CHAPTER ELEVEN
TRANSPORT AND COMMUNICATION
For the socio-economic development of a country, a sophisticated and well-planned transport and
communication system plays a vital and immeasurable role. It is very much necessary to make a
developed and integrated transport and communication system that will connect Bangladesh with
international and regional road network as well as with other ICT networks. The total length of highways
in the country is 22,476 km up to February 2023. Government has taken various initiatives for ensuring a
disciplined road transport sector and controlling road accident by applying modern technology to
national highways. From this point of view, Padma Bridge, Metro-rail, Bus Rapid Transit, Dhaka
Elevated Expressway, Karnaphuli Tunnel and some other mega-projects are being implemented on
priority basis. To operate Railway as an environment-friendly, safe, affordable and dependable means of
transport, total number of 230 projects costing of Tk. 5,53,662.00 crore have been included in newly
approved railway master plan and those projects are being implemented at six stages from July 2016 to
June 2045. At present, total length of railway is 3,101 km. Several measures have been taken for
development and maintenance of navigability of different river routes, ensuring safe movement of water
crafts, development of inland river ports, creating infrastructure facilities to carry container goods in
inland waterways etc. About 92 percent international trade is happening through Chattogram seaport. In
the FY2021-22 the average growth rate of import-export was 3.77 percent for cargoes and 7.16 percent
for containers. As national flagship carrier Biman Bangladesh Airlines Limited is conducting 7 national
and 21 international flights in different routes. In FY2021-22 Biman has carried 22.77 lakh passengers
and 43,975 tons of cargo. At present Bangladesh Submarine Cable Company Limited (BSCCL) alone is
satisfying about 60% demand in the case of the country's overall internet bandwidth, whose amount is
about 2524 Gbps (Gigabyte Per Second) up to 29 March 2023.Various development projects and
programs are in progress to ensure the application of information and communication technology based
on four pillars of information technology infrastructure development, human resources development in
information technology, establishment of e-governance and development of information and
communication technology industry.
A modern and planned transport and constant price during FY 2021-22 and FY 2022-
communication system is a vital physical 23 respectively considering the base year 2015-
infrastructure which acts as a prerequisite for the 16. In this context, for implementation of 8th
socio economic development of a country. The Five Year Plan, Perspective Plan keeping
high importance of connectivity with the regional consistency with the targets of SDG-2030, the
and international transport networking is government has taken various development
unanimously admitted in the context of initiatives over the years.
globalization and modern market economy.
A. Roads Communication
According to Bangladesh Bureau of Statistics
(BBS), the contribution of the transport and Roads and Highways Department (RHD)
communication sector to GDP is 7.34 percent and There are about 22,476 km highways of various
and 7.32 percent at constant price during FY types under the management of Roads and
2021-22 and FY 2022-23 respectively and the Highways Department. Out of this highway
rate of growth is 5.75 percent and 5.99 percent at network, 18 percent is National Highway, 22
percent is Regional Highway and remaining 60
percent is Zilla roads. In addition, RHD has ferry ghats of which 12 ferry ghats got
4,404 bridges and 15,084 culverts under its administrative clearance. 35 ferry ghats are also
control. Even though the length of road network under the process of administrative approval.
under RHD has not increased significantly during Currently the ferry service is provided by 148
last few years, the standard and the width of numbers of ferry boats, 140 numbers of pontoons
different important road segments have been and 114 numbers of gangways. The Table 11.1
improved including improvement to 4, 6 or 8 provides a thirteen-year time series data on RHD
lanes. RHD is currently operating 57 numbers of road lengths.
Table 11.1: Various Categories of Roads under Roads and Highways Department
( Length in kilometer)
construction of new roads and maintenance of The table 11.2 depicts achievements in transport
old roads. National Spatial Data Infrastructure infrastructure under various development projects
(NSDI) is being prepared under the supervision of LGED up to March 2023 of FY2022-23.
of Bangladesh Survey Directorate as a uniform
platform for sharing GIS data national.
Activities 2010- 2011- 2012- 2013- 2014- 2015- 2016- 2017- 2018- 2019- 2020- 2021- 2022- Total**
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023*
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Paved Road 4614 4905 6639 6549 5990 4813 5200 8534 5400 5500 3100 4450 3797 73514
(km)
Bridge/ 38502 26415 27057 32707 29000 28500 32000 29700 30000 7978 18000 20000 15390 340312
Culvert (m)
Construction 70 468 717 698 1315 1110 1037 1256 1746 2332 710 1560 430 13541
of road &
footpath at
urban area
(km)
Construction 791 627 784 1011 1240 915 795 1167 3615 2538 3857 1804 1750 21144
of bridge &
culvert at
urban area
(m)
• A central platform named ‘BRTA the applicant has to come to the BRTA
Service Portal (BSP)’ has been launched center once instead of at least 4 (four)
to bring all BRTA services to the times to provide bio-enrollment and
doorsteps of the people. The services of participate in the examination. The e-
BRTA such as learner driving license paper driving license with the QR code
print, Ridesharing Service Provider downloaded and printed from the
Enlistment Certificate and Ridesharing customer's own BSP account or
Motor Vehicle Enlistment Certificate displayed as a soft copy on the mobile
Print, taking appointment for renewal of phone is permissible to use temporarily
motor vehicle fitness from BRTA Dhaka for driving the motor vehicle. After the
Division and Chattogram Circle office, completion of smart card printing
payment of motor vehicle tax and fees, process, the driving license smart card is
submitting online application for motor delivered by post to the address given by
vehicle registration and publication of the applicant.
driving license test results etc. are now
provided online through the BRTA Up to February 2023 in FY2022-23, BRTA
Service Portal (BSP). collected revenues of Tk. 1,303.35 crore against
the target of Tk. 3,054.00 crore. The figures of
• In order to renew the fitness certificate of
motor vehicles in an automated manner target and actual collection of revenues from
FY2010-11 to FY 2022-23 are given in table 11.3
with the financial and technical
below:
assistance of a Korean international
organization, BRTA is renewing fitness Table 11.3: Revenue Target and Collection of
certificates at Dhaka Metro Circle-1, BRTA
Mirpur, through a 2 (two) lane Vehicle ( Taka in Crore)
Inspection Center (VIC) since October Fiscal Target Collection Percentage of
2016. Recently, an initiative has been year Amount Collection (%)
taken to set up a VIC with 12 (twelve) 2010-11 908.56 685.60 75.46
lanes in the same office. 2011-12 903.59 642.37 71.09
• A modern central Data Center has been 2012-13 1101.25 769.86 69.91
established for preserving different 2013-14 1156.60 952.25 82.33
vehicle and driving license data
2014-15 1249.23 1062.29 85.04
• National Road Safety Strategic Action 2015-16 1354.01 1619.02 119.57
Plan 2021-24 draft has been prepared to 2016-17 1771.84 1469.86 82.96
reduce the number of injured and death
2017-18 1805.51 1545.07 85.57
in road accidents. National Safe Roads
2018-19 1834.14 1825.83 99.55
Day has been celebrated on 22 October
2019-20 2017.92 1681.67 83.34
2023 under the theme "Obey the speed
limit, prevent road accidents". 2020-21 2235 1627 72.79
From the experiences of different countries in the Financial Year Revenue collection
world it is observed that Metro Rail cannot run
profitably with the collection of fare alone. Under 2010-11 267.66
this circumstances, plans have been made to 2011-12 304.66
establish TOD Hubs at the lands adjacent to the 2012-13 325.20
Uttara Center Station of MRT Line-6 and Gabtoli 2013-14 323.38
Station of MRT Line-5: Northern Route to 2014-15 349.08
generate Non-Fair Business revenue. The TOD 2015-16 402.43
land near the Uttara Center Station of MRT Line- 2016-17 484.42
6 has been designated as a Green Field and the 2017-18 543.80
TOD land adjacent to the Gabtoli Station of MRT 2018-19 575.41
Line-5: Northern Route has been designated as a 2019-20 560.28
Brown Field under a project taken up by RAJUK. 2020-21 654.82
Under this project, a Draft Concept Plan is
2021-22 704.55
ongoing now.
2022-23* 439.68
Source: Bangladesh Bridge Authority, * Up to February 2023
Expressway. The study project is being these development activities which will help to
implemented at an estimated cost of BDT 371.90
improve the overall transport facilities of the
crore with the own funding of Bangladesh Bridge
country including decrease in the traffic
Authority.
congestion of Dhaka.
B. Railway Communication
Achievements of Bangladesh Railway since 2009
To ensure railway communication as a reliable, are construction of 650.11 km new rail line,
affordable, environment-friendly and publicly conversion of 280.28 km railway line from meter
transport in Bangladesh, Railway Division has gauge to dual gauge, construction of 126 new
upgraded to a separate Ministry named as station buildings, construction of 732 new
Ministry of Railways (MoR) in December 2011. railway bridges.
The improvement of rail communication and
Ongoing important projects of Bangladesh
transport services has been included as a priority
Railway are Padma Bridge Rail Link Project,
sector in the national document on 8th Five-Year
Bangabandhu Sheikh Mujib Railway Bridge
Plan and Perspective Plan, Vision-2021 and more
Construction, Construction of Single Line Dual
budget has been provided for the development of
Gauge Railway Track from Dohazari to Cox's
the railway than that of the previous years. Total
Bazar via Ramu and Ramu to Gundum Near
Number of 230 projects costing of Tk
Myanmar, Construction of Dual Gauge Double
5,53,662.00 crore have been included in newly
Rail Line and Conversion of Existing Rail Line
approved railway master plan for implementing
into Dual Gauge Between Akhaura and Laksam,
those projects at six stages from July 2016 to
Construction of Khulna-Mongla Port Rail Line,
June 2045.
Construction of 3rd & 4th Dual Gauge Line in
Bangladesh Railway has around 3,101 km of Dhaka-Tongi and Dual Gauge Double Line in
network which connects 43 districts and almost Dhaka-Joydevpur Section of Bangladesh
all the important places of the country. Necessary Railway, Construction of Dual Gauge Railway
steps have been taken for renovation of existing Line from Bogra to Shahid M. Mansur Ali
rail tracks, purchase of new locomotives, wagons Station Sirajganj, Construction of Broad Gauge
and coaches, repair of old locomotives and Line From Madhukhali to Magura Via
wagons, expansion and rehabilitation of existing Kamarkhali, Construction of a Dual Gauge Line
rail tracks, modernization of the signaling system Parallel to the existing Meter Gauge Line in
and level crossing gates. As per instruction of Dhaka-Narayanganj Section, Conversion of
Honorable Prime Minister the activities are Meter Gauge Line into Dual Gauge Line from
continuing to promote Bangladesh Railway to 4 Parbatipur to Kaunia Section, Construction of
zones and 8 divisions. In financial year 2022- Khulna-Darsana Double Line.
2023, around 33 investment projects and TA
Table 11.7 présents year wise data on overall
projects are being implemented by the ministry.
performance of Bangladesh Railway over the
New districts will be brought under the rail
period from FY2010-11 to FY2021-22.
network and national and international
connections such as Trans Asians Rail Network,
SAARC rail network will be established through
MT of cargo in FY 2021-22, with the aid of than 1.50 crore MT of cargoes, 1 lakh TUEs of
newly constructed yards and terminals. In the containers and 20 thousand of cars annually.
fiscal year 2021-22, the growth rate of imports Table 11.13 shows the income and expenditure of
and exports on an average was 3.77 percent in the Mongla Port from FY2010-11 to FY2022-23.
case of cargo and 7.16 percent in the case of
Table 11.13: Income, Expenditure and
containers. To manage the rising volume of
Profit/Loss of Mongla Port
containers, the Chattogram port presently
(Taka in Crore)
possesses a fleet of 153 container handling
Fiscal Net Income/
equipment and 248 cargo handling equipment Income Expenditure
Year Loss (+/-)
including Quay Gantry Cranes and Rubber Tired
Gantry Cranes. Furthermore, the Chattogram port 2010-11 85.52 63.69 21.83
is procuring 104 nos. of equipment to enhance its 2011-12 105.81 71.66 34.15
operational capabilities. 2012-13 138.08 94.13 43.95
2013-14 155.73 102.10 53.63
Table 11.12 shows the income and expenditure of
CPA. 2014-15 170.17 109.48 60.69
2015-16 196.62 131.90 64.72
Table 11.12: Income and Expenditure of CPA 2016-17 226.56 155.15 71.41
(Taka in Crore) 2017-18 276.14 166.81 109.33
Fiscal Rev. Rev. Rev. Surplus
2018-19 329.12 196.12 133.00
Year Income Expenditure (Before Tax)
2019-20 338.19 221.01 117.18
2010-11 1453.15 634.13 819.02
2020-21 348.35 217.27 131.08
2011-12 1529.92 652.62 877.30
2021-22 317.08 219.99 97.09
2012-13 1570.37 803.00 767.37
2013-14 1634.32 815.65 818.67 2022-23* 207.93 152.93 55.00
2014-15 1876.82 860.95 1015.87 Source: Mongla Port Authority * Up to February 2023.
2015-16 2029.25 1065.83 963.42
From FY 2010-11 to FY 2019-20, handling of
2016-17 2407.65 1352.54 1055.11
ships increased by 12.23%, Cargo 14.75% and
2017-18 2661.76 1390.52 1271.24
2018-19 2892.86 1610.53 1282.33 Container 5.59% and revenue income 13.17%
mvgwqK
2019-20 2924.99 1716.29 1208.70 respectively. However, in the FY 2020-21,
2020-21 3070.36 1892.75 1177.61 Mongla port handled 970 ships, 119.45 lac m.ton
u
2021-22* 3585.01 1934.30 1650.71 cargo, 43959 TEUS container. Moreover, in the
2022- 2078.60 907.81 1170.79 FY2020-21 revenue income was Tk 340 crore.
Source: Chattogram Port Authority *Provisional **Up to January 2023.
23** Payra Port Authority
Mongla Port Authority (MPA)
Payra Port started its journey as third sea port of
Mongla Port is being turned into a modern the country on 19 November 2013. In order to
facilitated seaport gradually by implementing engage the port in operational activities on a
different development projects. At present, limited scale within clinker, fertilizer and other
Mongla port has the capacity to berth more than bulk carrier vessels at outer anchorage and
47 ships at a time, 6 in own jetties, 14 in private discharge the cargo by inland vessels for
jetties, 3 in mooring and 24 in anchorages hinterland transport. For hassle free foreign and
respectively. There are 2 warehouses, 4 transit inland vessels movement fare way and mooring
shed, 1 staffing and un-staffing shed, 6 container buoys have been laid to earmark navigational
yards, 2 car yards that can accommodate more channel. Very High Frequency (VHF) Base
station is also installed with telecommunication Table 11.14: Income and Expenditure of
equipment. The customs and shipping facilities Bangladesh Land Port Authority
(Taka in Crore)
have also been established. As per requirement of Fiscal year Income Expenditure Surplus (+/-)
International Association for Ports and Harbor,
2010-11 41.20 32.38 8.82
International Ship and Port Facility Security
2011-12 42.08 31.91 10.17
(ISPS) code has been implemented and UN
2012-13 47.78 35.82 11.96
locator code has been allotted for Payra Port by 2013-14 61.31 51.06 10.25
United Nations to ensure security of the port. 2014-15 70.52 47.38 23.14
5,390 acres of land has been acquired to establish 2015-16 83.20 55.36 27.84
2016-17 111.51 75.02 36.49
various infrastructures and support facilities for
2017-18 148.33 95.53 52.80
the port. An immediate maintenance dredging
2018-19 210.94 144.25 66.68
project was undertaken for about 9.75 million
2019-20 208.77 160.03 48.74
cubic meters of dredging. As a result, ships with
2020-21 264.83 174.73 90.10
a capacity of 25,000 DWT are being able to enter
2021-22 272.32 252.26 20.06
the Rabnabad Channel regularly. Moreover, The
2022-23* 128.31 91.38 36.93
Capital and Maintenance Dredging of the
Source: Bangladesh Land Port Authority* Up to December 2022
Rabnabad Channel was inaugurated by the
Honorable Prime Minister on October 27, 2022 During the FY 2022-23, a total of 06
to facilitate the arrival of ships with the capacity development projects/activities are being
of 50,000 DWT. Payra Port has earned Tk. 71.40 implemented under Bangladesh Land Port
crore (including Vat) by handling 1,302 national Authority at the cost of Tk 1424.00 crore. During
and international vessels so far. It is expected that this fiscal year, development activities of 3 land
the flow of ships will be doubled by March, ports named Bilonia, Sheola and Dhanua-
2024. Kamalpur will be completed and operation of the
ports will be commenced. A Project to construct
Bangladesh Land Port Authority (BLPA) Cargo Vehicle Terminal on 41.00 acres of land is
At present, total number of land ports are twenty being implemented at Benapole Land Port at the
four (24); among those fifteen (15) land ports are cost of Tk 329.00 crore and progress of the
project is 40%. In the fiscal year 2022-23,
in operation. Out of fifteen (15) land ports
International Passenger Terminal in Ramgarh
Benapole, Bhomra, Akhaura, Burimari,
Land Port has been constructed in Ramgarh
Nakugaon, Tamabil, Sonahat, Gobrakura-
Upazila of Khagrachari district with the financing
Koroitoli, Belonia and Ramgarh Land Ports are
of World Bank. As a result passenger movement
being operated by own management of BLPA
with Tripura state will start through this port very
while Sonamoshjid, Hilli, Teknaf, Banglabandha
soon.
and Bibirbazar Land Ports are being operated on
Build Operate Transfer (BOT) basis. Table 11.14
Department of Shipping (DOS)
shows year wise income and expenditure of
BPLA during the period from FY2010-11 to The training and examination procedures for the
FY2022-23. seafaring officers and crews of the ocean-going
vessels plying on the international routes have
been streamlined in accordance with the related
international convention. As a result, Bangladesh
is included in the ‘White List’ of the International
reliable, affordable and sophisticated telecom telephone exchanges with high speed internet
services. At present, it is working on the connection at district / upazila levels and strong
development of internet, especially broadband telecommunication network will be established
internet, across the country through efficient across the country. In addition, a project titled
utilization of resources of government and non- "Switching and Transmission Network
government organizations. Price of internet Development for Strengthening Digital
bandwidth has been decreased appreciably in the Connectivity” for the installation of high capacity
last 10 years. Besides optical fibre network switching exchanges and transmission equipment
coverage has been expanded throughout the at a cost of Tk 155.38 crore is being
country to ensure quality internet service. To implemented. BTCL is implementing
ensure the impact of this huge backbone network Telecommunication Network Establishment
development, BTRC has launched a new internet Project in Chattogram Mirsarai Economic Zone
tariff named “One Country One Rate”. For this at a cost of Tk 61.90 crore, Broadband Wifi
reason, people across the country are getting expansion project for disadvantaged people in
access to quality internet service at affordable Haor, Baor and remote areas at a cost of Tk
prices. 459.85 crore and “BTCL’s Internet Protocol (IP)
Network Development and Expansion” project at
Bangladesh Telecommunication Regulatory
a cost of BDT 945.50 crore to expand and
Commission (BTRC) has collected Tk 1676
improve the quality of high speed broadband
Crore as revenue up to March, 2023 during FY
internet services across the country.
2022-23. The "Ad Hoc-Digital Security Cell"
was formed through its own manpower of BTRC. The project titled “Establishment of
This cell is constantly conducting various state Telecommunication Networks in Economic
security and public safety monitoring activities Zones (Phase I)” at a cost of BDT 95.12 crore is
on social media. Besides, it removes these being implemented for setting up
harmful content from social media. Various telecommunication networks in 5 economic
internet giants- Facebook and Google-YouTube zones under BEZA. In order to provide modern
have started paying VAT including necessary and uninterrupted telecommunication services
registration. In order to ensure cyber security for with 5G readiness across the country, BTCL's
telecommunication sector related organizations project titled "Development of 5G-compliant
and to provide necessary assistance in mitigating Optical Fiber Transmission Network of BTCL" at
cyber security risks in any situation of the state, a cost of BDT 1059.10 crore is under
BTRC- CSIRT is formed in combination with implementation. The project titled 'Establishing
Posts & Telecommunications Division, BTRC, External Telecommunication Network for
Department of Telecom, Digital Security Agency Rooppur Nuclear Power Plant' is under
and related other organizations. implementation by BTCL for establishment of
state-of-the-art and high speed dedicated external
Bangladesh Telecommunications Company
telecommunication network for Rooppur Nuclear
Limited (BTCL)
Power Plant. Table 11.19 shows the revenue
At present the project titled ‘Modernization of targets, revenue income and expenditure of BTCL
Telecommunication Network for Digital during the period from FY 2010-11 to FY 2022-
Connectivity’ is being implemented at a cost of 23.
BDT 3314.94 crore through which modern
Bangladesh Submarine Cable Company 27,000 per Mbps (Mega bit per second) in 2009
Limited (BSCCL) to less than Tk. 300 in 2023.
Although the initial bandwidth capacity of Under upgradation process of the SEA-ME-
BSCCL through SEA-ME-WE 4 submarine cable WE 4 submarine cable a contract agreement
system was only 7.5 Gbps, by joining various has been signed with the supplier, Ciena and
upgradation programs and establishing with this upgradation, the total capacity of
connectivity with the SEA-ME-WE 5 submarine SMW4 Submarine Cable System will be 4600
cable system in 2017, it presently stands at 3420 Gbps. Bangladesh’s 3rd Submarine Cable
Gbps. At present BSCCL alone is satisfying about installation work is in progress under the
60% demand in the case of the country's overall SEA-ME-WE 6 (SMW6) consortium. The
internet bandwidth, whose amount is about 2524 supplier selected by the consortium started its
Gbps (Gigabyte Per Second) as per data collected job from 15/02/2022 and completed the
on 29 March 2023. Various initiatives taken by Desktop Study and the Route Survey work of
the government to reduce the cost of internet has Bangladesh portion.
made it affordable for the mass people. Due to
Table 11.20 shows year wise revenue iincome of
the relentless effort of the present government,
BSCCL during the period from FY2010-11 to FY
bandwidth price has been reduced from Tk.
2021-22.
Table 11.20: Income and Expenditure of Bangladesh Submarine Cable Company Limited
(Taka in Crore)
Particulars 2010- 2011- 2012- 2013- 2014- 2015- 2016- 2017- 2018- 2019- 2020- 2021-
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Revenue 83.78 121.45 124.84 75.37 54.07 61.86 103.67 140.5 195.57 249.86 344.85 441.74
Earned
Net Profit 54.48 83.13 109.59 48.81 13.90 17.87 38.95 29.39 77.90 125.20 239.98 320.10
(before
tax)
Net Profit 30.51 74.48 87.21 36.23 12.91 16.55 31.82 7.33 58.58 95.60 190.73 250.02
(after tax)
Source: BSCCL