Professional Documents
Culture Documents
9 - Electrical System NH 2023 - VF
9 - Electrical System NH 2023 - VF
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
MODUL 9
ELECTRICAL SYSTEM
Disampaikan oleh:
Ir. Nana Heryana, S.T.,M.T., IPM., ACPE, ASEAN Eng.
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
03 07
Electrical Safety Single Line Diagram
& Electrical System
Protection
01 04 08 11
Introduction to Electrical Electrical Introduction to
Electrical System .
Installation Grounding System Residual Life Assessment
of Electrical System
02 05 09 12
Reference, Basic of Electrical Introduction to Lightning Discussion & Case Study
Standards & Codes Power System Protection System of Electrical System
06 10
Basic of Electrical Inspection of
Calculation Electrical Installation
1
3/2/2023
BIMBINGAN TEKNIS
KPDM INTRODUCTION TO ELECTRICAL
Reference , Standards SYSTEM
& Codes INSPEKTUR INSTALASI MIGAS
.
BIMBINGAN TEKNIS
KPDM REFERENCE
Reference, STANDARDS
, Standards&&CODES
Codes(1) INSPEKTUR INSTALASI MIGAS
.
4
nanaheryana© 2023
2
3/2/2023
BIMBINGAN TEKNIS
KPDM REFERENCE
Reference, STANDARDS
, Standards&&CODES
Codes(2) INSPEKTUR INSTALASI MIGAS
.
REFERENCE STD. NUMBER/ YEAR DESCRIPTION
The National Fire Protection NFPA®70/ 2020 National Electrical Code® (NEC) is the benchmark for safe
Association (NFPA) electrical design, installation, and inspection to protect people
and property from electrical hazards.
NFPA®78 / 2020 Guide on Electrical Inspection
ANSI/NETA ANSI/NETA ECS-2015 STANDARD FOR ELECTRICAL COMMISSIONING
ANSI (American National Standards SPECIFICATIONS for Electrical Power Equipment and Systems
Institute) ANSI/NETA ATS-2017 STANDARD FOR ACCEPTANCE TESTING SPECIFICATIONS for
NETA, the InterNational Electrical Electrical Power Equipment and Systems
Testing Association
ANSI/NETA MTS-2019 STANDARD FOR MAINTENANCE TESTING SPECIFICATIONS for
Electrical Power Equipment and Systems
The Institute of Electrical and ANSI/ IEEE C57.12.00-2015 IEEE Standard for General Requirements for Liquid Immersed
Electronics Engineers (IEEE) Distribution, Power, and Regulating Transformers
IEEE C37.20.2-2015 IEEE Standard for Metal-Clad Switchgear.
The National Electrical Manufacturers ANSI/NEMA MG 1-2016 Motors and Generators
Association (NEMA)
ANSI/IEEE C50.10-2019 IEEE Standard Test Procedure for Synchronous Machines Part I–
Acceptance and Performance Testing
ANSI/IEEE 587-2019 Recommended Practice for Installation and Maintenance of Lead-
Acid Batteries for Photovoltaic (PV) Systems
5
nanaheryana© 2023
BIMBINGAN TEKNIS
KPDM REFERENCE
Reference, STANDARDS
, Standards&&CODES
Codes(3) INSPEKTUR INSTALASI MIGAS
.
Underwriters Laboratories (UL) IEC 620401:2017+AMD1:2021+AM Uninterruptible power systems (UPS) - Part 1: Safety
D2:2022 CSV requirements
IEC 60502-1:2021 RLV Power cables with extruded insulation and their accessories for
International Electrotechnical rated voltages from 1 kV (Um = 1,2 kV) up to 30 kV (Um = 36 kV)
Commission (IEC) - Part 1: Cables for rated voltages of 1 kV (Um = 1,2 kV) and 3 kV
(Um = 3,6 kV)
IEC 61439-1:2020 RLV Low-voltage switchgear and controlgear assemblies - Part 1:
General rules
6
nanaheryana© 2023
3
3/2/2023
BIMBINGAN TEKNIS
KPDM REFERENCE , STANDARDS & CODES (4) INSPEKTUR INSTALASI MIGAS
BIMBINGAN TEKNIS
KPDM REFERENCE
Reference, STANDARDS
, Standards&&CODES
Codes(5) INSPEKTUR INSTALASI MIGAS
.
Surge Protection
Lightning Protection /
Earthing
Safety Equipment
DEHN protects.
IEC 62305 -
INTERNATIONAL
STANDARD;
Lightning protection
standard
8
nanaheryana© 2023
4
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. ELECTRICAL SAFETY
Banyak kejadian kecelakaan kerja yang menyebabkan kematian (fatality) di tempat kerja
Kesalahan Pekerja
Kegagalan Peralatan
nanaheryana© 2023 9
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. BAHAYA LISTRIK: FATALITY EXAMPLE
nanaheryana© 2023 10
5
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. SAFETY FIRST & ALWAYS
Listrik Berbahaya
nanaheryana© 2023 11
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. SAFETY FIRST & ALWAYS (1)
i
V R
nanaheryana© 2023 12
6
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. SAFETY FIRST & ALWAYS (2)
V R
nanaheryana© 2023 13
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. SAFETY FIRST & ALWAYS (3)
i
V R
nanaheryana© 2023 14
7
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. # IMPORTANT ANNOUNCEMENTS #
nanaheryana© 2023 15
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. TERMINOLOGI DAN BESARAN LISTRIK
nanaheryana© 2023 16
8
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. VOLTAGE KILLS
1 mA-Terasa
10 mA-shock
nanaheryana© 2023 17
BIMBINGAN TEKNIS
KPDM ELECTRICAL CURRENT EFFECTS ON THE HUMAN BODY (3)
INSPEKTUR INSTALASI MIGAS
.
nanaheryana© 2023 18
9
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
.
ELECTRICAL CURRENT EFFECTS ON THE HUMAN BODY (4)
2 • Besar Arus
4
• Tahanan tubuh
Orang biasanya tidak terkena sengatan listrik oleh arus fase atau fase-ke-
netral, hampir semua kecelakaan adalah fase-ke-bumi.
nanaheryana© 2023 19
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. RESISTANSI TUBUH MANUSIA
Kering:
100.000 – 600.000 Ω
Basah: 1.000 Ω
Tangan-kaki:
400 – 600 Ω
nanaheryana© 2023 20
10
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. CARA AMAN MENGHINDARI BAHAYA LISTRIK (1)
V R
nanaheryana© 2023 21
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. CARA AMAN MENGHINDARI BAHAYA LISTRIK (2)
nanaheryana© 2023 22
11
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. CARA AMAN MENGHINDARI BAHAYA LISTRIK (3)
• Sepatu
nanaheryana© 2023 23
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. CARA AMAN MENGHINDARI BAHAYA LISTRIK (4)
Tahanan sepatu
Tahanan tubuh
V
=
+ +
nanaheryana© 2023 24
12
3/2/2023
BIMBINGAN TEKNIS
KPDM SAFE PRACTICES (1) INSPEKTUR INSTALASI MIGAS
.
Kawat Fasa
• Untuk keamanan
umumnya semua
rangkaian listrik
Sumber BEBAN dirancang memakai
Listrik saklar pemutus sumber
tegangan dengan beban.
Kawat Netral
Ground
Sumber BEBAN
Listrik
© nanaheryana2023 25
BIMBINGAN TEKNIS
KPDM SAFE PRACTICES (2) INSPEKTUR INSTALASI MIGAS
.
Sumber
Listrik
Sumber BEBAN
Listrik
© nanaheryana2023 26
13
3/2/2023
BIMBINGAN TEKNIS
KPDM SAFE PRACTICES (3) INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 27
BIMBINGAN TEKNIS
KPDM Principles of core balance protection INSPEKTUR INSTALASI MIGAS
.
earth leakage circuit breakers (ELCB) / residual The ELCBs are available with sensitivity of 30 mA, 100
mA and 300 mA. For human protection, 30 mA ELCBs
current circuit breakers (RCCB) is recommended, since currents flowing above 30 mA
in a human can cause serious damage including death.
© nanaheryana2023 28
14
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. # AVOIDKECELAKAAN
PENYEBAB ACCIDENTS #
Sumber Energi tidak Diputus/ Dimatikan
nanaheryana© 2023 29
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. BAHAYA LISTRIK: ELECTRICITY – LIVE OR STORED (1)
nanaheryana© 2023 30
15
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. BAHAYA LISTRIK: ELECTRICITY – LIVE OR STORED (2)
Batere
Battery
Penyimpan
(stored)
Energi Listrik
Kapasitor Electrical
Penyimpan capacitors
Energi (stored)
Electrical
Induktor
Inductors
(stored) Penyimpan Energi
nanaheryana© 2023 31
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Fatality accident study
Biro Statistik Tenaga Kerja USA
Pada cedera yang berhubungan dengan servis peralatan, 80% dari pekerja yang
disurvei gagal dalam mematikan peralatan sebelum melakukan pekerjaan
perawatatan.
Gagal mematikan mesin
Tidak Ada
Label
80% Peringatan
20%
Tidak Ada
Penguncian
Statistik menunjukkan bahwa dari 20% dari para pekerja yang mematikan mesin,
sekitar setengah dari mereka terluka ketika orang lain tanpa sengaja mengaktifkan
mesin.
Bureau of Labor Statistics
nanaheryana© 2023 32
16
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Hazardous Energy Source Examples
Penyimpan
Springs
energy mekanis
nanaheryana© 2023 33
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Fakta Kecelakaan
Sudah
dimatikan Bagian Mesin yang
Masih berputar: shaft
ada Rotor/Generator
Energi
nanaheryana© 2023 34
17
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. JARAK BERBAHAYA UNTUK TEGANGAN TINGGI
nanaheryana© 2023 35
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
.
Lockout –Tagout
nanaheryana© 2023 36
18
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Personil yang harus mengaplikasikan LOTO
nanaheryana© 2023 37
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. LOTO Procedures
nanaheryana© 2023 38
19
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. # avoid accidents #
nanaheryana© 2023 39
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. INSTALASI KETENAGALISTRIKAN
INSTALASI
PENYEDIAAN
TENAGA LISTRIK a. Instalasi pembangkit tenaga listrik
b. Instalasi transmisi tenaga listrik
c. Instalasi distribusi tenaga listrik
INSTALASI
PEMANFAATAN
TENAGA LISTRIK a. Instalasi konsumen tegangan tinggi
b. Instalasi konsumen tegangan menengah
c. Instalasi konsumen tegangan rendah
nanaheryana© 2023 40
20
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. INSTALASI PEMBANGKIT BESAR TERKONEKSI GRID 150-500 kV
nanaheryana© 2023 41
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. INSTALASI TRANSMISI
nanaheryana© 2023 42
21
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. INSTALASI DISTRIBUSI
nanaheryana© 2023 43
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. VOLTAGE LEVELS (1)
Level Tegangan I II
nanaheryana© 2023 44
22
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. VOLTAGE LEVELS (2)
nanaheryana© 2023 45
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. VOLTAGE LEVELS (3)
nanaheryana© 2023 46
23
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. TEGANGAN DAN FREKUENSI STANDAR
nanaheryana© 2023 47
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. LISTRIK ARUS BOLAK BALIK
nanaheryana© 2023 48
24
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Single-Phase System
Z=R+jX
nanaheryana© 2023 49
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Single-Phase System
Z=R+j0
nanaheryana© 2023 50
25
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Single-Phase System
Z=R+jXL
lagging
nanaheryana© 2023 51
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Single-Phase System
Z=R+jXC
leading
CAPACITOR BANK
nanaheryana© 2023 52
26
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Daya Listrik DC
watt (W)
nanaheryana© 2023 53
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Single-Phase System
Resistif
p
v Daya : perkalian tegangan dan arus setiap saat
i
nanaheryana© 2023 54
27
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Single-Phase System
BEBAN MOTOR (R-L)
p
v Daya : perkalian tegangan dan arus setiap saat
i
nanaheryana© 2023 55
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Single-Phase System
BEBAN KAPASITIF
p
v Daya : perkalian tegangan dan arus setiap saat
i
nanaheryana© 2023 56
28
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Daya Listrik AC
Pada kasus sistem AC dimana tegangan dan arus berbentuk sinusoidal, perkalian antara keduanya
akan menghasilkan daya tampak (apparent power), satuan volt-ampere (VA)) yang memiliki dua
buah bagian.
Bagian pertama adalah daya yang termanfaatkan oleh konsumen, bisa menjadi gerakan pada
motor, bisa menjadi panas pada elemen pemanas, dsb; daya yang termanfaatkan ini sering
disebut sebagai daya aktif (real power) memiliki satuan watt (W) yang mengalir dari sisi sumber ke
sisi beban bernilai rata-rata tidak nol.
Bagian kedua adalah daya yang tidak termanfaatkan oleh konsumen, namun hanya ada di
jaringan, daya ini sering disebut dengan daya reaktif (reactive power) memiliki satuan volt-
ampere-reactive (VAR) bernilai rata-rata nol.
Beban bersifat resistif hanya mengonsumsi daya aktif; beban bersifat induktif hanya mengonsumsi
daya reaktif; dan beban bersifat kapasitif hanya memberikan daya reaktif.
nanaheryana© 2023 57
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Daya Listrik Arus Bolak Balik Satu Fasa
S = VI
P = V I cos
Q= V I sin
nanaheryana© 2023 58
29
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Active, Reactive & Apparent Power
P S = VI
P = V I cos
Q= V I sin
nanaheryana© 2023 59
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Daya Listrik AC
S
Q
P
nanaheryana© 2023 60
30
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. DAYA LISTRIK AC
CONTOH SEDERHANA
nanaheryana© 2023 61
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Contoh Kasus: Memahami Faktor Daya
nanaheryana© 2023 62
31
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Three-Phase System
nanaheryana© 2023 63
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Three-Phase Systems
nanaheryana© 2023 64
32
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Daya Listrik Arus Bolak Balik Tiga Fasa
S= 3
P= 3 cos
Q= 3 sin
nanaheryana© 2023 65
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. LISTRIK TIGA-FASA
3,8 CM
2,2 CM
DARIMANA 3
1200
1200 R
N 2,2 CM
1200
T
= 3 .I
nanaheryana© 2023 66
33
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. LISTRIK TIGA-FASA 4 KAWAT- (PERUMAHAN)
Di tiang listrik dari gardu distribusi ada 4 kawat fasa R,S,T dan N Netral
Tegangan antar fasa (R-S, S-T dan R-T = 380 Volt)
Teganga Fasa Netral yang ke pelanggan satu fasa menggunakan 2 kawat, R-N
atau S-N atau T-N dengan tegangan 220 V
nanaheryana© 2023 67
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. LISTRIK TIGA-FASA LAPANGAN MIGAS
nanaheryana© 2023 68
34
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Three-Phase System
nanaheryana© 2023 69
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Harmonic in Low
THREE Voltage
PHASE POWERPower System (3)
SYSTEM
nanaheryana© 2023 70
35
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. STUDI KASUS PERHITUNGAN DAYA SISTEM TIGA-FASA (1)
= 3
nanaheryana© 2023 71
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. STUDI KASUS PERHITUNGAN DAYA SISTEM TIGA-FASA (2)
2500
= = = 104,7
3 1,73 13,8
2500
= = = 347
3 1,73 4,16
nanaheryana© 2023 72
36
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. STUDI KASUS PERHITUNGAN DAYA SISTEM TIGA-FASA (3)
30 HP
nanaheryana© 2023 73
BIMBINGAN TEKNIS
KPDM TYPICAL INDUSTRIAL POWER DISTRIBUTION INSPEKTUR INSTALASI MIGAS
.
37
3/2/2023
BIMBINGAN TEKNIS
KPDM INTRODUCTION TO SINGLE-LINE DIAGRAMS INSPEKTUR INSTALASI MIGAS
.
• Diagram satu garis (one line diagram) sering juga disebut dengan single line
diagram.
• Instalasi tenaga listrik arus bolak-balik AC, umumnya menggunakan saluran
tiga fasa.
• Instalasi tersebut menyalurkan tenaga listrik dari pusat-pusat listrik ke pusat-
pusat beban yang akan membentuk suatu jaringan yang komplek dan rumit.
• The single line diagram shows the overall strategy for system operation.
Duplication of a 3-wire system is reduced by showing single devices on a single
wire.
• One line diagram membuat sistem istalasi yang rumit menjadi lebih sederhana
© nanaheryana2023 75
BIMBINGAN TEKNIS
KPDM Electrical circuit symbols to DIN EN, NEMA ICS/ANSI/IEEE/CSA INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 76
38
3/2/2023
BIMBINGAN TEKNIS
KPDM Electrical circuit symbols to DIN EN, NEMA ICS/ANSI/IEEE/CSA INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 77
BIMBINGAN TEKNIS
KPDM Electrical circuit symbols to DIN EN, NEMA ICS/ANSI/IEEE/CSA INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 78
39
3/2/2023
BIMBINGAN TEKNIS
KPDM Electrical circuit symbols to DIN EN, NEMA ICS/ANSI/IEEE/CSA INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 79
BIMBINGAN TEKNIS
KPDM Electrical circuit symbols to DIN EN, NEMA ICS/ANSI/IEEE/CSA INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 80
40
3/2/2023
BIMBINGAN TEKNIS
KPDM One Line Diagram & Three Line Diagram
pada Instalasi Penyediaan Tenaga Listrik - Pembangkit Listrik
INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 81
BIMBINGAN TEKNIS
KPDM ONE-LINE DIAGRAMS (1) INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 82
41
3/2/2023
BIMBINGAN TEKNIS
KPDM ONE LINE DIAGRAM (2) INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 83
BIMBINGAN TEKNIS
KPDM ONE-LINE DIAGRAMS (3) INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 84
42
3/2/2023
BIMBINGAN TEKNIS
KPDM ONE LINE DIAGRAM- PLN & GENSET INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 85
BIMBINGAN TEKNIS
KPDM One Line Diagram (Simulasi? Studi Kasus) INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 86
43
3/2/2023
BIMBINGAN TEKNIS
KPDM ONE LINE DIAGRAM PADA PANEL PEMANFAATAN ENERGI LISTRIK INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 87
BIMBINGAN TEKNIS
KPDM THREE LINE DIAGRAM PADA INSTALASI MOTOR LISTRIK
(PADA INSTALASI PEMANFAATAN LISTRIK) INSPEKTUR INSTALASI MIGAS
.
Circuit
Breaker
TOR
Contactor
© nanaheryana2023 88
44
3/2/2023
BIMBINGAN TEKNIS
KPDM ONE LINE DIAGRAM PADA INSTALASI INSTALASI PMOTOR LISTRIK
(PADA INSTALASI PEMANFAATAN LISTRIK) INSPEKTUR INSTALASI MIGAS
.
Circuit
Breaker
TOR
Contactor
© nanaheryana2023 89
VSD
© nanaheryana2023 90
45
3/2/2023
BIMBINGAN TEKNIS
KPDM ONE LINE DIAGRAM PADA INSTALASI MCC
(PADA INSTALASI PEMANFAATAN LISTRIK)
INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 91
BIMBINGAN TEKNIS
KPDM ONE LINE DIAGRAM (MIGAS) INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 92
46
3/2/2023
BIMBINGAN TEKNIS
KPDM SLD MIGAS INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 93
BIMBINGAN TEKNIS
KPDM GROUNDING INSPEKTUR INSTALASI MIGAS
.
2. To operate electrical
protective devices
4. To control electrostatic
discharge
5. To minimize electrical
interference.
© nanaheryana2023 94
47
3/2/2023
BIMBINGAN TEKNIS
KPDM GROUNDING INSPEKTUR INSTALASI MIGAS
.
Equipment
grounding
Lightning protection
grounding
© nanaheryana2023 95
BIMBINGAN TEKNIS
KPDM Equipment grounding INSPEKTUR INSTALASI MIGAS
.
Equipment
enclosure Human
Grounding
Ground
Semua barang dari logam, yang bisa disentuh atau dijangkau manusia,
harus ditanahkan.
Grounding conductor hanya dialiri arus saat gangguan
© nanaheryana2023 96
48
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Lightning protection grounding
Terminasi Udara
© nanaheryana2023 97
BIMBINGAN TEKNIS
KPDM NEUTRAL GROUNDING INSPEKTUR INSTALASI MIGAS
.
49
3/2/2023
BIMBINGAN TEKNIS
KPDM Grounded Conductor INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 99
BIMBINGAN TEKNIS
KPDM Grounding Conductor Equipment INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 100
50
3/2/2023
BIMBINGAN TEKNIS
KPDM Effective Ground Fault Current Path INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 101
BIMBINGAN TEKNIS
KPDM HAL YANG MENDASARI ADANYA GROUNDING INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 102
51
3/2/2023
BIMBINGAN TEKNIS
KPDM Fault current flow in a grounded system INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 103
BIMBINGAN TEKNIS
KPDM Grounding of equipment INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 104
52
3/2/2023
BIMBINGAN TEKNIS
KPDM Importance of ground return path INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 105
BIMBINGAN TEKNIS
KPDM Sensitive ground fault protection connections INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 106
53
3/2/2023
BIMBINGAN TEKNIS
KPDM Neutral Grounding System INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 107
BIMBINGAN TEKNIS
KPDM Ungrounded INSPEKTUR INSTALASI MIGAS
.
KEUNTUNGAN
Apabila ada gangguan
tanah arus rendah
Tidak Perlu investasi
sistem grounding.
KERUGIAN
Kapasitansi konduktor
dengan tanah
Sulit dalam mendeteksi
lokasi gangguan tanah
Ungrounded
© nanaheryana2023 108
54
3/2/2023
BIMBINGAN TEKNIS
KPDM Solidly ground system INSPEKTUR INSTALASI MIGAS
.
Keuntungan
Netral secara langsung dibumikan
Gangguan fasa – ground besarnya
sama seperti gangguan fasa-fasa,
tidak membutuhkan relay yang
sensitif.
Murah : tidak memerlukan biaya
untuk komponen pembatas arus
Tingkat isolasi trafo dapat lebih
rendah dibandingkan dengan yang
tidak ditanahkan pada level tegangan
yang sama.
Kerugian
Arus gangguan tinggi
Solidly ground system Harmonik urutan nol mengalir lewat
netral.
© nanaheryana2023 109
BIMBINGAN TEKNIS
KPDM Impedance Grounding System INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 110
55
3/2/2023
BIMBINGAN TEKNIS
KPDM Grounding INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 111
BIMBINGAN TEKNIS
KPDM Grounding Electrode System INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 112
56
3/2/2023
BIMBINGAN TEKNIS
KPDM Sistem tegangan yang harus ditanahkan INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 113
BIMBINGAN TEKNIS
KPDM PENTANAHAN NETRAL INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 114
57
3/2/2023
BIMBINGAN TEKNIS
KPDM Sistem yang tidak boleh ditanahkan INSPEKTUR INSTALASI MIGAS
.
TIDAK BOLEH DI Rangkaian DC untuk sistem alarm kebakaran yang memiliki arus
GROUNDING maksimum 0.030 ampere.
© nanaheryana2023 115
BIMBINGAN TEKNIS
KPDM PETIR MERUPAKAN LISTRIK STATIS YANG BESAR INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 116
58
3/2/2023
BIMBINGAN TEKNIS
KPDM Formasi Dasar Terjadinya Listrik Statis-Petir (1) INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 117
BIMBINGAN TEKNIS
KPDM SAMBARAN PETIR INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 118
59
3/2/2023
BIMBINGAN TEKNIS
KPDM DESAIN PROTEKSI PETIR INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 119
BIMBINGAN TEKNIS
KPDM STANDARDS & CODES INSPEKTUR INSTALASI MIGAS
.
Surge Protection
Lightning Protection /
Earthing
Safety Equipment
DEHN protects.
IEC 62305 -
INTERNATIONAL
STANDARD;
Lightning protection
standard
© nanaheryana2023 120
60
3/2/2023
BIMBINGAN TEKNIS
KPDM BAHAYA PETIR PADA PERALATAN INSPEKTUR INSTALASI MIGAS
.
ABC Company
MCR
Data
Telephone
110 kV
Mobile
400/230 V phone
TV
© nanaheryana2023 121
BIMBINGAN TEKNIS
KPDM LEDAKAN TANGKI AKIBAT PETIR (1) INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 122
61
3/2/2023
BIMBINGAN TEKNIS
KPDM LEDAKAN TANGKI AKIBAT PETIR (2) INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 123
BIMBINGAN TEKNIS
KPDM PETIR PADA GEDUNG INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 124
62
3/2/2023
BIMBINGAN TEKNIS
KPDM PETIR MENYEBABKAN KEBAKARAN HUTAN INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 125
BIMBINGAN TEKNIS
KPDM FLASHOVER ON POWER LINES INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 126
63
3/2/2023
BIMBINGAN TEKNIS
KPDM DESAIN SISTEM PROTEKSI PETIR INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 127
BIMBINGAN TEKNIS
KPDM DESAIN PROTEKSI PETIR INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 128
64
3/2/2023
BIMBINGAN TEKNIS
KPDM Method for designing of air-termination systems for high buildings INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 129
BIMBINGAN TEKNIS
KPDM LIGHTNING PROTECTION ZONA INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 130
65
3/2/2023
BIMBINGAN TEKNIS
KPDM Components of a lightning protection system INSPEKTUR INSTALASI MIGAS
.
• Air-termination system
• Down conductor
• Earth-termination system
• Separation distances
• Lightning equipotential bonding
© nanaheryana2023 131
BIMBINGAN TEKNIS
KPDM EXTERNAL AND INTERNAL LIGHTNING PROTECTION SYSTEM INSPEKTUR INSTALASI MIGAS
.
Benyamin Franklin 1752 Petir merupakan fenomena Listrik, sehingga diperlakukan seperti sumber listrik
© nanaheryana2023 132
66
3/2/2023
BIMBINGAN TEKNIS
KPDM AIR TERMINATION INSPEKTUR INSTALASI MIGAS
.
Air Terminal for hazardous area must be no spark produced in strike point, down
conductor and grounding connection
© nanaheryana2023 133
BIMBINGAN TEKNIS
KPDM Sistem konduktor penyalur INSPEKTUR INSTALASI MIGAS
.
Menggunakan beberapa
jalur tersusun paralel
Panjang jalur sependek
mungkin, lurus, dan tidak
membuat rangkaian
tertutup
Hubungan terhadap
komponen induktif
struktur diperlukan jarak
tertentu
Diperlukan ikatan
penyama tegangan pada
bagian struktur konduktif
© nanaheryana2023 134
67
3/2/2023
BIMBINGAN TEKNIS
KPDM Grounding Electrode Resistance INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 135
BIMBINGAN TEKNIS
KPDM General Requirements INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 136
68
3/2/2023
BIMBINGAN TEKNIS
KPDM Tabel 1. Minimum Class I Material Requirement INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 137
BIMBINGAN TEKNIS
KPDM Tabel 2. Minimum Class II Material Requirement INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 138
69
3/2/2023
BIMBINGAN TEKNIS
KPDM Faraday Cage INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 139
BIMBINGAN TEKNIS
KPDM Reduction of the magnetic field by means of grid-like shields INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 140
70
3/2/2023
BIMBINGAN TEKNIS
KPDM Struktur Logam - Vessel & Column INSPEKTUR INSTALASI MIGAS
.
BIMBINGAN TEKNIS
KPDM Fixed Roof – Struktur Logam dengan peralatan
lain yang terpasang pada atap Tangki INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 142
71
3/2/2023
BIMBINGAN TEKNIS
KPDM Fixed Roof – Struktur Logam Tangki Dome INSPEKTUR INSTALASI MIGAS
.
BIMBINGAN TEKNIS
KPDM Floating Roof Tanks – NFPA 780 INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 144
72
3/2/2023
BIMBINGAN TEKNIS
KPDM DISCUSSION: LIGHTNING PROTECTION CRITERIA (1) INSPEKTUR INSTALASI MIGAS
.
A. Self-protection
© nanaheryana2023 145
BIMBINGAN TEKNIS
KPDM DISCUSSION: LIGHTNING PROTECTION CRITERIA (2) INSPEKTUR INSTALASI MIGAS
.
B. Non-Isolated System
73
3/2/2023
BIMBINGAN TEKNIS
KPDM DISCUSSION: LIGHTNING PROTECTION CRITERIA (3) INSPEKTUR INSTALASI MIGAS
.
C. Isolated System
BIMBINGAN TEKNIS
KPDM Basic of Internal Lightning Protection System INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 148
74
3/2/2023
BIMBINGAN TEKNIS
KPDM INTERNAL LIGHTNING PROTECTION SYSTEM INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 149
BIMBINGAN TEKNIS
KPDM INTERNAL LIGHTNING PROTECTION SYSTEM INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 150
75
3/2/2023
BIMBINGAN TEKNIS
KPDM Grounding INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 151
BIMBINGAN TEKNIS
KPDM Proper Grounding Bed INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 152
76
3/2/2023
BIMBINGAN TEKNIS
KPDM Offshore earthing INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 153
BIMBINGAN TEKNIS
KPDM Typical system distribution showing earthing arrangements INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 154
77
3/2/2023
BIMBINGAN TEKNIS
KPDM direct to local ground INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 155
BIMBINGAN TEKNIS
KPDM Bonding of earth conductor within a pipe sleeve INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 156
78
3/2/2023
BIMBINGAN TEKNIS
KPDM Grounding & Bonding INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 157
BIMBINGAN TEKNIS
KPDM Ikatan penyama potensial (Bonding) INSPEKTUR INSTALASI MIGAS
.
Bonding adalah menghubungkan berbagai sistem grounding serta metal yang tidak mengalirkan arus atau bagian
konduktif bersama sehingga tidak akan ada perbedaan potensial antara permukaan konduktor yang diakses berbeda
atau antara sistem grounding yang berbeda.
© nanaheryana2023 158
79
3/2/2023
BIMBINGAN TEKNIS
KPDM Grouding & Bonding INSPEKTUR INSTALASI MIGAS
.
Grounded
Service
Conductor LOAD
Service
Equipment
Equipment
Grounding
Terminal Bar
© nanaheryana2023 159
BIMBINGAN TEKNIS
KPDM BONDING PERALATAN & PIPA INSPEKTUR INSTALASI MIGAS
.
80
3/2/2023
BIMBINGAN TEKNIS
KPDM Earthing bus conductor / ring equipotential bonding INSPEKTUR INSTALASI MIGAS
.
Shield connection
© nanaheryana2023 161
© nanaheryana2023 162
81
3/2/2023
BIMBINGAN TEKNIS
KPDM System overview of a biogas plant INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 163
BIMBINGAN TEKNIS
KPDM Intermeshed earth-termination system for a biogas plant INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 164
82
3/2/2023
BIMBINGAN TEKNIS
KPDM Model of the lightning current distribution in case
of several parallel load systems – String topology
INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 165
BIMBINGAN TEKNIS
KPDM Use of arresters in power supply systems (schematic diagram) INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 166
83
3/2/2023
BIMBINGAN TEKNIS
KPDM Studi MIGAS: Block Diagram Grounding INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 167
BIMBINGAN TEKNIS
KPDM Studi Pertamina: Grounding Lay Out INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 168
84
3/2/2023
BIMBINGAN TEKNIS
KPDM BONDING INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 169
BIMBINGAN TEKNIS
KPDM BONDING INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 170
85
3/2/2023
BIMBINGAN TEKNIS
KPDM BONDING PADA ZONA PROTEKSI PETIR INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 171
BIMBINGAN TEKNIS
KPDM BONDING INSPEKTUR INSTALASI MIGAS
.
iB improvement !
iB2
iB2 iB2
iB1
© nanaheryana2023 172
86
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKSI DAN PENGUJIAN INSTALASI LISTRIK INSPEKTUR INSTALASI MIGAS
.
i
1. Document Review
2. Site Inspection
W-Witness
V-Verification
R-Review
INSPEKTUR
© nanaheryana2023 173
BIMBINGAN TEKNIS
KPDM PENDAHULUAN INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 174
87
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKSI INSPEKTUR INSTALASI MIGAS
.
Visual inspection
Detailed inspection
© nanaheryana2023 175
BIMBINGAN TEKNIS
KPDM INSPEKSI INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 176
88
3/2/2023
BIMBINGAN TEKNIS
KPDM Inspeksi Instalasi Listrik (1) INSPEKTUR INSTALASI MIGAS
.
Grade of Inspection
Document & Apparatus
Detailed Close Visual
1 Dokumentasi peralatan dan rangkaian sesuai dengan klasifikasi wilayah. •
2 Peralatan yang terpasang sesuai dalam dokumentasi •
© nanaheryana2023 177
BIMBINGAN TEKNIS
KPDM Inspeksi Instalasi Listrik (2) INSPEKTUR INSTALASI MIGAS
.
Grade of Inspection
Electrical Installation System (1)
Detailed Close Visual
89
3/2/2023
BIMBINGAN TEKNIS
KPDM Inspeksi Instalasi Listrik (3) INSPEKTUR INSTALASI MIGAS
.
Grade of Inspection
Electrical Installation System (2)
Detailed Close Visual
12
Instalasi penyediaan tenaga listrik dan pemanfaatan tenaga listrik terintegrasi
dengan baik sesuai dengan kapsitasnya • •
© nanaheryana2023 179
BIMBINGAN TEKNIS
KPDM Inspeksi Instalasi Listrik (4) INSPEKTUR INSTALASI MIGAS
.
1
Aparatus dilindungi secara memadai terhadap korosi,
Cuaca, getaran dan faktor-faktor buruk lainnya •
2 Tidak ada akumulasi debu dan kotoran luar yang tidak semestinya •
Grade of Inspection
Testing & Measurement
Detailed Close Visual
90
3/2/2023
BIMBINGAN TEKNIS
KPDM Inspection of Electrical Documentation INSPEKTUR INSTALASI MIGAS
.
• Load lists
• Single line diagrams
• Schematic & Control diagrams
• Cable Schedules & routing drawings
• Point to Point schedules
• Lighting Layouts
• Installation details
• Electrical Specifications
© nanaheryana2023 181
BIMBINGAN TEKNIS
KPDM Load lists INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 182
91
3/2/2023
BIMBINGAN TEKNIS
KPDM Single Line Diagram INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 183
BIMBINGAN TEKNIS
KPDM Schematic & Control diagrams INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 184
92
3/2/2023
BIMBINGAN TEKNIS
KPDM Point to Point schedules INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 185
BIMBINGAN TEKNIS
KPDM Racking and Routing INSPEKTUR INSTALASI MIGAS
.
Gambar ini digunakan untuk menunjukkan tata letak sistem, ukuran rak dan nomor kabel dari semua kabel dalam instalasi
© nanaheryana2023 186
93
3/2/2023
BIMBINGAN TEKNIS
KPDM Racking and Routing INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 187
BIMBINGAN TEKNIS
KPDM Cables Termination INSPEKTUR INSTALASI MIGAS
.
• Cable Identification
• Termination of Power Cables
• Termination of Control and Instrument Cables
• Special Termination Requirements
– High Voltage Terminations
– Terminations at Switchboards and Enclosures
– Termination of Earth Cables
– Terminations at Motors
© nanaheryana2023 188
94
3/2/2023
BIMBINGAN TEKNIS
KPDM Lighting Layouts INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 189
BIMBINGAN TEKNIS
KPDM Maximum Conductor Temperatures INSPEKTUR INSTALASI MIGAS
.
TEMPERATUR KABEL
© nanaheryana2023 190
95
3/2/2023
BIMBINGAN TEKNIS
KPDM Temperature Correction Factor INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 191
BIMBINGAN TEKNIS
KPDM Insulation Resistance (IR) Test INSPEKTUR INSTALASI MIGAS
.
• IR Test berfungsi
mengetahui
kualitas isolasi
• Reff. IEEE Std 43™-
2013
BACK
© nanaheryana2023 192
96
3/2/2023
BIMBINGAN TEKNIS
KPDM INSULATION RESISTANCE (IR) TEST INSPEKTUR INSTALASI MIGAS
.
Arus polarisasi
© nanaheryana2023 193
BIMBINGAN TEKNIS
KPDM Tegangan Megohmeter INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 194
97
3/2/2023
BIMBINGAN TEKNIS
KPDM Prosedur Pengujian IR Kabel INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 195
BIMBINGAN TEKNIS
KPDM Cable test connections for insulation resistance measurement INSPEKTUR INSTALASI MIGAS
.
(a) connection for single-conductor cable, one conductor to ground test; (b) connection for
three-conductor cable, one conductor to other conductors and sheath to ground;
© nanaheryana2023 196
98
3/2/2023
BIMBINGAN TEKNIS
KPDM Cable test connections for insulation resistance measurement INSPEKTUR INSTALASI MIGAS
.
(c) connection for three-conductor cable, one conductor to sheath and to ground and two conductors
guarded; and (d) connection for three-conductor cable, one conductor to all other conductors without
leakage to ground.
© nanaheryana2023 197
BIMBINGAN TEKNIS
KPDM Standar Pengujian (1) INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 198
99
3/2/2023
BIMBINGAN TEKNIS
KPDM Standar Pengujian (2) INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 199
BIMBINGAN TEKNIS
KPDM Faktor Koreksi untuk Insulation Resistance Test (1) INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 200
100
3/2/2023
BIMBINGAN TEKNIS
KPDM Faktor Koreksi untuk Insulation Resistance Test (2) INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 201
BIMBINGAN TEKNIS
KPDM Inspeksi Kondisi Kabel Instalasi INSPEKTUR INSTALASI MIGAS
.
OVERHEAD)
OUTDOOR (UNDERGROUND ATAU
INDOOR
© nanaheryana2023 202
101
3/2/2023
BIMBINGAN TEKNIS
KPDM Inspeksi Kondisi Kabel Instalasi INSPEKTUR INSTALASI MIGAS
.
Inspection
Inspection
Pemeriksaan perlu untuk kabel dalam • Mekanik akibat berbagai sebab
conduit maupun outdoor • Korosi pada lapisan pelindung akibat
• Sebelum memegang kabel untuk galvanic atau PH tanah
inspeksi harus di off dahulu • Penetrasi air dalam isolasi : water
tree
• Pengecekan tahunan dilakukan • Surja petir yang bisa merusak isolasi
untuk • Kebakaran (terutama yang berisolasi
– Cek kerusakan fisik minyak)
• Adanya partial discharge yang terus
– Bocor minyak menerus dan terbentuk electrical
– Korosi lapisan pelindung treeing
– Tracking/Corona • Cable joint yang kurang baik.
• Yang paling menentukan kualitas
kabel adalah titik terlemah dalam
isolasi
© nanaheryana2023 203
BIMBINGAN TEKNIS
KPDM Earth-Bonding Testing INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 204
102
3/2/2023
BIMBINGAN TEKNIS
KPDM PENGUJIAN KABEL INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 205
BIMBINGAN TEKNIS
KPDM IEC 840-TYPE TEST FOR CABLE INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 206
103
3/2/2023
BIMBINGAN TEKNIS
KPDM Pengujian Arus Bocor DC Kabel Tegangan Tinggi INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 207
BIMBINGAN TEKNIS
KPDM INSPEKSI SISTEM PROTEKSI PETIR EKSTERNAL AND INTERNAL INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 208
104
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKSI SISTEM PROTEKSI PETIR EKSTERNAL AND INTERNAL INSPEKTUR INSTALASI MIGAS
.
A B
© nanaheryana2023 209
BIMBINGAN TEKNIS
KPDM Pengujian Resistansi Grounding INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 210
105
3/2/2023
BIMBINGAN TEKNIS
KPDM NILAI TAHANAN GROUNDING INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 211
BIMBINGAN TEKNIS
KPDM METODE UNTUK GROUNDING RESISTANCE TEST INSPEKTUR INSTALASI MIGAS
.
Three-point method
Fall-of-potential method
Metode Pengujian
Tahanan Pentanahan Ratio method
Four-point method
Touch potential
measurements
Clamp-on method
© nanaheryana2023 212
106
3/2/2023
BIMBINGAN TEKNIS
KPDM GROUNDING RESISTANCE MEASUREMENT- YANG UMUM DILAKUKAN INSPEKTUR INSTALASI MIGAS
.
Acceptance Criteria
Based on (International Electrical Testing Association) grounding resistance should be
≤ 1 Ω and ≤ 5 Ω.
PUIL 2000 (Peraturan Umum Instalasi Listrik) ≤ 5 Ω
© nanaheryana2023 213
BIMBINGAN TEKNIS
KPDM Earth ground loop resistances for multi grounded systems INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 214
107
3/2/2023
BIMBINGAN TEKNIS
KPDM Pengukuran Tahanan Pentanahan)
INSPEKTUR INSTALASI MIGAS
3,93Ω
2,10Ω
2,63Ω
3,56Ω
BIMBINGAN TEKNIS
KPDM Pengukuran Grounding INSPEKTUR INSTALASI MIGAS
108
3/2/2023
BIMBINGAN TEKNIS
KPDM SAMPEL-HASIL INSPEKSI DI LAPANGAN (1) INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 217
BIMBINGAN TEKNIS
KPDM SAMPEL-HASIL INSPEKSI DI LAPANGAN (2) INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 218
109
3/2/2023
BIMBINGAN TEKNIS
KPDM SAMPEL-HASIL INSPEKSI SISTEM PENTANAHAN IBT 500/150 kV INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 219
BIMBINGAN TEKNIS
KPDM PENGUKURAN KUALITAS DAYA SISTEM KELISTRIKAN (2) INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 220
110
3/2/2023
BIMBINGAN TEKNIS
KPDM PENGUKURAN KUALITAS DAYA SISTEM KELISTRIKAN (3) INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 221
BIMBINGAN TEKNIS
KPDM PENGUKURAN KUALITAS DAYA SISTEM KELISTRIKAN (4) INSPEKTUR INSTALASI MIGAS
.
© nanaheryana2023 222
111
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. NFPA 78 G u i d e on E l e c t r i c a l I n s p e c t i o n s 2020 (1)
© nanaheryana2023 223
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. NFPA 78 G u i d e on E l e c t r i c a l I n s p e c t i o n s 2020 (2)
© nanaheryana2023 224
112
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. NFPA 78 G u i d e on E l e c t r i c a l I n s p e c t i o n s 2020 (3)
© nanaheryana2023 225
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. NFPA 78 G u i d e on E l e c t r i c a l I n s p e c t i o n s 2020 (4)
© nanaheryana2023 226
113
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. NFPA 78 G u i d e on E l e c t r i c a l I n s p e c t i o n s 2020 (5)
© nanaheryana2023 227
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. METODOLOGI RLA
Risiko Kegagalan
Metode RLA
114
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. RISIKO KEGAGALAN
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. HASIL ASSESSMENT BUKAN RLA
115
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. METODE RLA
Metode RLA yang digunakan adalah metode trending eksponensial mengacu formula
penuaan / aging material isolasi dari arhenius (yang telah dimodifikasi), seperti
ditunjukkan dalam persamaan (1)dan (2)
/
= (1)
= (2)
dengan L = sisa waktu, B/T konstanta waktu, A kondisi saat ini, y kondisi buruk
menurut standar dan x adalah sisa waktu ( remaining life)
Definisi umur sisa yang dihasilkan pada analisis ini adalah waktu untuk mencapai nilai
kritis laik operasi sesuai dengan standar yang ada dengan asumsi tidak dilakukan
treatment terhadap bahan isolasi.
Akurasi analisis dipengaruhi ketersediaan dan keakuratan data pabrikan, data historis
dan tes diagnostik. Parameter waktu merupakan prediksi hasil RLA yang terukur.
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. ANALISIS DATA
116
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. PROSES RLA INSTALASI LISTRIK
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. ANALISIS RLA
117
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. KURVA ESTIMASI UMUR SISA (METODE RLA)
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. REV METODE RLA YANG DIUSULKAN
Metode trending eksponensial mengacu formula penuaan/ aging material isolasi dari arrhenius
0 0
18-Oct-0705-May-0821-Nov-08 09-Jun-09 26-Dec-09 18-Oct-07 01-Mar-09 14-Jul-10
waktu waktu
09-Aug-12
22-Dec-13
06-May-15
17-Sep-16
30-Jan-18
sistem isolasi.
118
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. DATA BASE : RLA TRANSFORMER
Data Data
Pabrikan Historis
Data Tes Diagnostik
Analisis
RLA
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. RLA Power Transformer Berbasis Insulation Resistance (IR)Test
790 hari
Trafo mencapai nilai tahanan isolasi 100 MΩ mencapai nilai IR minimum untuk energize (IEEE 43-2000) dalam waktu 790 hari
119
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. DATA BASE : RLA PANEL DISTRIBUSI
Data Data
Historis
Data Tes Diagnostik
Pabrikan
Tahanan KESEREMPAKAN
R ISOLASI
Kontak KONTAK
Analisis
RLA
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. DATA BASE : RLA PANEL DISTRIBUSI
DATA TIDAK CUKUP UNTUK MELAKUKAN RLA Resume pengukuran tahanan kontak
Resume keserempakan kontak
120
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. DATA BASE : RLA PERALATAN PUTAR - MOTOR / GENERATOR
Data Data
Pabrikan Historis
Data Tes Diagnostik
RDC IR / PI TAN δ
Analisis
RLA
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. DATA BASE : RLA PERALATAN PUTAR - MOTOR / GENERATOR
121
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. OPSI SETELAH RLA
Perbaikan
Upgrading/Uprating
Penggantian(Replacement)
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. PERMASALAHAN PEROLEHAN DATA PADA PELAKSANAAN RLA
Data Test Diagnostic terkini sulit diperoleh, karena pada saat inspeksi
peralatan harus tetap beroperasi (tidak boleh off)
122
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. REV PERLU DATA BASE
JUMLAH DATA DAN PARAMETER FAKTOR PENTING DALAM RLA
1 2/10/1990 50 M 4
2 1/11/1995 40 M 3.5
3 2/10/2000 25 M 3.2
4 21/12/2004 15 M 2.8
5 5/10/2006 40 M 3.3
6 11/9/2009 35 M 3.2
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Online Monitoring of Electrical Equipment (1)
Power
Transformer Switchgear Panel Distribusi
MCC
Temp.
Torque
A A
V,A,W V V,A,W
THD
123
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Online Monitoring of Electrical Equipment (2)
40
AR01
21.1°C
Temp.
Torque
Thermography 73.5°C
• Circuit Breakers
50
• Distribution Panels
• Connections 40
• Cable Trays
Thermal Image 30
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. KUALITAS DAYA DALAM SISTEM TENAGA LISTRIK
Transformer
Temp.
Torque
MCC& VSD
V,A,W
THD
I1
PF DPF 2
p h k fB max p e k f 2 t 2 B m2 ax
I
124
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. MONITORING DENGAN DATA LOGGER
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Transformer Monitoring
125
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Monitoring Tegangan & Arus dengan Data Logger
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Monitoring Daya dengan Data Logger
126
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Monitoring Kualitas Daya
Dip / Sag Short Interruption
non sinusoidal
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Monitoring THD
127
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. Monitoring Arus Pentanahan Trafo
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. REKOMENDASI PEROLEHAN DATA BASE
1 2/10/1990 50 M 4
2 1/11/1995 40 M 3.5
3 2/10/2000 25 M 3.2
4 21/12/2004 15 M 2.8
5 5/10/2006 40 M 3.3
6 11/9/2009 35 M 3.2
7 15/3/2011 30 M 3.0
8 11/10/2014 20 M 2.7
Electrical sytem perlu dilengkapi dengan sensor (minimal sensor temperatur, sensor arus dan tegangan)
dan data logger untuk memonitor dan melakukan pemeriksaan secara online, sehingga kondisi peralatan
dapat dengan mudah diketahui setiap saat.
128
3/2/2023
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
. DISKUSI
BIMBINGAN TEKNIS
KPDM INSPEKTUR INSTALASI MIGAS
Terima kasih
129