Professional Documents
Culture Documents
Claire's Rent Shawl Knitting Pattern V2
Claire's Rent Shawl Knitting Pattern V2
Skill Level
Yarn
Yarn Notes
Please note that the skeins of yarn needed for Yarn A and Yarn B will
need to be made into two balls for each color.
This is because of the intarsia technique used in the pattern, you will
have to attach one ball at one end of the work and the other at the
other end when you are knitting.
Please see the next page for tips on keeping your yarn organized...
While working with 5 balls of yarn you need to find a system that works
for you - so that the yarn doesn't get tangled.
I used a basket with holes in to separate the yarn.
You can use ziplock bags, old coffee tins with a hole in the lid or a
knitting bag with holes in if you have one.
Tip!
Needles
Notions
Tape measure
Darning needle
Scissors
Stitch markers
Stitch holder (or spare cable with end caps to hold sts)
Gauge
10 x 10 cm/4 x 4 inches = 18 sts and 30 rows in garter stitch.
Measurements/Sizes
*Please note - these sizes are just a rough guide, you can knit this
shawl until it is comfortable for you to wear - test it out against
yourself to see if you want to make the length shorter or longer before
dividing the sections.
The smallest sizes will result in the shawl meeting in the middle of
your waist, the larger sizes will allow you to wrap the shawl around
your body and tie it at the back of the waist.
You can add fewer or more stitches to adjust the size to increase or
decrease.
Add fewer by - 40 stitches and more by + 40 sts.
Where you are able to adjust the size is noted in the pattern.
Abbreviations
Beg - beginning
Cont - continue
Foll - following
K - knit
K2tog - knit the next 2 stitches together
YO - yarn over needle
PM - place marker
SM - slip marker
Rem - remaining
Rep - repeat
RS - right side
WS - wrong side
Front
You can see here that the front
is neat with no seaming visible.
On the back you will see the
neat edges of the colours that
join when knitted with the
intarsia technique.
Back
Pattern
Yarn A - Shire 2445 (dark green)
Yarn B - Black 8555 (black)
Yarn C - Smoke Heather 9450 (light green)
Pattern
Row 1 (RS): Cont to knit with Yarn A, K6, add in Yarn B from the
back side and K1 stitch before the marker, YO, SM, K1, YO, K1,
attach the second ball of Yarn A, K to end.
Row 2 (WS): Knit the row, slipping the marker, and maintaining
the color pattern.
Row 3: With Yarn A, K6, With yarn B K to marker, YO, SM K1, YO,
K to color change, K to end in Yarn A.
Row 4: Rep row 2.
Rep rows 3 and 4 until there are 27 sts on the needle.
Please note - if you need help to see how to add in the color
changes - there is a video on my YouTube channel here or you can
cut and paste the link into your browser here -
https://www.youtube.com/watch?v=e5foajVMcH8&t=13s
Video
tutorial
Pattern
In the next stage, you will join in Yarn C the main color.
Row 1 (RS): With Yarn A, K6, With Yarn B, K6, add in Yarn C by
knitting the first stitch before the marker, YO, SM, K1, YO, K1,
attach the second ball of Yarn B and K6, then K6 in Yarn A.
Row 2 (WS): K across all stitches maintaining the color pattern
and slipping the marker.
Row 3: With Yarn A, K6, With Yarn B, K6, with Yarn C K to marker,
YO, SM, K1, YO, K to color change, K6 in Yarn B, K6 in Yarn A.
Row 4: Rep row 2.
Rep rows 3 and 4 until you have 145 sts (S) 185 sts (M – as seen in
the photos) 225 (L) 265 (XL).
Pattern
Pattern
Now you will cont to decrease the right section maintaining the
color pattern as you knit until you have 3 sts left on the needle:
Row 1: K to last 4 sts, K2tog, remove marker, K2.
Row 2: K to end maintaining the color pattern.
Row 3: K to last 3 sts, K2tog, k1.
Row 4: Rep row 2.
Row 5: K to last 2 sts, K2tog.
Row 6: Rep row 2.
Row 7: K to last 2 sts, K2tog.
Row 8: Rep row 2.
Row 9: K to last 4 sts, K2tog, K2.
Row 10: Rep row 2.
Row 11: K to last 4 sts, K2tog, K2.
Row 12: Rep row 2.
Row 13: K to last 4 sts, K2tog, K2.
Row 14: Rep row 2.
Row 15: K to last 3 sts, K2tog, K1.
Row 16: Rep row 2.
Row 17: K to last 2 sts, K2tog.
Row 18: Rep row 2.
Row 19: K to last 2 sts, K2tog.
Row 20: Rep row 2.
Pattern
Pattern
Finish The Left Section
Place sts from the spare cable or stitch holder onto the working
needles/cable.
Start at the center spine and join Yarn C to the first st.
Row 1: With Yarn, K2, PM, K to the end of the row, maintaining
the color pattern.
Row 2: K until 2 sts before the marker (maintaining color
pattern), K2tog, SM, K2.
Row 3: K to the end of the row maintaining the color pattern.
Rep rows 2 and 3 until you have 14 (16, 18, 20) sts left.
Now you will cont to decrease the left section maintaining the
color pattern as you knit until you have 3 sts left on the needle:
Pattern
Pattern
To Finish:
Weave in all of the loose ends and try it on!
The smaller version will give you the rent shawl that meets in the
middle of your waist.
The larger sizes will allow you to wrap and tie the shawl behind
your waist.