Download as pdf or txt
Download as pdf or txt
You are on page 1of 12

INDIAN INSTITUTE OF TECHNOLOGY MADRAS

M.Tech Project Weekly Update


on
Supply Chain Management (SCM)

Name: AMIT G SINGH


Guided by:
Roll No: CE22M106
Prof. Koshy Varghese
Branch: Construction Technology and Management
TABLE OF CONTENTS
SL No. Topic
1 Literature search on Google Scholar

2 Literature search on Scopus

3 Literature search on Research Gate

4 MS5332, Supply Chain Management ( Analytics) Course Assignment


1. Literature search on Google Scholar:

Keywords: Supply Chain Management , Construction , Collaboration , Project Delivery


Result: Got around 254 literatures related to the above mentioned keywords.
Some relevant literatures found :
1. Construction Supply-Chain Management: A Vision for Advanced
Coordination, Costing, and Control.
2. Supply Chain Management In Construction; Revealed.
3. Supply Chain Improvement in Construction Industry
4. A conceptual model for construction supply chain management
implementation
5. Understanding construction supply chains: an alternative interpretation.
6. Supply chain management in construction: a literature survey
7. Effective Supply Chain Management.
2(A) Literature search on Scopus:

Keywords: Supply Chain Management , Construction , Procurement


Result: Got around 449 literatures related to the above mentioned keywords.
Some relevant literatures found :
2(B) Literature search on Scopus:

Keywords: Supply Chain Management , Construction , Procurement, Collaboration


Result: Got around 58 literatures related to the above mentioned keywords.
Some relevant literatures found :
3. Literature search on Research Gate:

Keywords: Supply Chain Management , Construction.


Some relevant literatures found :

1. Impact of sustainable supply chain management in construction Industry.


2. A short review of the concept and principles of supply chain management
in Building construction Industry.
3. Impact of Effective Supply chain management and supply chain risk
management capabilities on construction project performance.
4. Procurement routes, supply chain management and Building Information
modelling: A review of trends and impacts on Construction Industry.
4. MS5332, Supply Chain Management ( Analytics) Course Assignment

 A case study involved forecasting the demand of the various spare parts of the L&T construction’s
and Mining Business.

 We were given the past data of 4 years for some spare parts and were required to forecast the
demand for future using various forecasting models.

 The various models used for forecasting is as follows:


 Autoregressive (AR ) Model
 Moving Average (MA) Model
 Autoregressive Moving Average ( ARMA ) Model
 Autoregressive Integrated Moving Average (ARIMA ) Model
 Exponential Smoothing

 The Various tools we used for analysis are Excel data Analysis Tool Pak, IBM SPSS Statistics software
for advanced statistical analysis.
THANK YOU

You might also like