DAILY SITE RECORD SHEET

(VERTICAL DRAIN INSTALLATION)


PROJECT :PROPOSED KPG.KEBUAW
PANEL NO:PANEL 29
RIG NO :EH18
OPERATOR:PETRUS 2023/01/19 PAGE= 1
-------------------------------------------------------------------------------------
NO POINT NO PILE CUT OFF DEPTH REMARK
1 CH- 12 7.39 0.20 07.59
2 CI- 12 7.06 0.20 07.26
3 CJ- 12 7.05 0.20 07.25
4 CK- 12 7.21 0.20 07.41
5 CL- 12 7.40 0.20 07.60
6 CM- 12 7.12 0.20 07.32
7 CN- 12 7.15 0.20 07.35
8 CO- 12 7.12 0.20 07.32
9 CP- 12 7.13 0.20 07.33
10 CP- 11 7.38 0.20 07.58
11 CO- 11 7.14 0.20 07.34
12 CN- 11 7.27 0.20 07.47
13 CM- 11 7.06 0.20 07.26
14 CL- 11 7.28 0.20 07.48
15 CK- 11 7.08 0.20 07.28
16 CJ- 11 7.33 0.20 07.53
17 CI- 11 7.15 0.20 07.35
18 CH- 11 7.09 0.20 07.29
19 CH- 10 7.31 0.20 07.51
20 CI- 10 7.33 0.20 07.53
21 CJ- 10 7.09 0.20 07.29
22 CK- 10 7.07 0.20 07.27
23 CL- 10 7.27 0.20 07.47
24 CM- 10 7.15 0.20 07.35
25 CN- 10 7.21 0.20 07.41
26 CO- 10 7.35 0.20 07.55
27 CP- 10 7.09 0.20 07.29
28 CP- 9 7.07 0.20 07.27
29 CO- 9 7.33 0.20 07.53
30 CN- 9 7.12 0.20 07.32
31 CM- 9 7.33 0.20 07.53
32 CL- 9 7.01 0.20 07.21
33 CK- 9 7.30 0.20 07.50
34 CJ- 9 7.35 0.20 07.55
35 CI- 9 7.14 0.20 07.34
36 CH- 9 7.24 0.20 07.44
37 CH- 8 7.09 0.20 07.29
38 CI- 8 7.32 0.20 07.52
39 CJ- 8 7.30 0.20 07.50
40 CK- 8 7.05 0.20 07.25
41 CL- 8 7.20 0.20 07.40
42 CM- 8 7.14 0.20 07.34
43 CN- 8 7.40 0.20 07.60
44 CO- 8 7.36 0.20 07.56
45 CP- 8 7.14 0.20 07.34
46 CP- 7 7.26 0.20 07.46
47 CO- 7 7.29 0.20 07.49
48 CN- 7 7.11 0.20 07.31
49 CM- 7 7.28 0.20 07.48
50 CL- 7 7.37 0.20 07.57
---------------------------------------------------------------------------------------
SUB TOTAL

Total Depth = 370.48


Total Max = 7.40
Total Min = 7.01
Total Cut Off= 10.00
Total Ave = 7.41
DAILY SITE RECORD SHEET
(VERTICAL DRAIN INSTALLATION)
PROJECT :PROPOSED KPG.KEBUAW
PANEL NO:PANEL 29
RIG NO :EH18
OPERATOR:PETRUS 2023/01/19 PAGE= 2
-------------------------------------------------------------------------------------
NO POINT NO PILE CUT OFF DEPTH REMARK
51 CK- 7 7.37 0.20 07.57
52 CJ- 7 7.30 0.20 07.50
53 CI- 7 7.28 0.20 07.48
54 CH- 7 7.24 0.20 07.44
55 CH- 6 7.12 0.20 07.32
56 CI- 6 7.35 0.20 07.55
57 CJ- 6 7.19 0.20 07.39
58 CK- 6 7.27 0.20 07.47
59 CL- 6 7.08 0.20 07.28
60 CM- 6 7.38 0.20 07.58
61 CN- 6 7.36 0.20 07.56
62 CO- 6 7.38 0.20 07.58
63 CP- 6 7.32 0.20 07.52
64 CP- 5 7.34 0.20 07.54
65 CO- 5 7.28 0.20 07.48
66 CN- 5 7.41 0.20 07.61
67 CM- 5 7.30 0.20 07.50
68 CL- 5 7.23 0.20 07.43
69 CK- 5 7.21 0.20 07.41
70 CJ- 5 7.17 0.20 07.37
71 CI- 5 7.38 0.20 07.58
72 CH- 5 7.10 0.20 07.30
73 CH- 4 7.31 0.20 07.51
74 CI- 4 7.26 0.20 07.46
75 CJ- 4 7.35 0.20 07.55
76 CK- 4 7.31 0.20 07.51
77 CL- 4 7.33 0.20 07.53
78 CM- 4 7.34 0.20 07.54
79 CN- 4 7.39 0.20 07.59
80 CO- 4 7.40 0.20 07.60
81 CP- 4 7.36 0.20 07.56
82 CP- 3 7.23 0.20 07.43
83 CO- 3 7.20 0.20 07.40
84 CN- 3 7.23 0.20 07.43
85 CM- 3 7.31 0.20 07.51
86 CL- 3 7.05 0.20 07.25
87 CK- 3 7.28 0.20 07.48
88 CJ- 3 7.19 0.20 07.39
89 CI- 3 7.31 0.20 07.51
90 CH- 3 7.13 0.20 07.33
91 CH- 2 7.27 0.20 07.47
92 CI- 2 7.21 0.20 07.41
93 CJ- 2 7.16 0.20 07.36
94 CK- 2 7.18 0.20 07.38
95 CL- 2 7.06 0.20 07.26
96 CM- 2 7.10 0.20 07.30
97 CN- 2 7.36 0.20 07.56
98 CO- 2 7.33 0.20 07.53
99 CP- 2 7.13 0.20 07.33
100 CP- 1 7.07 0.20 07.27
---------------------------------------------------------------------------------------
SUB TOTAL

Total Depth = 372.91


Total Max = 7.41
Total Min = 7.05
Total Cut Off= 10.00
Total Ave = 7.46
DAILY SITE RECORD SHEET
(VERTICAL DRAIN INSTALLATION)
PROJECT :PROPOSED KPG.KEBUAW
PANEL NO:PANEL 29
RIG NO :EH18
OPERATOR:PETRUS 2023/01/19 PAGE= 3
-------------------------------------------------------------------------------------
NO POINT NO PILE CUT OFF DEPTH REMARK
101 CO- 1 7.30 0.20 07.50
102 CN- 1 7.41 0.20 07.61
103 CM- 1 7.12 0.20 07.32
104 CL- 1 7.11 0.20 07.31
105 CK- 1 7.41 0.20 07.61
106 CJ- 1 7.37 0.20 07.57
107 CI- 1 7.16 0.20 07.36
108 CH- 1 7.11 0.20 07.31
---------------------------------------------------------------------------------------
SUB TOTAL

Total Depth = 59.59


Total Max = 7.41
Total Min = 7.11
Total Cut Off= 1.60
Total Ave = 7.45
TOTAL DAILY SITE RECORD SHEET
(VERTICAL DRAIN INSTALLATION)

PROJECT :PROPOSED KPG.KEBUAW


OPERATION-CO. :3E GEOSYNTHETICS SDN. BHD
CONTRUCTION-CO.:MIRECONT SDN/BHD
RIG NO :EH18
OPERATOR :PETRUS
PANEL NO :PANEL 29
WORK DATE :2023/01/19
---------------------------------------------------------------------------------------

Total Depth = 802.98


Total Max = 7.41
Total Min = 7.01
Total Cut Off= 21.60
Total Ave = 7.44

CODE S => Satisfactory NO.of Pts = 108


CODE X => Un Satisfactory NO.of Pts = 0
CODE R => Re-Drive NO.of Pts = 0
CODE O => Obstruction NO.of Pts = 0
CODE SPL => Connection NO.of Pts = 0

-----------------------------------------------------------------------------
| | CONSTRUCTION | OPERATION | CONSULTANT |
|--------------|--------------------|--------------------|--------------------|
| COMPANY.NAME |3E GEOSYNTHETICS S/B|MIRECONT SDN. BHD | |
|--------------|--------------------|--------------------|--------------------|
| NAME | | | |
|--------------|--------------------|--------------------|--------------------|
| SIGNATURE | | | |
|--------------|--------------------|--------------------|--------------------|
| DATE | 2023/01/19 | 2023/01/19 | 2023/01/19 |
-----------------------------------------------------------------------------