Callout of Detail Measurement of Sand Estimate

Cate. Location Total Area - Cu.ft Quantity Unit Fact. - Cu.ft Total- Suds

FOUNDATION Lean Conc. 101.479 1 53.7 0.5


1: 2 :4 CEMENT CONCRETE Footing , Column , Ground Beam , Floor Beam , Roof Beam , Stair , 1074.13 1 515.58 5
Slab and Roof Slab.
FLOORING
Sand Filling Ground Floor 135.208 1 100 2
1:3:6 Cement Concrete Flooring - 4 1/2’’ Thk. Ground Floor 202.81 1 48 1
1:2:4 Cement Concrete Flooring - 1 1/2 in. Thk. Ground Floor 67.6 1 46 0.031
BRICK WORK
Brick Work With 1:3 Cement Motor Parapet Wall 46.43 1 26 0.12
Brick Work With 1:3 Cement Motor External , Internal Wall 1096.59 1 26 2.9
Brick Work With 1:4 Cement Motor Retaining Wall 343.5 1 28 0.961
PLASTERING WITH CEMENT MOTOR
Building Plinth , External , Internal 5796.67 1 5 3
Parapet Wall Roof Slab 123.834 1 5 0.062

TOTAL 15.574