Name of Company: Balajee Infratech & Constructions Pvt. Ltd. Project / Location: MAIN SPINE ROAD PACKAGE PROJECT
REV NO : 00
Level Likelihood Rating (How frequent) Likelihood Rare Remote Occasional Frequent Certain
Severit (1) (2) (3) (4) (5)
y
2 Minor Injury or ill-health requiring first-aid only (includes minor cuts and bruises, irritation, ill-health Minor effect INR (50,000 – 5,00,000) Minor effect Minor impact
with temporary discomfort).
Injury requiring medical treatment or ill-health leading to temporary disability (includes
3 Moderate lacerations, burns, sprains, minor fractures, dermatitis, deafness, and work-related upper limb Localized effect INR (5,00,000 – 50,00,000) Localized effect Considerable impact
disorders).
4 Major Serious injuries or life- threatening occupational disease (includes single fatality, amputations, Major damage INR (50,00,000 – 5,00,00,000) Major effect National impact
permanent disability, major fractures, multiple injuries, occupational cancer, acute poisoning).
5 Catastrophic Multiple fatality, fatal diseases or multiple major injuries. Extensive damage INR (>5,00,00,000) Massive effect International impact
Consequence Applicable Legal
Sl No. Activity OH&S (nature of Existing Control Measures Probability Severity Risk Proposed Control Measures Residual Risk Category Person Signature
Hazard Description injury/ Illness) (Describe Briefly) Category (Including Additional) & Other Responsible
requirement
Consequence Applicable Legal
OH&S (nature of Existing Control Measures Risk Proposed Control Measures Person
Sl No. Activity Hazard Description injury/ Illness) (Describe Briefly) Probability Severity Category (Including Additional) Residual Risk Category & Other Responsible Signature
requirement
1.Hazardous waste
Soil • Fueling of oil for the excavators can be
2.Contamination- done using funneling system
5 Environmental Lubricants, oils, spillages, Personal injury • Maintenance can be done at separate Separate maintence yard should be
Aspect wastage during Fueling or and material yard. 2 2 4
given for vehicles
MODERATE • BOCW ACT Site Engg
maintenance of damage
machineries
Project - In charge / Manager HSE - In charge / Manager Project - In charge / Manager Lead EHS
Name
Designation
Signature