Tramo Largo Diametro Ancho

TR1-v1 4.141 0.16 0.76


v1-TR2 1 0.16 0.76
TR2-TR3 20.256 0.16 0.76
TR3-V2 9.53 0.16 0.76
V2-TR4 1.513 0.16 0.76
TR4 MED. (80mm)-RAD(25mm) 0.495 0.11 0.601
RAP(25MM) 4.423 0.11 0.601
TR4-RAD(13mm) 8.609 0.11 0.601
RAD(13mm) 4.423 0.11 0.601
TR4-TR5 16.298 0.11 0.601
TR5-TR6 3 0.11 0.601
TR6-TR7 17.1 0.11 0.601
TR7 1 0.11 0.601
TR6-TR8 13 0.11 0.601
TR6-TR9 13.8 0.11 0.601
TR9-TR10 25.7 0.11 0.601
TR10-TR11 13.8 0.11 0.601
TR11 1 0.11 0.601
TR10-TR12 24.5 0.11 0.601
TR12 1 0.11 0.601

TR4-TR13 22.6 0.11 0.601


TR13-TR14 19 0.11 0.601
TR14-TR15 12.6 0.11 0.601
TR15-TR16 12.3 0.11 0.601
TR16 1 0.11 0.601
TR15-TR17 24.5 0.11 0.601
TR17 1 0.11 0.601
TR14-TR18 38.8 0.11 0.601
TR18-TR19 18.3 0.11 0.601
TR19-TR20 13.3 0.11 0.601
TR20 1 0.11 0.601
TR19-TR21 24.5 0.11 0.601
TR21 1 0.11 0.601
Profundidad Excavacion
1.46 4.59
1.46 1.11
1.46 22.48
1.46 10.57
1.46 1.68
1.41 0.42
1.41 3.75
1.41 7.30
1.41 3.75
1.41 13.81
1.41 2.54
1.41 14.49
1.41 0.85
1.41 11.02
1.41 11.69
1.41 21.78
1.41 11.69
1.41 0.85
1.41 20.76
1.41 0.85

1.41 19.15
1.41
1.41 10.68
1.41 10.42
1.41 0.85
1.41 20.76
1.41 0.85
1.41 32.88
1.41 15.51
1.41 11.27
1.41 0.85
1.41 20.76
1.41 0.85

M3 excavacion 310.8
Esponjamiento 46.62
M3 total 357.42
ACAMADO ARENA
Tramo Largo Ancho Espesor
TR1-v1 4.141 0.76 0.10
v1-TR2 1 0.76 0.10
TR2-TR3 20.256 0.76 0.10
TR3-V2 9.53 0.76 0.10
V2-TR4 1.513 0.76 0.10
TR4 MED. (80mm)-RAD(25mm) 0.495 0.601 0.10
RAP(25MM) 4.423 0.601 0.10
TR4-RAD(13mm) 8.609 0.601 0.10
RAD(13mm) 4.423 0.601 0.10
TR4-TR5 16.298 0.601 0.10
TR5-TR6 3 0.601 0.10
TR6-TR7 17.1 0.601 0.10
TR7 1 0.601 0.10
TR6-TR8 13 0.601 0.10
TR6-TR9 13.8 0.601 0.10
TR9-TR10 25.7 0.601 0.10
TR10-TR11 13.8 0.601 0.10
TR11 1 0.601 0.10
TR10-TR12 24.5 0.601 0.10
TR12 1 0.601 0.10

TR4-TR13 22.6 0.601 0.10


TR13-TR14 19 0.601 0.10
TR14-TR15 12.6 0.601 0.10
TR15-TR16 12.3 0.601 0.10
TR16 1 0.601 0.10
TR15-TR17 24.5 0.601 0.10
TR17 1 0.601 0.10
TR14-TR18 38.8 0.601 0.10
TR18-TR19 18.3 0.601 0.10
TR19-TR20 13.3 0.601 0.10
TR20 1 0.601 0.10
TR19-TR21 24.5 0.601 0.10
TR21 1 0.601 0.10

M3 totales
Esponjamient
M3 total
relleno inicial arena
Tramo Largo Ancho Espesor
TR1-v1 4.141 0.76 0.30
v1-TR2 1 0.76 0.30
TR2-TR3 20.256 0.76 0.30
TR3-V2 9.53 0.76 0.30
V2-TR4 1.513 0.76 0.30
TR4 MED. (80mm)-RAD(25mm) 0.495 0.601 0.30
RAP(25MM) 4.423 0.601 0.30
TR4-RAD(13mm) 8.609 0.601 0.30
RAD(13mm) 4.423 0.601 0.30
TR4-TR5 16.298 0.601 0.30
TR5-TR6 3 0.601 0.30
TR6-TR7 17.1 0.601 0.30
TR7 1 0.601 0.30
TR6-TR8 13 0.601 0.30
TR6-TR9 13.8 0.601 0.30
TR9-TR10 25.7 0.601 0.30
TR10-TR11 13.8 0.601 0.30
TR11 1 0.601 0.30
TR10-TR12 24.5 0.601 0.30
TR12 1 0.601 0.30

TR4-TR13 22.6 0.601 0.30


TR13-TR14 19 0.601 0.30
TR14-TR15 12.6 0.601 0.30
TR15-TR16 12.3 0.601 0.30
TR16 1 0.601 0.30
TR15-TR17 24.5 0.601 0.30
TR17 1 0.601 0.30
TR14-TR18 38.8 0.601 0.30
TR18-TR19 18.3 0.601 0.30
TR19-TR20 13.3 0.601 0.30
TR20 1 0.601 0.30
TR19-TR21 24.5 0.601 0.30
TR21 1 0.601 0.30

M3 total
Esponjamient
M3 total

relleno final 2, material excavacion


Tramo Largo Ancho
TR1-v1 4.141 0.76
v1-TR2 1 0.76
TR2-TR3 20.256 0.76
TR3-V2 9.53 0.76
V2-TR4 1.513 0.76
TR4 MED. (80mm)-RAD(25mm) 0.495 0.601
RAP(25MM) 4.423 0.601
TR4-RAD(13mm) 8.609 0.601
RAD(13mm) 4.423 0.601
TR4-TR5 16.298 0.601
TR5-TR6 3 0.601
TR6-TR7 17.1 0.601
TR7 1 0.601
TR6-TR8 13 0.601
TR6-TR9 13.8 0.601
TR9-TR10 25.7 0.601
TR10-TR11 13.8 0.601
TR11 1 0.601
TR10-TR12 24.5 0.601
TR12 1 0.601

TR4-TR13 22.6 0.601


TR13-TR14 19 0.601
TR14-TR15 12.6 0.601
TR15-TR16 12.3 0.601
TR16 1 0.601
TR15-TR17 24.5 0.601
TR17 1 0.601
TR14-TR18 38.8 0.601
TR18-TR19 18.3 0.601
TR19-TR20 13.3 0.601
TR20 1 0.601
TR19-TR21 24.5 0.601
TR21 1 0.601

M3 totales relleno arena 136.993


M3 totales relleno excavacion 159.294
M3 Encamdado Tramo
0.315 TR1-v1
0.076 v1-TR2
1.539 TR2-TR3
0.724 TR3-V2
0.115 V2-TR4
0.030 TR4 MED. (80mm)-RAD(25mm)
0.266 RAP(25MM)
0.517 TR4-RAD(13mm)
0.266 RAD(13mm)
0.980 TR4-TR5
0.180 TR5-TR6
1.028 TR6-TR7
0.060 TR7
0.781 TR6-TR8
0.829 TR6-TR9
1.545 TR9-TR10
0.829 TR10-TR11
0.060 TR11
1.472 TR10-TR12
0.060 TR12

1.358 TR4-TR13
1.142 TR13-TR14
0.757 TR14-TR15
0.739 TR15-TR16
0.060 TR16
1.472 TR15-TR17
0.060 TR17
2.332 TR14-TR18
1.100 TR18-TR19
0.799 TR19-TR20
0.060 TR20
1.472 TR19-TR21
0.060 TR21

23.086
3.46
26.55
M3 relleno inicial Tramo
0.944 TR1-v1
0.228 v1-TR2
4.618 TR2-TR3
2.173 TR3-V2
0.345 V2-TR4
0.089 TR4 MED. (80mm)-RAD(25mm)
0.797 RAP(25MM)
1.552 TR4-RAD(13mm)
0.797 RAD(13mm)
2.939 TR4-TR5
0.541 TR5-TR6
3.083 TR6-TR7
0.180 TR7
2.344 TR6-TR8
2.488 TR6-TR9
4.634 TR9-TR10
2.488 TR10-TR11
0.180 TR11
4.417 TR10-TR12
0.180 TR12

4.075 TR4-TR13
3.426 TR13-TR14
2.272 TR14-TR15
2.218 TR15-TR16
0.180 TR16
4.417 TR15-TR17
0.180 TR17
6.996 TR14-TR18
3.299 TR18-TR19
2.398 TR19-TR20
0.180 TR20
4.417 TR19-TR21
0.180 TR21

69.258
10.39
79.65

material excavacion
Espesor M3 relleno inicial
0.30 0.944
0.30 0.228
0.30 4.618
0.30 2.173
0.30 0.345
0.30 0.089
0.30 0.797
0.30 1.552
0.30 0.797
0.30 2.939
0.30 0.541
0.30 3.083
0.30 0.180
0.30 2.344
0.30 2.488
0.30 4.634
0.30 2.488
0.30 0.180
0.30 4.417
0.30 0.180

0.30 4.075
0.30 3.426
0.30 2.272
0.30 2.218
0.30 0.180
0.30 4.417
0.30 0.180
0.30 6.996
0.30 3.299
0.30 2.398
0.30 0.180
0.30 4.417
0.30 0.180

M3 total 69.258
Esponjamiento 10.39
M3 total 79.65
Laterales hasta clave
Largo Ancho Espesor M3
4.141 0.76 0.16 0.504
1 0.76 0.16 0.122
20.256 0.76 0.16 2.463
9.53 0.76 0.16 1.159
1.513 0.76 0.16 0.184
0.495 0.601 0.11 0.033
4.423 0.601 0.11 0.292
8.609 0.601 0.11 0.569
4.423 0.601 0.11 0.292
16.298 0.601 0.11 1.077
3 0.601 0.11 0.198
17.1 0.601 0.11 1.130
1 0.601 0.11 0.066
13 0.601 0.11 0.859
13.8 0.601 0.11 0.912
25.7 0.601 0.11 1.699
13.8 0.601 0.11 0.912
1 0.601 0.11 0.066
24.5 0.601 0.11 1.620
1 0.601 0.11 0.066

22.6 0.601 0.11 1.494


19 0.601 0.11 1.256
12.6 0.601 0.11 0.833
12.3 0.601 0.11 0.813
1 0.601 0.11 0.066
24.5 0.601 0.11 1.620
1 0.601 0.11 0.066
38.8 0.601 0.11 2.565
18.3 0.601 0.11 1.210
13.3 0.601 0.11 0.879
1 0.601 0.11 0.066
24.5 0.601 0.11 1.620
1 0.601 0.11 0.066

M3 total 26.779
Esponjamient 4.02
M3 total 30.80
relleno final 1, material excavacion
Largo Ancho Espesor M3 relleno inicial
4.141 0.76 0.30 0.944
1 0.76 0.30 0.228
20.256 0.76 0.30 4.618
9.53 0.76 0.30 2.173
1.513 0.76 0.30 0.345
0.495 0.601 0.30 0.089
4.423 0.601 0.30 0.797
8.609 0.601 0.30 1.552
4.423 0.601 0.30 0.797
16.298 0.601 0.30 2.939
3 0.601 0.30 0.541
17.1 0.601 0.30 3.083
1 0.601 0.30 0.180
13 0.601 0.30 2.344
13.8 0.601 0.30 2.488
25.7 0.601 0.30 4.634
13.8 0.601 0.30 2.488
1 0.601 0.30 0.180
24.5 0.601 0.30 4.417
1 0.601 0.30 0.180

22.6 0.601 0.30 4.075


19 0.601 0.30 3.426
12.6 0.601 0.30 2.272
12.3 0.601 0.30 2.218
1 0.601 0.30 0.180
24.5 0.601 0.30 4.417
1 0.601 0.30 0.180
38.8 0.601 0.30 6.996
18.3 0.601 0.30 3.299
13.3 0.601 0.30 2.398
1 0.601 0.30 0.180
24.5 0.601 0.30 4.417
1 0.601 0.30 0.180

M3 total 69.258
Esponjamient 10.39
M3 total 79.65
Tramo Largo Diametro Ancho Profundidad
TR1-v1 4.141 0.16 0.76 1.46
V1-TR2 1 0.16 0.76 1.46
TR2-ND1 52.339 0.16 0.76 1.46
ND1-V3 1.288 0.16 0.76 1.46
V3-ND2 1.06 0.16 0.76 1.46
ND2 MED.(80mm)-ND3 5.3 0.11 0.601 1.42
ND3-ND4 1.8 0.11 0.601 1.42
ND4(D=25mm) 0.21 0.11 0.601 1.42
ND3-ND5 9.52 0.11 0.601 1.42
ND5-ND6 15.11 0.11 0.601 1.42
ND6-ND7 43.3 0.11 0.601 1.42
ND7-ND8 10.7 0.11 0.601 1.42
ND8-ND9 14 0.11 0.601 1.42
ND9 1 0.11 0.601 1.42
ND8-ND10 24.5 0.11 0.601 1.42
ND10 1 0.11 0.601 1.42

ND5-ND11 39.7 0.11 0.601 1.42


ND11-ND12 19.6 0.11 0.601 1.42
ND12 1 0.11 0.601 1.42
ND11-ND13 24.5 0.11 0.601 1.42
ND13 1 0.11 0.601 1.42

ND5-ND14 23.8 0.11 0.601 1.42


ND14-ND15 21.2 0.11 0.601 1.42
ND15 1 0.11 0.601 1.42
ND14-ND16 24.5 0.11 0.601 1.42
ND16 1 0.11 0.601 1.42
ND14-ND17 9.8 0.11 0.601 1.42
ND17-ND18 30.16 0.11 0.601 1.42
ND18(D13mm) 2 0.11 0.601 1.42
ND17-ND19 23.7 0.11 0.601 1.42
ND19-ND20 23.2 0.11 0.601 1.42
ND20 2 0.11 0.601 1.42
N19-ND21 24.5 0.11 0.601 1.42

M3 total excavacion
Esponjamiento
M3 total
Excavacion
4.59
1.11
58.08
1.43
1.18
4.52
1.54
0.18
8.12
12.90
36.95
9.13
11.95
0.85
20.91
0.85

33.88
16.73
0.85
20.91
0.85

20.31
18.09
0.85
20.91
0.85
8.36
25.74
1.71
20.23
19.80
1.71
20.91

407.0
61.05
468.03
ACAMADO ARENA
Tramo Largo Ancho
TR1-v1 4.141 0.76
V1-TR2 1 0.76
TR2-ND1 52.339 0.76
ND1-V3 1.288 0.76
V3-ND2 1.06 0.76

ND2 MED.(80mm)-ND3 5.3 0.601


ND3-ND4 1.8 0.601
ND4(D=25mm) 0.21 0.601
ND3-ND5 9.52 0.601
ND5-ND6 15.11 0.601
ND6-ND7 43.3 0.601
ND7-ND8 10.7 0.601
ND8-ND9 14 0.601
ND9 1 0.601
ND8-ND10 24.5 0.601
ND10 1 0.601

ND5-ND11 39.7 0.601


ND11-ND12 19.6 0.601
ND12 1 0.601
ND11-ND13 24.5 0.601
ND13 1 0.601

ND5-ND14 23.8 0.601


ND14-ND15 21.2 0.601
ND15 1 0.601
ND14-ND16 24.5 0.601
ND16 1 0.601
ND14-ND17 9.8 0.601
ND17-ND18 30.16 0.601
ND18(D13mm) 2 0.601
ND17-ND19 23.7 0.601
ND19-ND20 23.2 0.601
ND20 2 0.601
N19-ND21 24.5 0.601
relleno inicial are relleno inicial arena
Tramo Largo Ancho
TR1-v1 4.141 0.76
V1-TR2 1 0.76
TR2-ND1 52.339 0.76
ND1-V3 1.288 0.76
V3-ND2 1.06 0.76
ND2 MED.(80mm)-ND3 5.3 0.601
ND3-ND4 1.8 0.601
ND4(D=25mm) 0.21 0.601
ND3-ND5 9.52 0.601
ND5-ND6 15.11 0.601
ND6-ND7 43.3 0.601
ND7-ND8 10.7 0.601
ND8-ND9 14 0.601
ND9 1 0.601
ND8-ND10 24.5 0.601
ND10 1 0.601

ND5-ND11 39.7 0.601


ND11-ND12 19.6 0.601
ND12 1 0.601
ND11-ND13 24.5 0.601
ND13 1 0.601

ND5-ND14 23.8 0.601


ND14-ND15 21.2 0.601
ND15 1 0.601
ND14-ND16 24.5 0.601
ND16 1 0.601
ND14-ND17 9.8 0.601
ND17-ND18 30.16 0.601
ND18(D13mm) 2 0.601
ND17-ND19 23.7 0.601
ND19-ND20 23.2 0.601
ND20 2 0.601
N19-ND21 24.5 0.601
relleno final 2, material excavacion
Tramo Largo Ancho
TR1-v1 4.141 0.76
V1-TR2 1 0.76
TR2-ND1 52.339 0.76
ND1-V3 1.288 0.76
V3-ND2 1.06 0.76
ND2 MED.(80mm)-ND3 5.3 0.601
ND3-ND4 1.8 0.601
ND4(D=25mm) 0.21 0.601
ND3-ND5 9.52 0.601
ND5-ND6 15.11 0.601
ND6-ND7 43.3 0.601
ND7-ND8 10.7 0.601
ND8-ND9 14 0.601
ND9 1 0.601
ND8-ND10 24.5 0.601
ND10 1 0.601

ND5-ND11 39.7 0.601


ND11-ND12 19.6 0.601
ND12 1 0.601
ND11-ND13 24.5 0.601
ND13 1 0.601

ND5-ND14 23.8 0.601


ND14-ND15 21.2 0.601
ND15 1 0.601
ND14-ND16 24.5 0.601
ND16 1 0.601
ND14-ND17 9.8 0.601
ND17-ND18 30.16 0.601
ND18(D13mm) 2 0.601
ND17-ND19 23.7 0.601
ND19-ND20 23.2 0.601
ND20 2 0.601
N19-ND21 24.5 0.601
M3 totales relleno arena
M3 totales relleno excavacion
Laterales hasta clave
Espesor M3 Encamdado Tramo Largo
0.10 0.315 TR1-v1 4.141
0.10 0.076 V1-TR2 1
0.10 3.978 TR2-ND1 52.339
0.10 0.098 ND1-V3 1.288
0.10 0.081 V3-ND2 1.06

0.10 0.319 ND2 MED.(80mm)-ND3 5.3


0.10 0.108 ND3-ND4 1.8
0.10 0.013 ND4(D=25mm) 0.21
0.10 0.572 ND3-ND5 9.52
0.10 0.908 ND5-ND6 15.11
0.10 2.602 ND6-ND7 43.3
0.10 0.643 ND7-ND8 10.7
0.10 0.841 ND8-ND9 14
0.10 0.060 ND9 1
0.10 1.472 ND8-ND10 24.5
0.10 0.060 ND10 1

0.10 2.386 ND5-ND11 39.7


0.10 1.178 ND11-ND12 19.6
0.10 0.060 ND12 1
0.10 1.472 ND11-ND13 24.5
0.10 0.060 ND13 1

0.10 1.430 ND5-ND14 23.8


0.10 1.274 ND14-ND15 21.2
0.10 0.060 ND15 1
0.10 1.472 ND14-ND16 24.5
0.10 0.060 ND16 1
0.10 0.589 ND14-ND17 9.8
0.10 1.813 ND17-ND18 30.16
0.10 0.120 ND18(D13mm) 2
0.10 1.424 ND17-ND19 23.7
0.10 1.394 ND19-ND20 23.2
0.10 0.120 ND20 2
0.10 1.472 N19-ND21 24.5

M3 totales 28.218
Esponjamient 4.23
M3 total 32.45
relleno final 1, material excavacion
Espesor M3 Tramo Largo
0.30 0.944 TR1-v1 4.141
0.30 0.228 V1-TR2 1
0.30 11.933 TR2-ND1 52.339
0.30 0.294 ND1-V3 1.288
0.30 0.242 V3-ND2 1.06
0.30 0.956 ND2 MED.(80mm)-ND3 5.3
0.30 0.325 ND3-ND4 1.8
0.30 0.038 ND4(D=25mm) 0.21
0.30 1.716 ND3-ND5 9.52
0.30 2.724 ND5-ND6 15.11
0.30 7.807 ND6-ND7 43.3
0.30 1.929 ND7-ND8 10.7
0.30 2.524 ND8-ND9 14
0.30 0.180 ND9 1
0.30 4.417 ND8-ND10 24.5
0.30 0.180 ND10 1

0.30 7.158 ND5-ND11 39.7


0.30 3.534 ND11-ND12 19.6
0.30 0.180 ND12 1
0.30 4.417 ND11-ND13 24.5
0.30 0.180 ND13 1

0.30 4.291 ND5-ND14 23.8


0.30 3.822 ND14-ND15 21.2
0.30 0.180 ND15 1
0.30 4.417 ND14-ND16 24.5
0.30 0.180 ND16 1
0.30 1.767 ND14-ND17 9.8
0.30 5.438 ND17-ND18 30.16
0.30 0.361 ND18(D13mm) 2
0.30 4.273 ND17-ND19 23.7
0.30 4.183 ND19-ND20 23.2
0.30 0.361 ND20 2
0.30 4.417 N19-ND21 24.5

M3 totales 84.654
Esponjamient 12.70
M3 total 97.35
Espesor M3
0.30 0.944
0.30 0.228
0.30 11.933
0.30 0.294
0.30 0.242
0.30 0.956
0.30 0.325
0.30 0.038
0.30 1.716
0.30 2.724
0.30 7.807
0.30 1.929
0.30 2.524
0.30 0.180
0.30 4.417
0.30 0.180

0.30 7.158
0.30 3.534
0.30 0.180
0.30 4.417
0.30 0.180

0.30 4.291
0.30 3.822
0.30 0.180
0.30 4.417
0.30 0.180
0.30 1.767
0.30 5.438
0.30 0.361
0.30 4.273
0.30 4.183
0.30 0.361
0.30 4.417

M3 totales 84.654
Esponjamient 12.70
M3 total 97.35
167.933
194.705
aterales hasta clave
Ancho Espesor M3
0.76 0.16 0.504
0.76 0.16 0.122
0.76 0.16 6.364
0.76 0.16 0.157
0.76 0.16 0.129

0.601 0.11 0.350


0.601 0.11 0.119
0.601 0.11 0.014
0.601 0.11 0.629
0.601 0.11 0.999
0.601 0.11 2.863
0.601 0.11 0.707
0.601 0.11 0.926
0.601 0.11 0.066
0.601 0.11 1.620
0.601 0.11 0.066

0.601 0.11 2.625


0.601 0.11 1.296
0.601 0.11 0.066
0.601 0.11 1.620
0.601 0.11 0.066

0.601 0.11 1.573


0.601 0.11 1.402
0.601 0.11 0.066
0.601 0.11 1.620
0.601 0.11 0.066
0.601 0.11 0.648
0.601 0.11 1.994
0.601 0.11 0.132
0.601 0.11 1.567
0.601 0.11 1.534
0.601 0.11 0.132
0.601 0.11 1.620

M3 totales 33.156
Esponjamient 4.97
M3 total 38.13
elleno final 1, material excavacion
Ancho Espesor M3
0.76 0.30 0.944
0.76 0.30 0.228
0.76 0.30 11.933
0.76 0.30 0.294
0.76 0.30 0.242
0.601 0.30 0.956
0.601 0.30 0.325
0.601 0.30 0.038
0.601 0.30 1.716
0.601 0.30 2.724
0.601 0.30 7.807
0.601 0.30 1.929
0.601 0.30 2.524
0.601 0.30 0.180
0.601 0.30 4.417
0.601 0.30 0.180

0.601 0.30 7.158


0.601 0.30 3.534
0.601 0.30 0.180
0.601 0.30 4.417
0.601 0.30 0.180

0.601 0.30 4.291


0.601 0.30 3.822
0.601 0.30 0.180
0.601 0.30 4.417
0.601 0.30 0.180
0.601 0.30 1.767
0.601 0.30 5.438
0.601 0.30 0.361
0.601 0.30 4.273
0.601 0.30 4.183
0.601 0.30 0.361
0.601 0.30 4.417

M3 totales 84.654
Esponjamient 12.70
M3 total 97.35