PROJECT HANDOVER FORM

Project: Schools Group 33 and 34 ESCO: Green Solutions for Energy ( Eia Energy )
Project Reference No: RFP2022041 and 202242 Beneficiary Entity: MOE
Project ID#: Date:20/03/2023
Number of ESMs: 2
DESCRIPTION:
Project handover documents checklist
PROJECT LOCATION:

ATTACHMENTS:
Please check the box for completed items
Availability
Description N/A Remarks
Yes No
Post installation M&V Report
Final R&R Submitted
ESPC
Training Forms
Equipment Labelling Log Sheet (Asset List and Code)
Material Specifications & Data Sheets Submitted
Spare parts / Consumables list
Bill of Quantities Submitted
As-Built documents Submitted
Installation Method Statement Submitted
Standard Operating Procedure
Maintenance Checklist Template (for each ESM)
Submission of Lighting Stock to Entity Submitted
HSE manual Submitted
Entity Approvals (Material Submittal Approvals, Work Permits, Other
Submitted
Handover Documentation)
Risk Assessment (Execution + O&M) Submitted
SOW Variation Report Submitted
Performance Bond validity Submitted
Testing and Commissioning Report(s)
Snag list clearance report
Maintenance Requirements/Inspection Plans/PPMs (Yearly)
Standard Operating Procedure (bilingual)
O&M and M&V team contact info (residents in KSA with valid SCE License) Submitted
BMS User Manual
Remote login details – BMS Computer
ESCO
NAME Hamza Khan Hamza Khan
DESIGNATION PM O&M
SIGNATURE
DATE
TARSHID
NAME
DESIGNATION SPM STC O&M PM Director
SIGNATURE
DATE
Disclaimer for Defect Correction Period
By signing this letter (Al Abdulkarim Holding Company) acknowledges and undertakes that it will promptly response to Procurer’s (Tarshid) instruction for correction of any defects during the Defect Correction Period (18 Months), or as extended
according to the actual need to correct the defects. In the event of failure to respond to an instruction to correct any defect or (Al Abdulkarim Holding Company) refuses to correct a defect, the Procurer (Tarshid) reserves the right to hire other
contractor/s to make the correction, and ESCO shall be liable to compensate any damage arising out of the delay of correction even if it is not responsible for the defect.

ITCC Complex (Building No. IT02), 6764 Nakhil District Riyadh 12382, P.O. Box 240089, Riyadh 11322, Kingdom of Saudi Arabia,
Website: Tarshid.com.sa, Info@tarshid.com.sa

You might also like