Name of Contractor/Supplier-:CS- Dhorajia JV, C-25, Trezure Enclave, Nr. Aryaman Bungalows, Thaltej-Shilaj Road, Thaltej,
1- Ahmedabad, Sujarat-380059
Name of work: Construction of Two no. Tunnel T-12( Between Km 37+097 to Km 38+531 approx.) and T-13 (between Km
2- 38+775 to Km 41+403 approx) on Sivok (West Bengal) to Rangpo (Sikkim) New Single line BG Railway Line Project.
S.
ITEM YES NO Remarks
No.
With Ref. to bill
1 Measurement has been entered by the authorized person. √ no.CSDCCJV/T12&13/Siteoffice/2021/RAB-11 Dated:
01.12.2021
Verified By
Name &
Designation
of Officer
AM/ACC.
Controlling Officer
GM/PH
On Account Bill-11
Extra-over for transportation of spoil from excavation in open areas for distances from point of
excavation to the center of gravity of muck deposits in excess of 2.0 km single (one way distance).
Measurement and payment will be per cum per km (cum x km). Volumes in cum shall be determined for
materials in their original solid states.
A1027 Example: Distance from point of excavation to centre of gravity of muck deposit is 6.0 km. The
cum/
2_7 144560 ₹ 30.99 4479914.4
Quantity excavated is 100 cubic metres. Payment under this item is therefore for 6.0 km minus 2.0 km km
= 4.0 km times 100 cum.
Extra payment would be for 400 cum KM.
Extra-over for tunnel excavation under excessive water inflow conditions (measured as greater than 50 l/s
and confirmed by the Engineer within 20.0m from the excavation face). Accumulation of measured
quantities of water inflow is not permitted. Determination of the water quantities shall be done out of
3 A103 temporary sumps at 20 m distance to the face by means of a pump and flow meter or other suitable cum 1375 ₹ 267.80 368225
arrangements proposed by the Contractor and approved by the Engineer. Payment as
per volume of theoretical tunnel excavation under the respective water inflow.
4 A104 Rehandling of muck as per directions of engineer including loading and transportation at for all leads cum/
and lift 1375 ₹ 179.27 246496.25
km
Excavation of drain channels inside tunnel with hydraulic hammer for construction drainage trenches in all
5 A105 types of rock including disposal of muck as directed cum 1375 ₹ 2,867.24 3942455
TOTAL FOR SCHEDULE A 0
B1- ROCK BOLTS AND OTHER STEEL SUPPORTS ETC. 0
All items for: "Rock bolts and other steel support" include plant, logistics, equipment, manpower, time for
installation, materials, auxiliary works, and all other operational costs. Materials used shall at least meet the
minimum requirements of the technical specifications. All equipment used shall be suitable to perform works
properly. The costs associated with using appropriate equipment with suitable size of rock bolting as per 0
drawings at different construction sites (i.e., works in open areas, main tunnel, escape tunnel, side adits,
cross passages, roads, location with limited access) shall be included in all items.
Supply, drilling, testing and installation of Swellex type rockbolts of the specified length, ultimate load
1 B101 Fy>=200kN (tunnel support) as per approved drawings & specifications or as directed by Engineer.The rate 0
shall include costs of all materials, labour, equipment, etc. required for the complete job.
1_1 B1011 Length 3m nos. 6,355 ₹ 6,002.25 38141297.63
1_2 B1012 Length 4m nos. 110 ₹ 6,953.52 764887.2
SN type rock bolts for tunnel support, slope support, face bolts etc.
Supply, drilling, installation, grouting and testing of SN type rock bolts of specified length L, 200kN minimum
2 B102 ultimate load as per design drawings, technical specifications or as directed by Engineer. Measurement 0 0
and payment shall be per piece tested and accepted installed rock bolt (for exact payment details see
specifications).
Page 3 of 151
On Account Bill-11
Supply, drilling, installation, trsting and grouting of fibre glass all thread rock bolts of specified length and
ultimate strength Fy>=200KN (for face bolting) as per approved drawings pand specifications or as directed
2_6 B102A by Engineer. The rate shall include costs of all material, labour, equipment etc required for the complete job 0 0
Supply, fabrication, storing and erection of lattice girders . Geometries shall be as shown on design
drawings, in technical specifications or directed by the Engineer. These items include:
- all necessary elements for connection of lattice girder partitions, such as connection plate, connection bolts
and nuts etc.
- all auxiliary materials
6 B106 - bearing elements tonne 669 ₹ 89,688.76 59956936.06
Minimum steel grade is Fe 500. For underground works, measurement and payment shall be for the
theoretical length of lattice girders measured using the Payment line as shown on design drawings and in the
technical specifications.
Supply, cutting, bending, placing, binding steel reinforcement of grade Fe 500 as per approved drawings &
specifications or as directed by Engineer, for joint reinforcement of initial and final lining. This shall include
7 B107 straightening, hooking all lead, lift, all auxiliary materials, etc. (Nothing extra shall be paid for wastage of tonne 513 ₹ 63,136.89 32389224.57
reinforcement and binding wire).
Supply and placement of welded wire mesh of sizes 150x150x6, 100x100x6 or any other size as directed
by Engineer as reinforcement of sprayed concrete for tunnel lining works as shown
on design drawings, specifications or as directed by Engineer. Steel grade minimum Fe500. This item also
includes:
- Fixing elements and materials
- cutting, bending and placement
8 B108 - all auxiliary materials and works necessary tonne 55 ₹ 91,561.53 4990103.39
Measurement and payment shall be per square meter for each layer installed and instructed, measured along
Payment Line (see specifications). Overlapping as mentioned in technical specifications is mandatory but
shall not be paid
extra.
Supply, fabrication and erection of steel rib and all accessories including all lead, lift, wastage,storing,drilling
holes, fixing in phases etc. and installation of accessories for joining the steel rib segments as per approved
workshop drawings of contractor & specifications or as directed by Engineer.The rate shall include costs of all
9 B109 materials, labour, equipment,welding, etc tonne 246 ₹ 83,817.43 20619087.78
for the complete job including additional cost for enlargement
of top heading footing.
Permanent anchorage using prestressed bar anchors D32mm, fp 0.1k/fpk = 950/1050 N/mm2, with an
average length of 12 m including drilling, installation, grouting and prestress really installed of 200 KN as per
approved drawings & specifications or as directed by Engineer. The rate shall include costs of all materials,
10 B110 labout, equipments, etc. required for the complete job as per drawings, specifications or as directed by the m 3,717 ₹ 8,214.53 30533408.01
Engineer- in- Charge. Measurement and payment will be per m measured on the drawings.
Special treatment Tube-A-Manchette steel dia int 40mm and ext 50mm for grout injection through sleeves
valves @ 0.5m, in umbrellas or bottom in any length drill 75mm (Fe 500) at peripheral position, distribution
defined as per the decision of Engineer in charge.The rate shall include costs of all materials, labour,
11 B111 equipment, grouting of the pipe and ground consolidation injection by TAM meter 760 ₹ 10,026.09 7619828.4
sleeves, etc. required for the complete job.
Page 5 of 151
On Account Bill-11
Special treatment Tube-A-Manchette hard PVC dia int 40mm and ext 50mm for grout injection through
sleeves valves @ 0.5m, 20m length drill 75mm (Fe 500) at peripheral position, distribution defined as per the
decision of Engineer in charge.The rate shall include costs of all materials, labour, equipment, grouting of the
12 B112 pipe and ground consolidation injection by TAM sleeves, etc. required for meter 656 ₹ 10,012.49 6563187.2
the complete job.
Supply, drilling and installation of steel micropiles of dia upto 160 mm in vertical position or at an inclination for
all kinds of soil/rock class at any depth and as per approved drawings & specifications or as directed by
Engineer. The works include: drilling D200mm, installation of the pipe and grouting around and inside the pipe
up to fulfill the volume drilled no ocupated by the pipe. The rate shall include all labour, materials, connectors,
13 B113
welding, lead, lift, handling, including grouting with M35 grade of grout, wastage complete with contractor's 0 0
own equipment as a complete job as per specifications or as directed by Engineer-in-Charge.
Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical
thickness as shown on design drawings, in technical specifications and directed by the Engineer. These items
include:
- sprayed concrete of grade M25 according to Indian Standard
- all concrete additives
- wastage of sprayed concrete
1 B201 - rebound 0 0
- application of shotcrete in multiple layers
- all auxiliary materials and works
Measurement and payment shall be for the theoretical area or volume as shown on the design drawings in
square metres/ cubic meters, measured along Payment-Line (see specifications).
1_1 B 2011 50 mm thick shotcrete lining in tunnel sqm 905 ₹ 628.14 568466.7
1_2 B 2012 100 mm thick shotcrete lining in tunnel sqm 12556.5 ₹ 1,256.27 15774354.26
1_3 B 2013 150 mm thick shotcrete lining in tunnel sqm 19006 ₹ 1,884.41 35815096.46
1_4 B 2014 200 mm thick shotcrete lining in tunnel sqm 220 ₹ 2,512.54 552758.8
1_5 B 2015 250 mm thick shotcrete lining in tunnel sqm 21135.5 ₹ 3,140.67 66379630.79
1_6 B 2016 300 mm thick shotcrete lining in tunnel sqm 9618.5 ₹ 3,768.81 36250298.99
1_7 B 2017 Shotcrete lining for overbreak as per technical specification: cum 7227.5 ₹ 12,562.68 90796769.7
Page 6 of 151
On Account Bill-11
Sprayed concrete works for filling of cavities not caused by fault of contractor due to unavoidable
overbreak which has been designated as such by the Engineer and exceeds a volume of 2 m³ in each
individual case. This item includes:
1_8 B2018 - sprayed concrete of grade M25 according to Indian Standard cum 248.5 ₹ 13,314.55 3308665.68
- wastage of sprayed concrete
- rebound
- all auxiliary materials and works
1_9 B2019 Shotcrete
Measurement in slope stabilization
and payment shall be for the volume of sprayed concrete beyond the boundary surface 'A line' cum 742.5 ₹ 13,314.55 9886053.38
actually used
Sprayed and as
concrete approved
works by the Engineer.
for smoothening layer of 30mm and support of the waterproofing membrane
complying with the requirement in planarity as shown on design drawings, in technical specifications or as
directed by the Engineer. This item includes:
- sprayed concrete of grade M25 according to Indian Standard, maximum aggregate size 8mm
- wastage of sprayed concrete
- rebound
- all auxiliary materials and works
1_10 B20110 - washing down with hot water right before installig of waterproofing system(high pressure water jet, sqm 30250 ₹ 399.44 12083060
minimum
pressure 30 bar)
Measurement and payment shall for the theoretical area as shown on the design drawings in square
metres,
measured along Payment-Line
Extra for over item no B201 for supply and mixing of steel fibre double end hooked loose steel fibres of
circular cross section having diameter of 0.75mm and aspect ratio equal to 49 conforming to EC-
1_11 B20111 certificate of conformity as per EN14889 and tensile strength more than 1100MPa and ultimate strain less tonne 548.5 ₹ 162,048.81 88883772.29
than 4% as per specification and as directed by Engineer
Concrete works for construction of inner lining , inverts etc. as shown on design drawings, in technical
specification and as directed by the Engineer. These items include:
- Design Mix Cement Concrete of grade M30, machine mixed, machine vibrated
- all concrete additives
- Formwork, falsework and scaffolding: number as specified in the contract
- formwork carriages (number as specified in the contract) with adjustment facilities for inner-lining
construction
2 B202 - Contact grouting between primary and inner lining 0 0
- All difficulties due to requirements for cable ducts, pipes or similar
- All difficulties due to reinforcement installation
- All difficulties due to requirements of niches, junctions, cross passages, manholes, widenings etc.
- Curing of concrete to ensure concrete quality as described in the specifications
- sealing and curing agent
- concrete for filling in case of GOB Deformation of Initial Lining (DIL)
Measurement and payment shall be for the theoretical measured volumes of concrete as shown on the
2_1 B2021 designed
Inner lining drawing.
of main tunnel, Adit & niches with movable Shutter and / or Radial Formwork cum 14046 ₹ 8,621.01 121090706.46
2_2 B2022 Inner lining of main tunnel, Adit & niches for Invert cum 1799.5 ₹ 8,621.01 15513507.5
Page 7 of 151
On Account Bill-11
Construction , dowel jointed, cement concrete pavement of M30 grade concrete with 43 grade
cement, coarse and fine aggregate conforming of IS:383, maximum size of coarse aggregate not
exceeding 25mm, mixed in a batching plant as per approved mix design, transported at site, laid with a fixed
form or slip form paver or by fixed shuttering, spread, compacted and finished in a continuous
2_3 B2023 operation and texturing, including provision of contraction, expansion, construction and longitudinal joints, joint cum 55 ₹ 9,740.79 535743.45
filler, seperation membrane,sealant primer, joint sealant, debonding strip, dowel bar, tie bar/rod,
admixtures as approved, curing compound, finishing to lines and grades as per drawing. Item rate shall be
inclusive of all material, taxes, duties, manpower, equipment cost, royalties, transportation, etc.
Reinforcement will be paid separately under the item of reinforcement.
Manholes as shown on design drawings, in technical specification and as directed by the Engineer. These
items include:
-Manufacture of manholes either on-site or off-site
-Design Mix Cement Concrete of grade M30, machine mixed, machine vibrated
2_4 B2024 Measurement and payment shall be for the theoretical quantity of manholes as shown on the design cum 66 ₹ 8,621.01 568986.66
drawings.
Reinforcement will be paid separately under items of reinforcement.
Providing and installing of drainage gutters with M30 grade concrete within the non-ballast trackbed as
shown on design drawings, in technical specifications and as directed by the Engineer. These items include:
-all auxiliary works and materials necessary (bedding etc.) as per drawing
-all connections of drainage pipes and therefore necessary types of gutters
2_5 B2025
-casts cum 55 ₹ 8,621.01 474155.55
Design Mix Cement Concrete M15 in following PCC works including mechanically mixed machine
mixed, machine batched, machine vibrated, form work, etc as per specifications & drawings or as
3 B203 directed by Engineer-in charge 0 0
3_1 B2031 For all kinds of structures required (bed, portals, blinding, lean, protection lean concrete) cum 472.5 ₹ 5,619.59 2655256.28
3_2 B2032 No-fines porous concrete in tunnel cum 149 ₹ 5,046.39 751912.11
Page 8 of 151
On Account Bill-11
Design Mix Cement Concrete M35 in RCC works including machine mixed, machine batched, machine
vibrated, form work, etc as per specifications & drawings or as directed by Engineer-in charge
all concrete additives
- Formwork, falsework and scaffolding: number as specified in the contract
- formwork carriages (number as specified in the contract) with adjustment facilities for inner-lining
construction
- Contact grouting between primary and inner lining
- All difficulties due to requirements for cable ducts, pipes or similar
- All difficulties due to reinforcement installation
4 B204
- All difficulties due to requirements of niches, junctions, cross passages, manholes, widenings etc.
Cum 4466 ₹ 9,139.44 40816739.04
- Curing of concrete to ensure concrete quality as described in the specifications
- sealing and curing agent
- concrete for filling in case of GOB Deformation of Initial Lining (DIL)
Measurement and payment shall be for the theoretical measured volumes of concrete as shown on the dsign
Drawing
M30 RCC for Cladding Wall. Design mix cement concrete including machine mixed, machine batched,
machine vibrated with contractor's men, material, consumables (including additives), tools & plants,
5 B205 equipments, machineries, all lead & lifts, loading, unloading, wastages etc complete. The rate includes cost cum 799.5 ₹ 8,621.01 6892497.5
of form work, shuttering, centering, scaffolding, fixing and removing thereof, levelling, finishing of
exposed surfaces, curing etc.
Providing and installing PVC pipes of following diameters in the tunnel as per approved drawings &
1 C101 specifications or as directed by Engineer. 0 0
Page 9 of 151
On Account Bill-11
Providing and installation of perforated pipes . The pipes are protected by geotextile membrane as shown on
design drawings, in technical specifications or as directed by the Engineer. These items include:
- all connections and valves
- protection by geotextile membrane
- all necessary equipment (i.e. drilling jumbo equipped with AT-casing system)
2 C102 - other protection to ensure functionality as required locally meter 0 0
Measurement and payment shall be for the actual length measured along the pipe axis in
linear metres as confirmed by the Engineer.
2_1 C1021 35 mm internal dia PVC pipe meter 137.5 ₹ 163.97 22545.88
2_2 C1022 50 mm internal dia PVC pipe meter 31409 ₹ 160.26 5033606.34
2_3 C1023 150 mm internal dia PVC pipe (Fully perforated for side drain) meter 6019 ₹ 311.94 1877566.86
Drilling of different dia holes (diameter 42mm to 62mm) in shotcrete / lining as weep holes / relief holes of
required length including perforated pipes of required dia in any direction as per approved drawings and
specifications or as directed by the Engineer. These items also include:
- drilling through sprayed concrete, walls, reinforcement
3 C103
- drilling in presence of water meter 572 ₹ 305.42 174700.24
- all measures necessary in soft ground to ensure the stability of the drainage hole
Measurement and payment shall be for the actual length of drainage holes drilled in linear metres.
Drilling of different dia holes (diameter 42mm to 62mm) in rock/ soil of required length in any direction as per
approved drawings and specifications or as directed by the Engineer. These items also include:
- drilling through sprayed concrete, walls, reinforcement
- drilling in presence of water
4 C104 - all measures necessary in soft ground to ensure the stability of the drainage hole meter 31409 ₹ 327.55 10288017.95
Measurement and payment shall be for the actual length of drainage holes drilled in linear metres.
Drilling of exploratory holes up to 35m length with specified diameter in any direction as per the
technical specifications and as directed by the Engineer in the presence of an expert geologist. These
items also include:
- drilling through sprayed concrete, walls, reinforcement
5 C105
- drilling in presence of water 0 0
- all measures necessary in soft ground to ensure the stability of the drainage hole
Measurement and payment shall be for the actual length of drainage holes drilled in linear metres.
5_1 C1051 Horizontal/sub horizontal in all kinds of rock dia, equal or greater than 50mm meter 2010.5 ₹ 1,197.30 2407171.65
5_2 C1052b Horizontal/sub horizontal in all kinds of soft ground dia, equal or greater than 50mm meter 223.5 ₹ 2,248.53 502546.46
5_3 C1053 Vertical (downwards) in all kinds of rock dia, equal or greater than 50mm meter 229 ₹ 1,502.71 344120.59
5_4 C1054 Vertical (downwards) in all kinds of soft ground dia, equal or greater than 50mm meter 22 ₹ 2,937.96 64635.12
Drilling for installation of monitoring instruments up to 90 mm diameter in all kinds of rock and in any
5_5 C1055 direction, including widening of 500 mm length at the borehole mouth up to diameter of 120 mm 0 0
5_6 C1055a Up to 12m length meter 137.5 ₹ 1,197.30 164628.75
5_7 C1055b Up to 30m length meter 137.5 ₹ 1,797.08 247098.5
Page 10 of 151
On Account Bill-11
Drilling for installation of monitoring instruments up to 90 mm diameter in all kinds of soft ground and in
any direction, including widening of 500 mm length at the borehole mouth up to diameter of 120 mm (up to
5_8 C1056 12m length) meter 60.5 ₹ 2,248.53 136036.07
Providing and laying of pipes (i.e. collector pipe, connection pipes) of specified diameter as shown on
design drawings, the technical specifications or as directed by the Engineer. Thes items include:
- pipe bedding and support, and all materials required for this
- all moulded parts
- all connections and valves
- backfilling if required
6 C106 - protection against environmental influences (e.g. at conncetions from tunnel portal to the waste water basin) 0 0
- earthwork, rock excavation, support where necessary (in open areas)
Measurement and payment shall be for the actual length measured along the pipe axis in linear metres as
confirmed by the Engineer.
6_1 C1061 300 mm dia HDPE main drainage pipe at bottom (main collector pipes) meter 6925.5 ₹ 3,134.11 21705278.81
6_2 C1062 200 mm dia HDPE main drainage pipe meter 96.5 ₹ 3,110.62 300174.83
6_3 C1063 100 mm dia PVC pipe lateral drainage pipes (connection pipes) meter 69 ₹ 159.32 10993.08
Providing, laying and fixing of Protective Felt (geotextile ) with a minimum weight of 700 g/m2 for protection
of the waterproofing membrane & drainage on the finished outer lining surface, including the cost of all
7 C107 materials, labour, equipments, etc. required for the completion of job, as per specifications or as sqm 50399.5 ₹ 508.14 25610001.93
directed by the Engineer
Providing, placing, welding of 2 mm thick PVC or ECB Water Proofing Membrane including the cost of all
8 C108 materials, labour, equipments, testing etc. required for the completion of job, as per specifications or as sqm 41984.5 ₹ 1,361.34 57155179.23
directed by the Engineer
9 C109 PVC Water stop serrated with central bulb (min. 225mm wide, 8-11mm thick) meter 4468 ₹ 508.47 2271843.96
Pumping of water by furnishing,transporting,installing the equipment & system including pneumatic pumps
as per the requirement and as per specifications and as directed by the Engineer.( Note: Payment will be
10 C110 made only for actual use for dewatering as payable as per specifications and as per the certified KWh 731500 ₹ 26.56 19428640
Log book for each pump by the Engineer)
Providing and fixing of earthing flat bar of galvanized iron as shown on design drawings, in technical
specifications or as directed by the Engineer.
These items also include:
- all necessary auxiliary works and materials
11 C111 - all necessry works and materials for connection of earthing flat bars 0 0
- routing to and in niches for provision of sockets etc.
Measurement and payment shall be per metre length shown on design drawings. Extensions for welding shall
not be paid extra.
11_1 C1111 Longitudinal earthling flat bar, 40 x 4 mm, both sides of the Tunnel, meter 4468 ₹ 140.96 629809.28
Page 11 of 151
On Account Bill-11
11_2 C1112 Transversal earthling flat bar, 40 x 4 mm, Every 250m, meter 82.5 ₹ 140.96 11629.2
11_3 C1113 Connection bolt M8 with corresponding nuts and washers nos 1787 ₹ 99.17 177216.79
Providing of cable trays/ducts for both cable conduits and fire fighting as shown on design drawings and in
technical specifications. These items include:
-all connections
-all auxiliary works and materials required
12 C112
Measurement and payment shall be for the actual length installed, measured along tunnel axis, as confirmed 0 0
by the Engineer.
12_1 C1121 Cable Tray/ ducts for conduits dia. 100 mm PVC pipe (2 pipes each tray) meter 17917 ₹ 191.44 3430030.48
12_2 C1122 Cable Tray/ ducts for conduits dia. 160 mm PVC pipe - fire fighting supply meter 14208.5 ₹ 315.37 4480934.65
Grouting (cement) for ground improvement or filling of voids and cavities using suitable materials and
mixtures as appropriate. Measurement and payment shall be in tonnes for the actual quantity of cement used
13 C113 as approved by the Engineer tonne 3217 ₹ 10,543.50 33918439.5
Delta drain installed at damp areas of the excavation to collect and channelise water infiltration to the
provisional or definitive ground sidedrains. The rate shall include costs of all materials, labour, equipments,
14 C114 etc. required for the complete jobas per specificationsor as directed by Engineer-in-Charge. Measurement and sqm 18529.5 ₹ 636.28 11789950.26
payment will be per m2 on site measured.
Sand bags installed above steel ribs or lattice girders to fulfill voids during excavation to guarantee permanent
contact between the lining and the ground. The rate shall include costs of all materials, labour, equipments,
15 C115 etc. required for the complete jobas per specificationsor as directed by Engineer-in-Charge. Measurement and MT 4021 ₹ 1,231.61 4952303.81
payment will be per Tonne on site measured.
16 C116 Polypropylene Fibres for tunnel lining confirming to technical specifications MT 46 ₹ 196,495.78 9038805.88
TOTAL OF SCHEDULE C 0
D-GEOTECHNICAL AND INSTRUMENTATION 0
Supply, Installation and monitoring as per approved drawings, calibration/setting,
maintenance etc. of the following instrument in good working condition from approved supplier (s) /
manufacturer(s) for measuring the deformations, loads, pressures etc. on the support in various tunnels and 0 0
for seepage measurements as directed by Engineer-in-charge with all
contractors men, material and machinery.
Optical targets (including rods) in the tunnel roof and at wall at selected points along the tunnel roof,
at wall and slopes at selected points along the tunnel wall or portal to monitor vertical and longitudinal (in
1 D101 tunnel direction) deformation components (3 to 5 nos at each sections) or as per instruction of nos. 995 ₹ 1,573.29 1565423.55
Engineer-in-charge.
Page 12 of 151
On Account Bill-11
Shotcrete/ Concrete Stress cells NATM style vibrating wire stress cells to measure radial and tangential
stresses in shotcrete or concrete. Capacity of stress cells - tangential 200Kg/cm^2 and radial 50Kg/cm^2.
Accuracy of 0.5%, each cell should be marked with capacity, serial no. etc. alongwith the sufficient
Teflon / PVC or similar cable shielded, integral with stress cell for taking observations using the proper
readout, Connections/switch/junction box to be attached to the cable stress cell for connecting to readout. The
2 D102 readout should be compatible to vibrating wire stress cell, rechargeable battery operated, LCD display, nos. 21 ₹ 46,423.25 974888.25
stress cell should be calibrated with this readout, connector to connect the stress cells, perfectly
sealed to make it dust and
moisture proof including battery charger and one extra rechargeable battery.
Vibration wire type electrical rock bolt load cell of capacity 25 t of rock bolt load cell including atleast 2
read out units, operating temperature -100 to 550C, built in temperature device range - 450C to 1000C,
3 D103 signal cable 4 core shielded Teflon/PVC or similar cable with PVC packet water proof, stainless steel nos. 17 ₹ 47,121.45 801064.65
materials and with lightening protection device alongwith the readout, connector /switch/junction box to
be attached to the cable of load cell for connecting to read out.
Pressure Cells including atleast 2 read out units measuring range 50 Kg/cm^2 vibrating wire type to
access the radial support pressure coming on the steel rib supports from various directions alongwith
4 D104 the readout, switch/junction box to be attached to the PVC / teflon or similar cable of pressure cell nos. 40 ₹ 46,423.25 1856930
forconnecting to readout. The readout should be compatible to the vibrating wire type pressure cell = 0.5%.
Seepage measurement System to measure flow of water from the face of tunnel by using triangular nos.
5 D105 V notch with all-fittings and accessories complete set usage 20lps, including the arrangements for drain 2.5 ₹ 25,138.80 62847
etc. complete
Supply, Installation and monitoring of Multipoint borehole extensometer electronic type (MPBX 3-point)
measuring head, measuring rod (anchor depth: 7, 14 & 20m) and displacement transducers of 0-50 mm range
for measuring sub-surface movement in slope for the specified locations as per drawings and as per
approved method statement or as directed by Engineer-in-charge complete with S.S./ glass/ carbon fibre
connecting rods and groutable anchors at different depth up to 20 m in the boreholes (diameter of boreholes
6 D106 should not less than 76 mm). Sensor: vibrating wire displacement transducers, range of measurement FS=0- nos. 12 ₹ 47,524.50 570294
50mm,accuracy< 0.5% FS,Dial gauge FS=0-50mm resolution 0.01mm.The rate shall include all
accessories required for
installation and as per approved method statement.
Supply, fixing and monitoring (as per specifications) of Piezometer (vibrating wire sensors type) as per
the drawing or as per directed by Engineer-in- charge. The piezometer shall be designed for water table
7 D107 measurements and measuring pore pressure up to 2MPa with an accuracy of + /-0.5% of full scale The rate nos. 18 ₹ 10,296.98 185345.64
shall include all accessories required for installation and as per approved method statement.
Page 13 of 151
On Account Bill-11
Supply, Installation and monitoring of In place inclinometer to measure lateral movement in slope &
embankment suitable for depth up to 30 m. Each Inclinometer system consisting of following
accessories complete in all respect:
1. Biaxial sensor with SDI-12@ 3 m interval, with pair of wheels for up to 30m depth
2. Suspension kit with protective cap and placement tubing : 1No.
3. Spacer assembly for 3 m gage length
4. Bottom wheel assembly with plug : 1no.
8 D108 5. Protective rope to prevent loss of sensor down hole: 1no. Set 4 ₹ 818,477.50 3273910
6. Suspension stainless steel wire rope for positioning sensors: 1 no.
7. Self aligning ABS tubing, 70mm od, 58 mm id, 3 m length for up to 50m depth.
8. ABS fixed coupling for 70 mm od. Access tube, 77 mm od x 160 mm length as required for jointing of ABS
tubing.
9. Bottom cap for ABS tubing: 1no.
10. Dummy probe with 30 m cord: 1no. (Rate excluding Data logger)
Data logger for In-place Inclinometer to log data from IPI sensors having Memoty capacity 2 million
9 D109 data points and communication port to down load data on Laptop/ PC. Real time accuracy: +/- 1 minute/ year. Set 4 ₹ 459,403.50 1837614
1_1 E1011 In all condition and classifications of soil Cum 3664.5 ₹ 255.62 936719.49
Earthwork in formation in embankment by using corporations suitable cut spoils obtained from cuttings and
leading, spreading, watering, consolidating etc., as per technical specification prescribed in MoRTH, with
2 E102 contractors men, material, consumables, tools & plants, equipments, machineries, including all lead & lifts, Cum 4400 ₹ 92.96 409024
loading , unloading as directed by Engineer - in -Charge , etc. complete.
Cleaning side drains in cuttings by the side of track (Kutcha or Pucca) including disposal of the debris, soil,
muck etc. with contractors men, material, consumables, tools & plants, equipments, machineries, including all
3 E103 lead & lifts, loading , unloading as directed by Engineer - in -Charge , etc. complete. Cum 735.5 ₹ 153.82 113134.61
Preparation of sub grade by excavating earth upto 22.5cm depth, dressing to camber and consolidating with
power road roller of 8 to 12 tone capacity including making good the undulations etc. and disposal of surplus
4 E104 earth with lead upto 50m, as per technical specification prescribed in MoRTH, with contractors men, material, Sqm 6765 ₹ 61.97 419227.05
consumables, tools & plants, equipments, machineries, including all lead & lifts, loading , unloading as
directed by Engineer - in -Charge , etc. complete.
Removal of slips beyond theoretical profile and occurred not due to fault of contractor (to be certified by
5 E105 Engineer-in-charge), during excavation or after approach road construction during the currency of Cum 735.5 ₹ 100.70 74064.85
contract, has to be arranged by the contractor by deploying suitable machineries and men.
Page 14 of 151
On Account Bill-11
Constructing granular sub base of required compacted thickness as per technical specification
prescribed in MoRTH, with contractors men, material, consumables, tools & plants, equipments,
6 E106
machineries, including all lead & lifts, loading , unloading as directed by Engineer - in -Charge , etc Cum 1100 ₹ 1,976.31 2173941
complete.
Constructing Water Bound Macadam base course of required compacted thickness as per technical
specification prescribed in MoRTH, with contractors men, material, consumables, tools & plants,
7 E107
equipments, machineries, all lead & lifts, loading , unloading as directed by Engineer - in -Charge , etc Cum 1100 ₹ 3,170.30 3487330
complete.
8 E108 Supplying & fixing Mandatory/Cautionary/warning/ Informatory retro-reflectorised sign boards as per
technical specification prescribed in MoRTH , with contractors men, material, consumables, tools &
plants, equipments, machineries, all lead & lifts, loading , unloading ,as directed by Engineer - in - 0 0
Charge , etc complete.
8_1 E1081 Sign boards of size more than 0.6 sq.m & upto 0.9 sq.m with single post support Nos 15 ₹ 9,373.04 140595.6
Supplying and laying reinforced cement concrete pipes NP2 of various sizes, for culverts on cement
concrete leveling course including fixing collar with cement mortar 1:2 as per the drawing and as per
specification prescribed in MoRTH, with contractors men, material, consumables, tools & plants,
9 E109 equipments, machineries, all lead & lifts, loading , unloading as directed by Engineer - in -Charge , etc 0 0
complete. The rate includes Cost of pipes, hauling, storing, laying in position , aligning, joining complete and
all incidental costs to complete the work as per specification. (Ancillary works such as excavation with back
filling, leveling course, concrete and masonry shall be paid separately in relevant schedule items).
9_1 E1091 600mm dia. RMT 73.5 ₹ 3,173.40 233244.9
9_2 E1092 900mm dia. RMT 220 ₹ 6,158.58 1354887.6
Random rubble masonry, hammer dressed wherever necessary, in cement and sand 1 :6 in wing wall, toe
wall, breast wall, retaining wall, curtain wall, parapet wall, slope of guide bunds, catch water drains, side
drains etc, as per drawing and as per technical specification prescribed in MoRTH including providing
10 E1010 weep holes of 100mm dia. PVC pipe at 1 .Om c/c horizontally and vertically, with contractors men, material, Cum 2567.5 ₹ 3,465.62 8897979.35
consumables, tools & plants, equipments, machineries, including all lead & lifts, loading , unloading ,as
directed by Engineer -in -Charge , etc complete.
Providing boulder packing 600mm thick hand packed behind abutments, retaining walls, breast wall,
wing walls, etc. as per drawing with stone not less than 15cm in any direction and not less than 30 kg with
contractors men, material, consumables, tools & plants, equipments, machineries, including all lead & lifts,
11 E1011 loading , unloading, as per technical specification prescribed in MoRTH, with contractors men, material, Cum 660 ₹ 1,468.40 969144
consumables, tools & plants, equipments, machineries, including all lead & lifts, loading , unloading as
directed by Engineer - in -Charge , etc. complete.
U-PVC Pipe (working Pressure 4 Kg/Sqm) single socketed pipe 110mm dia. for drainag with contractors men,
12 E1012 material, consumables, tools & plants, equipments, machineries, including all lead & lifts, loading , unloading m 807.5 ₹ 214.27 173023.03
as directed by Engineer - in -Charge , etc. complete.
Providing and laying of knitted of woven crates of size 1 200 mm x 1 200 mm x 6000 mm made of Gl wires of
dia. 4.0 mm as per drawing and as per technical specification prescribed in MoRTH including supply of
13 E1013 stones, placing in position, hand packing , filled with stones/boulders, with all contractors men, material, Cum 733.5 ₹ 1,788.73 1312033.46
consumables, tools & plants, equipments, machnieries, all lead & lifts, loading, unloading, as directed by
Engineer - in -Charge , etc complete.
Page 15 of 151
On Account Bill-11
Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the
bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and
14 E1014 preparing the existing road surface as per specifications prescribed in MoRTH, including all 0 0
contractors men, material, consumables, tools & plants, equipments, machnieries, all lead & lifts,
loading, unloading, as directed by Engineer - in -Charge , etc complete.
Page 16 of 151
On Account Bill-11
Page 17 of 151
TAX INVOICE
INVOICE NO. CSDCCJV/T12&13/Siteoffice/2021/RAB-011 Job Type Service
INVOICE
05.12.2021
DATE: Period of service 26.10.2021 to 30.11.2021
RA Bill No. 11
State West Bengal Place of servicec Sukhia Khola Kalimpong, West Bengal
Details of Service Receiver Billed To Details of Service Provider Billed from
IRCON INTERNATIONAL LIMITED CS- Dhorajia JV, C-25, Trezure Enclave, Nr. Aryaman Bungalows, Thaltej-Shilaj Road, Thaltej, Ahmedabad, Sujarat-380059
(HO-C-4, District Center,Saket, New Delhi-110017) Contract No. IRCON/2046/Sivok-Rangpo/T12&T13/50
48U, SAIBABA ROAD, NEAR FOOD GODOWN, RANGPO BAZAR, RANGPO, SIKKIM,
Address TIN No.
732132.Rnagpo bazar,Gangtok East
GST IN: 19AAACI0684H12ZI PAN NO: AAPFC7962A
`
CGST SGST
HSN/SAC As per
Sl.No Product description Bill Amount LOA Amount Taxable Amount
Code LOA Rate Amount Rate Amount
1 Construction of Tunnel T-12 & T13 ₹ 106,346,089.00 4.81% ₹ 5,115,247.00 ₹ 111,461,336.00 6% ₹ 6,687,680.00 6% ₹ 6,687,680.00
₹ 111,461,336.00
Page 18
Quantity Amount
Total
Item No. Desription of item Unit
BOQ Qty
Rate Upto previous
Upto Date Bill This Bill Cumulative Upto Previous IPC This IPC
Bill
C1052b Horizontal/sub horizontal in all kinds of soft ground meter 447 ₹ 2,248.53 15.00 15.00 - ₹ 33,727.95 ₹ 33,727.95 ₹ 0.00
Providing
dia, equal or and laying
greater of pipes
than 50mm (i.e. collector pipe,
connection pipes) of specified diameter as shown on
design drawings, the technical specifications or as
directed by the Engineer. Thes items include:
C106 - pipe bedding and support, and all materials required - - ₹ 0.00 ₹ 0.00 ₹ 0.00
for this
- all moulded parts
- all connections and valves
- backfilling if required
C1063 -100protection
mm dia against
PVC pipe environmental
lateral drainageinfluences
pipes (e.g. at meter 138 ₹ 159.32 72.50 72.50 - ₹ 11,550.70 ₹ 11,550.70 ₹ 0.00
conncetions
Grouting
(connection from tunnel
(cement)
pipes) portal to
for ground the waste water
improvement or filling
basin)
of voids and cavities using suitable materials and
C113 -mixtures
earthwork, rock excavation,
as appropriate. support where
Measurement necessary
and payment tonne 6434 ₹ 10,543.50 1.10 1.10 - ₹ 11,597.85 ₹ 11,597.85 ₹ 0.00
(in open areas)
shall be in tonnes for the actual quantity of cement
Measurement
used as approved and bypayment
theand shall be for the actual
Engineer
Supply,
length measured Installation
along the pipemonitoring
axis in linear as metres per
asapproved
confirmed by drawings, calibration/setting,
the Engineer. - - 0 0 0
maintenance etc. of the following instrument in
good working condition from approved supplier (s) /
manufacturer(s) for measuring the deformations,
Optical targets etc.
loads, pressures (including rods) ininthe
on the support tunnel
various roof
tunnels
and
and for at wall
seepageat selected points along
measurements as the tunnel roof,
directed by
D101 at wall and slopes at selected points along the tunnel nos. 1,990 ₹ 1,573.29 171.00 138.00 33.00 ₹ 269,032.59 ₹ 217,114.02 ₹ 51,918.57
Engineer-in-charge with all
wall or portalmen,
contractors to monitor
material vertical and longitudinal (in
and machinery.
tunnel direction) deformation components (3 to 5 nos
Earthwork in formation
at each sections) or as inperembankment
instruction ofby using
E102 corporations
Engineer-in-charge. suitable cut spoils obtained from cuttings Cum 8,800 ₹ 92.96 2,425.10 2,425.10 - ₹ 225,437.30 ₹ 225,437.30 ₹ 0.00
and leading, spreading, watering, consolidating etc.,
as per technical specification prescribed in MoRTH,
Removal of slipsmen,
with contractors beyond theoretical
material, profile andtools &
consumables,
E105 occurred not due to fault of contractor (to be certified Cum 1,471 ₹ 100.70 3,299.60 3,299.60 - ₹ 332,269.72 ₹ 332,269.72 ₹ 0.00
plants, equipments, machineries, including all lead &
by
lifts,Engineer-in-charge),
loading , unloading as during
directedexcavation
by Engineer or after
- in -
Supplying
approach and laying
road reinforced
construction duringcement concreteof
the currency
Charge , etc. complete.
E109 pipes
contract, NP2 hasoftovarious
be arrangedsizes,byfortheculverts
contractor onby - - 0 0 0
cement
deploying concrete
suitableleveling
machineriescourse andincluding
men. fixing
E1091 collar
600mm with
dia.cement mortar 1:2 as per the drawing RMT 147 ₹ 3,173.40 - - 0 0 0
E1092 and
900mm as per
dia. specification prescribed in MoRTH, with RMT 440 ₹ 6,158.58 32.50 32.50 - ₹ 200,153.85 ₹ 200,153.85 ₹ 0.00
contractors
Random rubble men, material,
masonry, consumables,
hammer tools &
dressed wherever
plants, equipments,
necessary, in cement machineries,
and sand 1 all
:6 lead
in & lifts,
wing wall, toe
E1010 Cum 5,135 ₹ 3,465.62 3,610.06 3,289.25 320.81 ₹ 12,511,096.14 ₹ 11,399,290.59 ₹ 1,111,805.55
loading , unloading
wall, breast as directed
wall, retaining wall, by Engineer
curtain wall, -parapet
in -
Charge
wall, , etcofcomplete.
slope guide bunds, Thecatch
rate includes Cost of
water drains, side
Providing
pipes, etc,boulder
drains hauling, per packing
as storing, laying600mm
drawing as thick
in position
and hand
per, aligning,
technical
E1011 packed behind
joining complete
specification abutments,
prescribed retaining
and all incidental
in MoRTH costs walls,
including breast
to complete Cum 1,320 ₹ 1,468.40 654.99 592.87 62.12 ₹ 961,787.32 ₹ 870,570.31 ₹ 91,217.01
wall,
the wing walls, etc. as per drawing
providing weep holes of 100mm dia. PVC pipesuch
work as per specification. (Ancillarywith stone
works not as
at
less than
excavation
1 .Om c/c15cmwith inback
horizontallyany filling,
direction
and and not
leveling
vertically, less
course,
with than 30
contractors
kg
men, with
concrete contractors men,shall
and consumables,
material, masonry material, consumables,
be paid
tools separatelytools
& plants, in
& plants, schedule
relevant
equipments, equipments, machineries,
items).
machineries, including including
all lead & all lead &
lifts,
lifts,
loadingloading , unloading,
, unloading as perbytechnical
,as directed Engineer -in - Page 23 of 151
specification prescribed in MoRTH, with contractors
Charge , etc complete.
men, material, consumables, tools & plants,
Quantity Amount
Total
Item No. Desription of item Unit
BOQ Qty
Rate Upto previous
Upto Date Bill This Bill Cumulative Upto Previous IPC This IPC
Bill
Page 24 of 151
Certified that,
All taxes including Royalty charges, cess No materials has been issued to the
etc.due to the Govt. on the materials contractor for which the cost to be
3 2
used for this work have been fully paid recovered except such as specifically
and no payment is due to them. provided in the agreement /work order
11th
R.A.BILL
Name of work:
Construction of Two no. Tunnel T-12( Between Km 37+097 to Km 38+531 app
and T-13 (between Km 38+775 to Km 41+403 approx) on Sivok (West Bengal
Rangpo (Sikkim) New Single line BG Railway Line Project.
CA No- IRCON/2046/SIVOK-RANGPO/T12&13/50
AGEN
M/s. CS DHORAJ
11th RA BILL
Letter No :CSDCCJV/T12&T13/siteoffice/2021-22/
Excavation to lines and levels as required by the prevailing geotechnical conditions for installation of support as shown on
the drawings or as directed by the Engineer in portal areas and rescue place sites with limited access to construct berms,
surface drains, divert natural streams, nallah and the like etc. This item includes:
- excavation of all types of ground (soils and rock) by any means of excavation (i.e. digging, blasting).
- sequential excavation at limited height and slope support as shown on the drawings resp. as directed by the
Engineer following the prevailing geotechnical conditions. Support elements will be paid separately
- cutting of trees, shrubs, roots and other vegetation including loading onto transport, transportation and
appropriate depositing, separate from other material
- clearing of loose debris and loosened rock above cuts
1 A101 - appropriate measures for diversion of any waters
- loading of excavated material onto transport, ascending and descending handling of excavation and materials, transportation
lead up to 2.0 km (one way distance) from point of excavation to center of gravity of designated depositing sites and
appropriate depositing and compaction of the material to lines and levels as a complete job as per specification or
as directed by the Engineer in charge including handling if required
- setting out and demarcation of earthworks and muck deposits
- security fencing along top of cut
Measurement and payment shall be for volumes in their solid states as per drawings based on contractor´s survey
before and after excavation. Contractor´s survey shall be submitted to the Engineer for approval prior to excavation.
Average
Location Chainage Length (M) Area (M²) Quantity (M³) Remarks
Area (M²)
T12 P1 Portal Area
1 37,065.00 9.95
2 37,070.00 5.00 25.87 17.91 89.55
3 37,075.00 5.00 44.53 35.2 176.00
4 37,080.00 5.00 64.41 54.47 272.35
5 37,085.00 5.00 90.49 77.45 387.25
6 37,090.00 5.00 138.11 114.3 571.50
7 37,094.00 4.00 195.07 166.59 666.36
8 37,098.87 4.87 4.43 99.75 485.78
9 37,101.87 3.00 65.29 34.86 104.58
10 37,116.00 14.13 0.00 32.65 461.34 3214.71
T13 P1 Portal Area
1 38,811.96 0.00
2 38,806.92 5.03 89.92 44.96 226.33
3 38,803.92 3.00 32.84 61.38 184.14
4 38,797.86 6.06 171.53 102.18 619.62
5 38,794.86 3.00 143.15 157.34 472.02
6 38,790.49 4.37 375.50 259.33 1,132.75
7 38,785.00 5.49 330.58 353.04 1,938.19
8 38,780.00 5.00 262.66 296.62 1,483.10
9 38,775.00 5.00 195.78 229.22 1,146.10
10 38,770.00 5.00 139.00 167.39 836.95
11 38,765.00 5.00 63.60 101.3 506.50
12 38,760.00 5.00 1.52 32.56 162.80 8708.50
T12 P2 Portal Area
1 38,476.43 0.00 0.00
2 38,483.91 7.48 161.96 80.98 605.73
3 38,486.91 3.00 186.95 174.45 523.35
4 38,491.77 4.86 326.02 256.49 1,246.54
5 38,495.00 3.23 315.84 320.93 1,036.60
6 38,505.00 10.00 221.30 268.57 2,685.70
7 38,515.00 10.00 242.08 231.69 2,316.90
8 38,525.00 10.00 112.10 177.09 1,770.90
9 38,535.00 10.00 90.66 101.38 1,013.80
10 38,545.00 10.00 76.46 83.56 835.60
11 38,555.00 10.00 45.57 61.02 610.20 12645.32
T12 P1- Approach Road
From center of road of 12m
0.00 0.00 Span Bridge of Tumlang Khola
1
2 10.00 10 0.00 0.00 0.00
3 20.00 10 0.00 0.00 0.00
4 30.00 10 0.06 0.03 0.30
5 40.00 10 6.66 3.36 33.60
6 50.00 10 9.94 8.30 83.00
Page 28 of 151
Sl no Item No Description of Item
Excavation to lines and levels as required by the prevailing geotechnical conditions for installation of support as shown on
the drawings or as directed by the Engineer in portal areas and rescue place sites with limited access to construct berms,
surface drains, divert natural streams, nallah and the like etc. This item includes:
- excavation of all types of ground (soils and rock) by any means of excavation (i.e. digging, blasting).
- sequential excavation at limited height and slope support as shown on the drawings resp. as directed by the
Engineer following the prevailing geotechnical conditions. Support elements will be paid separately
- cutting of trees, shrubs, roots and other vegetation including loading onto transport, transportation and
appropriate depositing, separate from other material
- clearing of loose debris and loosened rock above cuts
1 A101 - appropriate measures for diversion of any waters
- loading of excavated material onto transport, ascending and descending handling of excavation and materials, transportation
lead up to 2.0 km (one way distance) from point of excavation to center of gravity of designated depositing sites and
appropriate depositing and compaction of the material to lines and levels as a complete job as per specification or
as directed by the Engineer in charge including handling if required
- setting out and demarcation of earthworks and muck deposits
- security fencing along top of cut
Measurement and payment shall be for volumes in their solid states as per drawings based on contractor´s survey
before and after excavation. Contractor´s survey shall be submitted to the Engineer for approval prior to excavation.
Average
Location Chainage Length (M) Area (M²) Quantity (M³) Remarks
Area (M²)
7 60.00 10 14.78 12.36 123.60
8 70.00 10 15.19 14.99 149.90
9 80.00 10 13.96 14.58 145.80
10 90.00 10 16.01 14.98 149.80
11 100.00 10 18.09 17.05 170.50
12 110.00 10 25.22 21.66 216.60
13 120.00 10 9.64 17.43 174.30
14 130.00 10 0.75 5.20 52.00
15 140.00 10 1.54 1.15 11.50
16 150.00 10 1.03 1.29 12.90
17 160.00 10 6.25 3.64 36.40
18 170.00 10 7.65 6.95 69.50
19 180.00 10 6.29 6.97 69.70
20 190.00 10 9.10 7.69 76.90
21 200.00 10 13.96 11.53 115.30
22 210.00 10 15.19 14.58 145.80
23 220.00 10 16.75 15.97 159.70
24 230.00 10 21.17 18.96 189.60
25 240.00 10 18.49 19.83 198.30
26 250.00 10 26.71 22.60 226.00
27 260.00 10 23.29 25.00 250.00
28 270.00 10 33.07 28.18 281.80
29 280.00 10 21.08 27.07 270.70
30 290.00 10 19.12 20.10 201.00
31 300.00 10 14.27 16.69 166.90
32 310.00 10 5.85 10.06 100.60 3,882.00
T12 P2 Approach road
1 0.00 0.00 From Dorajia Site Office Block
2 10.00 10 0.11 0.05 0.50
3 20.00 10 0.00 0.05 0.50
4 30.00 10 0.06 0.03 0.30
5 40.00 10 1.56 0.81 8.10
6 50.00 10 0.47 1.02 10.20
7 60.00 10 2.34 1.40 14.00
8 70.00 10 0.63 1.48 14.80
9 80.00 10 0.79 0.71 7.10
10 90.00 10 2.03 1.41 14.10
11 100.00 10 2.71 2.37 23.70
12 110.00 10 3.44 3.07 30.70
13 120.00 10 5.73 4.58 45.80
14 130.00 10 8.48 7.10 71.00
15 140.00 10 7.83 8.15 81.50
16 150.00 10 10.80 9.31 93.10
17 160.00 10 15.40 13.10 131.00
18 170.00 10 18.38 16.89 168.90
Page 29 of 151
Sl no Item No Description of Item
Excavation to lines and levels as required by the prevailing geotechnical conditions for installation of support as shown on
the drawings or as directed by the Engineer in portal areas and rescue place sites with limited access to construct berms,
surface drains, divert natural streams, nallah and the like etc. This item includes:
- excavation of all types of ground (soils and rock) by any means of excavation (i.e. digging, blasting).
- sequential excavation at limited height and slope support as shown on the drawings resp. as directed by the
Engineer following the prevailing geotechnical conditions. Support elements will be paid separately
- cutting of trees, shrubs, roots and other vegetation including loading onto transport, transportation and
appropriate depositing, separate from other material
- clearing of loose debris and loosened rock above cuts
1 A101 - appropriate measures for diversion of any waters
- loading of excavated material onto transport, ascending and descending handling of excavation and materials, transportation
lead up to 2.0 km (one way distance) from point of excavation to center of gravity of designated depositing sites and
appropriate depositing and compaction of the material to lines and levels as a complete job as per specification or
as directed by the Engineer in charge including handling if required
- setting out and demarcation of earthworks and muck deposits
- security fencing along top of cut
Measurement and payment shall be for volumes in their solid states as per drawings based on contractor´s survey
before and after excavation. Contractor´s survey shall be submitted to the Engineer for approval prior to excavation.
Average
Location Chainage Length (M) Area (M²) Quantity (M³) Remarks
Area (M²)
19 180.00 10 14.18 16.28 162.80
20 190.00 10 10.08 12.13 121.30
21 200.00 10 12.88 11.48 114.80
22 210.00 10 9.62 11.25 112.50
23 220.00 10 13.66 11.64 116.40
24 230.00 10 6.54 10.10 101.00
25 240.00 10 4.03 5.29 52.90
26 250.00 10 5.68 4.86 48.60
27 260.00 10 9.50 7.59 75.90
28 270.00 10 6.21 7.85 78.50
29 280.00 10 8.68 7.44 74.40
30 290.00 10 7.18 7.93 79.30
31 300.00 10 7.37 7.28 72.80
32 310.00 10 9.47 8.42 84.20
33 320.00 10 12.66 11.06 110.60
34 330.00 10 13.32 12.99 129.90
35 340.00 10 11.20 12.26 122.60
36 350.00 10 14.02 12.61 126.10
37 360.00 10 10.10 12.06 120.60
38 370.00 10 17.64 13.87 138.70
39 380.00 10 16.79 17.21 172.10
40 390.00 10 19.88 18.33 183.30
41 400.00 10 15.27 17.57 175.70
42 410.00 10 20.27 17.77 177.70
43 420.00 10 15.45 17.86 178.60
44 430.00 10 14.37 14.91 149.10
45 440.00 10 20.42 17.39 173.90
46 450.00 10 13.02 16.72 167.20
47 460.00 10 6.90 9.96 99.60
48 470.00 10 2.93 4.92 49.20
49 480.00 10 0.00 1.47 14.70
50 490.00 10 2.42 1.21 12.10
51 500.00 10 6.37 4.40 44.00
52 510.00 10 12.45 9.41 94.10
53 520.00 10 7.82 10.14 101.40
54 530.00 10 9.64 8.73 87.30
55 540.00 10 20.21 14.92 149.20
56 550.00 10 31.51 25.86 258.60
57 560.00 10 50.54 41.03 410.30
58 570.00 10 40.22 45.38 453.80
59 580.00 10 20.39 30.31 303.10
60 590.00 10 9.62 15.01 150.10
61 600.00 10 9.64 9.63 96.30
62 610.00 10 16.12 12.88 128.80
63 620.00 10 18.16 17.14 171.40
Page 30 of 151
Sl no Item No Description of Item
Excavation to lines and levels as required by the prevailing geotechnical conditions for installation of support as shown on
the drawings or as directed by the Engineer in portal areas and rescue place sites with limited access to construct berms,
surface drains, divert natural streams, nallah and the like etc. This item includes:
- excavation of all types of ground (soils and rock) by any means of excavation (i.e. digging, blasting).
- sequential excavation at limited height and slope support as shown on the drawings resp. as directed by the
Engineer following the prevailing geotechnical conditions. Support elements will be paid separately
- cutting of trees, shrubs, roots and other vegetation including loading onto transport, transportation and
appropriate depositing, separate from other material
- clearing of loose debris and loosened rock above cuts
1 A101 - appropriate measures for diversion of any waters
- loading of excavated material onto transport, ascending and descending handling of excavation and materials, transportation
lead up to 2.0 km (one way distance) from point of excavation to center of gravity of designated depositing sites and
appropriate depositing and compaction of the material to lines and levels as a complete job as per specification or
as directed by the Engineer in charge including handling if required
- setting out and demarcation of earthworks and muck deposits
- security fencing along top of cut
Measurement and payment shall be for volumes in their solid states as per drawings based on contractor´s survey
before and after excavation. Contractor´s survey shall be submitted to the Engineer for approval prior to excavation.
Average
Location Chainage Length (M) Area (M²) Quantity (M³) Remarks
Area (M²)
64 630.00 10 6.99 12.57 125.70
65 640.00 10 7.63 7.31 73.10
66 650.00 10 12.62 10.13 101.30
67 660.00 10 14.36 13.49 134.90
68 670.00 10 31.62 22.99 229.90
69 680.00 10 13.55 22.58 225.80
70 690.00 10 1.83 7.69 76.90
71 700.00 10 2.56 2.19 21.90
72 710.00 10 22.82 12.69 126.90
73 720.00 10 17.30 20.06 200.60
74 730.00 10 13.61 15.46 154.60
75 740.00 10 8.71 11.16 111.60
76 750.00 10 18.18 13.44 134.40
77 760.00 10 29.11 23.64 236.40
78 770.00 10 9.64 19.37 193.70
79 780.00 10 0.00 4.82 48.20 8,956.70
T13 P1 Approach road
1 0.00 0 0.00 0.00 0.00
2 10.00 10 0.42 0.21 2.10
3 20.00 10 1.60 1.01 10.10
4 30.00 10 0.12 0.86 8.60
5 40.00 10 0.82 0.47 4.70
6 50.00 10 4.28 2.55 25.50
7 60.00 10 6.95 5.62 56.20
8 70.00 10 4.15 5.55 55.50
9 80.00 10 2.54 3.34 33.40
10 90.00 10 3.62 3.08 30.80
11 100.00 10 3.40 3.51 35.10
12 110.00 10 1.68 2.54 25.40
13 120.00 10 1.69 1.69 16.90
14 130.00 10 2.81 2.25 22.50
15 140.00 10 2.23 2.52 25.20
16 150.00 10 3.59 2.91 29.10
17 160.00 10 2.96 3.27 32.70
18 170.00 10 0.51 1.73 17.30
19 180.00 10 0.32 0.41 4.10
20 190.00 10 7.46 3.89 38.90
21 200.00 10 6.63 7.04 70.40
22 210.00 10 0.71 3.67 36.70
23 220.00 10 3.80 2.26 22.60
24 230.00 10 18.99 11.40 114.00
25 240.00 10 17.22 18.11 181.10
26 250.00 10 10.26 13.74 137.40
27 260.00 10 9.04 9.65 96.50
28 270.00 10 8.54 8.79 87.90
Page 31 of 151
Sl no Item No Description of Item
Excavation to lines and levels as required by the prevailing geotechnical conditions for installation of support as shown on
the drawings or as directed by the Engineer in portal areas and rescue place sites with limited access to construct berms,
surface drains, divert natural streams, nallah and the like etc. This item includes:
- excavation of all types of ground (soils and rock) by any means of excavation (i.e. digging, blasting).
- sequential excavation at limited height and slope support as shown on the drawings resp. as directed by the
Engineer following the prevailing geotechnical conditions. Support elements will be paid separately
- cutting of trees, shrubs, roots and other vegetation including loading onto transport, transportation and
appropriate depositing, separate from other material
- clearing of loose debris and loosened rock above cuts
1 A101 - appropriate measures for diversion of any waters
- loading of excavated material onto transport, ascending and descending handling of excavation and materials, transportation
lead up to 2.0 km (one way distance) from point of excavation to center of gravity of designated depositing sites and
appropriate depositing and compaction of the material to lines and levels as a complete job as per specification or
as directed by the Engineer in charge including handling if required
- setting out and demarcation of earthworks and muck deposits
- security fencing along top of cut
Measurement and payment shall be for volumes in their solid states as per drawings based on contractor´s survey
before and after excavation. Contractor´s survey shall be submitted to the Engineer for approval prior to excavation.
Average
Location Chainage Length (M) Area (M²) Quantity (M³) Remarks
Area (M²)
29 280.00 10 5.99 7.27 72.70
30 290.00 10 2.87 4.43 44.30
31 300.00 10 3.51 3.19 31.90
32 310.00 10 8.49 6.00 60.00
33 320.00 10 8.72 8.60 86.00
34 330.00 10 1.25 4.98 49.80
35 340.00 10 13.66 7.45 74.50
36 350.00 10 0.00 6.83 68.30
37 360.00 10 31.54 15.77 157.70
38 370.00 10 17.97 24.75 247.50
39 380.00 10 22.23 20.10 201.00
40 390.00 10 8.06 15.15 151.50
41 400.00 10 6.15 7.10 71.00
42 410.00 10 14.38 10.27 102.70
43 420.00 10 50.48 32.43 324.30
44 430.00 10 42.34 46.41 464.10
45 440.00 10 32.16 37.25 372.50
46 450.00 10 38.02 35.09 350.90
47 460.00 10 38.92 38.47 384.70
48 470.00 10 28.78 33.85 338.50
49 480.00 10 27.06 27.92 279.20 5,153.80
T13 P2 Approach Road
From End Point of Local
0.00 19.99
1 Contractor
2 10.00 10 15.53 17.76 177.60
3 20.00 10 32.43 23.98 239.80
4 30.00 10 39.02 35.72 357.20
5 40.00 10 22.35 30.68 306.80
6 50.00 10 17.64 19.99 199.90
7 60.00 10 50.68 34.16 341.60
8 70.00 10 29.68 40.18 401.80
9 80.00 10 22.97 26.33 263.30
10 90.00 10 5.39 14.18 141.80
11 100.00 10 4.95 5.17 51.70
12 110.00 10 0.00 2.48 24.80
13 120.00 10 6.27 3.14 31.40
14 130.00 10 4.84 5.56 55.60
15 140.00 10 6.88 5.86 58.60
16 150.00 10 6.42 6.65 66.50 2,718.40
Excavation of Foundation for RRM Wall at T13 P1
1 Wall No 1 6.20 Area= 0.78 4.81
2 Wall No 2 8.30 Area= 0.78 6.43
3 Wall No 3 6.10 Area= 0.78 4.73
4 Wall No 4 6.12 Area= 0.78 4.74
5 Wall No 5 5.75 Area= 0.78 4.46 25.16
Page 32 of 151
Sl no Item No Description of Item
Excavation to lines and levels as required by the prevailing geotechnical conditions for installation of support as shown on
the drawings or as directed by the Engineer in portal areas and rescue place sites with limited access to construct berms,
surface drains, divert natural streams, nallah and the like etc. This item includes:
- excavation of all types of ground (soils and rock) by any means of excavation (i.e. digging, blasting).
- sequential excavation at limited height and slope support as shown on the drawings resp. as directed by the
Engineer following the prevailing geotechnical conditions. Support elements will be paid separately
- cutting of trees, shrubs, roots and other vegetation including loading onto transport, transportation and
appropriate depositing, separate from other material
- clearing of loose debris and loosened rock above cuts
1 A101 - appropriate measures for diversion of any waters
- loading of excavated material onto transport, ascending and descending handling of excavation and materials, transportation
lead up to 2.0 km (one way distance) from point of excavation to center of gravity of designated depositing sites and
appropriate depositing and compaction of the material to lines and levels as a complete job as per specification or
as directed by the Engineer in charge including handling if required
- setting out and demarcation of earthworks and muck deposits
- security fencing along top of cut
Measurement and payment shall be for volumes in their solid states as per drawings based on contractor´s survey
before and after excavation. Contractor´s survey shall be submitted to the Engineer for approval prior to excavation.
Average
Location Chainage Length (M) Area (M²) Quantity (M³) Remarks
Area (M²)
Excavation of Foundation for RRM Wall at T12 P1 Portal Area development
1 Wall No G 7.85 Area= 0.52 4.04
2 Wall No H 7.85 Area= 0.52 4.04 8.09
Excavation of Foundation for RRM Wall at T12 P1 Approach Road (Ch-251.5m to 281.0m)
1 Wall No O 8.30 Area= 0.64 5.28
2 Wall No P 8.10 Area= 0.64 5.15
3 Wall No Q 7.40 Area= 0.64 4.71
4 Wall No R 5.70 Area= 0.64 3.63 18.76
Excavation of Foundation for Gabion Wall at T12 P2 Approach Road (Ch-415m to 475.0m & 485.0m to 515.0m)
1 Wall No C 60.00 1.2 0.30 21.60
2 Wall No F 30.50 1.2 0.30 10.98 32.58
Excavation of Foundation for RRM Wall at T12P2 Portal Area Development
1 Wall No A 8.30 1.13 9.37 9.37
Excavation of Foundation for Gabion Wall at T12 P1 Portal Area
1 Wall No L 62.50 1.2 0.30 22.50 22.50
Excavation of Foundation for Gabion Wall at T12 P1 Approach road & River Protection
1 Wall No N 173.20 1.2 0.30 62.35 62.35
TOTAL= 45,458.24
Page 33 of 151
Executed Qauntity from 01.02.2021 to 09.03 2021
Sl no Item No Description of Item
Excavation to lines and levels as required by the prevailing geotechnical conditions for installation of support as shown on
the drawings or as directed by the Engineer in portal areas and rescue place sites with limited access to construct berms,
surface drains, divert natural streams, nallah and the like etc. This item includes:
- excavation of all types of ground (soils and rock) by any means of excavation (i.e. digging, blasting).
- sequential excavation at limited height and slope support as shown on the drawings resp. as directed by the
Engineer following the prevailing geotechnical conditions. Support elements will be paid separately
- cutting of trees, shrubs, roots and other vegetation including loading onto transport, transportation and
appropriate depositing, separate from other material
- clearing of loose debris and loosened rock above cuts
1 A101 - appropriate measures for diversion of any waters
- loading of excavated material onto transport, ascending and descending handling of excavation and materials, transportation
lead up to 2.0 km (one way distance) from point of excavation to center of gravity of designated depositing sites and
appropriate depositing and compaction of the material to lines and levels as a complete job as per specification or
as directed by the Engineer in charge including handling if required
- setting out and demarcation of earthworks and muck deposits
- security fencing along top of cut
Measurement and payment shall be for volumes in their solid states as per drawings based on contractor´s survey
before and after excavation. Contractor´s survey shall be submitted to the Engineer for approval prior to excavation.
Average
Location Chainage Length (M) Area (M²) Quantity (M³) Remarks
Area (M²)
Page 34 of 151
Sl no Item No Description of Item
Excavation to lines and levels as required by the prevailing geotechnical conditions for installation of support as shown on
the drawings or as directed by the Engineer in portal areas and rescue place sites with limited access to construct berms,
surface drains, divert natural streams, nallah and the like etc. This item includes:
- excavation of all types of ground (soils and rock) by any means of excavation (i.e. digging, blasting).
- sequential excavation at limited height and slope support as shown on the drawings resp. as directed by the
Engineer following the prevailing geotechnical conditions. Support elements will be paid separately
- cutting of trees, shrubs, roots and other vegetation including loading onto transport, transportation and
appropriate depositing, separate from other material
- clearing of loose debris and loosened rock above cuts
1 A101 - appropriate measures for diversion of any waters
- loading of excavated material onto transport, ascending and descending handling of excavation and materials, transportation
lead up to 2.0 km (one way distance) from point of excavation to center of gravity of designated depositing sites and
appropriate depositing and compaction of the material to lines and levels as a complete job as per specification or
as directed by the Engineer in charge including handling if required
- setting out and demarcation of earthworks and muck deposits
- security fencing along top of cut
Measurement and payment shall be for volumes in their solid states as per drawings based on contractor´s survey
before and after excavation. Contractor´s survey shall be submitted to the Engineer for approval prior to excavation.
Average
Location Chainage Length (M) Area (M²) Quantity (M³) Remarks
Area (M²)
TOTAL= 5,523.86
Page 35 of 151
Sl no Item No Description of Item
Excavation to lines and levels as required by the prevailing geotechnical conditions for installation of support as shown on
the drawings or as directed by the Engineer in portal areas and rescue place sites with limited access to construct berms,
surface drains, divert natural streams, nallah and the like etc. This item includes:
- excavation of all types of ground (soils and rock) by any means of excavation (i.e. digging, blasting).
- sequential excavation at limited height and slope support as shown on the drawings resp. as directed by the
Engineer following the prevailing geotechnical conditions. Support elements will be paid separately
- cutting of trees, shrubs, roots and other vegetation including loading onto transport, transportation and
appropriate depositing, separate from other material
- clearing of loose debris and loosened rock above cuts
1 A101 - appropriate measures for diversion of any waters
- loading of excavated material onto transport, ascending and descending handling of excavation and materials, transportation
lead up to 2.0 km (one way distance) from point of excavation to center of gravity of designated depositing sites and
appropriate depositing and compaction of the material to lines and levels as a complete job as per specification or
as directed by the Engineer in charge including handling if required
- setting out and demarcation of earthworks and muck deposits
- security fencing along top of cut
Measurement and payment shall be for volumes in their solid states as per drawings based on contractor´s survey
before and after excavation. Contractor´s survey shall be submitted to the Engineer for approval prior to excavation.
Average
Location Chainage Length (M) Area (M²) Quantity (M³) Remarks
Area (M²)
Page 36 of 151
Sl no Item No Description of Item
Excavation to lines and levels as required by the prevailing geotechnical conditions for installation of support as shown on the
drawings or as directed by the Engineer in portal areas and rescue place sites with limited access to construct berms, surface
drains, divert natural streams, nallah and the like etc. This item includes:
- excavation of all types of ground (soils and rock) by any means of excavation (i.e. digging, blasting).
- sequential excavation at limited height and slope support as shown on the drawings resp. as directed by the Engineer
following the prevailing geotechnical conditions. Support elements will be paid separately
- cutting of trees, shrubs, roots and other vegetation including loading onto transport, transportation and appropriate
depositing, separate from other material
- clearing of loose debris and loosened rock above cuts
1 A101 - appropriate measures for diversion of any waters
- loading of excavated material onto transport, ascending and descending handling of excavation and materials, transportation lead
up to 2.0 km (one way distance) from point of excavation to center of gravity of designated depositing sites and appropriate
depositing and compaction of the material to lines and levels as a complete job as per specification or as directed by the
Engineer in charge including handling if required
- setting out and demarcation of earthworks and muck deposits
- security fencing along top of cut
Measurement and payment shall be for volumes in their solid states as per drawings based on contractor´s survey before
and after excavation. Contractor´s survey shall be submitted to the Engineer for approval prior to excavation.
Average
Location Chainage Length (M) Area (M²) Quantity (M³) Remarks
Area (M²)
Excavation for RRM Wall at APPROACH ROAD OF T12P2 Chainage (300.0m to350.0m)
1 RRM Wall No B1 11.20 Area= 1.17 13.10
2 RRM Wall No B2 9.40 Area= 1.17 11.00
3 RRM Wall No B3 5.10 Area= 1.17 5.97
4 RRM Wall No B4 5.95 Area= 1.17 6.96
5 RRM Wall No B5 5.95 Area= 1.17 6.96
6 RRM Wall No B6 6.10 Area= 1.17 7.14
7 RRM Wall No B7 6.10 Area= 1.17 7.14
160.97
TOTAL= 160.97
Detail of Certified Quantity by IRCON
Total Up to date quantity Executed 103,849.57
Total Quantity Paid Up to Previous RA Bill 103,688.60
Quantity for This RA Bill 160.97
Page 37 of 151
Underground excavation (TopHeading,Bench,Invert) for main tunnel,adit,niches (Elctrical,Trolley Refuge and the like)and connection of the main tunnel to the adit by all
means of excavation (drilling,blasting /control blasting (wherever required) ,digging etc) in accordance with the New Austrian Tunnelling Method (NATM).This item
includes:-Mandatory excavation in sub divisons (Top heading, bench and invert)according to geometries, excavation and support sequence shown on design drawings
and as described in the technical specifications- in rock the application of smooth blasting techniques with contour hole spacing not exceeding 300 mm- Simultaneous
A102 excavation works in top heading, and half sided benching in rail tunnels as per technical specifications or as directed byEngineer- Systematic exploratory drillholes-
Appropriate Plant and Equipment with appropriate size specifically selected for the various tunnel sizes and as declared in the technical bid- Face maping & Rock
Classification after each blast.- Provision of drainages for all surfaces with vehicular circulation- Provision of adequate lighting and construction ventilation-
PORTAL- T13P1
38,788.50 3.00 T13P1/04 62.21 Full Face R0
38,789.50 4.00 T13P1/05 62.21 62.21 1.00 62.21 - - - - - Full Face R1
38,790.50 5.00 T13P1/06 64.12 63.16 1.00 63.16 - - - - - Full Face R3
38,791.50 6.00 T13P1/07 66.10 65.11 1.00 65.11 - - - - - Full Face R5
38,792.50 7.00 T13P1/08 68.08 67.09 1.00 67.09 - - - - - Full Face R7
38,793.50 8.00 T13P1/09 70.03 69.05 1.00 69.05 - - - - - Full Face R9
38,794.50 9.00 T13P1/10 70.03 70.03 1.00 70.03 - - - - - Full Face R9
38,795.50 10.00 T13P1/11 72.05 71.04 1.00 71.04 - - - - - Full Face R11
38,796.50 11.00 T13P1/12 62.21 67.13 1.00 67.13 9.06 4.53 4.53 2.98 1.49 1.49 Full Face R1
38,797.50 12.00 T13P1/13 64.12 63.16 1.00 63.16 8.31 8.69 8.69 3.47 3.22 3.22 Full Face R3
38,798.50 13.00 T13P1/14 66.10 65.11 1.00 65.11 4.59 6.45 6.45 3.55 3.51 3.51 Full Face R5
38,799.50 14.00 T13P1/15 66.10 66.10 1.00 66.10 1.89 3.24 3.24 1.74 2.65 2.65 Full Face R5
38,800.50 15.00 T13P1/16 68.08 67.09 1.00 67.09 2.32 2.10 2.10 1.99 1.86 1.86 Full Face R7
38,801.50 16.00 T13P1/17 68.08 68.08 1.00 68.08 1.69 2.00 2.00 1.61 1.80 1.80 Full Face R7
38,802.50 17.00 T13P1/18 70.03 69.05 1.00 69.05 3.09 2.39 2.39 3.23 2.42 2.42 Full Face R9
38,803.50 18.00 T13P1/19 70.03 70.03 1.00 70.03 4.02 3.56 3.56 2.86 3.05 3.05 Full Face R9
38,804.50 19.00 T13P1/20 72.05 71.04 1.00 71.04 5.18 4.60 4.60 2.18 2.52 2.52 Full Face R11
38,805.50 20.00 T13P1/21 72.05 72.05 1.00 72.05 2.62 3.90 3.90 2.96 2.57 2.57 Full Face R11
38,806.50 21.00 T13P1/22 72.05 72.05 1.00 72.05 4.68 3.65 3.65 3.04 3.00 3.00 Full Face R11
38,807.50 22.00 T13P1/23 62.21 67.13 1.00 67.13 - 2.34 2.34 1.52 1.52 Full Face R1
47.45 29.61 A
TOTAL= 1,285.71 23.73 14.80 50% of A
TOTAL= 1,309.44
Total= 373.00
PORTAL T12P1
T12P1/036 37.00 37,128.80 37,130.30 37.80 39.30 18.00 18.00 T12P1
Total= 449.00
PORTAL-T12P1
37,381.50 290.50 T12P1/205 56.58
37,383.00 292.00 T12P1/206 60.55 58.57 1.50 87.86 Ress no 7-06/11/2021
37,384.50 293.50 T12P1/207 60.55 59.23 1.50 88.85
37,386.00 295.00 T12P1/208 60.55 60.55 1.50 90.83
37,387.50 296.50 T12P1/209 60.55 60.55 1.50 90.83
37,389.00 298.00 T12P1/210 60.55 60.55 1.50 90.83
37,390.50 299.50 T12P1/211 60.55 60.55 1.50 90.83
37,392.00 301.00 T12P1/212 60.55 60.55 1.50 90.83
37,393.50 302.50 T12P1/213 60.55 60.55 1.50 90.83
37,395.00 304.00 T12P1/214 60.55 60.55 1.50 90.83
37,396.50 305.50 T12P1/215 60.55 60.55 1.50 90.83
37,398.00 307.00 T12P1/216 60.55 60.55 1.50 90.83
AVERAGE
TUNNEL AREA LENGTH QUANTITY
CHAINAGE ATSS No. AREA REMARKS
METER (sqm) (meter) (cum)
(sqm)
PORTAL-T13P2
41,331.00 15.00 T13P2/15 70.03 Ress no 4-09/10/2021
41,330.00 16.00 T13P2/16 62.63 66.33 1.00 66.33
41,329.00 17.00 T13P2/17 62.63 62.63 1.00 62.63
41,328.00 18.00 T13P2/18 62.63 62.63 1.00 62.63
41,327.00 19.00 T13P2/19 62.63 62.63 1.00 62.63
41,325.50 20.50 T13P2/20 62.63 62.63 1.50 93.95
41,324.00 22.00 T13P2/21 62.63 62.63 1.50 93.95
41,322.50 23.50 T13P2/22 62.63 62.63 1.50 93.95
41,321.00 25.00 T13P2/23 62.63 62.63 1.50 93.95
41,319.50 26.50 T13P2/24 62.63 62.63 1.50 93.95
41,318.00 28.00 T13P2/25 62.63 62.63 1.50 93.95
41,316.50 29.50 T13P2/26 62.63 62.63 1.50 93.95
41,315.00 31.00 T13P2/27 62.63 62.63 1.50 93.95
41,313.50 32.50 T13P2/28 62.63 62.63 1.50 93.95
41,312.00 34.00 T13P2/29 62.63 62.63 1.50 93.95
41,310.50 35.50 T13P2/30 62.63 62.63 1.50 93.95
41,309.00 37.00 T13P2/31 62.63 62.63 1.50 93.95
41,307.50 38.50 T13P2/32 62.63 62.63 1.50 93.95
AVERAGE
TUNNEL AREA LENGTH QUANTITY
CHAINAGE ATSS No. AREA REMARKS
METER (sqm) (meter) (cum)
(sqm)
TOTAL= 901.87
TOTAL= 4,269.01
T12P1
37,171.00 80.00 T12P1/064 1.50 3.974 4.270 6.41 2.513 2.410 3.62 CLASS V
37,172.50 81.50 T12P1/065 1.50 2.619 3.300 4.95 2.714 2.610 3.92 CLASS V
37,174.00 83.00 T12P1/066 1.50 3.162 2.890 4.34 2.112 2.410 3.62 CLASS V
37,175.50 84.50 T12P1/067 1.50 2.019 2.590 3.89 1.574 1.840 2.76 CLASS V
37,177.00 86.00 T12P1/068 1.50 2.170 2.090 3.14 1.715 1.640 2.46 CLASS V
37,178.50 87.50 T12P1/069 1.50 2.591 2.380 3.57 2.524 2.120 3.18 CLASS V
37,180.00 89.00 T12P1/070 1.50 2.334 2.460 3.69 2.037 2.280 3.42 CLASS V
37,181.50 90.50 T12P1/071 1.50 - 1.170 - - 1.020 - CLASS V
37,183.00 92.00 T12P1/072 1.50 - - - - - - CLASS V
37,184.50 93.50 T12P1/073 1.50 - - - - - - CLASS V
37,186.00 95.00 T12P1/074 1.50 - - - - - - CLASS V
37,187.50 96.50 T12P1/075 1.50 - - - - - - CLASS V
37,189.00 98.00 T12P1/076 1.50 2.405 1.200 - 2.126 1.060 - CLASS V
37,190.50 99.50 T12P1/077 1.50 - 1.200 - - 1.060 - CLASS V
78.15 48.18 B
NET TOTAL= 39.08 50% of total 24.09 50% of total B
37,207.50 116.50 T12P1/089 - - - - - - CLASS IV
37,209.00 118.00 T12P1/090 1.50 2.052 1.030 - 2.473 1.240 - CLASS IV
37,210.50 119.50 T12P1/091 1.50 - 1.030 - - 1.240 - CLASS IV
37,212.00 121.00 T12P1/092 1.50 - - - - - - CLASS IV
37,213.50 122.50 T12P1/093 1.50 3.686 1.840 2.76 2.540 1.270 - CLASS IV
37,215.00 124.00 T12P1/094 1.50 2.409 3.050 4.58 2.705 2.620 3.93 CLASS IV
37,216.50 125.50 T12P1/095 1.50 3.695 3.050 4.58 2.863 2.780 4.17 CLASS IV
37,218.00 127.00 T12P1/096 1.50 4.155 3.930 5.90 2.097 2.480 3.72 CLASS IV
37,219.50 128.50 T12P1/097 1.50 1.877 3.020 4.53 1.825 1.960 2.94 CLASS IV
37,221.00 130.00 T12P1/098 1.50 3.119 2.500 3.75 1.770 1.800 2.70 CLASS IV
37,222.50 131.50 T12P1/099 1.50 3.582 3.350 5.03 1.839 1.800 2.70 CLASS IV
37,224.00 133.00 T12P1/100 1.50 - 1.790 2.69 - 0.920 - CLASS IV
37,225.50 134.50 T12P1/101 1.50 1.674 0.840 - 1.708 0.850 - CLASS IV
37,227.00 136.00 T12P1/102 1.50 - 0.840 - - 0.850 - CLASS IV
37,417.50 326.50 T12P1/229 1.50 4.452 4.790 7.19 2.001 2.150 3.23 CLASS IV
37,419.00 328.00 T12P1/230 1.50 4.055 4.250 6.38 1.747 1.870 2.81 CLASS IV
37,420.50 329.50 T12P1/231 1.50 5.799 4.930 7.40 2.023 1.890 2.84 CLASS IV
37,422.00 331.00 T12P1/232 1.50 3.077 4.440 6.66 1.459 1.740 2.61 CLASS IV
37,423.50 332.50 T12P1/233 1.50 3.023 3.050 4.58 1.722 1.590 2.39 CLASS IV
37,425.00 334.00 T12P1/234 1.50 3.194 3.110 4.67 1.794 1.760 2.64 CLASS IV
37,426.50 335.50 T12P1/235 1.50 3.432 3.310 4.97 1.721 1.760 2.64 CLASS IV
37,428.00 337.00 T12P1/236 1.50 3.954 3.690 5.54 1.874 1.800 2.70 CLASS IV
37,429.50 338.50 T12P1/237 1.50 3.660 3.810 5.72 2.036 1.960 2.94 CLASS IV
242.20 102.64 B
NET TOTAL= 121.10 50% of total 51.32 50% of total B
37,324.50 233.50 T12P1/167 3.960 3.960 - 2.336 2.340 - CLASS III
37,326.00 235.00 T12P1/168 1.50 4.064 4.010 6.02 2.608 2.470 3.71 CLASS III
37,327.50 236.50 T12P1/169 1.50 4.259 4.160 6.24 2.247 2.430 3.65 CLASS III
37,405.50 314.50 T12P1/221 1.50 4.613 4.280 6.42 1.909 1.770 2.66 CLASS III
37,407.00 316.00 T12P1/222 1.50 6.893 5.750 8.63 2.145 2.030 3.05 CLASS III
209.48 95.66 A
NET TOTAL= 104.74 50% of total 47.83 50% of total A
T12P2
38,478.40 15.80 T12P2/26 6.20 4.77
38,477.70 16.50 T12P2/27 0.70 - 3.100 2.17 - 2.390 - Geological Over Break in Class VI
38,477.00 17.20 T12P2/28 0.70 7.05 3.530 2.47 2.26 1.130 - Geological Over Break in Class VI
38,476.30 17.90 T12P2/29 0.70 6.99 7.020 4.91 2.45 2.360 - Geological Over Break in Class VI
38,475.60 18.60 T12P2/30 0.70 11.42 9.210 6.45 3.25 2.850 2.00 Geological Over Break in Class VI
38,474.90 19.30 T12P2/31 0.70 9.57 10.500 7.35 3.17 3.210 2.25 Geological Over Break in Class VI
38,474.20 20.00 T12P2/32 0.70 9.70 9.640 6.75 3.14 3.160 2.21 Geological Over Break in Class VI
38,473.40 20.80 T12P2/33 0.80 7.37 8.540 6.83 2.38 2.760 2.21 Geological Over Break in Class VI
38,472.60 21.60 T12P2/34 0.80 - 3.690 2.95 - 1.190 - Geological Over Break in Class VI
38,471.80 22.40 T12P2/35 0.80 - - - - - - Geological Over Break in Class VI
38,471.00 23.20 T12P2/36 0.80 - - - - - - Geological Over Break in Class VI
38,470.20 24.00 T12P2/37 0.80 6.54 3.270 2.62 2.12 1.060 - Geological Over Break in Class VI
38,469.40 24.80 T12P2/38 0.80 6.86 6.700 5.36 2.15 2.140 - Geological Over Break in Class VI
38,468.60 25.60 T12P2/39 0.80 8.31 7.590 6.07 2.68 2.420 - Geological Over Break in Class VI
38,467.80 26.40 T12P2/40 0.80 2.44 5.380 4.30 1.47 2.080 - Geological Over Break in Class VI
38,467.00 27.20 T12P2/41 0.80 4.41 3.430 2.74 2.06 1.770 - Geological Over Break in Class VI
60.97 8.66 B
NET TOTAL= 30.49 50% of total 4.33 50% of total B
T13P1
38,807.50 22.00 T13P1/23 1.764 1.075 Geological Over Break in Class VI
38,808.50 23.00 T13P1/24 1.00 - 0.880 - - 0.540 - Geological Over Break in Class VI
38,809.50 24.00 T13P1/25 1.00 - - - - - - Geological Over Break in Class VI
38,810.50 25.00 T13P1/26 1.00 5.569 2.780 2.78 2.384 1.190 - Geological Over Break in Class VI
38,811.50 26.00 T13P1/27 1.00 3.332 4.450 4.45 1.372 1.880 - Geological Over Break in Class VI
38,812.50 27.00 T13P1/28 1.00 3.223 3.280 3.28 1.512 1.440 - Geological Over Break in Class VI
38,813.50 28.00 T13P1/29 1.00 3.436 3.330 3.33 1.614 1.560 - Geological Over Break in Class VI
38,814.50 29.00 T13P1/30 1.00 3.352 3.390 3.39 1.573 1.590 - Geological Over Break in Class VI
38,815.50 30.00 T13P1/31 1.00 1.445 2.400 2.40 0.926 1.250 - Geological Over Break in Class VI
19.63 - B
NET TOTAL= 9.82 50% of total - 50% of total B
38,828.50 43.00 T13P1/44 1.00 4.481 4.070 4.07 2.101 2.020 2.02 Geological Over Break in Class V
38,829.50 44.00 T13P1/45 1.00 5.000 4.740 4.74 2.369 2.240 2.24 Geological Over Break in Class V
38,830.50 45.00 T13P1/46 1.00 2.944 3.970 3.97 2.233 2.300 2.30 Geological Over Break in Class V
38,831.50 46.00 T13P1/47 1.00 2.685 2.810 2.81 2.118 2.180 2.18 Geological Over Break in Class V
38,832.50 47.00 T13P1/48 1.00 2.201 2.440 2.44 1.764 1.940 - Geological Over Break in Class V
38,833.50 48.00 T13P1/49 1.00 4.594 3.400 3.40 2.547 2.160 2.16 Geological Over Break in Class V
38,834.50 49.00 T13P1/50 1.00 2.176 3.390 3.39 1.275 1.910 - Geological Over Break in Class V
38,835.50 50.00 T13P1/51 1.00 2.652 2.410 2.41 1.610 1.440 - Geological Over Break in Class V
38,836.50 51.00 T13P1/52 1.00 3.088 2.870 2.87 1.883 1.750 - Geological Over Break in Class V
38,837.50 52.00 T13P1/53 1.00 3.576 3.330 3.33 1.934 1.910 - Geological Over Break in Class V
38,838.50 53.00 T13P1/54 1.00 3.344 3.460 3.46 1.487 1.710 - Geological Over Break in Class V
38,839.50 54.00 T13P1/55 1.00 2.245 2.790 2.79 1.861 1.670 - Geological Over Break in Class V
38,840.50 55.00 T13P1/56 1.00 2.878 2.560 2.56 1.974 1.920 - Geological Over Break in Class V
38,841.50 56.00 T13P1/57 1.00 2.496 2.690 2.69 2.126 2.050 2.05 Geological Over Break in Class V
38,842.50 57.00 T13P1/58 1.00 - 1.250 - - 1.060 - Geological Over Break in Class V
38,843.50 58.00 T13P1/59 1.00 2.223 1.110 - 1.610 0.810 - Geological Over Break in Class V
38,844.50 59.00 T13P1/60 1.00 2.653 2.440 2.44 1.822 1.720 - Geological Over Break in Class V
38,845.50 60.00 T13P1/61 1.00 - 1.330 - - 0.910 - Geological Over Break in Class V
38,846.50 61.00 T13P1/62 1.00 1.815 0.910 - 1.517 0.760 - Geological Over Break in Class V
38,847.50 62.00 T13P1/63 1.00 - 0.910 - - 0.760 - Geological Over Break in Class V
38,848.50 63.00 T13P1/64 1.00 - - - - - - Geological Over Break in Class V
38,849.50 64.00 T13P1/65 1.00 - - - - - - Geological Over Break in Class V
38,850.50 65.00 T13P1/66 1.00 1.655 0.830 - 1.577 0.790 - Geological Over Break in Class V
38,851.50 66.00 T13P1/67 1.00 2.356 2.010 2.01 1.557 1.570 - Geological Over Break in Class V
38,852.50 67.00 T13P1/68 1.00 - 1.180 - - 0.780 - Geological Over Break in Class V
38,853.50 68.00 T13P1/69 1.00 - - - - - - Geological Over Break in Class V
62.14 17.14 B
NET TOTAL= 31.07 50% of total 8.57 50% of total B
38,869.00 83.50 T13P1/80 - - - - Geological Over Break in ClassI IV
38,870.50 85.00 T13P1/81 1.50 2.320 1.160 - 1.588 0.790 - Geological Over Break in ClassI IV
38,872.00 86.50 T13P1/82 1.50 4.444 3.380 5.07 1.611 1.600 - Geological Over Break in ClassI IV
38,873.50 88.00 T13P1/83 1.50 - 2.220 3.33 - 0.810 - Geological Over Break in ClassI IV
38,875.00 89.50 T13P1/84 1.50 - - - - - - Geological Over Break in ClassI IV
38,876.50 91.00 T13P1/85 1.50 - - - - - - Geological Over Break in ClassI IV
38,878.00 92.50 T13P1/86 1.50 3.417 1.710 2.57 1.631 0.820 - Geological Over Break in ClassI IV
38,879.50 94.00 T13P1/87 1.50 - 1.710 2.57 - 0.820 - Geological Over Break in ClassI IV
38,881.00 95.50 T13P1/88 1.50 - - - - - - Geological Over Break in ClassI IV
38,891.50 106.00 T13P1/95 - - - - Geological Over Break in ClassI IV
38,893.00 107.50 T13P1/96 1.50 4.190 2.100 3.15 2.453 1.230 - Geological Over Break in ClassI IV
38,894.50 109.00 T13P1/97 1.50 - 2.100 3.15 - 1.230 - Geological Over Break in ClassI IV
38,896.00 110.50 T13P1/98 1.50 - - - - - - Geological Over Break in ClassI IV
38,897.50 112.00 T13P1/99 1.50 4.404 2.200 3.30 1.560 0.780 - Geological Over Break in ClassI IV
38,899.00 113.50 T13P1/100 1.50 3.658 4.030 6.05 1.585 1.570 2.36 Geological Over Break in ClassI IV
38,900.50 115.00 T13P1/101 1.50 2.659 3.160 4.74 1.650 1.620 2.43 Geological Over Break in ClassI IV
38,902.00 116.50 T13P1/102 1.50 1.927 2.290 3.44 1.517 1.580 2.37 Geological Over Break in ClassI IV
38,903.50 118.00 T13P1/103 1.50 3.139 2.530 3.80 2.387 1.950 2.93 Geological Over Break in ClassI IV
38,905.00 119.50 T13P1/104 1.50 5.775 4.460 6.69 2.993 2.690 4.04 Geological Over Break in ClassI IV
38,906.50 121.00 T13P1/105 1.50 2.571 4.170 6.26 2.215 2.600 3.90 Geological Over Break in ClassI IV
38,908.00 122.50 T13P1/106 1.50 3.089 2.830 4.25 2.312 2.260 3.39 Geological Over Break in ClassI IV
38,909.50 124.00 T13P1/107 1.50 3.559 3.320 4.98 1.979 2.150 3.23 Geological Over Break in ClassI IV
38,911.00 125.50 T13P1/108 1.50 4.419 3.990 5.99 2.771 2.380 3.57 Geological Over Break in ClassI IV
38,912.50 127.00 T13P1/109 1.50 4.454 4.440 6.66 3.046 2.910 4.37 Geological Over Break in ClassI IV
38,914.00 128.50 T13P1/110 1.50 7.061 5.760 8.64 3.411 3.230 4.85 Geological Over Break in ClassI IV
38,915.50 130.00 T13P1/111 1.50 9.139 8.100 12.15 3.411 3.410 5.12 Geological Over Break in ClassI IV
38,917.00 131.50 T13P1/112 1.50 4.452 6.800 10.20 1.437 2.420 3.63 Geological Over Break in ClassI IV
Geological Over Break
Annex-B
38,918.50 133.00 T13P1/113 1.50 3.755 4.100 6.15 1.528 1.480 2.22 Geological Over Break in ClassI IV
38,920.00 134.50 T13P1/114 1.50 2.960 3.360 5.04 1.428 1.480 2.22 Geological Over Break in ClassI IV
38,921.50 136.00 T13P1/115 1.50 3.840 3.400 5.10 1.522 1.480 2.22 Geological Over Break in ClassI IV
38,923.00 137.50 T13P1/116 1.50 - 1.920 2.88 - 0.760 - Geological Over Break in ClassI IV
38,924.50 139.00 T13P1/117 1.50 - - - - - - Geological Over Break in ClassI IV
38,926.00 140.50 T13P1/118 1.50 2.822 1.410 2.12 1.742 0.870 - Geological Over Break in ClassI IV
38,927.50 142.00 T13P1/119 1.50 - 1.410 2.12 - 0.870 - Geological Over Break in ClassI IV
38,929.00 143.50 T13P1/120 1.50 - - - - - - Geological Over Break in ClassI IV
38,930.50 145.00 T13P1/121 1.50 2.453 1.230 - 1.523 0.760 - Geological Over Break in ClassI IV
38,932.00 146.50 T13P1/122 1.50 2.457 2.460 3.69 1.667 1.600 2.40 Geological Over Break in ClassI IV
38,933.50 148.00 T13P1/123 1.50 - 1.230 - - 0.830 - Geological Over Break in ClassI IV
38,935.00 149.50 T13P1/124 1.50 2.679 1.340 2.01 1.814 0.910 - Geological Over Break in ClassI IV
38,936.50 151.00 T13P1/125 1.50 4.196 3.440 5.16 1.783 1.800 2.70 Geological Over Break in ClassI IV
38,938.00 152.50 T13P1/126 1.50 2.536 3.370 5.06 1.649 1.720 2.58 Geological Over Break in ClassI IV
38,939.50 154.00 T13P1/127 1.50 - 1.270 - - 0.820 - Geological Over Break in ClassI IV
38,941.00 155.50 T13P1/128 1.50 2.302 1.150 - 1.322 0.660 - Geological Over Break in ClassI IV
38,942.50 157.00 T13P1/129 1.50 - 1.150 - - 0.660 - Geological Over Break in ClassI IV
38,944.00 158.50 T13P1/130 1.50 2.714 1.360 2.04 1.689 0.840 - Geological Over Break in ClassI IV
38,945.50 160.00 T13P1/131 1.50 - 1.360 2.04 - 0.840 - Geological Over Break in ClassI IV
38,947.00 161.50 T13P1/132 1.50 - - - - - - Geological Over Break in ClassI IV
38,948.50 163.00 T13P1/133 1.50 2.421 1.210 - 1.403 0.700 - Geological Over Break in ClassI IV
38,950.00 164.50 T13P1/134 1.50 5.345 3.880 5.82 2.019 1.710 2.57 Geological Over Break in ClassI IV
38,951.50 166.00 T13P1/135 1.50 6.498 5.920 8.88 2.018 2.020 3.03 Geological Over Break in ClassI IV
38,953.00 167.50 T13P1/136 1.50 5.748 6.120 9.18 2.680 2.350 3.53 Geological Over Break in ClassI IV
38,954.50 169.00 T13P1/137 1.50 4.803 5.280 7.92 2.727 2.700 4.05 Geological Over Break in ClassI IV
38,955.50 170.00 T13P1/138 1.00 - 2.400 2.40 - 1.360 - Geological Over Break in ClassI IV
38,956.50 171.00 T13P1/139 1.00 - - - - - - Geological Over Break in ClassI IV
38,958.00 172.50 T13P1/140 1.50 - - - - - - Geological Over Break in ClassI IV
38,959.20 173.70 T13P1/141 1.20 - - - - - - Geological Over Break in ClassI IV
38,960.40 174.90 T13P1/142 1.20 3.314 1.660 - 1.778 0.890 - Geological Over Break in ClassI IV
38,961.60 176.10 T13P1/143 1.20 6.903 5.110 6.13 2.929 2.350 2.82 Geological Over Break in ClassI IV
38,963.00 177.50 T13P1/144 1.40 - 3.450 4.83 - 1.460 2.04 Geological Over Break in ClassI IV
38,964.20 178.70 T13P1/145 1.20 2.701 1.350 - 1.733 0.870 - Geological Over Break in ClassI IV
205.50 78.53 A
NET TOTAL= 102.75 50% of total 39.27 50% of total A
8 T12P1/206 209.00 37,383.00 37,384.50 290.50 292.00 9.00 9.00 RESS no-7-06/11/2021
25 T12P1/223 226.00 37,408.50 37,410.00 316.00 317.50 12.00 12.00 RESS no-9-18/11/2021
625.00
Total= 625.00
T12P2/16 16.00 38,484.80 38,484.15 8.70 9.35 5.00 5.00 Ress no 3-04/08/2021
PORTAL T13P1
T13P1/122 122.00 38,932.00 38,933.50 146.50 148.00 3.00 3.00 Ress no-4-18/10/2021
T13P2/14 14.00 41,333.00 41,332.00 13.00 14.00 18.00 18.00 RESS no-4-09/11/2021
588.00
Total= 588.00
Elevation
QUANTITY
Location Unit No Length REMARKS
From To (No)
Page 60 of 151
Self drilling rock bolts (IBO) for tunnel support, slope support, face bolts etc. Supply, drilling, installation, grouting
and testing of self driling rock bolts of specified length L, specified minimum ultimate load as per design
drawings (Fy=200kN), technical specifications or as directed by Engineer. Drilling with grout flushing is
mandatory. This item includes:
- couplings
- sacrificial drilling bits + grouting
Measurement and payment shall be per piece appropriately installed rock bolts (for exact payment details see
specifications).
BOQ Item No. B1041 - Outer diameter 76mm, steel grade S355, wall thickness 6.3mm
Tunnel T-13-P1
Page 62 of 151
Sl no Item No Description of Item
Supply, drilling hole, installation, testing and grouting of forepoling as per approved drawings & specifications or as
5 B105 directed by Engineer. 200kN minimum ultimate load. The rate shall include costs of all materials, labour, equipments, etc.
required for the complete job.
Tunnel-T12P1
37453.50 364.00 m 28 6.00 168.00
37458.00 368.50 m 28 6.00 168.00
4,494.00
TOTAL= 4,494.00
Detail of Certified Quantity by IRCON
Total Up to date quantity Executed 15,300.00
Total Quantity Paid Up to Previous RA Bill 10,806.00
Quantity for This RA Bill 4,494.00
Page 63 of 151
Pipe Roof Umbrella: Supply, drilling, installation and grouting of self-drilling pipe technology of length up to 18m as
per approved drawings & specifications (single row, double row, skin-to-skin single row) or as directed by Engineer.
The rate shall include costs of all materials like starter units, pipes (perforated), drill bits, grouting packers etc.,
labour, equipments, etc. required for the complete job. This item includes:
- Mobilistaion and demobilsation of all equipment necessary (drilling jumbo equipped with AT-casing system,
Symmetrix or similar) for single row, double row or skin-to skin single row
B104 - the necessary excavation
- loading, transport and appropriate depositing of the excavated material
- the excess use of inner lining concrete and waterproofing
- all auxiliary works and materials necessary
Measurement and payment shall be per meter installed pipe roof pipe as directed and approved by the Engineer.
BOQ Item No. B1041 - Outer diameter 76mm, steel grade S355, wall thickness 6.3mm
30 38+474.9m 9 40 360
38 38+468.6m 9 42 378
TOTAL= 738
Page 64 of 151
Sl no Item No Description of Item
Supply, fabrication, storing and erection of lattice girders . Geometries shall be as shown on design drawings, in technical specifications or
directed by the Engineer. These items include:
- all necessary elements for connection of lattice girder partitions, such as connection plate, connection bolts and nuts etc.
6 B106 - all auxiliary materials
- bearing elements
Minimum steel grade is Fe 500. For underground works, measurement and payment shall be for the theoretical length of lattice girders
measured using the Payment line as shown on design drawings and in the technical specifications.
Page 65 of 151
Sl no Item No Description of Item
Supply, fabrication, storing and erection of lattice girders . Geometries shall be as shown on design drawings, in technical specifications or
directed by the Engineer. These items include:
- all necessary elements for connection of lattice girder partitions, such as connection plate, connection bolts and nuts etc.
6 B106 - all auxiliary materials
- bearing elements
Minimum steel grade is Fe 500. For underground works, measurement and payment shall be for the theoretical length of lattice girders
measured using the Payment line as shown on design drawings and in the technical specifications.
37+383m
to
T12P1 RESS-7 & 9
37+398m & LG 29 281.14 8,153.06 Pentax 95/16/25
(06/11/2021 & 18/11/2021)
37+408.5m to
37+458m
Page 66 of 151
Sl no Item No Description of Item
Supply and placement of welded wire mesh of sizes 150x150x6, 100x100x6 or any other size as directed by Engineer as reinforcement of sprayed concrete for tunnel lining
works as shown
on design drawings, specifications or as directed by Engineer. Steel grade minimum Fe500. This item also includes:
- Fixing elements and materials
8 B108 - cutting, bending and placement
- all auxiliary materials and works necessary
Measurement and payment shall be per square meter for each layer installed and instructed, measured along Payment Line (see specifications). Overlapping as mentioned in
technical specifications is mandatory but shall not be paid
extra.
Wt
TUNNEL Avg =@2.96kg/sq
DESCRIPTION ATSS NO ROUND NO Layer CHAINAGE Length Area REMARKS
METER Perimeter m As per IS
1566-1982
PORTAL T12P1
WIRE MESH 150X150X6 T12P1/19 19 2 37,110.00 19.00 1.00 22.18 22.18 131.30 1
WIRE MESH 150X150X6 T12P1/20 20 2 37,111.00 20.00 1.00 21.55 21.55 127.57 3
WIRE MESH 150X150X6 T12P1/21 21 2 37,112.00 21.00 1.00 21.89 21.89 129.57 5
WIRE MESH 150X150X6 T12P1/22 22 2 37,113.00 22.00 1.00 21.89 21.89 129.57 5
WIRE MESH 150X150X6 T12P1/23 23 2 37,114.00 23.00 1.00 21.89 21.89 129.57 5
WIRE MESH 150X150X6 T12P1/24 24 2 37,115.00 24.00 1.00 22.17 22.17 131.22 7
WIRE MESH 150X150X6 T12P1/25 25 2 37,116.00 25.00 1.00 22.43 22.43 132.79 9
WIRE MESH 150X150X6 T12P1/26 26 2 37,117.00 26.00 1.00 22.43 22.43 132.79 9
WIRE MESH 150X150X6 T12P1/27 27 2 37,118.00 27.00 1.00 22.18 22.18 131.30 1
WIRE MESH 150X150X6 T12P1/28 28 2 37,119.00 28.00 1.00 21.55 21.55 127.57 3
WIRE MESH 150X150X6 T12P1/29 29 2 37,120.00 29.00 1.00 21.89 21.89 129.57 5
WIRE MESH 150X150X6 T12P1/30 30 2 37,121.00 30.00 1.00 22.17 22.17 131.22 7
WIRE MESH 150X150X6 T12P1/31 31 2 37,122.00 31.00 1.00 22.43 22.43 132.79 9
WIRE MESH 150X150X6 T12P1/32 32 2 37,123.00 32.00 1.00 22.18 22.18 131.30 1
WIRE MESH 150X150X6 T12P1/33 33 2 37,124.00 33.00 1.00 21.55 21.55 127.57 3
WIRE MESH 150X150X6 T12P1/34 34 2 37,125.00 34.00 1.00 21.89 21.89 129.57 5
WIRE MESH 150X150X6 T12P1/35 35 2 37,126.00 35.00 1.00 22.17 22.17 131.22 7
WIRE MESH 150X150X6 T12P1/36 36 2 37,127.00 36.00 1.00 22.43 22.43 132.79 9
WIRE MESH 150X150X6 T12P1/37 37 2 37,128.00 37.00 1.00 22.18 22.18 131.30 1
Wt
Slope Avg =@2.96kg/sq
Item Unit Layer Offset Width Area REMARKS
Length Length m As per IS
1566-1982
PORTAL T13P1
1 WIRE MESH 150X150X6 Kg 2 15.30 -44.15 0.00 0.00 EL=389.0m to 381.0m
2 WIRE MESH 150X150X6 Kg 2 15.28 15.29 -39.82 4.34 66.32 392.62
3 WIRE MESH 150X150X6 Kg 2 15.95 15.62 -35.23 4.58 71.58 423.76
4 WIRE MESH 150X150X6 Kg 2 15.43 15.69 -33.51 1.72 27.03 160.03
5 WIRE MESH 150X150X6 Kg 2 18.30 16.86 -30.00 3.51 59.16 350.22
6 WIRE MESH 150X150X6 Kg 2 8.99 13.64 -18.15 11.85 161.66 957.01
7 WIRE MESH 150X150X6 Kg 2 9.09 9.04 -15.00 3.15 28.47 168.54
8 WIRE MESH 150X150X6 Kg 2 12.48 10.79 -10.00 5.00 53.93 319.25
9 WIRE MESH 150X150X6 Kg 2 0.00 6.24 -6.00 4.00 24.96 147.76
10 WIRE MESH 150X150X6 Kg 2 9.66 4.83 -5 1.00 4.83 28.58
11 WIRE MESH 150X150X6 Kg 2 9.64 9.65 0.00 5.00 48.25 285.65
12 WIRE MESH 150X150X6 Kg 2 9.68 9.66 5.00 5.00 48.31 286.01
13 WIRE MESH 150X150X6 Kg 2 0.00 4.84 6.10 1.10 5.32 31.52
14 WIRE MESH 150X150X6 Kg 2 9.08 4.54 10.00 3.90 17.71 104.85
15 WIRE MESH 150X150X6 Kg 2 2.68 5.88 11.62 1.62 9.53 56.40
Single Layer
1 WIRE MESH 150X150X6 Kg 1 4.50 4.50 -6.00 0.00 0.00
2 WIRE MESH 150X150X6 Kg 1 4.87 4.69 -5.00 1.00 4.69 13.88
3 WIRE MESH 150X150X6 Kg 1 3.18 4.03 0.00 5.00 20.13 59.58
4 WIRE MESH 150X150X6 Kg 1 5.03 4.10 5.00 5.00 20.52 60.74
5 WIRE MESH 150X150X6 Kg 1 5.10 5.06 6.10 1.10 5.57 16.49
Supply and placement of welded wire mesh of sizes 150x150x6, 100x100x6 or any other size as directed by Engineer as reinforcement of sprayed concrete for tunnel lining works as shown
on design drawings, specifications or as directed by Engineer. Steel grade minimum Fe500. This item also includes:
- Fixing elements and materials
- cutting, bending and placement
8 B108
- all auxiliary materials and works necessary
Measurement and payment shall be per square meter for each layer installed and instructed, measured along Payment Line (see specifications). Overlapping as mentioned in technical
specifications is mandatory but shall not be paid
extra.
Wt
TUNNEL =@2.96kg/sq
Sl no DESCRIPTION ATSS NO ROUND NO Layer CHAINAGE
METER
Length Avg Perimeter Area REMARKS
m As per IS
1566-1982
Portal-T13 P1
1 WIRE MESH 150X150X6 T13P1/04 4 2 38,788.50 3.00 - 21.37 - 0.00
2 WIRE MESH 150X150X6 T13P1/05 5 2 38,789.50 4.00 1.00 21.37 21.37 126.52
3 WIRE MESH 150X150X6 T13P1/06 6 2 38,790.50 5.00 1.00 21.65 21.65 128.16
4 WIRE MESH 150X150X6 T13P1/07 7 2 38,791.50 6.00 1.00 21.93 21.93 129.84
5 WIRE MESH 150X150X6 T13P1/08 8 2 38,792.50 7.00 1.00 22.21 22.21 131.50
6 WIRE MESH 150X150X6 T13P1/09 9 2 38,793.50 8.00 1.00 22.48 22.48 133.06
7 WIRE MESH 150X150X6 T13P1/10 10 2 38,794.50 9.00 1.00 22.48 22.48 133.06
8 WIRE MESH 150X150X6 T13P1/11 11 2 38,795.50 10.00 1.00 22.75 22.75 134.70
9 WIRE MESH 150X150X6 T13P1/12 12 2 38,796.50 11.00 1.00 21.37 21.37 126.52
10 WIRE MESH 150X150X6 T13P1/13 13 2 38,797.50 12.00 1.00 21.65 21.65 128.16
11 WIRE MESH 150X150X6 T13P1/14 14 2 38,798.50 13.00 1.00 22.65 22.65 134.11
12 WIRE MESH 150X150X6 T13P1/15 15 2 38,799.50 14.00 1.00 21.93 21.93 129.84
13 WIRE MESH 150X150X6 T13P1/16 16 2 38,800.50 15.00 1.00 22.21 22.21 131.50
14 WIRE MESH 150X150X6 T13P1/17 17 2 38,801.50 16.00 1.00 22.21 22.21 131.50
15 WIRE MESH 150X150X6 T13P1/18 18 2 38,802.50 17.00 1.00 22.48 22.48 133.06
16 WIRE MESH 150X150X6 T13P1/19 19 2 38,803.50 18.00 1.00 22.48 22.48 133.06
17 WIRE MESH 150X150X6 T13P1/20 20 2 38,804.50 19.00 1.00 22.75 22.75 134.70
18 WIRE MESH 150X150X6 T13P1/21 21 2 38,805.50 20.00 1.00 22.75 22.75 134.70
19 WIRE MESH 150X150X6 T13P1/22 22 2 38,806.50 21.00 1.00 22.75 22.75 134.70
20 WIRE MESH 150X150X6 T13P1/23 23 2 38,807.50 22.00 1.00 21.37 21.37 126.52
Portal-T12 P1
1 WIRE MESH 150X150X6 T12P1/037 37.00 2 37,128.00 37.00 - 21.89 - 0.00 1
2 WIRE MESH 150X150X6 T12P1/036 38.00 2 37,128.80 37.80 0.80 21.67 17.33 102.62
3 WIRE MESH 150X150X6 T12P1/037 39.00 2 37,130.30 39.30 1.50 21.16 31.74 187.91
4 WIRE MESH 150X150X6 T12P1/038 40.00 2 37,131.80 40.80 1.50 21.16 31.74 187.91
5 WIRE MESH 150X150X6 T12P1/039 41.00 2 37,133.30 42.30 1.50 21.16 31.74 187.91
6 WIRE MESH 150X150X6 T12P1/040 42.00 2 37,134.80 43.80 1.50 21.16 31.74 187.91
7 WIRE MESH 150X150X6 T12P1/041 43.00 2 37,136.30 45.30 1.50 21.16 31.74 187.91
8 WIRE MESH 150X150X6 T12P1/042 44.00 2 37,137.80 46.80 1.50 21.16 31.74 187.91
9 WIRE MESH 150X150X6 T12P1/043 45.00 2 37,139.50 48.50 1.70 21.16 35.97 212.96
10 WIRE MESH 150X150X6 T12P1/044 46.00 2 37,141.00 50.00 1.50 21.16 31.74 187.91
11 WIRE MESH 150X150X6 T12P1/045 47.00 2 37,142.50 51.50 1.50 21.16 31.74 187.91
12 WIRE MESH 150X150X6 T12P1/046 48.00 2 37,144.00 53.00 1.50 21.16 31.74 187.91
13 WIRE MESH 150X150X6 T12P1/047 49.00 2 37,145.50 54.50 1.50 21.16 31.74 187.91
14 WIRE MESH 150X150X6 T12P1/048 50.00 2 37,147.00 56.00 1.50 21.16 31.74 187.91
15 WIRE MESH 150X150X6 T12P1/049 51.00 2 37,148.50 57.50 1.50 21.161 31.74 187.91
16 WIRE MESH 150X150X6 T12P1/050 52.00 2 37,150.00 59.00 1.50 21.161 31.74 187.91
17 WIRE MESH 150X150X6 T12P1/051 53.00 2 37,151.50 60.50 1.50 21.161 31.74 187.91
18 WIRE MESH 150X150X6 T12P1/052 54.00 2 37,153.00 62.00 1.50 21.161 31.74 187.91
19 WIRE MESH 150X150X6 T12P1/053 55.00 2 37,154.50 63.50 1.50 21.161 31.74 187.91
Wt
=@2.96kg/sq
Item Unit Layer Slope Length Avg Length Offset Width Area REMARKS
m As per IS
1566-1982
PORTAL T13P1
1 WIRE MESH 150X150X6 Kg 2 8.99 -18.15 0.00 0.00
2 WIRE MESH 150X150X6 Kg 2 8.00 8.49 -20.00 1.85 15.71 93.00 EL=389.55m to 385.50m
3 WIRE MESH 150X150X6 Kg 2 19.13 13.56 -25.00 5.00 67.82 401.47 EL=394.09m to 385.605m
4 WIRE MESH 150X150X6 Kg 2 15.39 17.26 -30.00 5.00 86.29 510.81 EL=392.37m to 386.294m
5 WIRE MESH 150X150X6 Kg 2 11.55 13.47 -35.23 5.23 70.45 417.09 EL=392.271m to 387.064m
6 WIRE MESH 150X150X6 Kg 2 5.96 8.76 -39.82 4.58 40.15 237.67 EL=391.556m to388.612m
PORTAL T13P2
1 WIRE MESH 150X150X6 Kg 2 5.16 25.00 0.00 0.00 EL=429.258m to 430.670m
2 WIRE MESH 150X150X6 Kg 2 9.97 7.57 20.00 5.00 37.84 223.99 EL=429.267m to 432.969m
3 WIRE MESH 150X150X6 Kg 2 13.31 11.64 15.00 5.00 58.21 344.59 EL=429.426m to 436.375m
4 WIRE MESH 150X150X6 Kg 2 12.65 12.98 10.00 5.00 64.91 384.26 EL=429.466m to 436.143m
5 WIRE MESH 150X150X6 Kg 2 12.71 12.68 5.00 5.00 63.41 375.41 EL=429.543m to 436.706m
6 WIRE MESH 150X150X6 Kg 2 10.99 11.85 0.00 5.00 59.26 350.79 EL=428.997m to 435.127m
7 WIRE MESH 150X150X6 Kg 2 9.27 10.13 -5.00 5.00 50.65 299.84 EL=428.892m to 434.112m
8 WIRE MESH 150X150X6 Kg 2 7.14 8.21 -10.00 5.00 41.03 242.87 EL=428.789m to 433.086m
PORTAL T12P1
1 WIRE MESH 150X150X6 Kg 2 16.24 -20.00 0.00 0.00 EL=386.49m to 377.741m
2 WIRE MESH 150X150X6 Kg 2 10.02 13.13 -25.00 5.00 65.63 388.53 EL=386.096m to 380.071m
3 WIRE MESH 150X150X6 Kg 2 3.96 6.99 -30.00 5.00 34.94 206.86 EL=385.805m to 383.116m
Sl no Item No Description of Item
Supply and placement of welded wire mesh of sizes 150x150x6, 100x100x6 or any other size as directed by Engineer as reinforcement of sprayed concrete for tunnel lining works as shown
on design drawings, specifications or as directed by Engineer. Steel grade minimum Fe500. This item also includes:
- Fixing elements and materials
- cutting, bending and placement
8 B108
- all auxiliary materials and works necessary
Measurement and payment shall be per square meter for each layer installed and instructed, measured along Payment Line (see specifications). Overlapping as mentioned in technical
specifications is mandatory but shall not be paid
extra.
Supply, fabrication and erection of steel rib and all accessories including all lead, lift, wastage,storing,drilling holes, fixing in phases etc. and
installation of accessories for joining the steel rib segments as per approved workshop drawings of contractor & specifications or as directed by
9 B109 Engineer.The rate shall include costs of all materials, labour, equipment,welding, etc
for the complete job including additional cost for enlargement
of top heading footing.
T12P1/20 to ISMB 250 3 1,037.79 3,113.36 Incremental RIB no 3 Weight as per Annexure -1
20to 37
T12P1/37 ISMB 250 5 1,051.62 5,258.12 Incremental RIB no 5 Attached
ISMB 250 3 1,065.71 3,197.12 Incremental RIB no 7
ISMB 250 4 1,079.21 4,316.83 Incremental RIB no 9
TOTAL IN Kg= 23,855.49
T12 P1 Bridge
Total weight
Sl no Item No length Total Length Unit weight Remarks
in Kg
1 ISMB 400X140 5 12.00 60.00 61.50 3,690.00 Spacing @1000mm C/C
2 ISMC 150X75 60 4.54 272.40 16.80 4,576.32 Spacing @250mm C/C
3 a. MS pipe 2' 26 1.00 26.00 4.11 106.86 Vertical
b. MS pipe 2' 2 13.10 26.20 4.11 107.68 Horizontal
4 Base Plate 10 Sqm= 0.002 7850.00 157.00 10mm Base Plate
5 Checqerd plate 1 Sqm= 0.45 7850.00 3,549.64 8mm checqured plate thick
6 Bracings ISA 50x50x6
a. Vertical 48 0.38 18.34 4.50 82.51 ISA 50x50x6
b. ties 48 1.00 48.00 4.50 216.00 ISA 50x50x6
TOTAL IN Kg= 12,486.01
TOTAL 36,341.50
TOTAL IN MT= 36.35
Detail of Certified Quantity by IRCON
Total Up to date quantity Executed 58.59
Total Quantity Paid Up to Previous RA Bill 22.24
Quantity for This RA Bill 36.35
Page 70 of 151
BAR BENDING SCHEDULE FOR T13P2 PORTAL REINFORCEMENT
Sl no Item No
Supply, cutting, bending, placing, binding steel reinforcement of grade Fe 500 as per approved drawings & specifications or as directed by Engineer, for
7 B107 joint reinforcement of initial and final lining. This shall include straightening, hooking all lead, lift, all auxiliary materials, etc. (Nothing extra shall be paid for
wastage of reinforcement and binding wire).
No of Cutting
S.NO BAR MARK Shape of bar No's Unit Weight Qty in Kg Remarks
Layer Length
REINFORCEMENT FOR CAPPING BEAM T12P2
0.42m
0.42m
0.42m
0.418m
10mm Dia 0.49m (A+B+C+D+E)+24d
No 5 Strriuips 1.00 2.18 150 0.62 202.74 =(.42+.418+.19+.42+.49)+24*10
@200c/c 0.190m
No=( 29.85/0.2)+1= 150No
0.42m
8 mm Dia 0.42m
Mesh inclined 1.00 0.42 300 0.39 48.91 No=( 29.85/0.1)+1= 300No
@100c/c
8 mm Dia
Mesh horizontal Longer 1.00 30.80 5 0.39 60.06 No=( 0.418/0.1)+1= 5No
@100c/c 12m 6.8m
12m
16mm Dia
No 1 & 2 Horizontal Longer 2.00 30.80 7 1.58 681.30
@150c/c 12m 6.8m
12m
16mm Dia
No 3 Top & Bottom Bar Longer 2.00 3.55 3 1.58 33.65
@150c/c 12m 6.8m
12m
REINFORCEMENT FOR RUNNER BEAM T12P2 st Row
0.16m 0.17m
0.36m
10mm Dia 0.92m
No 9 Strriuips 1.00 0.87m 2.90 128 0.62 230.14
@200c/c
0.42m
0.42m
0.418m
0.49m
10mm Dia
No 10 Strriuips 1.00 2.18 128 0.62 173.00
@200c/c 0.190m
0.42m
8 mm Dia 0.42m
Mesh inclined 1.00 0.42 256 0.39 41.73 No=( 25.45/0.1)+1= 256No
@100c/c
8 mm Dia
Mesh horizontal Longer 1.00 26.50 5 0.89 117.93
@100c/c 12m 2.5m
12m
16mm Dia
No 8 Top & Bottom Bar Longer 2.00 12m 12m 2.5m 26.50 3 1.58 251.22
@200c/c
Page 71 of 151
BAR BENDING SCHEDULE FOR T13P2 PORTAL REINFORCEMENT
Sl no Item No
Supply, cutting, bending, placing, binding steel reinforcement of grade Fe 500 as per approved drawings & specifications or as directed by Engineer, for
7 B107 joint reinforcement of initial and final lining. This shall include straightening, hooking all lead, lift, all auxiliary materials, etc. (Nothing extra shall be paid for
wastage of reinforcement and binding wire).
No of Cutting
S.NO BAR MARK Shape of bar No's Unit Weight Qty in Kg Remarks
Layer Length
12mm Dia
Vertical 2.00 2.5m 2.80 132 0.89 657.89
@150c/c
0.3m
0.36m
10mm Dia 0.92m
No 9 Strriuips 1.00 0.87m 2.90 51 0.62 91.70
@200c/c
0.42m
0.42m
0.418m
10mm Dia 0.49m
No 10 Strriuips 1.00 2.18 51 0.62 68.93
@200c/c
0.190m
0.42m
0.42m
8 mm Dia
Mesh inclined 1.00 0.42 101 0.39 16.47 No=( 25.45/0.1)+1= 256No
@100c/c
8 mm Dia
Mesh horizontal Longer 1.00 10.0m 10.00 5 0.89 44.50
@100c/c
20mm Dia
No 6 Horizontal Longer 1.00 10m 10.00 10 2.47 247.00
@100c/c
16mm Dia
No 7 Horizontal Longer 1.00 10m 10.00 10 1.58 158.00
@100c/c
16mm Dia
No 8 Top & Bottom Bar Longer 2.00 10.00 3 1.58 94.80
@200c/c 10m
0.42m
20mm Dia 1.49m
Main Vertical Bar 2.00 2.33 221 2.47 2543.75
@150c/c
0.42m
12m 1.7m
12mm Dia
Horizintal 2.00 1.7m 27.40 6 0.89 292.63
@300c/c
12m
Page 72 of 151
Sl no Item No Description of Item
Supply and placement of welded wire mesh of sizes 150x150x6, 100x100x6 or any other size as directed by Engineer as reinforcement of sprayed concrete for tunnel lining works
as shown
on design drawings, specifications or as directed by Engineer. Steel grade minimum Fe500. This item also includes:
- Fixing elements and materials
- cutting, bending and placement
8 B108 - all auxiliary materials and works necessary
Measurement and payment shall be per square meter for each layer installed and instructed, measured along Payment Line (see specifications). Overlapping as mentioned in
technical specifications is mandatory but shall not be paid
extra.
Wt
ROUND Avg =@2.96kg/sqm
Sl no DESCRIPTION ATSS NO Layer CHAINAGE TUNNEL METER Length Area REMARKS
NO Perimeter As per IS 1566-
1982
LOCATION T13P2
RESS no-4-
1 WIRE MESH 150X150X6 T13P2/10 10.00 2 41,337.00 41,336.00 9.00 10.00 1.00 21.48 21.48 127.16 09/11/2021
2 WIRE MESH 150X150X6 T13P2/11 11.00 2 41,336.00 41,335.00 10.00 11.00 1.00 21.48 21.48 127.16
3 WIRE MESH 150X150X6 T13P2/12 12.00 2 41,335.00 41,334.00 11.00 12.00 1.00 21.48 21.48 127.16
4 WIRE MESH 150X150X6 T13P2/13 13.00 2 41,334.00 41,333.00 12.00 13.00 1.00 21.48 21.48 127.16
5 WIRE MESH 150X150X6 T13P2/14 14.00 2 41,333.00 41,332.00 13.00 14.00 1.00 21.48 21.48 127.16
6 WIRE MESH 150X150X6 T13P2/15 15.00 2 41,332.00 41,331.00 14.00 15.00 1.00 21.48 21.48 127.16
7 WIRE MESH 150X150X6 T13P2/16 16.00 2 41,331.00 41,330.00 15.00 16.00 1.00 21.51 21.51 127.31
8 WIRE MESH 150X150X6 T13P2/17 17.00 2 41,330.00 41,329.00 16.00 17.00 1.00 21.51 21.51 127.31
9 WIRE MESH 150X150X6 T13P2/18 18.00 2 41,329.00 41,328.00 17.00 18.00 1.00 21.51 21.51 127.31
10 WIRE MESH 150X150X6 T13P2/19 19.00 2 41,328.00 41,327.00 18.00 19.00 1.00 21.51 21.51 127.31
11 WIRE MESH 150X150X6 T13P2/20 20.00 2 41,327.00 41,325.50 19.00 20.50 1.50 21.51 32.26 190.96
12 WIRE MESH 150X150X6 T13P2/21 21.00 2 41,325.50 41,324.00 20.50 22.00 1.50 21.51 32.26 190.96
13 WIRE MESH 150X150X6 T13P2/22 22.00 2 41,324.00 41,322.50 22.00 23.50 1.50 21.51 32.26 190.96
14 WIRE MESH 150X150X6 T13P2/23 23.00 2 41,322.50 41,321.00 23.50 25.00 1.50 21.51 32.26 190.96
15 WIRE MESH 150X150X6 T13P2/24 24.00 2 41,321.00 41,319.50 25.00 26.50 1.50 21.51 32.26 190.96
16 WIRE MESH 150X150X6 T13P2/25 25.00 2 41,319.50 41,318.00 26.50 28.00 1.50 21.51 32.26 190.96
17 WIRE MESH 150X150X6 T13P2/26 26.00 2 41,318.00 41,316.50 28.00 29.50 1.50 21.51 32.26 190.96
18 WIRE MESH 150X150X6 T13P2/27 27.00 2 41,316.50 41,315.00 29.50 31.00 1.50 21.51 32.26 190.96
19 WIRE MESH 150X150X6 T13P2/28 28.00 2 41,315.00 41,313.50 31.00 32.50 1.50 21.51 32.26 190.96
20 WIRE MESH 150X150X6 T13P2/29 29.00 2 41,313.50 41,312.00 32.50 34.00 1.50 21.51 32.26 190.96
21 WIRE MESH 150X150X6 T13P2/30 30.00 2 41,312.00 41,310.50 34.00 35.50 1.50 21.51 32.26 190.96
22 WIRE MESH 150X150X6 T13P2/31 31.00 2 41,310.50 41,309.00 35.50 37.00 1.50 21.51 32.26 190.96
23 WIRE MESH 150X150X6 T13P2/32 32.00 2 41,309.00 41,307.50 37.00 38.50 1.50 21.51 32.26 190.96
LOCATION T13P1
RESS no-4-
1 WIRE MESH 150X150X6 T13P1/112 112.00 1 38,917.00 38,918.50 131.50 133.00 1.50 21.19 31.78 94.06 18/10/2021
2 WIRE MESH 150X150X6 T13P1/113 113.00 1 38,918.50 38,920.00 133.00 134.50 1.50 21.19 31.78 94.06
3 WIRE MESH 150X150X6 T13P1/114 114.00 1 38,920.00 38,921.50 134.50 136.00 1.50 21.19 31.78 94.06
4 WIRE MESH 150X150X6 T13P1/115 115.00 1 38,921.50 38,923.00 136.00 137.50 1.50 21.19 31.78 94.06
5 WIRE MESH 150X150X6 T13P1/116 116.00 1 38,923.00 38,924.50 137.50 139.00 1.50 21.19 31.78 94.06
6 WIRE MESH 150X150X6 T13P1/117 117.00 1 38,924.50 38,926.00 139.00 140.50 1.50 21.19 31.78 94.06
7 WIRE MESH 150X150X6 T13P1/118 118.00 1 38,926.00 38,927.50 140.50 142.00 1.50 21.19 31.78 94.06
8 WIRE MESH 150X150X6 T13P1/119 119.00 1 38,927.50 38,929.00 142.00 143.50 1.50 21.19 31.78 94.06
9 WIRE MESH 150X150X6 T13P1/120 120.00 1 38,929.00 38,930.50 143.50 145.00 1.50 21.19 31.78 94.06
Sl no Item No Description of Item
Supply and placement of welded wire mesh of sizes 150x150x6, 100x100x6 or any other size as directed by Engineer as reinforcement of sprayed concrete for tunnel lining works
as shown
on design drawings, specifications or as directed by Engineer. Steel grade minimum Fe500. This item also includes:
- Fixing elements and materials
- cutting, bending and placement
8 B108 - all auxiliary materials and works necessary
Measurement and payment shall be per square meter for each layer installed and instructed, measured along Payment Line (see specifications). Overlapping as mentioned in
technical specifications is mandatory but shall not be paid
extra.
10 WIRE MESH 150X150X6 T13P1/121 121.00 1 38,930.50 38,932.00 145.00 146.50 1.50 21.19 31.78 94.06
11 WIRE MESH 150X150X6 T13P1/122 122.00 1 38,932.00 38,933.50 146.50 148.00 1.50 21.19 31.78 94.06
12 WIRE MESH 150X150X6 T13P1/123 123.00 1 38,933.50 38,935.00 148.00 149.50 1.50 21.19 31.78 94.06
13 WIRE MESH 150X150X6 T13P1/124 124.00 1 38,935.00 38,936.50 149.50 151.00 1.50 21.19 31.78 94.06
14 WIRE MESH 150X150X6 T13P1/125 125.00 1 38,936.50 38,938.00 151.00 152.50 1.50 21.19 31.78 94.06
15 WIRE MESH 150X150X6 T13P1/126 126.00 1 38,938.00 38,939.50 152.50 154.00 1.50 21.19 31.78 94.06
16 WIRE MESH 150X150X6 T13P1/127 127.00 1 38,939.50 38,941.00 154.00 155.50 1.50 21.19 31.78 94.06
17 WIRE MESH 150X150X6 T13P1/128 128.00 1 38,941.00 38,942.50 155.50 157.00 1.50 21.19 31.78 94.06
18 WIRE MESH 150X150X6 T13P1/129 129.00 1 38,942.50 38,944.00 157.00 158.50 1.50 21.19 31.78 94.06
19 WIRE MESH 150X150X6 T13P1/130 130.00 1 38,944.00 38,945.50 158.50 160.00 1.50 21.19 31.78 94.06
20 WIRE MESH 150X150X6 T13P1/131 131.00 1 38,945.50 38,947.00 160.00 161.50 1.50 21.19 31.78 94.06
21 WIRE MESH 150X150X6 T13P1/132 132.00 1 38,947.00 38,948.50 161.50 163.00 1.50 21.19 31.78 94.06
22 WIRE MESH 150X150X6 T13P1/133 133.00 1 38,948.50 38,950.00 163.00 164.50 1.50 21.19 31.78 94.06
23 WIRE MESH 150X150X6 T13P1/134 134.00 1 38,950.00 38,951.50 164.50 166.00 1.50 21.19 31.78 94.06
24 WIRE MESH 150X150X6 T13P1/135 135.00 1 38,951.50 38,953.00 166.00 167.50 1.50 21.19 31.78 94.06
25 WIRE MESH 150X150X6 T13P1/136 136.00 1 38,953.00 38,954.50 167.50 169.00 1.50 21.19 31.78 94.06
26 WIRE MESH 150X150X6 T13P1/137 137.00 1 38,954.50 38,955.50 169.00 170.00 1.00 21.19 21.19 62.71
27 WIRE MESH 150X150X6 T13P1/138 138.00 1 38,955.50 38,956.50 170.00 171.00 1.00 21.19 21.19 62.71
28 WIRE MESH 150X150X6 T13P1/139 139.00 1 38,956.50 38,957.85 171.00 172.35 1.35 21.19 28.60 84.66
29 WIRE MESH 150X150X6 T13P1/140 140.00 1 38,957.85 38,959.20 172.35 173.70 1.35 21.19 28.60 84.66
30 WIRE MESH 150X150X6 T13P1/141 141.00 1 38,959.20 38,960.40 173.70 174.90 1.20 21.19 25.42 75.25
31 WIRE MESH 150X150X6 T13P1/142 142.00 1 38,960.40 38,961.60 174.90 176.10 1.20 21.19 25.42 75.25
32 WIRE MESH 150X150X6 T13P1/143 143.00 1 38,961.60 38,963.00 176.10 177.50 1.40 21.19 29.66 87.79
33 WIRE MESH 150X150X6 T13P1/144 144.00 1 38,963.00 38,964.20 177.50 178.70 1.20 21.19 25.42 75.25
34 WIRE MESH 150X150X6 T13P1/145 145.00 1 38,964.20 38,965.50 178.70 180.00 1.30 21.19 27.54 81.52
35 WIRE MESH 150X150X6 T13P1/146 146.00 1 38,965.50 38,966.80 180.00 181.30 1.30 21.19 27.54 81.52
36 WIRE MESH 150X150X6 T13P1/147 147.00 1 38,966.80 38,968.10 181.30 182.60 1.30 21.19 27.54 81.52
37 WIRE MESH 150X150X6 T13P1/148 148.00 1 38,968.10 38,969.40 182.60 183.90 1.30 21.19 27.54 81.52
38 WIRE MESH 150X150X6 T13P1/149 149.00 1 38,969.40 38,970.70 183.90 185.20 1.30 21.19 27.54 81.52
39 WIRE MESH 150X150X6 T13P1/150 150.00 1 38,970.70 38,972.00 185.20 186.50 1.30 21.19 27.54 81.52
40 WIRE MESH 150X150X6 T13P1/151 151.00 1 38,972.00 38,973.30 186.50 187.80 1.30 21.19 27.54 81.52
41 WIRE MESH 150X150X6 T13P1/152 152.00 1 38,973.30 38,974.60 187.80 189.10 1.30 21.19 27.54 81.52
42 WIRE MESH 150X150X6 T13P1/153 153.00 1 38,974.60 38,975.90 189.10 190.40 1.30 21.19 27.54 81.52
43 WIRE MESH 150X150X6 T13P1/154 154.00 1 38,975.90 38,977.20 190.40 191.70 1.30 21.19 27.54 81.52
Sl no Item No Description of Item
Supply and placement of welded wire mesh of sizes 150x150x6, 100x100x6 or any other size as directed by Engineer as reinforcement of sprayed concrete for tunnel lining works
as shown
on design drawings, specifications or as directed by Engineer. Steel grade minimum Fe500. This item also includes:
- Fixing elements and materials
- cutting, bending and placement
8 B108 - all auxiliary materials and works necessary
Measurement and payment shall be per square meter for each layer installed and instructed, measured along Payment Line (see specifications). Overlapping as mentioned in
technical specifications is mandatory but shall not be paid
extra.
44 WIRE MESH 150X150X6 T13P1/155 155.00 1 38,977.20 38,978.50 191.70 193.00 1.30 21.19 27.54 81.52
T12P2
1 WIRE MESH 150X150X6 T12P1/206 209.00 1 37,381.50 37,383.00 290.50 292.00 1.50 21.19 31.78 94.06
2 WIRE MESH 150X150X6 T12P1/207 210.00 1 37,383.00 37,384.50 292.00 293.50 1.50 21.19 31.78 94.06
3 WIRE MESH 150X150X6 T12P1/208 211.00 1 37,384.50 37,386.00 293.50 295.00 1.50 21.19 31.78 94.06
4 WIRE MESH 150X150X6 T12P1/209 212.00 1 37,386.00 37,387.50 295.00 296.50 1.50 21.19 31.78 94.06
5 WIRE MESH 150X150X6 T12P1/210 213.00 1 37,387.50 37,389.00 296.50 298.00 1.50 21.19 31.78 94.06
6 WIRE MESH 150X150X6 T12P1/211 214.00 1 37,389.00 37,390.50 298.00 299.50 1.50 21.19 31.78 94.06
7 WIRE MESH 150X150X6 T12P1/212 215.00 1 37,390.50 37,392.00 299.50 301.00 1.50 21.19 31.78 94.06
8 WIRE MESH 150X150X6 T12P1/213 216.00 1 37,392.00 37,393.50 301.00 302.50 1.50 21.19 31.78 94.06
9 WIRE MESH 150X150X6 T12P1/214 217.00 1 37,393.50 37,395.00 302.50 304.00 1.50 21.19 31.78 94.06
10 WIRE MESH 150X150X6 T12P1/215 218.00 1 37,395.00 37,396.50 304.00 305.50 1.50 21.19 31.78 94.06
11 WIRE MESH 150X150X6 T12P1/216 219.00 1 37,396.50 37,398.00 305.50 307.00 1.50 21.19 31.78 94.06
- -
1 WIRE MESH 150X150X6 T12P1/223 226.00 1 37,407.00 37,408.50 317.50 319.00 1.50 21.19 31.78 94.06
2 WIRE MESH 150X150X6 T12P1/224 227.00 1 37,408.50 37,410.00 319.00 320.50 1.50 21.19 31.78 94.06
3 WIRE MESH 150X150X6 T12P1/225 228.00 1 37,410.00 37,411.50 320.50 322.00 1.50 21.19 31.78 94.06
4 WIRE MESH 150X150X6 T12P1/226 229.00 1 37,411.50 37,413.00 322.00 323.50 1.50 21.19 31.78 94.06
5 WIRE MESH 150X150X6 T12P1/227 230.00 1 37,413.00 37,414.50 323.50 325.00 1.50 21.19 31.78 94.06
6 WIRE MESH 150X150X6 T12P1/228 231.00 1 37,414.50 37,416.00 325.00 326.50 1.50 21.19 31.78 94.06
7 WIRE MESH 150X150X6 T12P1/229 232.00 1 37,416.00 37,417.50 326.50 328.00 1.50 21.19 31.78 94.06
8 WIRE MESH 150X150X6 T12P1/230 233.00 1 37,417.50 37,419.00 328.00 329.50 1.50 21.19 31.78 94.06
9 WIRE MESH 150X150X6 T12P1/231 234.00 1 37,419.00 37,420.50 329.50 331.00 1.50 21.19 31.78 94.06
10 WIRE MESH 150X150X6 T12P1/232 235.00 1 37,420.50 37,422.00 331.00 332.50 1.50 21.19 31.78 94.06
11 WIRE MESH 150X150X6 T12P1/233 236.00 1 37,422.00 37,423.50 332.50 334.00 1.50 21.19 31.78 94.06
12 WIRE MESH 150X150X6 T12P1/234 237.00 1 37,423.50 37,425.00 334.00 335.50 1.50 21.19 31.78 94.06
13 WIRE MESH 150X150X6 T12P1/235 238.00 1 37,425.00 37,426.50 335.50 337.00 1.50 21.19 31.78 94.06
14 WIRE MESH 150X150X6 T12P1/236 239.00 1 37,426.50 37,428.00 337.00 338.50 1.50 21.19 31.78 94.06
15 WIRE MESH 150X150X6 T12P1/237 240.00 1 37,428.00 37,429.50 338.50 340.00 1.50 21.19 31.78 94.06
16 WIRE MESH 150X150X6 T12P1/238 241.00 1 37,429.50 37,431.00 340.00 341.50 1.50 21.19 31.78 94.06
17 WIRE MESH 150X150X6 T12P1/239 242.00 1 37,431.00 37,432.50 341.50 343.00 1.50 21.19 31.78 94.06
18 WIRE MESH 150X150X6 T12P1/240 243.00 1 37,432.50 37,434.00 343.00 344.50 1.50 21.19 31.78 94.06
19 WIRE MESH 150X150X6 T12P1/241 244.00 1 37,434.00 37,435.50 344.50 346.00 1.50 21.19 31.78 94.06
20 WIRE MESH 150X150X6 T12P1/242 245.00 1 37,435.50 37,437.00 346.00 347.50 1.50 21.19 31.78 94.06
21 WIRE MESH 150X150X6 T12P1/243 246.00 1 37,437.00 37,438.50 347.50 349.00 1.50 21.19 31.78 94.06
22 WIRE MESH 150X150X6 T12P1/244 247.00 1 37,438.50 37,440.00 349.00 350.50 1.50 21.19 31.78 94.06
Sl no Item No Description of Item
Supply and placement of welded wire mesh of sizes 150x150x6, 100x100x6 or any other size as directed by Engineer as reinforcement of sprayed concrete for tunnel lining works
as shown
on design drawings, specifications or as directed by Engineer. Steel grade minimum Fe500. This item also includes:
- Fixing elements and materials
- cutting, bending and placement
8 B108 - all auxiliary materials and works necessary
Measurement and payment shall be per square meter for each layer installed and instructed, measured along Payment Line (see specifications). Overlapping as mentioned in
technical specifications is mandatory but shall not be paid
extra.
23 WIRE MESH 150X150X6 T12P1/245 248.00 1 37,440.00 37,441.50 350.50 352.00 1.50 21.19 31.78 94.06
24 WIRE MESH 150X150X6 T12P1/246 249.00 1 37,441.50 37,443.00 352.00 353.50 1.50 21.19 31.78 94.06
25 WIRE MESH 150X150X6 T12P1/247 250.00 1 37,443.00 37,444.50 353.50 355.00 1.50 21.19 31.78 94.06
26 WIRE MESH 150X150X6 T12P1/248 251.00 1 37,444.50 37,446.00 355.00 356.50 1.50 21.19 31.78 94.06
27 WIRE MESH 150X150X6 T12P1/249 252.00 1 37,446.00 37,447.50 356.50 358.00 1.50 21.19 31.78 94.06
28 WIRE MESH 150X150X6 T12P1/250 253.00 1 37,447.50 37,449.00 358.00 359.50 1.50 21.19 31.78 94.06
29 WIRE MESH 150X150X6 T12P1/251 254.00 1 37,449.00 37,450.50 359.50 361.00 1.50 21.19 31.78 94.06
30 WIRE MESH 150X150X6 T12P1/252 255.00 1 37,450.50 37,452.00 361.00 362.50 1.50 21.19 31.78 94.06
31 WIRE MESH 150X150X6 T12P1/253 256.00 1 37,452.00 37,453.50 362.50 364.00 1.50 21.19 31.79 94.08
32 WIRE MESH 150X150X6 T12P1/254 257.00 1 37,453.50 37,455.00 364.00 365.50 1.50 21.19 31.79 94.08
33 WIRE MESH 150X150X6 T12P1/255 258.00 1 37,455.00 37,456.50 365.50 367.00 1.50 21.19 31.79 94.08
34 WIRE MESH 150X150X6 T12P1/256 259.00 1 37,456.50 37,458.00 367.00 368.50 1.50 21.19 31.79 94.08
RESS no-6-
PORTAL T12P1 2nd TROLLY REFUGE NITCH
12/10/2021
RESS no-5-
PORTAL T13P1 1st TROLLY REFUGE NITCH
28/10/2021
Supply, fabrication and erection of steel rib and all accessories including all lead, lift, wastage,storing,drilling holes, fixing in phases etc. and
installation of accessories for joining the steel rib segments as per approved workshop drawings of contractor & specifications or as directed by
9 B109 Engineer.The rate shall include costs of all materials, labour, equipment,welding, etc
for the complete job including additional cost for enlargement
of top heading footing.
Steel
Lagging 12.4 11.40 0.00315 7850.00 3,495.48 T12P2
3.15
Page 78 of 151
Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as shown on design drawings, in technical
Sl no Item No specifications and directed by the Engineer. These items include: Description of Item
- sprayed concrete of grade M25 according to Indian Standard
- all concrete additives
- wastage of sprayed concrete
1 B201
- rebound
- application of shotcrete in multiple layers
- all auxiliary materials and works
1_1 B 2011 Measurement and payment
50 mm thick shotcrete lining shall be for the theoretical area or volume as shown on the design drawings in square metres/ cubic meters, measured along
in tunnel
Payment-Line (see specifications).
TUNNEL FACE AREA AS PER QUANTITY
DESCRIPTION UNIT CHAINAGE ATSS NO REMARKS
METER PAYLINE (Sqm)
Supply, fabrication and erection of steel rib and all accessories including all lead, lift, wastage,storing,drilling holes, fixing in phases etc. and
installation of accessories for joining the steel rib segments as per approved workshop drawings of contractor & specifications or as directed by
9 B109 Engineer.The rate shall include costs of all materials, labour, equipment,welding, etc
for the complete job including additional cost for enlargement
of top heading footing.
T12 P1 Bridge
Total weight
Sl no Item No length Total Length Unit weight Remarks
in Kg
1 ISMB 400X140 5 12.00 60.00 61.50 3,690.00 Spacing @1000mm C/C
2 ISMC 150X75 61 6.00 366.00 16.80 6,149.00 Spacing @250mm C/C
a. Sq hollow section
3 18 1.20 21.60 4.07 88.00 Vertical Post
49.5X49.5XX2.9
b. Sq hollow section
4 12.60 50.40 4.07 205.00 Horizontal Railing
49.5X49.5XX2.9
4 Base Plate 10 Sqm= 0.200 78.50 157.00 10mm Base Plate
5 Checqerd plate 1 Sqm= 72.00 62.80 4,521.60 8mm checqured plate thick
6 Bracings ISA 50x50x6
a. Vertical 48 0.38 18.34 4.50 82.51 ISA 50x50x6
b. ties 48 1.00 48.00 4.50 216.00 ISA 50x50x6
-12,486.02 Paid In RA 3 Bridge T12P1
TOTAL IN Kg= 2,623.09 A
TOTAL A IN Kg= 2,623.09
TOTAL A IN MT= 2.62
Detail of Certified Quantity by IRCON
Total Up to date quantity Executed 90.23 MT
Total Quantity Paid Up to Previous RA Bill 87.61 MT
Quantity for This RA Bill 2.62 MT
Page 80 of 151
Supply, drilling and installation of steel micropiles of dia upto 160 mm in vertical position or at an
inclination for all kinds of soil/rock class at any depth and as per approved drawings & specifications or
as directed by Engineer. The works include: drilling D200mm, installation of the pipe and grouting
13 B113 around and inside the pipe up to fulfill the volume drilled no ocupated by the pipe. The rate shall
include all labour, materials, connectors, welding, lead, lift, handling, including grouting with M35 grade
of grout, wastage complete with contractor's own equipment as a complete job as per specifications or
as directed by Engineer-in-Charge.
LENGTH QUANTITY
ELEVATION No REMARKS
(meter) (RM)
T-12P2
386.00 RHS 18 8 144
24 25 600
12 24 288
TOTAL= 1032
3064.23
PORTAL T13P1 FACE SEALING RESS no-4-18/10/2021
1 Shotcrete 50mm Thk sqm 38,933.50 148.00 T13P1/100 60.55 60.55
2 Shotcrete 50mm Thk sqm 38,935.00 149.50 T13P1/101 60.55 60.55
3 Shotcrete 50mm Thk sqm 38,936.50 151.00 T13P1/102 60.55 60.55
4 Shotcrete 50mm Thk sqm 38,938.00 152.50 T13P1/103 60.55 60.55
5 Shotcrete 50mm Thk sqm 38,939.50 154.00 T13P1/104 60.55 60.55
6 Shotcrete 50mm Thk sqm 38,941.00 155.50 T13P1/105 60.55 60.55
7 Shotcrete 50mm Thk sqm 38,942.50 157.00 T13P1/106 60.55 60.55
8 Shotcrete 50mm Thk sqm 38,944.00 158.50 T13P1/107 60.55 60.55
9 Shotcrete 50mm Thk sqm 38,945.50 160.00 T13P1/108 60.55 60.55
10 Shotcrete 50mm Thk sqm 38,947.00 161.50 T13P1/109 60.55 60.55
11 Shotcrete 50mm Thk sqm 38,948.50 163.00 T13P1/110 60.55 60.55
12 Shotcrete 50mm Thk sqm 38,950.00 164.50 T13P1/111 60.55 60.55
13 Shotcrete 50mm Thk sqm 38,951.50 166.00 T13P1/112 60.55 60.55
14 Shotcrete 50mm Thk sqm 38,953.00 167.50 T13P1/113 60.55 60.55
15 Shotcrete 50mm Thk sqm 38,954.50 169.00 T13P1/114 60.55 60.55
16 Shotcrete 50mm Thk sqm 38,955.50 170.00 T13P1/115 60.55 60.55
17 Shotcrete 50mm Thk sqm 38,956.50 171.00 T13P1/116 60.55 60.55
18 Shotcrete 50mm Thk sqm 38,957.85 172.35 T13P1/117 60.55 60.55
19 Shotcrete 50mm Thk sqm 38,959.20 173.70 T13P1/118 60.55 60.55
20 Shotcrete 50mm Thk sqm 38,960.40 174.90 T13P1/119 60.55 60.55
21 Shotcrete 50mm Thk sqm 38,961.60 176.10 T13P1/120 60.55 60.55
1271.55
PORTAL T12P2 FACE SEALING RESS no-2-07/08/2021
1 Shotcrete 50mm Thk sqm 38,477.70 16.50 T12P1/27 38.77 38.77
2 Shotcrete 50mm Thk sqm 38,477.00 17.20 T12P1/28 41.85 41.85
3 Shotcrete 50mm Thk sqm 38,476.30 17.90 T12P1/29 41.85 41.85
4 Shotcrete 50mm Thk sqm 38,475.60 18.60 T12P1/30 41.85 41.85
5 Shotcrete 50mm Thk sqm 38,474.90 19.30 T12P1/31 41.85 41.85
6 Shotcrete 50mm Thk sqm 38,474.20 20.00 T12P1/32 34.77 34.77
7 Shotcrete 50mm Thk sqm 38,473.40 20.80 T12P1/33 35.65 35.65
8 Shotcrete 50mm Thk sqm 38,472.60 21.60 T12P1/34 36.01 36.01
9 Shotcrete 50mm Thk sqm 38,471.80 22.40 T12P1/35 37.58 37.58
10 Shotcrete 50mm Thk sqm 38,471.00 23.20 T12P1/36 38.77 38.77
11 Shotcrete 50mm Thk sqm 38,470.20 24.00 T12P1/37 38.77 38.77
12 Shotcrete 50mm Thk sqm 38,469.40 24.80 T12P1/38 40.43 40.43
13 Shotcrete 50mm Thk sqm 38,468.60 25.60 T12P1/39 41.85 41.85
510.00
PORTAL T13P2 FACE SEALING RESS no-4-09/11/2021
1 Shotcrete 50mm Thk sqm 41,330.00 10.00 T13P1/11 62.21 62.21
2 Shotcrete 50mm Thk sqm 41,329.00 11.00 T13P1/12 64.12 64.12
3 Shotcrete 50mm Thk sqm 41,328.00 12.00 T13P1/13 66.10 66.10
4 Shotcrete 50mm Thk sqm 41,327.00 13.00 T13P1/14 67.74 67.74
5 Shotcrete 50mm Thk sqm 41,325.50 14.50 T13P1/15 70.03 70.03
6 Shotcrete 50mm Thk sqm 41,324.00 16.00 T13P1/16 70.03 70.03
7 Shotcrete 50mm Thk sqm 41,322.50 17.50 T13P1/17 62.32 62.32
8 Shotcrete 50mm Thk sqm 41,321.00 19.00 T13P1/18 62.32 62.32
9 Shotcrete 50mm Thk sqm 41,319.50 20.50 T13P1/19 62.32 62.32
10 Shotcrete 50mm Thk sqm 41,318.00 22.00 T13P1/20 62.32 62.32
11 Shotcrete 50mm Thk sqm 41,316.50 23.50 T13P1/21 62.32 62.32
Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as shown on design drawings, in technical
Sl no Item No specifications and directed by the Engineer. These items include: Description of Item
- sprayed concrete of grade M25 according to Indian Standard
- all concrete additives
- wastage of sprayed concrete
1 B201
- rebound
- application of shotcrete in multiple layers
- all auxiliary materials and works
1_1 B 2011 Measurement and payment
50 mm thick shotcrete lining shall be for the theoretical area or volume as shown on the design drawings in square metres/ cubic meters, measured along
in tunnel
12 Payment-Line
Shotcrete 50mm Thk (see specifications).
sqm 41,315.00 25.00 T13P1/22 62.32 62.32
13 Shotcrete 50mm Thk sqm 41,313.50 26.50 T13P1/23 62.32 62.32
14 Shotcrete 50mm Thk sqm 41,312.00 28.00 T13P1/24 62.32 62.32
15 Shotcrete 50mm Thk sqm 41,310.50 29.50 T13P1/25 62.32 62.32
16 Shotcrete 50mm Thk sqm 41,309.00 31.00 T13P1/26 62.32 62.32
17 Shotcrete 50mm Thk sqm 41,307.50 32.50 T13P1/27 62.32 62.32
1085.75
TOTAL= 5931.530
Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as shown on design drawings, in technical specifications
and directed by the Engineer. These items include:
- sprayed concrete of grade M25 according to Indian Standard
- all concrete additives
- wastage of sprayed concrete
1 B201
- rebound
- application of shotcrete in multiple layers
- all auxiliary materials and works
Measurement and payment shall be for the theoretical area or volume as shown on the design drawings in square metres/ cubic meters, measured along Payment-Line
(see specifications).
TUNNEL QUANTITY
DESCRIPTION ATSS NO ROUND UNIT CHAINAGE Length Perimeter Area REMARKS
METER (Sqm)
NO
PORTAL T12P1
1 Shotcrete 250mm Thk T12P1/036 37 sqm 37,128.80 37.80 21.69 0.00 0.00
2 Shotcrete 250mm Thk T12P1/037 38 sqm 37,130.30 39.30 1.50 21.19 31.78 31.78
3 Shotcrete 250mm Thk T12P1/038 39 sqm 37,131.80 40.80 1.50 21.19 31.78 31.78
4 Shotcrete 250mm Thk T12P1/039 40 sqm 37,133.30 42.30 1.50 21.19 31.78 31.78
5 Shotcrete 250mm Thk T12P1/040 41 sqm 37,134.80 43.80 1.50 21.19 31.78 31.78
6 Shotcrete 250mm Thk T12P1/041 42 sqm 37,136.30 45.30 1.50 21.19 31.78 31.78
7 Shotcrete 250mm Thk T12P1/042 43 sqm 37,137.80 46.80 1.50 21.19 31.78 31.78
8 Shotcrete 250mm Thk T12P1/043 44 sqm 37,139.50 48.50 1.70 21.19 36.02 36.02
9 Shotcrete 250mm Thk T12P1/044 45 sqm 37,141.00 50.00 1.50 21.19 31.78 31.78
10 Shotcrete 250mm Thk T12P1/045 46 sqm 37,142.50 51.50 1.50 21.19 31.78 31.78
11 Shotcrete 250mm Thk T12P1/046 47 sqm 37,144.00 53.00 1.50 21.19 31.78 31.78
12 Shotcrete 250mm Thk T12P1/047 48 sqm 37,145.50 54.50 1.50 21.19 31.78 31.78
13 Shotcrete 250mm Thk T12P1/048 49 sqm 37,147.00 56.00 1.50 21.19 31.78 31.78
14 Shotcrete 250mm Thk T12P1/049 50 sqm 37,148.50 57.50 1.50 21.19 31.78 31.78
15 Shotcrete 250mm Thk T12P1/050 51 sqm 37,150.00 59.00 1.50 21.19 31.78 31.78
16 Shotcrete 250mm Thk T12P1/051 52 sqm 37,151.50 60.50 1.50 21.19 31.78 31.78
17 Shotcrete 250mm Thk T12P1/052 53 sqm 37,153.00 62.00 1.50 21.19 31.78 31.78
18 Shotcrete 250mm Thk T12P1/053 54 sqm 37,154.50 63.50 1.50 21.19 31.79 31.79
TOTAL= 544.510
Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as shown on design drawings, in technical specifications
and directed by the Engineer. These items include:
- sprayed concrete of grade M25 according to Indian Standard
- all concrete additives
- wastage of sprayed concrete
1 B201
- rebound
- application of shotcrete in multiple layers
- all auxiliary materials and works
Measurement and payment shall be for the theoretical area or volume as shown on the design drawings in square metres/ cubic meters, measured along Payment-Line
(see specifications).
TUNNEL QUANTITY
DESCRIPTION ATSS NO ROUND UNIT CHAINAGE Length Perimeter Area REMARKS
METER (Sqm)
NO
PORTAL T12P1
1 Shotcrete 300mm Thk T12P1/18 18 sqm 37,109.00 18.00 1.00 22.33 22.33 22.33
2 Shotcrete 300mm Thk T12P1/19 19 sqm 37,110.00 19.00 1.00 21.70 21.70 21.70
3 Shotcrete 300mm Thk T12P1/20 20 sqm 37,111.00 20.00 1.00 22.04 22.04 22.04
4 Shotcrete 300mm Thk T12P1/21 21 sqm 37,112.00 21.00 1.00 22.04 22.04 22.04
5 Shotcrete 300mm Thk T12P1/22 22 sqm 37,113.00 22.00 1.00 22.04 22.04 22.04
6 Shotcrete 300mm Thk T12P1/23 23 sqm 37,114.00 23.00 1.00 22.32 22.32 22.32
7 Shotcrete 300mm Thk T12P1/24 24 sqm 37,115.00 24.00 1.00 22.58 22.58 22.58
8 Shotcrete 300mm Thk T12P1/25 25 sqm 37,116.00 25.00 1.00 22.58 22.58 22.58
9 Shotcrete 300mm Thk T12P1/26 26 sqm 37,117.00 26.00 1.00 22.33 22.33 22.33
10 Shotcrete 300mm Thk T12P1/27 27 sqm 37,118.00 27.00 1.00 21.70 21.70 21.70
11 Shotcrete 300mm Thk T12P1/28 28 sqm 37,119.00 28.00 1.00 22.04 22.04 22.04
12 Shotcrete 300mm Thk T12P1/29 29 sqm 37,120.00 29.00 1.00 22.32 22.32 22.32
13 Shotcrete 300mm Thk T12P1/30 30 sqm 37,121.00 30.00 1.00 22.58 22.58 22.58
14 Shotcrete 300mm Thk T12P1/31 31 sqm 37,122.00 31.00 1.00 22.33 22.33 22.33
15 Shotcrete 300mm Thk T12P1/32 32 sqm 37,123.00 32.00 1.00 21.70 21.70 21.70
16 Shotcrete 300mm Thk T12P1/33 33 sqm 37,124.00 33.00 1.00 22.04 22.04 22.04
17 Shotcrete 300mm Thk T12P1/34 34 sqm 37,125.00 34.00 1.00 22.32 22.32 22.32
18 Shotcrete 300mm Thk T12P1/35 35 sqm 37,126.00 35.00 1.00 22.58 22.58 22.58
19 Shotcrete 300mm Thk T12P1/36 36 sqm 37,127.00 36.00 1.00 22.33 22.33 22.33
20 Shotcrete 300mm Thk T12P1/37 37 sqm 37,128.00 37.00 1.00 21.07 21.07 21.07
TOTAL= 442.970
Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as shown on design drawings, in technical specifications and directed by the Engineer.
These items include:
- sprayed concrete of grade M25 according to Indian Standard
- all concrete additives
1 B201 - wastage of sprayed concrete
- rebound
- application of shotcrete in multiple layers
- all auxiliary materials and works
Measurement and payment shall be for the theoretical area or volume as shown on the design drawings in square metres/ cubic meters, measured along Payment-Line (see specifications).
ROUND QUANTITY
DESCRIPTION ATSS NO UNIT CHAINAGE TUNNEL METER Length Perimeter Area REMARKS
NO (Sqm)
2 Shotcrete 150mm Thk T12P1/201 204 sqm 37,374.00 37,375.50 283.00 284.50 1.50 20.48 30.72 30.72 SFRS
3 Shotcrete 150mm Thk T12P1/202 205 sqm 37,375.50 37,377.00 284.50 286.00 1.50 20.48 30.72 30.72 SFRS
4 Shotcrete 150mm Thk T12P1/203 206 sqm 37,377.00 37,378.50 286.00 287.50 1.50 20.48 30.72 30.72 SFRS
5 Shotcrete 150mm Thk T12P1/204 207 sqm 37,378.50 37,380.00 287.50 289.00 1.50 20.48 30.72 30.72 SFRS
6 Shotcrete 150mm Thk T12P1/205 208 sqm 37,380.00 37,381.50 289.00 290.50 1.50 20.48 30.72 30.72 SFRS
RESS no-8-15/11/2021
7 Shotcrete 150mm Thk T12P1/217 211 sqm 37,398.00 37,399.50 307.00 308.50 1.50 20.48 30.72 30.72 SFRS
8 Shotcrete 150mm Thk T12P1/218 212 sqm 37,399.50 37,401.00 308.50 310.00 1.50 20.48 30.72 30.72 SFRS
9 Shotcrete 150mm Thk T12P1/219 213 sqm 37,401.00 37,402.50 310.00 311.50 1.50 20.48 30.72 30.72 SFRS
10 Shotcrete 150mm Thk T12P1/220 214 sqm 37,402.50 37,404.00 311.50 313.00 1.50 20.48 30.72 30.72 SFRS
11 Shotcrete 150mm Thk T12P1/221 215 sqm 37,404.00 37,405.50 313.00 314.50 1.50 20.48 30.72 30.72 SFRS
12 Shotcrete 150mm Thk T12P1/222 216 sqm 37,405.50 37,407.00 314.50 316.00 1.50 20.48 30.72 30.72 SFRS
14.66 14.66
Face
TOTAL= 442.390
Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as shown on design drawings, in technical specifications and directed by the Engineer.
These items include:
- sprayed concrete of grade M25 according to Indian Standard
- all concrete additives
1 B201 - wastage of sprayed concrete
- rebound
- application of shotcrete in multiple layers
- all auxiliary materials and works
Measurement and payment shall be for the theoretical area or volume as shown on the design drawings in square metres/ cubic meters, measured along Payment-Line (see specifications).
ROUND QUANTITY
DESCRIPTION ATSS NO UNIT CHAINAGE TUNNEL METER Length Perimeter Area REMARKS
NO (Sqm)
PORTAL T13P1
1 Shotcrete 250mm Thk T13P1/122 99.00 sqm 38,932.00 38,933.50 146.50 148.00 1.50 21.21 31.82 31.82 RESS no-4-18/10/2021
2 Shotcrete 250mm Thk T13P1/123 100.00 sqm 38,933.50 38,935.00 148.00 149.50 1.50 21.21 31.82 31.82
3 Shotcrete 250mm Thk T13P1/124 101.00 sqm 38,935.00 38,936.50 149.50 151.00 1.50 21.21 31.82 31.82
4 Shotcrete 250mm Thk T13P1/125 102.00 sqm 38,936.50 38,938.00 151.00 152.50 1.50 21.21 31.82 31.82
5 Shotcrete 250mm Thk T13P1/126 103.00 sqm 38,938.00 38,939.50 152.50 154.00 1.50 21.21 31.82 31.82
6 Shotcrete 250mm Thk T13P1/127 104.00 sqm 38,939.50 38,941.00 154.00 155.50 1.50 21.21 31.82 31.82
7 Shotcrete 250mm Thk T13P1/128 105.00 sqm 38,941.00 38,942.50 155.50 157.00 1.50 21.21 31.82 31.82
8 Shotcrete 250mm Thk T13P1/129 106.00 sqm 38,942.50 38,944.00 157.00 158.50 1.50 21.21 31.82 31.82
9 Shotcrete 250mm Thk T13P1/130 107.00 sqm 38,944.00 38,945.50 158.50 160.00 1.50 21.21 31.82 31.82
10 Shotcrete 250mm Thk T13P1/131 108.00 sqm 38,945.50 38,947.00 160.00 161.50 1.50 21.21 31.82 31.82
11 Shotcrete 250mm Thk T13P1/132 109.00 sqm 38,947.00 38,948.50 161.50 163.00 1.50 21.21 31.82 31.82
12 Shotcrete 250mm Thk T13P1/133 110.00 sqm 38,948.50 38,950.00 163.00 164.50 1.50 21.21 31.82 31.82
13 Shotcrete 250mm Thk T13P1/134 111.00 sqm 38,950.00 38,951.50 164.50 166.00 1.50 21.21 31.82 31.82
14 Shotcrete 250mm Thk T13P1/135 112.00 sqm 38,951.50 38,953.00 166.00 167.50 1.50 21.21 31.82 31.82
15 Shotcrete 250mm Thk T13P1/136 113.00 sqm 38,953.00 38,954.50 167.50 169.00 1.50 21.21 31.82 31.82
16 Shotcrete 250mm Thk T13P1/137 114.00 sqm 38,954.50 38,955.50 169.00 170.00 1.00 21.21 21.21 21.21
17 Shotcrete 250mm Thk T13P1/138 115.00 sqm 38,955.50 38,956.50 170.00 171.00 1.00 21.21 21.21 21.21
18 Shotcrete 250mm Thk T13P1/139 116.00 sqm 38,956.50 38,957.85 171.00 172.35 1.35 21.21 28.63 28.63
19 Shotcrete 250mm Thk T13P1/140 117.00 sqm 38,957.85 38,959.20 172.35 173.70 1.35 21.21 28.63 28.63
20 Shotcrete 250mm Thk T13P1/141 118.00 sqm 38,959.20 38,960.40 173.70 174.90 1.20 21.21 25.45 25.45
21 Shotcrete 250mm Thk T13P1/142 119.00 sqm 38,960.40 38,961.60 174.90 176.10 1.20 21.21 25.45 25.45
22 Shotcrete 250mm Thk T13P1/143 120.00 sqm 38,961.60 38,963.00 176.10 177.50 1.40 21.21 29.70 29.70
23 Shotcrete 250mm Thk T13P1/144 121.00 sqm 38,963.00 38,964.20 177.50 178.70 1.20 21.21 25.45 25.45
24 Shotcrete 250mm Thk T13P1/145 122.00 sqm 38,964.20 38,965.50 178.70 180.00 1.30 21.21 27.57 27.57
25 Shotcrete 250mm Thk T13P1/146 123.00 sqm 38,965.50 38,966.80 180.00 181.30 1.30 21.21 27.57 27.57
26 Shotcrete 250mm Thk T13P1/147 124.00 sqm 38,966.80 38,968.10 181.30 182.60 1.30 21.21 27.57 27.57
27 Shotcrete 250mm Thk T13P1/148 125.00 sqm 38,968.10 38,969.40 182.60 183.90 1.30 21.21 27.57 27.57
28 Shotcrete 250mm Thk T13P1/149 126.00 sqm 38,969.40 38,970.70 183.90 185.20 1.30 21.21 27.57 27.57
29 Shotcrete 250mm Thk T13P1/150 127.00 sqm 38,970.70 38,972.00 185.20 186.50 1.30 21.21 27.57 27.57
30 Shotcrete 250mm Thk T13P1/151 128.00 sqm 38,972.00 38,973.30 186.50 187.80 1.30 21.21 27.57 27.57
31 Shotcrete 250mm Thk T13P1/152 129.00 sqm 38,973.30 38,974.60 187.80 189.10 1.30 21.21 27.57 27.57
32 Shotcrete 250mm Thk T13P1/153 130.00 sqm 38,974.60 38,975.90 189.10 190.40 1.30 21.21 27.57 27.57
33 Shotcrete 250mm Thk T13P1/154 131.00 sqm 38,975.90 38,977.20 190.40 191.70 1.30 21.21 27.57 27.57
34 Shotcrete 250mm Thk T13P1/155 132.00 sqm 38,977.20 38,978.50 191.70 193.00 1.30 21.21 27.57 27.57
1 Shotcrete 250mm Thk T12P1/206 209.00 sqm 37,381.50 37,384.50 290.50 293.50 3.00 21.21 63.63 63.63
2 Shotcrete 250mm Thk T12P1/207 210.00 sqm 37,384.50 37,386.00 293.50 295.00 1.50 21.21 31.82 31.82
Sl no Item No Description of Item
Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as shown on design drawings, in technical specifications and directed by the Engineer.
These items include:
- sprayed concrete of grade M25 according to Indian Standard
- all concrete additives
1 B201 - wastage of sprayed concrete
- rebound
- application of shotcrete in multiple layers
- all auxiliary materials and works
Measurement and payment shall be for the theoretical area or volume as shown on the design drawings in square metres/ cubic meters, measured along Payment-Line (see specifications).
ROUND QUANTITY
DESCRIPTION ATSS NO UNIT CHAINAGE TUNNEL METER Length Perimeter Area REMARKS
NO (Sqm)
3 Shotcrete 250mm Thk T12P1/208 211.00 sqm 37,386.00 37,387.50 295.00 296.50 1.50 21.21 31.82 31.82
4 Shotcrete 250mm Thk T12P1/209 212.00 sqm 37,387.50 37,389.00 296.50 298.00 1.50 21.21 31.82 31.82
5 Shotcrete 250mm Thk T12P1/210 213.00 sqm 37,389.00 37,390.50 298.00 299.50 1.50 21.21 31.82 31.82
6 Shotcrete 250mm Thk T12P1/211 214.00 sqm 37,390.50 37,392.00 299.50 301.00 1.50 21.21 31.82 31.82
7 Shotcrete 250mm Thk T12P1/212 215.00 sqm 37,392.00 37,393.50 301.00 302.50 1.50 21.21 31.82 31.82
8 Shotcrete 250mm Thk T12P1/213 216.00 sqm 37,393.50 37,395.00 302.50 304.00 1.50 21.21 31.82 31.82
9 Shotcrete 250mm Thk T12P1/214 217.00 sqm 37,395.00 37,396.50 304.00 305.50 1.50 21.21 31.82 31.82
10 Shotcrete 250mm Thk T12P1/215 218.00 sqm 37,396.50 37,398.00 305.50 307.00 1.50 21.21 31.82 31.82
- RESS no-09-18/11/2021
1 Shotcrete 250mm Thk T12P1/223 226.00 sqm 37,407.00 37,408.50 317.50 319.00 1.50 21.21 31.82 31.82
2 Shotcrete 250mm Thk T12P1/224 227.00 sqm 37,408.50 37,410.00 319.00 320.50 1.50 21.21 31.82 31.82
3 Shotcrete 250mm Thk T12P1/225 228.00 sqm 37,410.00 37,411.50 320.50 322.00 1.50 21.21 31.82 31.82
4 Shotcrete 250mm Thk T12P1/226 229.00 sqm 37,411.50 37,413.00 322.00 323.50 1.50 21.21 31.82 31.82
5 Shotcrete 250mm Thk T12P1/227 230.00 sqm 37,413.00 37,414.50 323.50 325.00 1.50 21.21 31.82 31.82
6 Shotcrete 250mm Thk T12P1/228 231.00 sqm 37,414.50 37,416.00 325.00 326.50 1.50 21.21 31.82 31.82
7 Shotcrete 250mm Thk T12P1/229 232.00 sqm 37,416.00 37,417.50 326.50 328.00 1.50 21.21 31.82 31.82
8 Shotcrete 250mm Thk T12P1/230 233.00 sqm 37,417.50 37,419.00 328.00 329.50 1.50 21.21 31.82 31.82
9 Shotcrete 250mm Thk T12P1/231 234.00 sqm 37,419.00 37,420.50 329.50 331.00 1.50 21.21 31.82 31.82
10 Shotcrete 250mm Thk T12P1/232 235.00 sqm 37,420.50 37,422.00 331.00 332.50 1.50 21.21 31.82 31.82
11 Shotcrete 250mm Thk T12P1/233 236.00 sqm 37,422.00 37,423.50 332.50 334.00 1.50 21.21 31.82 31.82
12 Shotcrete 250mm Thk T12P1/234 237.00 sqm 37,423.50 37,425.00 334.00 335.50 1.50 21.21 31.82 31.82
13 Shotcrete 250mm Thk T12P1/235 238.00 sqm 37,425.00 37,426.50 335.50 337.00 1.50 21.21 31.82 31.82
14 Shotcrete 250mm Thk T12P1/236 239.00 sqm 37,426.50 37,428.00 337.00 338.50 1.50 21.21 31.82 31.82
15 Shotcrete 250mm Thk T12P1/237 240.00 sqm 37,428.00 37,429.50 338.50 340.00 1.50 21.21 31.82 31.82
16 Shotcrete 250mm Thk T12P1/238 241.00 sqm 37,429.50 37,431.00 340.00 341.50 1.50 21.21 31.82 31.82
17 Shotcrete 250mm Thk T12P1/239 242.00 sqm 37,431.00 37,432.50 341.50 343.00 1.50 21.21 31.82 31.82
18 Shotcrete 250mm Thk T12P1/240 243.00 sqm 37,432.50 37,434.00 343.00 344.50 1.50 21.21 31.82 31.82
19 Shotcrete 250mm Thk T12P1/241 244.00 sqm 37,434.00 37,435.50 344.50 346.00 1.50 21.21 31.82 31.82
20 Shotcrete 250mm Thk T12P1/242 245.00 sqm 37,435.50 37,437.00 346.00 347.50 1.50 21.21 31.82 31.82
21 Shotcrete 250mm Thk T12P1/243 246.00 sqm 37,437.00 37,438.50 347.50 349.00 1.50 21.21 31.82 31.82
22 Shotcrete 250mm Thk T12P1/244 247.00 sqm 37,438.50 37,440.00 349.00 350.50 1.50 21.21 31.82 31.82
23 Shotcrete 250mm Thk T12P1/245 248.00 sqm 37,440.00 37,441.50 350.50 352.00 1.50 21.21 31.82 31.82
24 Shotcrete 250mm Thk T12P1/246 249.00 sqm 37,441.50 37,443.00 352.00 353.50 1.50 21.21 31.82 31.82
25 Shotcrete 250mm Thk T12P1/247 250.00 sqm 37,443.00 37,444.50 353.50 355.00 1.50 21.21 31.82 31.82
26 Shotcrete 250mm Thk T12P1/248 251.00 sqm 37,444.50 37,446.00 355.00 356.50 1.50 21.21 31.82 31.82
27 Shotcrete 250mm Thk T12P1/249 252.00 sqm 37,446.00 37,447.50 356.50 358.00 1.50 21.21 31.82 31.82
28 Shotcrete 250mm Thk T12P1/250 253.00 sqm 37,447.50 37,449.00 358.00 359.50 1.50 21.21 31.82 31.82
29 Shotcrete 250mm Thk T12P1/251 254.00 sqm 37,449.00 37,450.50 359.50 361.00 1.50 21.21 31.82 31.82
30 Shotcrete 250mm Thk T12P1/252 255.00 sqm 37,450.50 37,452.00 361.00 362.50 1.50 21.21 31.82 31.82
Sl no Item No Description of Item
Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as shown on design drawings, in technical specifications and directed by the Engineer.
These items include:
- sprayed concrete of grade M25 according to Indian Standard
- all concrete additives
1 B201 - wastage of sprayed concrete
- rebound
- application of shotcrete in multiple layers
- all auxiliary materials and works
Measurement and payment shall be for the theoretical area or volume as shown on the design drawings in square metres/ cubic meters, measured along Payment-Line (see specifications).
ROUND QUANTITY
DESCRIPTION ATSS NO UNIT CHAINAGE TUNNEL METER Length Perimeter Area REMARKS
NO (Sqm)
31 Shotcrete 250mm Thk T12P1/253 256.00 sqm 37,452.00 37,453.50 362.50 364.00 1.50 21.21 31.82 31.82
32 Shotcrete 250mm Thk T12P1/254 257.00 sqm 37,453.50 37,455.00 364.00 365.50 1.50 21.21 31.82 31.82
33 Shotcrete 250mm Thk T12P1/255 258.00 sqm 37,455.00 37,456.50 365.50 367.00 1.50 21.21 31.82 31.82
34 Shotcrete 250mm Thk T12P1/256 259.00 sqm 37,456.50 37,458.00 367.00 368.50 1.50 21.21 31.82 31.82
Shotcrete 250mm Thk T13P2/15 15.00 41,331.00 41,330.00 15.00 16.00 1.00 21.21 21.21
21.211
Shotcrete 250mm Thk T13P2/16 16.00 41,330.00 41,329.00 16.00 17.00 1.00 21.21 21.21
21.211
Shotcrete 250mm Thk T13P2/17 17.00 41,329.00 41,328.00 17.00 18.00 1.00 21.21 21.21
21.211
Shotcrete 250mm Thk T13P2/18 18.00 41,328.00 41,327.00 18.00 19.00 1.00 21.21 21.21
21.211
Shotcrete 250mm Thk T13P2/19 19.00 41,327.00 41,325.50 19.00 20.50 1.50 31.82 31.82
21.211
Shotcrete 250mm Thk T13P2/20 20.00 41,325.50 41,324.00 20.50 22.00 1.50 31.82 31.82
21.211
Shotcrete 250mm Thk T13P2/21 21.00 41,324.00 41,322.50 22.00 23.50 1.50 31.82 31.82
21.211
Shotcrete 250mm Thk T13P2/22 22.00 41,322.50 41,321.00 23.50 25.00 1.50 31.82 31.82
21.211
Shotcrete 250mm Thk T13P2/23 23.00 41,321.00 41,319.50 25.00 26.50 1.50 31.82 31.82
21.211
Shotcrete 250mm Thk T13P2/24 24.00 41,319.50 41,318.00 26.50 28.00 1.50 31.82 31.82
21.211
Shotcrete 250mm Thk T13P2/25 25.00 41,318.00 41,316.50 28.00 29.50 1.50 31.82 31.82
21.211
Shotcrete 250mm Thk T13P2/26 26.00 41,316.50 41,315.00 29.50 31.00 1.50 31.82 31.82
21.211
Shotcrete 250mm Thk T13P2/27 27.00 41,315.00 41,313.50 31.00 32.50 1.50 31.82 31.82
21.211
Shotcrete 250mm Thk T13P2/28 28.00 41,313.50 41,312.00 32.50 34.00 1.50 31.82 31.82
21.211
Shotcrete 250mm Thk T13P2/29 29.00 41,312.00 41,310.50 34.00 35.50 1.50 31.82 31.82
21.211
Shotcrete 250mm Thk T13P2/30 30.00 41,310.50 41,309.00 35.50 37.00 1.50 31.82 31.82
21.211
Shotcrete 250mm Thk T13P2/31 31.00 41,309.00 41,307.50 37.00 38.50 1.50 31.82 31.82
21.211
2,990.84
TOTAL= 2990.840
Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as shown on design drawings, in technical specifications and directed by the Engineer.
These items include:
- sprayed concrete of grade M25 according to Indian Standard
- all concrete additives
1 B201 - wastage of sprayed concrete
- rebound
- application of shotcrete in multiple layers
- all auxiliary materials and works
Measurement and payment shall be for the theoretical area or volume as shown on the design drawings in square metres/ cubic meters, measured along Payment-Line (see specifications).
ROUND QUANTITY
DESCRIPTION ATSS NO UNIT CHAINAGE TUNNEL METER Length Perimeter Area REMARKS
NO (Sqm)
PORTAL T12P2
1 Shotcrete 300mm Thk T12P2/26 26 sqm 38,478.40 38,477.70 15.80 16.50 0.70 15.66 10.96 10.96 RESS no-2-07/08/2021
2 Shotcrete 300mm Thk T12P2/27 27 sqm 38,477.70 38,477.00 16.50 17.20 0.70 16.27 11.39 11.39
3 Shotcrete 300mm Thk T12P2/28 28 sqm 38,477.00 38,476.30 17.20 17.90 0.70 16.27 11.39 11.39
4 Shotcrete 300mm Thk T12P2/29 29 sqm 38,476.30 38,475.60 17.90 18.60 0.70 16.27 11.39 11.39
5 Shotcrete 300mm Thk T12P2/30 30 sqm 38,475.60 38,474.90 18.60 19.30 0.70 16.67 11.67 11.67
6 Shotcrete 300mm Thk T12P2/31 31 sqm 38,474.90 38,474.20 19.30 20.00 0.70 14.34 10.04 10.04
7 Shotcrete 300mm Thk T12P2/32 32 sqm 38,474.20 38,473.40 20.00 20.80 0.80 15.02 12.02 12.02
8 Shotcrete 300mm Thk T12P2/33 33 sqm 38,473.40 38,472.60 20.80 21.60 0.80 15.10 12.08 12.08
9 Shotcrete 300mm Thk T12P2/34 34 sqm 38,472.60 38,471.80 21.60 22.40 0.80 15.42 12.34 12.34
10 Shotcrete 300mm Thk T12P2/35 35 sqm 38,471.80 38,471.00 22.40 23.20 0.80 15.66 12.53 12.53
11 Shotcrete 300mm Thk T12P2/36 36 sqm 38,471.00 38,470.20 23.20 24.00 0.80 15.66 12.53 12.53
12 Shotcrete 300mm Thk T12P2/37 37 sqm 38,470.20 38,469.40 24.00 24.80 0.80 15.99 12.79 12.79
13 Shotcrete 300mm Thk T12P2/38 38 sqm 38,469.40 38,468.60 24.80 25.60 0.80 16.27 13.02 13.02
TOTAL= 788.450
AVERAGE
TUNNEL M25 Area LENGTH QUANTITY
CHAINAGE ATSS No. M25 AREA REMARKS
METER (sqm) (meter) (cum)
(sqm)
LOCATION T12P1
TOTAL= 43.64
RA 2 4.21 OB
39.43 GOB
RA 4 14.80 OB
47.45 GOB
RA 6 1.10 OB
7.74 GOB
RA 8 7.10 OB
12.49 GOB
RA 9 81.36 OB
RA 10 42.63 OB
1,357.22
IRCON Engineer
AVERAGE
TUNNEL M25 Area LENGTH QUANTITY
CHAINAGE ATSS No. M25 AREA REMARKS
METER (sqm) (meter) (cum)
(sqm)
RA 2 -4.21 OB
-39.43 GOB
RA 4 -14.80 OB
-47.45 GOB
RA 6 -1.10 OB
-7.74 GOB
RA 8 -7.10 OB
-12.49 GOB
RA 9 -81.36 OB
RA 10 -42.63 OB
TOTAL= (258.31)
PORTAL T13P2
1 Shotcrete 150mm Thk 4.12 5.00 0.00 0.15 0.00
2 Shotcrete 150mm Thk Cum 3.84 3.98 0.00 5.00 19.90 0.15 2.99
3 Shotcrete 150mm Thk Cum 3.70 3.77 -5.00 5.00 18.85 0.15 2.83
4 Shotcrete 150mm Thk Cum 3.67 3.69 -10.00 5.00 18.43 0.15 2.76
5 Shotcrete 150mm Thk Cum 3.22 3.45 -15.00 5.00 17.23 0.15 2.58
6 Shotcrete 150mm Thk Cum 4.09 3.66 -20.00 5.00 18.28 0.15 2.74
7 Shotcrete 150mm Thk Cum 4.27 4.18 -23.50 3.50 14.63 0.15 2.19
16.09
PORTAL T12P2RHS SIDE
1 Shotcrete 50mm Thk Cum 5.06 38505.47 0.00
2 Shotcrete 50mm Thk Cum 5.69 5.38 38510.50 5.03 27.04 0.05 1.35
3 Shotcrete 50mm Thk Cum 5.80 5.75 38515.50 5.00 28.73 0.05 1.44
4 Shotcrete 50mm Thk Cum 6.18 5.99 38520.50 5.00 29.95 0.05 1.50
5 Shotcrete 50mm Thk Cum 5.95 6.07 38525.50 5.00 30.33 0.05 1.52
6 Shotcrete 50mm Thk Cum 5.43 5.69 38530.50 5.00 28.45 0.05 1.42
7 Shotcrete 150mm Thk Cum 5.37 5.40 38535.50 5.00 27.00 0.15 4.05
8 Shotcrete 150mm Thk Cum 8.77 7.07 38539.32 3.82 27.01 0.15 4.05
9 Shotcrete 150mm Thk Cum 9.20 8.99 38545.52 6.20 55.71 0.15 8.36
10 Shotcrete 150mm Thk Cum 7.29 8.25 38549.02 3.50 28.86 0.15 4.33
11 Shotcrete 150mm Thk Cum 3.13 5.21 38554.67 5.65 29.44 0.15 4.42
TOTAL= 48.53
PORTAL T13P1
Shotcrete 250mm Thk Cum 8.00 -18.15
Shotcrete 250mm Thk Cum 8.00 8.00 -20.00 1.85 9.85 0.25 2.46
Shotcrete 250mm Thk Cum 19.19 13.59 -25.00 5.00 18.59 0.25 4.65
Shotcrete 250mm Thk Cum 15.39 17.29 -30.00 5.00 22.29 0.25 5.57
Shotcrete 250mm Thk Cum 11.52 13.45 -35.23 5.23 18.68 0.25 4.67
Shotcrete 250mm Thk Cum 5.96 8.74 -39.82 4.58 13.33 0.25 3.33
PORTAL T13P2
Shotcrete 250mm Thk Cum 5.16 25.00 0.00 0.25 0.00
Shotcrete 250mm Thk Cum 9.97 7.57 20.00 5.00 12.57 0.25 3.14
Shotcrete 250mm Thk Cum 13.31 11.64 15.00 5.00 16.64 0.25 4.16
Shotcrete 250mm Thk Cum 12.65 12.98 10.00 5.00 17.98 0.25 4.50
Shotcrete 250mm Thk Cum 12.71 12.68 5.00 5.00 17.68 0.25 4.42
Shotcrete 250mm Thk Cum 10.99 11.85 0.00 5.00 16.85 0.25 4.21
Shotcrete 250mm Thk Cum 9.27 10.13 -5.00 5.00 15.13 0.25 3.78
Shotcrete 250mm Thk Cum 7.14 8.21 -10.00 5.00 13.21 0.25 3.30
PORTAL T12P1
Shotcrete 250mm Thk Cum 16.24 -14.00 0.00 0.25 0.00
Shotcrete 250mm Thk Cum 16.24 16.24 -20.00 6.00 22.24 0.25 5.56
Shotcrete 250mm Thk Cum 10.02 13.13 -25.00 5.00 18.13 0.25 4.53
Shotcrete 250mm Thk Cum 3.96 6.99 -30.00 5.00 11.99 0.25 3.00
Design Mix Cement Concrete M15 in following PCC works including mechanically mixed machine
3 B203 mixed, machine batched, machine vibrated, form work, etc as per specifications & drawings or as directed by
Engineer-in charge
3_1 B2031 For all kinds of structures required (bed, portals, blinding, lean, protection lean concrete)
Location Unit Length Breadth Height Quantity Remarks
APPROACH ROAD T13 P1 (Chainage-230.0m to 288.40m)
RRM Wall 1 A 230.00 235.15 Cum 5.15 1.46 0.10 0.75
RRM Wall 2 A 235.15 240.70 Cum 5.55 1.46 0.10 0.81
RRM Wall 3 A 240.70 245.80 Cum 5.10 1.46 0.10 0.75
RRM Wall 4 A 255.00 261.00 Cum 6.00 1.46 0.10 0.88
RRM Wall 5 A 261.00 267.00 Cum 6.00 1.46 0.10 0.88
RRM Wall 6 A 270.00 276.00 Cum 6.00 1.46 0.10 0.88
RRM Wall 7 A 276.00 282.00 Cum 6.00 1.46 0.10 0.88
RRM Wall 8 A 282.00 288.40 Cum 6.40 1.46 0.10 0.94 6.77
T12P2 Bridge PCC
LHS Cum 7.20 4.00 0.15 4.32
RHS Cum 7.20 4.00 0.15 4.32
TOTAL= 15.41
Design Mix Cement Concrete M15 in following PCC works including mechanically mixed machine
3 B203 mixed, machine batched, machine vibrated, form work, etc as per specifications & drawings or as directed by
Engineer-in charge
3_1 B2031 For all kinds of structures required (bed, portals, blinding, lean, protection lean concrete)
Location Unit Length Breadth Height Quantity Remarks
PCC for RRM Wall at T12 P1 (Chainage-250.9m to 281.0m RHS)
RRM Wall 1 A 281.00 275.20 Cum 5.80 1.46 0.10 0.85
RRM Wall 2 A 275.20 269.20 Cum 6.00 1.46 0.10 0.88
RRM Wall 3 A 269.20 262.90 Cum 6.30 1.46 0.10 0.92
RRM Wall 4 A 262.90 257.90 Cum 5.00 1.46 0.10 0.73
RRM Wall 5 A 257.90 250.90 Cum 7.00 1.46 0.10 1.02
PCC for RRM Wall at T12 P1 (Chainage-251.5m to 187.3m LHS)
Wall No 16 251.50 246.50 Cum 5.00 1.46 0.10 0.73
Wall No 17 246.50 241.50 Cum 5.00 1.46 0.10 0.73
Wall No 18 241.50 236.50 Cum 5.00 1.46 0.10 0.73
Wall No 19 236.50 231.50 Cum 5.00 1.46 0.10 0.73
Wall No 20 231.50 226.50 Cum 5.00 1.46 0.10 0.73
Wall No 21 226.50 221.80 Cum 4.70 1.46 0.10 0.69
Wall No 22 221.80 216.80 Cum 5.00 1.46 0.10 0.73
Wall No 23 216.80 211.80 Cum 5.00 1.46 0.10 0.73
Wall No 24 211.80 206.80 Cum 5.00 1.46 0.10 0.73
Wall No 25 206.80 201.30 Cum 5.50 1.46 0.10 0.81
Wall No 26 201.30 197.40 Cum 3.90 1.46 0.10 0.57
Wall No 27 197.40 192.40 Cum 5.00 1.46 0.10 0.73
Wall No 28 192.40 187.30 Cum 5.10 1.46 0.10 0.75
PCC for RRM Wall at T13P2 (Chainage-90.0m to 161.55m)
Wall No 1 90.00 95.80 Cum 5.80 2.08 0.10 1.20
Wall No 1 LHS 95.80 101.70 Cum 5.90 2.28 0.10 1.35
Wall No 2 101.70 107.55 Cum 5.85 2.08 0.10 1.21
Wall No 3 107.55 113.55 Cum 6.00 2.08 0.10 1.25
Wall No 4 113.55 119.55 Cum 6.00 2.08 0.10 1.25
Wall No 5 119.55 125.60 Cum 6.05 2.08 0.10 1.26
Wall No 6 125.60 131.60 Cum 6.00 2.08 0.10 1.25
Wall No 7 131.60 137.45 Cum 5.85 2.08 0.10 1.21
Wall No 8 137.45 143.45 Cum 6.00 2.08 0.10 1.25
Wall No 9 143.45 149.65 Cum 6.20 2.08 0.10 1.29
Wall No 10 149.65 155.65 Cum 6.00 2.08 0.10 1.25
Wall No 11 155.65 161.55 Cum 5.90 2.08 0.10 1.22
PCC for RRM Wall at T12P2 (Chainage-515.0m to 580.0m)
Wall No 1 A 515.00 519.90 Cum 4.90 1.77 0.10 0.87
Wall No 2 A 519.90 524.85 Cum 4.95 1.77 0.10 0.88
Wall No 3 A 524.85 529.80 Cum 4.95 1.77 0.10 0.88
Wall No 4 A 539.80 545.00 Cum 5.20 1.77 0.10 0.92
Wall No 5 A 545.00 550.10 Cum 5.10 1.77 0.10 0.90
Wall No 6 A 550.10 555.20 Cum 5.10 1.77 0.10 0.90
Wall No 7 A 555.20 560.20 Cum 5.00 1.77 0.10 0.89
Wall No 8 A 560.20 565.20 Cum 5.00 1.77 0.10 0.89
Wall No 9 A 559.80 564.80 Cum 5.00 1.77 0.10 0.89
Wall No 10 A 564.80 570.00 Cum 5.20 1.77 0.10 0.92
Wall No 11 A 570.00 575.10 Cum 5.10 1.77 0.10 0.90
Wall No 12 A 575.10 580.00 Cum 4.90 1.77 0.10 0.87
PCC for RRM Wall at T13P1 (Chainage-230.0m to 288.4m)
Wall No 3B Cum 5.15 1.46 0.10 0.75
Wall No 3C Cum 7.90 1.77 0.10 1.40
Wall No 9A Cum 5.00 1.46 0.10 0.73
TOTAL= 42.37 Cum
Extra for over item no B201 for supply and mixing of steel fibre double end hooked loose steel fibres of circular cross section having diameter of 0.75mm and aspect ratio
1_11 B20111 equal to 49 conforming to EC- certificate of conformity as per EN14889 and tensile strength more than 1100MPa and ultimate strain less than 4% as per specification and
as directed by Engineer
ROUND QUANTITY
DESCRIPTION ATSS NO UNIT CHAINAGE TUNNEL METER Length Perimeter Thickness REMARKS
NO (Cum)
PORTAL T12P1
1 Shotcrete 150mm Thk T12P1/200 203 sqm 37,372.50 37,374.00 281.50 283.00 1.50 20.48 0.15 4.61 SFRS
2 Shotcrete 150mm Thk T12P1/201 204 sqm 37,374.00 37,375.50 283.00 284.50 1.50 20.48 0.15 4.61 SFRS
3 Shotcrete 150mm Thk T12P1/202 205 sqm 37,375.50 37,377.00 284.50 286.00 1.50 20.48 0.15 4.61 SFRS
4 Shotcrete 150mm Thk T12P1/203 206 sqm 37,377.00 37,378.50 286.00 287.50 1.50 20.48 0.15 4.61 SFRS
5 Shotcrete 150mm Thk T12P1/204 207 sqm 37,378.50 37,380.00 287.50 289.00 1.50 20.48 0.15 4.61 SFRS
6 Shotcrete 150mm Thk T12P1/205 208 sqm 37,380.00 37,381.50 289.00 290.50 1.50 20.48 0.15 4.61 SFRS
1 Shotcrete 150mm Thk T12P1/217 211 sqm 37,398.00 37,399.50 307.00 308.50 1.50 20.48 0.15 4.61 SFRS
2 Shotcrete 150mm Thk T12P1/218 212 sqm 37,399.50 37,401.00 308.50 310.00 1.50 20.48 0.15 4.61 SFRS
3 Shotcrete 150mm Thk T12P1/219 213 sqm 37,401.00 37,402.50 310.00 311.50 1.50 20.48 0.15 4.61 SFRS
4 Shotcrete 150mm Thk T12P1/220 214 sqm 37,402.50 37,404.00 311.50 313.00 1.50 20.48 0.15 4.61 SFRS
5 Shotcrete 150mm Thk T12P1/221 215 sqm 37,404.00 37,405.50 313.00 314.50 1.50 20.48 0.15 4.61 SFRS
6 Shotcrete 150mm Thk T12P1/222 216 sqm 37,405.50 37,407.00 314.50 316.00 1.50 20.48 0.15 4.61 SFRS
Extra for over item no B201 for supply and mixing of steel fibre double end hooked loose steel fibres of circular cross section having diameter of 0.75mm and aspect ratio
1_11 B20111 equal to 49 conforming to EC- certificate of conformity as per EN14889 and tensile strength more than 1100MPa and ultimate strain less than 4% as per specification and
as directed by Engineer
ROUND QUANTITY
DESCRIPTION ATSS NO UNIT CHAINAGE TUNNEL METER Length Perimeter Thickness REMARKS
NO (Sqm)
PORTAL T12P1
1 Shotcrete 150mm Thk T12P1/115 118 sqm 37,246.50 37,248.00 154.00 155.50 1.50 20.48 0.15 4.61 SFRS
2 Shotcrete 150mm Thk T12P1/116 119 sqm 37,248.00 37,249.50 155.50 157.00 1.50 20.48 0.15 4.61 SFRS
3 Shotcrete 150mm Thk T12P1/117 120 sqm 37,249.50 37,251.00 157.00 158.50 1.50 20.48 0.15 4.61 SFRS
4 Shotcrete 150mm Thk T12P1/118 121 sqm 37,251.00 37,252.50 158.50 160.00 1.50 20.48 0.15 4.61 SFRS
5 Shotcrete 150mm Thk T12P1/119 122 sqm 37,252.50 37,254.00 160.00 161.50 1.50 20.48 0.15 4.61 SFRS
6 Shotcrete 150mm Thk T12P1/120 123 sqm 37,254.00 37,255.50 161.50 163.00 1.50 20.48 0.15 4.61 SFRS
7 Shotcrete 150mm Thk T12P1/121 124 sqm 37,255.50 37,257.00 163.00 164.50 1.50 20.48 0.15 4.61 SFRS
8 Shotcrete 150mm Thk T12P1/122 125 sqm 37,257.00 37,258.50 164.50 166.00 1.50 20.48 0.15 4.61 SFRS
9 Shotcrete 150mm Thk T12P1/123 126 sqm 37,258.50 37,260.00 166.00 167.50 1.50 20.48 0.15 4.61 SFRS
10 Shotcrete 150mm Thk T12P1/124 127 sqm 37,260.00 37,261.50 167.50 169.00 1.50 20.48 0.15 4.61 SFRS
11 Shotcrete 150mm Thk T12P1/125 128 sqm 37,261.50 37,263.00 169.00 170.50 1.50 20.48 0.15 4.61 SFRS
12 Shotcrete 150mm Thk T12P1/126 129 sqm 37,263.00 37,264.50 170.50 172.00 1.50 20.48 0.15 4.61 SFRS
13 Shotcrete 150mm Thk T12P1/127 130 sqm 37,264.50 37,266.00 172.00 173.50 1.50 20.48 0.15 4.61 SFRS
14 Shotcrete 150mm Thk T12P1/128 131 sqm 37,266.00 37,267.50 173.50 175.00 1.50 20.48 0.15 4.61 SFRS
15 Shotcrete 150mm Thk T12P1/129 132 sqm 37,267.50 37,269.00 175.00 176.50 1.50 20.48 0.15 4.61 SFRS
16 Shotcrete 150mm Thk T12P1/130 133 sqm 37,269.00 37,270.50 176.50 178.00 1.50 20.48 0.15 4.61
RD/ Avg.
Location Unit Area Avg Area Quantity Remarks
Chainage Length
T12P2
Unit Length Breadth Height
Capping Beam Cum 29.85 Area= 0.54 16.12 Capping Beam
Runner Beam Cum 25.45 Area= 0.53 13.49 Runner Beam 1st Row
Cum 10.00 Area= 0.53 5.30 Runner Beam 2nd Row
TOTAL= 70.65
Design Mix Cement Concrete M15 in following PCC works including mechanically mixed machine
3 B203 mixed, machine batched, machine vibrated, form work, etc as per specifications & drawings or as directed by Engineer-
in charge
3_1 B2031 For all kinds of structures required (bed, portals, blinding, lean, protection lean concrete)
T12P2 Trapezoital-Type Drain Cum 1 32.00 Area= 0.28 8.96 Ch-510.0m to 542.0m
T12P2 Trapezoital-Type Drain Cum 1 87.00 Area= 0.28 24.36 Ch-300.0m to 387.0m
Design Mix Cement Concrete M15 in following PCC works including mechanically mixed machine
3 B203 mixed, machine batched, machine vibrated, form work, etc as per specifications & drawings or as directed by Engineer-
in charge
3_1 B2031 For all kinds of structures required (bed, portals, blinding, lean, protection lean concrete)
QSS PROJECT MANAGER
Providing and installation of perforated pipes . The pipes are protected by geotextile membrane as shown on design drawings, in
technical specifications or as directed by the Engineer. These items include:
- all connections and valves
- protection by geotextile membrane
2 C102
- all necessary equipment (i.e. drilling jumbo equipped with AT-casing system)
- other protection to ensure functionality as required locally
Measurement and payment shall be for the actual length measured along the pipe axis in linear metres as confirmed
by the Engineer.
Total= 82.00
LOCATION-T12P1
37,271.60 37,273.10 179.50 181.00 5.00 5.00 25.00 RESS no-5-23/09/2021
LOCATION-T13P2 SLOPE
414.00 418.00 4.00 6.00 24.00
Total= 503.00
ELEVATION RD
REMARKS
From To From To Nos Length QUANTITY (Nos)
LOCATION-T13P2
402.50 408.00 6.00 12.00 72.00
LOCATION-T12P2
397.00 400.00 10.00 12.00 10.00
Total= 82.00
ELEVATION/CHAINAGE RD
ATSS NO. REMARKS
From To From To Nos Length QUANTITY (RM)
LOCATION-T12P2
38,918.50 38,920.00 133.00 134.50 3.00 6.00 18.00 RESS no-4-18/10/2021
LOCATION-T12P1
37,271.60 37,273.10 179.50 181.00 5.00 5.00 25.00 RESS no-5-23/09/2021
Total= 503.00
M30 RCC for Cladding Wall. Design mix cement concrete including machine mixed, machine batched, machine vibrated with contractor's men, material,
5 B205 consumables (including additives), tools & plants, equipments, machineries, all lead & lifts, loading, unloading, wastages etc complete. The rate includes
cost of form work, shuttering, centering, scaffolding, fixing and removing thereof, levelling, finishing of exposed surfaces, curing etc.
TOTAL= 288.93
5_1 C1051 Horizontal/sub horizontal in all kinds of rock dia, equal or greater than 50mm
Tunnel T-12-P1
37+171.0 80 51 15 1 15
Tunnel T-13-P1
38+822.5 37 51 15 1 15
TOTAL= 30
5_1 C1051 0
Tunnel T-12-P1
37+374 238 51 15 1 15
37+392 301 51 15 1 15
37+423.5 332.5 51 15 1 15
37+456.5 365.5 51 15 1 15
Tunnel T-13-P1
38+933.5 148 51 15 1 15
38+954.5 169 51 15 1 15
38+977.2 191.7 51 15 1 15
TOTAL= 105
Round QUANTITY
Chainage TM No REMARKS
No (No)
Tunnel T-12P1
37249 5.00 5.00
37398 5.00 5.00
Tunnel T-12P2 Capping Beam 3.00 3.00
Tunnel T-13P1 38865 5.00 5.00
TOTAL= 33.00
Random rubble masonry, hammer dressed wherever necessary, in cement and sand 1 :6 in wing wall, toe wall, breast wall,
retaining wall, curtain wall, parapet wall, slope of guide bunds, catch water drains, side drains etc, as per drawing and
10 E1010 as per technical specification prescribed in MoRTH including providing weep holes of 100mm dia. PVC pipe at 1 .Om
c/c horizontally and vertically, with contractors men, material, consumables, tools & plants, equipments, machineries,
including all lead & lifts, loading , unloading ,as directed by Engineer -in -Charge , etc complete.
Chainage
From to
RRM Wall at APPROACH ROAD OF T12P2 Chainage ( 300.00m to 350.00m)
RRM Wall No B1 Cum 11.20 Area= 3.60 40.32
RRM Wall No B2 Cum 9.40 Area= 3.60 33.84
RRM Wall No B3 Cum 5.10 Area= 3.60 18.36
RRM Wall No B4 Cum 5.95 Area= 3.60 21.42
RRM Wall No B5 Cum 5.95 Area= 3.60 21.42
RRM Wall No B6 Cum 6.10 Area= 3.60 21.96
RRM Wall No B7 Cum 6.10 Area= 3.60 21.96
TOTAL= 320.81
9.415m
1 3 10mm 9.415 0.620 17.51 Connecting Bar
3.824m
Segment 2 2 1 25mm 3.824 3.850 29.44 Inner Bar
LG
96/25/16 9.415m
Pantex 2 3 10mm 5.624 0.620 20.92 Connecting Bar
3.233m
Segment 3 2 1 25mm 3.233 3.850 24.89 Inner Bar
4.632m
2 3 10mm 4.632 0.620 17.23 Connecting Bar
`
CGST SGST
HSN/SAC As per
Sl.No Product description Bill Amount LOA Amount Taxable Amount
Code LOA Rate Amount Rate Amount
1 Construction of Tunnel T-12 & T13 ₹ 33,883,322.36 4.81% ₹ 1,629,787.81 ₹ 35,513,110.17 6% ₹ 2,130,787.00 6% ₹ 2,130,787.00
₹ 35,513,110.17
Page 114
ANNEXURE A
No of
LG MARKED No Dia of Bar Length Unit Weight Total Weight Remarks
Segment
9.415m
1 3 10mm 3.480 0.620 6.47 Connecting Bar
3.824m
Segment 2 2 1 25mm 3.340 3.850 25.72 Inner Bar
LG
96/25/16 9.415m
Pantex 2 3 10mm 3.480 0.620 12.95 Connecting Bar
2.080m
Segment 3 2 1 25mm 2.080 3.850 16.02 Inner Bar
4.632m
2 3 10mm 1.740 0.620 6.47 Connecting Bar
`
CGST SGST
HSN/SAC As per
Sl.No Product description Bill Amount LOA Amount Taxable Amount
Code LOA Rate Amount Rate Amount
1 Construction of Tunnel T-12 & T13 ₹ 106,346,089.00 4.81% ₹ 5,115,247.00 ₹ 111,461,336.00 6% ₹ 6,687,680.20 6% ₹ 6,687,680.00
₹ 111,461,336.00
Page 122
Underground excavation (TopHeading,Bench,Invert) for main tunnel,adit,niches (Elctrical,Trolley Refuge and the like)and
connection of the main tunnel to the adit by all means of excavation (drilling,blasting /control blasting (wherever
required) ,digging etc) in accordance with the New Austrian Tunnelling Method (NATM).This item includes:-Mandatory
excavation in sub divisons (Top heading, bench and invert)according to geometries, excavation and support sequence shown
on design drawings and as described in the technical specifications- in rock the application of smooth blasting techniques
A102 with contour hole spacing not exceeding 300 mm- Simultaneous excavation works in top heading, and half sided benching in
rail tunnels as per technical specifications or as directed byEngineer- Systematic exploratory drillholes- Appropriate Plant and
Equipment with appropriate size specifically selected for the various tunnel sizes and as declared in the technical bid- Face
maping & Rock Classification after each blast.- Provision of drainages for all surfaces with vehicular circulation- Provision of
adequate lighting and construction ventilation-
AVERAGE
TUNNEL AREA LENGTH QUANTITY
CHAINAGE ATSS No. AREA REMARKS
METER (sqm) (meter) (cum)
(sqm)
Self drilling rock bolts (IBO) for tunnel support, slope support, face bolts etc. Supply, drilling, installation,
grouting and testing of self driling rock bolts of specified length L, specified minimum ultimate load as per
design drawings (Fy=200kN), technical specifications or as directed by Engineer. Drilling with grout
flushing is mandatory. This item includes:
B103
- couplings
- sacrificial drilling bits + grouting
Measurement and payment shall be per piece appropriately installed rock bolts (for exact payment details
see specifications).
Total= 58.00
BOQ Item No. B1041 - Outer diameter 76mm, steel grade S355, wall thickness 6.3mm
LENGTH
Round (meter) QUANTITY
Chaiage TM ATSS No. No REMARKS
No (RM)
Tunnel T12P1
7 37099 8 T12/P1-8 6 43 258
12 37103 12 T12/P1-12 6 41 246
17 37108 17 T12/P1-17 9 42 378
TOTAL= 882
BOQ Item No. B1041 - Outer diameter 76mm, steel grade S355, wall thickness 6.3mm
Tunnel T-13-P1
0 38788.49 12 41 492
Tunnel T-12-P1
9 30 270
26 37116 25 T12/P1-25
6 2 12
TOTAL= 774
Tunnel-T12-P1
37094.00 3.00 m 138 9.00 1,242.00 69 X 2 Rows
TOTAL= 1,242.00
Detail of Certified Quantity by IRCON
Total Up to date quantity Executed 1,242.00
Total Quantity Paid Up to Previous RA Bill 0.00
Quantity for This RA Bill 1,242.00
Cutting Unit
S.NO BAR MARK Shape of bar No's Qty in Kg Remarks
Length Weight
PEDISTRIAL REINFORCEMENT FOR PORTAL FOOTING
A Main Bar
0.66m
0.66m
1 2.73 26 2.47
0.66m
@250c/c Side=26no
1.41m
5.4m
B Distribution Bar
0.356m
0.3m
9.073m
0.356m
CS-DHORAJIA JV CS-DHORAJIA JV
QSS PROJECT MANAGER DDC IRCON Engineer IRCON Site in Charge
REINFORCEMENT FOR 12m SPAN BRIDGE T12P1
Total
DIA Spacing Cutting Unit
S.NO BAR MARK Shape of bar No's Weight Remarks
"mm" in mm Length Weight
kg
RAFT REINFORCEMENT FOR LEFT , RIGHT ABUTMENT & MIDDLE PIER
A Main Bar
0.420m
Bottom
0.420m
1 20.00 200.00 72 4.74 2.47 842.96
Reinforcement
3.9m
5.4m
0.420m
.420m
2 Top Reinforcement 20.00 200.00 3.9m 72 4.74 2.47 842.96
B Distribution Bar
Bottom
.420m
1 16.00 200.00 32 7.94 1.58 401.45
.420m
Reinforcement 7.1m
.420m
7.1m
.420m
2 Top Reinforcement 16.00 200.00 32 7.94 1.58 401.45
C SUPER STRUCTURE
REINFORCEMENT FOR LEFT & RIGHT ABUTMENT
.560m
.818m
4.401m
.600.6
1.31m
3.843m
.600m
D Distribution Bar
1.02m
5.06m
1.02m
5.06m
1.02m
CS-DHORAJIA JV CS-DHORAJIA JV
QSS PROJECT MANAGER DDC IRCON Engineer
BAR BENDING SCHEDULE FOR T12P1 PORTAL
Sl no Item No
Supply, cutting, bending, placing, binding steel reinforcement of grade Fe 500 as per approved drawings & specifications or as directed by Engineer, for
7 B107 joint reinforcement of initial and final lining. This shall include straightening, hooking all lead, lift, all auxiliary materials, etc. (Nothing extra shall be paid for
wastage of reinforcement and binding wire).
Cutting Unit
S.NO BAR MARK Shape of bar No's Qty in Kg Remarks
Length Weight
PORTAL BEAM
A Main Bar
0.66m
0.984
Stirrups 12mm @ 150mm c/c 2(A+B)X24d
1 3.50 88 0.89 273.81 =2(0.984+0.620)X
Portal Beam 24X.012=3.496m
0.620m
m
2 Bottom 32dia mm Main Bar 6.0 7.0
m 13.00 5 6.31 410.15
5m
6.2 7.2
5
3 1st Intermediate 16mm dia m 13.50 2 1.58 42.66
5m
4 1st Intermediate 16mm dia 6. 3 7.3
5
13.70 2 1.58 43.29
m
m 8.5
5 Top 16mm dia 7.5 m 16.00 3 1.58 75.84
PARAPET WALL
0.392m
0.50m
0.455m
0.41m
0.510m
20mm dia rear reinforcement of 0.110m
8 0.82 84 2.47 170.13
parapet wall coping
0.200m
2.955m 2.955m
9 12mm dia distridution bar front 15.60 8 0.89 111.07
9.69m
2.545m 2.545m
10 12mm dia distridution bar rear 13.96 8 0.89 99.40
8.87m
2.75m 2.75m
11 12mm dia distridution bar coping 15.19 5 0.89 67.60
9.69m
Supply and placement of welded wire mesh of sizes 150x150x6, 100x100x6 or any other size as directed by Engineer as reinforcement of sprayed concrete for tunnel lining
works as shown
on design drawings, specifications or as directed by Engineer. Steel grade minimum Fe500. This item also includes:
- Fixing elements and materials
8 B108 - cutting, bending and placement
- all auxiliary materials and works necessary
Measurement and payment shall be per square meter for each layer installed and instructed, measured along Payment Line (see specifications). Overlapping as mentioned in
technical specifications is mandatory but shall not be paid
extra.
Wt
TUNNEL Avg =@2.96kg/sq
DESCRIPTION ATSS NO ROUND NO Layer CHAINAGE Length Area REMARKS
METER Perimeter m As per IS
1566-1982
PORTAL T12P1
WIRE MESH 150X150X6 T12P1/ 4 4 2 37,094.00 3.00 19.85
WIRE MESH 150X150X6 T12P1/ 5 5 2 37,095.00 4.00 1.00 20.79 20.79 123.05
WIRE MESH 150X150X6 T12P1/ 6 6 2 37,096.00 5.00 1.00 20.79 20.79 123.05
WIRE MESH 150X150X6 T12P1/ 7 7 2 37,097.00 6.00 1.00 20.79 20.79 123.05
WIRE MESH 150X150X6 T12P1/ 8 8 2 37,098.00 7.00 1.00 20.79 20.79 123.05
WIRE MESH 150X150X6 T12P1/ 9 9 2 37,099.00 8.00 1.00 20.79 20.79 123.05
WIRE MESH 150X150X6 T12P1/ 10 10 2 37,100.00 9.00 1.00 20.79 20.79 123.05
WIRE MESH 150X150X6 T12P1/ 11 11 2 37,101.00 10.00 1.00 21.97 21.97 130.03
WIRE MESH 150X150X6 T12P1/ 12 12 2 37,102.00 11.00 1.00 22.34 22.34 132.25
WIRE MESH 150X150X6 T12P1/ 13 13 2 37,103.00 12.00 1.00 22.53 22.53 133.36
WIRE MESH 150X150X6 T12P1/ 14 14 2 37,104.00 13.00 1.00 21.97 21.97 130.03
WIRE MESH 150X150X6 T12P1/ 15 15 2 37,105.00 14.00 1.00 22.27 22.27 131.83
WIRE MESH 150X150X6 T12P1/ 16 16 2 37,106.00 15.00 1.00 22.53 22.53 133.36
WIRE MESH 150X150X6 T12P1/ 17 17 2 37,107.00 16.00 1.00 22.53 22.53 133.36
WIRE MESH 150X150X6 T12P1/18 18 2 37,108.00 17.00 1.00 22.27 22.27 131.83
Wt
Slope Avg =@2.96kg/sq
Item Unit Layer Offset Width Area REMARKS
Length Length m As per IS
1566-1982
PORTAL T13P1
1 WIRE MESH 150X150X6 Kg 2 3.48 8.60 0.00 0.00 RHS
2 WIRE MESH 150X150X6 Kg 2 16.04 9.76 5.00 3.60 35.13 207.97 RHS
3 WIRE MESH 150X150X6 Kg 2 18.15 17.09 0.00 5.00 85.46 505.94 CL
4 WIRE MESH 150X150X6 Kg 2 27.26 22.71 -5.00 5.00 113.53 672.10 LHS
5 WIRE MESH 150X150X6 Kg 2 27.89 27.58 -10.00 5.00 137.89 816.29 LHS
6 WIRE MESH 150X150X6 Kg 2 29.63 28.76 -15.00 5.00 143.81 851.33 LHS
7 WIRE MESH 150X150X6 Kg 2 29.04 29.34 -20.00 5.00 146.68 868.33 LHS
8 WIRE MESH 150X150X6 Kg 2 17.18 23.11 -25.00 5.00 115.56 684.10 LHS
9 WIRE MESH 150X150X6 Kg 2 10.59 13.88 -30.00 5.00 69.42 410.97 LHS
`
CGST SGST
HSN/SAC As per
Sl.No Product description Bill Amount LOA Amount Taxable Amount
Code LOA Rate Amount Rate Amount
1 Construction of Tunnel T-12 & T13 ₹ 47,724,015.91 4.81% ₹ 2,295,525.17 ₹ 50,019,541.00 6% ₹ 3,001,172.50 6% ₹ 3,001,172.50
₹ 50,019,541.00
Page 134
Executed Qauntity from 01.02.2021 to 09.03 2021
Sl no Item No Description of Item
Supply, fabrication and erection of steel rib and all accessories including all lead, lift, wastage,storing,drilling holes, fixing in phases etc.
and installation of accessories for joining the steel rib segments as per approved workshop drawings of contractor & specifications or as
9 B109 directed by Engineer.The rate shall include costs of all materials, labour, equipment,welding, etc
for the complete job including additional cost for enlargement
of top heading footing.
Quantity in
ATSS NO ROUND NO Item No Unit Weight RIB SHAPE/NO Remarks
Kg
Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as shown on design drawings, in technical
specifications and directed by the Engineer. These items include:
- sprayed concrete of grade M25 according to Indian Standard
- all concrete additives
- wastage of sprayed concrete
1 B201
- rebound
- application of shotcrete in multiple layers
- all auxiliary materials and works
Measurement and payment shall be for the theoretical area or volume as shown on the design drawings in square metres/ cubic meters, measured along
Payment-Line (see specifications).
Sprayed concrete works for primary lining, face sealing, headwalls or temporary faces with theoretical thickness as shown on design drawings, in technical specifications
and directed by the Engineer. These items include:
- sprayed concrete of grade M25 according to Indian Standard
- all concrete additives
- wastage of sprayed concrete
1 B201
- rebound
- application of shotcrete in multiple layers
- all auxiliary materials and works
Measurement and payment shall be for the theoretical area or volume as shown on the design drawings in square metres/ cubic meters, measured along Payment-Line
(see specifications).
TUNNEL QUANTITY
DESCRIPTION ATSS NO ROUND UNIT CHAINAGE Length Perimeter Area REMARKS
METER (Sqm)
NO
PORTAL T12P1
1 Shotcrete 300mm Thk T12P1/4 4 sqm 37,094.00 3.00 20.00 0.00
2 Shotcrete 300mm Thk T12P1/5 5 sqm 37,095.00 4.00 1.00 20.94 20.94 20.94
3 Shotcrete 300mm Thk T12P1/6 6 sqm 37,096.00 5.00 1.00 20.94 20.94 20.94
4 Shotcrete 300mm Thk T12P1/7 7 sqm 37,097.00 6.00 1.00 20.94 20.94 20.94
5 Shotcrete 300mm Thk T12P1/8 8 sqm 37,098.00 7.00 1.00 20.94 20.94 20.94
6 Shotcrete 300mm Thk T12P1/9 9 sqm 37,099.00 8.00 1.00 20.94 20.94 20.94
7 Shotcrete 300mm Thk T12P1/10 10 sqm 37,100.00 9.00 1.00 20.94 20.94 20.94
8 Shotcrete 300mm Thk T12P1/11 11 sqm 37,101.00 10.00 1.00 22.11 22.11 22.11
9 Shotcrete 300mm Thk T12P1/12 12 sqm 37,102.00 11.00 1.00 22.42 22.42 22.42
10 Shotcrete 300mm Thk T12P1/13 13 sqm 37,103.00 12.00 1.00 22.68 22.68 22.68
11 Shotcrete 300mm Thk T12P1/14 14 sqm 37,104.00 13.00 1.00 22.11 22.11 22.11
12 Shotcrete 300mm Thk T12P1/15 15 sqm 37,105.00 14.00 1.00 22.42 22.42 22.42
13 Shotcrete 300mm Thk T12P1/16 16 sqm 37,106.00 15.00 1.00 22.68 22.68 22.68
14 Shotcrete 300mm Thk T12P1/17 17 sqm 37,107.00 16.00 1.00 22.68 22.68 22.68
15 Shotcrete 300mm Thk T12P1/18 18 sqm 37,108.00 17.00 1.00 22.42 22.42 22.42 305.13
TOTAL= 305.140
Design Mix Cement Concrete M15 in following PCC works including mechanically mixed machine
3 B203 mixed, machine batched, machine vibrated, form work, etc as per specifications & drawings or as directed by
Engineer-in charge
3_1 B2031 For all kinds of structures required (bed, portals, blinding, lean, protection lean concrete)
Location Unit Length Breadth Height Quantity Remarks
APPROACH ROAD T12 P1 CHAINAGE 190.95m to 251.5m
Chainage
From To
RRM Wall 5 190.95 196.65 Cum 5.70 1.46 0.10 0.83
RRM Wall 6 196.65 202.85 Cum 6.20 1.46 0.10 0.91
RRM Wall 7 202.85 208.95 Cum 6.10 1.46 0.10 0.89
RRM Wall 8 208.95 215.65 Cum 6.70 1.46 0.10 0.98
RRM Wall 9 215.65 221.75 Cum 6.10 1.46 0.10 0.89
RRM Wall 10 221.75 226.65 Cum 4.90 1.46 0.10 0.72
RRM Wall 11 226.65 231.90 Cum 5.25 1.46 0.10 0.77
RRM Wall 12 231.90 236.80 Cum 4.90 1.46 0.10 0.72
RRM Wall 13 236.80 241.30 Cum 4.50 1.46 0.10 0.66
RRM Wall 14 241.30 246.50 Cum 5.20 1.46 0.10 0.76
RRM Wall 15 246.50 251.50 Cum 5.00 1.46 0.10 0.73 8.86
PORTAL T13-P1
Elevation
QUANTITY
Location Unit No Length REMARKS
From To (No)
TOTAL= 60
Detail of Certified Quantity by IRCON
Total Up to date quantity Executed 60.00
Total Quantity Paid Up to Previous RA Bill 0.00
Quantity for This RA Bill 60.00
Random rubble masonry, hammer dressed wherever necessary, in cement and sand 1 :6 in wing wall, toe wall, breast wall,
retaining wall, curtain wall, parapet wall, slope of guide bunds, catch water drains, side drains etc, as per drawing and
10 E1010 as per technical specification prescribed in MoRTH including providing weep holes of 100mm dia. PVC pipe at 1 .Om
c/c horizontally and vertically, with contractors men, material, consumables, tools & plants, equipments, machineries,
including all lead & lifts, loading , unloading ,as directed by Engineer -in -Charge , etc complete.
Chainage
From to
APPROACH ROAD OF T13P1 CHANAGE-403.27m to 411.27m
f. RRm Wall 6 403.27 411.27 Cum 8.00 Area= 3.83 30.60
APPROACH ROAD OF T13P1 CHANAGE-411.27 to 442.47m
RRM wall 7 461.13 457.93 Cum 3.20 Area= 2.58 8.27
RRM wall 8 457.93 462.88 Cum 4.95 Area= 2.63 13.04
RRM wall 9 462.88 468.68 Cum 5.80 Area= 3.91 22.70
RRM wall 10 468.68 473.60 Cum 4.92 Area= 4.79 23.55
RRM wall 11 433.00 438.05 Cum 5.05 Area= 7.44 37.56
RRM wall 12 438.05 442.47 Cum 4.42 Area= 7.27 32.14 167.86
APPROACH ROAD OF T12P1 CHANAGE-190.95m to 251.50m
RRM Wall 5 190.95 196.65 Cum 5.70 Area= 3.20 18.27
RRM Wall 6 196.65 202.85 Cum 6.20 Area= 3.38 20.99
RRM Wall 7 202.85 208.95 Cum 6.10 Area= 3.40 20.76
RRM Wall 8 208.95 215.65 Cum 6.70 Area= 3.11 20.87
RRM Wall 9 215.65 221.75 Cum 6.10 Area= 3.02 18.45
RRM Wall 10 221.75 226.65 Cum 4.90 Area= 3.07 15.04
RRM Wall 11 226.65 231.90 Cum 5.25 Area= 2.93 15.41
RRM Wall 12 231.90 236.80 Cum 4.90 Area= 3.47 17.03
RRM Wall 13 236.80 241.30 Cum 4.50 Area= 3.56 16.04
RRM Wall 14 241.30 246.50 Cum 5.20 Area= 3.70 19.24
RRM Wall 15 246.50 251.50 Cum 5.00 Area= 3.29 16.47 198.57
TUNNEL T12P2 DEVELOPMENT
a. RRM Wall A Cum 22.15 Area= 8.87 196.45 196.45
APPROACH ROAD OF T12P2 CHANAGE-465.0m to 495.55m
RRM Wall 1 465.00 465.35
Wall A Cum 4.80 Area= 2.53 12.16
Wall B Cum 2.30 Area= 1.45 3.35
Wall C Cum 0.35 Area= 1.51 0.53
RRM Wall 2 465.35 470.35 Cum 5.00 Area= 5.50 27.50
RRM Wall 3 470.35 475.35 Cum 5.00 Area= 5.50 27.50
RRM Wall 4 475.35 480.45 Cum 5.10 Area= 5.50 28.05
RRM Wall 5 480.45 485.45 Cum 5.00 Area= 5.50 27.50
RRM Wall 6 485.45 490.45 Cum 5.00 Area= 5.27 26.35
RRM Wall 7 490.45 495.55 Cum 5.10 Area= 3.31 16.91
APPROACH ROAD OF T12P2 CHANAGE-640.0m to680.8m
RRM Wall 1 640.00 645.00 Cum 5.00 Area= 3.20 16.00
RRM Wall 2 645.00 649.85 Cum 4.85 Area= 3.20 15.52
RRM Wall 3 649.85 655.70 Cum 5.85 Area= 4.69 27.46
RRM Wall 4 655.70 660.70 Cum 5.00 Area= 5.50 27.50
RRM Wall 5 660.70 665.70 Cum 5.35 Area= 5.61 30.04
RRM Wall 6 665.70 670.70 Cum 5.00 Area= 5.50 27.50
RRM Wall 7 670.70 675.80 Cum 5.10 Area= 5.50 28.05
RRM Wall 8 675.80 680.80 Cum 5.00 Area= 5.50 27.50
TOTAL= 932.30
Random rubble masonry, hammer dressed wherever necessary, in cement and sand 1 :6 in wing wall, toe wall, breast wall,
retaining wall, curtain wall, parapet wall, slope of guide bunds, catch water drains, side drains etc, as per drawing and
10 E1010 as per technical specification prescribed in MoRTH including providing weep holes of 100mm dia. PVC pipe at 1 .Om
c/c horizontally and vertically, with contractors men, material, consumables, tools & plants, equipments, machineries,
including all lead & lifts, loading , unloading ,as directed by Engineer -in -Charge , etc complete.
Chainage
From to
APPROACH ROAD OF T13P1 CHANAGE-230.0m to 288.4m
RRM wall 1 A 230.00 235.15 Cum 5.15 Area= 2.12 10.94
RRM wall 2 A 235.15 240.70 Cum 5.55 Area= 2.12 11.79
RRM wall 3 A 240.70 245.80 Cum 5.10 Area= 2.48 12.67
RRM wall 4 A 255.00 261.00 Cum 6.00 Area= 2.84 17.06
RRM wall 5 A 261.00 267.00 Cum 6.00 Area= 2.84 17.06
RRM wall 6 A 270.00 276.00 Cum 6.00 Area= 2.84 17.06
RRM wall 7 A 276.00 282.00 Cum 6.00 Area= 2.84 17.06
RRM wall 8 A 282.00 288.40 Cum 6.40 Area= 2.84 18.20
121.84
TOTAL= 121.84
Supply and placement of welded wire mesh of sizes 150x150x6, 100x100x6 or any other size as directed by Engineer as reinforcement of sprayed concrete for tunnel lining
works as shown
on design drawings, specifications or as directed by Engineer. Steel grade minimum Fe500. This item also includes:
- Fixing elements and materials
8 B108 - cutting, bending and placement
- all auxiliary materials and works necessary
Measurement and payment shall be per square meter for each layer installed and instructed, measured along Payment Line (see specifications). Overlapping as mentioned in
technical specifications is mandatory but shall not be paid
extra.
Wt
Slope Avg =@2.96kg/sq
Item Unit Chainage Width Area REMARKS
Length Length m As per IS
1566-1982
PORTAL T12P1
1 WIRE MESH 150X150X6 Kg 8.90 30 0.00 0.00
2 WIRE MESH 150X150X6 Kg 22.57 15.74 25 5 78.69 232.91
3 WIRE MESH 150X150X6 Kg 28.39 25.48 20 5 127.40 377.09
4 WIRE MESH 150X150X6 Kg 29.93 29.16 15 5 145.79 431.54
5 WIRE MESH 150X150X6 Kg 28.56 29.24 10 5 146.21 432.78
6 WIRE MESH 150X150X6 Kg 27.91 28.23 5 5 141.15 417.81
7 WIRE MESH 150X150X6 Kg 28.83 28.37 0 5 141.85 419.86
8 WIRE MESH 150X150X6 Kg 29.40 29.12 -5 5 145.59 430.95
9 WIRE MESH 150X150X6 Kg 26.73 28.07 -10 5 140.34 415.41
10 WIRE MESH 150X150X6 Kg 25.75 26.24 -14 4 104.97 310.72
Supply, fabrication and erection of steel rib and all accessories including all lead, lift, wastage,storing,drilling holes, fixing in phases etc. and installation of accessories
for joining the steel rib segments as per approved workshop drawings of contractor & specifications or as directed by Engineer.The rate shall include costs of all
9 B109 materials, labour, equipment,welding, etc
for the complete job including additional cost for enlargement
of top heading footing.
Design Mix Cement Concrete M15 in following PCC works including mechanically mixed machine
3 B203 mixed, machine batched, machine vibrated, form work, etc as per specifications & drawings or as directed by
Engineer-in charge
Construction , dowel jointed, cement concrete pavement of M30 grade concrete with 43 grade cement, coarse and fine aggregate
conforming of IS:383, maximum size of coarse aggregate not exceeding 25mm, mixed in a batching plant as per approved mix design,
transported at site, laid with a fixed form or slip form paver or by fixed shuttering, spread, compacted and finished in a continuous
operation and texturing, including provision of contraction, expansion, construction and longitudinal joints, joint filler, seperation
2_3 B2023
membrane,sealant primer, joint sealant, debonding strip, dowel bar, tie bar/rod, admixtures as approved, curing compound, finishing to
lines and grades as per drawing. Item rate shall be inclusive of all material, taxes, duties, manpower, equipment cost, royalties,
transportation, etc.
Reinforcement will be paid separately under the item of reinforcement.
RD/
Location Unit Length Breadth Height Quantity Remarks
Chainage
PORTAL T12P1
a. RHS of Portal Pedistrial Cum 3.00 2.00 0.75 4.50
b. LHS of Portal Pedistrial Cum 3.00 2.00 0.75 4.50
c.Portal Concrete Length Area Avg. Area
i. At Chainage 37091 37091.00 Cum 0.00 46.89 0.00
ii. At Chainage 37092 37092.00 Cum 1.00 48.02 47.46 47.46 0
iii. At Chainage 37093 37093.00 Cum 1.00 47.11 47.57 47.57
iv. At Chainage 37094 37094.00 Cum 1.00 48.60 47.85 47.85
TOTAL= 151.88
Average
Filling
Location Chainage Length (M) Filling Area Quantity (M³) REMARKS
Area (M²)
(M²)
20 190.00 10 0 0 -
21 200.00 10 0 0 -
22 210.00 10 0 0 -
23 220.00 10 0 0 -
24 230.00 10 0 0 -
25 240.00 10 0 0 -
26 250.00 10 0 0 -
27 260.00 10 0 0 -
28 270.00 10 0 0 -
29 280.00 10 0 0 -
30 290.00 10 0 0 -
31 300.00 10 0 0 -
32 310.00 10 0 0 -
33 320.00 10 0 0 -
34 330.00 10 0 0 -
35 340.00 10 0 0 -
36 350.00 10 0 0 -
37 360.00 10 0 0 -
38 370.00 10 0 0 -
39 380.00 10 0 0 -
40 390.00 10 0 0 -
41 400.00 10 0 0 -
42 410.00 10 0 0 -
43 420.00 10 0 0 -
44 430.00 10 0 0 -
45 440.00 10 0 0 -
46 450.00 10 0 0 -
47 460.00 10 11.934 5.97 59.70
48 470.00 10 13.01 12.47 124.70
49 480.00 10 19.889 16.45 164.50
50 490.00 10 3.031 11.46 114.60
51 500.00 10 2.203 2.62 26.20
52 510.00 10 0 1.1 11.00
53 520.00 10 2.69 1.35 13.50
54 530.00 10 0 1.35 13.50
55 540.00 10 0 0 -
56 550.00 10 0 0 -
57 560.00 10 0 0 -
58 570.00 10 0 0 -
59 580.00 10 0 0 -
60 590.00 10 4.03 2.02 20.20
61 600.00 10 0 2.02 20.20
62 610.00 10 0 0 -
63 620.00 10 0 0 -
64 630.00 10 4.285 2.14 21.40
65 640.00 10 0 2.14 21.40
66 650.00 10 5.794 2.9 29.00
67 660.00 10 0 2.9 29.00
68 670.00 10 0 0 -
69 680.00 10 0 0 -
70 690.00 10 1.546 0.77 7.70
71 700.00 10 6.172 3.86 38.60
72 710.00 10 0 3.09 30.90
73 720.00 10 0 0 -
74 730.00 10 0 0 -
75 740.00 10 4.655 2.33 23.30
76 750.00 10 0 2.33 23.30
77 760.00 10 0 0 -
78 770.00 10 2.85 1.43 14.30
7 60.00 10 0 0 -
8 70.00 10 0 0 -
9 80.00 10 0 0 -
10 90.00 10 0 0 -
11 100.00 10 3.24 1.62 16.20
12 110.00 10 27.284 15.26 152.60
13 120.00 10 19.106 23.2 232.00
14 130.00 10 17.149 18.13 181.30
15 140.00 10 17.144 17.15 171.50
16 150.00 10 9.119 13.13 131.30 1,074.30
TOTAL= 2,425.10
Supply, cutting, bending, placing, binding steel reinforcement of grade Fe 500 as per approved drawings & specifications or as directed by Engineer, for joint reinforcement of initial and final lining. This shall include
7 B107 straightening, hooking all lead, lift, all auxiliary materials, etc. (Nothing extra shall be paid for wastage of reinforcement and binding wire).
Spacing in Cutting
S.NO BAR MARK DIA "mm" Shape of bar No's a b c d 12mm 20mm Remarks
mm Length
PEDISTRIAL REINFORCEMENT FOR PORTAL FOOTING
A Main Bar
Bottom
207.35 No= 13 X 2
0.66m
0.66m
1 20.00 250.00 26 0.66 1.91 0.66 0.00 3.23 0.00
Reinforcement Side=26no
1.91m
5.4m
B Distribution Bar
Bottom
1 12.00 250.00 16 2.91 0.00 0.00 0.00 2.91 41.44 0.00 No= 8 X 2 Side=16no
Reinforcement 2.91m
0.356m
7.846m
0.3m
9.073m
0.356m
D Distribution Bar
2.91
2 Distribution Bar Outer 12.00 300.00 60 2.91 2.91 155.39 0.00
Distribution Bar at
3 12.00 300.00 2.91 30 2.91 0.00 2.91 77.70 0.00
Top
`
CGST SGST
HSN/SAC As per
Sl.No Product description Bill Amount LOA Amount Taxable Amount
Code LOA Rate Amount Rate Amount
1 Construction of Tunnel T-12 & T13 ₹ 26,783,177.18 4.81% ₹ 1,288,270.82 ₹ 28,071,448.00 6% ₹ 1,684,287.00 6% ₹ 1,684,287.00
Page 151