Energy Saving Plan
Energy Saving Plan
Equipment Load Description No. of Total Kw Capacity Operating Hours Total Kw-hr Variance
Units Desaign Actual Previous Run Proposed Run Previous Proposed kw-hr
AHU AHU GF 1- Cold Kitchen 1 17.0 10.1 6am - 10pm 17 6am - 8pm 15 170.86 150.76 20.10
AHU GF-2 Hot Kitchen 1 43.9 26.0 5am - 10pm 18 5am - 8pm 16 467.85 415.87 51.98
AHU GF-3 ( Bakery ) 1 23.4 13.9 5am - 10pm 18 5am - 8pm 16 249.53 221.80 27.73
AHU GF-4 ( Lobby & Coridor ) 1 133.6 79.0 5am - 12pm 19 6am - 12pm 18 1,501.31 1,422.29 79.02
PAU 1 175.7 104.0 24hrs 24 24hrs 24 2,495.34 2,495.34 -
AHU 2.1 Kembang Goyang 4 30.8 18.2 5am - 8pm/4 unit 15 5am - 8pm/4 unit 15 1,091.61 1,091.61 36.39
8pm - 11pm/2unit 3 8pm - 10pm/2unit 2 109.16 72.77
AHU 2.2 Lobby Lift 4 36.7 21.7 6am - 9pm/4 unit 15 6am - 9pm/4 unit 15 1,301.77 1,301.77 -
9pm - 6am/2unit 9 9pm - 6am/2unit 9 390.53 390.53 -
AHU 5.1 Ballroom 4 126.5 74.8 In order - In Order - - - -
FCU BOH lantai GF 8 5.9 7am-10pm 15 7am-9pm 14 - - -
Chinese Restaurant 2 36.6 21.7 10am-3am 5 10am-3am 5 216.55 216.55 -
6pm-10pm 4 6pm-10pm 4 86.62 86.62 -
Chinese Kitchen 1 29.3 17.3 10am-3am 5 10am-3am 5 43.34 43.34 -
6pm-10pm 4 6pm-10pm 4 34.67 34.67 -
MIS 1 3.8 2.2 24hrs 24 24hrs 24 53.96 53.96 -
MATV room 1 1.8 1.0 24hrs 24 24hrs 24 24.99 24.99 -
CCTV room 1 3.0 1.8 24hrs 24 24hrs 24 42.60 42.60 -
Meeting room 1 1 14.6 8.6 In order - In order - - - -
Meeting room 2 1 14.6 8.6 In order - In order - - - -
Meeting room 3 1 14.6 8.6 In order - In order - - - -
Meeting room 4 1 14.6 8.6 In order - In order - - - -
Meeting room 5 1 14.6 8.6 In order - In order - - - -
Meeting room 6 1 14.6 8.6 In order - In order - - - -
Meeting room 7 1 29.3 17.3 In order - In order - - - -
Meeting room 8 1 29.3 17.3 In order - In order - - - -
Busines centre 1 14.6 8.6 8am-10pm 14 8am-10pm 14 120.94 120.94 -
Back entrance 1 29.3 17.3 24hrs 24 24hrs 24 416.06 416.06 -
BOH lantai 1 23 4.7 2.8 7am-10pm 15 7am-9pm 14 959.38 895.42 63.96
House Clinic 1 14.6 8.6 8am-10pm 14 8am-10pm 14 120.94 120.94 -
Retail lantai 1 5 4.7 2.8 In order - In Order - - - -
Private room 1 9.3 5.5 7am-10pm 15 7am-10pm 15 82.54 82.54 -
Room lantai 1 16 4.7 2.8 24hrs 24 24hrs 24 1,067.83 1,067.83 -
Corridor lantai 1 2 4.7 2.8 24hrs 24 24hrs 24 133.48 133.48 -
Room lantai 2 57 4.7 2.8 24hrs 24 24hrs 24 3,804.14 3,804.14 -
Corridor lantai 2 7 4.7 2.8 24hrs 24 24hrs 24 467.17 467.17 -
Room lantai 3 53 4.7 2.8 24hrs 24 24hrs 24 3,537.18 3,537.18 -
Corridor lantai 3 7 4.7 2.8 24hrs 24 24hrs 24 467.17 467.17 -
Room lantai 5 53 4.7 2.8 24hrs 24 24hrs 24 3,537.18 3,537.18 -
Corridor lantai 5 7 4.7 2.8 24hrs 24 24hrs 24 467.17 467.17 -
Room lantai 6 45 4.7 2.8 24hrs 24 24hrs 24 3,003.27 3,003.27 -
Corridor lantai 6 7 4.7 2.8 24hrs 24 24hrs 24 467.17 467.17 -
Room lantai 7 29 4.7 2.8 24hrs 24 24hrs 24 1,935.44 1,935.44 -
Corridor lantai 7 7 4.7 2.8 24hrs 24 24hrs 24 467.17 467.17 -
Room lantai 8 7 5.9 3.5 24hrs 24 24hrs 24 586.45 586.45 -
Corridor lantai 8 3 4.7 2.8 24hrs 24 24hrs 24 200.22 200.22 -
Executive Lounge 3 13.2 7.8 24hrs 24 24hrs 24 561.46 561.46 -
Sky lounge 3 37.0 21.9 6am - 11pm 17 24hrs 17 1,116.46 1,116.46 -
Mezanine 2 20.0 11.8 6am - 11pm 17 24hrs 17 402.33 402.33 -
Prefunction ballroom 3 36.6 21.7 In order - In Order - - - -
Drop off Ballroom 3 36.6 21.7 24hrs 24 24hrs 24 1,559.14 1,559.14 -
Lobby lift Ballroom 1 17.6 10.4 24hrs 24 24hrs 24 249.92 249.92 -
Kid Club 1 22.0 13.0 8am - 10pm 14 24hrs 14 182.23 182.23 -
VIP Meeting room Ballroom 1 17.6 10.4 In order - In Order - - - -
Exhaust Fan Main kitchen 1 17.0 10.1 5am - 12pm 19 5am - 10pm 17 191.11 170.99 20.12
Bakery 1 2.0 1.2 5am - 12pm 19 5am - 10pm 17 22.48 20.12 2.37
Chinese Kitchen 1 13.0 7.7 10am-3am 5 10am-3am 5 38.46 38.46 -
6pm-10pm 4 6pm-10pm 4 30.77 30.77 -
Toilet GF 1 1.1 0.7 24hrs 24 24hrs 24 15.62 15.62 -
Locker 1 0.8 0.4 24hrs 24 24hrs 24 10.65 10.65 -
Toilet lantai 1 1 0.4 0.2 24hrs 24 24hrs 24 5.68 5.68 -
Changing room 1 0.4 0.2 6am - 8pm 14 6am - 8pm 14 3.31 3.31 -
Kitchen lantai 1 1 3.0 1.8 6am - 11pm 17 6am - 9pm 15 30.17 26.62 3.55
Rooms 5 5.0 3.0 24hrs 24 24hrs 24 355.00 355.00 -
Kitchen lantai 8 1 2.0 1.2 6am - 10pm 16 6am - 10pm 16 18.93 18.93 -
Kitchen lantai 9 1 2.0 1.2 6pm - 3am 9 6pm - 3am 9 10.65 10.65 -
Fresh air Main kitchen 1 3.0 1.8 5am - 10pm 17 5am - 10pm 17 30.17 30.17 -
Chinese kitchen 1 3.0 1.8 10am-3am 5 10am-3am 5 8.87 8.87 -
6pm-10pm 4 6pm-10pm 4 7.10 7.10 -
Kitchen lantai 8 1 1.0 0.6 6am - 10pm 16 6pm-10pm 16 9.47 9.47 -
Kitchen lantai 9 1 1.0 0.6 6am - 12pm 18 6am - 12pm 18 10.65 10.65 -
Chillers Chlllers 3 4,218.0 2,495.6 24hrs/1 unit/1663Kw 24 24hrs/1 unit/1663Kw 24 32,057 31,551 506
ESTIMATED TOTAL KW-HR SAVINGS (Previous-Proposed) = 872.45 907,350.97 - Rupiah Savings /day(Estimated)
Variance
%Reduced
11.76%
11.11%
11.11%
5.26%
0.00%
3.33%
0.00%
0.00%
-
#DIV/0!
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
6.67%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
10.53%
10.53%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
11.76%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.58%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
50.00%
50.00%
50.00%
50.00%
50.00%
0.00%
0.00%
0.00%
50.00%
50.00%
50.00%
0.00%
0.00%
0.00%
0.00%
0.00%
5.56%
0.00%
0.00%
0.00%
0.00%
1.23%
26,173.59
ENERGY SAVING PLAN
Fresh air AHU R-1 fresh air guest room wing A floor 5-17 1 5.5 3.3
AHU R-2 fresh air guest room tengah floor 5-17 1 5.5 3.3
AHU R-3 fresh air guest room wing B floor 5-17 1 5.5 3.3
Chillers Chlllers
Lamp
ESTIMATED TOTAL KW-HR SAVINGS (Previous-Proposed) =
TARGET / MONTH
2015
Total KWH ( Actual PLN )
Total Rupiah ( Actual PLN )
Note :
-Equipment with diversity factor of 0.95
-Electricity Rate - Rp. 1040/ kw-hr average on year 2016
-Not on BMS (Building Management System) - On Manual Operation
1
2
3
4
5
6
7
8
9
60,000 56,719
52,531
40,000
27,320 28,200 25,840
18,760
20,000
KWH
-
Jan Feb Mar April May Jun Jul
ENERGY SAVING PROGRAM DHCA
80,000
60,000 56,719
52,531
40,000
27,320 28,200 25,840
18,760
20,000
KWH
-
Jan Feb Mar April May Jun Jul
(20,000)
(40,000) (37,520)
(60,000)
PA/Kwh Target
ENERGY SAVING PLAN
7am - 3pm 8
7am - 3pm 8
7am - 3pm 8
7am - 10pm 15
24 jam 24
4am - 12pm 20
4am - 12pm 20
5.30am - 12pm 20
2pm-5pm 3
8pm-11pm 3
2pm-10pm 8
24 jam
Posisi standby adalah OFF
dan dinyalakan 1 jam
sebelum event dimulai dan
langsung dimatikan ketika
event selesai
4am-10pm 18
Auditor
Chief Engineer
Energy Conservation program
2016
Month PMA PA PA / Kwh PA/Kwh
RAM DHCA
56,719 56,616
25,840 25,592
56,719 56,616
25,840 25,592
36.84%
36.84%
36.84%
37.50%
37.02%
#DIV/0!
Target PA/IDR
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! -
#DIV/0! -
#DIV/0! -
#DIV/0! -
#DIV/0! -
#DIV/0! #DIV/0!
Saving Energy Program
NO. UNIT SERVE AREA / USAGE Capasity KW
Jumlah
Unit Name
Actual
Plate
1 Chiller Supply dingin AHU/FCU 214
2 CHWP 24 jam 1 30
3 CWP 1 unit 24 jam. 2 unit Tergantung ACC 2 30
4 Cooling Tower Roof top 1 11
5 AHU S-1 Laundry 1.5
6 AHU S-4 Laundry 1.1
7 EF -S -2 Laundry 2.2
8 AHU S-3 Eng ,sec,loker 2.2
9 AHU O,caffe O,cafee 11
10 AHU L-1 Business Centre area 3.7
11 AHU L-2 Main Lobby 7.5
12 AHU L-3 Lobby Lounge Bar 7.5
13 AHU L-4 Sapphire 1.5
14 FCU
15 AHU M-1 Gallery 7.5
16 AHU M-2 Kantin Karyawan 2.2
*note1: semua AC (FCU dan AC split) di back office adalah tanggung jawab dept. masing-masing.
*note2: semua FCU di ruang meeting/guest area, hanya dinyalakan saat ada meeting/event.
Boiler
NO. UNIT SCHEDULE SAVING keterangan
1 Steam Boiler 07.00 - 16.00 atau sesuai request HK
2 Hot water Boiler 04.00 - 10.00 04.00 - 12.00
15.00 - 22.00 15.00 - 22.00
*note: steam boiler dimatikan 1 jam sebelum laundry tutup.
Lift / Escalator
NO. UNIT SCHEDULE SAVING keterangan
1 Guest Lift (2 unit) 50% acc
atau sesuai request DM
2 Service Lift (1 unit) 50% acc
Lighting
NO. AREA SCHEDULE OFF Keterangan
1 floor 5-17 ketika 1 lantai kosong
2 Ceiling lobby 04.00 - 18.00
3 Lampu gantung lobby 06.00 - 18.00 Atau sesuai request DM
4 Lampu pillar Lobby 06.00 - 18.00
5 Lobby Bar / Lounge 02.00 - 06.00 mati 50 %
6 06.00 - 17.30 mati 100 %
7 Prefunction F 24.00 - 06.00
8 Prefunction M 24.00 - 06.00
9 Lampu sorot balkon lt. 5 01.00 - 18.00
10 Neon signage logo 04.00 - 18.00
11 Neon signage list kubah 04.00 - 18.00
JAM OPERASIONAL Total Kw-hr Variance
03.00 - 08.00 19
03.00 - 08.00 19
03.00 - 08.00 19
03.00 - 08.00 19
03.00 - 08.00 19
03.00 - 08.00 19
11.00-12.00, 14.00-15.00, 16.00 -10.0 4
request 1
24jam 24
24jam 24
16.00 - 08.00 8
01.00 - 04.00 20
01.00 - 04.00 20
24jam 24
Variance
OPERATING
%
Reduced
ENERGY SAVING PLAN
2015 Year
Total Water ( Actual PDAM ) 94,681
Total Rupiah ( Actual PDAM ) 1,738,348,227
Note :
-PDAM Rate - Rp. 15.060/ M3 average on year 2016
1 Auditor
2 Controller
3 Supervisor
4 Duty Engineer
5 Duty Engineer
6 Shift Operation
7 Shift Operation
8 Shift Operation
9 Shift Operation
8,000
6,000 5,696
5,031
4,314
M3
4,000 3,399
2,096 2,174
2,000
818
-
Jan Feb Mar
(29) April May Jun Jul Aug
(2,000)
PA/M3 Target
4,000 3,399
2,096 2,174
2,000
818
-
Jan Feb Mar
(29) April May Jun Jul Aug
(2,000)
PA/M3 Target
SAVING PLAN
Auditor
Chief Engineer
Energy Conservation program
2016
Month PMA PA PA / M3 PA/M3 Target PA/IDR
HCA
10,404
5,696
2,174
28,177,260
PERENCANAAN
1 Kondisi Udara Luar
Design Actual
Temperature 35oC 34 - 34,5oC
Relative Humidity % RH 85% 81 - 82 %
STANDARD 18 - 26 40 - 70
Guest Rooms/Suites 23 ± 2oC 55 ± 5 21 - 24oC 64 - 66 27oC & 62 - 64%
Public Areas 23 ± 2oC 55 ± 5 22 - 24oC 62 - 66
Offices 23 ± 2 C
o
55 ± 5 22 - 24 C
o
59 - 64
Meeting Rooms 22 ± 2 C
o
55 ± 5 22 - 24 C
o
60 - 65
Function Rooms 22 ± 2 C
o
55 ± 5 20 - 24 C
o
60 - 62
Corridors 24 ± 2 C
o
55 ± 5 23 - 25 C
o
60 - 67
3 Noise Criteria
Area NC ( dB ) Actual (dB)
Guest Rooms/Suites 30-40 35-45
Public Areas 35-45 40-50
Offices 35-45 40-50
Meeting Rooms 25-35 30-40
Function Rooms 35-45 40-50
Restaurants 40-50 45-55
Coffee Shops/Bars 35-45 40-50
Kitchens/Laundry 50-60 55-65
Corridors 35-45 40-50
Toilets 40-50 45-55
ENERGY SAVING ACTION PLAN
Koordinasi dengan departemen lain, untuk meminimalkan semua operasi peralatan dimatikan jika tidak perlu. Operation Supervisor
Matikan lampu area daylight Operation Supervisor
Mengurangi lumen ( pencahayaan lampu penerangan ) dengan setting dimmer lampu Operation Supervisor
Pasang timmer dan foto cell lampu untuk akurasi jam operasional lampu Operation Supervisor
Electricity Mengurangi waktu operasi lampu antara ½ - 1 jam di beberapa tempat Operation Supervisor
Mengurangi waktu penggunaan lampu di office sebanyak mungkin. Operation Supervisor
Setting temperature Hot Water Boiler air panas pada 50oC Operation Supervisor
Membuat Scedhule opersional peralatan sesuai kebutuhan Operation Supervisor
Monitoring pemakaian energy kwh listrik per shift Operation Supervisor
Air Kolam renang dikondisikan level di bawah sistem overflow ( tidak luber ) Operation Supervisor
Pool Mengurangi waktu backwash. Operation Supervisor
Terus memantau level permukaan air. Operation Supervisor
Off