06-GR60-D-008.001 of 07

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

PMT OPRNS

SALINE WATER CONVERSION CORPORATION

TABLE OF CONTENTS
ENGG CERT

JGL

JGL
FOM

FOM

1. SEQUENCE OF OPERATION (DDC PANEL) .................................................................................. 3


1.1. PACU-001, PACU-002 UNITS ............................................................................................................ 3
RE-ISSUED FOR CONSTRUCTION

1.2. SYSTEM START AND STOP ............................................................................................................. 3


ISSUED FOR CONSTRUCTION

1.3. MOTORIZED DAMPERS .................................................................................................................... 3


DESCRIPTION

1.4. AUTO CHANGE OVER FOR PACU .................................................................................................. 4


1.5. BATTERY ROOM ................................................................................................................................ 4
1.6. AUTO CHANGE OVER FOR EXHAUST FAN .................................................................................. 5
1.7. TEMPERATURE CONTROL............................................................................................................... 5
1.8. EQUIPMENT FAILURE ....................................................................................................................... 5
1.9. SMOKE / FIRE DETECTION............................................................................................................... 5
1.10. DIRTY FILTER...................................................................................................................................... 5
BI-21-00097
BI-21-00097
JO/EWO

1.11. BUILDING PRESSURIZATION CONTROL....................................................................................... 6


POWER INPUT/OUTPUT .................................................................................................................... 6
07/14/22

03/31/22

1.12.
DATE

1.13. CAUSE & EFFECT CHART ................................................................................................................ 7


NO.
REV

01

00

DISCIPLINE
ENGINEER
SNN
07/14/22
DATE:
PROJECT
ENGINEER
FOM
07/14/22
DATE:
CERTIFIED
JGL

07/14/22
DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

21-00097-0001-001
(DCC) NO. _____________________

HVAC CONTROL PHILOSOPHY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ELECTRICAL/CONTROL BUILDING -SWCC GRS AREA DOC


- K 06-GR60-D-008 2
SWCC YANBU PHASE-3 OF
01
YANBU SAUDI ARABIA JO / EWO: 21-00097-0001 7
PMT OPRNS
SALINE WATER CONVERSION CORPORATION

1. SEQUENCE OF OPERATION (DDC PANEL)


ENGG CERT

JGL

JGL

1.1. PACU-001, PACU-002 UNITS


FOM

FOM

1.2. SYSTEM START AND STOP

• Electrical control building at Air conditioning shall be served by two PACU unit
RE-ISSUED FOR CONSTRUCTION

01SAB90AH301(Duty) and 01SAB90AH302(standby).01SAB90AH301 shall be


ISSUED FOR CONSTRUCTION

operating unit and 01SAB90AH302 (standby).


DESCRIPTION

• The technical room HVAC system consists of two (2) constant air volume Dx-type
precision air handling 01SAB90AH401(Duty) and 01SAB90AH402(standby) with
matching air-cooled condensing (01SAB90AH401 & 01SAB90AH402).
01SAB90AH401 shall be operating unit and 01SAB90AH402 (standby).

• Each PACU has two Motorized Volume Dampers (MVD) located in supply and
return air duct. These motorized dampers are interlocked with respective PACU.
BI-21-00097
BI-21-00097
JO/EWO

• In case of fire the Power supply to HVAC units shall be enabled manually.


07/14/22

03/31/22
DATE

System start and stop shall be commanded by the DDC panel. PACU shall start
when motorized volume dampers are fully open then the associated PACU will
start through the cooling stages communicated by the DDC.
NO.
REV

01

00

DISCIPLINE
ENGINEER
SNN • When the system is commanded to stop through DDC panel, PACU and their
07/14/22
DATE: associated Motorized Volume Damper shall close.
PROJECT
ENGINEER


FOM
07/14/22
An interlock between the DDC panel and battery charger switch shall be provided,
DATE:
CERTIFIED such that failure of the (01SAB90AH301 & 01SAB90AH302) & exhaust fans
JGL
(01SAB90AH501 & 01SAB90AH502) shall cause the high rate charging of
07/14/22
DATE: batteries to stop.
CONSTRUCTION
AGENCY

DATE: 1.3. MOTORIZED DAMPERS


OPERATIONS

• Motorized Volume Dampers MVD-001 & MVD-003 shall be interlocked with


DATE:
01SAB90AH301 (DUTY). Motorized Volume Dampers MVD-002 & MVD-004 shall
CONTROL NUMBER
VERIFICATION

be interlocked with 01SAB90AH302 (STAND-BY).


EDSD

• PDIT shall modulate the Motorized Volume Dampers MVD-005, through the DDC,
DATE:
BY:

to maintain the building pressurization.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

21-00097-0001-001
(DCC) NO. _____________________

HVAC CONTROL PHILOSOPHY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ELECTRICAL/CONTROL BUILDING -SWCC GRS AREA DOC


- K 06-GR60-D-008 3
SWCC YANBU PHASE-3 OF
01
YANBU SAUDI ARABIA JO / EWO: 21-00097-0001 7
PMT OPRNS
SALINE WATER CONVERSION CORPORATION
1.4. AUTO CHANGE OVER FOR PACU


ENGG CERT

01SAB90AH301 (DUTY) & 01SAB90AH302 (STAND-BY) shall have an operating


JGL

JGL

cycle of 7 days interval, but can be altered or adjusted as per maintenance and
FOM

FOM

operational requirements. In case, the STAND-BY (01SAB90AH302) be isolated


for maintenance and the time interval elapsed or expired, the failure of the STAND-
BY (01SAB90AH302) to start shall abort the change-over sequence and the fan on
DUTY (01SAB90AH301) shall continue to run.
RE-ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

• If the DUTY 01SAB90AH301 fails, failure alarm shall be initiated at the DDC panel.
Auto change-over shall take place to energize 01SAB90AH302. Motorized Volume
DESCRIPTION

Dampers MVD-001& MVD-003 shall close and MVD-002 & MVD-004 shall open.
When the DDC panel commands the system to shut down, both operating and
STAND-BY PACU's shall also stop all Motorized Volume Dampers shall close.
System reset shall be done manually when the fault has been cleared.

• Upon detection of high temperature by the main supply air duct temperature
sensor (TS-001) or zero pressure deference across (PDS-003 or PDS-006) ither is
duty units it shall give a signal to the DDC panel for automatic change over. This
BI-21-00097
BI-21-00097
JO/EWO

shall stop the 01SAB90AH301 (DUTY) after pre-set time delay the
01SAB90AH302 (STAND-BY) shall start as stated in the system start and stop
07/14/22

03/31/22
DATE

procedure.
NO.
REV

01

00

DISCIPLINE
1.5. BATTERY ROOM
ENGINEER
SNN

DATE:
07/14/22 • Battery room has two wall mounted exhaust fans 01SAB90AH501 (DUTY) &
PROJECT
ENGINEER
01SAB90AH502 (STAND-BY).
FOM

DATE:
07/14/22
• Upon detection of no run fails of the duty fan (01SAB90AH501) the automatic
CERTIFIED
JGL change-over stand-by fan (01SAB90AH502) to be provided.
07/14/22
DATE:
CONSTRUCTION • Upon detection of fails in both the exhaust fans, a signal shall be sent to the DDC
AGENCY
panel horn & beacon shall be turn "on".
DATE: An audio-visual alarm shall be "on" till the system is reset and fan is operational.
OPERATIONS

• Power supply to the horn/beacon shall be fed from HVAC DDC PANEL (DDC-001).
DATE:
(Power consumption of horn/beacon is approximately 500ma)
CONTROL NUMBER
VERIFICATION


EDSD

Thermostat of battery room (TS-003) will be connected to DDC. High temperature


(26°C) alarm shall be sent to the DDC panel and activate the horn/beacon as per
DATE:
BY:

the above point 3.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

21-00097-0001-001
(DCC) NO. _____________________

HVAC CONTROL PHILOSOPHY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ELECTRICAL/CONTROL BUILDING -SWCC GRS AREA DOC


- K 06-GR60-D-008 4
SWCC YANBU PHASE-3 OF
01
YANBU SAUDI ARABIA JO / EWO: 21-00097-0001 7
PMT OPRNS
SALINE WATER CONVERSION CORPORATION
1.6. AUTO CHANGE OVER FOR EXHAUST FAN

• 01SAB90AH501 (DUTY) & 01SAB90AH502 (STAND-BY) shall have an operating


ENGG CERT

JGL

JGL

cycle of 7 days interval but can be altered or adjusted as per maintenance and
FOM

FOM

operational Requirements. In case, the STAND-BY fan be isolated for maintenance


and the time interval elapsed or expired, the failure of the STAND-BY fan to start
shall abort the change-over sequence and the fan on DUTY shall continue to run.
RE-ISSUED FOR CONSTRUCTION


ISSUED FOR CONSTRUCTION

ON/OFF status of all battery room exhaust fans 01SAB90AH501 (DUTY) &
01SAB90AH502 (STAND-BY) shall be displayed at the DDC panel.
DESCRIPTION

• Battery room exhaust fans (01SAB90AH501 & 01SAB90AH502) auto changeover


panel shall be mounted on DDC panel.

1.7. TEMPERATURE CONTROL

• The temperature sensors (TS-001 and TS-004) on the supply air room from PACU
communicates with the DDC panel, the supply air temperature will be maintained
BI-21-00097
BI-21-00097
JO/EWO

at around 23°C.

• Battery Room shall have high temperature sensor (TS-003) set point 26°c. This
07/14/22

03/31/22
DATE

sensor shall be connected to DDC panel and shall initiate an audio-visual alarm
when temperature reaches set point to give attention to the maintenance
NO.
REV

01

00

DISCIPLINE personnel.
ENGINEER
SNN

DATE:
07/14/22 1.8. EQUIPMENT FAILURE
PROJECT
ENGINEER
FOM • In case of equipment failure (01SAB90AH301/302 OR 01SAB90AH401/402) or
07/14/22
DATE: any alarm signals, an audible alarm shall be initiated, and visual indication shall be
CERTIFIED
JGL displayed at DDC panel. Audible alarm shall have the provision to be mute
DATE:
07/14/22 silenced. However, visual alarm shall last until the fault is attended and reset.
CONSTRUCTION
AGENCY
1.9. SMOKE / FIRE DETECTION
DATE:
OPERATIONS • When smoke or fire is detected within the spaces or inside the air stream by the
duct smoke detector signal shall be sent FACP to de-energize all operating
DATE:
PACU's & EXAUST FANS.
CONTROL NUMBER
VERIFICATION


EDSD

FSD shall be powered through DDC panel. Upon detection of fire/smoke inside the
duct, DDC shall close all the FSD. DDC panel upon actuation of any of FSD shall
DATE:
BY:

send signal to DDC to actuate the building horn & beacon.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

1.10. DIRTY FILTER


21-00097-0001-001
(DCC) NO. _____________________

• When the pre-filter (PF) or final filter (FF) of PACU is dirty, the pressure differential
HVAC CONTROL PHILOSOPHY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ELECTRICAL/CONTROL BUILDING -SWCC GRS AREA DOC


- K 06-GR60-D-008 5
SWCC YANBU PHASE-3 OF
01
YANBU SAUDI ARABIA JO / EWO: 21-00097-0001 7
PMT OPRNS
SALINE WATER CONVERSION CORPORATION
switch (PDS) across each filter shall initiate an alarm on the DDC panel. The alarm
shall be reset after filters are cleaned or replaced.
ENGG CERT

JGL

JGL

• Pre-filter dirty condition shall be set at 125 Pa (0.5 inch of WG) pressure differential
FOM

FOM

switch (PDS) across each filter.

• Final filter dirty condition shall be set at 250 Pa (1.0 inch of WG) pressure
differential switch (PDS) across each filter.
RE-ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

1.11. BUILDING PRESSURIZATION CONTROL


DESCRIPTION

• A wall mounted industrial type PDIT, shall be provided in the equipment room.

• PDIT shall modulate the Motorized Volume Dampers MVD-005, through the DDC,
to maintain the building pressurization at the set point 62.5 Pa (0.25"WG).

• If the building pressure drops below 25 Pa (0.10"WG), 01SAB90AH301 shall stop


& the (STAND-BY) units 01SAB90AH302 shall start automatically to maintain the
BI-21-00097
BI-21-00097
JO/EWO

building pressurization at the set point 62.5 Pa (0.25"WG).


07/14/22

03/31/22

Alarm signals (audible & visible) located at the DDC Panel, shall alert the
DATE

personnel if the building pressure gets down to 25 Pa (0.1" WG). Also, audible &
visible alarm signals shall sound via common fault alarm if the building
NO.
REV

01

00

DISCIPLINE pressurization exceeds 87.5 Pa (0.35"WG).


ENGINEER
SNN

DATE:
07/14/22
• A time delay in DDC shall be utilized to prevent the unnecessary changeover from
PROJECT
ENGINEER the DUTY system to the STAND-BY system during normal personnel entering &
FOM
07/14/22
leaving the building. All control components required for this function shall be
DATE:
CERTIFIED
duplicated for the independent operations of the (DUTY) & (STAND-BY) systems.
JGL

DATE:
07/14/22
1.12. POWER INPUT/OUTPUT
CONSTRUCTION
AGENCY
• Power supply to DDC Control panel shall be 230 V, 1ph, 60 Hz.
DATE: Power supply to DDC power section for exhaust fans (EF) is 230 V, 1ph, 60 Hz.
OPERATIONS
Power supply to DDC power section for blowers is 380 V, 3ph, 60 Hz.


DATE:
All auto change over switch for PACU's, PAHU's and exhaust fans shall be
CONTROL NUMBER
VERIFICATION

mounted at DDC panel.


EDSD


DATE:

ON-OFF status of all PACU's, PAHU's and exhaust fans shall be displayed at DDC
BY:

panel.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

21-00097-0001-001
(DCC) NO. _____________________

HVAC CONTROL PHILOSOPHY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ELECTRICAL/CONTROL BUILDING -SWCC GRS AREA DOC


- K 06-GR60-D-008 6
SWCC YANBU PHASE-3 OF
01
YANBU SAUDI ARABIA JO / EWO: 21-00097-0001 7
EDSD REV
REVISION CERTIFICATE
REVISIONCERTIFICATION VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
01

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
01 07/14/22 BI-21-00097 RE-ISSUED FOR CONSTRUCTION FOM JGL
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER

JGL
SNN

FOM
APPROVAL/CERTIFICATION REQUIREMENTS, 00 03/31/22 BI-21-00097 FOM JGL
ISSUED FOR CONSTRUCTION

AGENCY
BY:

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

07/14/22

07/14/22
07/14/22

CERTIFIED

OPERATIONS
CONSTRUCTION
21-00097-0001-001
(DCC) NO. _____________________ DATE:

YANBU
1.13.

SWCC YANBU PHASE-3


HVAC CONTROL PHILOSOPHY
ELECTRICAL/CONTROL BUILDING -SWCC GRS AREA
CAUSE & EFFECT CHART

DOC

SAUDI ARABIA
-
JO / EWO:
K
DWG.TYPE PLANT NO. INDEX

21-00097-0001
SALINE WATER CONVERSION CORPORATION

DRAWING NO.

06-GR60-D-008
7
7
OF
SHT.NO.

01
REV.NO.