Professional Documents
Culture Documents
06-GR60-D-008.001 of 07
06-GR60-D-008.001 of 07
06-GR60-D-008.001 of 07
TABLE OF CONTENTS
ENGG CERT
JGL
JGL
FOM
FOM
03/31/22
1.12.
DATE
01
00
DISCIPLINE
ENGINEER
SNN
07/14/22
DATE:
PROJECT
ENGINEER
FOM
07/14/22
DATE:
CERTIFIED
JGL
07/14/22
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
21-00097-0001-001
(DCC) NO. _____________________
HVAC CONTROL PHILOSOPHY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
JGL
JGL
FOM
• Electrical control building at Air conditioning shall be served by two PACU unit
RE-ISSUED FOR CONSTRUCTION
• The technical room HVAC system consists of two (2) constant air volume Dx-type
precision air handling 01SAB90AH401(Duty) and 01SAB90AH402(standby) with
matching air-cooled condensing (01SAB90AH401 & 01SAB90AH402).
01SAB90AH401 shall be operating unit and 01SAB90AH402 (standby).
• Each PACU has two Motorized Volume Dampers (MVD) located in supply and
return air duct. These motorized dampers are interlocked with respective PACU.
BI-21-00097
BI-21-00097
JO/EWO
• In case of fire the Power supply to HVAC units shall be enabled manually.
•
07/14/22
03/31/22
DATE
System start and stop shall be commanded by the DDC panel. PACU shall start
when motorized volume dampers are fully open then the associated PACU will
start through the cooling stages communicated by the DDC.
NO.
REV
01
00
DISCIPLINE
ENGINEER
SNN • When the system is commanded to stop through DDC panel, PACU and their
07/14/22
DATE: associated Motorized Volume Damper shall close.
PROJECT
ENGINEER
•
FOM
07/14/22
An interlock between the DDC panel and battery charger switch shall be provided,
DATE:
CERTIFIED such that failure of the (01SAB90AH301 & 01SAB90AH302) & exhaust fans
JGL
(01SAB90AH501 & 01SAB90AH502) shall cause the high rate charging of
07/14/22
DATE: batteries to stop.
CONSTRUCTION
AGENCY
• PDIT shall modulate the Motorized Volume Dampers MVD-005, through the DDC,
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
21-00097-0001-001
(DCC) NO. _____________________
HVAC CONTROL PHILOSOPHY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
•
ENGG CERT
JGL
cycle of 7 days interval, but can be altered or adjusted as per maintenance and
FOM
FOM
• If the DUTY 01SAB90AH301 fails, failure alarm shall be initiated at the DDC panel.
Auto change-over shall take place to energize 01SAB90AH302. Motorized Volume
DESCRIPTION
Dampers MVD-001& MVD-003 shall close and MVD-002 & MVD-004 shall open.
When the DDC panel commands the system to shut down, both operating and
STAND-BY PACU's shall also stop all Motorized Volume Dampers shall close.
System reset shall be done manually when the fault has been cleared.
• Upon detection of high temperature by the main supply air duct temperature
sensor (TS-001) or zero pressure deference across (PDS-003 or PDS-006) ither is
duty units it shall give a signal to the DDC panel for automatic change over. This
BI-21-00097
BI-21-00097
JO/EWO
shall stop the 01SAB90AH301 (DUTY) after pre-set time delay the
01SAB90AH302 (STAND-BY) shall start as stated in the system start and stop
07/14/22
03/31/22
DATE
procedure.
NO.
REV
01
00
DISCIPLINE
1.5. BATTERY ROOM
ENGINEER
SNN
DATE:
07/14/22 • Battery room has two wall mounted exhaust fans 01SAB90AH501 (DUTY) &
PROJECT
ENGINEER
01SAB90AH502 (STAND-BY).
FOM
DATE:
07/14/22
• Upon detection of no run fails of the duty fan (01SAB90AH501) the automatic
CERTIFIED
JGL change-over stand-by fan (01SAB90AH502) to be provided.
07/14/22
DATE:
CONSTRUCTION • Upon detection of fails in both the exhaust fans, a signal shall be sent to the DDC
AGENCY
panel horn & beacon shall be turn "on".
DATE: An audio-visual alarm shall be "on" till the system is reset and fan is operational.
OPERATIONS
• Power supply to the horn/beacon shall be fed from HVAC DDC PANEL (DDC-001).
DATE:
(Power consumption of horn/beacon is approximately 500ma)
CONTROL NUMBER
VERIFICATION
•
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
21-00097-0001-001
(DCC) NO. _____________________
HVAC CONTROL PHILOSOPHY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
JGL
JGL
cycle of 7 days interval but can be altered or adjusted as per maintenance and
FOM
FOM
•
ISSUED FOR CONSTRUCTION
ON/OFF status of all battery room exhaust fans 01SAB90AH501 (DUTY) &
01SAB90AH502 (STAND-BY) shall be displayed at the DDC panel.
DESCRIPTION
• The temperature sensors (TS-001 and TS-004) on the supply air room from PACU
communicates with the DDC panel, the supply air temperature will be maintained
BI-21-00097
BI-21-00097
JO/EWO
at around 23°C.
• Battery Room shall have high temperature sensor (TS-003) set point 26°c. This
07/14/22
03/31/22
DATE
sensor shall be connected to DDC panel and shall initiate an audio-visual alarm
when temperature reaches set point to give attention to the maintenance
NO.
REV
01
00
DISCIPLINE personnel.
ENGINEER
SNN
DATE:
07/14/22 1.8. EQUIPMENT FAILURE
PROJECT
ENGINEER
FOM • In case of equipment failure (01SAB90AH301/302 OR 01SAB90AH401/402) or
07/14/22
DATE: any alarm signals, an audible alarm shall be initiated, and visual indication shall be
CERTIFIED
JGL displayed at DDC panel. Audible alarm shall have the provision to be mute
DATE:
07/14/22 silenced. However, visual alarm shall last until the fault is attended and reset.
CONSTRUCTION
AGENCY
1.9. SMOKE / FIRE DETECTION
DATE:
OPERATIONS • When smoke or fire is detected within the spaces or inside the air stream by the
duct smoke detector signal shall be sent FACP to de-energize all operating
DATE:
PACU's & EXAUST FANS.
CONTROL NUMBER
VERIFICATION
•
EDSD
FSD shall be powered through DDC panel. Upon detection of fire/smoke inside the
duct, DDC shall close all the FSD. DDC panel upon actuation of any of FSD shall
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
• When the pre-filter (PF) or final filter (FF) of PACU is dirty, the pressure differential
HVAC CONTROL PHILOSOPHY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
JGL
JGL
• Pre-filter dirty condition shall be set at 125 Pa (0.5 inch of WG) pressure differential
FOM
FOM
• Final filter dirty condition shall be set at 250 Pa (1.0 inch of WG) pressure
differential switch (PDS) across each filter.
RE-ISSUED FOR CONSTRUCTION
• A wall mounted industrial type PDIT, shall be provided in the equipment room.
• PDIT shall modulate the Motorized Volume Dampers MVD-005, through the DDC,
to maintain the building pressurization at the set point 62.5 Pa (0.25"WG).
•
07/14/22
03/31/22
Alarm signals (audible & visible) located at the DDC Panel, shall alert the
DATE
personnel if the building pressure gets down to 25 Pa (0.1" WG). Also, audible &
visible alarm signals shall sound via common fault alarm if the building
NO.
REV
01
00
DATE:
07/14/22
• A time delay in DDC shall be utilized to prevent the unnecessary changeover from
PROJECT
ENGINEER the DUTY system to the STAND-BY system during normal personnel entering &
FOM
07/14/22
leaving the building. All control components required for this function shall be
DATE:
CERTIFIED
duplicated for the independent operations of the (DUTY) & (STAND-BY) systems.
JGL
DATE:
07/14/22
1.12. POWER INPUT/OUTPUT
CONSTRUCTION
AGENCY
• Power supply to DDC Control panel shall be 230 V, 1ph, 60 Hz.
DATE: Power supply to DDC power section for exhaust fans (EF) is 230 V, 1ph, 60 Hz.
OPERATIONS
Power supply to DDC power section for blowers is 380 V, 3ph, 60 Hz.
•
DATE:
All auto change over switch for PACU's, PAHU's and exhaust fans shall be
CONTROL NUMBER
VERIFICATION
•
DATE:
ON-OFF status of all PACU's, PAHU's and exhaust fans shall be displayed at DDC
BY:
panel.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
21-00097-0001-001
(DCC) NO. _____________________
HVAC CONTROL PHILOSOPHY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
01 07/14/22 BI-21-00097 RE-ISSUED FOR CONSTRUCTION FOM JGL
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER
JGL
SNN
FOM
APPROVAL/CERTIFICATION REQUIREMENTS, 00 03/31/22 BI-21-00097 FOM JGL
ISSUED FOR CONSTRUCTION
AGENCY
BY:
PROJECT
BY DRAWING COMPLETION CERTIFICATE
ENGINEER
ENGINEER
DISCIPLINE
07/14/22
07/14/22
07/14/22
CERTIFIED
OPERATIONS
CONSTRUCTION
21-00097-0001-001
(DCC) NO. _____________________ DATE:
YANBU
1.13.
DOC
SAUDI ARABIA
-
JO / EWO:
K
DWG.TYPE PLANT NO. INDEX
21-00097-0001
SALINE WATER CONVERSION CORPORATION
DRAWING NO.
06-GR60-D-008
7
7
OF
SHT.NO.
01
REV.NO.