PIMU2

You might also like

Download as pdf
Download as pdf
You are on page 1of 2
"RESTORATI B.0.Q OF L/S GUIDE BANK U/S AQUEDUCT RD 770+460 CRB C. AL OF RENT" Sr.No Deseriptions Quantity Unit Rate Quoted by Contractor Earthwork in excavation of drains, irrigation channels through excavator Jdrag lines in all kind of soil and Jconditions(dry,wet stush.daldal and lunder water) including its disposal and Jpreparation of working pad for Joperation of machir 100 ft lead) . (Rates includes y B 3 1000 Borrowpit excavation from outside dressed lead upto 2 miles. 333020037 1000 eft Providing and weaving GL. wire Jnetting for wire crates, with G.L wire of approved size (including siding and partition to make erate):- 6" (130mm) Jmesh i) 8 SWG wire 94500,00 100 sft Supply and dumping at site. without boat, including handling of materials within three chains (90m) i) stone or boulder 179001.12 100 cit Supply and filling in wire crates, including sewing crates (excluding cost of crates): 4727628 100 cit Provinding and laying graded bajei 1/8 inch to 1/2 inch on slope 58197.03 100 cit Provinding and laying graded bajei 1/2 « 7 ig 4 $197.03 e inch to 2 inch on slope SSE 1m ft Providing and laying stone pitching on slope 116304.06 100 | ca 9 [Provinding and laying graded bajei 1/8 siege sae: | ee inch to 1/2 inch on level 0 g and laying graded bajei 1/2 jo [Provinding and laying graded bajei | ee ie | @ inch to 2 inch on level Providing and laying stone pitching on 11 level 2321.38 100 | et [Carriage of 100 CR. (2.83 cum) of all Imaterials like stone 16.1 laguregote. Spawl, kankar lime (unslaked), surkhi etc. or 150 CA. (4.2Scu.m) timber, by 12 truck or by any other means owned by 510079.11 100 | eft Jcontractor. Average lead 24 KM Ist [KM hilly area and lost 1 KM Kacha Divisinal Head Draftsman Contractor CRB Canal Division Taunsa Sharif

You might also like