.10 1.29
Wall No 10 149.65 155.65 Cum 6.00 2.08 0.10 1.25
Wall No 11 155.65 161.55 Cum 5.90 2.08 0.10 1.22
PCC for RRM Wall at T12P2 (Chainage-515.0m to 580.0m)
Wall No 1 A 515.00 519.90 Cum 4.90 1.77 0.10 0.87
Wall No 2 A 519.90 524.85 Cum 4.95 1.77 0.10 0.88
Wall No 3 A 524.85 529.80 Cum 4.95 1.77 0.10 0.88
Wall No 4 A 539.80 545.00 Cum 5.20 1.77 0.10 0.92
Wall No 5 A 545.00 550.10 Cum 5.10 1.77 0.10 0.90
Wall No 6 A 550.10 555.20 Cum 5.10 1.77 0.10 0.90
Wall No 7 A 555.20 560.20 Cum 5.00 1.77 0.10 0.89
Wall No 8 A 560.20 565.20 Cum 5.00 1.77 0.10 0.89
Wall No 9 A 559.80 564.80 Cum 5.00 1.77 0.10 0.89
Wall No 10 A 564.80 570.00 Cum 5.20 1.77 0.10 0.92
Wall No 11 A 570.00 575.10 Cum 5.10 1.77 0.10 0.90
Wall No 12 A 575.10 580.00 Cum 4.90 1.77 0.10 0.87
PCC for RRM Wall at T13P1 (Chainage-230.0m to 288.4m)
Wall No 3B Cum 5.15 1.46 0.10 0.75
Wall No 3C Cum 7.90 1.77 0.10 1.40
Wall No 9A Cum 5.00 1.46 0.10 0.73
TOTAL= 42.37 Cum

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 118.62 Cum
Total Quantity Paid Up to Previous RA Bill 76.25 Cum
Quantity for This RA Bill 42.37 Cum

CS-DHORAJIA JV CS DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Sl no Item No Description of Item

Extra for over item no B201 for supply and mixing of steel fibre double end hooked loose steel fibres of circular cross section having diameter of 0.75mm and aspect ratio
1_11 B20111 equal to 49 conforming to EC- certificate of conformity as per EN14889 and tensile strength more than 1100MPa and ultimate strain less than 4% as per specification and
as directed by Engineer

ROUND QUANTITY
DESCRIPTION ATSS NO UNIT CHAINAGE TUNNEL METER Length Perimeter Thickness REMARKS
NO (Cum)

PORTAL T12P1

1 Shotcrete 150mm Thk T12P1/200 203 sqm 37,372.50 37,374.00 281.50 283.00 1.50 20.48 0.15 4.61 SFRS

2 Shotcrete 150mm Thk T12P1/201 204 sqm 37,374.00 37,375.50 283.00 284.50 1.50 20.48 0.15 4.61 SFRS

3 Shotcrete 150mm Thk T12P1/202 205 sqm 37,375.50 37,377.00 284.50 286.00 1.50 20.48 0.15 4.61 SFRS

4 Shotcrete 150mm Thk T12P1/203 206 sqm 37,377.00 37,378.50 286.00 287.50 1.50 20.48 0.15 4.61 SFRS

5 Shotcrete 150mm Thk T12P1/204 207 sqm 37,378.50 37,380.00 287.50 289.00 1.50 20.48 0.15 4.61 SFRS

6 Shotcrete 150mm Thk T12P1/205 208 sqm 37,380.00 37,381.50 289.00 290.50 1.50 20.48 0.15 4.61 SFRS

1 Shotcrete 150mm Thk T12P1/217 211 sqm 37,398.00 37,399.50 307.00 308.50 1.50 20.48 0.15 4.61 SFRS

2 Shotcrete 150mm Thk T12P1/218 212 sqm 37,399.50 37,401.00 308.50 310.00 1.50 20.48 0.15 4.61 SFRS

3 Shotcrete 150mm Thk T12P1/219 213 sqm 37,401.00 37,402.50 310.00 311.50 1.50 20.48 0.15 4.61 SFRS

4 Shotcrete 150mm Thk T12P1/220 214 sqm 37,402.50 37,404.00 311.50 313.00 1.50 20.48 0.15 4.61 SFRS

5 Shotcrete 150mm Thk T12P1/221 215 sqm 37,404.00 37,405.50 313.00 314.50 1.50 20.48 0.15 4.61 SFRS

6 Shotcrete 150mm Thk T12P1/222 216 sqm 37,405.50 37,407.00 314.50 316.00 1.50 20.48 0.15 4.61 SFRS

Cum with 30kg steel


55.320 fiber per cum
TOTAL=
1659.600 Kg
1.660 MT

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 15.63 Sqm
Total Quantity Paid Up to Previous RA Bill 13.97 Sqm
Quantity for This RA Bill 1.66 Sqm

CS DHORAJIA JV CS DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Sl no Item No Description of Item

Extra for over item no B201 for supply and mixing of steel fibre double end hooked loose steel fibres of circular cross section having diameter of 0.75mm and aspect ratio
1_11 B20111 equal to 49 conforming to EC- certificate of conformity as per EN14889 and tensile strength more than 1100MPa and ultimate strain less than 4% as per specification and
as directed by Engineer

ROUND QUANTITY
DESCRIPTION ATSS NO UNIT CHAINAGE TUNNEL METER Length Perimeter Thickness REMARKS
NO (Sqm)

PORTAL T12P1

1 Shotcrete 150mm Thk T12P1/115 118 sqm 37,246.50 37,248.00 154.00 155.50 1.50 20.48 0.15 4.61 SFRS

2 Shotcrete 150mm Thk T12P1/116 119 sqm 37,248.00 37,249.50 155.50 157.00 1.50 20.48 0.15 4.61 SFRS

3 Shotcrete 150mm Thk T12P1/117 120 sqm 37,249.50 37,251.00 157.00 158.50 1.50 20.48 0.15 4.61 SFRS

4 Shotcrete 150mm Thk T12P1/118 121 sqm 37,251.00 37,252.50 158.50 160.00 1.50 20.48 0.15 4.61 SFRS

5 Shotcrete 150mm Thk T12P1/119 122 sqm 37,252.50 37,254.00 160.00 161.50 1.50 20.48 0.15 4.61 SFRS

6 Shotcrete 150mm Thk T12P1/120 123 sqm 37,254.00 37,255.50 161.50 163.00 1.50 20.48 0.15 4.61 SFRS

7 Shotcrete 150mm Thk T12P1/121 124 sqm 37,255.50 37,257.00 163.00 164.50 1.50 20.48 0.15 4.61 SFRS

8 Shotcrete 150mm Thk T12P1/122 125 sqm 37,257.00 37,258.50 164.50 166.00 1.50 20.48 0.15 4.61 SFRS

9 Shotcrete 150mm Thk T12P1/123 126 sqm 37,258.50 37,260.00 166.00 167.50 1.50 20.48 0.15 4.61 SFRS

10 Shotcrete 150mm Thk T12P1/124 127 sqm 37,260.00 37,261.50 167.50 169.00 1.50 20.48 0.15 4.61 SFRS

11 Shotcrete 150mm Thk T12P1/125 128 sqm 37,261.50 37,263.00 169.00 170.50 1.50 20.48 0.15 4.61 SFRS

12 Shotcrete 150mm Thk T12P1/126 129 sqm 37,263.00 37,264.50 170.50 172.00 1.50 20.48 0.15 4.61 SFRS

13 Shotcrete 150mm Thk T12P1/127 130 sqm 37,264.50 37,266.00 172.00 173.50 1.50 20.48 0.15 4.61 SFRS

14 Shotcrete 150mm Thk T12P1/128 131 sqm 37,266.00 37,267.50 173.50 175.00 1.50 20.48 0.15 4.61 SFRS

15 Shotcrete 150mm Thk T12P1/129 132 sqm 37,267.50 37,269.00 175.00 176.50 1.50 20.48 0.15 4.61 SFRS

16 Shotcrete 150mm Thk T12P1/130 133 sqm 37,269.00 37,270.50 176.50 178.00 1.50 20.48 0.15 4.61

73.760 Cum with 30kg steel


TOTAL= fiber per cum
2212.800 Kg
2.210 MT

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 4.57 Sqm
Total Quantity Paid Up to Previous RA Bill 2.36 Sqm
Quantity for This RA Bill 2.21 Sqm

CS DHORAJIA JV CS DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Sl no Item No Description of Item
M30 RCC for Cladding Wall. Design mix cement concrete including machine mixed, machine batched, machine vibrated with contractor's
men, material, consumables (including additives), tools & plants, equipments, machineries, all lead & lifts, loading, unloading, wastages etc
5 B205
complete. The rate includes cost of form work, shuttering, centering, scaffolding, fixing and removing thereof, levelling, finishing of
exposed surfaces, curing etc.

RD/ Avg.
Location Unit Area Avg Area Quantity Remarks
Chainage Length

T12P2
Unit Length Breadth Height
Capping Beam Cum 29.85 Area= 0.54 16.12 Capping Beam

Runner Beam Cum 25.45 Area= 0.53 13.49 Runner Beam 1st Row
Cum 10.00 Area= 0.53 5.30 Runner Beam 2nd Row

CLADDING WALL T12P2


Chainage 38+511.7m to 38+531.4m
EL-386.0m to 388.5m 1 Cum 19.70 0.30 2.50 14.78

PARAPET WALL T13P2 PORTAL


Longer Side 2 Cum 10.20 0.50 1.60 16.32
Shorter Side 2 Cum 2.90 0.50 1.60 4.64

TOTAL= 70.65

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 1,032.26
Total Quantity Paid Up to Previous RA Bill 961.61
Quantity for This RA Bill 70.65

CS DHORAJIA JV CS DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Sl no Item No Description of Item

Design Mix Cement Concrete M15 in following PCC works including mechanically mixed machine
3 B203 mixed, machine batched, machine vibrated, form work, etc as per specifications & drawings or as directed by Engineer-
in charge

3_1 B2031 For all kinds of structures required (bed, portals, blinding, lean, protection lean concrete)

Location Unit No Length Breadth Height Quantity Remarks


PCC for RRM Wall at APPROACH ROAD OF T12P2 Chainage ( 300.00m to 350.00m)

RRM Wall No B1 Cum 1 11.20 1.77 0.10 1.98


RRM Wall No B2 Cum 1 9.40 1.77 0.10 1.66
RRM Wall No B3 Cum 1 5.10 1.77 0.10 0.90
RRM Wall No B4 Cum 1 5.95 1.77 0.10 1.05
RRM Wall No B5 Cum 1 5.95 1.77 0.10 1.05
RRM Wall No B6 Cum 1 6.10 1.77 0.10 1.08
RRM Wall No B7 Cum 1 6.10 1.77 0.10 1.08

RRM Wall at APPROACH ROAD OF T12P2 (Chainage 623.0m to 640.0m)


RRM Wall No -1 Cum 1 8.30 1.77 0.10 1.47
RRM Wall No -2 Cum 1 8.70 1.77 0.10 1.54

RRM Wall at APPROACH ROAD OF T12P2 (Chainage 623.0m to 640.0m)


RRM Wall No 11 Cum 1 6.25 2.08 0.10 1.30
RRM Wall No 12 Cum 1 6.20 2.08 0.10 1.29
RRM Wall No 13 Cum 1 3.90 2.08 0.10 0.81

T12P2 Trapezoital-Type Drain Cum 1 32.00 Area= 0.28 8.96 Ch-510.0m to 542.0m
T12P2 Trapezoital-Type Drain Cum 1 87.00 Area= 0.28 24.36 Ch-300.0m to 387.0m

T12P2 PCC For Capping Beam


i. Longer Side Cum 1 29.85 0.60 0.10 1.79
T12P2 PCC For Runner Beam
1st Runner beam Cum 1 25.45 0.60 0.10 1.53
2nd Runner beam Cum 1 10.00 0.60 0.10 0.60

T12P2 PCC at RHS of Portal EL 386.0m


Cum 1 40.30 2.00 0.60 48.36
Cum 1 4.00 2.80 0.60 6.72
T12P2 PCC at RHS of Portal Cladding wall base EL 386.0m
Cum 1 19.50 2.00 0.15 5.85
T12P2 PCC at LHS of Portal TopEL 386.0m
Cum 1 Area= 43.20 0.30 12.96
Cum 1 13.00 0.30 0.80 3.12 Parapet

T13P1 PCC at LHS of Side Drain


Floor Cum 1 3.00 Area= 2.96 8.88
Parapet 1 Cum 2 2.90 0.30 1.25 2.18
Parapet 2 Cum 2 2.60 0.30 1.35 2.11
Parapet 3 Cum 2 2.60 0.30 1.75 2.73

T13P1 PCC at PORTAL TOP LHS


Cum 1 14.50 6.30 0.15 13.70

TOTAL= 159.06 Cum

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 725.53 Cum
Total Quantity Paid Up to Previous RA Bill 566.47 Cum
Quantity for This RA Bill 159.06 Cum

CS-DHORAJIA JV CS DHORAJIA JV IRCON Engineer IRCON Site in Charge


Sl no Item No Description of Item

Design Mix Cement Concrete M15 in following PCC works including mechanically mixed machine
3 B203 mixed, machine batched, machine vibrated, form work, etc as per specifications & drawings or as directed by Engineer-
in charge

3_1 B2031 For all kinds of structures required (bed, portals, blinding, lean, protection lean concrete)
QSS PROJECT MANAGER
Providing and installation of perforated pipes . The pipes are protected by geotextile membrane as shown on design drawings, in
technical specifications or as directed by the Engineer. These items include:
- all connections and valves
- protection by geotextile membrane
2 C102
- all necessary equipment (i.e. drilling jumbo equipped with AT-casing system)
- other protection to ensure functionality as required locally
Measurement and payment shall be for the actual length measured along the pipe axis in linear metres as confirmed
by the Engineer.

2_2 C1022 50 mm internal dia PVC pipe


ELEVATION RD
ATSS NO. REMARKS
From To From To Nos Length QUANTITY (Nos)
LOCATION-T13P2
402.50 408.00 6.00 12.00 72.00
LOCATION-T12P2
397.00 400.00 10.00 12.00 10.00

Total= 82.00

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 82.00
Total Quantity Paid Up to Previous RA Bill 0.00
Quantity for This RA Bill 82.00

CS-DHORAJIA JV CS-DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Providing and installation of perforated pipes . The pipes are protected by geotextile membrane as shown on design drawings, in
technical specifications or as directed by the Engineer. These items include:
- all connections and valves
- protection by geotextile membrane
2 C102 - all necessary equipment (i.e. drilling jumbo equipped with AT-casing system)
- other protection to ensure functionality as required locally
Measurement and payment shall be for the actual length measured along the pipe axis in linear metres as confirmed
by the Engineer.

2_2 C1022 50 mm internal dia PVC pipe


CHAINAGE/ELEVATION Tunnel Meter
ATSS NO. REMARKS
From To From To Nos Length QUANTITY (RM)
LOCATION-T13P1
38,918.50 38,920.00 133.00 134.50 3.00 6.00 18.00 RESS no-4-18/10/2021

38,921.50 38,923.00 136.00 137.50 2.00 6.00 12.00


38,924.50 38,926.00 139.00 140.50 0.00 6.00 0.00
38,927.50 38,929.00 142.00 143.50 4.00 6.00 24.00
38,930.50 38,932.00 145.00 146.50 0.00 6.00 0.00
38,933.50 38,935.00 148.00 149.50 2.00 6.00 12.00
38,936.50 38,938.00 151.00 152.50 0.00 6.00 0.00
38,939.50 38,941.00 154.00 155.50 0.00 6.00 0.00
38,942.50 38,944.00 157.00 158.50 4.00 6.00 24.00
38,945.50 38,947.00 160.00 161.50 0.00 6.00 0.00
38,948.50 38,950.00 163.00 164.50 2.00 6.00 12.00
38,951.50 38,953.00 166.00 167.50 0.00 6.00 0.00
38,954.50 38,955.50 169.00 170.00 0.00 6.00 0.00
38,957.85 38,959.20 172.35 173.70 4.00 6.00 24.00
38,960.40 38,961.60 174.90 176.10 5.00 6.00 30.00
38,963.05 38,964.50 177.50 178.95 0.00 6.00 0.00
38,965.85 38,967.20 180.30 181.65 2.00 6.00 12.00
38,970.20 38,971.60 184.65 186.05 4.00 6.00 24.00
38,972.50 38,973.80 187.00 188.50 2.00 6.00 12.00
38,975.10 38,976.40 190.00 191.50 0.00 6.00 0.00
38,977.70 38,979.00 193.00 194.50 0.00 6.00 0.00

LOCATION-T12P1
37,271.60 37,273.10 179.50 181.00 5.00 5.00 25.00 RESS no-5-23/09/2021

37,279.10 37,280.60 187.00 188.50 5.00 5.00 25.00


37,289.60 37,291.10 197.50 199.00 5.00 5.00 25.00
37,303.10 37,304.60 211.00 212.50 5.00 5.00 25.00
37,329.10 37,325.60 237.00 233.50 5.00 5.00 25.00
37,342.50 37,344.00 250.40 251.90 5.00 5.00 25.00
37,360.50 37,362.00 268.40 269.90 5.00 5.00 25.00
37,368.00 37,369.50 275.90 277.40 5.00 5.00 25.00
37,375.50 37,377.00 283.00 284.50 5.00 5.00 25.00
37,378.50 37,380.00 286.00 287.50 5.00 5.00 25.00
37,399.50 37,401.00 307.00 308.50 5.00 5.00 25.00

LOCATION-T13P2 SLOPE
414.00 418.00 4.00 6.00 24.00
Total= 503.00

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 3,710.00 RM
Total Quantity Paid Up to Previous RA Bill 3,207.00 RM
Quantity for This RA Bill 503.00 RM

CS-DHORAJIA JV CS-DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Drilling of different dia holes (diameter 42mm to 62mm) in rock/ soil of required length in any direction as per approved drawings and
specifications or as directed by the Engineer. These items also include:
- drilling through sprayed concrete, walls, reinforcement
4 C104
- drilling in presence of water
- all measures necessary in soft ground to ensure the stability of the drainage hole
Measurement and payment shall be for the actual length of drainage holes drilled in linear metres.

ELEVATION RD
REMARKS
From To From To Nos Length QUANTITY (Nos)
LOCATION-T13P2
402.50 408.00 6.00 12.00 72.00
LOCATION-T12P2
397.00 400.00 10.00 12.00 10.00

Total= 82.00

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 82.00
Total Quantity Paid Up to Previous RA Bill 0.00
Quantity for This RA Bill 82.00

CS-DHORAJIA JV CS-DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Drilling of different dia holes (diameter 42mm to 62mm) in rock/ soil of required length in any direction as per approved drawings and
specifications or as directed by the Engineer. These items also include:
- drilling through sprayed concrete, walls, reinforcement
4 C104
- drilling in presence of water
- all measures necessary in soft ground to ensure the stability of the drainage hole
Measurement and payment shall be for the actual length of drainage holes drilled in linear metres.

ELEVATION/CHAINAGE RD
ATSS NO. REMARKS
From To From To Nos Length QUANTITY (RM)
LOCATION-T12P2
38,918.50 38,920.00 133.00 134.50 3.00 6.00 18.00 RESS no-4-18/10/2021

38,921.50 38,923.00 136.00 137.50 2.00 6.00 12.00


38,924.50 38,926.00 139.00 140.50 0.00 6.00 0.00
38,927.50 38,929.00 142.00 143.50 4.00 6.00 24.00
38,930.50 38,932.00 145.00 146.50 0.00 6.00 0.00
38,933.50 38,935.00 148.00 149.50 2.00 6.00 12.00
38,936.50 38,938.00 151.00 152.50 0.00 6.00 0.00
38,939.50 38,941.00 154.00 155.50 0.00 6.00 0.00
38,942.50 38,944.00 157.00 158.50 4.00 6.00 24.00
38,945.50 38,947.00 160.00 161.50 0.00 6.00 0.00
38,948.50 38,950.00 163.00 164.50 2.00 6.00 12.00
38,951.50 38,953.00 166.00 167.50 0.00 6.00 0.00
38,954.50 38,955.50 169.00 170.00 0.00 6.00 0.00
38,957.85 38,959.20 172.35 173.70 4.00 6.00 24.00
38,960.40 38,961.60 174.90 176.10 5.00 6.00 30.00
38,963.05 38,964.50 177.50 178.95 0.00 6.00 0.00
38,965.85 38,967.20 180.30 181.65 2.00 6.00 12.00
38,970.20 38,971.60 184.65 186.05 4.00 6.00 24.00
38,972.50 38,973.80 187.00 188.50 2.00 6.00 12.00
38,975.10 38,976.40 190.00 191.50 0.00 6.00 0.00
38,977.70 38,979.00 193.00 194.50 0.00 6.00 0.00

LOCATION-T12P1
37,271.60 37,273.10 179.50 181.00 5.00 5.00 25.00 RESS no-5-23/09/2021

37,279.10 37,280.60 187.00 188.50 5.00 5.00 25.00


37,289.60 37,291.10 197.50 199.00 5.00 5.00 25.00
37,303.10 37,304.60 211.00 212.50 5.00 5.00 25.00
37,329.10 37,325.60 237.00 233.50 5.00 5.00 25.00
37,342.50 37,344.00 250.40 251.90 5.00 5.00 25.00
37,360.50 37,362.00 268.40 269.90 5.00 5.00 25.00
37,368.00 37,369.50 275.90 277.40 5.00 5.00 25.00
37,375.50 37,377.00 283.00 284.50 5.00 5.00 25.00
37,378.50 37,380.00 286.00 287.50 5.00 5.00 25.00
37,399.50 37,401.00 307.00 308.50 5.00 5.00 25.00
LOCATION-T13P2 SLOPE
414.00 418.00 4.00 6.00 24.00

Total= 503.00

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 3,710.00 RM
Total Quantity Paid Up to Previous RA Bill 3,207.00 RM
Quantity for This RA Bill 503.00 RM

CS-DHORAJIA JV CS-DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Sl no Item No Description of Item

M30 RCC for Cladding Wall. Design mix cement concrete including machine mixed, machine batched, machine vibrated with contractor's men, material,
5 B205 consumables (including additives), tools & plants, equipments, machineries, all lead & lifts, loading, unloading, wastages etc complete. The rate includes
cost of form work, shuttering, centering, scaffolding, fixing and removing thereof, levelling, finishing of exposed surfaces, curing etc.

Location No Unit Length Breadth Height Quantity Remarks

PORTAL T13P1 Chainage Area Avg Area PORTAL CONCRETE


Chainage 38785.5 38785.50 Cum 69.07
Chainage 38786.5 38786.50 Cum 1.00 76.00 72.53 72.53
Chainage 38787.5 38787.50 Cum 1.00 73.20 74.60 74.60
Chainage 38788.5 38788.50 Cum 1.00 72.42 72.81 72.81
Chainage 38790.847 38790.95 Cum 1.00 61.24 61.24 61.24
-32.18 Paid in RA 3
Deduction for sand filling portion= -1.00 8.78 1.50 1.40 -36.88
PORTAL T12P2
Length Breadth Height Quantity Face side Cladding Wall
Face Side 22.00 0.40 4.00 35.20 Avg Thickness
RHS side Cladding Wall
RHS Slope
26.00 0.40 4.00 41.60 Avg Thickness
Side

TOTAL= 288.93

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 408.66
Total Quantity Paid Up to Previous RA Bill 119.73
Quantity for This RA Bill 288.93

CS DHORAJIA JV CS DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Drilling of exploratory holes up to 35m length with specified diameter in any direction as per the technical
specifications and as directed by the Engineer in the presence of an expert geologist. These items also
include:
- drilling through sprayed concrete, walls, reinforcement
5 C105 - drilling in presence of water
- all measures necessary in soft ground to ensure the stability of the drainage hole
Measurement and payment shall be for the actual length of drainage holes drilled in linear metres.

5_1 C1051 Horizontal/sub horizontal in all kinds of rock dia, equal or greater than 50mm

Round Dia of Hole LENGTH QUANTITY


Chainage TM No REMARKS
No (mm) (meter) (RM)

Tunnel T-12-P1

37+171.0 80 51 15 1 15
Tunnel T-13-P1
38+822.5 37 51 15 1 15

TOTAL= 30

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 45.00 Rm
Total Quantity Paid Up to Previous RA Bill 15.00 Rm
Quantity for This RA Bill 30.00 Rm

CS DHORAJIA JV CS DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER

Page 109 of 151


Drilling of exploratory holes up to 35m length with specified diameter in any direction as per the technical
specifications and as directed by the Engineer in the presence of an expert geologist. These items also
include:
- drilling through sprayed concrete, walls, reinforcement
5 C105 - drilling in presence of water
- all measures necessary in soft ground to ensure the stability of the drainage hole
Measurement and payment shall be for the actual length of drainage holes drilled in linear metres.

5_1 C1051 0

Round Dia of Hole LENGTH QUANTITY


Chainage TM No REMARKS
No (mm) (meter) (RM)

Tunnel T-12-P1

37+374 238 51 15 1 15
37+392 301 51 15 1 15
37+423.5 332.5 51 15 1 15
37+456.5 365.5 51 15 1 15

Tunnel T-13-P1
38+933.5 148 51 15 1 15
38+954.5 169 51 15 1 15
38+977.2 191.7 51 15 1 15

TOTAL= 105

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 150.00 Rm
Total Quantity Paid Up to Previous RA Bill 45.00 Rm
Quantity for This RA Bill 105.00 Rm

CS DHORAJIA JV CS DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER

Page 110 of 151


0
1 D101

Round QUANTITY
Chainage TM No REMARKS
No (No)

Tunnel T-12P1
37249 5.00 5.00
37398 5.00 5.00
Tunnel T-12P2 Capping Beam 3.00 3.00
Tunnel T-13P1 38865 5.00 5.00

38890 5.00 5.00


38915 5.00 5.00
38940 5.00 5.00

TOTAL= 33.00

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 138.00 No
Total Quantity Paid Up to Previous RA Bill 105.00 No
Quantity for This RA Bill 33.00 No

CS DHORAJIA JV CS DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER

Page 111 of 151


Sl no Item No Description of Item

Random rubble masonry, hammer dressed wherever necessary, in cement and sand 1 :6 in wing wall, toe wall, breast wall,
retaining wall, curtain wall, parapet wall, slope of guide bunds, catch water drains, side drains etc, as per drawing and
10 E1010 as per technical specification prescribed in MoRTH including providing weep holes of 100mm dia. PVC pipe at 1 .Om
c/c horizontally and vertically, with contractors men, material, consumables, tools & plants, equipments, machineries,
including all lead & lifts, loading , unloading ,as directed by Engineer -in -Charge , etc complete.

Location Unit Length Breadth Height Quantity Remarks

Chainage
From to
RRM Wall at APPROACH ROAD OF T12P2 Chainage ( 300.00m to 350.00m)
RRM Wall No B1 Cum 11.20 Area= 3.60 40.32
RRM Wall No B2 Cum 9.40 Area= 3.60 33.84
RRM Wall No B3 Cum 5.10 Area= 3.60 18.36
RRM Wall No B4 Cum 5.95 Area= 3.60 21.42
RRM Wall No B5 Cum 5.95 Area= 3.60 21.42
RRM Wall No B6 Cum 6.10 Area= 3.60 21.96
RRM Wall No B7 Cum 6.10 Area= 3.60 21.96

RRM Wall at APPROACH ROAD OF T12P2 (Chainage 623.0m to 640.0m)


RRM Wall No -1 Cum 8.30 Area= 3.30 27.39
RRM Wall No -2 Cum 8.70 Area= 3.30 28.71

RRM Wall at APPROACH ROAD OF T12P2 (Chainage 623.0m to 640.0m)


RRM Wall No 11 Cum 6.25 Area= 5.81 36.31
RRM Wall No 12 Cum 6.20 Area= 4.91 30.44
RRM Wall No 13 Cum 3.90 Area= 4.79 18.68

TOTAL= 320.81

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 3,289.25
Total Quantity Paid Up to Previous RA Bill 2,968.44
Quantity for This RA Bill 320.81

CS-DHORAJIA JV CS-DHORAJIA JV IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
ANNEXURE A
No of
LG MARKED No Dia of Bar Length Unit Weight Total Weight Remarks
Segment

1 2 16mm 6.522 1.580 20.61 Outer Bar


6.522m

Segment 1 1 1 25mm 6.348 6.522m 3.850 24.44 Inner Bar

9.415m
1 3 10mm 9.415 0.620 17.51 Connecting Bar

2 2 16mm 3.906 3.906m 1.580 24.69 Outer Bar

3.824m
Segment 2 2 1 25mm 3.824 3.850 29.44 Inner Bar

LG
96/25/16 9.415m
Pantex 2 3 10mm 5.624 0.620 20.92 Connecting Bar

2 2 16mm 3.311 3.311m 1.580 20.93 Outer Bar

3.233m
Segment 3 2 1 25mm 3.233 3.850 24.89 Inner Bar

4.632m
2 3 10mm 4.632 0.620 17.23 Connecting Bar

No Area Breadth Unit weight


Area=0.5(0.112+0.112)X0.136=
20 0.0152 0.010 7850.000 23.860 0.0152sqm
Joint Plate
Area=0.5(0.112+0.112)X0.136=
20 0.0152 0.010 7850.000 23.860 0.0152sqm
M20 X 75N Bolt 16 0.270 4.320 4X4=16no
Tie Rod 12 16mm 1.500 1.580 28.440
281.140
TAX INVOICE
INVOICE NO. CSDCCJV/T12&13/Siteoffice/2021/RAB-07 Job Type Service

INVOICE DATE: 14.08.2021


Period of service 01.07.2021 to 31.07.2021
RA Bill No. 7
State West Bengal Place of servicec Sukhia Khola Kalimpong, West Bengal
Details of Service Receiver Billed To Details of Service Provider Billed from
IRCON INTERNATIONAL LIMITED CS- Dhorajia JV, C-25, Trezure Enclave, Nr. Aryaman Bungalows, Thaltej-Shilaj Road, Thaltej, Ahmedabad, Sujarat-380059
(HO-C-4, District Center,Saket, New Delhi-110017) Contract No. IRCON/2046/Sivok-Rangpo/T12&T13/50
48U, SAIBABA ROAD, NEAR FOOD GODOWN, RANGPO BAZAR, RANGPO, SIKKIM, 732132.Rnagpo
Address TIN No.
bazar,Gangtok East
GST IN: 19AAACI0684H12ZI PAN NO: AAPFC7962A

LOA No. IRCON/CC/TN/SR-2046/Const/T12&T13/12/1937. dated.05.10.2020 GSTIN: 19AAPFC7962A1Z7

`
CGST SGST
HSN/SAC As per
Sl.No Product description Bill Amount LOA Amount Taxable Amount
Code LOA Rate Amount Rate Amount

1 Construction of Tunnel T-12 & T13 ₹ 33,883,322.36 4.81% ₹ 1,629,787.81 ₹ 35,513,110.17 6% ₹ 2,130,787.00 6% ₹ 2,130,787.00

₹ 35,513,110.17

Gross Amount before GST


Add CGST 6% ₹ 2,130,787.00
ADD SGST 6% ₹ 2,130,787.00
Bank Details :Yes Bank Common seal
A/C No. :000763400002607 NET AMOUNT ₹ 39,774,684.00
IFS CODE: :YESB0000007(Ahmedabad branch)
Certified that the particulars given above are true and corrected
Terms & Conditions:
1.Security deposit to be deducted on taxable value only.
2. TDS to be duducted as per statutory rules.
3. GST will be applicable as per statutory rules.

Page 114
ANNEXURE A
No of
LG MARKED No Dia of Bar Length Unit Weight Total Weight Remarks
Segment

1 2 16mm 3.483 1.580 11.01 Outer Bar


6.522m

Segment 1 1 1 25mm 3.340 6.522m 3.850 12.86 Inner Bar

9.415m
1 3 10mm 3.480 0.620 6.47 Connecting Bar

2 2 16mm 3.482 3.906m 1.580 22.01 Outer Bar

3.824m
Segment 2 2 1 25mm 3.340 3.850 25.72 Inner Bar

LG
96/25/16 9.415m
Pantex 2 3 10mm 3.480 0.620 12.95 Connecting Bar

2 2 16mm 2.080 2.080m 1.580 13.15 Outer Bar

2.080m
Segment 3 2 1 25mm 2.080 3.850 16.02 Inner Bar

4.632m
2 3 10mm 1.740 0.620 6.47 Connecting Bar

No Area Breadth Unit weight


Area=0.5(0.112+0.112)X0.136=
20 0.0152 0.010 7850.000 23.860 0.0152sqm
Joint Plate
Area=0.5(0.112+0.112)X0.136=
20 0.0152 0.010 7850.000 23.860 0.0152sqm
M20 X 75N Bolt 16 0.270 4.320 4X4=16no
Tie Rod 10 16mm 1.500 1.580 23.700
202.400
INCREMENTAL RIB DETAILS HEADING PORTION T12P2 ANNEXURE -1
Length Total Weight in
RIB MARKED No Unit Weight Remarks
Inner Outer Average Kg

R1 1 5.099 4.794 4.947 37.300 184.504 Drawing no:


R2 1 4.002 3.762 3.882 37.300 144.799 IN151006-T12-F-D-12316
R2x 1 4.002 3.762 3.882 37.300 144.799 Revision-0
PORTAL RIB D No Length Breadth Thickness Unit weight
Shaped Splice Plate 2 0.562 0.125 0.012 7850.000 13.240
Joint Plate 8 0.250 0.125 0.012 7850.000 23.550
M20 X 75N Bolt 12 0.270 3.240 2X6=12no
Tie Rod 10 0.500 2.470 12.350
526.482

R1 1 6.664 6.271 6.468 37.300 241.238 Drawing no:


R2 1 2.241 2.108 2.175 37.300 81.109 IN151006-T12-F-D-12309A
R2x 1 2.241 2.108 2.175 37.300 81.109 Revision-0
R3 1 1.675 1.675 1.675 37.300 62.478
R3x 1 1.675 1.675 1.675 37.300 62.478
RIB 1 (ISMB 250) R4 1 1.175 0.209 0.692 37.300 25.812 Avg length=(.209+1.175)/2
R4x 1 1.175 0.209 0.692 37.300 25.812
No Length Breadth Thickness Unit weight
Joint Plate 6 0.400 0.225 0.010 7850.000 42.390
M20 X 75N Bolt 16 0.270 4.320 4X4=16no
Tie Rod 10 0.500 2.470 12.350
639.094

R1 1 6.733 6.340 6.537 37.300 243.811 Drawing no:


R2 1 2.264 2.132 2.198 37.300 81.985 IN151006-T12-F-D-12309A
R2x 1 2.264 2.132 2.198 37.300 81.985 Revision-0
R3 1 1.686 1.686 1.686 37.300 62.888
R3x 1 1.686 1.686 1.686 37.300 62.888
RIB 2 (ISMB 250) R4 1 1.175 0.209 0.692 37.300 25.812 Avg length=(.209+1.175)/2
R4x 1 1.175 0.209 0.692 37.300 25.812
No Length Breadth Thickness Unit weight
Joint Plate 6 0.400 0.225 0.010 7850.000 42.390
M20 X 75N Bolt 16 0.270 4.320 4X4=16no
Tie Rod 10 0.500 2.470 12.350
644.241
No Length
RIB MARKED Unit Weight Total Weight Remarks
Inner Outer Average
R1 1 6.802 6.409 6.606 37.300 246.385 Drawing no:
R2 1 2.288 2.155 2.222 37.300 82.862 IN151006-T12-F-D-12309B
R2x 1 2.288 2.155 2.222 37.300 82.862
R3 1 1.698 1.698 1.698 37.300 63.335
R3x 1 1.698 1.698 1.698 37.300 63.335
R4 1 1.175 0.209 0.692 37.300 25.812 Avg length=(.209+1.175)/2
RIB 3 (ISMB 250)
R4x 1 1.175 0.209 0.692 37.300 25.812
No Length Breadth Thickness Unit weight
Splice Plate 2 0.562 0.125 0.012 7850.000 13.240
Joint Plate 8 0.250 0.125 0.012 7850.000 23.550
M20 X 75N Bolt 16 0.270 4.320 4X4=16no
Tie Rod 10 0.500 2.470 12.350
643.863
No Length
RIB MARKED Unit Weight Total Weight Remarks
Inner Outer Average
R1 1 6.871 6.478 6.675 37.300 248.959 Drawing no:
R2 1 2.311 2.178 2.245 37.300 83.720 IN151006-T12-F-D-12309B
R2x 1 2.311 2.178 2.245 37.300 83.720
R3 1 1.709 1.709 1.709 37.300 63.746
R3x 1 1.709 1.709 1.709 37.300 63.746
RIB 4 (ISMB 250)
Page 116 of 151
INCREMENTAL RIB DETAILS HEADING PORTION T12P2 ANNEXURE -1
R4 1 1.175 0.209 0.692 37.300 25.812 Avg length=(.209+1.175)/2
RIB 4 (ISMB 250)
R4x 1 1.175 0.209 0.692 37.300 25.812
No Length Breadth Thickness Unit weight
Splice Plate 2 0.562 0.125 0.012 7850.000 13.240
Joint Plate 8 0.250 0.125 0.012 7850.000 23.550
M20 X 75N Bolt 16 0.270 4.320 4X4=16no
Tie Rod 10 0.500 2.470 12.350
648.973
No Length
RIB MARKED Unit Weight Total Weight Remarks
Inner Outer Average
R1 1 6.940 6.547 6.744 37.300 251.533 Drawing no:
R2 1 2.335 2.202 2.269 37.300 84.615 IN151006-T12-F-D-12309B
R2x 1 2.335 2.202 2.269 37.300 84.615
R3 1 1.721 1.721 1.721 37.300 64.193
R3x 1 1.721 1.721 1.721 37.300 64.193
R4 1 1.175 0.209 0.692 37.300 25.812 Avg length=(.209+1.175)/2
RIB 5 (ISMB 250)
R4x 1 1.175 0.209 0.692 37.300 25.812
No Length Breadth Thickness Unit weight
Splice Plate 2 0.562 0.125 0.012 7850.000 13.240
Joint Plate 8 0.250 0.125 0.012 7850.000 23.550
M20 X 75N Bolt 16 0.270 4.320 4X4=16no
Tie Rod 10 0.500 2.470 12.350
654.232
No Length
RIB MARKED Unit Weight Total Weight Remarks
Inner Outer Average
R1 1 7.009 6.617 6.813 37.300 254.125 Drawing no:
R2 1 2.358 2.225 2.292 37.300 85.473 IN151006-T12-F-D-12309B
R2x 1 2.358 2.225 2.292 37.300 85.473
R3 1 1.732 1.732 1.732 37.300 64.604
R3x 1 1.732 1.732 1.732 37.300 64.604
R4 1 1.175 0.209 0.692 37.300 25.812 Avg length=(.209+1.175)/2
RIB 6 (ISMB 250)
R4x 1 1.175 0.209 0.692 37.300 25.812
No Length Breadth Thickness Unit weight
Splice Plate 2 0.562 0.125 0.012 7850.000 13.240
Joint Plate 8 0.250 0.125 0.012 7850.000 23.550
M20 X 75N Bolt 16 0.270 4.320 4X4=16no
Tie Rod 10 0.500 2.470 12.350
659.361
No Length
RIB MARKED Unit Weight Total Weight Remarks
Inner Outer Average
R1 1 7.079 6.686 6.883 37.300 256.717 Drawing no:
R2 1 2.381 2.257 2.319 37.300 86.499 IN151006-T12-F-D-12309B
R2x 1 2.381 2.257 2.319 37.300 86.499
R3 1 1.743 1.743 1.743 37.300 65.014
R3x 1 1.743 1.743 1.743 37.300 65.014
R4 1 1.175 0.209 0.692 37.300 25.812 Avg length=(.209+1.175)/2
RIB 7 (ISMB 250)
R4x 1 1.175 0.209 0.692 37.300 25.812
No Length Breadth Thickness Unit weight
Splice Plate 2 0.562 0.125 0.012 7850.000 13.240
Joint Plate 8 0.250 0.125 0.012 7850.000 23.550
M20 X 75N Bolt 16 0.270 4.320 4X4=16no
Tie Rod 10 0.500 2.470 12.350
664.826
No Length
RIB MARKED Unit Weight Total Weight Remarks
Inner Outer Average
R1 1 7.147 6.755 6.951 37.300 259.272 Drawing no:
R2 1 2.405 2.280 2.343 37.300 87.375 IN151006-T12-F-D-12309B
R2x 1 2.405 2.280 2.343 37.300 87.375
R3 1 1.755 1.755 1.755 37.300 65.462
R3x 1 1.755 1.755 1.755 37.300 65.462
R4 1 1.175 0.209 0.692 37.300 25.812 Avg length=(.209+1.175)/2
RIB 8 (ISMB 250)
R4x 1 1.175 0.209 0.692 37.300 25.812
No Length Breadth Thickness Unit weight

Page 117 of 151


RIB 8 (ISMB 250)
INCREMENTAL RIB DETAILS HEADING PORTION T12P2 ANNEXURE -1
Splice Plate 2 0.562 0.125 0.012 7850.000 13.240
Joint Plate 8 0.250 0.125 0.012 7850.000 23.550
M20 X 75N Bolt 16 0.270 4.320 4X4=16no
Tie Rod 10 0.500 2.470 12.350
670.029

Page 118 of 151


MODIFIED INCREMENTAL RIB DETAILS ANNEXURE -1
Length Total Weight in
RIB MARKED No Unit Weight Remarks
Inner Outer Average Kg
R1 1 6.664 6.271 6.468 37.300 241.238 Drawing no:
R2 1 2.241 2.108 2.175 37.300 81.109 IN151006-T12-F-D-12309A
R2x 1 2.241 2.108 2.175 37.300 81.109
R3 1 3.971 3.766 3.869 37.300 144.295 Modified
R3x 1 9.971 2.766 6.369 37.300 237.545 Modified
R5 1 3.300 3.124 3.212 37.300 119.808
RIB 1 (ISMB 250)
R5x 1 3.300 3.124 3.212 37.300 119.808
No Length Breadth Thickness Unit weight
Splice Plate 2 0.562 0.125 0.012 7850.000 13.240
Joint Plate 12 0.250 0.125 0.012 7850.000 35.330
M20 X 75N Bolt 24 0.270 6.480 6X4=24no
Tie Rod 15 1.000 2.470 37.050
1,117.011
No Length
RIB MARKED Unit Weight Total Weight Remarks
Inner Outer Average
R1 1 6.733 6.340 6.537 37.300 243.811 Drawing no:
R2 1 2.264 2.134 2.199 37.300 82.023 IN151006-T12-F-D-12309B
R2x 1 2.264 2.134 2.199 37.300 82.023
R3 1 4.006 3.800 3.903 37.300 145.582 Modified
R3x 1 4.006 3.800 3.903 37.300 145.582 Modified
R5 1 3.300 3.131 3.216 37.300 119.938
RIB 2 (ISMB 250)
R5x 1 3.300 3.131 3.216 37.300 119.938
No Length Breadth Thickness Unit weight
Splice Plate 2 0.562 0.125 0.012 7850.000 13.240
Joint Plate 12 0.250 0.125 0.012 7850.000 35.330
M20 X 75N Bolt 24 0.270 6.480 6X4=24no
Tie Rod 15 1.000 2.470 37.050
1,030.997
No Length
RIB MARKED Unit Weight Total Weight Remarks
Inner Outer Average
R1 1 6.802 6.409 6.606 37.300 246.385 Drawing no:
R2 1 2.288 2.155 2.222 37.300 82.862 IN151006-T12-F-D-12309C
R2x 1 2.288 2.155 2.222 37.300 82.862
R3 1 4.040 3.834 3.937 37.300 146.850 Modified
R3x 1 4.040 3.834 3.937 37.300 146.850 Modified
R5 1 3.300 3.131 3.216 37.300 119.938
RIB 3 (ISMB 250)
R5x 1 3.300 3.131 3.216 37.300 119.938
No Length Breadth Thickness Unit weight
Splice Plate 2 0.562 0.125 0.012 7850.000 13.240
Joint Plate 12 0.250 0.125 0.012 7850.000 35.330
M20 X 75N Bolt 24 0.270 6.480 6X4=24no
Tie Rod 15 1.000 2.470 37.050
1,037.786
No Length
RIB MARKED Unit Weight Total Weight Remarks
Inner Outer Average
R1 1 6.871 6.478 6.675 37.300 248.959 Drawing no:
R2 1 2.311 2.178 2.245 37.300 83.720 IN151006-T12-F-D-12309D
R2x 1 2.311 2.178 2.245 37.300 83.720
RIB 4 (ISMB 250) R3 1 4.085 3.869 3.977 37.300 148.342 Modified
R3x 1 4.085 3.869 3.977 37.300 148.342 Modified
R5 1 3.300 3.131 3.216 37.300 119.938
R5x 1 3.300 3.131 3.216 37.300 119.938
No Length Breadth Thickness Unit weight
Splice Plate 2 0.562 0.125 0.012 7850.000 13.240
Joint Plate 12 0.250 0.125 0.012 7850.000 35.330
M20 X 75N Bolt 24 0.270 6.480 6X4=24no
Tie Rod 15 1.000 2.470 37.050
1,045.059

Page 119 of 151


MODIFIED INCREMENTAL RIB DETAILS ANNEXURE -1
No Length
RIB MARKED Unit Weight Total Weight Remarks
Inner Outer Average
R1 1 6.940 6.547 6.744 37.300 251.533 Drawing no:
R2 1 2.335 2.202 2.269 37.300 84.615 IN151006-T12-F-D-12309E
R2x 1 2.335 2.202 2.269 37.300 84.615
RIB 5 (ISMB 250) R3 1 4.109 3.904 4.007 37.300 149.442 Modified
R3x 1 4.109 3.904 4.007 37.300 149.442 Modified
R5 1 3.300 3.131 3.216 37.300 119.938
R5x 1 3.300 3.131 3.216 37.300 119.938
No Length Breadth Thickness Unit weight
Splice Plate 2 0.562 0.125 0.012 7850.000 13.240
Joint Plate 12 0.250 0.125 0.012 7850.000 35.330
M20 X 75N Bolt 24 0.270 6.480 6X4=24no
Tie Rod 15 1.000 2.470 37.050
1,051.624
No Length Unit Weight Total Weight
RIB MARKED Remarks
Inner Outer Average
R1 1 7.009 6.617 6.813 37.300 254.125 Drawing no:
R2 1 2.358 2.225 2.292 37.300 85.473 IN151006-T12-F-D-12309F
R2x 1 2.358 2.225 2.292 37.300 85.473
RIB 6 (ISMB 250) R3 1 4.144 3.938 4.041 37.300 150.729 Modified
R3x 1 4.144 3.938 4.041 37.300 150.729 Modified
R5 1 3.300 3.131 3.216 37.300 119.938
R5x 1 3.300 3.131 3.216 37.300 119.938
No Length Breadth Thickness Unit weight
Splice Plate 2 0.562 0.125 0.012 7850.000 13.240
Joint Plate 12 0.250 0.125 0.012 7850.000 35.330
M20 X 75N Bolt 24 0.270 6.480 6X4=24no
Tie Rod 15 1.000 2.470 37.050
1,058.506
No Length
RIB MARKED Unit Weight Total Weight Remarks
Inner Outer Average
R1 1 7.078 6.686 6.882 37.300 256.699 Drawing no:
R2 1 2.381 2.257 2.319 37.300 86.499 IN151006-T12-F-D-12309G
R2x 1 2.381 2.257 2.319 37.300 86.499
RIB 7 (ISMB 250) R3 1 4.178 3.973 4.076 37.300 152.016 Modified
R3x 1 4.178 3.973 4.076 37.300 152.016 Modified
R5 1 3.300 3.131 3.216 37.300 119.938
R5x 1 3.300 3.131 3.216 37.300 119.938
No Length Breadth Thickness Unit weight
Splice Plate 2 0.562 0.125 0.012 7850.000 13.240
Joint Plate 12 0.250 0.125 0.012 7850.000 35.330
M20 X 75N Bolt 24 0.270 6.480 6X4=24no
Tie Rod 15 1.000 2.470 37.050
1,065.705
No Length Unit Weight Total Weight
RIB MARKED Remarks
Inner Outer Average
R1 1 7.147 6.755 6.951 37.300 259.272 Drawing no:
R2 1 2.405 2.280 2.343 37.300 87.375 IN151006-T12-F-D-12309H
R2x 1 2.405 2.280 2.343 37.300 87.375
RIB 8 (ISMB 250) R3 1 4.213 4.007 4.110 37.300 153.303 Modified
R3x 1 4.213 4.007 4.110 37.300 153.303 Modified
R5 1 3.300 3.131 3.216 37.300 119.938
R5x 1 3.300 3.131 3.216 37.300 119.938
No Length Breadth Thickness Unit weight
Splice Plate 2 0.562 0.125 0.012 7850.000 13.240
Joint Plate 12 0.250 0.125 0.012 7850.000 35.330
M20 X 75N Bolt 24 0.270 6.480 6X4=24no
Tie Rod 15 1.000 2.470 37.050
1,072.605

Page 120 of 151


MODIFIED INCREMENTAL RIB DETAILS ANNEXURE -1
No Length
RIB MARKED Unit Weight Total Weight Remarks
Inner Outer Average
R1 1 7.216 6.824 7.020 37.300 261.846 Drawing no:
R2 1 2.428 2.295 2.362 37.300 88.084 IN151006-T12-F-D-12309I
R2x 1 2.428 2.295 2.362 37.300 88.084
RIB 9 (ISMB 250) R3 1 4.248 4.042 4.145 37.300 154.609 Modified
R3x 1 4.248 4.042 4.145 37.300 154.609 Modified
R5 1 3.300 3.131 3.216 37.300 119.938
R5x 1 3.300 3.131 3.216 37.300 119.938
No Length Breadth Thickness Unit weight
Splice Plate 2 0.562 0.125 0.012 7850.000 13.240
Joint Plate 12 0.250 0.125 0.012 7850.000 35.330
M20 X 75N Bolt 24 0.270 6.480 6X4=24no
Tie Rod 15 1.000 2.470 37.050
1,079.207
No Length
RIB MARKED Unit Weight Total Weight Remarks
Inner Outer Average
R1 1 7.286 6.893 7.090 37.300 264.438 Drawing no:
R2 1 2.452 2.319 2.386 37.300 88.979 IN151006-T12-F-D-12309J
R2x 1 2.452 2.319 2.386 37.300 88.979
RIB 10 (ISMB 250) R3 1 4.282 4.076 4.179 37.300 155.877 Modified
R3x 1 4.282 4.076 4.179 37.300 155.877 Modified
R5 1 3.300 3.131 3.216 37.300 119.938
R5x 1 3.300 3.131 3.216 37.300 119.938
No Length Breadth Thickness Unit weight
Splice Plate 2 0.562 0.125 0.012 7850.000 13.240
Joint Plate 12 0.250 0.125 0.012 7850.000 35.330
M20 X 75N Bolt 24 0.270 6.480 6X4=24no
Tie Rod 15 1.000 2.470 37.050
1,086.126
No Length Unit Weight Total Weight
RIB MARKED Remarks
Inner Outer Average
R1 1 7.355 6.962 7.159 37.300 267.012 Drawing no:
R2 1 2.475 2.342 2.409 37.300 89.837 IN151006-T12-F-D-12309K
R2x 1 2.475 2.342 2.409 37.300 89.837
RIB 11 (ISMB 250) R3 1 4.317 4.111 4.214 37.300 157.182 Modified
R3x 1 4.317 4.111 4.214 37.300 157.182 Modified
R5 1 3.300 3.131 3.216 37.300 119.938
R5x 1 3.300 3.131 3.216 37.300 119.938
No Length Breadth Thickness Unit weight
Splice Plate 2 0.562 0.125 0.012 7850.000 13.240
Joint Plate 12 0.250 0.125 0.012 7850.000 35.330
M20 X 75N Bolt 24 0.270 6.480 6X4=24no
Tie Rod 15 1.000 2.470 37.050
1,093.027
No Length Unit Weight Total Weight
RIB MARKED Remarks
Inner Outer Average
R1 1 7.424 7.031 7.228 37.300 269.586 Drawing no:
R2 1 2.489 2.365 2.427 37.300 90.527 IN151006-T12-F-D-12309L
R2x 1 2.489 2.365 2.427 37.300 90.527
RIB 12 (ISMB 250) R3 1 4.351 4.146 4.249 37.300 158.469 Modified
R3x 1 4.351 4.146 4.249 37.300 158.469 Modified
R5 1 3.300 3.131 3.216 37.300 119.938
R5x 1 3.300 3.131 3.216 37.300 119.938
No Length Breadth Thickness Unit weight
Splice Plate 2 0.562 0.125 0.012 7850.000 13.240
Joint Plate 12 0.250 0.125 0.012 7850.000 35.330
M20 X 75N Bolt 24 0.270 6.480 6X4=24no
Tie Rod 15 1.000 2.470 37.050
1,099.554

Page 121 of 151


TAX INVOICE
INVOICE NO. CSDCCJV/T12&13/Siteoffice/2021/RAB-09 Job Type Service
INVOICE
02.10.2021
DATE: Period of service 01.09.2021 to 30.09.2021
RA Bill No. 9
State West Bengal Place of servicec Sukhia Khola Kalimpong, West Bengal
Details of Service Receiver Billed To Details of Service Provider Billed from
IRCON INTERNATIONAL LIMITED CS- Dhorajia JV, C-25, Trezure Enclave, Nr. Aryaman Bungalows, Thaltej-Shilaj Road, Thaltej, Ahmedabad, Sujarat-380059
(HO-C-4, District Center,Saket, New Delhi-110017) Contract No. IRCON/2046/Sivok-Rangpo/T12&T13/50
48U, SAIBABA ROAD, NEAR FOOD GODOWN, RANGPO BAZAR, RANGPO, SIKKIM,
Address TIN No.
732132.Rnagpo bazar,Gangtok East
GST IN: 19AAACI0684H12ZI PAN NO: AAPFC7962A

LOA No. IRCON/CC/TN/SR-2046/Const/T12&T13/12/1937. dated.05.10.2020 GSTIN: 19AAPFC7962A1Z7

`
CGST SGST
HSN/SAC As per
Sl.No Product description Bill Amount LOA Amount Taxable Amount
Code LOA Rate Amount Rate Amount

1 Construction of Tunnel T-12 & T13 ₹ 106,346,089.00 4.81% ₹ 5,115,247.00 ₹ 111,461,336.00 6% ₹ 6,687,680.20 6% ₹ 6,687,680.00

₹ 111,461,336.00

Gross Amount before GST


Add CGST 6% ₹ 6,687,680.00
ADD SGST 6% ₹ 6,687,680.00
Bank Details :Yes Bank Common seal
A/C No. :000763400002607 NET AMOUNT ₹ 124,836,696.00
IFS CODE: :YESB0000007
Certified that the particulars given above are true and corrected
Branch: :Ahmedabad
Terms & Conditions:
1.Security deposit to be deducted on taxable value only.
2. TDS to be duducted as per statutory rules.
3. GST will be applicable as per statutory rules.

Page 122
Underground excavation (TopHeading,Bench,Invert) for main tunnel,adit,niches (Elctrical,Trolley Refuge and the like)and
connection of the main tunnel to the adit by all means of excavation (drilling,blasting /control blasting (wherever
required) ,digging etc) in accordance with the New Austrian Tunnelling Method (NATM).This item includes:-Mandatory
excavation in sub divisons (Top heading, bench and invert)according to geometries, excavation and support sequence shown
on design drawings and as described in the technical specifications- in rock the application of smooth blasting techniques
A102 with contour hole spacing not exceeding 300 mm- Simultaneous excavation works in top heading, and half sided benching in
rail tunnels as per technical specifications or as directed byEngineer- Systematic exploratory drillholes- Appropriate Plant and
Equipment with appropriate size specifically selected for the various tunnel sizes and as declared in the technical bid- Face
maping & Rock Classification after each blast.- Provision of drainages for all surfaces with vehicular circulation- Provision of
adequate lighting and construction ventilation-

BOQ ITEM NO. A1026 - Excavation in Support Class-VI

AVERAGE
TUNNEL AREA LENGTH QUANTITY
CHAINAGE ATSS No. AREA REMARKS
METER (sqm) (meter) (cum)
(sqm)

37,094.00 3.00 T12P1/4 61.06


37,095.00 4.00 T12P1/5 61.06 61.06 1.00 61.06 Full Face
37,096.00 5.00 T12P1/6 61.06 61.06 1.00 61.06 Full Face
37,097.00 6.00 T12P1/7 61.06 61.06 1.00 61.06 Full Face
37,098.00 7.00 T12P1/8 61.06 61.06 1.00 61.06 Full Face
37,099.00 8.00 T12P1/9 61.06 61.06 1.00 61.06 Full Face
37,100.00 9.00 T12P1/10 61.06 61.06 1.00 61.06 Full Face
37,101.00 10.00 T12P1/11 62.25 61.65 1.00 61.65 Full Face R1
37,102.00 11.00 T12P1/12 64.18 63.22 1.00 63.22 Full Face R3
37,103.00 12.00 T12P1/13 66.13 65.16 1.00 65.16 Full Face R5
37,104.00 13.00 T12P1/14 62.25 64.19 1.00 64.19 Full Face R1
37,105.00 14.00 T12P1/15 64.18 63.22 1.00 63.22 Full Face R3
37,106.00 15.00 T12P1/16 66.13 65.16 1.00 65.16 Full Face R5
37,107.00 16.00 T12P1/17 66.13 66.13 1.00 66.13 Full Face R5
37,108.00 17.00 T12P1/18 64.18 65.16 1.00 65.16 Full Face R3
37,109.00 18.00 T12P1/19 61.89 63.04 1.00 63.04 Full Face R1
37,110.00 19.00 T12P1/017 63.59 62.74 1.00 62.74 Full Face R3
37,111.00 20.00 T12P1/018 65.77 64.68 1.00 64.68 Full Face R5
37,112.00 21.00 T12P1/019 65.77 65.77 1.00 65.77 Full Face R5
37,113.00 22.00 T12P1/020 65.77 65.77 1.00 65.77 Full Face R5
37,114.00 23.00 T12P1/021 67.74 66.75 1.00 66.75 Full Face R7
37,115.00 24.00 T12P1/022 69.69 68.72 1.00 68.72 Full Face R9
37,116.00 25.00 T12P1/023 69.69 69.69 1.00 69.69 Full Face R9
37,117.00 26.00 T12P1/024 61.89 65.79 1.00 65.79 Full Face R1
37,118.00 27.00 T12P1/025 63.59 62.74 1.00 62.74 Full Face R3
37,119.00 28.00 T12P1/026 65.77 64.68 1.00 64.68 Full Face R5
37,120.00 29.00 T12P1/027 67.74 66.75 1.00 66.75 Full Face R7
37,121.00 30.00 T12P1/028 69.69 68.72 1.00 68.72 Full Face R9
37,122.00 31.00 T12P1/029 61.89 65.79 1.00 65.79 Full Face R1
37,123.00 32.00 T12P1/030 63.59 62.74 1.00 62.74 Full Face R3
37,124.00 33.00 T12P1/031 65.77 64.68 1.00 64.68 Full Face R5
37,125.00 34.00 T12P1/032 67.74 66.75 1.00 66.75 Full Face R7
37,126.00 35.00 T12P1/033 69.69 68.72 1.00 68.72 Full Face R9
37,127.00 36.00 T12P1/034 61.89 65.79 1.00 65.79 Full Face R1
37,128.00 37.00 T12P1/035 63.59 62.74 1.00 62.74 Full Face R3
TOTAL= 2,193.30

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 2,193.30 Cum
Total Quantity Paid Up to Previous RA Bill 1,026.47 Cum
Quantity for This RA Bill 1,166.83 Cum

CS-DHORAJIA JV CS-DHORAJIA JV DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Executed Qauntity from 01.02.2021 to 09.03 2021

Self drilling rock bolts (IBO) for tunnel support, slope support, face bolts etc. Supply, drilling, installation,
grouting and testing of self driling rock bolts of specified length L, specified minimum ultimate load as per
design drawings (Fy=200kN), technical specifications or as directed by Engineer. Drilling with grout
flushing is mandatory. This item includes:
B103
- couplings
- sacrificial drilling bits + grouting
Measurement and payment shall be per piece appropriately installed rock bolts (for exact payment details
see specifications).

BOQ ITEM NO. B1033 Length 6 m


ROUND CHAINAGE (m) TUNNEL METER
ATSS NO. Nos QUANTITY (Nos) REMARKS
NO From To From To
T12P1/4 4.00 37,094.00 37,095.00 4.00 5.00 8.00 8.00 T12P1

T12P1/5 5.00 37,095.00 37,096.00 5.00 6.00 7.00 7.00 T12P1

T12P1/6 6.00 37,096.00 37,097.00 6.00 7.00 8.00 8.00 T12P1

T12P1/7 7.00 37,097.00 37,098.00 7.00 8.00 8.00 8.00 T12P1

T12P1/8 8.00 37,098.00 37,099.00 8.00 9.00 9.00 9.00 T12P1

T12P1/9 9.00 37,099.00 37,100.00 9.00 10.00 9.00 9.00 T12P1

T12P1/10 10.00 37,100.00 37,101.00 10.00 11.00 9.00 9.00 T12P1

Total= 58.00

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 58.00
Total Quantity Paid Up to Previous RA Bill 0.00
Quantity for This RA Bill 58.00

CS-DHORAJIA JV CS-DHORAJIA JV DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Executed Qauntity Upto 31st Jan 2021
Sl no Item No Description of Item
Self drilling rock bolts (IBO) for tunnel support, slope support, face bolts etc. Supply, drilling, installation, grouting and
testing of self driling rock bolts of specified length L, specified minimum ultimate load as per design drawings
(Fy=200kN), technical specifications or as directed by Engineer. Drilling with grout flushing is mandatory. This item
includes:
3 B103 - couplings
- sacrificial drilling bits + grouting
Measurement and payment shall be per piece appropriately installed rock bolts (for exact payment details see
specifications).

3_4 B1034 Length 9 m,


PORTAL T12-P1
Elevation
QUANTITY
Location Unit No Length REMARKS
From To (No)

378.00 384.00 1st slope No 50 50


372.00m RHS No 8 8
373.50m RHS No 8 8
375.00m RHS No 7 7
TOTAL= 73
Detail of Certified Quantity by IRCON
Total Up to date quantity Executed 73.00
Total Quantity Paid Up to Previous RA Bill 0.00
Quantity for This RA Bill 73.00

DHORAJIA DHORAJIA DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER

Page 125 of 151


Executed Qauntity from 01.02.2021 to 09.03 2021
Pipe Roof Umbrella: Supply, drilling, installation and grouting of self-drilling pipe technology of length up to 18m
as per approved drawings & specifications (single row, double row, skin-to-skin single row) or as directed by
Engineer. The rate shall include costs of all materials like starter units, pipes (perforated), drill bits, grouting
packers etc., labour, equipments, etc. required for the complete job. This item includes:
- Mobilistaion and demobilsation of all equipment necessary (drilling jumbo equipped with AT-casing system,
Symmetrix or similar) for single row, double row or skin-to skin single row
- the necessary excavation
B104 - loading, transport and appropriate depositing of the excavated material
- the excess use of inner lining concrete and waterproofing
- all auxiliary works and materials necessary
Measurement and payment shall be per meter installed pipe roof pipe as directed and approved by the Engineer.

BOQ Item No. B1041 - Outer diameter 76mm, steel grade S355, wall thickness 6.3mm
LENGTH
Round (meter) QUANTITY
Chaiage TM ATSS No. No REMARKS
No (RM)

Tunnel T12P1
7 37099 8 T12/P1-8 6 43 258
12 37103 12 T12/P1-12 6 41 246
17 37108 17 T12/P1-17 9 42 378

TOTAL= 882

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 882.00
Total Quantity Paid Up to Previous RA Bill 0.00
Quantity for This RA Bill 882.00

CS DHORAJIA JV CS DHORAJIA JV DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER

Page 126 of 151


Self drilling rock bolts (IBO) for tunnel support, slope support, face bolts etc. Supply, drilling, installation, grouting
and testing of self driling rock bolts of specified length L, specified minimum ultimate load as per design
drawings (Fy=200kN), technical specifications or as directed by Engineer. Drilling with grout flushing is
mandatory. This item includes:
- couplings
- sacrificial drilling bits + grouting
Measurement and payment shall be per piece appropriately installed rock bolts (for exact payment details see
specifications).

NON SCHEDULE ITEM NO. Length 12 m


ELEVATION RD
ATSS NO. REMARKS
From To From To Nos QUANTITY (Nos)
LOCATION-T12P2
402.50 408.00 73.00 73.00
LOCATION-T13P1
397.00 400.00 5.00 5.00
385.00 387.00 36.00 36.00
Total= 114.00

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 165.00
Total Quantity Paid Up to Previous RA Bill 51.00
Quantity for This RA Bill 114.00

CS-DHORAJIA JV CS-DHORAJIA JV DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Pipe Roof Umbrella: Supply, drilling, installation and grouting of self-drilling pipe technology of length up to 18m as
per approved drawings & specifications (single row, double row, skin-to-skin single row) or as directed by Engineer.
The rate shall include costs of all materials like starter units, pipes (perforated), drill bits, grouting packers etc.,
labour, equipments, etc. required for the complete job. This item includes:
- Mobilistaion and demobilsation of all equipment necessary (drilling jumbo equipped with AT-casing system,
Symmetrix or similar) for single row, double row or skin-to skin single row
- the necessary excavation
B104
- loading, transport and appropriate depositing of the excavated material
- the excess use of inner lining concrete and waterproofing
- all auxiliary works and materials necessary
Measurement and payment shall be per meter installed pipe roof pipe as directed and approved by the Engineer.

BOQ Item No. B1041 - Outer diameter 76mm, steel grade S355, wall thickness 6.3mm

Round LENGTH QUANTITY


Chainage TM ATSS No. No REMARKS
No (meter) (RM)

Tunnel T-13-P1

0 38788.49 12 41 492
Tunnel T-12-P1
9 30 270
26 37116 25 T12/P1-25
6 2 12
TOTAL= 774

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 1,656.00
Total Quantity Paid Up to Previous RA Bill 882.00
Quantity for This RA Bill 774.00

CS DHORAJIA JV CS DHORAJIA JV DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER

Page 128 of 151


Executed Qauntity Upto 31st Jan 2021
Sl no Item No Description of Item
Supply, drilling hole, installation, testing and grouting of forepoling as per approved drawings & specifications or as
5 B105 directed by Engineer. 200kN minimum ultimate load. The rate shall include costs of all materials, labour, equipments, etc.
required for the complete job.

5_1 B1051 Self-drilling bolts, Fy >= 200 KN

Tunnel Length QUANTITY


Round No Chainage Unit No REMARKS
Metre (m) (Rm)

Tunnel-T12-P1
37094.00 3.00 m 138 9.00 1,242.00 69 X 2 Rows

TOTAL= 1,242.00
Detail of Certified Quantity by IRCON
Total Up to date quantity Executed 1,242.00
Total Quantity Paid Up to Previous RA Bill 0.00
Quantity for This RA Bill 1,242.00

DHORAJIA DHORAJIA DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER

Page 129 of 151


STEEL FOR T13P1 PORTAL
Sl no Item No
Supply, cutting, bending, placing, binding steel reinforcement of grade Fe 500 as per approved drawings & specifications or as directed by
7 B107 Engineer, for joint reinforcement of initial and final lining. This shall include straightening, hooking all lead, lift, all auxiliary materials, etc. (Nothing
extra shall be paid for wastage of reinforcement and binding wire).

Cutting Unit
S.NO BAR MARK Shape of bar No's Qty in Kg Remarks
Length Weight
PEDISTRIAL REINFORCEMENT FOR PORTAL FOOTING
A Main Bar

Bottom Reinforcement 20mm


175.32 No= 13 X 2

0.66m

0.66m
1 2.73 26 2.47

0.66m
@250c/c Side=26no

1.41m
5.4m
B Distribution Bar

Bottom Reinforcement 12mm 2.91m


1 2.91 14 0.89 36.26 No= 7X 2 Side=14no
@250c/c

REINFORCEMENT FOR STRUCTURE


7.718m

Vertical Main Bar A Inner 20mm


1 8.07 40 2.47 797.71 No= 20 X 2
@150c/c Side=40no

0.356m

Vertical Main Bar B Inner 20mm


2 7.85 20 2.47 387.59 No= 20 no
@150c/c 7.846m

0.3m
9.073m

Vertical Main Bar C Outer


3 9.73 40 2.47 961.23 No= 20 X 2
20mm @150c/c Side=40no

0.356m

Horizontal Main Bar D Outer 8.78m


4 8.78 20 2.47 433.73 No= 20 no
20mm @150c/c

D Distribution Bar 0.00


Distribution Bar Inner 12mm 2.91m
1 2.91 70 0.89 181.29
@300c/c

Distribution Bar Outer 12mm


2 2.91 2.91 60 0.89 155.39
@300c/c

Distribution Bar at Top 12mm


3 2.91 2.91 30 0.89 77.70
@300c/c

TOTAL IN KG= 3206.22


T13P1 Portal
TOTAL IN MT= 3.21 reinforcement
T12P1 Bridge
From Annex A 5.66 Reinforcement
TOTAL = 8.87

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 14.75
Total Quantity Paid Up to Previous RA Bill 5.88
Quantity for This RA Bill 8.87

CS-DHORAJIA JV CS-DHORAJIA JV
QSS PROJECT MANAGER DDC IRCON Engineer IRCON Site in Charge
REINFORCEMENT FOR 12m SPAN BRIDGE T12P1

Total
DIA Spacing Cutting Unit
S.NO BAR MARK Shape of bar No's Weight Remarks
"mm" in mm Length Weight
kg
RAFT REINFORCEMENT FOR LEFT , RIGHT ABUTMENT & MIDDLE PIER
A Main Bar

0.420m
Bottom

0.420m
1 20.00 200.00 72 4.74 2.47 842.96
Reinforcement
3.9m
5.4m

0.420m
.420m
2 Top Reinforcement 20.00 200.00 3.9m 72 4.74 2.47 842.96

B Distribution Bar

Bottom

.420m
1 16.00 200.00 32 7.94 1.58 401.45
.420m

Reinforcement 7.1m
.420m

7.1m

.420m
2 Top Reinforcement 16.00 200.00 32 7.94 1.58 401.45

C SUPER STRUCTURE
REINFORCEMENT FOR LEFT & RIGHT ABUTMENT
.560m
.818m
4.401m

1 Vertical Main Bar A 20.00 200.00 72 6.38 2.47 1134.44

.600.6

1.31m
3.843m

2 Vertical Main Bar B 20.00 200.00 72 5.76 2.47 1024.89

.600m

D Distribution Bar
1.02m

1 Distribution Bar at A 16.00 200.00 44 7.10 1.58 493.59


1.02m

5.06m
1.02m

5.06m
1.02m

2 Distribution Bar at B 16.00 200.00 34 7.10 1.58 381.41


1.02m

Distribution Bar at 5.06m


1.02m

3 16.00 200.00 12 7.10 1.58 134.62


Top

TOTAL IN KG= 5657.77


TOTAL IN MT= 5.66

CS-DHORAJIA JV CS-DHORAJIA JV
QSS PROJECT MANAGER DDC IRCON Engineer
BAR BENDING SCHEDULE FOR T12P1 PORTAL
Sl no Item No
Supply, cutting, bending, placing, binding steel reinforcement of grade Fe 500 as per approved drawings & specifications or as directed by Engineer, for
7 B107 joint reinforcement of initial and final lining. This shall include straightening, hooking all lead, lift, all auxiliary materials, etc. (Nothing extra shall be paid for
wastage of reinforcement and binding wire).

Cutting Unit
S.NO BAR MARK Shape of bar No's Qty in Kg Remarks
Length Weight
PORTAL BEAM
A Main Bar

0.66m
0.984
Stirrups 12mm @ 150mm c/c 2(A+B)X24d
1 3.50 88 0.89 273.81 =2(0.984+0.620)X
Portal Beam 24X.012=3.496m

0.620m

m
2 Bottom 32dia mm Main Bar 6.0 7.0
m 13.00 5 6.31 410.15

5m
6.2 7.2
5
3 1st Intermediate 16mm dia m 13.50 2 1.58 42.66

5m
4 1st Intermediate 16mm dia 6. 3 7.3
5
13.70 2 1.58 43.29
m

m 8.5
5 Top 16mm dia 7.5 m 16.00 3 1.58 75.84

PARAPET WALL

0.392m

20mm dia front reinforcement of 2.253m


6 3.15 84 2.47 652.52
parapet wall

0.50m

0.455m

20mm dia rear reinforcement of 2.44m


7 3.31 84 2.47 685.72
parapet wall

0.41m

0.510m
20mm dia rear reinforcement of 0.110m
8 0.82 84 2.47 170.13
parapet wall coping
0.200m

2.955m 2.955m
9 12mm dia distridution bar front 15.60 8 0.89 111.07
9.69m

2.545m 2.545m
10 12mm dia distridution bar rear 13.96 8 0.89 99.40
8.87m

2.75m 2.75m
11 12mm dia distridution bar coping 15.19 5 0.89 67.60

9.69m

TOTAL IN KG= 2632.20

TOTAL IN MT= 2.64

CS-DHORAJIA JV CS-DHORAJIA JV DDC IRCON Eng IRCON Site in Charge


QSS PROJECT MANAGER
Executed Qauntity from 01.02.2021 to 09.03 2021
Sl no Item No Description of Item

Supply and placement of welded wire mesh of sizes 150x150x6, 100x100x6 or any other size as directed by Engineer as reinforcement of sprayed concrete for tunnel lining
works as shown
on design drawings, specifications or as directed by Engineer. Steel grade minimum Fe500. This item also includes:
- Fixing elements and materials
8 B108 - cutting, bending and placement
- all auxiliary materials and works necessary
Measurement and payment shall be per square meter for each layer installed and instructed, measured along Payment Line (see specifications). Overlapping as mentioned in
technical specifications is mandatory but shall not be paid
extra.

Wt
TUNNEL Avg =@2.96kg/sq
DESCRIPTION ATSS NO ROUND NO Layer CHAINAGE Length Area REMARKS
METER Perimeter m As per IS
1566-1982
PORTAL T12P1
WIRE MESH 150X150X6 T12P1/ 4 4 2 37,094.00 3.00 19.85
WIRE MESH 150X150X6 T12P1/ 5 5 2 37,095.00 4.00 1.00 20.79 20.79 123.05
WIRE MESH 150X150X6 T12P1/ 6 6 2 37,096.00 5.00 1.00 20.79 20.79 123.05
WIRE MESH 150X150X6 T12P1/ 7 7 2 37,097.00 6.00 1.00 20.79 20.79 123.05
WIRE MESH 150X150X6 T12P1/ 8 8 2 37,098.00 7.00 1.00 20.79 20.79 123.05
WIRE MESH 150X150X6 T12P1/ 9 9 2 37,099.00 8.00 1.00 20.79 20.79 123.05
WIRE MESH 150X150X6 T12P1/ 10 10 2 37,100.00 9.00 1.00 20.79 20.79 123.05
WIRE MESH 150X150X6 T12P1/ 11 11 2 37,101.00 10.00 1.00 21.97 21.97 130.03
WIRE MESH 150X150X6 T12P1/ 12 12 2 37,102.00 11.00 1.00 22.34 22.34 132.25
WIRE MESH 150X150X6 T12P1/ 13 13 2 37,103.00 12.00 1.00 22.53 22.53 133.36
WIRE MESH 150X150X6 T12P1/ 14 14 2 37,104.00 13.00 1.00 21.97 21.97 130.03
WIRE MESH 150X150X6 T12P1/ 15 15 2 37,105.00 14.00 1.00 22.27 22.27 131.83
WIRE MESH 150X150X6 T12P1/ 16 16 2 37,106.00 15.00 1.00 22.53 22.53 133.36
WIRE MESH 150X150X6 T12P1/ 17 17 2 37,107.00 16.00 1.00 22.53 22.53 133.36
WIRE MESH 150X150X6 T12P1/18 18 2 37,108.00 17.00 1.00 22.27 22.27 131.83

Wt
Slope Avg =@2.96kg/sq
Item Unit Layer Offset Width Area REMARKS
Length Length m As per IS
1566-1982
PORTAL T13P1
1 WIRE MESH 150X150X6 Kg 2 3.48 8.60 0.00 0.00 RHS
2 WIRE MESH 150X150X6 Kg 2 16.04 9.76 5.00 3.60 35.13 207.97 RHS
3 WIRE MESH 150X150X6 Kg 2 18.15 17.09 0.00 5.00 85.46 505.94 CL
4 WIRE MESH 150X150X6 Kg 2 27.26 22.71 -5.00 5.00 113.53 672.10 LHS
5 WIRE MESH 150X150X6 Kg 2 27.89 27.58 -10.00 5.00 137.89 816.29 LHS
6 WIRE MESH 150X150X6 Kg 2 29.63 28.76 -15.00 5.00 143.81 851.33 LHS
7 WIRE MESH 150X150X6 Kg 2 29.04 29.34 -20.00 5.00 146.68 868.33 LHS
8 WIRE MESH 150X150X6 Kg 2 17.18 23.11 -25.00 5.00 115.56 684.10 LHS
9 WIRE MESH 150X150X6 Kg 2 10.59 13.88 -30.00 5.00 69.42 410.97 LHS

PORTAL T12P2 FACE SLOPE EL-410.0m To 414.0m


1 6.22 18.00
1 6.55 6.39 23.00 5.00 31.94 94.54
1 5.06 5.81 26.33 3.33 19.31 57.15
1 6.54 5.80 31.83 5.50 31.90 94.42
PORTAL T12P2 SIDE SLOPE (EL-410.0m to 414.0m)
1 5.56 38474.86 0.00 0.00 0.00
1 7.42 6.49 38479.86 5.00 32.46 96.07
1 8.21 7.82 38484.86 5.00 39.08 115.68
1 3.69 5.95 38489.07 4.21 25.06 74.17
1 0.00 1.84 38492.80 3.74 6.88 20.38
1 T13 P1 Catchment Drain at EL-404.0m 18.60 2.48 46.11 136.48
2 T13 P1 Catchment Drain LHS Smaller section 8.90 1.44 12.84 38.01
3 T13 P1 Catchment Drain LHS Large section 12.73 4.51 57.43 169.98

4 T12 P2 Catchment Drain 28.50 0.50 14.25 42.18


TOTAL WEIGHT IN Kg= 7,750.48
TOTAL WEIGHT IN MT= 7.76

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 11.23
Total Quantity Paid Up to Previous RA Bill 3.47
Quantity for This RA Bill 7.76

CS DHORAJIA JV CS DHORAJIA JV DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
TAX INVOICE
INVOICE NO. CSDCCJV/T12&13/Siteoffice/2021/RAB-04 Job Type Service

INVOICE DATE: 30.04.2021


Period of service 01.04.2021 to 30.04.2021
RA Bill No. 4
State West Bengal Place of servicec Sukhia Khola Kalimpong, West Bengal
Details of Service Receiver Billed To Details of Service Provider Billed from
IRCON INTERNATIONAL LIMITED CS- Dhorajia JV, C-25, Trezure Enclave, Nr. Aryaman Bungalows, Thaltej-Shilaj Road, Thaltej, Ahmedabad, Sujarat-380059
(HO-C-4, District Center,Saket, New Delhi-110017) Contract No. IRCON/2046/Sivok-Rangpo/T12&T13/50
48U, SAIBABA ROAD, NEAR FOOD GODOWN, RANGPO BAZAR, RANGPO, SIKKIM, 732132.Rnagpo
Address TIN No.
bazar,Gangtok East
GST IN: 19AAACI0684H12ZI PAN NO: AAPFC7962A

LOA No. IRCON/CC/TN/SR-2046/Const/T12&T13/12/1937. dated.05.10.2020 GSTIN: 19AAPFC7962A1Z7

`
CGST SGST
HSN/SAC As per
Sl.No Product description Bill Amount LOA Amount Taxable Amount
Code LOA Rate Amount Rate Amount

1 Construction of Tunnel T-12 & T13 ₹ 47,724,015.91 4.81% ₹ 2,295,525.17 ₹ 50,019,541.00 6% ₹ 3,001,172.50 6% ₹ 3,001,172.50

₹ 50,019,541.00

Gross Amount before GST


Add CGST 6% ₹ 3,001,172.50
(Rupees Five crore Sixty Laks Twenty Four Thousands and Nine Hundred & Fifty Six Only) ADD SGST 6% ₹ 3,001,172.50
Bank Details :Yes Bank Common seal
A/C No. :000763400002607 NET AMOUNT ₹ 56,021,886.00
IFS CODE: :YESB0000007(Ahmedabad branch)
Certified that the particulars given above are true and corrected
Terms & Conditions:
1.Security deposit to be deducted on taxable value only.
2. TDS to be duducted as per statutory rules.
3. GST will be applicable as per statutory rules.

Page 134
Executed Qauntity from 01.02.2021 to 09.03 2021
Sl no Item No Description of Item

Supply, fabrication and erection of steel rib and all accessories including all lead, lift, wastage,storing,drilling holes, fixing in phases etc.
and installation of accessories for joining the steel rib segments as per approved workshop drawings of contractor & specifications or as
9 B109 directed by Engineer.The rate shall include costs of all materials, labour, equipment,welding, etc
for the complete job including additional cost for enlargement
of top heading footing.

Quantity in
ATSS NO ROUND NO Item No Unit Weight RIB SHAPE/NO Remarks
Kg

ISMB 250 6 875.504 5253.02 D Shape

Item No Weight of 1 set


T12P1/4 to Weight as per Annexure -1
4 to 20 ISMB 250
T12P1/4=20 3 1,229.43 3,688.30 Incremental RIB no 1 Attached
ISMB 250 4 1,239.32 4,957.27 Incremental RIB no 3
ISMB 250 3 1,249.69 3,749.06 Incremental RIB no 5
TOTAL IN Kg= 17,647.65
TOTAL IN MT= 17.30

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 22.24
Total Quantity Paid Up to Previous RA Bill 4.94
Quantity for This RA Bill 17.30

CS DHORAJIA JV CS DHORAJIA JV DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER

Page 135 of 151


Executed Qauntity from 01.02.2021 to 09.03 2021
Sl no Item No Description of Item

Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as shown on design drawings, in technical
specifications and directed by the Engineer. These items include:
- sprayed concrete of grade M25 according to Indian Standard
- all concrete additives
- wastage of sprayed concrete
1 B201
- rebound
- application of shotcrete in multiple layers
- all auxiliary materials and works
Measurement and payment shall be for the theoretical area or volume as shown on the design drawings in square metres/ cubic meters, measured along
Payment-Line (see specifications).

1_1 B 2011 50 mm thick shotcrete lining in tunnel

TUNNEL FACE AREA AS PER QUANTITY


DESCRIPTION UNIT CHAINAGE ATSS NO REMARKS
METER PAYLINE (Sqm)

PORTAL T12P1 FACE SEALING


1 Shotcrete 50mm Thk sqm 37,094.00 3.00 61.06 61.06
2 Shotcrete 50mm Thk sqm 37,095.00 4.00 T12P1/4 61.06 61.06
3 Shotcrete 50mm Thk sqm 37,096.00 5.00 T12P1/5 61.06 61.06
4 Shotcrete 50mm Thk sqm 37,097.00 6.00 T12P1/6 61.06 61.06
5 Shotcrete 50mm Thk sqm 37,098.00 7.00 T12P1/7 61.06 61.06
6 Shotcrete 50mm Thk sqm 37,099.00 8.00 T12P1/8 61.06 61.06
7 Shotcrete 50mm Thk sqm 37,100.00 9.00 T12P1/9 61.06 61.06
8 Shotcrete 50mm Thk sqm 37,101.00 10.00 T12P1/10 62.24 62.24
9 Shotcrete 50mm Thk sqm 37,102.00 11.00 T12P1/11 64.61 64.61
10 Shotcrete 50mm Thk sqm 37,103.00 12.00 T12P1/12 66.57 66.57
11 Shotcrete 50mm Thk sqm 37,104.00 13.00 T12P1/13 62.24 62.24
12 Shotcrete 50mm Thk sqm 37,105.00 14.00 T12P1/14 64.61 64.61
13 Shotcrete 50mm Thk sqm 37,106.00 15.00 T12P1/15 66.57 66.57
14 Shotcrete 50mm Thk sqm 37,107.00 16.00 T12P1/16 66.57 66.57
15 Shotcrete 50mm Thk sqm 37,108.00 17.00 T12P1/17 64.61 64.61 945.38
TOTAL= 945.390

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 945.39
Total Quantity Paid Up to Previous RA Bill 0.00
Quantity for This RA Bill 945.39

CS DHORAJIA JV CS DHORAJIA JV DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Executed Qauntity from 01.02.2021 to 09.03 2021
Sl no Item No Description of Item

Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as shown on design drawings, in technical specifications
and directed by the Engineer. These items include:
- sprayed concrete of grade M25 according to Indian Standard
- all concrete additives
- wastage of sprayed concrete
1 B201
- rebound
- application of shotcrete in multiple layers
- all auxiliary materials and works
Measurement and payment shall be for the theoretical area or volume as shown on the design drawings in square metres/ cubic meters, measured along Payment-Line
(see specifications).

1_6 B 2016 300 mm thick shotcrete lining in tunnel

TUNNEL QUANTITY
DESCRIPTION ATSS NO ROUND UNIT CHAINAGE Length Perimeter Area REMARKS
METER (Sqm)
NO

PORTAL T12P1
1 Shotcrete 300mm Thk T12P1/4 4 sqm 37,094.00 3.00 20.00 0.00
2 Shotcrete 300mm Thk T12P1/5 5 sqm 37,095.00 4.00 1.00 20.94 20.94 20.94
3 Shotcrete 300mm Thk T12P1/6 6 sqm 37,096.00 5.00 1.00 20.94 20.94 20.94
4 Shotcrete 300mm Thk T12P1/7 7 sqm 37,097.00 6.00 1.00 20.94 20.94 20.94
5 Shotcrete 300mm Thk T12P1/8 8 sqm 37,098.00 7.00 1.00 20.94 20.94 20.94
6 Shotcrete 300mm Thk T12P1/9 9 sqm 37,099.00 8.00 1.00 20.94 20.94 20.94
7 Shotcrete 300mm Thk T12P1/10 10 sqm 37,100.00 9.00 1.00 20.94 20.94 20.94
8 Shotcrete 300mm Thk T12P1/11 11 sqm 37,101.00 10.00 1.00 22.11 22.11 22.11
9 Shotcrete 300mm Thk T12P1/12 12 sqm 37,102.00 11.00 1.00 22.42 22.42 22.42
10 Shotcrete 300mm Thk T12P1/13 13 sqm 37,103.00 12.00 1.00 22.68 22.68 22.68
11 Shotcrete 300mm Thk T12P1/14 14 sqm 37,104.00 13.00 1.00 22.11 22.11 22.11
12 Shotcrete 300mm Thk T12P1/15 15 sqm 37,105.00 14.00 1.00 22.42 22.42 22.42
13 Shotcrete 300mm Thk T12P1/16 16 sqm 37,106.00 15.00 1.00 22.68 22.68 22.68
14 Shotcrete 300mm Thk T12P1/17 17 sqm 37,107.00 16.00 1.00 22.68 22.68 22.68
15 Shotcrete 300mm Thk T12P1/18 18 sqm 37,108.00 17.00 1.00 22.42 22.42 22.42 305.13

TOTAL= 305.140

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 305.14
Total Quantity Paid Up to Previous RA Bill 0.00
Quantity for This RA Bill 305.14

CS DHORAJIA JV CS DHORAJIA JV DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Executed Qauntity from 01.02.2021 to 09.03 2021
Sl no Item No Description of Item

Design Mix Cement Concrete M15 in following PCC works including mechanically mixed machine
3 B203 mixed, machine batched, machine vibrated, form work, etc as per specifications & drawings or as directed by
Engineer-in charge

3_1 B2031 For all kinds of structures required (bed, portals, blinding, lean, protection lean concrete)
Location Unit Length Breadth Height Quantity Remarks
APPROACH ROAD T12 P1 CHAINAGE 190.95m to 251.5m
Chainage
From To
RRM Wall 5 190.95 196.65 Cum 5.70 1.46 0.10 0.83
RRM Wall 6 196.65 202.85 Cum 6.20 1.46 0.10 0.91
RRM Wall 7 202.85 208.95 Cum 6.10 1.46 0.10 0.89
RRM Wall 8 208.95 215.65 Cum 6.70 1.46 0.10 0.98
RRM Wall 9 215.65 221.75 Cum 6.10 1.46 0.10 0.89
RRM Wall 10 221.75 226.65 Cum 4.90 1.46 0.10 0.72
RRM Wall 11 226.65 231.90 Cum 5.25 1.46 0.10 0.77
RRM Wall 12 231.90 236.80 Cum 4.90 1.46 0.10 0.72
RRM Wall 13 236.80 241.30 Cum 4.50 1.46 0.10 0.66
RRM Wall 14 241.30 246.50 Cum 5.20 1.46 0.10 0.76
RRM Wall 15 246.50 251.50 Cum 5.00 1.46 0.10 0.73 8.86

APPROACH ROAD T13 P1 CHAINAGE 403.27 to 411.27m


RRM Wall 6 403.27 411.27 Cum 8.00 1.77 0.10 1.42 1.42
APPROACH ROAD T13 P1 (Chainage-403.27m to 411.27m,461.13m to 480.0m,433.0m to 442.47m)
RRM Wall 7 461.13 457.93 Cum 3.20 1.46 0.10 0.47
RRM Wall 8 457.93 462.88 Cum 4.95 1.46 0.10 0.72
RRM Wall 9 462.88 468.68 Cum 5.80 1.77 0.10 1.03
RRM Wall 10 468.68 473.60 Cum 4.92 1.77 0.10 0.87
RRM Wall 11 433.00 438.05 Cum 5.05 2.08 0.10 1.05
RRM Wall 12 438.05 442.47 Cum 4.42 2.08 0.10 0.92 5.06
PORTAL T12P2
a. RRM Wall A Cum 22.15 3 0.10 6.65 6.65
APPROACH ROAD T12P2 CHAINAGE 465.0m to 495.55m
RRM Wall 1 465.00 465.35 Cum 0.35 2.08 0.10 0.07
RRM Wall 2 465.35 470.35 Cum 5.00 2.08 0.10 1.04
RRM Wall 3 470.35 475.35 Cum 5.00 2.08 0.10 1.04
RRM Wall 4 475.35 480.45 Cum 5.10 2.08 0.10 1.06
RRM Wall 5 480.45 485.45 Cum 5.00 2.08 0.10 1.04
RRM Wall 6 485.45 490.45 Cum 5.00 2.08 0.10 1.04
RRM Wall 7 490.45 495.55 Cum 5.10 2.08 0.10 1.06 6.34
APPROACH ROAD T12P2 CHAINAGE 640.0m to 680.80m
RRM Wall 1 640.00 645.00 Cum 5.00 2.08 0.10 1.04
RRM Wall 2 645.00 649.85 Cum 4.85 2.08 0.10 1.01
RRM Wall 3 649.85 655.70 Cum 5.85 2.08 0.10 1.21
RRM Wall 4 655.70 660.70 Cum 5.00 2.08 0.10 1.04
RRM Wall 5 660.70 665.70 Cum 5.00 2.08 0.10 1.04
RRM Wall 6 665.70 670.70 Cum 5.00 2.08 0.10 1.04
RRM Wall 7 670.70 675.80 Cum 5.10 2.08 0.10 1.06
RRM Wall 8 675.80 680.80 Cum 5.00 2.08 0.10 1.04 8.47
T12P1 CATCHMENT DRAIN
a. Top Slope Cum 117.00 0.60 0.10 7.02
b. 1st Bench Drain Cum 52.50 0.60 0.05 1.58 8.60
TOTAL= 45.39

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 60.84
Total Quantity Paid Up to Previous RA Bill 15.45
Quantity for This RA Bill 45.39

CS-DHORAJIA JV CS DHORAJIA JV DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Sl no Item No Description of Item
Drilling of different dia holes (diameter 42mm to 62mm) in rock/ soil of required length in any direction as per approved
drawings and specifications or as directed by the Engineer. These items also include:
- drilling through sprayed concrete, walls, reinforcement
- drilling in presence of water
4 C104 - all measures necessary in soft ground to ensure the stability of the drainage hole
Measurement and payment shall be for the actual length of drainage holes drilled in linear metres.

PORTAL T13-P1
Elevation
QUANTITY
Location Unit No Length REMARKS
From To (No)

397.00 400.00 No 3 3.00 9


385.00 387.00 No 9 3.00 27
PORTAL T12-P2
400.00 413.00 No 8 3.00 24

TOTAL= 60
Detail of Certified Quantity by IRCON
Total Up to date quantity Executed 60.00
Total Quantity Paid Up to Previous RA Bill 0.00
Quantity for This RA Bill 60.00

CS DHORAJIA JV CS DHORAJIA JV DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Executed Qauntity from 01.02.2021 to 09.03 2021
Sl no Item No Description of Item

Random rubble masonry, hammer dressed wherever necessary, in cement and sand 1 :6 in wing wall, toe wall, breast wall,
retaining wall, curtain wall, parapet wall, slope of guide bunds, catch water drains, side drains etc, as per drawing and
10 E1010 as per technical specification prescribed in MoRTH including providing weep holes of 100mm dia. PVC pipe at 1 .Om
c/c horizontally and vertically, with contractors men, material, consumables, tools & plants, equipments, machineries,
including all lead & lifts, loading , unloading ,as directed by Engineer -in -Charge , etc complete.

Location Unit Length Breadth Height Quantity Remarks

Chainage
From to
APPROACH ROAD OF T13P1 CHANAGE-403.27m to 411.27m
f. RRm Wall 6 403.27 411.27 Cum 8.00 Area= 3.83 30.60
APPROACH ROAD OF T13P1 CHANAGE-411.27 to 442.47m
RRM wall 7 461.13 457.93 Cum 3.20 Area= 2.58 8.27
RRM wall 8 457.93 462.88 Cum 4.95 Area= 2.63 13.04
RRM wall 9 462.88 468.68 Cum 5.80 Area= 3.91 22.70
RRM wall 10 468.68 473.60 Cum 4.92 Area= 4.79 23.55
RRM wall 11 433.00 438.05 Cum 5.05 Area= 7.44 37.56
RRM wall 12 438.05 442.47 Cum 4.42 Area= 7.27 32.14 167.86
APPROACH ROAD OF T12P1 CHANAGE-190.95m to 251.50m
RRM Wall 5 190.95 196.65 Cum 5.70 Area= 3.20 18.27
RRM Wall 6 196.65 202.85 Cum 6.20 Area= 3.38 20.99
RRM Wall 7 202.85 208.95 Cum 6.10 Area= 3.40 20.76
RRM Wall 8 208.95 215.65 Cum 6.70 Area= 3.11 20.87
RRM Wall 9 215.65 221.75 Cum 6.10 Area= 3.02 18.45
RRM Wall 10 221.75 226.65 Cum 4.90 Area= 3.07 15.04
RRM Wall 11 226.65 231.90 Cum 5.25 Area= 2.93 15.41
RRM Wall 12 231.90 236.80 Cum 4.90 Area= 3.47 17.03
RRM Wall 13 236.80 241.30 Cum 4.50 Area= 3.56 16.04
RRM Wall 14 241.30 246.50 Cum 5.20 Area= 3.70 19.24
RRM Wall 15 246.50 251.50 Cum 5.00 Area= 3.29 16.47 198.57
TUNNEL T12P2 DEVELOPMENT
a. RRM Wall A Cum 22.15 Area= 8.87 196.45 196.45
APPROACH ROAD OF T12P2 CHANAGE-465.0m to 495.55m
RRM Wall 1 465.00 465.35
Wall A Cum 4.80 Area= 2.53 12.16
Wall B Cum 2.30 Area= 1.45 3.35
Wall C Cum 0.35 Area= 1.51 0.53
RRM Wall 2 465.35 470.35 Cum 5.00 Area= 5.50 27.50
RRM Wall 3 470.35 475.35 Cum 5.00 Area= 5.50 27.50
RRM Wall 4 475.35 480.45 Cum 5.10 Area= 5.50 28.05
RRM Wall 5 480.45 485.45 Cum 5.00 Area= 5.50 27.50
RRM Wall 6 485.45 490.45 Cum 5.00 Area= 5.27 26.35
RRM Wall 7 490.45 495.55 Cum 5.10 Area= 3.31 16.91
APPROACH ROAD OF T12P2 CHANAGE-640.0m to680.8m
RRM Wall 1 640.00 645.00 Cum 5.00 Area= 3.20 16.00
RRM Wall 2 645.00 649.85 Cum 4.85 Area= 3.20 15.52
RRM Wall 3 649.85 655.70 Cum 5.85 Area= 4.69 27.46
RRM Wall 4 655.70 660.70 Cum 5.00 Area= 5.50 27.50
RRM Wall 5 660.70 665.70 Cum 5.35 Area= 5.61 30.04
RRM Wall 6 665.70 670.70 Cum 5.00 Area= 5.50 27.50
RRM Wall 7 670.70 675.80 Cum 5.10 Area= 5.50 28.05
RRM Wall 8 675.80 680.80 Cum 5.00 Area= 5.50 27.50
TOTAL= 932.30

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 1,197.93
Total Quantity Paid Up to Previous RA Bill 265.63
Quantity for This RA Bill 932.30

CS-DHORAJIA JV CS-DHORAJIA JV DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Sl no Item No Description of Item

Random rubble masonry, hammer dressed wherever necessary, in cement and sand 1 :6 in wing wall, toe wall, breast wall,
retaining wall, curtain wall, parapet wall, slope of guide bunds, catch water drains, side drains etc, as per drawing and
10 E1010 as per technical specification prescribed in MoRTH including providing weep holes of 100mm dia. PVC pipe at 1 .Om
c/c horizontally and vertically, with contractors men, material, consumables, tools & plants, equipments, machineries,
including all lead & lifts, loading , unloading ,as directed by Engineer -in -Charge , etc complete.

Location Unit Length Breadth Height Quantity Remarks

Chainage
From to
APPROACH ROAD OF T13P1 CHANAGE-230.0m to 288.4m
RRM wall 1 A 230.00 235.15 Cum 5.15 Area= 2.12 10.94
RRM wall 2 A 235.15 240.70 Cum 5.55 Area= 2.12 11.79
RRM wall 3 A 240.70 245.80 Cum 5.10 Area= 2.48 12.67
RRM wall 4 A 255.00 261.00 Cum 6.00 Area= 2.84 17.06
RRM wall 5 A 261.00 267.00 Cum 6.00 Area= 2.84 17.06
RRM wall 6 A 270.00 276.00 Cum 6.00 Area= 2.84 17.06
RRM wall 7 A 276.00 282.00 Cum 6.00 Area= 2.84 17.06
RRM wall 8 A 282.00 288.40 Cum 6.40 Area= 2.84 18.20
121.84
TOTAL= 121.84

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 1,319.77
Total Quantity Paid Up to Previous RA Bill 1,197.93
Quantity for This RA Bill 121.84

CS-DHORAJIA JV CS-DHORAJIA JV DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Executed Qauntity Upto 31st Jan 2021
Sl no Item No Description of Item

Supply and placement of welded wire mesh of sizes 150x150x6, 100x100x6 or any other size as directed by Engineer as reinforcement of sprayed concrete for tunnel lining
works as shown
on design drawings, specifications or as directed by Engineer. Steel grade minimum Fe500. This item also includes:
- Fixing elements and materials
8 B108 - cutting, bending and placement
- all auxiliary materials and works necessary
Measurement and payment shall be per square meter for each layer installed and instructed, measured along Payment Line (see specifications). Overlapping as mentioned in
technical specifications is mandatory but shall not be paid
extra.

Wt
Slope Avg =@2.96kg/sq
Item Unit Chainage Width Area REMARKS
Length Length m As per IS
1566-1982

PORTAL T12P1
1 WIRE MESH 150X150X6 Kg 8.90 30 0.00 0.00
2 WIRE MESH 150X150X6 Kg 22.57 15.74 25 5 78.69 232.91
3 WIRE MESH 150X150X6 Kg 28.39 25.48 20 5 127.40 377.09
4 WIRE MESH 150X150X6 Kg 29.93 29.16 15 5 145.79 431.54
5 WIRE MESH 150X150X6 Kg 28.56 29.24 10 5 146.21 432.78
6 WIRE MESH 150X150X6 Kg 27.91 28.23 5 5 141.15 417.81
7 WIRE MESH 150X150X6 Kg 28.83 28.37 0 5 141.85 419.86
8 WIRE MESH 150X150X6 Kg 29.40 29.12 -5 5 145.59 430.95
9 WIRE MESH 150X150X6 Kg 26.73 28.07 -10 5 140.34 415.41
10 WIRE MESH 150X150X6 Kg 25.75 26.24 -14 4 104.97 310.72

TOTAL WEIGHT IN Kg= 3,469.07


TOTAL WEIGHT IN MT= 3.47

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 3.47
Total Quantity Paid Up to Previous RA Bill 0.00
Quantity for This RA Bill 3.47

DHORAJIA DHORAJIA DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Executed Qauntity Upto 31st Jan 2021
Sl no Item No Description of Item

Supply, fabrication and erection of steel rib and all accessories including all lead, lift, wastage,storing,drilling holes, fixing in phases etc. and installation of accessories
for joining the steel rib segments as per approved workshop drawings of contractor & specifications or as directed by Engineer.The rate shall include costs of all
9 B109 materials, labour, equipment,welding, etc
for the complete job including additional cost for enlargement
of top heading footing.

Calculation of Steel RIB


Quantity in
Item No Unit Weight Perimeter
Kg
Perimeter=(2X3.676)+
ISMB 250 4 37.3 20.51 3060.09
((2X3.14X4.19)/2)=20.51m
Quantity in
Item No Length Breadth Thickness Unit Weight
Kg
Splice plate 32 0.4 0.225 0.01 7,850.00 226.08 No=8*X4=32no
Base Plate 8 0.25 0.125 0.012 7,850.00 23.55 No=2X4=8no
M20 J-Bolt 16 0.455 2.47 17.98 No=2X4X2=16no
M20 X 75N
96 0.27 26.11 No=6X4X4=96no
Bolt
Total Weight In Kg 3,353.82 A

25 Dia Rod Bracing welded connecting Steel RIB


Tunnel RD RIB No Quantity
No Length Unit Weight
From To From To (Kg)
0.00 1.00 1 2 10 1.00 3.85 38.50 25dia Steel Bar
1.00 2.00 2 3 10 1.00 3.85 38.50 25dia Steel Bar
2.00 3.00 3 4 10 1.00 3.85 38.50 25dia Steel Bar
Steel Lagging (3.15mm)
RIB No Periphery Quantity
No ATSS No. Width Thickness Unit Weight
From To Length (Kg)
1 4 1 19.77 3.00 0.00315 7850.00 1,466.59 3.15mm steel plate (B)
TOTAL IN Kg= 4,935.91 A+B
TOTAL IN MT= 4.94

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 4.94
Total Quantity Paid Up to Previous RA Bill 0.00
Quantity for This RA Bill 4.94

DHORAJIA DHORAJIA DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER

Page 143 of 151


Executed Qauntity Upto 31st Jan 2021
Sl no Item No Description of Item

Design Mix Cement Concrete M15 in following PCC works including mechanically mixed machine
3 B203 mixed, machine batched, machine vibrated, form work, etc as per specifications & drawings or as directed by
Engineer-in charge

Location Unit Length Breadth Height Quantity Remarks


PORTAL T12P1
a. RHS of Portal Foundation Cum 3.00 2.00 0.10 0.60
b. LHS of Portal Foundation Cum 3.00 2.00 0.10 0.60
c. PCC of RRM wall at RHS of Portal
i. RRM Wall G Cum 7.85 0.95 0.10 0.71
ii. RRM Wall H Cum 7.60 0.95 0.10 0.69 0.18
APPROACH ROAD T12 P1 CHAINAGE 251.5m to 281.0m
a. RRM Wall O Cum 8.30 1.71 0.10 1.42
b. RRM Wall P Cum 8.10 1.71 0.10 1.38
c. RRM Wall Q Cum 7.40 1.71 0.10 1.26
d. RRM Wall R Cum 5.70 1.71 0.10 0.97 0.43
APPROACH ROAD T13 P1 CHAINAGE 371.0m to 403.27m
a. RRM Wall 1 Cum 6.20 2.01 0.10 1.24
b. RRM Wall 2 Cum 8.30 2.01 0.10 1.67
c. RRM Wall 3 Cum 6.10 2.01 0.10 1.22
d. RRM Wall 4 Cum 6.12 2.01 0.10 1.23
e. RRM Wall 5 Cum 5.75. 2.01 0.10 0.20 0.63
PORTAL T12P2
a. RRM Wall A Cum 8.30 2.71 0.10 2.25 2.25
TOTAL= 15.45

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 15.45
Total Quantity Paid Up to Previous RA Bill 0.00
Quantity for This RA Bill 15.45

DHORAJIA DHORAJIA DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Executed Qauntity Upto 31st Jan 2021
Sl no Item No Description of Item

Construction , dowel jointed, cement concrete pavement of M30 grade concrete with 43 grade cement, coarse and fine aggregate
conforming of IS:383, maximum size of coarse aggregate not exceeding 25mm, mixed in a batching plant as per approved mix design,
transported at site, laid with a fixed form or slip form paver or by fixed shuttering, spread, compacted and finished in a continuous
operation and texturing, including provision of contraction, expansion, construction and longitudinal joints, joint filler, seperation
2_3 B2023
membrane,sealant primer, joint sealant, debonding strip, dowel bar, tie bar/rod, admixtures as approved, curing compound, finishing to
lines and grades as per drawing. Item rate shall be inclusive of all material, taxes, duties, manpower, equipment cost, royalties,
transportation, etc.
Reinforcement will be paid separately under the item of reinforcement.

RD/
Location Unit Length Breadth Height Quantity Remarks
Chainage

PORTAL T12P1
a. RHS of Portal Pedistrial Cum 3.00 2.00 0.75 4.50
b. LHS of Portal Pedistrial Cum 3.00 2.00 0.75 4.50
c.Portal Concrete Length Area Avg. Area
i. At Chainage 37091 37091.00 Cum 0.00 46.89 0.00
ii. At Chainage 37092 37092.00 Cum 1.00 48.02 47.46 47.46 0
iii. At Chainage 37093 37093.00 Cum 1.00 47.11 47.57 47.57
iv. At Chainage 37094 37094.00 Cum 1.00 48.60 47.85 47.85
TOTAL= 151.88

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 151.88
Total Quantity Paid Up to Previous RA Bill 0.00
Quantity for This RA Bill 151.88

DHORAJIA DHORAJIA DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
Executed Qauntity Upto 31st Jan 2021
Sl no Item No Description of Item
Earthwork in formation in embankment by using corporations suitable cut spoils obtained from cuttings and leading, spreading,
watering, consolidating etc., as per technical specification prescribed in MoRTH, with contractors men, material, consumables,
2 E102 tools & plants, equipments, machineries, including all lead & lifts, loading , unloading as directed by Engineer - in -Charge ,
etc. complete.

Average
Filling
Location Chainage Length (M) Filling Area Quantity (M³) REMARKS
Area (M²)
(M²)

T12 P1- Approach Road From center of road of 12m Span


1 0.00 0 Bridge of Tumlang Khola
2 10.00 10 0 0 -
3 20.00 10 0 0 -
4 30.00 10 0 0 -
5 40.00 10 0 0 -
6 50.00 10 0 0 -
7 60.00 10 0 0 -
8 70.00 10 0 0 -
9 80.00 10 0 0 -
10 90.00 10 0 0 -
11 100.00 10 0 0 -
12 110.00 10 0 0 -
13 120.00 10 0 0 -
14 130.00 10 4.08 2.04 20.40
15 140.00 10 7.05 5.57 55.70
16 150.00 10 5.77 6.41 64.10
17 160.00 10 0.00 2.89 28.90
18 170.00 10 0 0 -
19 180.00 10 0 0 -
20 190.00 10 0 0 -
21 200.00 10 0 0 -
22 210.00 10 0 0 -
23 220.00 10 0 0 -
24 230.00 10 0 0 -
25 240.00 10 0 0 -
26 250.00 10 0 0 -
27 260.00 10 0 0 -
28 270.00 10 0 0 -
29 280.00 10 0 0 -
30 290.00 10 0 0 -
31 300.00 10 0 0 -
32 310.00 10 0.857 0.43 4.30 173.40
T12 P2 Approach road
1 0.00 0 From Dorajia Site Office Block
2 10.00 10 0.996 0.5 5.00
3 20.00 10 1.123 1.06 10.60
4 30.00 10 0.795 0.96 9.60
5 40.00 10 0 0.4 4.00
6 50.00 10 0 0 -
7 60.00 10 0 0 -
8 70.00 10 0 0 -
9 80.00 10 0 0 -
10 90.00 10 0 0 -
11 100.00 10 0 0 -
12 110.00 10 0 0 -
13 120.00 10 0 0 -
14 130.00 10 0 0 -
15 140.00 10 0 0 -
16 150.00 10 0 0 -
17 160.00 10 0 0 -
18 170.00 10 0 0 -
19 180.00 10 0 0 -

Page 146 of 151


Executed Qauntity Upto 31st Jan 2021
Sl no Item No Description of Item
Earthwork in formation in embankment by using corporations suitable cut spoils obtained from cuttings and leading, spreading,
watering, consolidating etc., as per technical specification prescribed in MoRTH, with contractors men, material, consumables,
2 E102 tools & plants, equipments, machineries, including all lead & lifts, loading , unloading as directed by Engineer - in -Charge ,
etc. complete.

20 190.00 10 0 0 -
21 200.00 10 0 0 -
22 210.00 10 0 0 -
23 220.00 10 0 0 -
24 230.00 10 0 0 -
25 240.00 10 0 0 -
26 250.00 10 0 0 -
27 260.00 10 0 0 -
28 270.00 10 0 0 -
29 280.00 10 0 0 -
30 290.00 10 0 0 -
31 300.00 10 0 0 -
32 310.00 10 0 0 -
33 320.00 10 0 0 -
34 330.00 10 0 0 -
35 340.00 10 0 0 -
36 350.00 10 0 0 -
37 360.00 10 0 0 -
38 370.00 10 0 0 -
39 380.00 10 0 0 -
40 390.00 10 0 0 -
41 400.00 10 0 0 -
42 410.00 10 0 0 -
43 420.00 10 0 0 -
44 430.00 10 0 0 -
45 440.00 10 0 0 -
46 450.00 10 0 0 -
47 460.00 10 11.934 5.97 59.70
48 470.00 10 13.01 12.47 124.70
49 480.00 10 19.889 16.45 164.50
50 490.00 10 3.031 11.46 114.60
51 500.00 10 2.203 2.62 26.20
52 510.00 10 0 1.1 11.00
53 520.00 10 2.69 1.35 13.50
54 530.00 10 0 1.35 13.50
55 540.00 10 0 0 -
56 550.00 10 0 0 -
57 560.00 10 0 0 -
58 570.00 10 0 0 -
59 580.00 10 0 0 -
60 590.00 10 4.03 2.02 20.20
61 600.00 10 0 2.02 20.20
62 610.00 10 0 0 -
63 620.00 10 0 0 -
64 630.00 10 4.285 2.14 21.40
65 640.00 10 0 2.14 21.40
66 650.00 10 5.794 2.9 29.00
67 660.00 10 0 2.9 29.00
68 670.00 10 0 0 -
69 680.00 10 0 0 -
70 690.00 10 1.546 0.77 7.70
71 700.00 10 6.172 3.86 38.60
72 710.00 10 0 3.09 30.90
73 720.00 10 0 0 -
74 730.00 10 0 0 -
75 740.00 10 4.655 2.33 23.30
76 750.00 10 0 2.33 23.30
77 760.00 10 0 0 -
78 770.00 10 2.85 1.43 14.30

Page 147 of 151


Executed Qauntity Upto 31st Jan 2021
Sl no Item No Description of Item
Earthwork in formation in embankment by using corporations suitable cut spoils obtained from cuttings and leading, spreading,
watering, consolidating etc., as per technical specification prescribed in MoRTH, with contractors men, material, consumables,
2 E102 tools & plants, equipments, machineries, including all lead & lifts, loading , unloading as directed by Engineer - in -Charge ,
etc. complete.

79 780.00 10 3.054 2.95 29.50 865.70


T13 P1 Approach road
1 0.00 0 0 0 -
2 10.00 10 0 0 -
3 20.00 10 0 0 -
4 30.00 10 0.331 0.17 1.70
5 40.00 10 0 0.17 1.70
6 50.00 10 0 0 -
7 60.00 10 0 0 -
8 70.00 10 0 0 -
9 80.00 10 0 0 -
10 90.00 10 0 0 -
11 100.00 10 0 0 -
12 110.00 10 0 0 -
13 120.00 10 0 0 -
14 130.00 10 0 0 -
15 140.00 10 0 0 -
16 150.00 10 0 0 -
17 160.00 10 0 0 -
18 170.00 10 0 0 -
19 180.00 10 0 0 -
20 190.00 10 0 0 -
21 200.00 10 0 0 -
22 210.00 10 0.956 0.48 4.80
23 220.00 10 1.168 1.06 10.60
24 230.00 10 0 0.58 5.80
25 240.00 10 0 0 -
26 250.00 10 0 0 -
27 260.00 10 0 0 -
28 270.00 10 0 0 -
29 280.00 10 0 0 -
30 290.00 10 2.034 1.02 10.20
31 300.00 10 0 1.02 10.20
32 310.00 10 0 0 -
33 320.00 10 0 0 -
34 330.00 10 4.512 2.26 22.60
35 340.00 10 11.657 8.08 80.80
36 350.00 10 10.508 11.08 110.80
37 360.00 10 0 5.25 52.50
38 370.00 10 0 0 -
39 380.00 10 0 0 -
40 390.00 10 0 0 -
41 400.00 10 0 0 -
42 410.00 10 0 0 -
43 420.00 10 0 0 -
44 430.00 10 0 0 -
45 440.00 10 0 0 -
46 450.00 10 0 0 -
47 460.00 10 0 0 -
48 470.00 10 0 0 -
49 480.00 10 0 0 - 311.70
T13 P2 Approach Road
From End Point of Local
1 0.00 0 Contractor
2 10.00 10 18.943 9.47 94.70
3 20.00 10 0 9.47 94.70
4 30.00 10 0 0 -
5 40.00 10 0 0 -
6 50.00 10 0 0 -

Page 148 of 151


Executed Qauntity Upto 31st Jan 2021
Sl no Item No Description of Item
Earthwork in formation in embankment by using corporations suitable cut spoils obtained from cuttings and leading, spreading,
watering, consolidating etc., as per technical specification prescribed in MoRTH, with contractors men, material, consumables,
2 E102 tools & plants, equipments, machineries, including all lead & lifts, loading , unloading as directed by Engineer - in -Charge ,
etc. complete.

7 60.00 10 0 0 -
8 70.00 10 0 0 -
9 80.00 10 0 0 -
10 90.00 10 0 0 -
11 100.00 10 3.24 1.62 16.20
12 110.00 10 27.284 15.26 152.60
13 120.00 10 19.106 23.2 232.00
14 130.00 10 17.149 18.13 181.30
15 140.00 10 17.144 17.15 171.50
16 150.00 10 9.119 13.13 131.30 1,074.30

TOTAL= 2,425.10

Detail of Certified Quantity by IRCON


Total Up to date quantity Executed 2,425.10
Total Quantity Paid Up to Previous RA Bill 0.00
Quantity for This RA Bill 2,425.10

DHORAJIA DHORAJIA DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER

Page 149 of 151


BAR BENDING SCHEDULE FOR T12P1 PORTAL
Sl no Item No Description of Item

Supply, cutting, bending, placing, binding steel reinforcement of grade Fe 500 as per approved drawings & specifications or as directed by Engineer, for joint reinforcement of initial and final lining. This shall include
7 B107 straightening, hooking all lead, lift, all auxiliary materials, etc. (Nothing extra shall be paid for wastage of reinforcement and binding wire).

Spacing in Cutting
S.NO BAR MARK DIA "mm" Shape of bar No's a b c d 12mm 20mm Remarks
mm Length
PEDISTRIAL REINFORCEMENT FOR PORTAL FOOTING
A Main Bar

Bottom
207.35 No= 13 X 2

0.66m
0.66m
1 20.00 250.00 26 0.66 1.91 0.66 0.00 3.23 0.00
Reinforcement Side=26no

1.91m
5.4m
B Distribution Bar

Bottom
1 12.00 250.00 16 2.91 0.00 0.00 0.00 2.91 41.44 0.00 No= 8 X 2 Side=16no
Reinforcement 2.91m

REINFORCEMENT FOR STRUCTURE

Vertical Main Bar A


7.718m

1 20.00 150.00 40 0.36 7.72 8.07 0.00 797.39 No= 20 X 2


Inner Side=40no

0.356m

Vertical Main Bar B


2 20.00 150.00 20 7.85 7.85 0.00 387.44 No= 20 no
Inner

7.846m

0.3m
9.073m

Vertical Main Bar C


3 20.00 150.00 40 0.36 9.07 0.30 9.73 0.00 960.84 No= 20 X 2
Outer Side=40no

0.356m

Horizontal Main Bar 8.78m


4 20.00 150.00 20 8.78 8.78 0.00 433.56 No= 20 no
D Outer

D Distribution Bar

1 Distribution Bar Inner 12.00 300.00 70 2.91 2.91 181.29 0.00


2.91m

2.91
2 Distribution Bar Outer 12.00 300.00 60 2.91 2.91 155.39 0.00

Distribution Bar at
3 12.00 300.00 2.91 30 2.91 0.00 2.91 77.70 0.00
Top

TOTAL IN KG= 455.82 2786.56


TOTAL IN MT= 0.46 2.79
TOTAL IN MT= 3.24

DHORAJIA DHORAJIA DDC IRCON Engineer IRCON Site in Charge


QSS PROJECT MANAGER
TAX INVOICE
INVOICE NO. CSDCCJV/T12&13/Siteoffice/2021/RAB-03 Job Type Service

INVOICE DATE: 31.03.2021


Period of service 10.03.2021 to 31.03.2021
RA Bill No. 3
State West Bengal Place of servicec Sukhia Khola Kalimpong, West Bengal
Details of Service Receiver Billed To Details of Service Provider Billed from
IRCON INTERNATIONAL LIMITED CS- Dhorajia JV, C-25, Trezure Enclave, Nr. Aryaman Bungalows, Thaltej-Shilaj Road, Thaltej, Ahmedabad, Sujarat-380059
(HO-C-4, District Center,Saket, New Delhi-110017) Contract No. IRCON/2046/Sivok-Rangpo/T12&T13/50
48U, SAIBABA ROAD, NEAR FOOD GODOWN, RANGPO BAZAR, RANGPO, SIKKIM, 732132.Rnagpo
Address TIN No.
bazar,Gangtok East
GST IN: 19AAACI0684H12ZI PAN NO: AAPFC7962A

LOA No. IRCON/CC/TN/SR-2046/Const/T12&T13/12/1937. dated.05.10.2020 GSTIN: 19AAPFC7962A1Z7

`
CGST SGST
HSN/SAC As per
Sl.No Product description Bill Amount LOA Amount Taxable Amount
Code LOA Rate Amount Rate Amount

1 Construction of Tunnel T-12 & T13 ₹ 26,783,177.18 4.81% ₹ 1,288,270.82 ₹ 28,071,448.00 6% ₹ 1,684,287.00 6% ₹ 1,684,287.00

₹ 28,071,448.00 CGST :-1684287&


SGST:-1684287
Total GST:-
Gross Amount before GST 3368574
Add CGST 6% ₹ 1,684,287.00
(Rupees Three crore Fourteen Laks Fourty Thousands and Twenty Two Only) ADD SGST 6% ₹ 1,684,287.00
Bank Details :Yes Bank Common seal
A/C No. :000763400002607 NET AMOUNT ₹ 31,440,022.00
IFS CODE: :YESB0000007(Ahmedabad branch)
Certified that the particulars given above are true and corrected
Terms & Conditions:
1.Security deposit to be deducted on taxable value only.
2. TDS to be duducted as per statutory rules.
3. GST will be applicable as per statutory rules.

Page 151