Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

FORM

Title: Halliburton Management System


ALGERIA Slickline Pre-Job Truck Service Checklist Document Number:
Region: Function/PSL: CL-ALG-HAL-SL-204
Algeria WPS - Slickline
Owner: Approved By: Job Revision By: Rev Date: Rev No: Page:
Ammar Zebda Mohamed Hassan Parampal Singh Madhok 17-Feb-22 B 1 of 1

Pre-Job Truck Service Checklist


Unit No.______11248585 _________ Date:______24/08/2023_________
Location:_____ONI 501__________________
Use the following Inspection Code
( ) OK
( O ) Follow up repairs made
( X ) Adjustments made

To be performed before transporting unit to job.


( OK )Fuel up unit.
( OK )Fill line oiler tank.
WARNING Vent tank before removing fill plug.
( )Check engine crankcase oil levels (main and generator).
( )Check hydraulic tank fluid level.
( )Drain water from fuel filter bowls and air dryer (if equipped).
( )Fill grease injection supply reservoir (if equipped).
( )Check and stow tools.
( )Start engines and allow to warm up.
( )Check that engine oil pressure and coolant temperature are in the normal range.
( )Increase main engine rpm and check console pressure gauges to ensure all systems are functioning normally.
( )320 psi charge pump pressure
( )10 psi return pressure (35 psi maximum)
( )Check hydraulic filter change indicators.
( )Reduce speed and shut off engines.
( )(Check that all safety equipment is present.
( )Walk around trailer visually checking tires, doors, brakes, and lights.

COMPLETED BY:
(Employee #)_____SAID ZEGHIDI_______ Signature:_______________________________________
Comments: HORN/ CRANE SWITCH LIMTE/TEMP AND HYDRAULIC GAUGES NOT WORKING
________________________________________________________________________

PRINTED VERSION OF THIS DOCUMENT IS UNCONTROLLED

You might also like