Download as pdf
Download as pdf
You are on page 1of 3
MENDOZA, ALCRIS DG. ZO1BT06G4O Salynha, @LAIZA c. zOIgINIGI’ BSAR 3-A BUILDING “TecHNOLOGY WV ESTIMATE OF MATERIALS EXCAVATION WORKS A, anRa To BR EXCAVATED A. DIMENSIONS OF THE COLUMN FoorING CaP 21. ROM x t.20m B. DEPTH OF THE COLUMN FOOTING FROM THE NATIOURL GRADE LINE = 4.Z0M ©. TOTAL Numpu OF Foomias = cars D, TOTAL YoLuME (1.20 x 1.20% 4. 20)( 44) = [FF 008 Cu.m] EL TOTAL LENGTH OF THE WALL ROOTING (2(8.003 -(0.8 F4.2+4-2+0-B)) + (6.553 “CL ZEA. Zt 0.8))+(2.263-1.2 +6-4)) + (2(3.73-(0.675))+ (2.80 -(0.84 0.675)) + 2.152 - 675) +2.18¢ + 1600 = [25.346 mI F. TOTAL VOLUME OF WALL FOOTING EXCAVATION WORKS = 25.340 x 0.4 X 0.6 [6.063 cu-m. 19.008 cu. + 6.083 Cu.m [25.091 Gu-m) BACKFILL 25.041 = EXCAVATION work Cri = (9.20% 1-20%1.20) 1 = Cou CER) = (0-80 x 0.40X 0.150) 11 = [0-528 GM, WF =(0.em xO4n x 31.429) = [2.504 cum.) TOTAL LENGTH = ((G.003)-(0-40 x4)(2)) + ((6.983)- (0.4 40.4)+0.48)) + {%.208 0.45) +€3.150-(045+ 0.19) ¢(C 2.152 -(0,15))2) 41-6 30.416 Mm Cie = (0.30 x 0.15 x 30, 1om) = fl. 959 Cun] 4.782 +0.520 + 2.5144 4.355 = [4.149 cum TOTAL BACKFILL YoLUME = 29.091- 9.149 MENDOTA, ALCAIS DG. 219106920 SALVRNO, GLAIZA C. 2014 1L1GIS pene s-a ‘BUILDING TECHNOLOGY IV ESTIMATE OF MATERIALS EARTHFILL VOLUME OF SPACE ty BE FILLED IN (a): 5.423 X 0.593 x 0.8 = 26.856 Cum. VOLUME OF Spree TD $= FILED WN (B)? 2.880 x 3.750 ¥0.8 = 8.64 cam, 2e. 850 Ulm. + B.G4du.m. = 35.44%6 aim. 33.446 Gum. - 9.489 cum. = 26-347 cum. LEPr OVER BACKFILL VOLUME OF EARTHFLL To ORDER! 26-347 x 1.25 = 32.933, Say [35 cum) TOTAL VOLUME OF ASOMM THICK GRAVEL FILL ON WHICH THE CONCRETE siag FLOW % FOR THE FOUNDATION PLAN BE PouReD AREA OF CONCRETE SLAB As S.AZ3% 6.533 = 33.57! sam B= 2.880% 3.750 = 10.8 som 44.3T1sam VOuINe OF GRAVEL FILL REQUIRED #(4437I) x(0.15) = 6.655 cU.m, say [7-00 cu.) CONCRETE Works, CF, COLUMNS, BEAMS, WALL FooTINSS, SLABS. OTE. VOLUME OF FLL THE STRUCTURAL COMPONENTS; 4) CAF) = (4.2 x42 x03) # 4.752 com, 2) cov. = (0-4 0.15% 8.35)19 © 5.511 cu BRB «(045x040 x 31.dzq) = 1.885 cum, A) WE = (2X O48 x 34.429) «2.514 CoM, 5) SOF = (5.125 K 6.593) +( 2.082 * 3.750) = 44 3T1saM 44.371 0.15 + 6.655san 1) GR =4.752 * 140= 5.23 cum Chase 9 2) CoL.= S54 X L1O= 6.06 LM Crass q 3) RBS 1885x4407 267 cum cunss ® 4) We = 2514 1402 2.77 Cam CLase B 8) SOF = ©.685 1102 7.32 cum CLASS c M™ENDOZA, BLews DG. SALUATA, GLAIZA C. BsAR 3-4 4) OFt = 3.23. CuI. Cement = 6.23 x 7.65 = [4b06 BAaS| 2.20 CoM) SAUD Gravel 2) COL. = 6.96 cu.m. cement: o.06 x 7.05 « 2757 Bae] SAND = 6.06 x 6.2 . Grenver * 6-06 * 0.84 = 3) Re = 2.07 cum. CEMENT= 2.07 x 7.95 = [1e.t5 BAGS| SAND = 207K O.W2 = 4) we = 2-77 cuM. CEMENT = 2.7% x 7-85 = SAND = 2.77 x OW2 = [1.16 € GRaveL? 2-77 x 0-84 = [2.33 5.) SOF = 7.32 cum, cCEMEN 7.32% 7.85 (S746 B4es. SAND SUMMARY: _ cemeur = 164.04 + [185 sags sana = 9.04 =[Ko cum) GRAVEL = 19-7 fZo_cu.m.|

You might also like