10 603128 0000100201 Mah Civ MST 000003 - 03 - A
10 603128 0000100201 Mah Civ MST 000003 - 03 - A
10 Spine Infrastructure
Spine Infrastructure
NEOM
Saudi Arabia
To
(2) Bechtel Document Management - Bechtel KSA (+1 more...)
Cc
(2) NEOM Quality & Excellence Document Control - NEOM - Engineering & Technical Services Dept (+1 more...)
Status N/A
DOCUMENT ATTACHMENTS
(2)
(0 selected)
Revision
File Document No Revision Title Status
Date
A-
10-603128- WO 057 - Spine Earthworks Lot 8B - (Ch58+200 -
Work
0000100201-MAH- 03 25/06/2022 Ch65+500) (Coastal Desert West Region) - Method
May
CIV-CRS-000004 Statement For Excavation, Backfill And Compaction_CRS
Proceed
A-
10-603128- WO 057 - Spine Earthworks Lot 8B - (Ch58+200 -
Work
0000100201-MAH- 03 25/06/2022 Ch65+500) (Coastal Desert West Region) - Method
May
CIV-MST-000003 Statement For Excavation, Backfill And Compaction
Proceed
MESSAGE
The attached documents have completed the "WO 057 - Spine Earthworks Lot 8B - (Ch58+200 - Ch65+500) (Coastal Desert West Region) -
Method Statement For Excavation, Backfill And Compaction" workflow with the following results :
10-603128-0000100201-
EPM DCC B Document Management A - Work May Proceed
MAH-CIV-MST-000003
10-603128-0000100201-
EPM DCC B Document Management A - Work May Proceed
MAH-CIV-CRS-000004
NEOM - 10 SPINE INFRASTRUCTURE
Work Order Title Spine Earthworks Lot 8B CH 58+200 to CH 65+500 (Coastal Desert
West Region)
Revision No. 03
Page 1 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
WO 057 - Spine Earthworks Lot 8B -
(Ch58+200 - Ch65+500) (Coastal Desert
West Region) - Method Statement For
Excavation, Backfill And Compaction
1 0 - 6 0 3 1 2 8 - 0 0 0 0 1 0 0 2 0 1 - M A H - C I V - M S T - 0 0 0 0 0 3 – R e v . 03 , D a t e
23 / 0 6 / 2 0 2 2
Page 2 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
NEOM - 10 SPINE INFRASTRUCTURE
Contract No. - 100201
Contract Name - Coastal Desert West Region
Method Statement For Excavation, Backfill And
Compaction
Document History
Page 3 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
MOFARREH
NEOM ALHARBI &
PARTNERS
MS for Excavation,
Document Type: Document No.:
Backfill and Compaction
MAH-MS-FORM
Page 4 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
MOFARREH
NEOM ALHARBI &
PARTNERS
MS for Excavation,
Document Type: Document No.:
Backfill and Compaction
Table of Contents
1. DESCRIPTION OF WORKS
2. LOCATION AND WORK LIMITS (AREA/SITE SPECIFIC LAYOUT)
3. ACCESS/EGRESS
4. PROTECTION AND ISOLATION ARRANGEMENTS (E.G 3RD PARTIES)
5. TASK SPECIFIC EMERGENCY ARRANGEMENTS
6. WORK METHODOLOGY
7. RESOURCES
A. SITE KEY PERSONNEL AND WORKFORCE
B. PLANT AND EQUIPMENT
C. MATERIALS AND TOOLS
D. CHEMICALS REQUIRED
E. TASK SPECIFIC PPE REQUIRED
8. INTERFACES – OTHER SITES, WORK ACTIVITIES, GENERAL PUBLIC ETC.
9. PERMITS
10. REFERENCES DRAWINGS / SPECIFICATIONS / OTHER
11. Attachments: 1. RISK ASSESMENT
2. SUPPLEMENTARY FILES
Page 5 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
MOFARREH
NEOM ALHARBI &
PARTNERS
MS for Excavation,
Document Type: Document No.:
Backfill and Compaction
1. DESCRIPTION OF WORKS
This document demonstrates the sequence of activities to be carried out for Excavation, Backfill
& Compaction of suitable materials to lower grade areas of Spine Earthworks Lot 8B (CH58+200
to CH65+500) as per the design, grade, level and dimension shown on IFC drawings and NEOM
Specification Section 312000.
This shall include standard procedure for excavation, taking soil samples and material type, test
requirements, backfilling & compaction process, dust control and traffic control during work
operation.
Page 6 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
MOFARREH
NEOM ALHARBI &
PARTNERS
MS for Excavation,
Document Type: Document No.:
Backfill and Compaction
3. ACCESS/EGRESS
Access/egress going into jobsite shall be as per TMP layout submitted to NEOM for
review and approval including the borrow pit access/egress
Page 7 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
MOFARREH
NEOM ALHARBI &
PARTNERS
MS for Excavation,
Document Type: Document No.:
Backfill and Compaction
6. NEOM Representatives:
6. WORK METHODOLOGY
Number Activity Description and sequencing
A. GENERAL
Prior to start the task, activity in-charge along with the foreman and the
1. safety officer shall conduct toolbox in language which can be
understandable by all the crew members, JHA & RA will discuss, and
responsibilities will be assigned to the crew members and STARRTCARD
will be filled and available. They must present in detail the task, potential
risk, safe activity implementation and the preventive control measures,
PPE requirements, safe work procedures, HSE regulations and conditions
to prevent incident. All concerned workers shall attend toolbox talk and
the related records shall be maintained.
2. Construction of temporary access road and traffic management are carried
as per the MAH Traffic Management Plan and Road Access Plan.
Ensure installation of traffic speed limit signs & related warning will be
3. posted on designated areas, speed humps especially in the intersection,
temporary road access diversion when there is on-going road TMP
maintenance.
Dust control measures shall be arranged in all TMP during work operation
4. including huge movement of plant and equipment which creates dust
storm especially during loading/unloading and during summer. Water
spraying to all TMP’s access haul roads done by water tankers must be
arrange in daily basis.
All Excess Waste materials are stockpiled properly with temporary
5. barricade and will transfer to the client approved area in the working site.
Emergency Preparedness
6.
- Upon identification or awareness of an emergency event, notification
shall be made by any means necessary, including but not limited to:
Page 9 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
MOFARREH
NEOM ALHARBI &
PARTNERS
MS for Excavation,
Document Type: Document No.:
Backfill and Compaction
B. EXCAVATION
Page 10 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
MOFARREH
NEOM ALHARBI &
PARTNERS
MS for Excavation,
Document Type: Document No.:
Backfill and Compaction
Safe access road to be provided for the excavators to move easily while
11. excavating the trench
Page 11 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
MOFARREH
NEOM ALHARBI &
PARTNERS
MS for Excavation,
Document Type: Document No.:
Backfill and Compaction
Page 12 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
MOFARREH
NEOM ALHARBI &
PARTNERS
MS for Excavation,
Document Type: Document No.:
Backfill and Compaction
Upon receiving IFC Drawing, Contractor will provide cross section drawings
b. for the excavation at each 100m to be submitted for approval. Attached
please find indicative cross section drawing. (Please see above drawing)
There are 4 centerlines: GMT (Group Mass Transit), HSR (High Speed Rail),
c. Center Line, FRT (Freight Rail Transit). We will locate the Center Line using
200 m offset control line. From the Center Line, the rest of the GMT, HSR
and FRT center lines will be located and levels of excavation per each
center line to be followed.
Where blasting to take place, specialist advise will be sought and activities
d. to be executed on approved blasting plan. Contractor will submit separate
Method Statement for Blasting.
Initially, the Contractor shall excavate to a meter above the water table
e. and before continuing to the Top of Rail (ToR) of the highest rail system
either High Speed Rail (HSR), Group Mass Transit (GMT) or the Freight
as specified in the drawings and gain Employer direction to excavate
further. A ground water model and a method of dewatering will be agreed.
The Contractor shall request approval to proceed beyond this point in line
f. with the Control of Excavation.
Page 13 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
MOFARREH
NEOM ALHARBI &
PARTNERS
MS for Excavation,
Document Type: Document No.:
Backfill and Compaction
Page 14 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
MOFARREH
NEOM ALHARBI &
PARTNERS
MS for Excavation,
Document Type: Document No.:
Backfill and Compaction
Contractor divided the excavation length into seven (7) zones, as detailed
i. below: (Please see attached drawing above)
Page 15 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
MOFARREH
NEOM ALHARBI &
PARTNERS
MS for Excavation,
Document Type: Document No.:
Backfill and Compaction
Control of Excavation
j. It is essential that the depth of excavation is controlled to protect against
over-excavation. The Contractor shall initially excavate to the highest Top
of Rail (ToR) or 1M above the water level, whichever is encountered first,
and seek the Employer’s approval before proceeding to excavate to the
Formation Level. Intermediate excavation levels to the ToR will be set by
the Employer and subject to approval including slope design and ground
protection measures and method statements tailored to the ground
conditions. Please see below control measures. The Contractor shall
excavate and seek approval from the Employer prior to proceeding to the
next stage as follows:
The installation of slope protection in 2m intervals to ensure the stability
of the excavation is progressively controlled.
One meter above the ground water as identified by the initial ground
investigation reports and actual site condition.
B. BACKFILLING
1. All excavated materials will be stored in stock piles within the LUP, stock
piles will have sign boards nearby showing the stock pile number, the
material type of the stock pile as well as the quantity of stored material in
that stock pile
Ensure only approved backfill material shall be used as per test reports of
2. soil samples taken from borrow pit areas within project limit submitted by
approved 3rd party testing laboratory.
Taking soil samples with 3rd party testing lab shall be witnessed by NEOM
3. upon submission of inspection Request 24 hours prior for actual
inspection.
Ensure the testing for backfilling materials samples will be tested
4.
according to the project specification
Page 16 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
MOFARREH
NEOM ALHARBI &
PARTNERS
MS for Excavation,
Document Type: Document No.:
Backfill and Compaction
C. COMPACTION
Page 17 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
MOFARREH
NEOM ALHARBI &
PARTNERS
MS for Excavation,
Document Type: Document No.:
Backfill and Compaction
7. RESOURCES
A. SITE KEY PERSONNEL AND WORKFORCE
Title No. Required Task Specific Training Required (if applicable)
Project To manage the project execution and planning in
1
Manager accordance tocontract requirements
Construction To manage the construction execution and providing all
2
Manager resourcesrequired to complete the work
To manage the safety requirements are properly
HSE Manager 2
implementedand maintained on the site as per ES&H
requirements
To ensure that the work is executed according to safety
HSE Engineer 8
requirements
To manage the Environmental requirements are
Environmental
2 properly
Manager
implemented and maintained on the site as
per ES&Hrequirements
Quality To manage the quality requirements are properly
1
Manager implemented
and maintained on the site as per project quality
requirements
To execute the construction and allocating resources
Site Engineer 8
required tocomplete the work
Quality To verify the works are carried as per approved
2
Engineer drawings andproject requirements
Supervisor / Supervising the works and guiding the workers for
2
Foreman the properexecution of the works in accordance to
drawing requirements.
Page 18 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
MOFARREH
NEOM ALHARBI &
PARTNERS
MS for Excavation,
Document Type: Document No.:
Backfill and Compaction
Page 19 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
MOFARREH
NEOM ALHARBI &
PARTNERS
MS for Excavation,
Document Type: Document No.:
Backfill and Compaction
D. CHEMICALS REQUIRED
Item MSDS Number Reason for use
N/A N/A N/A
9. PERMITS
To control the activities in safe manner for the protection of all personnel, assets, and
environment.
The permit shall be filled and signed by competent person. Describe the nature of work,
involved tools, equipment, work location details, start date and time in the work permit.
People in-charge of work/job performers shall be fully aware of activities, regulations and the
permits shall be always kept available nearby the work area.
a. Permit to Dig is mandatory for any kind of excavation.
b. Hot work permit is mandatory if work is producing and spark.
Any Permits Required (from NEOM ESH Manual or 3rd Party)
Permit Type Issued By Additional Information (Reference No. etc.)
Hot work permit MAH If necessary
Lowbed transportation
MAH If necessary
permit
Page 20 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
MOFARREH
NEOM ALHARBI &
PARTNERS
MS for Excavation,
Document Type: Document No.:
Backfill and Compaction
SUPPLEMENTARY FILES
As per attachment No.2
Page 21 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
MOFARREH
NEOM ALHARBI &
PARTNERS
MS for Excavation,
Document Type: Document No.:
Backfill and Compaction
ATTACHMENT NO.1
RISK ASSESSMENT
Page 22 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
MOFARREH
NEOM ALHARBI &
PARTNERS
MS for Excavation,
Document Type: Document No.:
Backfill and Compaction
Page 23 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
JOB HAZARD ANALYSIS WORKSHEET
JHA Preparation Team: Responsible Implementation Team: Evacuation/Muster point: As Per Individual Sites
1 Arslan Adrees 1 Site Engineer
2 M.Adel Rageh 2 - Supervisor Tools and or Equipment required:
3- 3 -Safety Officer Excavators, Truck & Trailer, Mandatory PPE, Job
4- 4- specific PPE
5- 5-
6- 6-
7- 7- JHA No: MAH-JHA-02
RISK RESIDUAL ACTION
Job Steps HAZARDS IDENTIFIED CONTROL METHOD
RATING RISK BY/RECORD
STEP 1. 10 - Full use of PPE to include Hi-Viz 4 Site
- Live Traffic vest. Engineer/S
- Equipment at site - Construction Equipment H - All equipment shall be inspected L upervisor/S
afety
prior to use at site. Officer
- Be aware of the traffic routes inside
the work site and make eye contact
with any construction equipment.
- Equipment operators shall have
valid Saudi license and TUV.
- Flag Man shall be provided if
machines are working near workers.
Page 24 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
- Equipment’s shall have audible
reverse alarm, beacon light.
STEP 2. - Unqualified Workers 12 - Edge protection will be in place for 4 Site
- Excavation - Damaged to existing Facilities. all excavations regardless of depth Engineer/S
H to ensure a safe distance is L upervisor/S
- Equipment Break down.
afety
- Traffic Accident maintained by personnel, plant and Officer
- Caught in between equipment’s / Run equipment as well as ensuring
over by vehicle or equipment. materials are not stored near the
- Un protected Excavations. edge.
- Excavation collapses due to - Concrete barriers will be provided
equipment movement and vibration. for all excavation Edges,
- Limited access/egress Equipment's will be kept away 2
- Equipment roll over due to un even feet (0.61 meters) from the edge of
ground. the excavation.
- Emergency rescue operation - Excavation depth will be as per the
- Hazardous atmosphere. design (IFC Drawings) Side slope
and slope protection will be
provided.
- Workers should have proper
training and undergo orientation /
Worker should have valid certificate
and licenses / New workers should
undergo orientation and will be
under full supervision of the
foreman.
- Before any excavation Pre-Job
survey to be done to identify any
existing utilities in the area.
- If any existing utilities are in the
area, the stake holders to be
informed and permission shall be
taken for work to be carried out.
- Prior to any excavation Permit to
break ground shall be required from
EPM /Neom.
- Once clear to excavate all
excavation activities shall be
Page 25 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
controlled by MAH Permit System.
Site engineer to issue permit to
excavate with all control measure.
Safety to ensure that permit
requirements are met.
- Site engineer shall communicate
utilities status to all working team.
- All operators shall have valid TUV.
Page 26 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
- All equipment shall be Third party
certified.
- Workers are briefed regarding
emergency procedures in case of
any incident/accident.
- Train Flag man to be provided
where machines are working close
to workers.
- In case where workers and
machines are working next to each
other, physical hard barriers shall
be provided between workers and
machines.
- All excavations shall be done as per
approved drawings. Appropriate
techniques to be used to protect
excavations from collapsing e.g.,
benching, shoring etc.
- All excavations shall be protected
with physical barriers and log to be
maintained.
- No equipment shall enter any
excavation of more than 1.2m.
- If it is required to send any
equipment in an excavation, site
engineer shall inform safety team
prior to activity start.
- for equipment’s to go in excavation
clear access/ egress shall be
maintained.
- Soil compatibility shall be checked.
- Appropriate shoring or benching
control measures are in place to
prevent cave in risk.
Page 27 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
- Atmosphere shall be checked for
any hazardous gases.
- Area is well lit.
- Ground shall be assessed by
engineer and safe sloping shall be
provided for equipment to move in
and out.
- Ground shall be even and stable.
- Watchman shall be assigned to
assist and help the operator.
- Hazards and control measures shall
be communicated with operators
via Task briefing.
- Operators are trained regarding
emergency response process.
- Rescue equipment’s i.e., tripod,
crane, man basket etc.
- no equipment can go inside an
excavation without these
requirements.
STEP 3. - Hit by moving equipment. - Task briefing shall be conducted
- Back Filling/Compaction - Vehicle Collusion. prior to activity and all hazards to
- Un qualified operators. be communicated with operators
- Dust due to backfilling. and workers involved in activity.
- Equipment Roll over - All equipment shall have a
designated access route.
- Pedestrian access shall be
established with physical barriers.
- Flag man shall be assigned to
control the equipment movement.
- All equipment shall be inspected
prior to activity and third party
certified.
Page 28 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
- Equipment shall have audible
reverse alarm, beacon light visible
to all workers in the area.
- Operators are not allowed to use
phones while operation the
equipment.
- All operators shall have valid Third-
party certificate.
- Water tankers shall be used when
loading/offloading muck away
material to control dust.
- Dust mask shall be given to workers
working near back filling /
compaction areas.
- Equipment shall be switched off
and emergency brakes applied
when parked.
- All equipment shall have roll over
protection.
- Equipment shall be parked on level
ground away from any excavation.
- Rescue equipment. Where
hazardous atmospheres exist or
may reasonably be expected to
exist, emergency rescue
equipment will be on the worksite
and readily accessible to rescue
personnel.
- In the event of any emergency
situation requiring rescue from an
excavation, workers will not
attempt to enter an unprotected
excavation to perform rescue.
Local emergency services will be
notified using the standard
reporting system.
Page 29 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
STEP 4. - Could suffer from back pain and work-related 12 - Task Briefing shall be given to all 4 Site
- Manual Handling upper body disorder (WRULD) due to: workers to start of activity and Engineer/S
H L upervisor/S
- Using incorrect handling techniques when hazards communicated.
afety
cleaning at site) - All workers shall go site safety Officer
- Poor body position when working at site induction prior to mobilize at site.
- Labor involve in cleaning activities
resulting in poor posture.
shall be briefed regarding safe
- Individuals with health conditions, previous lifting techniques.
back injuries etc. affecting ability to safely - Individuals with back pain and other
handle items. injuries shall not be allowed to
work.
- Workers shall be provided with
Mandatory and task related PPE.
Page 30 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
STEP 5. 12 - Night work hazards to be 4 Site
- Extended Works / Night - Adequate Working environment e.g., communicated before darkness. Engineer/S
Works Light H - Night work notification shall be L upervisor/S
afety
issued and Bechtel approval to be Officer
taken prior to work.
- Adequate light shall be available at
work area as well as pathways, exit
entry points.
- Emergency arrangements shall be
available at site e.g., nurse,
ambulance.
- Safety officer shall be available at
site.
-
HAZARDS WHICH ARE NOT TASK SPECIFIC
- Damage to surrounding property from 12 - Provide water coolers for the 3 Site
- Conditional Risks - Sand flying materials. workforce. Engineer/S
Storm. H - Provide waste bin and toilet pods L upervisor/S
afety
- Heat Stress - Dust and particles entering employees’ - Provide sufficient sheltered areas Officer
eyes with enclosed sides for all
employees.
- Actively monitor the local weather
conditions
- Cease work during the storm.
- Prepare for high winds by securing
loose materials.
- All workers are to take shelter
during extreme weather.
- All workers are to wear safety
glasses (Mandatory PPE).
- Worker Injury. 8 - Emergency procedure & locations 3 Site
- Emergency Response of first aid kits clearly Engineer/S
- Fire on site. M communicated. L upervisor/S
afety
- Clearly communicated & defined Officer
muster points.
Page 31 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
- Address and directions to nearest
Hospital shall be communicated
with whole survey team.
- Project emergency number
distributed to all employees.
PROBABILITY TEST
PROBABILITY LEVEL
PROBABILIITY DEFINITION
1 Practically Never Occurs Consequence unheard of or not known to have occurred on MAH projects or in the EPC industry
2 Not likely to Occur Consequence rarely occurs on MAH projects or in the EPC industry
3 Could Occur Consequence may have occurred on MAH and could occur again
4 Known to Occur Consequence has occurred more than once on MAH and will likely occur again
5 Occurs Frequently Consequence has occurred multiple times on MAH projects and will very likely occur again
Page 32 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
1 – Practically Never Occurs 2 – Not Likely to occur 3 – Could Occur 4 – Known to Occur 5 – Occurs Frequently
1 - Slight 1 - LOW 2 - LOW 3 - LOW 4 - LOW 5 - MEDIUM
Traffic Management Segment Installation Public Safety Mobile plant movement Lifting Activity
Hearing Protection Tripod Scaffold Power Hand Tools Do not Use tag Confined Space
Page 33 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
Do not Enter High Pressure /
SCBA Retractable Life line Fire Extinguisher Scissor Lift
signage Abrasive Blasting
Suspended
Compressor Unauthorised Keep
Airline Restraint Line Personnel
machine away
Platform
Vibratory Pile Tunnel Boring Hazardous
Hammer machine Substances
SKILLS/COMPETENCIES/AUTHORISATIONS
“Check ”
EWP boom <11m Operator Crane Signaller / Banksman Rigger I Demolisher
EWP boom > 11m Tunnel Boring machine Excavator Rigger II Asbestos removalist
Scissor Lift Articulate Boom Platform Front End Loader Rigger III Light Vehicle
Concrete Placing Boom Working inside manhole Backhoe Dogger Heavy Rigid
Other Comments:
This JHA (MAH-JHA03) Excavation work has been developed to be applicable to all activities involving ‘across the project.
Page 34 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
JHA SIGN OFF REGISTER
JOB DESCRIPTION: Excavation Works JHA No: MAH JHA 03
I have read and understood this JHA
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
Page 35 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
MOFARREH
NEOM ALHARBI &
PARTNERS
MS for Excavation, 10-603128-0000100201-MAH-
Document Type: Document No.: CIV-MST-000003
Backfill and Compaction
ATTACHMENT NO.2
SUPPLEMENTARY FILES
Page 16 of 26 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-CIV-MST-000003_01
SPINE EARTHWORKS LOT 8B (WO # 57)
Contractor: Date:
Contract No:
Location:
Sl CHECKS Competent
N Person
Initials
o (Yes= Y No=N Not Applicable = N/A)
1 All open trenches were inspected
Surcharge was located proper distance from top of the slope?
2
(1.8 m or depth of excavation, whichever is greater)
3 Were any tension cracks observed along top of any slopes?
4 Were slopes cut at proper angle of repose?
5 Was any water seepage noted in trench walls or bottom?
6 Was bracing system installed in accordance with design?
7 Was there any evidence of cave-in of soil since last inspection?
8 Are there any unusual weak soils not anticipated?
9 Is there any evidence of significant fracture in soil?
10 Are there any noted dramatic dips or voids?
11 Were all short-term trenches covered within 24 hours?
12 Have any RC Prohibition / Improvement Notices been issued?
13 Have all protective systems been certified?
14 Are all hydraulic shores pumped to design pressure?
15 Is the shoring system secure?
16 Was Method Statement adequate?
Is traffic adequately away from the excavation / trench with barricades
17
in place? (6 ft. / 1.8 m for pedestrians)
18 Are there any other hazards in the area?
19 Are there excessive vibrations from equipment / traffic?
20 Access/egress within 25 ft. / 7.5 m of all workers?
21 List construction plant in use:
22 Observations:
I hereby attest that the above conditions existed and were checked and reviewed during the inspection.
Competent Person Name:
Supervisor Signature:
10-603128-0000100201-MAH-CIV-MST-000003_03
6/2/22, 10:25 AM Aconex
Cc
(2) NEOM ETSD Document Control - NEOM - Engineering & Technical Services Dept (+1 more...)
Status N/A
DOCUMENT ATTACHMENTS
(2)
(0 selected)
Revision
File Document No Revision Title Status
Date
MESSAGE
Workflow Note
https://ksa1.aconex.com/Logon?Action=View&ENTITY=MAIL&ID=1353638200&USERID=1342246452 1/2
10-603128-0000100201-MAH-CIV-MST-000003_03
6/2/22, 10:25 AM Aconex
WO 057 - Spine Earthworks Lot 8B - (CH58+200 - CH65+500) (Coastal Desert West Region) - MAH - H&S Training Matrix
https://ksa1.aconex.com/Logon?Action=View&ENTITY=MAIL&ID=1353638200&USERID=1342246452 2/2
10-603128-0000100201-MAH-CIV-MST-000003_03
NEOM - 10 SPINE INFRASTRUCTURE
Work Order Title Spine Earthworks Lot 8B CH 58+200 to CH 65+500 (Coastal Desert
West Region)
Revision No. 01
Page 1 of 6 10-603128-0000100201-MAH-CIV-MST-000003_03
10-603128-0000100201-MAH-HSE-PLN-000005_01
WO 057 - Spine Earthworks Lot 8B -
(CH58+200 - CH65+500) (Coastal Desert
West Region) - H&S Training Matrix
10-603128-0000100201-MAH-CIV-MST-000003_03
Document History
10-603128-0000100201-MAH-CIV-MST-000003_03
Mofarreh Al Harbi (MAH)
H&S Training Matrix
Training Required for particular designation marked with green shade in each training
Emergency Preparedness
Environmental Training
Supervisor Orientation
Change Management
Power Tools Training
BLASTING SAFETY
Temporary Works
Defensive driving
Burried services
Electrical Safety
Work at height
H&S Induction
Training Conducted
Night works
Department Designation Training Topics
Project Director
Project Manager
Electrical Manager
Logistics Manager
Electrical Engineer
Mechanical Engineer
Civil / Structural Engineer
Project Engineer
Survey Engineer
Logistics Engineer
Planning Engineer
Regional H&S Manager
Project H&S Manager
Project H&S Engineer
H&S Officer
H&S Team
H&S Inspector
Fire Warden
Site Nurse
Ambulance Driver
QA/QC Inspector
Surveyor
Time Keeper
Store Keeper
Procurement Officer
Site Staff
Accounts Officer
HSE-CF-99-R0
10-603128-0000100201-MAH-CIV-MST-000003_03
Mofarreh Al Harbi (MAH)
H&S Training Matrix
Training Required for particular designation marked with green shade in each training
Emergency Preparedness
Environmental Training
Supervisor Orientation
Change Management
Power Tools Training
BLASTING SAFETY
Temporary Works
Defensive driving
Burried services
Electrical Safety
Work at height
H&S Induction
Training Conducted
Night works
Site Staff
Document Controller
Designation Training Topics
Draft Man
Purchaser
Office Boy
General Foreman
Civil Foreman
Electrical Foreman
Mechanical Foreman
Mechanics Foreman
Site Foreman
HVAC Foreman
Plumbing Foreman
Welding Foreman
Rebar Bending Foreman
Excavator Operator
JCB Operator
Skid Loader Operator
Forklift Operator
Boom Truck Operator
Drivers HTV
Drivers
Driver LTV
Electrician
HSE-CF-99-R0
10-603128-0000100201-MAH-CIV-MST-000003_03
Mofarreh Al Harbi (MAH)
H&S Training Matrix
Training Required for particular designation marked with green shade in each training
Emergency Preparedness
Environmental Training
Supervisor Orientation
Change Management
Power Tools Training
BLASTING SAFETY
Temporary Works
Defensive driving
Burried services
Electrical Safety
Work at height
H&S Induction
Training Conducted
Night works
Welder
Designation Training Topics
Steel Fixer
Carpenter
Mason
Mechanic
Pipe Fitter
Plumber
Painter
Site Workers
Duct Fitter
Gas Cutter
Helper
Scaffolder
Rigger
Banksman
Security Guard
Cleaner
Lifting Supervisor
Camp Boss
Others
Visitor
HSE-CF-99-R0
10-603128-0000100201-MAH-CIV-MST-000003_03
Project Name : S. N :
Date : Plate Number :
AL HARBI Contractor Hired
Safe Unsafe
Inspected By :
Signature :
10-603128-0000100201-MAH-CIV-MST-000003_03
Project Name : S.N :
Date : Plate Number :
AL HARBI Contractor Hired
Safe Unsafe
Inspected By :
Signature :
10-603128-0000100201-MAH-CIV-MST-000003_03
Project Name : S.N :
Date : Plate Number :
AL HARBI Contractor Hired
Safe Unsafe
Inspected By :
Signature :
10-603128-0000100201-MAH-CIV-MST-000003_03
Project Name : S.N :
Date : Plate Number :
AL HARBI Contractor Hired
Safe Unsafe
Inspected By :
Signature :
10-603128-0000100201-MAH-CIV-MST-000003_03
Project Name : S.N :
Date : Plate Number :
AL HARBI Contractor Hired
Safe Unsafe
Inspected By :
Signature :
10-603128-0000100201-MAH-CIV-MST-000003_03
Project Name : S.N :
Date : Plate Number :
AL HARBI Contractor Hired
Safe Unsafe
Inspected By :
Signature :
10-603128-0000100201-MAH-CIV-MST-000003_03
Project Name : S.N :
Date : Plate Number :
AL HARBI Contractor Hired
Safe Unsafe
Inspected By :
Signature :
10-603128-0000100201-MAH-CIV-MST-000003_03
Project Name : S. N :
Date : Plate Number :
MOBCO Contractor Hired
Safe Unsafe
Inspected By :
Signature :
10-603128-0000100201-MAH-CIV-MST-000003_03
Project Name : S.N :
Date : Plate Number :
AL HARBI Contractor Hired
Safe Unsafe
Inspected By :
Signature :
10-603128-0000100201-MAH-CIV-MST-000003_03
Project Name : S.N :
Date : Plate Number :
AL HARBI Contractor Hired
Safe Unsafe
Inspected By :
Signature :
10-603128-0000100201-MAH-CIV-MST-000003_03
Project Name : S.N :
Date : Plate Number :
AL HARBI Contractor Hired
Safe Unsafe
Inspected By :
Signature :
10-603128-0000100201-MAH-CIV-MST-000003_03
Project Name : S.N :
Date : Plate Number :
AL HARBI Contractor Hired
Safe Unsafe
Inspected By :
Signature :
10-603128-0000100201-MAH-CIV-MST-000003_03
Project Name : S.N :
Date : Plate Number :
AL HARBI Contractor Hired
Safe Unsafe
Inspected By :
Signature :
10-603128-0000100201-MAH-CIV-MST-000003_03
Project Name : S.N :
Date : Plate Number :
AL HARBI Contractor Hired
Safe Unsafe
Inspected By :
Signature :
10-603128-0000100201-MAH-CIV-MST-000003_03
Project Name : S.N :
Date : Plate Number :
AL HARBI Contractor Hired
Safe Unsafe
Inspected By :
Signature :
10-603128-0000100201-MAH-CIV-MST-000003_03
Project Name : S.N :
Date : Plate Number :
AL HARBI Contractor Hired
Safe Unsafe
Inspected By :
Signature :
10-603128-0000100201-MAH-CIV-MST-000003_03