Professional Documents
Culture Documents
D CR202 Os JV CWD ZZ S TMP-DR Sec 2509 09.06.2023
D CR202 Os JV CWD ZZ S TMP-DR Sec 2509 09.06.2023
F
NEW SP
O
TOPOGRAPHICAL SURVEY BOUNDARY
SPPG No :
R S
AVENUE
APPROVED LOAD: 8471kVA @22kV
U BSTATIO
PG LINE
N
SP PowerGrid Ltd
O
E=24126.3915 DP3
Distribution Planning Section
DP
E=24081.8895
4
Electric Substation Site/ Layout/ Misc Details is /are acceptable
N=35474.8823
subject to approval of building Authority
D=22.12m D=46.29m D=49.82m
N=35441.9574 D=28.82m E=24033.9717 Type of Substation:22kV(Temp S/S)
E=24149.2888
100
50
00 CR202 ACCESS ROAD
Date:_______________________ _____________________________
Goh Li Qing
Subject to revision 18 months f. Dy Director (DPL)
15
after this date SP PowerGrid Ltd
As agent for and on behalf of
0
SP PowerAssets Ltd
TOPOGRAPHICAL SURVEY BOUNDARY
D=
49.
85m
Y
DAR
Y
N
AR
OU
D
B
N
E
U
XI
VE
BO
S
UR
Y
T
VE
S
IN
R
G
PH
CA
U S
CO
HI
L
AS
CA
N
A
N=35520.5556
I
E
H
OG
EA
AP
E=24014.0059
1B
P
L
R
TO
10
ED
OG
25
P
/
AC
TO
C
JP
PH
/ SE
5
R
A
/D
SS
P
SE
/S /TM
1A
ZZ
W D/
JV/C
S
/O
02
LEAD-IN PIPE ROUTE LAYOUT PLAN
C R2
SCALE 1:300 D/
MATCH 1-1
PROP 1.6m (w) EXISTING 0.3m (w)
1500
1350
LTA Endorsement :
46290
MATCH 2-2
PROPOSED ROAD
49820
+16.201m SHD
+15.773m SHD
DP 3 Owner :
+15.014m SHD
+14.673m SHD
+14.091m SHD
2 ROWS OF 4 NOS Ø150MM UPVC CABLE
EXISTING ROAD Main Contractor :
LEAD-IN PIPES ENCASED IN CONCRETE
OBAYASHI - STECS CR202
3°
JOINT - VENTURE
PIPE BEND SUBJECTED TO OBAYASHI
PASSING OF MANDREL TEST
Consultant :
Project Title :
49850
CONTRACT CR202
SURFACE DRAW PIT C/W REINFORCED DESIGN AND CONSTRUCTION OF BORED
CONCRETE COVER SURFACE DRAW PIT C/W REINFORCED
EXISTING ROAD CONCRETE COVER TUNNEL BETWEEN FAIRWAYS DRIVE AND SIN
MATCH 2-2
MATCH 3-3
(SEE DETAIL-STD 2210-211)
PROPOSED ROAD (SEE DETAIL-STD 2210-211) MING WALK AND ASSOCIATED WORKS.
Drawing No : Rev
D/CR202/OSJV/CWD/ZZ/S/TMP/DR/SEC/2509
LEAD-IN PIPE ROUTE ELEVATION
SCALE 1:100 CAD File Name : D_CR202_OS_JV_CWD_ZZ_S_TMP-DR_SEC_2509~2513_09.06.2023.dwg Sheet 1 of 1 A1