Professional Documents
Culture Documents
Summary M03
Summary M03
03
GENERAL SUMMARY
Analysis of risks related to electricity
The overall analysis of all risks incorporating dangers of electricity must be made before any work.
The measures to be taken against the risks are in the following order:
avoid risks;
limit the risks.
2
Environnement of the structures or installations
Before any work it is imperative to perform a risk analysis of electrical and particularly in the case of pres-
ence of live components in the environment.
Limits are based on distances:
of bare live parts;
of insulated pipes.
Personnel operating in zones as defined must have the corresponding certifications and authorizations to
the specific zone.
3
Environnement of the structures or installations
4
Environnement of the structures or installations
5
©Apave - Tous droits réservés