Professional Documents
Culture Documents
Ventures Report - 4
Ventures Report - 4
Hotel Projects
in the GCC
1
Ventures Onsite Top 25 Planned Hotel Projects in the GCC
The project calls for the construction of a moon replica building along the Jumeirah area.
The structure will be 200 meters tall, with a 198-meter sphere diameter. It will house 4,000 luxury
suites. It will incorporate boutique private residences of 300 units wherein owners will be members of
an exclusive club. The resort’s main attraction is to enable guests to experience walking on the lunar
surface while exploring the lunar colony.
2
Ventures Onsite Top 25 Planned Hotel Projects in the GCC
The project calls for the construction of a new leisure Island resort located at a mega-resort, between
the cities of Amlaj and Wajh, Tabouk Province. The Dolphin shape island will include 11 hotels with
approximately 8,000 rooms. The project will include a new beach and a new lagoon with a sunken
seating area and fire pit overlooking the Red Sea, and a new sea pool.
Country: KSA
Project Status: Design
Consultant: WSP
Construction Start: Oct 2024
The project calls for the construction of a hospitality, hotels and resorts area including other related
facilities located in New Jeddah Downtown.
3
Ventures Onsite Top 25 Planned Hotel Projects in the GCC
Country: KSA
Consultant: --
The project calls for the construction of mixed-use luxury towers located at the intersection of King
Fahd with Anas bin Malik in Riyadh Province. The project will cover an area of 27,700 sq.m, with a total
built-up area of 160,000 sq.m. The towers will be 60 stories and will be used for residential,
commercial, office, and hotel purposes.
Country: UAE
Project Status: Tender for Construction
WorldCare Limited, Moafaq Al Gaddah
Client: (MAG) Group
The development calls for the construction of a 26-acre beachfront project in Jumeirah, in the same
location as Burj Al Arab.
The project will have the following scope: MGM hotel 1 is of ground + 17 storey + roof and is 82.225
meters tall. | MGM Hotel 2 is of ground + 14 storey + roof and 72.18 meters tall | Bellagio Hotel is of
ground + 10 storey + roof and is of 58.53 meters tall | Aria Hotel is of ground + 11 storey + roof and is
60.165 meters tall; and the Central Entertainment is of ground + 4 levels + roof and is 35.20 meters
tall.
Included in the scope is Bellagio Villas. There are 2 levels of basement in the development. Project No
is R1029/E. The BUA project is estimated at 400,000 square meters.
Country: Qatar
The project will comprise over 350 apartments, more than 260 rooms, a business/boutique hotel, and
many lifestyle cafes and retail outlets. The project is phase 2 of Place Vendome which is currently
under construction.
5
Ventures Onsite Top 25 Planned Hotel Projects in the GCC
Consultant: Muamir
L.L.C.
Design & Engineering Consultancy
The project calls for the construction of a mixed-use resort on a 620,000 square metres plot in Barka.
The development will feature 243 villas, 600 apartments, 56 townhouses, three 5-star hotels, a 4-star
hotel, a retail area of around 24,000 square metres, retail and office area of around 70,000 square
metres, lagoon of around 4 hectares and a promenade. The project was earlier known as Barka Resort.
Consultant: --
Construction Start: Nov 2024
The project calls for the construction of District 4, the Nabataean Horizon in Al Ula consisting of an
Equestrian Village for equestrian sports in the valley, Nabataean Village, Maraya Hall, Luxury
Nabataean Farms, Resorts, Arabian Horse Heritage Museum, Nabataean Theater, and Ashar RV Park.
6
Ventures Onsite Top 25 Planned Hotel Projects in the GCC
Consultant: --
The project calls for the construction of Dadan District consisting of a heritage site, interpretive center,
Modern Dadan Village, Kingdoms Institute, Black Basalt Museum, Skyviews, a 5-star hotel, and a
luxury new resort in Al Ula.
The project calls for the construction of a heritage village within the Sahel Al Emarat Development,
Ghantoot, Abu Dhabi. The area will include a wellness clinic and retreat, a boutique hotel, town centre
and additional amenities where modernity meets tradition in a unique setting of Arabian culture.
7
Ventures Onsite Top 25 Planned Hotel Projects in the GCC
The project calls for the construction of a 159-key luxury resort located at the Red Sea Project in
Tabouk Province.
Consultant:
Construction Start: May 2025
The project calls for the construction of a new hotel located in a mega-resort, between the cities of
Amlaj and Wajh, Tabouk Province. The project consists of 430 rooms along with associated facilities.
The project calls for the construction of a ski village, ultra-luxury family and wellness resorts located
at TROJENA mountain tourism project. The project is 2,400 meters above sea level and will features
sporting events, art exhibitions, concerts and cultural festivals.
9
Ventures Onsite Top 25 Planned Hotel Projects in the GCC
The project involves construction of a mega development located in Al Khobar, Eastern Province. The
project includes a five star and a four star hotel, club house, Marine Resort & Cafe and duplex villas.
The project calls for the construction of a luxury located just 30km from the city center and 45km from
King Fahd International Airport. The project will include 33 luxuriously designed rooms, 90
InterContinental residences, and 36 villas, and will also have four dining options, an indoor and
outdoor pool, a health club, and a spa. The hotel will also offer a business center and four meeting
rooms, catering to the needs of both business and leisure guests.
10
Ventures Onsite Top 25 Planned Hotel Projects in the GCC
The project calls for the construction of a new luxury hotel located in Riyadh Province. The project
consists of 400-room and serviced apartments and will feature dining options, multipurpose meeting,
and events rooms, a health club, and a spa.
The project calls for the construction of a 230-room hotel in Al Zorah Resorts in Ajman. Al Zorah
Resorts will have an area of 5.4 million square meters developed across 12 kilometers of shoreline on
Ajman's northern coast. It will have 139 standard guestrooms, 17 executive suites, 11 spa suites, 10
pool chalets, 10 family suites, 6 villas, and beaches.
11
Ventures Onsite Top 25 Planned Hotel Projects in the GCC
The project calls for the construction of a new hotel located in a mega resort, between the cities of
Amlaj and Wajh, Tabouk Province. The project consists of 210-rooms along with associated facilities.
Project calls for the construction of Canopy by Hilton, a hotel comprising 200 rooms within the project
"The Avenues Khobar".
12
Ventures Onsite Top 25 Planned Hotel Projects in the GCC
Country: KSA
The project calls for the construction of a 300 room Rove Hotel and a 117 high end smart apartments
Rove Home Aljada. The hotel and the residences will be connected to each other.
The residences will feature colorful and contemporary design that offers its residents impressive
facilities, including exclusive access to a well-stocked gym and swimming pool, as well as the presence
of a café, restaurant, co-working, meeting spaces, and retail on the ground-floor level.
13
Ventures Onsite Top 25 Planned Hotel Projects in the GCC
The project includes 149 rooms and suites and also features six restaurants and lounge outlets,
meeting and events spaces, a marine discovery center, and Kids For All Seasons space.
The project calls for a new mixed-use project with architecture inspired by gemstones located in
Riyadh province.
The project will include a 250-room hotel, 120 serviced apartments, and a 135,000 square meter
residential complex with 700 apartments, also will features 50,000 square meters of office space and
a 20,000 square meter ‘entertainment city’ with 15,000 sq. m of green areas, and parking space for
5,500 vehicles.
This report is prepared by Ventures Onsite
Top 25 Planned Hotel Projects in the GCC